EP4394250A1 - Capacity verification system and method of operation thereof - Google Patents
Capacity verification system and method of operation thereof Download PDFInfo
- Publication number
- EP4394250A1 EP4394250A1 EP23220343.0A EP23220343A EP4394250A1 EP 4394250 A1 EP4394250 A1 EP 4394250A1 EP 23220343 A EP23220343 A EP 23220343A EP 4394250 A1 EP4394250 A1 EP 4394250A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- temperature difference
- heat exchanger
- main heat
- anomalies
- verification system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H15/00—Control of fluid heaters
- F24H15/10—Control of fluid heaters characterised by the purpose of the control
- F24H15/104—Inspection; Diagnosis; Trial operation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N5/00—Systems for controlling combustion
- F23N5/24—Preventing development of abnormal or undesired conditions, i.e. safety arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H15/00—Control of fluid heaters
- F24H15/10—Control of fluid heaters characterised by the purpose of the control
- F24H15/112—Preventing or detecting blocked flues
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H15/00—Control of fluid heaters
- F24H15/20—Control of fluid heaters characterised by control inputs
- F24H15/212—Temperature of the water
- F24H15/215—Temperature of the water before heating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H15/00—Control of fluid heaters
- F24H15/20—Control of fluid heaters characterised by control inputs
- F24H15/212—Temperature of the water
- F24H15/219—Temperature of the water after heating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H15/00—Control of fluid heaters
- F24H15/40—Control of fluid heaters characterised by the type of controllers
- F24H15/414—Control of fluid heaters characterised by the type of controllers using electronic processing, e.g. computer-based
- F24H15/421—Control of fluid heaters characterised by the type of controllers using electronic processing, e.g. computer-based using pre-stored data
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/20—Arrangement or mounting of control or safety devices
- F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
- F24H9/2035—Arrangement or mounting of control or safety devices for water heaters using fluid fuel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23N—REGULATING OR CONTROLLING COMBUSTION
- F23N2225/00—Measuring
- F23N2225/08—Measuring temperature
- F23N2225/19—Measuring temperature outlet temperature water heat-exchanger
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/20—Arrangement or mounting of control or safety devices
- F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
- F24H9/2035—Arrangement or mounting of control or safety devices for water heaters using fluid fuel
- F24H9/2042—Preventing or detecting the return of combustion gases
Definitions
- the invention is a capacity verification system for a combustion boiler which comprises a main heat exchanger, a circulation pump, a fan wherein the fan supplies air/gas mixture to the main heat exchanger at least one inlet temperature sensor to measure the inlet water temperature entering to main heat exchanger, and at least one outlet temperature sensor to measure outlet water temperature exiting from the main heat exchanger
- the capacity verification system comprises a controller that detects anomalies in the operating conditions of the combustion boiler by comparing measured temperature difference between said sensors with predefined temperature difference corresponding to certain fan RPM values, while the heating water is circulated in the primary circuit.
- the controller is configured to estimate the anomalies caused by a blockage on an air/gas passage of heat exchanger or a flue pipe, in case the measured temperature difference is less than the predefined temperature difference.
- the controller estimate that the anomalies are caused by a blockage on a water passage on primary circuit or an anomaly of the circulation pump.
- the invention is also a capacity verification system operating method for a combustion boiler which comprises a main heat exchanger, a circulation pump, a fan wherein the fan supplies air/gas mixture to the main heat exchanger at least one inlet temperature sensor to measure inlet water temperature entering to main heat exchanger, and at least one outlet temperature sensor to measure outlet water temperature exiting from the main heat exchanger, and the method comprising the steps of
- the controller detects the anomalies which causes nominal capacity decrease in case the measured temperature difference is less than the predefined temperature difference, and the controller detects the anomalies which causes heat transfer efficiency decrease in case the measured temperature difference is greater than the predefined temperature difference.
- Figure 1 A schematic view of combustion boiler having capacity verification system.
- the predefined temperature difference (dTa) corresponding to certain fan RPM values should be uploaded to the software of the controller (18) for a precise comparison. If the predefined temperature difference (dTa) and fan RPM values are subject to change, a calibration of the software values may be applied.
- Predefined temperature difference (dTa) means the temperature difference (expected T1-T2) assigned at the design stage of the combustion boiler (10) in response to the specific fan RPM when the combustion boiler (10) is in domestic hot water mode.
- Measured temperature difference (dTo) represents the difference (actual T1-T2) of the values read by the outlet temperature sensor (16) and inlet temperature sensors (17) when the combustion boiler (10) is operating in the field in domestic water mode.
- Abnormal 1 It is the case when measured temperature difference (dTo) during operation is smaller than the predefined temperature difference (dTa). According to the fan speed at which the device operates, this fan (15) detects that it cannot provide the expected capacity at the speed at which it operates. As a result, the user/service is warned about the possibility of a blockage on the air side of the main heat exchanger (12) and excessive pressure loss in the flue gas line.
- Abnormal 2 It is the case when the measured temperature difference (dTo) operation is greater than the predefined temperature difference (dTa). It detects that less water passes through the main heat exchanger (12) than expected, according to the fan RPM at which the combustion boiler (10) operates. As a result, the user/service is warned about the possibility of a blockage on the water side of the main heat exchanger (12) or in the circuit, and the circulation pump (13) not working at the expected power.
- the controller (18) detects the anomalies which causes nominal capacity decrease in case the measured temperature difference (dTo) is less than the predefined temperature difference (dTa).
- the controller (18) estimate that the anomalies are caused by a blockage on an air/gas passage of heat exchanger or a flue pipe, in case the measured temperature difference (dTo) is less than the predefined temperature difference (dTa).
- the controller (18) detects the anomalies which causes heat transfer efficiency decrease.
- the controller (18) estimate that the anomalies are caused by a blockage on a water passage on primary circuit or an anomaly of the circulation pump (13).
- the capacity verification system operating method further comprises the step of notifying the user with a warning message about the anomalies in the operating conditions of the combustion boiler (10).
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Computer Hardware Design (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- Control Of Combustion (AREA)
Abstract
Description
- The present invention relates to a capacity verification system and method for detecting anomalies that may occur during operation by comparing the difference between heat exchanger inlet and outlet temperatures measured during field operation of boilers with a pre-assigned temperature difference value for specific fan revolutions.
- In order to explain the state of the art, we can describe some possible problems as follows. Having a blockage in boilers used for central heating and/or domestic hot water, in the pipes inside the boiler, in the water channels of the main heat exchanger and in the plate heat exchanger, or not working of the circulation pump at the expected capacity are common problems. These problems reduce the water flow rate in the boiler, prevent the efficient transfer of the heat generated by combustion to the water and reduce the heat transfer efficiency.
- In addition to these, in gas-fired boilers, accumulation of dirt in the combustion chamber and thus congestion, congestion in the chimney that discharges the combustion products, or increased pressure loss due to the use of a very long chimney are also among the frequently encountered problems in the field. These problems cause the nominal capacity of the boiler to decrease by reducing the flow rate of the combustion air-gas mixture in the main heat exchanger.
- In the known method, early diagnosis of these anomalies that reduce the boiler's heat transfer efficiency is impossible without using additional equipment to measure the water flow rate in the boiler. In addition, early detection of these anomalies that reduce the boiler's nominal capacity is impossible without using additional equipment to measure the gas or air flow rate entering the combustion chamber.
- In summary, in the known method, it is not possible to detect these anomalies before they cause any customer complaints and before the service/technician examines the product after this complaint. It is important to detect these anomalies before they get big enough to cause customer complaints and to take the necessary precautions for the efficient and safe use of the related device.
- In the utility model No.
CN211668039U , relates to a monitoring platform, in particular to a boiler safety monitoring platform, which comprises a data acquisition communication module used for acquiring data information of water inlet temperature, water inlet pressure, water outlet temperature, water storage pressure and gas leakage of a boiler; the data transmission module is used for transmitting the data information acquired by the data acquisition communication module; and the remote monitoring terminal is used for receiving the data transmitted by the data transmission module and displaying the received data information in real time. - In the patent No.
, control system is designed for use with gas or oilfired central heating boilers. The following variables are monitored by transducers: water temp., room temp., fan speed, air flow and selected room temp. The transducer outputs are fed to a central electronic processor which controls the fuel flow by means of a series of valves, and the air flow by fan motor control.NL8102571A - Although there are so many improvements in the art, there is no known method that can detect possible errors that is disclosed with the invention and problems caused by errors before the user realizes them. Therefore, in order to identify these problems in heating devices through a system and to convey this information to the user, it is necessary to determine the relationship between temperature difference and fan speed values by creating reference values and to interpret the difference according to the values read during the operation of the product in the field.
- The aim of the present invention is to determine the anomalies that may occur during the operation of combustion boilers and notify its users.
- In order to realize above purpose, the invention is a capacity verification system for a combustion boiler which comprises a main heat exchanger, a circulation pump, a fan wherein the fan supplies air/gas mixture to the main heat exchanger at least one inlet temperature sensor to measure the inlet water temperature entering to main heat exchanger, and at least one outlet temperature sensor to measure outlet water temperature exiting from the main heat exchanger wherein the capacity verification system comprises a controller that detects anomalies in the operating conditions of the combustion boiler by comparing measured temperature difference between said sensors with predefined temperature difference corresponding to certain fan RPM values, while the heating water is circulated in the primary circuit.
- In the preferred embodiment of the invention, mentioned controller is configured to detect the anomalies which causes nominal capacity decrease or heat transfer efficiency decrease in case the temperature difference is less or greater than the predefined temperature difference.
- The controller is configured to estimate the anomalies caused by a blockage on an air/gas passage of heat exchanger or a flue pipe, in case the measured temperature difference is less than the predefined temperature difference.
- In case the measured temperature difference is greater than the predefined temperature difference, then the controller estimate that the anomalies are caused by a blockage on a water passage on primary circuit or an anomaly of the circulation pump.
- The invention is also a capacity verification system operating method for a combustion boiler which comprises a main heat exchanger, a circulation pump, a fan wherein the fan supplies air/gas mixture to the main heat exchanger at least one inlet temperature sensor to measure inlet water temperature entering to main heat exchanger, and at least one outlet temperature sensor to measure outlet water temperature exiting from the main heat exchanger, and the method comprising the steps of
- measuring the inlet water temperature entering to the main heat exchanger, the outlet water temperature exiting from the main heat exchanger, and the fan RPM values while the heating water is circulated in the primary circuit,
- calculating measured temperature difference between the inlet water temperature and the outlet water temperature,
- comparing this measured temperature difference with predefined temperature difference corresponding to certain fan RPM values,
- according to the result obtained, determining the anomalies in the operating conditions of the combustion boiler.
- In a preferred capacity verification system operating method, in the step of identifying anomalies, it is evaluated whether the predefined temperature difference is greater or less than the measured temperature difference.
- According to the capacity verification system operating method, the controller detects the anomalies which causes nominal capacity decrease in case the measured temperature difference is less than the predefined temperature difference, and the controller detects the anomalies which causes heat transfer efficiency decrease in case the measured temperature difference is greater than the predefined temperature difference.
- After detecting the anomalies, the capacity verification system operating method also comprises the step of notifying user with a warning message about the anomalies in the operating conditions of the combustion boiler.
- The invention is also a combustion boiler having a main heat exchanger, a circulation pump, a fan wherein the fan supplies air/gas mixture to the main heat exchanger, at least one inlet temperature sensor to measure inlet water temperature entering to the main heat exchanger, and at least one outlet temperature sensor to measure outlet water temperature exiting from the main heat exchanger, and further comprises a capacity verification system mentioned above.
-
Figure 1 ; A schematic view of combustion boiler having capacity verification system. -
- 10. Combustion boiler
- 11. (Plate) heat exchanger
- 12. Main heat exchanger
- 13. Circulation pump
- 14. 3-way valve
- 15. Fan
- 16. Outlet temperature sensor
- 17. Inlet temperature sensor
- 18. Controller
- T1. Outlet water temperature
- T2. Inlet water temperature
- dTo. Measured temperature difference
- dTa. Predefined temperature difference
- The invention relates to a capacity verification system and operating method for a combustion boiler (10).
- According to the
Figure 1 , the combustion boiler comprises a main heat exchanger (12), a circulation pump (13), a fan (15) and the fan (15) supplies air/gas mixture to the main heat exchanger (12), at least one inlet temperature sensor (17) to measure inlet water temperature (T2) entering to main heat exchanger (12), and at least one outlet temperature sensor (16) to measure outlet water temperature (T1) exiting from the main heat exchanger (12). The capacity verification system comprises a controller (18) which is the key element of the verification system and managed by a software. The controller (18) detects anomalies in the operating conditions of the combustion boiler (10) by comparing the measured temperature difference (dTo) between mentioned sensors (16, 17) with the predefined temperature difference (dTa) corresponding to certain fan RPM values, while the heating water is circulated in the primary circuit. - The predefined temperature difference (dTa) corresponding to certain fan RPM values should be uploaded to the software of the controller (18) for a precise comparison. If the predefined temperature difference (dTa) and fan RPM values are subject to change, a calibration of the software values may be applied.
- A sample table is given below for detecting anomalies based on predefined temperature difference (dTa) and fan RPM values.
Table 1 Fan RPM Predefined temperature difference (dTa) Measured temperature difference (dTo) Result 10.000 rpm 20 °C ∼ 20 °C Normal 10.000 rpm 20 °C << 20 °C Abnormal 1 10.000 rpm 20 °C >> 20 °C Abnormal 2 - Predefined temperature difference (dTa) means the temperature difference (expected T1-T2) assigned at the design stage of the combustion boiler (10) in response to the specific fan RPM when the combustion boiler (10) is in domestic hot water mode.
- Measured temperature difference (dTo) represents the difference (actual T1-T2) of the values read by the outlet temperature sensor (16) and inlet temperature sensors (17) when the combustion boiler (10) is operating in the field in domestic water mode.
- While the combustion boiler (10) is operating in domestic water mode, the circulation pump (13) is always running at maximum RPM.
- Abnormal 1: It is the case when measured temperature difference (dTo) during operation is smaller than the predefined temperature difference (dTa). According to the fan speed at which the device operates, this fan (15) detects that it cannot provide the expected capacity at the speed at which it operates. As a result, the user/service is warned about the possibility of a blockage on the air side of the main heat exchanger (12) and excessive pressure loss in the flue gas line.
- Abnormal 2: It is the case when the measured temperature difference (dTo) operation is greater than the predefined temperature difference (dTa). It detects that less water passes through the main heat exchanger (12) than expected, according to the fan RPM at which the combustion boiler (10) operates. As a result, the user/service is warned about the possibility of a blockage on the water side of the main heat exchanger (12) or in the circuit, and the circulation pump (13) not working at the expected power.
- It detects that all of the energy of the water heated in the main heat exchanger (12) is not transferred to the domestic water through the plate heat exchanger (11) as it should be. As a result, the user/service is warned about the possibility that some of the water heated in the main heat exchanger (12) may be escaping to the central heating installation due to a malfunction in the 3-way valve (14).
- In sum, the capacity verification system operating method for a combustion boiler (10) comprising the steps of
- measuring the inlet water temperature (T2) entering to the main heat exchanger (12), the outlet water temperature (T1) exiting from the main heat exchanger (12), and the fan RPM values while the heating water is circulated in the primary circuit,
- calculating the measured temperature difference (dTo) between the inlet water temperature (T2) and the outlet water temperature (T1),
- comparing this measured temperature difference (dTo) with the predefined temperature difference (dTa) corresponding to certain fan RPM values,
- according to the result obtained, determining the anomalies in the operating conditions of the combustion boiler (10).
- In the step of identifying anomalies, it is evaluated whether the predefined temperature difference (dTa) is greater or less than the measured temperature difference (dTo).
- The controller (18) detects the anomalies which causes nominal capacity decrease in case the measured temperature difference (dTo) is less than the predefined temperature difference (dTa).
- The controller (18) estimate that the anomalies are caused by a blockage on an air/gas passage of heat exchanger or a flue pipe, in case the measured temperature difference (dTo) is less than the predefined temperature difference (dTa).
- In case the measured temperature difference (dTo) is greater than the predefined temperature difference (dTa), then the controller (18) detects the anomalies which causes heat transfer efficiency decrease.
- In case the measured temperature difference (dTo) is greater than the predefined temperature difference (dTa), then the controller (18) estimate that the anomalies are caused by a blockage on a water passage on primary circuit or an anomaly of the circulation pump (13).
- The capacity verification system operating method further comprises the step of notifying the user with a warning message about the anomalies in the operating conditions of the combustion boiler (10).
Claims (11)
- A capacity verification system for a combustion boiler (10) which comprises a main heat exchanger (12), a circulation pump (13), a fan (15) wherein the fan (15) supplies air/gas mixture to the main heat exchanger (12), at least one inlet temperature sensor (17) to measure inlet water temperature (T2) entering to main heat exchanger (12), and at least one outlet temperature sensor (16) to measure outlet water temperature (T1) exiting from the main heat exchanger (12) characterized in that the capacity verification system comprises a controller (18) that detects anomalies in the operating conditions of the combustion boiler (10) by comparing measured temperature difference (dTo) between said sensors (16, 17) with predefined temperature difference (dTa) corresponding to certain fan RPM values, while the heating water is circulated in the primary circuit.
- The capacity verification system according to Claim 1 wherein the controller (18) is configured to detect the anomalies which causes nominal capacity decrease in case the measured temperature difference (dTo) is less than the predefined temperature difference (dTa).
- The capacity verification system according to Claim 2 wherein the controller (18) is configured to estimate anomalies caused by a blockage on an air/gas passage of heat exchanger or a flue pipe, in case the measured temperature difference (dTo) is less than the predefined temperature difference (dTa).
- The capacity verification system according to Claim 1 wherein the controller (18) is configured to detect the anomalies which causes heat transfer efficiency decrease in case the measured temperature difference (dTo) is greater than the predefined temperature difference (dTa).
- The capacity verification system according to Claim 4 wherein the controller (18) is configured to estimate anomalies caused by a blockage on a water passage on primary circuit or an anomaly of the circulation pump (13), in case the measured temperature difference (dTo) is greater than the predefined temperature difference (dTa).
- A capacity verification system operating method for a combustion boiler (10) which comprises a main heat exchanger (12), a circulation pump (13), a fan (15) wherein the fan (15) supplies air/gas mixture to the main heat exchanger (12), at least one inlet temperature sensor (17) to measure inlet water temperature (T2) entering to main heat exchanger (12), and at least one outlet temperature sensor (16) to measure outlet water temperature (T1) exiting from the main heat exchanger (12), and
the method characterized by comprising the steps of- measuring the inlet water temperature (T2) entering to the main heat exchanger (12), the outlet water temperature (T1) exiting from the main heat exchanger (12), and the fan RPM values while the heating water is circulated in the primary circuit,- calculating measured temperature difference (dTo) between the inlet water temperature (T2) and the outlet water temperature (T1),- comparing this measured temperature difference (dTo) with predefined temperature difference (dTa) corresponding to certain fan RPM values,- according to the result obtained, determining the anomalies in the operating conditions of the combustion boiler (10). - The capacity verification system operating method according to Claim 6 wherein in the step of identifying anomalies, it is evaluated whether the predefined temperature difference (dTa) is greater or less than the measured temperature difference (dTo).
- The capacity verification system operating method according to Claim 6 wherein the controller (18) detects the anomalies which causes nominal capacity decrease in case the measured temperature difference (dTo) is less than the predefined temperature difference (dTa).
- The capacity verification system operating method according to Claim 6 wherein the controller (18) detects the anomalies which causes heat transfer efficiency decrease in case the measured temperature difference (dTo) is greater than the predefined temperature difference (dTa).
- The capacity verification system operating method according to Claim 6 wherein after detecting the anomalies, it further comprises the step of notifying user with a warning message about the anomalies in the operating conditions of the combustion boiler (10).
- A combustion boiler (10) having a main heat exchanger (12), a circulation pump (13), a fan (15) wherein the fan (15) supplies air/gas mixture to the main heat exchanger (12), at least one inlet temperature sensor (17) to measure inlet water temperature (T2) entering to the main heat exchanger (12), and at least one outlet temperature sensor (16) to measure outlet water temperature (T1) exiting from the main heat exchanger (12) characterized in that it further comprises a capacity verification system according to any one of Claims 1 to 5.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| TR202220829 | 2022-12-27 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP4394250A1 true EP4394250A1 (en) | 2024-07-03 |
| EP4394250B1 EP4394250B1 (en) | 2025-10-15 |
Family
ID=91370907
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23220343.0A Active EP4394250B1 (en) | 2022-12-27 | 2023-12-27 | Capacity verification system and method of operation thereof |
Country Status (1)
| Country | Link |
|---|---|
| EP (1) | EP4394250B1 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL8102571A (en) | 1981-05-26 | 1982-12-16 | Neom Bv | Electronically-controlled boiler control system - regulates flow of fuel and air, and has safety cut=outs which operate in fault conditions |
| EP2980506B1 (en) * | 2014-08-01 | 2016-06-29 | Rinnai Corporation | Hot water supply device |
| US10488042B2 (en) * | 2014-04-22 | 2019-11-26 | Kyungdong Navien Co., Ltd | Method for detecting blockage in exhaust flue of gas boiler |
| CN211668039U (en) | 2019-12-20 | 2020-10-13 | 拉萨市暖心供暖供气服务有限责任公司 | Boiler safety monitoring platform |
-
2023
- 2023-12-27 EP EP23220343.0A patent/EP4394250B1/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NL8102571A (en) | 1981-05-26 | 1982-12-16 | Neom Bv | Electronically-controlled boiler control system - regulates flow of fuel and air, and has safety cut=outs which operate in fault conditions |
| US10488042B2 (en) * | 2014-04-22 | 2019-11-26 | Kyungdong Navien Co., Ltd | Method for detecting blockage in exhaust flue of gas boiler |
| EP2980506B1 (en) * | 2014-08-01 | 2016-06-29 | Rinnai Corporation | Hot water supply device |
| CN211668039U (en) | 2019-12-20 | 2020-10-13 | 拉萨市暖心供暖供气服务有限责任公司 | Boiler safety monitoring platform |
Also Published As
| Publication number | Publication date |
|---|---|
| EP4394250B1 (en) | 2025-10-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4445638A (en) | Hydronic antitrust operating system | |
| WO2008097745A2 (en) | Water heater monitor/diagnostic display apparatus | |
| CN112393377A (en) | Fault judgment method and air conditioner | |
| WO2023139449A1 (en) | Method and system for checking the operation of an expansion vessel in a closed-circuit heating system | |
| KR101618245B1 (en) | a heat exchanger monitoring apparatus using wireless network and method thereof | |
| CN110895041A (en) | Drainage device, heat exchange equipment and drainage control method of heat exchange equipment | |
| EP4394250B1 (en) | Capacity verification system and method of operation thereof | |
| US12486988B2 (en) | Method for the predictive maintenance of primary circuit components of a boiler | |
| CN110388755B (en) | Wall-mounted furnace combustion control method and device, control equipment, medium and wall-mounted furnace | |
| JP3579440B2 (en) | Self-check method of temperature sensor in large capacity hot water supply system with combined heat source | |
| CN110836746A (en) | Method and device for safely detecting water flow in closed pipeline | |
| CN108895738A (en) | Heat pump unit control method adaptive to engineering water pump | |
| KR20220165969A (en) | Abnormality determination device and abnormality determination method for boiler | |
| TR2022020829A2 (en) | CAPACITY VERIFICATION SYSTEM AND WORKING METHOD | |
| JPH0658628A (en) | Capacity deterioration detecting method for circulating pump in hot-water boiler | |
| KR101994228B1 (en) | Method of sensing disengagement of hot water temperature sensor in heating boiler having an external hot water tank | |
| JP2681149B2 (en) | Data communication system for management of thermal equipment such as boilers | |
| CN213542626U (en) | Wall-mounted furnace capable of monitoring water circulation of heating system | |
| JP2017133723A (en) | Heating heat source machine | |
| KR20000032723A (en) | Method for sensing disorder of three-way valve of gas boiler | |
| JP3569583B2 (en) | Gas water heater with abnormality detection function | |
| EP4336105B1 (en) | A method for detecting air in a heating or cooling system, and a heating or cooling system | |
| EP4612471A1 (en) | A method for monitoring a check valve condition in a modular fluid-fluid heat transfer arrangement and a modular fluid-fluid heat transfer arrangement | |
| EP4483098B1 (en) | Method for controlling the operation of a gas boiler | |
| KR102884901B1 (en) | Abnormality determination device for boiler |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20241223 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: F24H 9/20 20220101ALI20250508BHEP Ipc: F24H 15/421 20220101ALI20250508BHEP Ipc: F24H 15/219 20220101ALI20250508BHEP Ipc: F24H 15/215 20220101ALI20250508BHEP Ipc: F24H 15/112 20220101ALI20250508BHEP Ipc: F24H 15/104 20220101ALI20250508BHEP Ipc: F23N 5/24 20060101AFI20250508BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20250522 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Ref country code: CH Ref legal event code: F10 Free format text: ST27 STATUS EVENT CODE: U-0-0-F10-F00 (AS PROVIDED BY THE NATIONAL OFFICE) Effective date: 20251015 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Free format text: CASE NUMBER: UPC_APP_7124_4394250/2025 Effective date: 20250915 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602023007547 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20251211 Year of fee payment: 3 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20260113 Year of fee payment: 3 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20251015 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1847234 Country of ref document: AT Kind code of ref document: T Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260115 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20251231 Year of fee payment: 3 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260115 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260215 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260216 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251015 |