EP4524081A1 - Working equipment with a hydraulically operated arm arrangement, and a method related to the working equipment - Google Patents
Working equipment with a hydraulically operated arm arrangement, and a method related to the working equipment Download PDFInfo
- Publication number
- EP4524081A1 EP4524081A1 EP23197085.6A EP23197085A EP4524081A1 EP 4524081 A1 EP4524081 A1 EP 4524081A1 EP 23197085 A EP23197085 A EP 23197085A EP 4524081 A1 EP4524081 A1 EP 4524081A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- arm member
- member tip
- arm
- rule
- tip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/20—Control systems or devices for non-electric drives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/46—Position indicators for suspended loads or for crane elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/48—Automatic control of crane drives for producing a single or repeated working cycle; Program control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/06—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs mounted for jibbing or luffing movements
- B66C23/08—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs mounted for jibbing or luffing movements and adapted to move the loads in predetermined paths
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/54—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with pneumatic or hydraulic motors, e.g. for actuating jib-cranes on tractors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F9/00—Devices for lifting or lowering bulky or heavy goods for loading or unloading purposes
- B66F9/06—Devices for lifting or lowering bulky or heavy goods for loading or unloading purposes movable, with their loads, on wheels or the like, e.g. fork-lift trucks
- B66F9/065—Devices for lifting or lowering bulky or heavy goods for loading or unloading purposes movable, with their loads, on wheels or the like, e.g. fork-lift trucks non-masted
Definitions
- the present disclosure relates to a working equipment, e.g. a crane mounted to a vehicle, comprising a hydraulically operated arm arrangement. Specifically, it is disclosed a working equipment provided with an improved control of movements of an arm member tip in particular with regard to velocity.
- the invention relates to the field of hydraulics, and motion control. It provides an improved solution for controlling e.g. the arm member tip velocity to ensure that maximised arm member tip velocity can be achieved and still remain within available pump flow provided by one or more hydraulic pump(s) of the working equipment comprising a hydraulically operated arm arrangement.
- US20210231140A1 discloses a method of controlling the movement of a boom of a work machine, wherein the work machine comprises a plurality of booms which are articulately connected to each other, a plurality of sensors for monitoring the position of the boom and a controller to control the hydraulic fluid flow.
- EP4086216A1 discloses a crane that is arranged to be mounted to a vehicle which comprises a crane boom system consisting of hydraulic actuators to perform movements according to operating signals, a sensor system to monitor boom position and crane operating conditions and a control unit configured to estimate a required flow level of each of the hydraulic actuators for the wanted movements of the crane components.
- US6498973B2 discloses a work vehicle provided with several hydraulic actuators in a system and method for controlling and scaling flow between the actuators.
- the system includes an electronic controller that is connected to several hand controls that provide a proportional signal indicating how far the operator has moved the hand controls. The controller reads the hand controls and proportionally scales the total available flow to make sure the operator does not demand too much fluid from the hydraulic pump.
- CTC crane tip control
- boom tip control the operator input is applied to move the crane tip in vertical or horizontal directions, or a combination of both.
- Performing a full remote control lever stroke for horizontal movement means a motion of the crane tip in horizontal direction with full speed.
- the CTC or boom tip control offers an alternative control methodology to the standard crane arm control methodology where the movement of the booms of the crane are controlled individually for each boom, by the crane operator via e.g. the operator's remote control unit.
- a loader crane comprising a rotatable crane column with a first boom pivotally attached to the crane column and in turn a second boom pivotally mounted to the first boom, where the second boom further has telescopically extendable and retractable boom extensions.
- the standard crane control methodology would then imply that the crane operator controls the rotation (also referred to the slewing angle) of the crane column with one lever of the remote control unit, the pivoting angle of the first boom relative to the crane column with another lever, the pivoting angle of the second boom relative to the first boom with another lever and the retraction and extension of the telescopic boom extensions of the second boom with yet another lever. All lever strokes are hence also affecting the crane tip indirectly but the crane tip in itself is in this example not directly controlled by the operator via the remote control unit.
- a CTC algorithm will convert the wanted crane tip motion of a crane arm, with several booms, into small steps, and tries to achieve those small steps within a fixed time interval, such as within a sample time and calculates what is the crane joint positions of the booms of the crane arm positions of the booms of the crane arm in the next interval.
- the difference between desired and current joint positions is used to calculate the required flow for each boom, which is systematically proportional to a certain velocity in time that a crane can achieve.
- the rotatable connection of the crane column to a base of the loader crane is one example of a joint and the rotation angle (sometimes referred to as a slewing angle) would the respective joint position.
- the pivoting connection of the first boom to the crane column and the pivoting connection of the second boom to the first boom would also be further examples of joints with their respective pivoting angles being further examples of pivoting positions.
- the telescopic extension of the second boom is a further example of a joint with the extension length of the telescopic boom being an example of a joint position.
- the crane tip velocity is specified as a constant parameter in the system. This means that the total flow needed for the movement of the crane tip in each step may be varying, and if the crane tip velocity is set to a relatively high value that cannot be reached due the actual flow limitation of the crane, a pump flow distribution (PFD) control feature will typically scale the crane functions, i.e. here the individual boom movements, so that the crane functions do not demand more flow than is provided by the pump by distributing the available flow to each function, typically in an equal manner. This may result in loss of crane tip position accuracy. For example, a crane tip will not be able follow a straight line within an error tolerance, and may move along a sinusoidal trajectory with a low frequency.
- PFD pump flow distribution
- Specifying a well-balanced parameter for the crane tip velocity is a time-consuming task in these implementations and does not guarantee an optimised solution that can provide maximum crane tip velocity and position accuracy.
- An articulated system such as a loader crane, is composed of different angular and prismatic joints, such as slew, first boom and second boom as revolute joints and second boom extension is a prismatic joint.
- the maximum crane tip velocity is dependent on the joint position configuration and joint velocities.
- first boom and second boom are positioned at 0 degree, and second boom extension joint is operated at 100% speed, then the crane tip velocity will be directly proportional to second boom extension joint velocity in m/s.
- the object of the present invention is to achieve an improved control of arm member tip movements specifically to achieve higher arm member tip velocity, improved accuracy, and/or improved energy efficiency.
- the present invention is intended to provide a technical solution to determine an improved control of arm member tip movements that considers each arm member connection velocity limits and available pump flow for the working equipment.
- the arm member tip velocity is planned in a way such that the highest possible arm member tip velocity is achieved by considering the pump flow available for the movable arm arrangement of the working equipment and current arm member connection configuration before calculating the next desired arm member connection position.
- Implementing the present invention makes it possible to control the pump flow distribution prioritisation based on the presently applied optimization goal such as maximising the crane tip velocity or position accuracy or energy efficiency, e.g. by scaling the crane tip velocity up/down based on the available pump flow, and crane joint configuration.
- the moved distance instead of moving the arm member tip a predetermined distance during a sample, the moved distance instead is adapted to the available hydraulic flow, which may result in that a shorter movement distance but at the same speed.
- the arm member tip velocity is planned in dependence of the available hydraulic flow.
- the capabilities, e.g. the position, of each arm member connection are determined, i.e. by determining the angle and length/extension, then the velocity of arm member connection movement is estimated, and based upon that, the flow required is estimated for each arm member connection.
- This information is combined in order to determine the tip velocity.
- Important aspects when combining this information are e.g. the configuration of the arm member connections, and scaling up/down various calculated parameters. If an adaption rule directed to achieve a maximum arm member tip velocity is applied, the maximum velocity is adapted to available hydraulic flow. Thereby, smooth movements of arm member tip will be achieved.
- the present invention is also applicable for semi- or fully autonomous systems.
- the equipment controller may instead be controlled by an autonomous control unit.
- the present invention relates to a working equipment 2, e.g. a crane mounted on a vehicle 1, comprising a hydraulically movable arm arrangement 4, comprising two or more movable arm members 6 having an arm member configuration.
- the movable arm members are articulately and/or telescopically connected to each other via arm member connections 8, such as arm member joints and telescopic boom extensions, and having associated connection functions.
- the arm arrangement is provided with an arm member tip 10 at a free end of the utmost of the two or more movable arm members 6.
- the expression arm member connection function generally is used to represent various crane functions such as slew of a crane arm member such as a crane column, pivoting of a first boom of a crane relative to its crane column, pivoting of a second boom of a crane relative to its first boom and/or the extension and/or retraction of a telescopic boom e.g. used as a second boom or a third boom of a crane.
- the working equipment further comprises a plurality of actuators 12, arranged to be operated by hydraulic fluid discharged from at least one hydraulic pump 14 and further arranged to move the two or more arm members 6 of the movable arm arrangement 4 during a working assignment, e.g. a loading/unloading procedure.
- a working assignment e.g. a loading/unloading procedure.
- the hydraulic fluid discharged from the at least one pump 14 to the plurality of actuators 12 and further to provide movements to the arm members 6, is indicated by block arrows.
- a sensor system 16 is included in the working equipment, that comprises a plurality of sensors for sensing measures of various parameters of the movable arm arrangement 4.
- the sensing measures of various parameters are indicated by a block arrow from the arm arrangement 4 to the sensor system 16.
- the working equipment 2 also comprises an equipment controller 18 configured to receive arm member tip commands 20, comprising characteristics of wanted movements of the arm member tip 10, such as a direction of movement for the arm member tip 10, and to receive signals 22 from the sensor system 16, to determine and monitor current position of the arm member tip 10, and one or many of relative positions of the two or more arm members 6, position configurations and movement velocities of the arm member connections 8. Additional examples of characteristics of wanted movements of the arm member tip 10 may be a parameter indicating a relative speed of the movement.
- the equipment controller is also configured to control movements of the two or more arm members 6 in accordance with the received arm member tip commands 20, by generating and applying operating signals 24 controlling the flow and/or pressure of hydraulic fluid to the plurality of actuators 12.
- the operating signals 24 are applied to a hydraulic system controlling the supply and return of hydraulic oil to the chambers of at least some of the actuators 12.
- the hydraulic system comprises the hydraulic pump 14 which may be controlled by the operating signals 12 as well as other hydraulic components for controlling direction and/or flow and/or pressure of the hydraulic fluid that are supplied and returned from the chambers of at least some of the actuators 12, this includes hydraulic valves and control valves. Hydraulic components controlling the inlet and outlet at the actuators 12 may also form part of this hydraulic system.
- the equipment controller 18 is further arranged to monitor the required flow of hydraulic fluid from the at least one pump 14 for the movements of the two or more arm members 6 and to apply an adaption rule to maintain the required flow below a predetermined maximum flow limit and to comply with the received arm member tip command 20 when generating the operating signals 24.
- the equipment controller 18 is arranged to apply an adaption rule when generating the operating signals 24 to control the flow to the plurality of actuators 12 for moving each of the two or more arm members 6.
- an adaption rule in this embodiment, various parameters for setting the flow and/or pressure of the hydraulic fluid at the actuators 12 are scaled and prioritized, thereby resulting in smooth movements of the arm member tip 10.
- the predetermined maximum flow limit is preferably equal to or less than a maximal flow of hydraulic fluid discharged from said at least one hydraulic pump 14.
- the adaption rule is a rule to maximise the velocity of the arm member tip 10
- the working equipment 2 is further arranged to apply the adaption rule to maximase the velocity when generating operating signals 24 to increase the required flow and comply with the received arm member tip command 20.
- the joints may be of any type, as earlier explained.
- the first joint may be the slew of the crane arm's crane column
- the second joint may be the pivoting joint of the first boom connected to the crane column
- the third joint may be the pivoting joint of the second boom connected to the first boom
- the fourth joint may be the telescopic extension/retraction of the second boom (the second boom is here a telescopic boom).
- the procedure comprises a number of steps C1-C5.
- a PFD speed factor 38 may also be calculated and output from this procedure.
- the PFD speed factor 38 is calculated using an accumulated prioritized flow 36 summing the scaled requested flow from all the four joints in this example. This accumulated prioritized flow 36 is then compared to the available flow from the pump(s) and the PFD speed factor then reflects if there in fact is a possibility to increase flow consumption and thereby achieve increase the resulting speed of the crane tip. However, if the procedure is used for achieve a high precision in the crane tip position then the PFD speed factor will not be used to increase the speed of the crane tip.
- the oil need parameters for the wanted movements of the joints is denoted 30
- joint priority function(s) is denoted 32
- pump flow is denoted 34
- accumulated prioritized flow is denoted 36
- PFD speed factor is denoted 38.
- the procedure for pump flow distribution in the context of CTC operation of a crane arm, described above, is an example of how an equipment controller 18 may apply an adaption rule when generating operation signals 24.
- the adaption rule is applied to the calculated joint velocities calculated by a CTC control algorithm to achieve scaled joint velocities.
- the scaled joint velocities are then transformed into operation signals 24 by the equipment controller 18.
- an exemplary procedure is provided to be used in order to adapt the generated operating signals 24 according to the adaption rule, the exemplary procedure essentially corresponds to the steps C1-C5 described above.
- Input to the procedure are joint velocities calculated through CTC, as known in the art and earlier described based on received sensor values describing current joint positions and characteristics of wanted movements received through arm members tip commands by the equipment controller 18.
- the equipment controller 18 is configured to: Step I - Convert joint velocities, calculated by using CTC, for the respective connection functions of the movable arm arrangement 4 to operating signal commands in % for all involved connection functions.
- This step may be performed by estimating the relationship between these parameters for each connection function using only few parameter values:
- Deadband is referred as a value of a command input via e.g. a lever on a remote control unit 26 ⁇ X% at which an arm member connection is started to move.
- the remote lever command is calculated as if an operator was operating each function manually.
- Figure 3 shows an estimation of such a relationship for a first boom joint.
- the first curve S1 shows measured points at lever of remote control unit in % [ ⁇ O, ⁇ 10, ⁇ 20, ⁇ 30, ⁇ 40, t50,t60,t70,t80,t 90, ⁇ 100] and joint velocity estimated at corresponding commands.
- the second curve S2 shows estimated relationship using only above-mentioned parameters. The curves essentially follow each other, i.e. this estimation is close enough to give an estimate of lever command.
- Step II Convert the operating signal commands in % to requested flows Q (e.g. in l/min), preferably in a linear manner, using a hydraulic fluid need parameter for positive or negative movement 30.
- Step III Convert the requested flows Q to scaled flows sQ for all involved connection functions, by scaling the requested flows up/down for all involved connection functions. More specifically, as in normal PFD control feature, slew can be kept at highest priority, so that the requested slew flow will not be scaled down or up, and only do so on the rest of the connection functions.
- the scaling request flow down/up of each of the connection functions can be equally distributed among all, or one or more connection functions may be prioritized.
- CTC there are typically two functions to create a straight line other than slew. From the CTC algorithm it is known which those functions are, and the priority may be set based on optimization goals, such as maximize the crane tip velocity, or position accuracy, or energy efficiency. This is advantageous in that various possibilities may be tested and switched in/between whenever needed.
- Step IV Convert the scaled flows sQ to scaled operating signal commands, and calculate accumulated flow after scaling down the operating signal commands.
- Step V Convert scaled operating signal commands to scaled connection velocities for all involved connection functions, by applying the relationship previously discussed (see figure 3 where an exemplary relationship is shown) related to respective arm member connection as an inverse function given the scaled operating signal command.
- Step VI Apply adaption rule to achieve the determined scaled connection velocities for all involved connection functions.
- the accumulated flow is calculated based on summing the scaled flows sQ of the different connection functions.
- the equipment controller 8 is then further arranged to calculate an accumulated flow speed factor 38 for the involved connection functions, and based on priority of speed factor, either increase or decrease the arm member tip velocity.
- the total accumulated pump flow after the scaling is still less than the total available pump flow then it may also be calculated (in percentage) how much is remaining and adding more speed to the arm member tip velocity in order to always maximise the usage of the available pump flow.
- this extra speed factor may be disabled.
- a first connection function may be the slew of the crane arm's crane column
- a second connection function may be the pivoting joint of the first boom connected to the crane column
- a third connection function may be the pivoting joint of the second boom connected to the first boom
- a fourth connection function may be the telescopic extension/retraction of the second boom (the second boom is here a telescopic boom).
- Minimum Crane Tip Velocity Factor A fixed minimum crane tip velocity factor cannot be set to zero, and it is therefore assumed that it is equal to the 50% of maximum crane tip velocity factor. This does not guarantee that this assumption is correct. What is guaranteed is that if TipMaxVelParam is less than or equal to second boom extension arm member connection velocity in m/s, an improvement is identified. And this factor cannot be set equal to zero, because in this case, the crane tip might never move.
- a PFD speed factor is determined and used as described in the following equation (Equation 5):
- XLimitMin XLimitMinFixed + XLimitMinFixed ⁇ PFDSpeedFactor 100
- YLimitMin YLimitMinFixed + YLimitMinFixed ⁇ PFDSpeedFactor 100
- ZLimitMin ZLimitMinFixed + ZLimitMinFixed ⁇ PFDSpeedFactor 100
- the adaption rule is:
- the rule to prioritize accuracy is applied if not the speed factor is used to scale up the velocity of the arm member tip 10 as much as possible.
- the rule to prioritize energy efficiency would for example be based on which crane functions to give priority to, and which functions to allow operating at the same time, to reduce the operating time with functions having a mismatch in the pressure and/or flow, when operating with a single pump system, or other strategies to minimize or optimize the energy consumption of the movements of an arm arrangement.
- the working equipment preferably further comprises a remote control unit 26, e.g. a handheld remote control unit, configured to receive the arm member tip commands 20 of wanted arm member tip movements from an operator and to transmit the arm member tip commands 20 as arm member tip command signals 28 to the equipment controller 18.
- a remote control unit 26 may further be configured to receive an adaption rule command from the operator by selecting one of the at least one adaption rule to be applied by the equipment controller 18.
- the adaption rule may alternatively be activated, added, selected and/or enabled as part a configuration procedure of the equipment controller 18.
- the hydraulically movable arm arrangement 4 is a crane arm arrangement comprising one or many crane booms, telescopic booms, and crane boom extensions, that preferably is mounted to a vehicle 1, such as a truck.
- the crane arm arrangement 4 may also be arranged to be mounted to any other object, e.g. a boat, a building, a wind turbine.
- the crane arm members 6 includes the arm member tip 10 arranged at a free end of an outermost crane boom.
- the arm members 6 may comprise a crane column arranged to rotate, or slew, around a vertical axis perpendicular to the plane of the vehicle, a first (inner) boom connected to the crane column, and a second (outer) telescopic boom connected to the first boom and provided with one or more extensions. Additional components, such as additional telescopic booms (also referred to as jibs) or crane tool may form part of the crane components.
- additional telescopic booms also referred to as jibs
- crane tool may form part of the crane components.
- the working equipment comprises hydraulic actuators 12 arranged to be operated by hydraulic fluid having a hydraulic flow, where the hydraulic fluid being discharged from the at least one hydraulic pump 14.
- the hydraulic actuators are further arranged to apply movements to the crane arm arrangement such that the crane tip 10 is moved from a current position to a target position in response to received operating signals 24.
- the crane also comprises a sensor system 16 configured to monitor current positions of the crane components, and to generate sensor signals 22 in response to the monitored current positions and operating conditions.
- the sensor system is configured to monitor current positions of the crane components, and comprises sensors arranged to measure e.g. an angle of a crane boom compared to a reference plane, or the extension length of the telescopic boom (individual extension of a boom extension or the extension of the telescopic boom as a whole).
- the sensor system is also configured to monitor the operating conditions of the system of the hydraulic actuators and the hydraulic pump, and to generate sensor signals in response to measured pressures and flows at specific parts of the hydraulic system.
- the sensor system is hence used to monitor current positions and operating conditions of the crane.
- the present invention also relates to a method of a working equipment 2 arranged to be mounted to e.g. a vehicle 1.
- the working equipment has been described in detail above and it is herein referred to that description. The method will now be described with references to the flow diagram shown in figure 5 .
- the method comprises:
- the method further comprises, monitoring, by the equipment controller 18, the required flow of hydraulic fluid from the at least one pump 14 for the movements of the two or more arm members 6 and applying an adaption rule to maintain the required flow below a predetermined maximum flow limit and to comply with the received arm member tip command 20, when generating the operating signals 24.
- the method comprises applying said adaption rule when generating the operating signals 24 to control the flow to the plurality of actuators 12 for moving each of the two or more arm members 6 by scaling, and prioritizing parameters in calculations performed when applying said adaption rule, thereby resulting in smooth movements of said arm member tip 10.
- the predetermined maximum flow limit is equal to or less than a maximal flow of hydraulic fluid discharged from the at least one hydraulic pump 14.
- the adaption rule is a rule to maximise the velocity of the arm member tip 10
- the method then comprises applying said adaption rule to maximise the velocity when generating operating signals 24 to increase the required flow and comply with the received arm member tip command 20.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automation & Control Theory (AREA)
- Transportation (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Control And Safety Of Cranes (AREA)
Abstract
A working equipment (2) comprising a hydraulically movable arm arrangement (4) comprising two or more movable arm members (6) having an arm member configuration, and which are articulately connected to each other via arm member connections (8), and having associated connection functions, and an arm member tip (10); a plurality of actuators (12), arranged to be operated by hydraulic fluid discharged from at least one hydraulic pump (14); a sensor system (16), and an equipment controller (18) configured to receive arm member tip commands (20), comprising characteristics of wanted movements of the arm member tip (10), receive signals (22) from the sensor system (16), to e.g. determine and monitor current position of the arm member tip (10), and to control movements of the two or more arm members (6) in accordance with the received arm member tip commands (20), by generating and applying operating signals (24) controlling the flow and/or pressure of hydraulic fluid to the plurality of actuators (12).
The equipment controller (18) is further arranged to monitor the required flow of hydraulic fluid from the at least one pump (14) for the movements of the movements of the two or more arm members (6) and to apply an adaption rule to maintain the required flow below a predetermined maximum flow limit and to comply with the received arm member tip command (20) when generating the operating signals (24)..
Description
- The present disclosure relates to a working equipment, e.g. a crane mounted to a vehicle, comprising a hydraulically operated arm arrangement. Specifically, it is disclosed a working equipment provided with an improved control of movements of an arm member tip in particular with regard to velocity.
- Generally, the invention relates to the field of hydraulics, and motion control. It provides an improved solution for controlling e.g. the arm member tip velocity to ensure that maximised arm member tip velocity can be achieved and still remain within available pump flow provided by one or more hydraulic pump(s) of the working equipment comprising a hydraulically operated arm arrangement.
- Below are listed references that disclose working equipment comprising a plurality of sensors for sensing crane boom positions/fluid flows and a controller for controlling hydraulic actuators of a crane.
-
US20210231140A1 discloses a method of controlling the movement of a boom of a work machine, wherein the work machine comprises a plurality of booms which are articulately connected to each other, a plurality of sensors for monitoring the position of the boom and a controller to control the hydraulic fluid flow. -
EP4086216A1 discloses a crane that is arranged to be mounted to a vehicle which comprises a crane boom system consisting of hydraulic actuators to perform movements according to operating signals, a sensor system to monitor boom position and crane operating conditions and a control unit configured to estimate a required flow level of each of the hydraulic actuators for the wanted movements of the crane components.US6498973B2 discloses a work vehicle provided with several hydraulic actuators in a system and method for controlling and scaling flow between the actuators. The system includes an electronic controller that is connected to several hand controls that provide a proportional signal indicating how far the operator has moved the hand controls. The controller reads the hand controls and proportionally scales the total available flow to make sure the operator does not demand too much fluid from the hydraulic pump. - In crane operation, the simplest form of crane tip control (CTC), also called boom tip control, the operator input is applied to move the crane tip in vertical or horizontal directions, or a combination of both. Performing a full remote control lever stroke for horizontal movement, means a motion of the crane tip in horizontal direction with full speed. The CTC or boom tip control offers an alternative control methodology to the standard crane arm control methodology where the movement of the booms of the crane are controlled individually for each boom, by the crane operator via e.g. the operator's remote control unit. The following illustrative example can be made for a loader crane comprising a rotatable crane column with a first boom pivotally attached to the crane column and in turn a second boom pivotally mounted to the first boom, where the second boom further has telescopically extendable and retractable boom extensions. The standard crane control methodology would then imply that the crane operator controls the rotation (also referred to the slewing angle) of the crane column with one lever of the remote control unit, the pivoting angle of the first boom relative to the crane column with another lever, the pivoting angle of the second boom relative to the first boom with another lever and the retraction and extension of the telescopic boom extensions of the second boom with yet another lever. All lever strokes are hence also affecting the crane tip indirectly but the crane tip in itself is in this example not directly controlled by the operator via the remote control unit.
- In a presently applied control method, a CTC algorithm will convert the wanted crane tip motion of a crane arm, with several booms, into small steps, and tries to achieve those small steps within a fixed time interval, such as within a sample time and calculates what is the crane joint positions of the booms of the crane arm positions of the booms of the crane arm in the next interval. The difference between desired and current joint positions is used to calculate the required flow for each boom, which is systematically proportional to a certain velocity in time that a crane can achieve. If we again go back to the previously explained illustrative example of a loader crane, the rotatable connection of the crane column to a base of the loader crane is one example of a joint and the rotation angle (sometimes referred to as a slewing angle) would the respective joint position. Similarly, the pivoting connection of the first boom to the crane column and the pivoting connection of the second boom to the first boom would also be further examples of joints with their respective pivoting angles being further examples of pivoting positions. In this context and example, the telescopic extension of the second boom is a further example of a joint with the extension length of the telescopic boom being an example of a joint position.
- In some of the presently applied implementations, the crane tip velocity is specified as a constant parameter in the system. This means that the total flow needed for the movement of the crane tip in each step may be varying, and if the crane tip velocity is set to a relatively high value that cannot be reached due the actual flow limitation of the crane, a pump flow distribution (PFD) control feature will typically scale the crane functions, i.e. here the individual boom movements, so that the crane functions do not demand more flow than is provided by the pump by distributing the available flow to each function, typically in an equal manner. This may result in loss of crane tip position accuracy. For example, a crane tip will not be able follow a straight line within an error tolerance, and may move along a sinusoidal trajectory with a low frequency.
- Specifying a well-balanced parameter for the crane tip velocity is a time-consuming task in these implementations and does not guarantee an optimised solution that can provide maximum crane tip velocity and position accuracy.
- An articulated system, such as a loader crane, is composed of different angular and prismatic joints, such as slew, first boom and second boom as revolute joints and second boom extension is a prismatic joint. The maximum crane tip velocity is dependent on the joint position configuration and joint velocities.
- For example, if slew, first boom and second boom are positioned at 0 degree, and second boom extension joint is operated at 100% speed, then the crane tip velocity will be directly proportional to second boom extension joint velocity in m/s.
- But if instead a straight line for crane tip movement should be followed using a combination of either of (1) a first and second boom movements, or (2) second boom and second boom extension movements, or (3) first boom and second boom movements, then the crane tip velocity will depend on the joint positions and their respective velocities.
- Considering the above discussion, it is observed that the maximum crane tip velocity is not a fixed value and cannot be defined using a fixed value, and that modified crane function commands from a proper regulator will override the commands, but there is no guarantee that the joints will be able to move to the desired position.
- The object of the present invention is to achieve an improved control of arm member tip movements specifically to achieve higher arm member tip velocity, improved accuracy, and/or improved energy efficiency.
- The above-mentioned objects are achieved by the present invention according to the independent claims.
- Preferred embodiments are set forth in the dependent claims.
- The present invention is intended to provide a technical solution to determine an improved control of arm member tip movements that considers each arm member connection velocity limits and available pump flow for the working equipment.
- According to the technical solution, the arm member tip velocity is planned in a way such that the highest possible arm member tip velocity is achieved by considering the pump flow available for the movable arm arrangement of the working equipment and current arm member connection configuration before calculating the next desired arm member connection position.
- Implementing the present invention makes it possible to control the pump flow distribution prioritisation based on the presently applied optimization goal such as maximising the crane tip velocity or position accuracy or energy efficiency, e.g. by scaling the crane tip velocity up/down based on the available pump flow, and crane joint configuration.
- Instead of moving the arm member tip a predetermined distance during a sample, the moved distance instead is adapted to the available hydraulic flow, which may result in that a shorter movement distance but at the same speed.
- The arm member tip velocity is planned in dependence of the available hydraulic flow. In order to achieve this planning, the capabilities, e.g. the position, of each arm member connection are determined, i.e. by determining the angle and length/extension, then the velocity of arm member connection movement is estimated, and based upon that, the flow required is estimated for each arm member connection. This information is combined in order to determine the tip velocity. Important aspects when combining this information are e.g. the configuration of the arm member connections, and scaling up/down various calculated parameters. If an adaption rule directed to achieve a maximum arm member tip velocity is applied, the maximum velocity is adapted to available hydraulic flow. Thereby, smooth movements of arm member tip will be achieved.
- The present invention is also applicable for semi- or fully autonomous systems.
- Thus, instead of an operator controlling the equipment controller via a remote control unit, the equipment controller may instead be controlled by an autonomous control unit.
-
-
Figure 1 is a schematic illustration of a vehicle provided with a working equipment according to the present invention. -
Figure 2 is a block diagram that schematically illustrates the present invention. -
Figure 3 shows an exemplary relationship between a first boom velocity and a lever command according to one embodiment. -
Figure 4 shows a block diagram that schematically illustrates an embodiment of the present invention. -
Figure 5 is a flow diagram illustrating the method according to the present invention. - The working equipment will now be described in detail with references to the appended figures. Throughout the figures the same, or similar, items have the same reference signs. Moreover, the items and the figures are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention.
- With references to
figures 1 and 2 , the present invention relates to aworking equipment 2, e.g. a crane mounted on avehicle 1, comprising a hydraulicallymovable arm arrangement 4, comprising two or moremovable arm members 6 having an arm member configuration. The movable arm members are articulately and/or telescopically connected to each other viaarm member connections 8, such as arm member joints and telescopic boom extensions, and having associated connection functions. The arm arrangement is provided with anarm member tip 10 at a free end of the utmost of the two or moremovable arm members 6. - Herein, the expression arm member connection function generally is used to represent various crane functions such as slew of a crane arm member such as a crane column, pivoting of a first boom of a crane relative to its crane column, pivoting of a second boom of a crane relative to its first boom and/or the extension and/or retraction of a telescopic boom e.g. used as a second boom or a third boom of a crane.
- The working equipment further comprises a plurality of
actuators 12, arranged to be operated by hydraulic fluid discharged from at least onehydraulic pump 14 and further arranged to move the two ormore arm members 6 of themovable arm arrangement 4 during a working assignment, e.g. a loading/unloading procedure. Infigure 2 , the hydraulic fluid discharged from the at least onepump 14 to the plurality ofactuators 12 and further to provide movements to thearm members 6, is indicated by block arrows. Also, asensor system 16 is included in the working equipment, that comprises a plurality of sensors for sensing measures of various parameters of themovable arm arrangement 4. Infigure 2 , the sensing measures of various parameters are indicated by a block arrow from thearm arrangement 4 to thesensor system 16. - The working
equipment 2 also comprises anequipment controller 18 configured to receive arm member tip commands 20, comprising characteristics of wanted movements of thearm member tip 10, such as a direction of movement for thearm member tip 10, and to receivesignals 22 from thesensor system 16, to determine and monitor current position of thearm member tip 10, and one or many of relative positions of the two ormore arm members 6, position configurations and movement velocities of thearm member connections 8. Additional examples of characteristics of wanted movements of thearm member tip 10 may be a parameter indicating a relative speed of the movement. - The equipment controller is also configured to control movements of the two or
more arm members 6 in accordance with the received arm member tip commands 20, by generating and applyingoperating signals 24 controlling the flow and/or pressure of hydraulic fluid to the plurality ofactuators 12. The operating signals 24 are applied to a hydraulic system controlling the supply and return of hydraulic oil to the chambers of at least some of theactuators 12. The hydraulic system comprises thehydraulic pump 14 which may be controlled by the operating signals 12 as well as other hydraulic components for controlling direction and/or flow and/or pressure of the hydraulic fluid that are supplied and returned from the chambers of at least some of theactuators 12, this includes hydraulic valves and control valves. Hydraulic components controlling the inlet and outlet at theactuators 12 may also form part of this hydraulic system. - The
equipment controller 18 is further arranged to monitor the required flow of hydraulic fluid from the at least onepump 14 for the movements of the two ormore arm members 6 and to apply an adaption rule to maintain the required flow below a predetermined maximum flow limit and to comply with the received armmember tip command 20 when generating the operating signals 24. - In one embodiment, the
equipment controller 18 is arranged to apply an adaption rule when generating the operating signals 24 to control the flow to the plurality ofactuators 12 for moving each of the two ormore arm members 6. By applying the adaption rule in this embodiment, various parameters for setting the flow and/or pressure of the hydraulic fluid at theactuators 12 are scaled and prioritized, thereby resulting in smooth movements of thearm member tip 10. - The predetermined maximum flow limit is preferably equal to or less than a maximal flow of hydraulic fluid discharged from said at least one
hydraulic pump 14. - In another embodiment, the adaption rule is a rule to maximise the velocity of the
arm member tip 10, and the workingequipment 2 is further arranged to apply the adaption rule to maximase the velocity when generatingoperating signals 24 to increase the required flow and comply with the received armmember tip command 20. - With references to
figure 4 , an illustrative example of a procedure for pump flow distribution in the context of CTC operation of a crane arm having four different joints will be described. The joints may be of any type, as earlier explained. For the sake of this example, the first joint may be the slew of the crane arm's crane column, the second joint may be the pivoting joint of the first boom connected to the crane column, the third joint may be the pivoting joint of the second boom connected to the first boom and the fourth joint may be the telescopic extension/retraction of the second boom (the second boom is here a telescopic boom). The procedure comprises a number of steps C1-C5. - C1. Conversion from joint position velocities of the four joints (these input joint position velocities being calculated according a CTC control method based on input of wanted crane tip movements) (denoted q̇ 1 - q̇ 4) to joint commands in % (denoted cmd1 [%]-cmd4 [%]). These joint commands are corresponding to the commands that would have been received from a crane operator if he or she would have operated the individual joints in the same manner as was calculated using the CTC control method.
- C2. Conversion of joint commands to requested flow Q in l/min (denoted Q 1-Q 4) using oil need parameter (30) for the requested movement (positive or negative; extension or retraction of the involved actuators controlling the joints) of each of the joints.
- C3. Scaling the requested flow to a scaled requested flow (denoted SQ 1-SQ 4) and calculating accumulated flow based on available pump flow (34), joint priorities (32) and oil need parameter (30).
- C4. Conversion from scaled requested flow to scaled joint commands (denoted Scmd 1-Scmd 4).
- C5. Conversion of the scaled joint commands to scaled joint velocities. This is the inverse of the conversion performed in step C1. In addition to this a
PFD speed factor 38 may also be calculated and output from this procedure. ThePFD speed factor 38 is calculated using an accumulated prioritizedflow 36 summing the scaled requested flow from all the four joints in this example. This accumulated prioritizedflow 36 is then compared to the available flow from the pump(s) and the PFD speed factor then reflects if there in fact is a possibility to increase flow consumption and thereby achieve increase the resulting speed of the crane tip. However, if the procedure is used for achieve a high precision in the crane tip position then the PFD speed factor will not be used to increase the speed of the crane tip. - As earlier explained with reference to
figure 4 , the oil need parameters for the wanted movements of the joints is denoted 30, joint priority function(s) is denoted 32, pump flow is denoted 34, accumulated prioritized flow is denoted 36, and the PFD speed factor is denoted 38. - The procedure for pump flow distribution in the context of CTC operation of a crane arm, described above, is an example of how an
equipment controller 18 may apply an adaption rule when generating operation signals 24. In that example the adaption rule is applied to the calculated joint velocities calculated by a CTC control algorithm to achieve scaled joint velocities. The scaled joint velocities are then transformed into operation signals 24 by theequipment controller 18. - In the following, an exemplary procedure is provided to be used in order to adapt the generated operating signals 24 according to the adaption rule, the exemplary procedure essentially corresponds to the steps C1-C5 described above. Input to the procedure are joint velocities calculated through CTC, as known in the art and earlier described based on received sensor values describing current joint positions and characteristics of wanted movements received through arm members tip commands by the
equipment controller 18. In this exemplary procedure, schematically described as procedure steps I-VI and with references tofigure 4 , theequipment controller 18 is configured to:
Step I - Convert joint velocities, calculated by using CTC, for the respective connection functions of themovable arm arrangement 4 to operating signal commands in % for all involved connection functions. - This step may be performed by estimating the relationship between these parameters for each connection function using only few parameter values:
- 1. Maximum ± connection function velocity at
t 100%. - 2. Minimum ± connection function velocity at ± deadband.
- Deadband is referred as a value of a command input via e.g. a lever on a
remote control unit 26 ±X% at which an arm member connection is started to move. - Given the above-mentioned parameters and joint velocities, the remote lever command is calculated as if an operator was operating each function manually.
-
Figure 3 shows an estimation of such a relationship for a first boom joint. The first curve S1 shows measured points at lever of remote control unit in % [±O,± 10,±20,±30,±40, t50,t60,t70,t80,t 90,±100] and joint velocity estimated at corresponding commands. The second curve S2 shows estimated relationship using only above-mentioned parameters. The curves essentially follow each other, i.e. this estimation is close enough to give an estimate of lever command. - Step II - Convert the operating signal commands in % to requested flows Q (e.g. in l/min), preferably in a linear manner, using a hydraulic fluid need parameter for positive or
negative movement 30. - As an example, if the operating signal command to request flow is made in a linear manner, a command of 10% will request 10% of maximum flow required for a connection function.
- Step III - Convert the requested flows Q to scaled flows sQ for all involved connection functions, by scaling the requested flows up/down for all involved connection functions. More specifically, as in normal PFD control feature, slew can be kept at highest priority, so that the requested slew flow will not be scaled down or up, and only do so on the rest of the connection functions. The scaling request flow down/up of each of the connection functions, can be equally distributed among all, or one or more connection functions may be prioritized.
- In CTC, there are typically two functions to create a straight line other than slew. From the CTC algorithm it is known which those functions are, and the priority may be set based on optimization goals, such as maximize the crane tip velocity, or position accuracy, or energy efficiency. This is advantageous in that various possibilities may be tested and switched in/between whenever needed.
- Step IV - Convert the scaled flows sQ to scaled operating signal commands, and calculate accumulated flow after scaling down the operating signal commands.
- Step V - Convert scaled operating signal commands to scaled connection velocities for all involved connection functions, by applying the relationship previously discussed (see
figure 3 where an exemplary relationship is shown) related to respective arm member connection as an inverse function given the scaled operating signal command. - Step VI - Apply adaption rule to achieve the determined scaled connection velocities for all involved connection functions.
- The scaling in step III of the requested flows up/down for all involved connection functions is performed either by equally distributing the flow between all involved connection functions, or by prioritising one or more of the involved connection functions, based upon the optimization goal of the adaptation rule. If needed to comply with the received arm member tip command for e.g. linear tip movements this may further be considered in the scaling and/or prioritization.
- In one variation of the above procedure, the accumulated flow is calculated based on summing the scaled flows sQ of the different connection functions. The
equipment controller 8 is then further arranged to calculate an accumulatedflow speed factor 38 for the involved connection functions, and based on priority of speed factor, either increase or decrease the arm member tip velocity. - Various exemplary embodiments and variations will be discussed in the following.
-
- If the total accumulated pump flow after the scaling is still less than the total available pump flow then it may also be calculated (in percentage) how much is remaining and adding more speed to the arm member tip velocity in order to always maximise the usage of the available pump flow.
- If instead it is required to increase the arm member tip position precision, this extra speed factor may be disabled.
- Taking an example with a loader crane, a first connection function may be the slew of the crane arm's crane column, a second connection function may be the pivoting joint of the first boom connected to the crane column, a third connection function may be the pivoting joint of the second boom connected to the first boom and a fourth connection function may be the telescopic extension/retraction of the second boom (the second boom is here a telescopic boom). The crane tip velocity in X, Y and Z coordinates may for this example be calculated using following equation (Equation 2):
where, - q1 is slew arm member connection angle in radians,
- q2 is first boom arm member connection in radians,
- q3 is second boom arm member connection angle in radians,
- q4 is second boom extension arm member connection position in meters,
- q1_dot is first boom arm member connection velocity in radians/s
- q2_dot is slew arm member connection velocity in radians/s
- q3_dot is second boom arm member connection velocity in radians/s
- q4_dot is second boom extension arm member connection velocity in m/s
- Calculations of Crane Tip Velocity Factor with PFD Scaled arm member connection velocities:
Given arm member connection positions measurements and scaled arm member connection velocities by CTCPFD, the new crane tip velocity is calculated usingEquation 2 that is in meter/second, and it is possible to convert that into meter per interval by multiplying with system sample time (Δt). See equation 3: - Calculations of Maximum Crane Tip Velocity Factor:
The maximum crane tip velocity can be set using a parameter called TipMaxVelParam that allows user to specify maximum velocity limit that is in meter per second, and it is possible to convert that into meter per interval by multiplying with system sample time (Δt). See equation 4: - Calculations of Minimum Crane Tip Velocity Factor:
A fixed minimum crane tip velocity factor cannot be set to zero, and it is therefore assumed that it is equal to the 50% of maximum crane tip velocity factor. This does not guarantee that this assumption is correct. What is guaranteed is that if TipMaxVelParam is less than or equal to second boom extension arm member connection velocity in m/s, an improvement is identified. And this factor cannot be set equal to zero, because in this case, the crane tip might never move. To overcome this, a PFD speed factor is determined and used as described in the following equation (Equation 5): -
- If an operator desires precision in positions over speed, then it is possible to disable this additional speed factor PFD. The tip will then move step-wise as fast as possible given present joint configuration, velocities and available pump flow.
- According to another embodiment, the adaption rule is:
- a rule to maximise the velocity of the
arm member tip 10, or - a rule to prioritise the accuracy of the position of the
arm member tip 10, or - a rule to prioritise the energy efficiency in the movement of the
arm member tip 10. - The rule to prioritize accuracy is applied if not the speed factor is used to scale up the velocity of the
arm member tip 10 as much as possible. - The rule to prioritize energy efficiency would for example be based on which crane functions to give priority to, and which functions to allow operating at the same time, to reduce the operating time with functions having a mismatch in the pressure and/or flow, when operating with a single pump system, or other strategies to minimize or optimize the energy consumption of the movements of an arm arrangement.
- The working equipment preferably further comprises a
remote control unit 26, e.g. a handheld remote control unit, configured to receive the arm member tip commands 20 of wanted arm member tip movements from an operator and to transmit the arm member tip commands 20 as arm member tip command signals 28 to theequipment controller 18. This embodiment is shown by dashed lines infigure 2 . Theremote control unit 26 may further be configured to receive an adaption rule command from the operator by selecting one of the at least one adaption rule to be applied by theequipment controller 18. As an example, the adaption rule may alternatively be activated, added, selected and/or enabled as part a configuration procedure of theequipment controller 18. - In a preferred application, the hydraulically
movable arm arrangement 4 is a crane arm arrangement comprising one or many crane booms, telescopic booms, and crane boom extensions, that preferably is mounted to avehicle 1, such as a truck. Thecrane arm arrangement 4 may also be arranged to be mounted to any other object, e.g. a boat, a building, a wind turbine. - The
crane arm members 6 includes thearm member tip 10 arranged at a free end of an outermost crane boom. - More particularly, the
arm members 6 may comprise a crane column arranged to rotate, or slew, around a vertical axis perpendicular to the plane of the vehicle, a first (inner) boom connected to the crane column, and a second (outer) telescopic boom connected to the first boom and provided with one or more extensions. Additional components, such as additional telescopic booms (also referred to as jibs) or crane tool may form part of the crane components. - Furthermore, the working equipment comprises
hydraulic actuators 12 arranged to be operated by hydraulic fluid having a hydraulic flow, where the hydraulic fluid being discharged from the at least onehydraulic pump 14. The hydraulic actuators are further arranged to apply movements to the crane arm arrangement such that thecrane tip 10 is moved from a current position to a target position in response to received operating signals 24. - The crane also comprises a
sensor system 16 configured to monitor current positions of the crane components, and to generatesensor signals 22 in response to the monitored current positions and operating conditions. - Thus, the sensor system is configured to monitor current positions of the crane components, and comprises sensors arranged to measure e.g. an angle of a crane boom compared to a reference plane, or the extension length of the telescopic boom (individual extension of a boom extension or the extension of the telescopic boom as a whole). The sensor system is also configured to monitor the operating conditions of the system of the hydraulic actuators and the hydraulic pump, and to generate sensor signals in response to measured pressures and flows at specific parts of the hydraulic system. The sensor system is hence used to monitor current positions and operating conditions of the crane.
- The present invention also relates to a method of a working
equipment 2 arranged to be mounted to e.g. avehicle 1. The working equipment has been described in detail above and it is herein referred to that description. The method will now be described with references to the flow diagram shown infigure 5 . - Thus, the method comprises:
- receiving arm member tip commands 20, comprising characteristics of wanted movements of the
arm member tip 10, such as a direction of movement for thearm member tip 10; - receiving signals 22 from the
sensor system 16, to determine and monitor current position of thearm member tip 10, one or many of relative positions of the two ormore arm members 6, and position configurations and movement velocities of thearm member connections 8, - controlling movements of the two or
more arm members 6 in accordance with the received arm member tip commands 20, by generating and applyingoperating signals 24 controlling the flow and/or pressure of hydraulic fluid to the plurality ofactuators 12. - The method further comprises, monitoring, by the
equipment controller 18, the required flow of hydraulic fluid from the at least onepump 14 for the movements of the two ormore arm members 6 and applying an adaption rule to maintain the required flow below a predetermined maximum flow limit and to comply with the received armmember tip command 20, when generating the operating signals 24. - In the following, some embodiments of the method are listed. In the flow diagram, embodiments are shown within dashed lines. These embodiments have the same technical features and advantages as for the corresponding features of the working equipment described above. Consequently, these technical features and advantages are not repeated or explained anew in order to avoid unnecessary repetition.
- In one embodiment, the method comprises applying said adaption rule when generating the operating signals 24 to control the flow to the plurality of
actuators 12 for moving each of the two ormore arm members 6 by scaling, and prioritizing parameters in calculations performed when applying said adaption rule, thereby resulting in smooth movements of saidarm member tip 10. - In a further embodiment, the predetermined maximum flow limit is equal to or less than a maximal flow of hydraulic fluid discharged from the at least one
hydraulic pump 14. - In another embodiment, the adaption rule is a rule to maximise the velocity of the
arm member tip 10, and the method then comprises applying said adaption rule to maximise the velocity when generatingoperating signals 24 to increase the required flow and comply with the received armmember tip command 20. - In a further embodiment, the adaption rule is:
- a rule to maximise the velocity of the
arm member tip 10, or - a rule to prioritise the accuracy of the position of the
arm member tip 10, or - a rule to prioritise the energy efficiency in the movement of the
arm member tip 10. - The present invention is not limited to the above-described preferred embodiments. Various alternatives, and modifications may be used. Therefore, the above embodiments should not be taken as limiting the scope of the invention, which is defined by the appending claims.
Claims (13)
- A working equipment (2) comprising:- a hydraulically movable arm arrangement (4) comprising two or more movable arm members (6) having an arm member configuration, and which are articulately connected to each other via arm member connections (8), such as arm member joints and telescopic boom extensions, and having associated connection functions, and an arm member tip (10) at a free end of the utmost of said two or more movable arm members (6);- a plurality of actuators (12), arranged to be operated by hydraulic fluid discharged from at least one hydraulic pump (14) and further arranged to move the two or more arm members (6) of the movable arm arrangement (4) during a working assignment;- a sensor system (16) comprising a plurality of sensors for sensing measures of various parameters of said movable arm arrangement (4), and- an equipment controller (18) configured to:characterized in that the equipment controller (18) is further arranged to monitor the required flow of hydraulic fluid from the at least one pump (14) for the movements of the two or more arm members (6) and to apply an adaption rule to maintain the required flow below a predetermined maximum flow limit and to comply with the received arm member tip command (20) when generating the operating signals (24).- receive arm member tip commands (20), comprising characteristics of wanted movements of the arm member tip (10), such as a direction of movement for the arm member tip (10),- receive signals (22) from the sensor system (16), to determine and monitor current position of the arm member tip (10), one or many of relative positions of the two or more arm members (6), and position configurations and movement velocities of said arm member connections (8),- control movements of the two or more arm members (6) in accordance with the received arm member tip commands (20), by generating and applying operating signals (24) controlling the flow and/or pressure of hydraulic fluid to the plurality of actuators (12),
- Working equipment (2) according to claim 1, wherein the equipment controller (18) is arranged to apply said adaption rule when generating the operating signals (24) to control the flow to the plurality of actuators (12) for moving each of the two or more arm members (6) by scaling, and prioritizing parameters in calculations performed when applying said adaption rule, thereby resulting in smooth movements of said arm member tip (10).
- Working equipment (2) according to claim 1 or 2, wherein said predetermined maximum flow limit is equal to or less than a maximal flow of hydraulic fluid discharged from said at least one hydraulic pump (14).
- Working equipment (2) according to any of claims 1-3, wherein the adaption rule is a rule to maximise the velocity of the arm member tip (10), and the working equipment (2) is further arranged to apply said adaption rule to maximase the velocity when generating operating signals (24) to increase the required flow and comply with the received arm member tip command (20).
- Working equipment (2) according to any of claims 1-4, wherein the adaption rule is:- a rule to maximise the velocity of the arm member tip (10), or- a rule to prioritise the accuracy of the position of the arm member tip (10), or- a rule to prioritise the energy efficiency in the movement of the arm member tip (10).
- Working equipment (2) according to any of claims 1-5, further comprising a remote control unit (26) configured to receive said arm member tip commands (20) of wanted arm member tip movements from an operator and to transmit the arm member tip commands (20) as arm member tip command signals (28) to the equipment controller (18), and wherein the remote control unit (26) further is configured to receive an adaption rule command from the operator by selecting one of said at least one adaption rule to be applied by the equipment controller (18).
- Working equipment (2) according to any of claims 1-6, wherein the hydraulically movable arm arrangement (4) is a crane arm arrangement comprising one or many crane booms, telescopic booms, and crane boom extensions.
- A vehicle (1) comprising a working equipment (2) according to any preceding claim.
- A method of a working equipment (2), the working equipment comprises:- a hydraulically movable arm arrangement (4) comprising two or more movable arm members (6) having an arm member configuration, and which are articulately connected to each other via arm member connections (8), such as arm member joints and telescopic boom extensions, and having associated connection functions, and an arm member tip (10) at a free end of the utmost of said two or more movable arm members (6);- a plurality of actuators (12), arranged to be operated by hydraulic fluid discharged from at least one hydraulic pump (14) and further arranged to move the two or more arm members (6) of the movable arm arrangement (4) during a working assignment;- a sensor system (16) comprising a plurality of sensors for sensing measures of various parameters of said movable arm arrangement (4), and- an equipment controller (18), wherein the method comprises:characterized in that the method further comprises, monitoring, by said equipment controller (18), the required flow of hydraulic fluid from the at least one pump (14) for the movements of the two or more arm members (6) and applying an adaption rule to maintain the required flow below a predetermined maximum flow limit and to comply with the received arm member tip command (20) when generating the operating signals (24).- receiving arm member tip commands (20), comprising characteristics of wanted movements of the arm member tip (10), such as a direction of movement for the arm member tip (10),- receiving signals (22) from the sensor system (16), to determine and monitor current position of the arm member tip (10), one or many of relative positions of the two or more arm members (6), and position configurations and movement velocities of said arm member connections (8),- controlling movements of the two or more arm members (6) in accordance with the received arm member tip commands (20), by generating and applying operating signals (24) controlling the flow and/or pressure of hydraulic fluid to the plurality of actuators (12),
- The method according to claim 9, comprising applying said adaption rule when generating the operating signals (24) to control the flow to the plurality of actuators (12) for moving each of the two or more arm members (6) by scaling, and prioritizing parameters in calculations performed when applying said adaption rule, thereby resulting in smooth movements of said arm member tip (10).
- The method according to claim 9 or 10, wherein said predetermined maximum flow limit is equal to or less than a maximal flow of hydraulic fluid discharged from said at least one hydraulic pump (14).
- The method according to any of claims 9-11, wherein the adaption rule is a rule to maximise the velocity of the arm member tip (10), and the method comprises applying said adaption rule to maximise the velocity when generating operating signals (24) to increase the required flow and comply with the received arm member tip command (20).
- The method according to any of claims 9-12, wherein the adaption rule is:- a rule to maximise the velocity of the arm member tip (10), or- a rule to prioritise the accuracy of the position of the arm member tip (10), or- a rule to prioritise the energy efficiency in the movement of the arm member tip (10).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP23197085.6A EP4524081A1 (en) | 2023-09-13 | 2023-09-13 | Working equipment with a hydraulically operated arm arrangement, and a method related to the working equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP23197085.6A EP4524081A1 (en) | 2023-09-13 | 2023-09-13 | Working equipment with a hydraulically operated arm arrangement, and a method related to the working equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4524081A1 true EP4524081A1 (en) | 2025-03-19 |
Family
ID=88021067
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23197085.6A Pending EP4524081A1 (en) | 2023-09-13 | 2023-09-13 | Working equipment with a hydraulically operated arm arrangement, and a method related to the working equipment |
Country Status (1)
| Country | Link |
|---|---|
| EP (1) | EP4524081A1 (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6498973B2 (en) | 2000-12-28 | 2002-12-24 | Case Corporation | Flow control for electro-hydraulic systems |
| JP4107694B2 (en) * | 1997-02-18 | 2008-06-25 | 株式会社タダノ | Control device for work equipment |
| JP4308617B2 (en) * | 2003-09-30 | 2009-08-05 | 株式会社アイチコーポレーション | Boom type work vehicle horizontal and vertical movement control device |
| US20210231140A1 (en) | 2018-04-24 | 2021-07-29 | Putzmeister Engineering Gmbh | Method for Controlling the Movement of a Boom, and Work Machine |
| EP3929141A1 (en) * | 2020-06-24 | 2021-12-29 | Hiab AB | Working equipment with electrically powered hydraulically operated arm arrangement |
| EP4086216A1 (en) | 2021-05-04 | 2022-11-09 | Hiab AB | An energy efficient crane, and a method of the crane |
-
2023
- 2023-09-13 EP EP23197085.6A patent/EP4524081A1/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4107694B2 (en) * | 1997-02-18 | 2008-06-25 | 株式会社タダノ | Control device for work equipment |
| US6498973B2 (en) | 2000-12-28 | 2002-12-24 | Case Corporation | Flow control for electro-hydraulic systems |
| JP4308617B2 (en) * | 2003-09-30 | 2009-08-05 | 株式会社アイチコーポレーション | Boom type work vehicle horizontal and vertical movement control device |
| US20210231140A1 (en) | 2018-04-24 | 2021-07-29 | Putzmeister Engineering Gmbh | Method for Controlling the Movement of a Boom, and Work Machine |
| EP3929141A1 (en) * | 2020-06-24 | 2021-12-29 | Hiab AB | Working equipment with electrically powered hydraulically operated arm arrangement |
| EP4086216A1 (en) | 2021-05-04 | 2022-11-09 | Hiab AB | An energy efficient crane, and a method of the crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7912584B2 (en) | Power consumption estimation apparatus | |
| JP4795228B2 (en) | Crane or excavator with optimal movement guidance for handling rope-loaded luggage | |
| RU2344923C1 (en) | Lifting arm intellectual control device | |
| EP3361007B1 (en) | Construction machinery | |
| US6282891B1 (en) | Method and system for controlling fluid flow in an electrohydraulic system having multiple hydraulic circuits | |
| US12208723B2 (en) | Crane, a vehicle, and a method of the crane | |
| US11230821B2 (en) | Construction machine | |
| EP0905325A1 (en) | Control device of construction machine | |
| KR102728877B1 (en) | Method for controlling movement of boom and working machine | |
| US11920325B2 (en) | Construction machine | |
| JP7762227B2 (en) | Method for open-loop and/or closed-loop control of a vehicle-connected lifting device - Patent application | |
| US11105066B2 (en) | Work machine | |
| JP7114429B2 (en) | construction machinery | |
| CN109375584A (en) | Boom joint control method and system and construction machinery including the system | |
| US6915599B2 (en) | System for controlling movement of a work machine arm | |
| EP4524081A1 (en) | Working equipment with a hydraulically operated arm arrangement, and a method related to the working equipment | |
| CN114237048A (en) | Intelligent operation track planning system for polar region ship unmanned crane and operation method thereof | |
| EP4086216B1 (en) | An energy efficient crane, and a method of the crane | |
| CN102701122B (en) | A high-altitude vehicle operation stop control method, device, system and a high-altitude vehicle | |
| EP4086215B1 (en) | An energy efficient crane, and a method of the crane | |
| CN118510716A (en) | Method for indirectly determining the push-out length of at least one telescopic push arm of a telescopic boom | |
| JP2024526649A (en) | Method and system for controlling movement of an adjustable distributor boom and method for dispensing building materials and/or dense materials with a building material and/or dense materials pumping device having an adjustable distributor boom | |
| RU2819298C2 (en) | Method of controlling and/or adjusting a lifting device associated with a vehicle | |
| RU2832093C2 (en) | Method for indirect determination of extension length of at least one telescopic section of telescopic boom | |
| US20250320883A1 (en) | Method and System for Controlling a Total Movement of a Distribution Boom, and Method for Distributing Construction Material and/or Thick Matter by Means of a Construction Material and/or Thick Matter Pump Device Having a Distribution Boom |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20250918 |




