Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to ES1970163059UpriorityCriticalpatent/ES163059Y/en
Publication of ES163059UpublicationCriticalpatent/ES163059U/en
Application grantedgrantedCritical
Publication of ES163059YpublicationCriticalpatent/ES163059Y/en
Metallic profile perfected for the construction, essentially characterized in that it comprises the provision of an intermediate wing of straight and flat projection, of uniform width in all its points and that represents the center of general resistance of the structural assembly, said soul at its upper part and with projecting projection in perpendicular line, defined by a curved folding, a wing that is elbowed at a certain point of its length, at a curved angle and creates a lower parallel section with respect to its opposite plane, there being a new folding towards the section of origin, forming a sensibly quadrangular section open in the middle part of the interior side, existing in the lower part of the piece another wing with projection protruding projection and also perpendicular, with a terminal profile equal to the upper, but rectangular section interrupted. (Machine-translation by Google Translate, not legally binding)
ES1970163059U1970-11-071970-11-07
METALLIC PROFILE PERFECTED FOR CONSTRUCTION.
ExpiredES163059Y
(en)