ES1076451U - Prefabricated pilot (Machine-translation by Google Translate, not legally binding) - Google Patents

Prefabricated pilot (Machine-translation by Google Translate, not legally binding) Download PDF

Info

Publication number
ES1076451U
ES1076451U ES201230183U ES201230183U ES1076451U ES 1076451 U ES1076451 U ES 1076451U ES 201230183 U ES201230183 U ES 201230183U ES 201230183 U ES201230183 U ES 201230183U ES 1076451 U ES1076451 U ES 1076451U
Authority
ES
Spain
Prior art keywords
pile
axial hole
anchoring element
prefabricated pile
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
ES201230183U
Other languages
Spanish (es)
Other versions
ES1076451Y (en
Inventor
Borja Sainz De Baranda Graf
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gtceisu Construccion S A
Gtceisu Construccion Sa
Original Assignee
Gtceisu Construccion S A
Gtceisu Construccion Sa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gtceisu Construccion S A, Gtceisu Construccion Sa filed Critical Gtceisu Construccion S A
Priority to ES201230183U priority Critical patent/ES1076451Y/en
Publication of ES1076451U publication Critical patent/ES1076451U/en
Application granted granted Critical
Publication of ES1076451Y publication Critical patent/ES1076451Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Pilot (1) prefabricated characterized because it comprises: - one body (3), - an axial hole (4), - an anchoring element (2), in which the anchoring element (2) is fixed in the axial hole (4), the axial hole (4) being located in the center of a face (7) of the upper end of the pile (1). (Machine-translation by Google Translate, not legally binding)

Description

Pilote prefabricado. Prefabricated pile.

Objeto de la invención Object of the invention

La presente invención se refiere a un pilote prefabricado que incorpora en su parte superior un perno o una varilla roscada en donde anclar estructuras ligeras, de manera que un elemento de cimentación amplía su ámbito de utilización y se emplea también como un elemento de anclaje para estructuras ligeras. The present invention relates to a prefabricated pile that incorporates in its upper part a bolt or a threaded rod in which to anchor light structures, so that a foundation element expands its scope of use and is also used as an anchoring element for structures light

En general la invención es aplicable para la cimentación de cualquier tipo de estructura ligera, concretamente en la construcción de estructuras en el ámbito de la obra civil. In general, the invention is applicable to the foundation of any type of light structure, specifically in the construction of structures in the field of civil works.

Problema técnico a resolver y antecedentes de la invención Technical problem to solve and background of the invention

En obra civil, en numerosas ocasiones, se emplean pilotes prefabricados para la cimentación de estructuras metálicas. El uso de estos pilotes queda restringido a la posibilidad de hinca de los pilotes, estando esta posibilidad limitada por la resistencia que presentan los pilotes a los esfuerzos a que se someten durante la hinca. In civil works, on many occasions, prefabricated piles are used for the foundation of structures metallic The use of these piles is restricted to the possibility of driving the piles, this possibility being limited by the resistance of the piles to the stresses they undergo during driving.

Principalmente existen dos tipologías de pilotes: -pilotes prefabricados, y -pilotes realizados “in situ”. Mainly there are two types of piles: -prefabricated piles, and -piles made “in situ”.

Los pilotes prefabricados sin embargo requieren para su colocación de una máquina capaz de suministrar el empuje necesario para su hinca, pero tienen una limitación por su capacidad de carga o resistencia. Debido a la limitación mencionada de los pilotes prefabricados, el empleo de dichos pilotes prefabricados está restringido a terrenos donde la hinca se pueda producir sin dañar al pilote, es decir a terrenos poco compactos en los que el pilote se introduce sin romperse. Cuando los pilotes se emplean para la cimentación de una estructura, posteriormente a su hincado se procede al descabezado de los pilotes, esto es a eliminar su parte superior, para posteriormente unir unos pilotes a otros mediante un encepado. El encepado, cuando se va a cimentar una estructura, es una losa de hormigón construida in situ, sobre la que se monta la estructura. Este método constructivo requiere de maquinaria capaz de hincar los pilotes, maquinaria para el descabezado de los pilotes y la realización de un encepado posterior. The prefabricated piles however require for their placement a machine capable of supplying the thrust. necessary for their driving, but they have a limitation for their load capacity or resistance. Due to limitation mentioned of the prefabricated piles, the use of said prefabricated piles is restricted to land where the driver can be produced without damaging the pile, that is to say, in little compact terrain where the pile is introduced without breaking When the piles are used for the foundation of a structure, after its installation, It proceeds to the headings of the piles, this is to eliminate its upper part, to later join some piles to others by means of an encpado. The veneer, when a structure is going to be laid, is a concrete slab built in situ, on which the structure is mounted. This constructive method requires machinery capable of drive the piles, machinery for the decarbonation of the piles and the realization of a back wrapping.

La realización de pilotes “in situ” requiere de maquinaria de grandes dimensiones que realiza la perforación en la que posteriormente se introduce una armadura para finalmente verter hormigón en la perforación realizada sobre la armadura introducida en dicha perforación. Posteriormente al hormigonado de los pilotes in situ, se debe realizar una estructura que los una, para lo que previamente es necesario proceder a descabezar los pilotes dejando al descubierto una parte superior de la estructura metálica a la que se solidariza la estructura que une los pilotes. The realization of piles "in situ" requires large machinery that performs drilling in the that later armor is introduced to finally pour concrete into the drilling made on the reinforcement introduced in said perforation. After concreting the piles in situ, a structure that unites them, for which it is previously necessary to proceed to decapitate the piles leaving the discovered an upper part of the metal structure that is joined by the structure that joins the piles.

En el estado de la técnica se conoce el documento JP 2 009 287 263 A que divulga un pilote que impide la salida inesperada o la caída del pilote durante su hinca, incorporando un saliente perpendicular a la dirección de hinca del pilote. También es conocido el documento SI 22549 A que divulga un pilote prefabricado, compuesto por un tramo principal con una punta y tramos rectos que se unen al tramo principal mediante juntas metálicas. JP 2 009 287 263 A is known in the state of the art which discloses a pile that prevents the exit unexpected or the fall of the pile during its driving, incorporating a projection perpendicular to the direction of the pile. It is also known document SI 22549 A which discloses a prefabricated pile, consisting of a section main with a tip and straight sections that join the main section through metal joints.

Descripción de la invención Description of the invention

La invención divulga un pilote prefabricado que incorpora en su parte superior un perno de anclaje donde se solidariza una estructura ligera. The invention discloses a prefabricated pile that incorporates in its upper part an anchor bolt where Solidarity a light structure.

El pilote prefabricado objeto de la invención comprende: un cuerpo, un orificio axial y un elemento de anclaje. El elemento de anclaje se introduce en el orifico axial, estando el orificio axial situado en el extremo superior del cuerpo del pilote, y teniendo dicho orificio axial forma cilíndrica. The prefabricated pile object of the invention comprises: a body, an axial hole and an anchoring element. He anchoring element is introduced into the axial hole, the axial hole being located at the upper end of the body of the pile, and said axial bore having a cylindrical shape.

El cuerpo del pilote prefabricado en una primera realización tiene forma prismática, y en una segunda realización tiene forma cilíndrica. El elemento de anclaje del pilote prefabricado objeto de la invención se elige entre un perno y una varilla roscada. En el pilote prefabricado la fijación del elemento de anclaje al orificio axial se obtiene : The prefabricated pile body in a first embodiment has a prismatic shape, and in a second embodiment It has a cylindrical shape. The anchoring element of the prefabricated pile object of the invention is chosen between a bolt and a threaded rod. In the prefabricated pile the fixing of the anchoring element to the axial hole is obtained:

--
de una forma química, mediante: in a chemical way, by:

o resina, or resin,

o mortero sin retracción de alta resistencia; -de una forma mecánica, mediante pernos de expansión. or mortar without high strength shrinkage; - in a mechanical way, by means of expansion bolts.

Descripción de las figuras Description of the figures

Para completar la descripción y con objeto de ayudar a una mejor comprensión de las características del invento, se To complete the description and in order to help a better understanding of the features of the invention,

acompaña a esta memoria descriptiva, como parte integrante de la misma, un conjunto de dibujos en dónde con carácter ilustrativo y no limitativo, se ha representado lo siguiente: accompanies this descriptive report, as an integral part of it, a set of drawings where illustrative and not limiting, the following has been represented:

La figura 1 muestra una vista de una sección longitudinal del pilote objeto de la invención. Figure 1 shows a view of a longitudinal section of the pile object of the invention.

La figura 2 muestra una vista en perspectiva de la instalación de un pilote prefabricado según la primera realización. Figure 2 shows a perspective view of the installation of a prefabricated pile according to the first embodiment.

La figura 3 muestra una vista en perspectiva de la instalación de un pilote prefabricado según la segunda realización. Figure 3 shows a perspective view of the installation of a prefabricated pile according to the second embodiment.

Las referencias numéricas que se reflejan en las figuras corresponden a los siguientes elementos: The numerical references reflected in the figures correspond to the following elements:

1.-pilote, 2.-elemento de anclaje, 3.-cuerpo, 4.-orificio axial, 5.-terreno, 6.-tuercas, 7.-cara. 1.-pile, 2.-anchoring element, 3.-body, 4.-axial hole, 5.-ground, 6.-nuts, 7.-face.

Realización preferente de la invención Preferred Embodiment of the Invention

Como ya se ha indicado, y tal y como puede observarse en las figuras reseñadas el objeto de la invención es un pilote que comprende en la parte superior un elemento que permite el anclaje de estructuras ligeras, funcionando el conjunto pilote (1) -elemento de anclaje (2) de forma similar a como trabaja un anclaje realizado directamente en el terreno (5). Ejemplos de estructuras ligeras son: pantallas cortavientos o antirruido, paneles solares, etc. As already indicated, and as can be seen in the figures outlined, the object of the invention is a pile comprising at the top an element that allows the anchoring of light structures, the pile assembly (1) -element element operating anchor (2) similar to how an anchor works directly on the ground (5). Examples of light structures are: windshield or noise shields, solar panels, etc.

En la figura 1 se puede ver una sección longitudinal del pilote (1) objeto de la invención, en la que se observa en la parte superior del pilote (1) el elemento de anclaje (2) de la estructura ligera, estando el citado pilote (1) introducido en el terreno (5). In Figure 1 a longitudinal section of the pile (1) object of the invention can be seen, in which the anchoring element (2) of the light structure is observed in the upper part of the pile (1) being said pile (1) introduced in the field (5).

El pilote (1) objeto de la invención es un pilote (1) prefabricado realizado en una fábrica, que se traslada hasta el lugar de utilización para proceder a su hinca. The pile (1) object of the invention is a prefabricated pile (1) made in a factory, which is moved to the place of use to proceed to its driving.

Existen dos posibles realizaciones del pilote (1) objeto de la invención, y que vienen dadas por dos posibles geometrías del cuerpo (3) del pilote (1), una primera realización en la que el cuerpo (3) del pilote (1) tiene geometría prismática y una segunda realización en la que el cuerpo (3) del pilote (1) tiene geometría cilíndrica. There are two possible embodiments of the pile (1) object of the invention, and which are given by two possible geometries of the body (3) of the pile (1), a first embodiment in which the body (3) of the pile (1) has prismatic geometry and a second embodiment in which the body (3) of the pile (1) has cylindrical geometry.

El elemento de anclaje (2) se instala en un orifico axial (4) que se realiza en una cara (7) del pilote (1) situada en el extremo superior del pilote (1), en el eje del cuerpo (3) del pilote (1), y que se prolonga por el interior del cuerpo (3) del pilote (1) una longitud tal que el elemento de anclaje (2) se introduce en esa longitud y resiste las solicitaciones a que va a estar sometido en el anclaje de la estructura ligera, y se rellena el orificio axial (4) con un material que fije el elemento de anclaje (2) al orificio axial (4). The anchoring element (2) is installed in an axial hole (4) that is made on one side (7) of the pile (1) located at the top end of the pile (1), on the axis of the body (3) of the pile (1), and extending along the inside of the body (3) of the pile (1) a length such that the anchoring element (2) is introduced in that length and resists the solicitations to which it will be subjected in the anchoring the light structure, and the axial hole (4) is filled with a material that fixes the anchoring element (2) to the axial hole (4).

La fijación del elemento de anclaje (2) al orificio axial (4) realizado en el pilote (1), se obtiene de dos maneras: -fijación química, que a su vez puede ser: The fixing of the anchoring element (2) to the axial hole (4) made in the pile (1), is obtained in two ways: chemical fixation, which in turn can be:

o con resina: epoxi, de poliéster y epoxi acrilato; or with resin: epoxy, polyester and epoxy acrylate;

o con mortero sin retracción de alta resistencia, con o sin inhibidores de corrosión; -mecánica: mediante pernos de expansión. or with mortar without high resistance shrinkage, with or without corrosion inhibitors; -mechanics: through expansion bolts.

Existen dos posibilidades para la colocación del elemento de anclaje (2) en el pilote (1): There are two possibilities for placing the anchoring element (2) on the pile (1):

--
una primera posibilidad es instalar el elemento de anclaje (2) en el pilote (1) en el momento de la fabricación A first possibility is to install the anchoring element (2) on the pile (1) at the time of manufacture

del citado pilote (1), para lo que se realiza el orificio axial (4) en la fábrica, debiendo realizar orificios axiales of said pile (1), for which the axial hole (4) is made in the factory, and axial holes must be made

(4) específicos en cada pilote según la función a que se vaya a destinar el pilote, -y una segunda posibilidad es instalar el elemento de anclaje (2) en el pilote (1) una vez que el pilote se ha trasladado al lugar donde va a ser colocado, pudiendo, en este caso, realizarse, el orificio axial (4), antes de la hinca del pilote (1) o después del proceso de hinca, cuando el pilote (1) se encuentra en su ubicación definitiva. (4) specific to each pile according to the function to which the pile is to be used, - and a second possibility is to install the anchoring element (2) in the pile (1) once the pile has moved to the place where The axial hole (4) can be placed, in this case, before the pile driving (1) or after the driving process, when the pile (1) is in its final location.

La segunda posibilidad de realización del orificio axial (4) tiene la ventaja de poder automatizar de una manera mejor la fabricación del pilote (1), ya que tanto el orificio axial (4) como el elemento de anclaje (2) se pueden adaptar a las solicitaciones que tendrá que resistir según la estructura ligera que el elemento de anclaje (2) vaya a soportar, no teniendo que realizar orificios axiales (4) de dimensiones diferentes durante el proceso de fabricación, según se vaya a emplear para una tipología de estructura ligera u otra. The second possibility of realization of the axial hole (4) has the advantage of being able to automate in a better way the manufacture of the pile (1), since both the axial hole (4) and the anchoring element (2) can be adapted to the solicitations that will have to resist according to the light structure that the anchoring element (2) will support, not having to make axial holes (4) of different dimensions during the manufacturing process, as it will be used for a structure typology Light or other.

Con el pilote (1) prefabricado objeto de la invención, se eliminan tanto el paso del descabezado de los pilotes (1), como el paso de la construcción de un encepado, reduciendo de esta manera tanto el residuo de obra que se produce como el tiempo de ejecución de la cimentación de la estructura. With the prefabricated pile (1) object of the invention, both the passage of the pile headings (1) and the step of the construction of a plywood are eliminated, thus reducing both the construction waste produced and the execution time of the foundation of the structure.

En una realización del pilote (1) objeto de la invención, el elemento de anclaje (2) de la parte superior del pilote (1), 5 es una varilla roscada que cuenta con unas tuercas (6) para la sujeción de la estructura ligera. Y en otra realización de la invención, el elemento de anclaje (2) es un perno. In an embodiment of the pile (1) object of the invention, the anchoring element (2) of the upper part of the pile (1), 5 is a threaded rod that has nuts (6) for fastening the light structure . And in another embodiment of the invention, the anchoring element (2) is a bolt.

La invención no debe verse limitada a la realización particular descrita en este documento. Expertos en la materia pueden desarrollar otras realizaciones a la vista de la descripción aquí realizada. En consecuencia, el alcance de la 10 invención se define por las siguientes reivindicaciones. The invention should not be limited to the particular embodiment described herein. Experts in the field can develop other embodiments in view of the description made here. Accordingly, the scope of the invention is defined by the following claims.

Claims (7)

REIVINDICACIONES 1.-Pilote (1) prefabricado caracterizado por que comprende: -un cuerpo (3), -un orificio axial (4), -un elemento de anclaje (2), en el que elemento de anclaje (2) se fija en el orifico axial (4), estando el orificio axial (4) emplazado en el centro de 1.-Prefabricated pile (1) characterized by comprising: -a body (3), -a axial hole (4), -an anchoring element (2), wherein the anchoring element (2) is fixed in the axial hole (4), the axial hole (4) being located in the center of una cara (7) del extremo superior del pilote (1). one face (7) of the upper end of the pile (1). 2.-Pilote (1) prefabricado, según la reivindicación 1, caracterizado por que el cuerpo (3) del pilote (1) tiene forma prismática. 3.-Pilote (1) prefabricado, según la reivindicación 1, caracterizado por que el cuerpo (3) del pilote (1) tiene forma 2. Prefabricated pile (1) according to claim 1, characterized in that the body (3) of the pile (1) is shaped prismatic 3. Prefabricated pile (1) according to claim 1, characterized in that the body (3) of the pile (1) is shaped cilíndrica. cylindrical 4.-Pilote (1) prefabricado, según las reivindicaciones anteriores, caracterizado por que el elemento de anclaje (2) se elige entre un perno y una varilla roscada. 5.-Pilote (1) prefabricado, según las reivindicaciones anteriores, caracterizado por que el orificio axial (4) tiene 4. Prefabricated pile (1), according to the preceding claims, characterized in that the anchoring element (2) It is chosen between a bolt and a threaded rod. 5. Prefabricated pile (1), according to the preceding claims, characterized in that the axial hole (4) has forma cilíndrica. cylindrical. 6.-Pilote (1) prefabricado, según cualquiera de las reivindicaciones 1 a 3, caracterizado por que la fijación del elemento de anclaje (2) al orificio axial (4) se obtiene mediante resina. 7.-Pilote (1) prefabricado, según la reivindicación 6, caracterizado por que la fijación del elemento de anclaje (2) al 6. Prefabricated pile (1), according to any of claims 1 to 3, characterized in that the fixing of the anchoring element (2) to the axial hole (4) is obtained by resin. 7. Prefabricated pile (1) according to claim 6, characterized in that the fixing of the anchoring element (2) to the orificio axial (4) se obtiene mediante resina epoxi. 8.-Pilote (1) prefabricado, según la reivindicación 6, caracterizado por que la fijación del elemento de anclaje (2) al orificio axial (4) se obtiene mediante resina de poliéster. axial hole (4) is obtained by epoxy resin. 8. Prefabricated pile (1) according to claim 6, characterized in that the fixing of the anchoring element (2) to the axial hole (4) is obtained by polyester resin. 9.-Pilote (1) prefabricado, según la reivindicación 6, caracterizado por que la fijación del elemento de anclaje (2) al orificio axial (4) se obtiene mediante resina epoxi acrilato. 10.-Pilote (1) prefabricado, según cualquiera de las reivindicaciones 1 a 3, caracterizado por que la fijación del 9. Prefabricated pile (1) according to claim 6, characterized in that the fixing of the anchoring element (2) to the axial hole (4) is obtained by epoxy acrylate resin. 10. Prefabricated pile (1), according to any of claims 1 to 3, characterized in that the fixing of the elemento de anclaje (2) al orificio axial (4) se obtiene mediante mortero. anchoring element (2) to the axial hole (4) is obtained by mortar. 11.-Pilote (1) prefabricado, según la reivindicación 10, caracterizado por que la fijación del elemento de anclaje (2) al orificio axial (4) se obtiene mediante mortero sin retracción. 12.-Pilote (1) prefabricado, según las reivindicaciones 10 y 11, caracterizado por que la fijación del elemento de 11.-Prefabricated pile (1) according to claim 10, characterized in that the fixing of the anchoring element (2) The axial hole (4) is obtained by mortar without retraction. 12. - Prefabricated pile (1), according to claims 10 and 11, characterized in that the fixing of the element of anclaje (2) al orificio axial (4) se obtiene mediante mortero sin retracción con inhibidores de corrosión. Anchoring (2) to the axial hole (4) is obtained by mortar without retraction with corrosion inhibitors. 13.-Pilote (1) prefabricado, según las reivindicaciones 10 y 11, caracterizado por que la fijación del elemento de anclaje (2) al orificio axial (4) se obtiene mediante mortero sin retracción sin inhibidores de corrosión. 14.-Pilote (1) prefabricado, según la reivindicación 1, caracterizado por que la fijación del elemento de anclaje (2) 13.-Prefabricated pile (1), according to claims 10 and 11, characterized in that the fixing of the element of Anchoring (2) to the axial hole (4) is obtained by mortar without shrinkage without corrosion inhibitors. 14. Prefabricated pile (1) according to claim 1, characterized in that the anchoring element fixing (2) al orificio axial (4) se obtiene mediante pernos de expansión. The axial hole (4) is obtained by means of expansion bolts.
ES201230183U 2012-02-22 2012-02-22 PREFABRICATED PILOT Expired - Lifetime ES1076451Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES201230183U ES1076451Y (en) 2012-02-22 2012-02-22 PREFABRICATED PILOT

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201230183U ES1076451Y (en) 2012-02-22 2012-02-22 PREFABRICATED PILOT

Publications (2)

Publication Number Publication Date
ES1076451U true ES1076451U (en) 2012-03-09
ES1076451Y ES1076451Y (en) 2012-06-05

Family

ID=45689069

Family Applications (1)

Application Number Title Priority Date Filing Date
ES201230183U Expired - Lifetime ES1076451Y (en) 2012-02-22 2012-02-22 PREFABRICATED PILOT

Country Status (1)

Country Link
ES (1) ES1076451Y (en)

Also Published As

Publication number Publication date
ES1076451Y (en) 2012-06-05

Similar Documents

Publication Publication Date Title
AlAjarmeh et al. Hollow concrete columns: Review of structural behavior and new designs using GFRP reinforcement
ES2460715T3 (en) Mounting rail
ES2895967T3 (en) Foundation for a windmill
JP4472729B2 (en) Reinforced structure
ES2522440A2 (en) Steel tube splice and procedure for connecting a steel tube pile and a steel tube column using the same
JP4750562B2 (en) Connection structure between pile head and precast girder
JP5584520B2 (en) Reinforcement method of abutment and back embankment
ES2716004T3 (en) Connection arrangement and procedure for manufacturing a reinforcement against a perforation, a supplementary reinforcement against a transverse force and / or a reinforcement connection
CN202914107U (en) Roadway support truss
ES2847211T3 (en) Connecting device for connecting thin-walled precast parts and precast parts equipped with them
CN207110083U (en) Prefabricated building system
JP6317122B2 (en) Yamazushi support work
KR101017292B1 (en) Precast column unit for level adjustment and column structure construction method using the same
JP2014091979A (en) Upper edge widening structure of bridge footing, and method for widening upper edge
ES1076451U (en) Prefabricated pilot (Machine-translation by Google Translate, not legally binding)
JP5265471B2 (en) Abutment and bridge girder reinforcement method
KR100756517B1 (en) Hollow Composite Pier
KR100942129B1 (en) Concrete filling support member and construction method
JP5003448B2 (en) Shear reinforcement structure of existing reinforced concrete structures
JP2019148141A (en) Sheath joint with shear key function, pc member, pc floor slab, pc member connection method, and pc floor slab connection method
JP6352092B2 (en) Junction structure
ES2928275B2 (en) Structure connection method
CN212077956U (en) Supporting structure of foundation pit supporting system
KR100690014B1 (en) Steel structure with spiral plate
JP3133649U (en) Column structure

Legal Events

Date Code Title Description
FG1K Utility model granted

Effective date: 20120524