ES1067775U - Mechanism of clamps for simultaneous load management (Machine-translation by Google Translate, not legally binding) - Google Patents
Mechanism of clamps for simultaneous load management (Machine-translation by Google Translate, not legally binding) Download PDFInfo
- Publication number
- ES1067775U ES1067775U ES200800868U ES200800868U ES1067775U ES 1067775 U ES1067775 U ES 1067775U ES 200800868 U ES200800868 U ES 200800868U ES 200800868 U ES200800868 U ES 200800868U ES 1067775 U ES1067775 U ES 1067775U
- Authority
- ES
- Spain
- Prior art keywords
- loads
- rocker
- claws
- clamp
- clamps
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007246 mechanism Effects 0.000 title claims abstract description 36
- 210000000078 claw Anatomy 0.000 claims abstract description 15
- 238000010304 firing Methods 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 238000004873 anchoring Methods 0.000 claims 2
- 230000005484 gravity Effects 0.000 description 7
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
Mecanismo de pinzas para manejo simultáneo de cargas.Clamp mechanism for simultaneous handling of loads
La invención, tal como expresa el enunciado de la presente memoria descriptiva, se refiere a un mecanismo de pinzas para manejo simultáneo de cargas, que aporta a la función a que se destina una serie de ventajas e innovadoras características, aparte de otras inherentes a su organización y constitución, que se describirán en detalle más adelante y que suponen una destacable mejora frente a lo ya conocido en este campo.The invention, as expressed in the statement of the present specification refers to a mechanism of clamps for simultaneous handling of loads, which contributes to the function of that a series of advantages and innovative features are destined, apart from others inherent in its organization and constitution, which they will describe in detail later and that they represent a remarkable improvement compared to what is already known in this field.
Más en particular, el objeto de la invención se centra en un mecanismo de manipulación múltiple, aplicable para cargas, tales como por ejemplo, bloques de hormigón, en maniobras de elevación y desplazamiento de las mismas, siendo del tipo constituido por diversas pinzas con sistema de tijera de accionamiento por gravedad, el cual, entre otras innovaciones, presenta la particularidad de permitir ventajosamente el manejo simultáneo y/o selectivo de dichas cargas o bloques.More particularly, the object of the invention is focuses on a multiple manipulation mechanism, applicable to loads, such as concrete blocks, in maneuvers of elevation and displacement of the same, being of the type constituted by diverse tweezers with scissor system of gravity drive, which, among other innovations, It has the peculiarity of advantageously allowing handling simultaneous and / or selective of said loads or blocks.
Las pinzas actualmente existentes para elevación de bloques múltiples emplean, bien mecanismos diferentes del de tijera (contando, por ejemplo, con mecanismos más complejos con correderas y bielas) o bien mecanismos de apriete de la carga mediante cilindros hidráulicos, lo cual resulta más inseguro por la posibilidad de fallo del sistema de apriete, y que además resultan de una fabricación y mantenimiento más caro y complejo.The currently existing clamps for multiple block elevation employ, well different mechanisms that of scissors (counting, for example, with more complex mechanisms with sliders and connecting rods) or load tightening mechanisms by hydraulic cylinders, which is more insecure because of the possibility of tightening system failure, and that also result of a more expensive and complex manufacturing and maintenance.
Por su parte, las pinzas actualmente existentes con mecanismo de apriete por gravedad para la manipulación de más de un bloque o carga simultáneamente, presentan el inconveniente de que sólo permiten la manipulación de todos los bloques para los que está prevista simultáneamente o la elevación en vacío, sin permitir la manipulación selectiva de unos bloques sí y otros no en la misma maniobra. Es decir, no permiten entresacar determinados bloques de entre el conjunto a manipular, dejando el resto en el suelo; o los elevan todos a la vez o no elevan ninguno.On the other hand, the existing clamps With gravity tightening mechanism for handling more of a block or load simultaneously, have the disadvantage of which only allow the manipulation of all the blocks for which is planned simultaneously or empty lifting without allow selective manipulation of some blocks yes and others not in The same maneuver. That is, they do not allow you to thin certain blocks between the set to manipulate, leaving the rest in the ground; either they raise them all at once or they don't raise any.
Otra de las deficiencias existentes en los sistemas conocidos viene dada por el hecho de que las pinzas convencionales de apriete por gravedad para manipulación de más de dos bloques o cargas, presentan problemas de grapado cuando los bloques o cargas no están perfectamente alineados entre sí.Another of the deficiencies in the known systems is given by the fact that the tweezers Conventional gravity tightening for handling more than two blocks or loads, have stapling problems when blocks or loads are not perfectly aligned with each other.
Finalmente, cabe señalar que las pinzas de apriete por gravedad actualmente conocidas sólo son aptas para manejar dos bloques simultáneamente, mientras que las que manejan más de dos son de apriete hidráulico, no por gravedad.Finally, it should be noted that the tweezers of gravity tightening currently known are only suitable for handle two blocks simultaneously, while those that handle More than two are hydraulic tightening, not gravity.
El objetivo de la presente invención es, pues, aportar una solución práctica y efectiva a los inconvenientes anteriormente descritos que presentan los sistemas actualmente conocidos para tal fin, debiendo señalarse que, por parte del solicitante, se desconoce la existencia de ninguna otra invención que presente unas características técnicas, estructurales y de configuración semejantes, a las que presenta el que aquí se preconiza.The aim of the present invention is therefore provide a practical and effective solution to the inconveniences previously described that presently present systems known for this purpose, it should be noted that, by the applicant, the existence of any other invention is unknown that has technical, structural and similar configuration, to those presented here advocates
Así, el mecanismo de pinzas para manejo simultáneo de cargas que la presente invención propone se configura como una destacable novedad dentro de su campo de aplicación, alcanzando satisfactoriamente los objetivos anteriormente señalados como idóneos, consiguiéndose, a tenor de su creación, y de forma taxativa, un sistema que, ventajosamente, resulta totalmente fiable al realizar el apriete por peso propio de la carga con un mecanismo simple y seguro; que, ventajosamente, permite entresacar bloques o cargas del conjunto a manipular, pudiendo seleccionar cuales se desea elevar y cuales no de entre el conjunto de cargas; que, ventajosamente, gracias a las poleas de tiro que incorpora, permite que las pinzas se recoloquen y equilibren adecuadamente respecto a cargas que no están perfectamente alineadas y presentan algún desplazamiento relativo entre ellas; y que, ventajosamente, permite la manipulación de múltiples bloques en cantidades superiores a dos utilizando el sistema de apriete por gravedad, estando los detalles caracterizadores que lo hacen posible, adecuadamente recogidos en las reivindicaciones finales que acompañan a la presente memoria descriptiva.Thus, the tweezers mechanism for handling Simultaneous loads proposed by the present invention are configured as a remarkable novelty within its field of application, satisfactorily achieving the aforementioned objectives as suitable, getting, according to its creation, and in a way taxative, a system that, advantageously, is completely reliable when tightening by weight of the load with a mechanism simple and safe; which, advantageously, allows to block blocks or loads of the set to manipulate, being able to select which want to raise and which not from among the set of loads; that, advantageously, thanks to the pulleys that it incorporates, it allows that the tweezers reposition and balance properly with respect to loads that are not perfectly aligned and have some relative displacement between them; and that, advantageously, allows handling multiple blocks in quantities greater than two using the gravity tightening system, the details being characterizers that make it possible, properly collected in the final claims that accompany the present specification descriptive
De forma concreta, el mecanismo de pinzas preconizado comprende, esencialmente, un bastidor o estructura principal, soporte del resto de elementos del mecanismo, compuesto, a su vez, por dos largueros principales, paralelos entre sí, y varios travesaños perpendiculares a ellos, y que los conectan entre sí.Specifically, the clamp mechanism recommended includes essentially a frame or structure main, support of the rest of the elements of the mechanism, compound, in turn, by two main stringers, parallel to each other, and several crossbars perpendicular to them, and that connect them between yes.
El mecanismo cuenta, asimismo, con varias parejas de garras, formando un mecanismo de tijera, dispuestas entre los citados travesaños perpendiculares a los largueros principales.The mechanism also has several pairs of claws, forming a scissor mechanism, arranged between the mentioned crossbars perpendicular to the stringers main.
Cada una de dichas garras cuenta con zapatas articuladas, o fijas, de apoyo sobre los bloques de hormigón o cargas a elevar.Each of these claws has shoes articulated, or fixed, of support on the concrete blocks or loads to lift.
Asimismo, se contempla la existencia de unas eslingas o bielas de tiro previstas en el extremo de las garras y ancladas, en su otro extremo, a un punto de tiro o balancín, mediante enganche fijo (bulón, grilletes, etc.), o bien, mediante poleas de equilibrado del tiro.It also contemplates the existence of some slings or connecting rods provided at the end of the claws and anchored, at its other end, to a firing point or rocker, by means of fixed hook (bolt, shackles, etc.), or, by Balancing pulleys.
Por su parte, los citados balancines de tiro se conectan a los puntos fijos de tiro o a poleas de tiro de las eslingas o bielas antedichas.On the other hand, the aforementioned shot rockers are connect to the fixed firing points or pulleys of the slings or connecting rods above.
Finalmente, cabe señalar que se prevé un sistema de enclavamiento en apertura de las garras de la pinza, para evitar que estas se cierren sobre la carga cuando se quiera elevar la pinza en vacío, permitiendo con ello la elevación selectiva de unos bloques u otros. Este sistema de enclavamiento está compuesto por un mecanismo de enganche (bulón o gancho) que efectúa el bloqueo de las garras en posición de apertura, contando con un sistema de accionamiento de dicho mecanismo que puede ser de tipo eléctrico, neumático o hidráulico.Finally, it should be noted that a opening interlocking system of the clamp claws, to prevent them from closing on the load when you want raise the clamp in a vacuum, thereby allowing the elevation Selective of some blocks or others. This interlocking system It is composed of a hook mechanism (bolt or hook) that it makes the claws lock in the open position, counting with a drive system of said mechanism that can be of Electric, pneumatic or hydraulic type.
Visto lo que antecede, el funcionamiento del mecanismo de pinzas para manejo simultáneo de cargas de la invención será:Given the above, the operation of the clamp mechanism for simultaneous handling of loads of the invention will be:
- Accionamiento por gravedad, mediante cables para la elevación y transporte de las cargas o bloques, una vez asidas por la pinza. La sujeción de las cargas se produce por apriete del mecanismo sobre la carga debido inicialmente al peso de la pinza y, posteriormente, al peso de la propia carga que está siendo elevada.- Gravity drive, via cables for lifting and transporting loads or blocks, once grabbed by the clamp. The securing of the loads is produced by tighten the mechanism on the load initially due to the weight of the clamp and, subsequently, the weight of the load itself that is being high
- El accionamiento de apertura de la pinza se efectúa por el peso propio de la pinza, pudiendo ésta ser bloqueada en posición de apertura mediante el sistema de enclavamiento anteriormente citado, o bien, mediante un tiro de elevación conectado al bastidor o estructura principal de la pinza, igualmente mencionado anteriormente.- The clamp opening drive is made by the caliper's own weight, which can be blocked in the open position through the interlocking system previously cited, or, by a lifting shot connected to the main frame or structure of the clamp, also mentioned above.
- La disposición de los balancines y poleas de tiro permite el correcto grapado de las cargas frente a desviaciones de posición de las mismas.- The arrangement of rocker arms and pulleys throw allows the correct stapling of the loads in front of position deviations thereof.
- El sistema de enclavamiento de las garras, en posición de apertura, permite la selección de las cargas a elevar y de aquellas que no se desea elevar de un mismo grupo.- The claw interlocking system, in opening position, allows the selection of the loads to be lifted and of those that you don't want to raise from the same group.
El nuevo mecanismo de pinzas para manejo simultáneo de cargas representa, por consiguiente, una estructura innovadora de características estructurales y constitutivas desconocidas hasta ahora para tal fin, razones que unidas a su utilidad práctica, la dotan de fundamento suficiente para obtener el privilegio de exclusividad que se solicita.The new handle clamp mechanism Simultaneous loads represent, therefore, a structure Innovative structural and constitutive features unknown so far for that purpose, reasons that together with its practical utility, provide it with sufficient foundation to obtain the privilege of exclusivity that is requested.
Para complementar la descripción que se está realizando y con objeto de ayudar a una mejor comprensión de las características de la invención, se acompaña a la presente memoria descriptiva, como parte integrante de la misma, de un juego de planos, en los que con carácter ilustrativo y no limitativo se ha representado lo siguiente:To complement the description that is being performing and in order to help a better understanding of the characteristics of the invention, is attached herein descriptive, as an integral part of it, of a game of planes, in which with an illustrative and non-limiting nature, represented the following:
Las figuras número 1 y 2.- Muestran sendas vistas en alzado lateral y frontal de un ejemplo de realización del mecanismo de pinzas para manejo simultáneo de cargas objeto de la invención, en las que se aprecian las principales partes y elementos que comprende, así como la configuración y disposición de los mismos.Figures number 1 and 2.- They show paths side and front elevation views of an exemplary embodiment of the clamp mechanism for simultaneous handling of loads subject to invention, in which the main parts and elements that you understand, as well as the configuration and arrangement of the same.
Las figuras número 3 y 4.- Muestran sendas vistas en alzado lateral y frontal del mecanismo de la invención en posición de trabajo.Figures number 3 and 4.- Show paths side and front elevation views of the mechanism of the invention in work position.
A la vista de las mencionadas figuras, y de acuerdo con la numeración adoptada, se puede observar en ellas un ejemplo de realización preferente de la invención, la cual comprende las partes y elementos que se indican y describen en detalle a continuación.In view of the aforementioned figures, and of according to the numbering adopted, you can see in them a preferred embodiment of the invention, which includes the parts and elements that are indicated and described in detail below.
Así, tal como se aprecia en dichas figuras, el mecanismo (1) en cuestión consta de un bastidor (2) o estructura principal, que constituye el soporte del resto de elementos del mecanismo (1), estando dicho bastidor (2) conformado por dos largueros principales (3), paralelos entre sí, y varios travesaños (4) perpendiculares a dichos largueros (3), y que los conectan entre sí.Thus, as can be seen in these figures, the mechanism (1) in question consists of a frame (2) or structure principal, which constitutes the support for the rest of the elements of the mechanism (1), said frame (2) being formed by two main stringers (3), parallel to each other, and several crossbars (4) perpendicular to said stringers (3), and connecting them each.
Dispuestas entre los citados travesaños (4) el mecanismo (1) cuenta, con varias parejas de garras (5), formando una pinza (6) con mecanismo de tijera, cada una de las cuales cuenta en su extremo inferior con zapatas (7) que podrán ser articuladas, o fijas, destinadas a servir de apoyo sobre los bloques de hormigón o cargas a elevar (C).Arranged between the mentioned crossbars (4) the mechanism (1) has, with several pairs of claws (5), forming a clamp (6) with scissor mechanism, each of which account at its lower end with shoes (7) that may be articulated, or fixed, intended to support the concrete blocks or loads to lift (C).
Asimismo, se contempla la existencia de unas eslingas (8) o bielas de tiro previstas en el extremo superior de las garras (5) ancladas, a un punto de tiro o balancín (9), mediante enganche fijo (bulón, grilletes, etc.), o bien, mediante poleas (10), permitiendo el equilibrado del tiro.It also contemplates the existence of some slings (8) or connecting rods provided at the upper end of the claws (5) anchored, to a firing point or rocker (9), by means of fixed hook (bolt, shackles, etc.), or, by pulleys (10), allowing the balance of the shot.
Por su parte, los citados balancines de tiro (9), a cada uno de los cuales fijarán dos pinzas (6), se conectan, a su vez, mediante enganche fijo (bulón, grilletes, etc.) o mediante otras poleas (10), tal como en el ejemplo representado, a un balancín de tiro superior (11).For their part, the aforementioned shot rockers (9), to each of which will fix two clamps (6), connect, in turn, by means of fixed hitch (bolt, shackles, etc.) or by other pulleys (10), as in the example shown, to a top shot rocker (11).
Por su parte, cada pinza (6) cuenta con un sistema de enclavamiento que permite mantener las garras (5) abiertas, evitando que se cierren sobre la carga (C) cuando se quiera elevar la pinza (6) en vacío, el cual consiste en un mecanismo de enganche (12) mediante bulón o gancho dotado de un sistema de accionamiento que puede ser de tipo eléctrico, neumático o hidráulico.For its part, each clamp (6) has a interlocking system that allows to keep the claws (5) open, preventing them from closing over the load (C) when want to raise the clamp (6) in a vacuum, which consists of a coupling mechanism (12) by means of a pin or hook equipped with a drive system that can be electric type, pneumatic or hydraulic
Descrita suficientemente la naturaleza de la presente invención, así como la manera de ponerla en práctica, no se considera necesario hacer más extensa su explicación para que cualquier experto en la materia comprenda su alcance y las ventajas que de ella se derivan, haciendo constar que, dentro de su esencialidad, podrá ser llevada a la práctica en otras formas de realización que difieran en detalle de la indicada a título de ejemplo, y a las cuales alcanzará igualmente la protección que se recaba siempre que no se altere, cambie o modifique su principio fundamental.Describe sufficiently the nature of the present invention, as well as the way of putting it into practice, not it is considered necessary to extend its explanation so that any subject matter expert understands its scope and advantages that derive from it, stating that, within its essentiality, may be implemented in other forms of embodiment that differ in detail from that indicated by way of example, and which will also achieve the protection that collects as long as it does not alter, change or modify its principle fundamental.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ES200800868U ES1067775Y (en) | 2008-04-25 | 2008-04-25 | CLAMP MECHANISM FOR SIMULTANEOUS LOAD MANAGEMENT |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ES200800868U ES1067775Y (en) | 2008-04-25 | 2008-04-25 | CLAMP MECHANISM FOR SIMULTANEOUS LOAD MANAGEMENT |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| ES1067775U true ES1067775U (en) | 2008-06-16 |
| ES1067775Y ES1067775Y (en) | 2008-09-16 |
Family
ID=39469890
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ES200800868U Expired - Fee Related ES1067775Y (en) | 2008-04-25 | 2008-04-25 | CLAMP MECHANISM FOR SIMULTANEOUS LOAD MANAGEMENT |
Country Status (1)
| Country | Link |
|---|---|
| ES (1) | ES1067775Y (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111056425A (en) * | 2020-01-10 | 2020-04-24 | 中国水利水电第四工程局有限公司 | Lifting appliance for hinge type prefabricated block |
| CN117864936A (en) * | 2024-03-11 | 2024-04-12 | 江油市重鑫特种金属材料有限公司 | Steel billet forging lifting appliance with positioning clamping mechanism |
-
2008
- 2008-04-25 ES ES200800868U patent/ES1067775Y/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111056425A (en) * | 2020-01-10 | 2020-04-24 | 中国水利水电第四工程局有限公司 | Lifting appliance for hinge type prefabricated block |
| CN117864936A (en) * | 2024-03-11 | 2024-04-12 | 江油市重鑫特种金属材料有限公司 | Steel billet forging lifting appliance with positioning clamping mechanism |
| CN117864936B (en) * | 2024-03-11 | 2024-05-17 | 江油市重鑫特种金属材料有限公司 | Steel billet forging lifting appliance with positioning clamping mechanism |
Also Published As
| Publication number | Publication date |
|---|---|
| ES1067775Y (en) | 2008-09-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| ES2365431A1 (en) | Shackle connecting device | |
| US9897123B2 (en) | Connector for concrete barriers | |
| PE20181939A1 (en) | CLIMBING HEAD TO ATTACH A CLIMBING SCAFFOLD TO A CONCRETE SECTION OF A BUILDING UNDER CONSTRUCTION | |
| JP2017531770A5 (en) | ||
| ES1067775U (en) | Mechanism of clamps for simultaneous load management (Machine-translation by Google Translate, not legally binding) | |
| US20100320787A1 (en) | Lifting device | |
| CN108779763B (en) | Lifting frames for wind turbine blades | |
| KR200465321Y1 (en) | Jig for Transfer | |
| US9206829B2 (en) | Retaining pin assembly for a lifting system | |
| ES2366847A8 (en) | CRANE WITH ELEVABLE ARM PROVIDED WITH A MECHANICAL INTERLOCK SYSTEM. | |
| ES2366720A9 (en) | HOOK THAT ALLOWS TO PASS A CORD AROUND AN OBJECT. | |
| CN109437009A (en) | A kind of small-sized cage of bridge construction | |
| ES2334629B1 (en) | PROCEDURE FOR THE TRANSPORTATION, HANDLING, POSITIONING AND FIXING OF PREFABRICATED ROOF CONSTRUCTION ELEMENTS TO CONFORM WALLS OR INTERIOR FIRE RESISTANT TABIQUES IN ANY KIND OF CONSTRUCTIONS, INCLUDING NAVAL CONSTRUCTION. | |
| ES2304330A1 (en) | Excavator arm hitch system (Machine-translation by Google Translate, not legally binding) | |
| CN203794448U (en) | Retractable gantry lifting frame | |
| ES2579315T3 (en) | Capstan for a boat | |
| ES2432523T3 (en) | Telescopic boom | |
| ES1063403U (en) | Improved loop caliper for impulse loading (Machine-translation by Google Translate, not legally binding) | |
| ES2398283B1 (en) | USEFUL AND DOVELAS HANDLING PROCEDURE FORMING THE AEROGENERATOR TOWER SECTIONS | |
| ES2598729B1 (en) | NUCLEAR FUEL CELL CONTROL BARS HOLDING DEVICE | |
| ES1063405U (en) | Perfected clamp for handling and removal of formwork (Machine-translation by Google Translate, not legally binding) | |
| CN203545442U (en) | Chain four-branch hook | |
| ES1060823U (en) | Loaded clamp suitable for handling blocks of different sizes or charges gravity. (Machine-translation by Google Translate, not legally binding) | |
| CN210766436U (en) | Railway bridge overhead suspension cable operation device | |
| ES2214077B1 (en) | SECURITY LOCK DEVICE. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG1K | Utility model granted | ||
| FD1K | Utility model lapsed |