EP4627159A1 - Process of anchoring a floating platform on a rocky seabed - Google Patents
Process of anchoring a floating platform on a rocky seabedInfo
- Publication number
- EP4627159A1 EP4627159A1 EP23813381.3A EP23813381A EP4627159A1 EP 4627159 A1 EP4627159 A1 EP 4627159A1 EP 23813381 A EP23813381 A EP 23813381A EP 4627159 A1 EP4627159 A1 EP 4627159A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- trench portion
- line
- anchor structure
- median part
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/30—Anchors rigid when in use
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
- B63B2021/267—Anchors securing to bed by penetration of anchor into the sea bed using water jets, e.g. by ground or sand fluidisation
Definitions
- Drilled and grouted piles usually have a 3m diameter. Installing them requires digging a 20m deep hole, and filling the annulus between the pile and the rock with grout. They require investigating the seabed over a depth of more than 20m.
- the solution of drilled and grouted piles is in fact very challenging for water depths where jack-ups cannot be jacked, e.g. for water depths over 60m.
- drilling is subject to risks, such as weather and ocean conditions, and technical problems such as hole collapse, very hard rock, management of cuttings...
- the number of drilling contractors is quite limited in the world.
- Gravity based structures filled with sand and gravel represent an alternative. However, they lead to large structures occupying a surface of about 20m x 20m. They require thousands of tons of sand or gravel for ballasting. In the end, they are also quite expensive, and have a non-negligible environmental footprint because of their footprint and influence over the water column.
- An aim of the invention is to provide an anchoring process adapted to a rocky seabed allowing reducing costs and environmental footprint.
- the invention proposes a process of anchoring a floating platform on a rocky seabed, comprising the following steps:
- the anchor structure comprising a median part located at a junction of the first trench portion and the second trench portion, and two lateral parts extending from the median part along the line respectively on either sides of the median part, the median part comprising more steel than the lateral parts per unit of length along the line,
- the process comprises one or several of the following features, taken in isolation or any technically feasible combination:
- the process comprises providing the first trench portion and the second trench portion includes digging the seabed along the line and along the transverse direction using a subsea trencher;
- the process comprises injecting the grout includes using at least one grout line of the anchor structure, said grout line extending along the line, and/or using at least one stinger in order to inject at least part of the grout;
- the median part comprises several steel plates approximately parallel to the transverse direction;
- the median part comprises a first plurality of at least three plates parallel to each other, and a second plurality of at least three plates parallel to each, perpendicular to the plates of the first plurality, and connecting the plates of the of the first plurality one with the other;
- the median part comprises a plate protruding transversely on which the mooring chain is attached;
- each of the two lateral parts comprises a reinforcement cage fixed to the median part, the injected grout at least partly filling the reinforcement cage of the two lateral parts;
- the anchor structure comprises a first wall extending along the line and approximately perpendicular to the transverse direction, the first wall forming part of the median part, and of the two lateral parts; and the two lateral parts respectively comprise a first sheet and a second sheet extending along the line and approximately perpendicular to the first wall, the first sheet and the third wall protruding transversely from the first wall opposite said transverse wall; - the first wall and the first sheet, and the first wall and the second sheet form “T” profiles;
- the anchor structure comprises a second wall extending along the line and approximately perpendicular to the transverse direction, the second wall forming part of the median part and of the two lateral parts, the first sheet and the second sheet being fixed to the second wall;
- the grout is also injected between the second wall and another transverse wall of the first trench portion opposite said transverse wall in the transverse direction;
- the anchor structure 22 comprises a median part 34 located at a junction 36 of the first trench portion 20 and the second trench portion 21 , and two lateral parts 38, 40 extending from the median part along the line L respectively on either sides of the median part.
- the anchor structure 22 is symmetric with respect to a median plan P perpendicular to the line L.
- the median part 34 advantageously comprises several steel plates 46 approximately parallel to the transverse direction T.
- the median part 34 advantageously comprises a plate 48 (figures 2 and 3) protruding transversely on which the mooring chain 26 is attached.
- the median part 34 and the two lateral parts 38, 40 do not comprise walls or sheets, but are formed by a reinforcement cage, the injected grout 24 at least partly filling said reinforcement cage.
- the mooring chain 26 has a portion 58 in the second trench portion 21 , the floating platform 12 applying a traction force F on the anchor structure 22 transversely from the first trench portion 20 toward the second trench portion 21.
- the mooring chain 26 is connected to the median part 34, advantageously at a certain depth L7 with respect to an upper part 60 of the anchor structure, for example to the plate 48.
- the second mooring chain 28 has a portion 62 in the second trench portion 21 , on the other side of the portion 58 of the mooring chain 26 with respect to the anchor structure 22, the second platform 13 applying a second traction force F2 on the anchor structure transversely.
- the seabed 14 is first surveyed for example by a remotely operated vehicle 66. Goal is to detect possible obstacles which could cause issues with the installation. One may also rely on previous knowledge of the seabed 14 such as bathymetry and seabed imagery.
- the first trench portion 20 and/or the second trench portion 21 are existing one(s), and do not have to be dug.
- the first trench portion 20 and is cleaned, advantageously using water jets (not shown) directed at the walls 25, 64 of the first trench portion 20.
- the jets are for example produced by the remotely operated vehicle 66.
- the anchor structure 22 is installed, for example pre-assembled and lowered, in the first trench portion 20.
- the mooring chain 26, and in the example the second mooring chain 28, are attached to the median part 31 of the anchor structure 22.
- grout is injected in the first trench portion 20 at least between the anchor structure 22 and the transverse wall 25, in the example via the grout line 42 from a source (not shown), in order to obtain the grout 24.
- grout is injected using a stinger (not shown).
- the mooring chain 26 After curing, the mooring chain 26 is connected to the floating platform 12, and is tensioned. In the example, the same is performed with the second mooring chain 28 and the second floating platform 13.
- the anchoring process advantageously allows anchoring several floating platforms.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP22306748 | 2022-11-28 | ||
| PCT/EP2023/083187 WO2024115397A1 (en) | 2022-11-28 | 2023-11-27 | Process of anchoring a floating platform on a rocky seabed |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4627159A1 true EP4627159A1 (en) | 2025-10-08 |
Family
ID=84462524
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23813381.3A Pending EP4627159A1 (en) | 2022-11-28 | 2023-11-27 | Process of anchoring a floating platform on a rocky seabed |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP4627159A1 (en) |
| WO (1) | WO2024115397A1 (en) |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| BRPI0702973B1 (en) * | 2007-07-16 | 2018-06-12 | Petroleo Brasileiro S. A. - Petrobras | HIGH CAPACITY ANCHORAGE SYSTEM IN DEEP WATER AND OPERATING METHOD |
| US20140161538A1 (en) * | 2012-12-12 | 2014-06-12 | Dallas Joel Meggitt | System and method for undersea micropile deployment |
| WO2020046614A1 (en) * | 2018-08-30 | 2020-03-05 | Exxonmobil Upstream Research Company | Pile anchor reinforcement systems |
| FR3112754B1 (en) * | 2020-07-22 | 2022-10-14 | Technip France | Method for setting up at least one anchor line of a floating installation in a body of water and associated floating installation |
-
2023
- 2023-11-27 EP EP23813381.3A patent/EP4627159A1/en active Pending
- 2023-11-27 WO PCT/EP2023/083187 patent/WO2024115397A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| WO2024115397A1 (en) | 2024-06-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6173533B2 (en) | Subsea anchoring system and method | |
| US20200071903A1 (en) | Earth retaining system such as a sheet pile wall with integral soil anchors | |
| US11149395B2 (en) | Cellular sheet pile retaining systems with unconnected tail walls, and associated methods of use | |
| KR101211811B1 (en) | Cast in concrete pile With precast type Caisson | |
| CN102392458A (en) | Piling beam cofferdam construction method used for bare rock foundation construction in water | |
| Malhotra | Design and construction considerations for offshore wind turbine foundations | |
| US20250065989A1 (en) | Process of anchoring a floating platform on a rocky seabed | |
| JP2020122288A (en) | Substructure of offshore wind power foundation and construction method of offshore wind power generation foundation substructure | |
| JP4876991B2 (en) | Rehabilitation and reinforcement method for existing quay and rehabilitation structure | |
| WO2024115397A1 (en) | Process of anchoring a floating platform on a rocky seabed | |
| EP4627158A1 (en) | Process of anchoring a floating platform on a rocky seabed | |
| JP2020122286A (en) | Foundation structure for offshore wind power generation and construction method of foundation structure for offshore wind power generation | |
| KR20150105891A (en) | The underground facilities for offshore airfield of semi land reclamation type | |
| JP2020122287A (en) | Foundation structure for offshore wind power generation and construction method of foundation structure for offshore wind power generation | |
| Sheshpari et al. | New frontiers in the offshore geotechnics and foundation design | |
| GB2533772A (en) | Mooring anchor | |
| JP4182501B2 (en) | Construction method for underground structures | |
| JPS5972324A (en) | Construction of artificial islet for excavation of shaft | |
| JPS638273B2 (en) | ||
| Gazzarrini et al. | A Case History of a Jet Grouted Wall in Saturated Course Granular Material with Boulders | |
| Schlechter et al. | Newport Dock Remediation and Geotechnical Risk Mitigation in Variably Weathered Rock Conditions | |
| KR20210042541A (en) | Gravity Based Offshore Structure | |
| Karels | Foundation design and construction challenges at river crossing for 345 kV transmission line | |
| Dover et al. | Construction, Inspection and Lessons Learned for 3.81-m Diameter CIDH Piles–Richmond-San Rafael Bridge Seismic Retrofit | |
| Luxford et al. | Design and Construction Aspects of a High Pressure Gas Pipeline Crossing Lytteltqn Harbour |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20250528 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |