- EP4511938A1 EP4511938A1 EP23722841.6A EP23722841A EP4511938A1 EP 4511938 A1 EP4511938 A1 EP 4511938A1 EP 23722841 A EP23722841 A EP 23722841A EP 4511938 A1 EP4511938 A1 EP 4511938A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- module
- winding
- impedance
- voltage
- electrical equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/10—Regulating voltage or current
- G05F1/12—Regulating voltage or current wherein the variable actually regulated by the final control device is AC
- G05F1/14—Regulating voltage or current wherein the variable actually regulated by the final control device is AC using tap transformers or tap changing inductors as final control devices
- G05F1/147—Regulating voltage or current wherein the variable actually regulated by the final control device is AC using tap transformers or tap changing inductors as final control devices with motor driven tap switch
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F29/00—Variable transformers or inductances not covered by group H01F21/00
- H01F29/02—Variable transformers or inductances not covered by group H01F21/00 with tappings on coil or winding; with provision for rearrangement or interconnection of windings
- H01F29/04—Variable transformers or inductances not covered by group H01F21/00 with tappings on coil or winding; with provision for rearrangement or interconnection of windings having provision for tap-changing without interrupting the load current
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J3/1878—Arrangements for adjusting, eliminating or compensating reactive power in networks using tap changing or phase shifting transformers
Definitions
- the invention relates to a method for changing a gear ratio, an impedance or a voltage used for excitation of an electrical equipment and a device for changing a gear ratio, an impedance or a voltage used for excitation of an electrical equipment.
- reactive power control represents an essential component of safe, efficient and loss-minimized network management.
- Suitable operating resources are already known from the prior art both for network regulation in the steady-state range and for dynamic voltage regulation.
- controllable transformers, phase shifters or controllable shunt reactors are used to control stationary network operation.
- static synchronous compensators (STATCOM) or static reactive power compensators (SVC) are used to control dynamic network behavior.
- the resources for control in the dynamic range will become increasingly relevant in the foreseeable future for a secure supply of network operations due to the energy transition and the integration of decentralized energy generation into network operations, since the feed-in from renewable energies is less easy to plan.
- the improved concept is based on the idea of combining a classic tap changer, as is well known from the prior art, with a power electronic tap changer in series. Since the power electronic tap changer can change its switching position quickly, namely in the millisecond range, and can assume any position, it enables the voltage to be quickly adjusted to rapidly changing load conditions.
- the steady state range is operated with the classic tap changer, covering the largest possible control range. In this way, a great deal of flexibility can be achieved for network management as well as system and process management.
- a method for changing a gear ratio, an impedance or a voltage used for excitation of an electrical equipment includes at least one main winding, a control winding with winding taps and at least one partial winding.
- the electrical equipment includes a tap changer for changing the gear ratio, the impedance or the voltage used for excitation of the electrical equipment.
- the electrical equipment can be designed as a controllable transformer, in particular as a phase shifter transformer, as a controllable choke or as a controllable transformer with a capacitor.
- the tap changer comprises a first module for connecting the winding taps of the control winding and a second module with semiconductor switching elements for quickly connecting, counter-switching or bridging the at least one partial winding.
- the at least one partial winding has a specific number of turns, which is preferably greater than the largest number of turns present between two adjacent winding taps of the control winding.
- the number of turns of the several partial windings can be integer multiples of one another.
- the first module is designed as an on-load tap changer for uninterrupted switching between different winding taps of the control winding of the electrical equipment and has a selector for power-free preselection of the winding tap of the electrical equipment to which switching is to be made, as well as a diverter switch for the actual, uninterrupted switching from the the previously connected winding tap to the new, preselected winding tap.
- the selector usually has two movable selector contacts, which cover the winding taps.
- the diverter switch usually has switching contacts and resistors for the actual load transfer.
- the switching contacts are designed, for example, as vacuum interrupters.
- the resistors serve to limit the circulating current flowing briefly in the diverter switch during the switching process and are also referred to as switching resistors.
- the second module comprises at least one, in the event that the electrical equipment has several partial windings, preferably several sub-modules with semiconductor switching elements. At least one partial winding is assigned to each sub-module and each sub-module is designed for quick connection, counter-connection or bridging of the assigned partial winding.
- the semiconductor switching elements each comprise a thyristor or IGBT pair connected in anti-parallel.
- the method of changing the gear ratio, impedance or to The voltage of the electrical equipment used for excitation has the following steps: a) receipt of a request to change the gear ratio, the impedance or the voltage used for excitation of the electrical equipment, b) checking at least one relevant parameter, c) changing the gear ratio, the impedance or the voltage used for excitation of the electrical equipment either by means of the first module or by means of the second module depending on the testing of the at least one relevant parameter.
- the relevant parameter comprises an amount of deviation of an actual voltage of the electrical equipment, for example the voltage on the primary or secondary side of a transformer, from a predetermined target voltage.
- the transmission ratio is changed by means of the second module if the amount of deviation from the target voltage is greater than a step voltage present between two adjacent winding taps of the control winding.
- the electrical equipment is designed as a controllable transformer.
- the change in the transformation ratio of the transformer i.e. the adjustment to the desired target voltage on the primary or secondary side of the transformer, is carried out with the second module when the amount of the voltage to be regulated or the desired voltage change is so large that the change cannot be achieved by operating the first module.
- the relevant parameter comprises an amount of deviation of an impedance of the electrical equipment from a predetermined target impedance.
- the impedance is changed by means of the second module if the amount of deviation from the target impedance is greater than an impedance acting between two adjacent winding taps of the control winding.
- the electrical equipment is designed as a controllable throttle.
- the change in the impedance of the choke i.e. the adjustment to the desired target impedance
- the relevant parameter comprises an amount of deviation of an actual voltage in a first inductive arrangement for exciting a second inductive arrangement from a predetermined target voltage.
- the actual voltage is measured, for example, on the primary side of the first inductive arrangement or the secondary side of the second inductive arrangement.
- the voltage used for excitation of the second inductive arrangement is then adjusted using the second module if the amount of deviation from the target voltage is greater than a step voltage present between two adjacent winding taps of the control winding.
- the electrical equipment comprises a first inductive arrangement and a second inductive arrangement.
- the actual voltage in the first inductive arrangement excites the second inductive arrangement and thereby increases the performance of the first inductive arrangement.
- an exciter transformer a first inductive arrangement
- a booster transformer a second inductive arrangement
- the setting of the voltage used to excite the booster transformer is carried out here using the second module if the amount of the desired voltage to excite the booster transformer is so large that the change is not achieved by actuating the first module can be.
- the electrical equipment can be designed as a phase shifter and the first inductive arrangement can be designed as an excitation transformer and the second inductive arrangement can be designed as a booster transformer.
- the method can therefore also be used analogously for the operation of a phase shifter transformer.
- the relevant parameter comprises the gradient of a required voltage change.
- the transmission ratio is changed using the second module if the gradient of the required voltage change is greater than a specified limit value.
- the electrical equipment is designed as a controllable transformer.
- the change in gear ratio of the transformer i.e. the adaptation to the desired target voltage on the primary or secondary side of the transformer, is carried out with the second module if the gradient of the required voltage change is so high, for example a required rate of change of the voltage in the millisecond range, that a change in the transformation ratio with the first Module could not run fast enough.
- the set limit is, for example, one second.
- the relevant parameter comprises the gradient of a required impedance change.
- the impedance is changed using the second module if the gradient of the required impedance change is greater than a specified limit value.
- the electrical equipment is designed as a controllable throttle.
- the change in the impedance of the choke i.e. the adaptation to the desired target impedance
- the second module when the gradient of the required impedance change is so high, for example a required rate of change of the impedance in the millisecond range, that a change in the impedance occurs the first module could not be executed fast enough.
- the set limit is, for example, one second.
- the relevant parameter comprises a fundamental oscillation plus a component of harmonics of a voltage applied to the electrical equipment.
- the gear ratio is changed using the second module if the proportion of harmonics is greater than a specified limit value.
- the electrical equipment is designed as a controllable transformer.
- the change in the transformation ratio of the transformer i.e. the adjustment to the desired target voltage on the primary or secondary side of the transformer, is carried out with the second module when the proportion of harmonics above the fundamental wave of the voltage applied to the transformer is so high that the harmonics can no longer be controlled with the first module.
- the definition of the limit value depends on the respective system configuration and the grid connection conditions.
- the proportion of harmonics above the fundamental oscillation of the voltage applied to the electrical equipment is determined Voltage, a Fourier analysis was carried out.
- the first and second modules are actuated such that the second module assumes a neutral position in which the at least one partial winding is bridged .
- Bridged i.e. H. at potential, but not carrying current.
- the semiconductor switching elements of the second module are connected to one another in such a way that a bypass is formed for the at least one partial winding.
- the first and second modules are operated alternately.
- the first and second modules are operated alternately until the first module has reached a position that indicates a new, stationary operating point of the energy supply network, and the second module is in the neutral position.
- the first module is tightened in stages by adjusting the winding ratio by switching between the winding taps of the control winding with the first module and thereby switching out the at least one partial winding again by gradually actuating the semiconductor switching elements of the second module.
- the tap changer is then in a position in which the first module has resumed the new stationary operating point and the second module is in the neutral position.
- the advantage of this embodiment is that the tap changer is then again in a starting position in which current no longer flows through the at least one partial winding, and the full control range is again available to the second module in both directions starting from the neutral position.
- the first module and the second module are actuated in such a way that the second module assumes a first end position from which the entire dynamic control range of the second module from the first end position to a second end position is available.
- the first end position of the second module there is at least one Partial winding of the control winding is switched on, ie the turns of the partial winding are added to the control winding, and in the second end position the partial winding of the control winding is switched against, ie the turns of the partial winding are subtracted from the control winding.
- the advantage of this embodiment is that the entire control range of the second module is available for specific network requirements that require a quick response in one direction.
- the first module and the second module are not activated at the same time.
- a device for changing a gear ratio, an impedance or a voltage used for excitation of an electrical equipment is provided.
- the device is preferably designed to carry out a method according to the first aspect of the invention.
- the electrical equipment has at least one main winding, a control winding with winding taps, at least one partial winding and a tap changer for changing the gear ratio, the impedance or the voltage used for excitation of the electrical equipment.
- the device comprises at least one sensor for measuring a voltage present at a suitable measuring point and/or at least one sensor for measuring a current flowing at a suitable measuring point.
- the device has an evaluation unit which is designed to carry out a method according to the first aspect of the improved concept.
- the tap changer comprises a first module for connecting the winding taps of the control winding and a second module with semiconductor switching elements for quick connection, counter-switching or bridging of the at least one partial winding.
- the first module includes a first control unit and the second module includes a second control unit.
- the evaluation unit is designed to actuate the first control unit and the second control unit.
- the first module is designed as an on-load tap changer for uninterrupted switching between the different winding taps of the control winding of the electrical equipment and has a selector for the power-free preselection of the winding tap of the electrical equipment to which switching is to be made, as well as a diverter switch for the actual, uninterrupted switching of the previously connected winding tap to the new, preselected winding tap.
- the selector usually has two movable selector contacts, which cover the winding taps.
- the diverter switch has mechanical switching contacts, for example vacuum interrupters, for the actual load transfer.
- the first control unit is designed as a motor drive that actuates the selector contacts and the switching contacts of the on-load tap changer.
- the second module comprises at least one, in the event that the electrical equipment has several partial windings, preferably several sub-modules with semiconductor switching elements. At least one partial winding is assigned to each sub-module and each sub-module is designed for quick connection, counter-connection or bridging of the assigned partial winding.
- the second control unit is designed to actuate the at least one or more sub-modules or their associated semiconductor switching elements in a suitable manner, such that the at least one or more partial windings are quickly switched on or off the control winding or are bridged .
- the second control unit is designed, for example, as a microcontroller.
- Figure 1 shows a first embodiment of a device according to the improved concept in a schematic representation
- Figure 2 shows a second embodiment of the device in a schematic representation
- Figure 3 shows a third embodiment of the device in a schematic representation
- Figure 4 shows a fourth embodiment of the device in a schematic representation
- Figure 5 shows a fifth embodiment of the device in a schematic representation
- Figure 6 shows a sixth embodiment of the device in a schematic representation
- Figure 7 shows a preferred embodiment of a method according to the improved concept
- Figure 8 shows a control range of a tap changer in a device according to an embodiment of the method according to the improved concept
- Figure 9 shows a further control range of a tap changer in a device according to a further embodiment of the method according to the improved concept.
- the device 1 is used to change the transmission ratio of an electrical equipment 14, which is designed here as a single-phase controllable transformer.
- the controllable transformer 14 has a main winding 2, a control winding 3 with n winding taps and two partial windings 4 and 5 on the primary or secondary side.
- the partial winding 5 has a larger number of turns than the partial winding 4, for example three times as many turns.
- the number of turns of the partial winding 4, and consequently also that of the partial winding 5 is greater than the largest number of turns available between two adjacent winding taps, for example between n and n + 1, of the control winding 3.
- the number of partial windings is not limited to two. In principle, several partial windings can also be provided, the number of windings of which can each have an integer multiple of the partial winding 4.
- the first module 7 is preferred as an on-load tap changer consisting of a selector for power-free preselection of the winding taps n, n+1 and a load changeover switch for uninterrupted switching from the previously connected winding tap n to the new, preselected winding tap n+1.
- the on-load tap changer can have a preselector, which can be designed as a coarse step or turner.
- the first module 7 is shown in a very simplified manner in FIG.
- the device 1 also has a voltage sensor 9 and a current sensor 10.
- the voltage sensor 9 is arranged here, for example, on the high-voltage terminal of the main winding 2 and is designed to measure the equipment voltage or actual voltage.
- the current sensor 10 is between the second module 8 and one Load derivation 15 arranged and designed to measure the current flowing between the second module 8 and the load derivation 15.
- FIG. 1 A second embodiment of the device 1 according to the invention is shown schematically in FIG. With regard to the device 1 from FIG. 2, reference is made to the previous explanations of the device from FIG. 1 in an analogous manner and only the differences from the device from FIG.
- FIG. 2 shows a device 1 for changing the impedance of an electrical equipment 14, which is designed here as a controllable throttle. Such arrangements are used to control reactive power in the energy supply network.
- a control winding 3 with n winding taps and two partial windings 4 and 5 the controllable throttle 14 also has a coarse step winding 16 and a coarse step controller 17.
- the coarse stage controller 17 can assume a first position in which it contacts a first end A of the coarse stage winding 16 and a second position in which it contacts a second end B of the coarse stage winding 16. If the coarse step controller 17 is in the first position, no current flows through the coarse step winding 16.
- the device 1 regulates the consumption of reactive power from the network.
- FIG. 3 shows a third embodiment of the device 1 according to the invention shown schematically.
- the device 1 from FIG. 3 reference is made to the previous explanations of the device from FIGS. 1 and 2 in an analogous manner and only the differences will be discussed below.
- FIG. 3 shows a device 1 for changing the transmission ratio of an electrical equipment 14, which is designed here as a controllable transformer 14 with a connected capacitor 18.
- the controllable transformer 14 can, for example, include a series winding 19, a control winding 3 and a main winding 2 with load derivation 15.
- the capacitor 18 is arranged between the first module 7 and the second module 8 of the tap changer 6.
- FIG. 4 shows a fourth embodiment of the device 1 according to the invention schematically, which, like FIG. 3, shows a device 1 for changing the transmission ratio of an electrical equipment 14, which is designed as a controllable transformer 14 with a connected capacitor 18. Therefore, reference will be made here in an analogous manner to the previous explanations of the device from FIGS. 1, 2 and 3 and only the differences will be discussed below.
- controllable transformer 14 comprises a main winding 2, a control winding 3 with n winding taps, two partial windings 4 and 5 and an additional coarse step winding 16 with a coarse step controller 17.
- a capacitor 18 for controlling capacitive reactive power into the energy supply network is in an electrical line 20 arranged, which branches off between the main winding 2 and the coarse stage winding 16 and ends in a load transfer 15.
- FIG. 1 A fifth embodiment of the device 1 according to the invention is shown schematically in FIG. With regard to the device 1 from Figure 5, reference is made to the previous explanations of the device from Figures 1, 2, 3 and 4 in an analogous manner and only the differences will be discussed below.
- FIG. 5 shows a device 1 for changing the voltage used to excite an electrical equipment 14, which is used, for example, in arc furnace applications.
- the electrical equipment 14 here consists of a first inductive arrangement 22, which is designed as an excitation transformer, and a second inductive arrangement 23, which is designed as a booster transformer.
- the excitation transformer 22 includes a main winding 2, a control winding 3 with n winding taps and two partial windings 4 and 5.
- the booster transformer 23 has a Primary winding 24 and a secondary winding 25, with an arc furnace 21 being arranged on the secondary side.
- the control winding 3 of the excitation transformer 22 is electrically conductively connected to the primary winding 24 of the booster transformer 23.
- the voltage of the excitation transformer 22, which is used to excite the booster transformer 23, is regulated via the tap changer 6.
- the first module 7 or the second module 8 is used.
- FIG. 6 A sixth embodiment of the device 1 according to the invention is shown schematically in FIG. With regard to the device 1 from FIG. 6, reference is made to the previous explanations of the device from FIGS. 1, 2, 3, 4 and 5 in an analogous manner and only the differences will be discussed below.
- Figure 6 shows a further device 1 for changing the voltage used to excite an electrical equipment 14, as used, for example, in arc furnace applications.
- the electrical equipment 14 consists of a first inductive arrangement 22, which is designed as an excitation transformer, and a second inductive arrangement 23, which is designed as a booster transformer.
- the excitation transformer 22 has a primary winding 26 and a secondary winding 27 and the booster transformer 23 has a control winding 24 on the primary side.
- the secondary winding 27 of the excitation transformer 22 is electrically connected to the control winding 24 or to the primary side of the booster transformer 23.
- the voltage excited by the excitation transformer 22 in the booster transformer 23 is regulated by means of the tap changer 6.
- FIG. 7 shows a flowchart of an advantageous embodiment of a method according to the improved concept. The method is carried out using a device according to one of the embodiments, as already explained in connection with FIGS. 1 to 6.
- a request to change the gear ratio, the impedance or the voltage used for excitation of an electrical equipment 14 is received.
- This request can come from a higher-level system, for example a control center of an energy supply network operator, or from an on-site control device, such as for example a voltage regulator.
- a step b at least one relevant parameter is checked and in a step c, the transmission ratio, the impedance or the voltage used for excitation of the electrical equipment is changed 14 by means of the first module 7 or the second module 8 of the tap changer 6 depending on the test of the at least one relevant parameter.
- Steps b and c are carried out by means of the evaluation unit 13, which controls either the first control unit 11 or the second control unit 12 depending on the test carried out in step b.
- the relevant parameter can be an amount of deviation of an actual voltage of the electrical equipment 14 from a predetermined target voltage.
- the actual voltage or the operating medium voltage is measured using the voltage sensor 9 and the measured value is compared with the specified target voltage using the evaluation unit 13.
- the transmission ratio is changed by means of the second module 8 if the amount of deviation from the target voltage is greater than a step voltage present between two adjacent winding taps of the control winding 3, for example between n and n+1.
- Another example of a relevant characteristic that can be checked is an amount of deviation of an impedance of the electrical equipment 14 from a predetermined target impedance.
- the impedance of the electrical equipment 14 is determined based on current values measured with the current sensor 10 and the determined value is compared with a predetermined target impedance by means of the evaluation unit 13.
- the impedance is changed by means of the second module 8 if the amount of deviation from the target impedance is greater than an impedance acting between two adjacent winding taps n, n+1 of the control winding 3.
- relevant parameters are the gradient of a required voltage change, the gradient of a required impedance change or the amount of a deviation of an actual voltage in a first inductive arrangement 22 for exciting a second inductive arrangement 23 from a predetermined target voltage.
- the first module 7 and the second module 8 are alternately actuated until the first module 7 reaches a position has reached, which indicates a new, stationary operating point of a power supply network or a process-driven system, and the second module 8 is in a neutral position in which the partial windings 4 and 5 are bridged, ie at potential, but no current flows through them.
- the first module 7 is “tightened” in stages.
- the first module 7 switches one level up (+1) and the second module switches one level down again (- 1 ).
- the first module 7 switches one step up again (+1) and the second module 8 switches one step down again (-1).
- the first module 7 is two steps higher than before and the second module 8 is back in its neutral position.
- FIG 8 what was described above is illustrated in relation to a variable impedance. Shown here is the control range of a tap changer 6, more precisely the reactive power control range. The percentage of the reactive power of the inductive equipment 14 is plotted on the y-axis.
- the position of the first module 7 of the tap changer 6 can be read on the x-axis, i.e. which winding tap n of the control winding 3 is contacted by the first module 7 of the tap changer 6.
- the points 28 mark the possible positions that the first module 7 can assume, with the regulation taking place in the steady state range, i.e. every minute.
- the point 30 represents the stationary operating point, which is set via the first module 7 according to this embodiment.
- the area extending vertically upwards and downwards from points 28 and 30, which is limited by lines 29, is the control area that the second module 8 covers.
- the control is carried out quickly by means of the second module 8, namely in the millisecond range, in both directions, so that dynamic fluctuations in the network or in a system can be reacted flexibly and quickly.
- the fast, but also cost-intensive, semiconductor switching elements do not have to be dimensioned for the entire control range of the tap changer 6, but only for the area that needs to be regulated quickly.
- FIG. 9 shows a further control range of a tap changer 6, more precisely the reactive power control range, according to a further embodiment of the method.
- the impedance or the voltage used for excitation by means of the second module 8 are actuated in such a way that the second module 8 assumes a first end position in which the windings of the partial windings 4 and 5 are either both added to the control winding 3 or subtracted from it.
- the respective end position represents the operating point 30.
- the entire dynamic control range of the second module 8 is available starting from the operating point 30 in one direction, namely from the first end position to the second end position or vice versa. This version is advantageous for certain network requirements that require the tap changer 6 to react quickly in one direction.
- the combination of a classic on-load tap changer, a first module, with a power electronic tap changer, a second module enables the realization of a large control range with a cost-effective and space-saving arrangement at high potential.
- the second module for fast control in the dynamic control range which is more expensive than the first module, can be designed to be optimized for the respective application. Consequently, the second module can only be designed accordingly for that part of the control for which the power electronics-based second module offers an advantage due to its speed of sound.
- the combined solution is significantly more space-saving than a purely power electronics-based solution.
- a large degree of flexibility can be achieved with a comparatively small space requirement for network management and furnace operation.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Automation & Control Theory (AREA)
- Control Of Electrical Variables (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102022111762.6A DE102022111762A1 (de) | 2022-05-11 | 2022-05-11 | Verfahren und vorrichtung zum ändern eines übersetzungsverhältnisses, einer impedanz oder einer zur erregung verwendeten spannung |
| PCT/EP2023/060610 WO2023217517A1 (de) | 2022-05-11 | 2023-04-24 | Verfahren und vorrichtung zum ändern eines übersetzungsverhältnisses, einer impedanz oder einer zur erregung verwendeten spannung |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP4511938A1 true EP4511938A1 (de) | 2025-02-26 |
Family
ID=86330987
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23722841.6A Pending EP4511938A1 (de) | 2022-05-11 | 2023-04-24 | Verfahren und vorrichtung zum ändern eines übersetzungsverhältnisses, einer impedanz oder einer zur erregung verwendeten spannung |
Country Status (6)
| Country | Link |
|---|---|
| EP (1) | EP4511938A1 (de) |
| JP (1) | JP2025515710A (de) |
| KR (1) | KR20250009984A (de) |
| CN (1) | CN119174076A (de) |
| DE (1) | DE102022111762A1 (de) |
| WO (1) | WO2023217517A1 (de) |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5166597A (en) * | 1991-08-08 | 1992-11-24 | Electric Power Research Institute | Phase-shifting transformer system |
| US5408171A (en) * | 1991-10-21 | 1995-04-18 | Electric Power Research Institute, Inc. | Combined solid-state and mechanically-switched transformer tap-changer |
| DE4437143C1 (de) | 1994-10-18 | 1995-12-21 | Reinhausen Maschf Scheubeck | Stufenwähler mit Mehrfach-Grobwähler für einen Stufenschalter |
| UA112302C2 (uk) | 2010-12-17 | 2016-08-25 | Машіненфабрік Райнхаузен Гмбх | Ступеневий перемикач |
| US9417639B2 (en) * | 2014-03-24 | 2016-08-16 | Brandon & Clark, Inc. | Non-bridging position tap changer control and method of operation |
| DE102014106322B4 (de) * | 2014-05-06 | 2017-02-09 | Maschinenfabrik Reinhausen Gmbh | Anlage und Verfahren zum Bereitstellen von Blindleistung |
| US9600004B2 (en) * | 2015-02-09 | 2017-03-21 | General Electric Company | System and method for regulation of voltage on an electrical network |
| US10666053B2 (en) * | 2017-12-21 | 2020-05-26 | Eaton Intelligent Power Limited | Control system for voltage regulation device |
-
2022
- 2022-05-11 DE DE102022111762.6A patent/DE102022111762A1/de active Pending
-
2023
- 2023-04-24 WO PCT/EP2023/060610 patent/WO2023217517A1/de not_active Ceased
- 2023-04-24 JP JP2024566243A patent/JP2025515710A/ja active Pending
- 2023-04-24 KR KR1020247038159A patent/KR20250009984A/ko active Pending
- 2023-04-24 EP EP23722841.6A patent/EP4511938A1/de active Pending
- 2023-04-24 CN CN202380039549.9A patent/CN119174076A/zh active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| JP2025515710A (ja) | 2025-05-20 |
| US20250330018A1 (en) | 2025-10-23 |
| KR20250009984A (ko) | 2025-01-20 |
| WO2023217517A1 (de) | 2023-11-16 |
| DE102022111762A1 (de) | 2023-11-16 |
| CN119174076A (zh) | 2024-12-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE69826243T2 (de) | Transformator mit spannungsregelungsmitteln | |
| EP2332229B1 (de) | Windenergieanlagenprüfeinrichtung | |
| EP0152002B1 (de) | Phasenschieber | |
| EP3417523B1 (de) | Verfahren zum steuern eines regeltransformators und elektrische anlage zum koppeln zweier wechselstromnetze | |
| WO2002086647A2 (de) | Anordnung zur automatischen netzbeeinflussung und motorantrieb für eine solche anordnung | |
| EP2837091B1 (de) | Regeltransformator | |
| DE102008048258A1 (de) | Windpark und Verfahren zum Betreiben eines Windparks | |
| DE102009014243A1 (de) | Ortsnetztrafo, bzw. Schaltung für einen elektrischen Verteiltransformator | |
| WO2024017645A1 (de) | Elektrisches betriebsmittel mit stufenschalter | |
| WO2010049185A1 (de) | Anordnung und verfahren zur phasenanschnitt-steuerung | |
| DE112009001732T5 (de) | System zum Regeln einer Lastspannung in Leistungsverteilungsstromkreisen und Verfahren zum Regeln einer Lastspannung in Leistungsverteilungsstromkreisen | |
| EP0169488B1 (de) | Transformatorschaltung | |
| EP0023366A1 (de) | Transformator zum steuerbaren Verschieben der Phasenwinkel der Ausgangsspannungen gegenüber den Phasenwinkeln der Eingangsspannungen | |
| WO2023217505A1 (de) | Vorrichtung und verfahren zur anpassung eines phasenwinkels einer spannung in einer übertragungsleitung | |
| WO2015169692A2 (de) | Anlage und verfahren zum bereitstellen von blindleistung | |
| WO2023217517A1 (de) | Verfahren und vorrichtung zum ändern eines übersetzungsverhältnisses, einer impedanz oder einer zur erregung verwendeten spannung | |
| EP1398867B1 (de) | Vorrichtung zur Spannungserhaltung eines elektrischen Wechselspannungsnetzes sowie Verfahren zum Betrieb einer solchen Vorrichtung | |
| WO2001033308A1 (de) | Verfahren zur regelung der elektrischen spannung sowie einrichtung zur durchführung des verfahrens | |
| EP2389723B1 (de) | Verfahren zur parallelsteuerung von transformatoren mit stufenschaltern | |
| DE102019112716A1 (de) | Antriebssystem für einen Schalter und ein Verfahren zum Antreiben eines Schalters | |
| EP2907210A2 (de) | Verfahren zur spannungsregelung eines transformators | |
| DE102012108363A1 (de) | Verfahren zum Ändern der Spannung in einem einphasigen Stromnetz und Transformatorschaltung zum Durchführen des Verfahrens | |
| DE102012103735A1 (de) | Erdschluss-System | |
| EP3367116B1 (de) | Verfahren und vorrichtung zur prüfung einer stromerzeugungseinheit | |
| EP3447602B1 (de) | Verfahren und vorrichtung zum regeln der spannung eines transformatorsystems |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20241118 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: REINHAUSEN GMBH |