EP4194096B1 EP21213227.8A EP21213227A EP4194096B1 EP 4194096 B1 EP4194096 B1 EP 4194096B1 EP 21213227 A EP21213227 A EP 21213227A EP 4194096 B1 EP4194096 B1 EP 4194096B1
Authority
EP
European Patent Office
Prior art keywords
fan
control device
control
cooled
predefined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP21213227.8A
Other languages
German (de)
French (fr)
Other versions
EP4194096A1 (en
Inventor
René Kreher
Falk Binder
Thomas Sporn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eppendorf SE
Original Assignee
Eppendorf SE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eppendorf SE filed Critical Eppendorf SE
Priority to EP21213227.8A priority Critical patent/EP4194096B1/en
Priority to JP2022187076A priority patent/JP7481415B2/en
Priority to US18/074,666 priority patent/US20230175755A1/en
Priority to CN202211562021.3A priority patent/CN116242091A/en
Publication of EP4194096A1 publication Critical patent/EP4194096A1/en
Application granted granted Critical
Publication of EP4194096B1 publication Critical patent/EP4194096B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/04Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection
    • F25D17/06Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection by forced circulation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B04CENTRIFUGAL APPARATUS OR MACHINES FOR CARRYING-OUT PHYSICAL OR CHEMICAL PROCESSES
    • B04BCENTRIFUGES
    • B04B15/00Other accessories for centrifuges
    • B04B15/02Other accessories for centrifuges for cooling, heating, or heat insulating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D29/00Arrangement or mounting of control or safety devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B04CENTRIFUGAL APPARATUS OR MACHINES FOR CARRYING-OUT PHYSICAL OR CHEMICAL PROCESSES
    • B04BCENTRIFUGES
    • B04B7/00Elements of centrifuges
    • B04B7/02Casings; Lids
    • B04B7/06Safety devices ; Regulating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D23/00General constructional features
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01LCHEMICAL OR PHYSICAL LABORATORY APPARATUS FOR GENERAL USE
    • B01L7/00Heating or cooling apparatus; Heat insulating devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2600/00Control issues
    • F25D2600/06Controlling according to a predetermined profile

Definitions

  • the invention relates to a method for operating a laboratory device cooled by means of a flammable refrigerant and a laboratory device which is cooled by means of a flammable refrigerant.
  • Refrigerated laboratory equipment must meet various safety requirements.
  • DIN EN 61010-2-011 standard specifies safety regulations for electrical measuring, control, regulation and laboratory devices.
  • the DIN EN 378 standard considers the life cycle of refrigeration systems, particularly with regard to system/equipment safety, but also, for example, with regard to installation areas of the systems, limit values for refrigerants or the protection of people in cold rooms.
  • the standard specifically addresses the flammability classes 1 (no flame spread), 2L (low flammability), 2 (flammable), 3 (highly flammable) for refrigerants, which are defined in the ISO 817 standard.
  • refrigerants include: E.g.: propane, (iso-)butane (flammability class 3); R152a (flammability class 2); R1234yf (flammability class 2L); R410A, R22 (flammability class 1).
  • ODP ozone depletion potential
  • GWP global warming potential
  • refrigerants that have favorable environmental properties in today's refrigerated laboratory equipment.
  • propane and (iso)butane extended safety precautions are necessary.
  • a safe environment within the machine is necessary.
  • the environment must remain safe even if a flammable refrigerant escapes, for example in the event of a leak, damage or malfunction.
  • WO 2019/238891 A1 describes a centrifuge and methods for preventing ignition of flammable temperature control media in centrifuges, especially after a crash of the centrifuge rotor. Monitoring is carried out to determine whether the pressure in the evaporator is below a predetermined minimum pressure and/or above a predetermined maximum pressure.
  • a centrifuge with a cooling device which is designed to cool a chamber of the centrifuge.
  • the cooling device contains a compressor.
  • a controller of the compressor motor performs intermittent control to switch ON-OFF the cooling function of the compressor when the speed of the compressor motor is less than a predetermined speed.
  • the present invention is based on the technical problem of improving the operational safety of cooled laboratory equipment that is cooled using a flammable refrigerant. Another technical problem on which the present invention is based is to implement a particularly fail-safe and reliable fan control and to detect defects in a fan particularly early and reliably.
  • a ventilation process can in particular have a defined minimum duration.
  • a first test operation by means of which, for example, proper functionality of the fan can be checked
  • a first safety operation by means of which, for example, refrigerant can be removed from the interior by the fan
  • the first control device and/or the fan can have a power supply that can be independent of other power supplies of other components or devices of the cooled laboratory device and/or can be activated independently of the other power supplies and/or can be designed separately.
  • the power supply can in particular, for example, have a separate cable harness.
  • the first control device can in particular have a particularly simple structure.
  • “Hardware-based” can mean in particular that all control commands are specified, defined and/or implemented on the hardware side in the first control device - for example by using electrical or electronic components.
  • “Hardware-based” can alternatively or additionally mean in particular that a function of the first control device can be achieved by a discretely constructed circuit and/or that a function of the first control device can be achieved by using standard components (in particular these can be standard electrical or electronic components).
  • the first control device can be a control device without a data interface and/or without a data memory.
  • the first control device can also, for example, only have a ROM memory.
  • Hardware-based in relation to the first control device can alternatively or additionally mean that the first control device has no software or no firmware. “Hardware-based” in relation to the first control device can alternatively or additionally mean that the first control device does not have a chip or memory on which software or firmware is stored. “Hardware based” can be in Reference to the first control device alternatively or additionally means that the first control device does not have any control algorithms or control commands that are stored on a chip or in a memory.
  • the first control device can in particular have an on/off switch or, in a particularly simple embodiment, consist of an on/off switch which can be coupled to an on/off switch of the laboratory device. For example, if the on/off switch of the laboratory device is switched on, the first control device can also be switched on automatically in such a way that the fan ventilates the interior area.
  • Venting can serve as a test run for the fan and also remove refrigerant from the interior.
  • Other (or all other) devices of the laboratory device that are to be supplied with electrical power can remain switched off at least - until it is automatically determined that the ventilation was successful and / or - until control of the fan has been handed over to a second control device and is automatically determined that the control of the fan by the second control device is successful.
  • the second control device can in particular be a control device that is a software and/or firmware-based control device. It can, for example, have a memory (e.g. a rewritable memory chip or a hard drive), for example with stored program commands and/or a measuring sensor system (e.g. a temperature sensor or a measuring probe for a concentration of the refrigerant) and/or a enable variable-speed control of the fan, for example by means of pulse width modulation, with the help of appropriate devices, for example with the help of stored characteristic curves, which can, for example, connect values of the temperature sensor or measuring probe with speeds.
  • a memory e.g. a rewritable memory chip or a hard drive
  • a measuring sensor system e.g. a temperature sensor or a measuring probe for a concentration of the refrigerant
  • a enable variable-speed control of the fan for example by means of pulse width modulation
  • the help of appropriate devices for example with the help of stored characteristic curves, which can,
  • the second control device is software-based, program commands can in particular be stored in a read-write memory.
  • the second control device can be designed to also activate the fan during normal operation of the cooled laboratory device steer. Normal operation of the cooled laboratory device can follow or follow the method according to the invention.
  • “Software-based” in relation to the second control device can alternatively or additionally mean that the second control device has software. “Software-based” in relation to the second control device can alternatively or additionally mean that the second control device has a chip or a memory on which software "Software-based” can alternatively or additionally mean in relation to the second control device that the second control device has control algorithms or control commands that are stored on a chip or in a memory (in particular on a read-write memory). .
  • “Firmware-based” in relation to the second control device can alternatively or additionally mean that the second control device has firmware.
  • firmware-based can alternatively or additionally mean that the second control device has a chip or a memory on which firmware is stored.
  • “Firmware-based” in relation to the second control device can alternatively or additionally mean that the second control device has control algorithms or control commands that are stored on a chip or in a memory (in particular on a read-only memory).
  • the second control device can be a control device in which the safety and/or reliability and/or correct function must first be proven through an approval process or certification process. Such a process can be very time-consuming and expensive. In addition, even small subsequent changes can therefore involve a lot of effort. For example, even small subsequent changes may require their own approval process or certification process.
  • the second control device can generally be connected to a device-side control device which controls the cooled laboratory device (and in particular a fan of the cooled laboratory device) during operation.
  • the second control device can be this device-side control device or a part of this device-side control device or can be connected to it or integrated into it. However, it is not excluded that the second control device can be a control device that is separate from the device-side control device.
  • the flammable refrigerant can in particular be a refrigerant of flammability class 2L, 2 or 3.
  • the flammable refrigerant can in particular be, for example, propane or butane or isobutane (flammability class 3).
  • Other refrigerants, including refrigerants with flammability classes 2L and 2, are not excluded.
  • the cooled laboratory device can be a device that has a cooling function during operation, for example for samples.
  • the cooled laboratory device can in particular have a refrigeration circuit in which the refrigerant is used.
  • the refrigeration circuit can in particular have an evaporator, a compressor (e.g. a compressor), a condenser (e.g. a condenser) and/or a throttle element.
  • the refrigeration circuit can in particular have connecting elements, seals and/or pipes.
  • the further device to be supplied with electrical power can be, for example, a component of the refrigeration circuit, for example the compressor, which can be designed as an electrically operated compressor, or for example a motor (e.g. of a centrifuge rotor).
  • the cooled laboratory device can in particular, for example, one Be a laboratory centrifuge or a laboratory freezer. Other devices and device types are not excluded.
  • Ventilating the interior area can in particular be ventilating the interior area, in particular so that any flammable refrigerant that may be present is completely or largely removed from the interior area.
  • Flammable refrigerant could be present in the interior area in situations in which, for example, a leak or a leak in the refrigeration circuit or a component of the refrigeration circuit occurs and as a result the flammable refrigerant has partially reached the interior area.
  • the interior area can be, for example, an interior area of a housing or a housing part or an interior area under, on, near or within a cover or an inner wall or an outer wall of the cooled laboratory device.
  • the interior region can, for example, contain at least one component or all components of the refrigeration circuit and/or be adjacent to at least one component or all components of the refrigeration circuit and/or be arranged close to at least one component of the refrigeration circuit.
  • the interior can also contain other components of the cooled laboratory device, for example electronics or a motor.
  • the interior area can, for example, have at least one opening to the outside, preferably several openings, to ensure air exchange with a space outside the interior area, in particular an outdoor area and/or an environment.
  • the fan can in particular be a fan or have a fan.
  • the fan can, for example, be an axial fan or an axial blower or have an axial fan or an axial blower.
  • the speed of the fan can in particular be controllable, so that different fan speeds are possible, for example by means of pulse width modulation (the term pulse width modulation can be understood as a synonym for the term pulse duration modulation).
  • the fan can be located, for example, at the opening to the outside.
  • the fan can preferably be integrated in particular into the cooled laboratory device. It is not excluded that the fan is designed as an external unit.
  • Controlling the fan over the first period can, in a simple implementation, mean that the fan turns on and stays on for the first period.
  • the fan can, for example, be controlled in such a way that it should reach and/or not fall below a first predefined fan speed over the first period of time.
  • the fan can have a speed determining device (e.g. a Hall sensor) for determining a tachometer signal and/or a number of revolutions per unit of time or can be connected to such a speed determining device.
  • the first period can, for example, be a predefined time period, for example 3-20 seconds, preferably 5-15 seconds, particularly preferably 8-10 seconds.
  • the first period can be dependent in particular on an interior volume and a volume flow of a fan used.
  • a count or measurement of the first period can be done automatically using a timing device that includes a timer.
  • the counting or measurement of the first period can alternatively or additionally be implemented using an analog or digital timer.
  • a count or measurement of the first period can begin as soon as the fan is switched on or running.
  • a count or measurement - in particular the start of a count or measurement - can be linked to a condition.
  • the first period or a time measurement can begin as soon as the fan is turned on and has reached a certain fan speed.
  • the first control device can, for example, have an on/off switch.
  • the on/off switch can be activated, for example, when the laboratory device is switched on.
  • the on/off switch can be coupled to an on/off switch of the laboratory device or can be the on/off switch of the laboratory device.
  • Carrying out the ventilation can be part of the switching on process of the laboratory device.
  • the ventilation can be carried out in particular before the further device of the cooled laboratory device to be supplied with electrical power (or several or all other devices of the cooled laboratory device to be supplied with electric power) are switched on or supplied with power.
  • the ventilation can in particular be carried out automatically. This can mean in particular that the intervention of a human user is not required to carry out the ventilation. If desired, a human user can initiate a switch-on process of the cooled laboratory device, for example by pressing the on/off switch of the laboratory device.
  • the first control device can in particular have a particularly simple structure. In particular, it can be hardware-based. Reference is made to the above explanations in this regard.
  • the first control device can in particular have a simple, hardware-implemented control logic that enables the fan to be operated at a specific fan speed, which can be a maximum speed of the fan or a specific fan speed. More complex versions of the first Control devices are not excluded.
  • the first control device and/or the fan can have a power supply device/devices (for example, this can be a cable, a connection, and/or a power supply unit), which are separate and/or independent and/or spatially separated from other power supply devices other facilities of the cooled laboratory device is/are.
  • the power supply device/s can, for example, have a separate line/separate lines and/or a separate external connection/separate external connections on the cooled laboratory device or a separate cable harness or connection/separate cable harnesses or connections within the cooled laboratory device.
  • the power supply device(s) can be connected independently of the other power supply devices.
  • the first predefined criterion can be checked in particular using a checking device.
  • the checking device can have a threshold switch, for example.
  • a threshold switch may include an electrical capacitor that is charged as soon as a certain fan speed is reached) and/or an alternative timer or time counter. As soon as, for example after the first period of time, a certain charge value of the electrical capacitor is reached and thus a certain voltage value on the electrical capacitor, the presence of the voltage value can be used as a signal that the checking using the first predefined criterion is successful. However, if the fan speed falls below a certain level, the electrical capacitor can be discharged again.
  • the checking device can alternatively or additionally have checking logic, for example implemented using a computing device (e.g. a processor). and corresponding commands, control rules and/or characteristics.
  • the checking device can also have a timer.
  • the checking device can alternatively or additionally, for example, have an AC voltage amplifier which charges energy into the electrical capacitor when the edges of a tachometer signal (corresponding to a fan speed signal) change. If a frequency of the edge changes (and thus the fan speed) is sufficiently high (e.g. equal to or above the specific fan speed), a higher electrical power enters the electrical capacitor than is withdrawn from it.
  • the checking device can also alternatively or additionally, for example, have an integrated circuit such as a retriggerable, monostable multivibrator or a monoflop.
  • the checking device can also alternatively or additionally z. B. have a counter or counter that defines a minimum time for ventilation (which can be the first period) in the form of a defined cycle duration. If the fan speed falls below the specified speed, the counter or counter can be reset, so that the counting process of the counter or counter must begin again.
  • the fan can have a speed measuring device for measuring a tachometer signal and/or a number of revolutions per unit of time or can be connected to such a speed measuring device.
  • Embodiments for speed measuring devices are known in the prior art; for example, speed measurement using a Hall sensor is possible.
  • the checking device can be part of the first control device or connected to it.
  • a power supply of the checking device can be connected to a power supply of the first control device.
  • the power supply of the checking device can be carried out using a power supply device that is separate and/or independent and/or spatially separated from other power supply devices of other devices of the cooled laboratory device.
  • the first predefined criterion may, for example, have a condition related to a fan speed and/or related to a period of time in which the fan should operate, for example, at a specific fan speed.
  • the first predefined criterion can - more specifically - be, for example, that a certain fan speed, which can also be referred to as the first predefined fan speed, for example, must be reached and/or not fallen below. Achieving and/or not falling below the first predefined fan speed can occur over a certain period of time, which is the first period of time can be required by the first predefined criterion.
  • the condition that a specific fan speed (which can be the first predefined fan speed) must be achieved over a specific period of time (which can be the first period of time) can be designed in such a way that experience has shown that at the specific fan speed and the specific period of time, that flammable refrigerant located in the interior area is completely or almost completely removed from the interior area. Ventilation can be considered successful in particular if the first predefined criterion has been met.
  • the second control device can in particular be a control device that is a software and/or firmware-based control device.
  • the second control device can be designed to implement demand-based control of the fan.
  • the second control device can have a measuring sensor system (e.g. a temperature sensor for determining a temperature value in the indoor area and/or in an outdoor area or a measuring probe for a concentration of the refrigerant), with the help of which a ventilation requirement can be determined - for example using integrated software -/firmware-defined rules and/or characteristics - and a corresponding fan speed can be determined.
  • a measuring sensor system e.g. a temperature sensor for determining a temperature value in the indoor area and/or in an outdoor area or a measuring probe for a concentration of the refrigerant
  • Handing over control of the fan can, for example, be handing over control over a power supply of the fan, for example using a transfer device, which can be, for example, a corresponding switch (e.g. an RS flip-flop) or a corresponding switch (e.g. an RS flip-flop) that triggers a corresponding switching process.
  • the switch can be triggered, for example, if a signal or a voltage value is output or is present at the electrical capacitor which indicates that the ventilation was successful.
  • the transfer device can also have an electronic control and/or a computing device (e.g. a processor) and/or a relay.
  • the handover can be carried out in particular when the first predefined criterion has been successfully met. If the first predefined criterion has not been successfully met or the ventilation was not successful, the particular consequence may be that the transfer is not carried out. In this case, for example, operation of the cooled laboratory device can be stopped or prevented, for example based on a predefined switch-off criterion, for example if after a predefined period of time the first predefined criterion has not been met. If If the ventilation was not successful, the cooled laboratory device can be switched off automatically or not switched on at all.
  • the second control device can generally have a more complex structure than the first control device, particularly if it is software and/or firmware-based. Since it has a particularly simple structure, the first control device can be particularly reliable or fail-safe, in particular more reliable or fail-safe or less error-prone than the second control device. The first control device is therefore well suited to initially ventilate the interior area in order to particularly reliably remove any flammable refrigerant that may be present from the interior area. In addition, it is advantageous that the risk of sparking is reduced, as explained above.
  • Whether the second predefined criterion has been met can be checked in particular using a further checking device, for example comprising a computing device (e.g. a processor) and commands, control rules and/or characteristics for checking the tacho signal of the fan and/or a timer .
  • a further checking device for example comprising a computing device (e.g. a processor) and commands, control rules and/or characteristics for checking the tacho signal of the fan and/or a timer .
  • the checking device with which the first predefined criterion is checked additionally checks whether the second predefined criterion has been met.
  • the further checking device can be part of the second control device or connected to it.
  • a power supply of the further checking device can be connected to a power supply of the second control device.
  • the power supply of the further checking device can be carried out using a power supply device that is separate and/or independent and/or spatially separated from further power supply devices of other devices of the cooled laboratory device.
  • the second predefined criterion may, for example, have a condition related to a fan speed and/or related to a period of time in which the fan should operate, for example, at a specific fan speed.
  • the second predefined criterion can - more concretely - be, for example, that a certain fan speed, which can also be referred to, for example, as a second predefined fan speed, must be reached and/or not fallen below. Reaching and/or not falling below the second predefined fan speed can be required by the second predefined criterion over a certain period of time.
  • the power supply for the at least one further device to be supplied with electrical power can be activated, for example, using an activation device, for example comprising a computing device (e.g. a processor) and corresponding commands. Activation can take place after a certain delay time, which for security reasons must have passed since the handover.
  • the delay time can be, for example, 5 seconds or 10 seconds.
  • the delay time can also be shorter, for example, e.g. B. 5-1 seconds.
  • the activation device can alternatively or additionally in particular have a switch, for example a relay, for activating a power supply for the at least one further device to be supplied with electrical power, or can be connected to such a switch. Activation can be carried out in particular when the second predefined criterion has been successfully met.
  • the term “further device to be supplied with electrical power” is to be understood in such a way that the fan itself is not included in this term.
  • the at least one further device to be supplied with electrical power can be any other component of the cooled laboratory device that is supplied with electrical power.
  • it can be a component of the refrigeration circuit, for example the compressor (which can be designed as a compressor, for example), a drive motor (for example if the cooled laboratory device is a centrifuge), a display or a control device.
  • Activating the power supply for the at least one further device to be supplied with electrical power can also mean that the cooled laboratory device is switched on - for example completely - so that operation of the cooled laboratory device (for example, if it is a centrifuge) is stopped operation) can begin.
  • the method can be designed in such a way that the activation of the power supply for the at least one component is not carried out or, for example, not in a predefined period of time or not before the cooled laboratory device is switched off and switched on again, if the control is carried out by the second control device or the second Tax procedure is not successful.
  • the step of ventilating the indoor area can be followed by the step of checking using the first predefined criterion.
  • the step of checking using the first predefined criterion can be followed by passing control.
  • the passing step can be checked using the second predefined criterion consequences.
  • the step of checking using the second predefined criterion can be followed by the step of activating.
  • the method can be designed so that the next step only follows when the previous step has been completed.
  • the presented method offers a simple and cost-effective way to improve the operational safety of refrigerated laboratory equipment that is cooled using a flammable refrigerant. Before there is a risk of sparking from the flammable refrigerant, venting the interior will remove any flammable refrigerant that may be present. Furthermore, a test run of the fan is carried out in order to detect a malfunction of the fan at an early stage.
  • a particularly fail-safe and independent hardware-based control controls the ventilation and a defect in the fan (for example a mechanical blockage or a Contact problem) can be detected early and reliably, especially before spark sources within the cooled laboratory device are activated.
  • the second control device It is also advantageous that a problem in the second control device can be recognized separately, with the second control device being able to realize a fan speed that meets requirements, in particular by means of pulse width modulation, provided it is designed accordingly. If necessary, the second control device is only activated in an advantageous manner when a defect in the fan can be ruled out. Since the first control device is fundamentally more reliable than the second control device, a potentially harmful fan malfunction directly after switching on the cooled laboratory device is particularly effectively prevented - through the initial use of the first control device.
  • Another advantage is that an initial ventilation control, which can in particular be hardware-based, requires little effort in development and approval. Other, more structurally complex and/or more expensive control or protective measures (e.g. pressure sensors) become unnecessary.
  • the present invention is fundamentally suitable for all devices that contain a refrigeration circuit with flammable refrigerant.
  • the present invention can also be applied to other devices that contain or produce dangerous gases or other fumes that are hazardous to health.
  • a power supply for the fan is produced before the interior area is ventilated, in particular immediately before the ventilation.
  • the power supply can preferably be produced in particular using an on/off switch of the cooled laboratory device.
  • the cooled laboratory device can be designed so that the on/off switch is the only switch that needs to be pressed at the start of operation of the cooled laboratory device. Ventilation of the interior can then begin automatically. Power can also, less preferably, be provided using a separate on/off switch.
  • “Immediately before ventilating” can mean that ventilating immediately follows the establishment of the power supply - for example using the on/off switch of the cooled laboratory device - for example preferably within 5 seconds, or within 10 seconds or 20 seconds or a minute.
  • the presented design allows a simple and user-friendly switching process.
  • the switch-on process can be particularly safe, as it were, since the period of time in which the fan is supplied with electrical power before the interior is ventilated is very small and so there is a risk of sparks forming on the fan itself is minimized.
  • the power supply for the fan is produced by switching on the cooled laboratory device.
  • This can mean in particular that the power supply for the fan is automatically established when the cooled laboratory device is switched on, for example using an on/off switch of the cooled laboratory device.
  • the power-on process may include additional steps after power is supplied to the fan. Further steps of the switch-on process - in particular the transfer of control of the fan and the activation of the power supply for at least one further device of the cooled laboratory device to be supplied with electrical power - can then follow.
  • the presented embodiment allows a particularly simple and user-friendly switching process.
  • the first control device is a hardware-based control device.
  • the hardware-based control device can have a particularly simple structure and can be independent of other devices of the cooled laboratory device and can therefore be particularly reliable and fail-safe.
  • a defect in the fan for example a blockage or a contact problem, can be detected before other components of the cooled laboratory device can be damaged. If the fan is defective, operation of the cooled laboratory device may still be impossible.
  • a determination of such a defect can advantageously be made before there is a risk of the refrigerant being ignited by other, potentially spark-generating devices of the cooled laboratory device, the switching of which would be pointless and possibly harmful in the event of a defective fan.
  • the second control device is a software-based or a firmware-based control device.
  • the software-based or firmware-based control device is advantageous because it can enable, in particular, needs-based control of the fan, in particular needs-based control of the fan speed. If the ventilation requirement is low, for example due to an already low temperature indoors, a low fan speed may be sufficient. Only when there is a high need for ventilation, for example when there is an increased temperature indoors, can a high fan speed be set. Implementation can be done, for example, using characteristic curves or maps. This configuration allows low energy consumption by the fan, low wear and a long service life of the fan, lower maintenance requirements, low contamination, for example from dust in the interior, and lower noise.
  • the first criterion is or includes not falling below or reaching a first predefined fan speed.
  • the specific period can in particular be, for example, the first period.
  • the specific period of time may be a period of time which, in conjunction with the first predefined fan speed, enables ventilation such that flammable refrigerant is completely or approximately completely removed from the interior.
  • the first predefined fan speed may be selected to enable ventilation such that flammable refrigerant is completely or approximately completely removed from the interior within the specific period of time.
  • the first predefined fan speed can alternatively be a (e.g. predefined) maximum speed at a specific voltage (e.g. 12 V) or a nominal speed of the fan.
  • a first predefined fan speed is also conceivable as a first criterion. Achievement can, for example, be required within a certain period of time. For example, it can be measured whether the first predefined fan speed is reached properly and/or whether it is reached within a period of time.
  • the time period can be, for example, a typical acceleration time of the fan, for example in the interval of 0.1 to 3 seconds. If the acceleration is too slow, i.e. the first predefined fan speed is not reached within the time period, this may indicate a defect in the fan.
  • the first predefined fan speed can itself be a variable value.
  • the first predefined fan speed may depend on a temperature, for example an indoor temperature or an outdoor temperature, or on a period of time during which the cooled laboratory device was not in operation.
  • the presented embodiment makes it possible to carry out a reliable assessment of the functionality of the fan in a simple and easy-to-implement manner with little control and testing effort. In particular, it is easy to test whether the fan itself is functioning properly. If, for example, proper control by the second control device fails, it can be ruled out that there is an error in the fan itself (e.g. blockage, mechanical defect, contact problems, etc.).
  • the second criterion is or includes not falling below a second predefined fan speed.
  • Not falling below the limit can in particular mean not falling below the limit over a further specific period of time.
  • the further specific period of time can, for example, be a period of the order of seconds (e.g. located in the interval of 2-20 seconds).
  • the second predefined fan speed can be a fan speed at which safe ventilation is guaranteed during (normal) operation of the cooled laboratory device.
  • Safe here can refer, for example, to a temperature, for example a temperature in the interior, that should be maintained for safety reasons, or for example to a refrigerant leak, for example in the event of a leak.
  • safe can mean, for example, that the refrigerant leakage at the fan speed can be safely compensated for by transporting it away using ventilation.
  • the second predefined fan speed can also be above a minimum fan speed (which can also be referred to as forced ventilation speed) at which safe ventilation is just guaranteed in (normal) operation of the cooled laboratory device.
  • the second predefined fan speed can itself be a variable value.
  • the second predefined fan speed may depend on a temperature, for example an indoor temperature or an outdoor temperature.
  • the presented embodiment allows a reliable assessment of the functionality of the second control device (and also of the fan) to be implemented in a simple and easy-to-implement manner with little control and testing effort. This can prevent damage to other equipment in the cooled laboratory device.
  • a simulation of typical ventilation situations of the cooled laboratory device - as they occur in normal operation of the cooled laboratory device - can be carried out before the actual start of normal operation.
  • the fan speed is briefly increased by the first control device.
  • the short-term increase in speed can also be referred to as a “boost”.
  • the short-term increase in speed can be carried out in particular if the second predefined fan speed is slightly below the speed limit. In such cases, it can be assumed, for example, that there is a mechanical problem with the fan, which can possibly be solved with a short boost. This could be, for example, dust deposits on the fan.
  • the short-term increase in speed can, for example, be in an interval of 0.5 to 5 seconds, preferably 1 to 2 seconds.
  • the short-term speed increase can be carried out several times in a row if the fan speed falls below the second predefined speed several times in a row.
  • the short-term increase in speed can also lead to a possible malfunction of the second control device, which causes a drop in speed of the fan, being eliminated.
  • the presented embodiment makes it possible to easily eliminate an underlying cause if the fan speed is too low.
  • the cause can in particular be of a mechanical nature or have its origin in the second control device.
  • the design is user-friendly, since a possible deactivation of a main switch of the cooled laboratory device and/or switching the cooled laboratory device off and on again and/or even repairs of the cooled laboratory device can be avoided.
  • the power supply for the at least one further device to be supplied with electrical power is permanently or temporarily deactivated if a third predefined criterion is violated.
  • the third predefined criterion can in particular be not falling below a third predefined fan speed.
  • the third predefined fan speed can be a minimum fan speed (which can also be referred to as forced ventilation speed) at which safe ventilation is just guaranteed in (normal) operation of the cooled laboratory device.
  • the third predefined fan speed may be below the second predefined fan speed (if provided).
  • the permanent deactivation can in particular deactivate a switch, for example a relay, for the power supply of the at least one further device to be supplied with electrical power.
  • the switch or relay may involve a main power supply to the refrigerated laboratory equipment being deactivated.
  • the deactivation can, for example, be maintained until the cooled laboratory device is switched on again or over a predefined period of time.
  • the presented embodiment increases operational reliability because operation of the cooled laboratory device can be avoided in advance in the event of a malfunction of the second control device and/or the fan.
  • the malfunction is detected before operation begins, so that damage to other equipment of the cooled laboratory device or dangerous situations in which refrigerant is not removed or is not removed sufficiently can be avoided.
  • the power supply for the at least one further device to be supplied with electrical current is activated only after a second period of time has elapsed, which begins with or after the fan control is transferred to the second control device.
  • the second period can, for example, be understood as the minimum period during which checking using the second predefined criterion must always take place. This further increases the informative value and quality of the checking using the second predefined criterion and thus the operational reliability of the cooled laboratory device.
  • the measures mentioned prevent the at least one further device to be supplied with electrical power, e.g. B. is supplied with electrical power due to a malfunction and therefore represents a source of danger due to the possible formation of sparks.
  • the further device to be supplied with electrical power can be supplied with power by means of a relay, it can be checked whether the relay is properly deactivated.
  • a proper function of the fan speed detection can, for example, be designed in such a way that it is checked whether the fan, which is still stationary, properly outputs a signal that its speed is at zero before the interior area is ventilated.
  • the cooled laboratory device can in particular be designed to carry out the method according to the invention in at least one of the embodiments set out, in particular to carry it out automatically.
  • the cooled laboratory device and configurations of the cooled laboratory device reference is made in full to explanations of the method according to the invention and to the configurations of the method according to the invention.
  • the first control device, the checking device, the second control device, the transfer device, the activation device and/or the further transfer device can be units integrated into the cooled laboratory device.
  • the devices mentioned can each, at least partially or all, comprise at least one electronic component and/or a programmable computing device and/or use or share a programmable computing device.
  • the first control device does not have a programmable computing device and/or is not or only indirectly connected to a programmable computing unit.
  • the cooled laboratory device can in particular be a laboratory freezer or a centrifuge.
  • the same reference numbers are used for functionally identical devices, steps, instances and elements. However, this does not necessarily mean that the exemplary embodiments are the same exemplary embodiment or parts of the same exemplary embodiment.
  • FIG. 1 A cooled laboratory device 1 according to the invention is shown, which is designed as a laboratory centrifuge.
  • the invention is not limited to laboratory centrifuges.
  • the cooled laboratory device 1 could also be a laboratory freezer.
  • the cooled laboratory device 1 has a fan 2.
  • a speed sensor 22 and a fan motor 21 are provided on the fan 2, more precisely on a fan shaft.
  • the speed sensor 22 and the fan motor 21 can be understood as parts of the fan 2.
  • the fan 2 is located at a first opening OE1 of a housing 11 of the cooled laboratory device 1.
  • the housing 11 may have a cover that can be opened (not shown) to provide access to a centrifuge rotor 4.
  • the centrifuge rotor 4 can be set in rotation via a drive motor 5 integrated in the housing.
  • the centrifuge rotor 4 is also rotatably mounted via rotor bearings 52 integrated in the housing, which can be designed as roller bearings, for example.
  • a second opening OE2 is provided on the side of the housing 11 opposite the first opening OE1 in order to enable ventilation through the interior region 3. Additional openings (not shown) may be provided.
  • the cooled laboratory device 1 has an interior area 3.
  • the interior area 3 extends essentially below the centrifuge rotor 4, that is, facing away from the top of the centrifuge rotor with oblique insertion areas for sample tubes, and extends to the underside of the cooled laboratory device 1.
  • Inside the interior area 3 is the cooled laboratory device 1 in the state shown a small amount of refrigerant KM - for example due to a small leak in the refrigeration circuit KM and a long downtime of the cooled laboratory device without use.
  • the refrigerant KM is a flammable refrigerant, for example propane.
  • the cooled laboratory device 1 has a KAE refrigeration circuit.
  • the KAE refrigeration circuit has several evaporators 6 (i.e. cold generators). They serve in particular to cool the centrifuge rotor 4, the surroundings of the centrifuge rotor 4, the drive motor 5 and the rotor bearings 52.
  • the refrigeration circuit KAE also has a compressor 7 (e.g. a compressor), a capacitor 8 located outside the housing 11 (the can be a condenser), and a throttle 9.
  • the compressor 7 is with a power line 73 connected, which is used to power the compressor 7.
  • the drive motor 5 is connected to a power line 53, which serves to power the drive motor 5.
  • the compressor 7 and the drive motor 5 can be understood as further devices of the cooled laboratory device 1 to be supplied with electrical power.
  • the cooled laboratory device 1 is supplied with electrical power via an external power supply EX (which can have a power plug and possibly a power supply unit) and a power cable EXN.
  • EX external power supply
  • the EXN power cable docks into an on/off switch 10 of the cooled laboratory device.
  • the on/off switch 10 has a push button (indicated here) for switching on/off.
  • the on/off switch 10 allows electric current to flow when turned on through a power line 103, a power line ST13, a power line UEP3, and a power line ST23.
  • the power lines through which circuits can be created are explained in more detail below.
  • the power line ST13 runs from the on/off switch 10 to a first control device ST1.
  • the power line ST23 runs from the on/off switch 10 to a second control device ST2.
  • the power line 103 runs from the on/off switch 10 to an activation device AKE.
  • the power line UEP3 runs from the on/off switch 10 to a checking device UEP.
  • the first control device ST1 is designed to enable ventilation of the interior area 3 of the fan 2 over a first period of time, which can last, for example, 8-10 seconds.
  • a voltage can be present on the fan 2, which causes the fan 2 to be operated at a maximum speed, for example at least 2500 revolutions per minute.
  • the first control device ST1 is hardware-based. It has a switch that can produce a power supply to the fan 2 (more precisely: to the fan motor 21), coming from the power line ST13, which can ultimately supply both the fan 2 and the first control device ST1 itself with electrical power.
  • the switch can basically be switched on at the start of operation of the cooled laboratory device 1 or can be designed to be switched on automatically or to be switched on automatically for the first period of time.
  • hardware-based reference is also made to the explanations in the general part of the description.
  • the first control device ST1 alternatively or additionally has a control by a chip or processor, and has control commands that control the fan 2 (the fan motor 21) or a power supply for the fan 2 (the fan motor 21) can control. It is not excluded that the first control device ST1 is designed to be able to adjust a speed of the fan 2 (of the fan motor 21), for example by means of pulse width modulation. In principle, however, it is preferred that the first control device ST1 has a simple structure and, for example, achieves its functionality using the switch mentioned (which can be an on/off switch).
  • An interface ST1-UEG is used to control and/or supply energy to the fan 2 (the fan motor 21).
  • the interface ST1-UEG can be designed to transmit or route electrical energy (and/or alternatively or additionally control commands) from the first control device ST1 to a transfer device UEG.
  • the ST1-UEG interface can therefore have a power line that can create a power circuit, and possibly also a data line.
  • the transfer device UEG is designed to transfer the control of the fan 2 (of the fan motor 21) from the first control device ST1 to the second control device ST2 or, conversely, from the second control device ST2 to the first control device ST1.
  • the transfer device UEG can have a switch which, in particular, can carry out a change in the power supply of the fan motor 21 between the first control device ST1 and the second control device ST2.
  • An interface UEG-2 which has a power line (which can create a circuit), leads from the transfer device to the fan 2 (to the fan motor 21) in order to enable the fan motor 21 to be supplied with power. It is not excluded that the UEG-2 interface also has a data line if, for example, the fan 2 is designed accordingly (if, for example, it has its own additional control device).
  • the UEP checking device is also provided. It is designed to use a first predefined criterion to check whether the ventilation of the interior area was successful over the first period of time.
  • the first predefined criterion can be that a first predefined fan speed (e.g. 2500 revolutions per minute) is reached and maintained over a minimum period of time (corresponding to the first period of time, it can be 8 seconds long, for example) for safe ventilation. Other configurations of the first predefined criterion are not excluded.
  • the checking device UEP is designed in such a way that it has a computing device (e.g. a processor) and corresponding commands. It cannot be ruled out that the checking device UEP is constructed differently, in particular more simply, for example as an electrical capacitor which is charged as soon as a certain fan speed is reached and which reaches a certain voltage value (at the earliest) after the first period of time has elapsed ( Threshold switch) has been reached, which triggers a switchover at the transfer device UEG.
  • a computing device e.g. a processor
  • the checking device UEP has a device for time counting, which begins a time measuring process as soon as the first predefined fan speed is reached and, as soon as the first period of time has expired, triggers the switchover at the transfer device UEG.
  • the checking device UEP is connected to the speed sensor 22 via an interface 22-UEP and can therefore receive a fan speed signal for the purpose of checking whether the first predefined criterion is met.
  • the interface 22-UEP is designed to transmit the fan speed signal from the speed sensor 22 (which can be designed, for example, as a Hall sensor), so that it is received and used to check whether the ventilation of the interior area was successful over the first period of time , can be interpreted. Receiving and interpreting is carried out by the checking device UEP. All interfaces mentioned, including the 22-UEP interface, can e.g. B. have a power cable and / or a data cable.
  • the checking device UEP is connected to the first control device ST1 via an optional interface UEP-ST1. Via the optional interface UEP-ST1, the checking device UEP can, for example, check whether the switch of the first control device ST1 was switched correctly during the first period of time as part of checking whether the ventilation was successful.
  • the checking device UEP is connected to the transfer device UEG via an interface UEP-UEG. If the first predefined criterion was met, i.e. the ventilation of the interior area 3 was successful, a signal is sent to the transfer device UEG via the UEP-UEG interface, which is sent from the first control device ST1 (and from the ST1-UEG interface) to the second Control device ST2 (and the interface ST2-UEG) can be switched, for example switching the Switch of the transfer device UEG can be done.
  • the switch of the transfer device UEG can be designed to be switchable based on this signal.
  • the second control device ST2 is designed to enable the fan 2 to be controlled, for example by means of pulse width modulation (PWM).
  • the second control device ST2 is firmware-based. This can mean in particular that it has a memory, for example a ROM memory, which contains control commands, for example functional relationships or (predetermined) characteristics that enable the fan 2 (the fan motor 21) to be controlled as required, for example based on Temperature values that a temperature sensor (not shown) in the interior 3 and / or a temperature sensor outside the interior 3 can measure. It is not excluded that the second control device ST2 is alternatively or additionally software-based, for example having a read-write memory that contains control commands that can be adapted.
  • the second control device ST2 also contains a computing device, e.g. B. a processor for implementing and interpreting the control commands.
  • the second control device ST2 can be designed to control the fan 2 even during normal operation of the cooled laboratory device.
  • An interface ST2-UEG is used to control and/or power the fan 2 (the fan motor 21).
  • the interface ST2-UEG can be designed to transmit or route electrical energy and/or control commands from the second control device ST2 to the transfer device UEG.
  • the ST2-UEG interface can have a power line that can create a power circuit, and possibly also a data line.
  • the transfer device UEG is designed to transfer the control of the fan 2 (the fan motor 21) to the second control device ST2. When the transfer has taken place, the fan 2 (the fan motor 21) is supplied with electrical power via the interface ST2-UEG and the further interface UEG-2.
  • the checking device UEP is designed to use a second predefined criterion to check whether the fan 2 is successfully controlled by the second control device ST2.
  • the second predefined criterion that must be met is that the fan speed must not fall below a specified minimum speed for safe basic ventilation (second predefined fan speed) over a second period of time.
  • the second period can be, for example, 5 seconds long.
  • the second predefined fan speed can be, for example, 1100 revolutions per minute.
  • the checking device UEP is connected to the speed sensor 22 via an interface 22-UEP and can therefore receive a fan speed signal for the purpose of checking whether the second predefined criterion is met.
  • the checking device UEP can also have a time measuring device.
  • the interface 22-UEP is configured to transmit the fan speed signal from the speed sensor 22 so that it can be received and interpreted to check whether control over the second period was successful. Receiving and interpreting is carried out by the checking device UEP.
  • the checking device UEP is connected to the second control device ST2 via an optional interface UEP-ST2. Via the optional interface UEP-ST2, the checking device UEP can, for example, additionally check whether the control of the fan 2 by the second control device ST2 is carried out properly during the second period of time as part of checking whether the control over the second period of time was successful is.
  • a signal is sent via an interface UEP-AKE to the activation device AKE that power supplies for the compressor 7 (via the power line 73) and the drive motor 5 ( can be activated via the power line 53).
  • the activation device 103 in particular has a switch, for example a relay, which can produce the power supplies when a corresponding signal is present.
  • the cooled laboratory device 1 is shown in a state in which refrigerant KM is located in the interior 3. Already the control by the first control device ST1 - the ventilation of the interior area 3 over the first period of time - removes the refrigerant KM completely from the interior area 3, so that when potentially sparking further devices of the cooled laboratory device 1 (compressor 7 and Drive motor 5) is no longer present and no longer poses a danger. At the time of activation, the control of the fan 2 is also checked for proper function using the second control device ST2. The second control device ST2 also controls the fan during normal operation of the cooled laboratory device 1, which can be connected.
  • the checking device UEP can optionally be additionally designed to initiate a short-term speed increase by the first control device ST1 if the fan speed falls below the second predefined fan speed (minimum speed for safe basic ventilation during operation) within the second predefined period of time.
  • the checking device UEP can be designed (in particular, it can have corresponding control commands), in this case to instruct the transfer device UEG to carry out a switching process to the first control device ST1.
  • the short-term increase in speed can, for example, take place over a short period of time (e.g. 1 second) until a switch is made.
  • the checking device UEP can be designed in such a way that the second period of time is started again after the short-term increase in speed in order to check whether the control by the second control device ST2 is successful.
  • the checking device UEP can optionally be additionally designed to include the switch (which can be a relay, for example) of the activation device AKE, which can enable power supplies for the compressor 7 (via the power line 73) and the drive motor 5 (via the power line 53). , for a certain period of time or permanently (e.g. until the cooled laboratory device 1 is switched on again) to deactivate or block if a third predefined (critical) fan speed is undershot, which no longer guarantees safe operation in the event of a leak would.
  • the third predefined fan speed can e.g. B. be at 500 revolutions per minute.
  • the checking device UEP can optionally be additionally designed to check a signal from the speed sensor 22 and/or the correct state of the activation device AKE before the first period of time, i.e. before the start of ventilation of the interior area 3.
  • the checking device UEP can have corresponding control commands.
  • the signal from the speed sensor (which can also be called a tachometer signal) should initially correspond to a fan speed of zero.
  • the AKE activation device switch should be deactivated.
  • the checking device UEP can be designed to include the switch (which can be a relay, for example) of the activation device AKE, the power supplies for the compressor 7 (via the power line 73) and the drive motor 5 ( via the power line 53) can enable deactivation or blocking for a certain period of time or permanently (e.g. until the cooled laboratory device 1 is switched on again).
  • the switch which can be a relay, for example
  • Fig. 2 a further embodiment of the cooled laboratory device 101 according to the invention is shown.
  • the cooled laboratory device 101 now shown has, in contrast to cooled laboratory device 101 has a first checking device UEP1 and a second checking device UEP2.
  • the (joint) verification facility UEP does not exist.
  • the comments on the first presented embodiment of the cooled laboratory device 1 apply accordingly, apart from the following comments, which include the first checking device UPE1 and the second checking device UEP2 as well as the interfaces 22-UEP1, 22-UEP2, UEP2-ST2, UEP2-AKE and UEP2 -UEG and the UEP23 power line.
  • the power line UEP23 runs from the on/off switch 10 to the second checking device UEP2.
  • the first checking device UEP1 is designed to use a first predefined criterion to check whether the ventilation of the interior area was successful over the first period of time.
  • the first predefined criterion is that the first predefined fan speed (e.g. 2500 revolutions per minute) is reached and maintained over a minimum period of time (corresponding to the first period, it can be 8 seconds long, for example) for safe ventilation. In this way, any potentially dangerous mixture within the cooled laboratory device can be neutralized. Other configurations of the first predefined criterion are not excluded.
  • the first checking device UEP1 has a threshold switch (e.g. an electrical capacitor that is charged as soon as the first predefined fan speed is reached). Alternatively or additionally, it can have a time counting device that begins a time measurement process as soon as the first predefined fan speed is reached.
  • a threshold switch e.g. an electrical capacitor that is charged as soon as the first predefined fan speed is reached.
  • it can have a time counting device that begins a time measurement process as soon as the first predefined fan speed is reached.
  • the first checking device UEP1 is connected to the speed sensor 22 via the interface 22-UEP1 and can therefore receive a fan speed signal for the purpose of checking whether the first predefined criterion is met.
  • the information is transmitted to the transfer device UEG via the UEP1-UEG interface that the specific voltage value of the electrical capacitor has been reached or that the time measurement process has reached the minimum period.
  • This information may mean that ventilation of the refrigerated laboratory equipment was successful.
  • the switch of the transfer device UEG is designed to be switchable based on the information.
  • the interface 22-UEP1 is designed to transmit the fan speed signal from the speed sensor 22 (which can be designed, for example, as a Hall sensor), so that the threshold switch (e.g. an electrical capacitor that is being charged) or a alternative timer/counter of the first checking device UEP1 can be used to check whether the first predefined criterion is met.
  • the threshold switch e.g. an electrical capacitor that is being charged
  • a alternative timer/counter of the first checking device UEP1 can be used to check whether the first predefined criterion is met.
  • the second checking device UEP2 is designed to use a second predefined criterion to check whether the fan 2 is successfully controlled by the second control device ST2.
  • the second predefined criterion that must be met is that the fan speed must not fall below a second predefined fan speed (this can be a predefined minimum speed for safe basic ventilation) over a second period of time.
  • the second period can be, for example, 5 seconds long.
  • the second predefined fan speed can be, for example, 1100 revolutions per minute.
  • the second checking device UEP2 is connected to the speed sensor 22 via an interface 22-UEP2 and can therefore receive a fan speed signal for the purpose of checking whether the second predefined criterion is met.
  • the interface 22-UEP2 is configured to transmit the fan speed signal from the speed sensor 22 so that it can be received and interpreted to check whether control over the second period was successful. The reception and interpretation is carried out by the second checking device UEP2.
  • the second checking device UEP2 is connected to the second control device ST2 via an optional interface UEP-ST2. Via the optional interface UEP-ST2, the second checking device UEP2 can, for example, check whether the control of the fan 2 was carried out properly by the second control device ST2 as part of checking whether the control over the second period of time was successful. It is not excluded that the second checking device UEP and the second control device ST2 are designed as a common unit.
  • a signal is sent via an interface UEP2-AKE to the activation device AKE that power supplies for the compressor 7 (via the power line 73) and the drive motor 5 ( can be activated via the power line 53).
  • the activation device 103 in particular has a switch, for example a relay, which can produce the power supplies when a corresponding signal is present.
  • the second checking device UEP2 can exchange information with the transfer device UEG via the UEP2-UEG interface.
  • the second checking device UEP2 can optionally be additionally designed to initiate a short-term speed increase by the first control device ST1 when the fan speed falls below the second predefined fan speed (predetermined minimum speed for safe basic ventilation during operation).
  • the second checking device UEP2 can be designed (in particular, it can have corresponding control commands), in this case to instruct the transfer device UEG to carry out a switching process to the first control device ST1.
  • the short-term increase in speed can occur briefly (for example over a period of 1 second) until switching back (brief boost of fan 2 to avoid a critical lower speed).
  • the second checking device UEP2 can be designed in such a way that the second period of time is started again after the short-term increase in speed in order to check again whether the control by the second control device ST2 is successful.
  • the second checking device UEP2 can optionally be additionally designed to enable the switch (which can be a relay, for example) of the activation device AKE, which enables power supplies for the compressor 7 (via the power line 73) and the drive motor 5 (via the power line 53). can be deactivated or blocked for a certain period of time or permanently (e.g. until the cooled laboratory device 101 is switched on again) if a third predefined fan speed is undershot, which would no longer ensure safe operation in the event of a leak.
  • the third predefined fan speed can e.g. B. be at 500 revolutions per minute.
  • the second checking device UEP2 can optionally be additionally designed to check a signal from the speed sensor 22 and/or the correct state of the activation device AKE before the first period of time, i.e. before the start of ventilation of the interior area 3.
  • the second checking device UEP2 can do the corresponding Have control commands.
  • the signal from the speed sensor (which can also be called a tachometer signal) should initially correspond to a fan speed of zero, the switch of the activation device AKE should be deactivated.
  • the second checking device UEP2 can be designed to include the switch (which can be a relay, for example) of the activation device AKE, the power supplies for the compressor 7 (via the power line 73) and the drive motor 5 (via the power line 53) can enable deactivation or blocking for a certain period of time or permanently (e.g. until the cooled laboratory device 101 is switched on again).
  • the switch which can be a relay, for example
  • the power supplies for the compressor 7 via the power line 73
  • the drive motor 5 via the power line 53
  • Fig. 3 an embodiment of the method according to the invention for operating a laboratory device cooled by means of a flammable refrigerant (for example a laboratory centrifuge or a laboratory freezer) is shown.
  • the cooled laboratory device can be, for example, the cooled laboratory device 1 or the cooled laboratory device 101.
  • the cooled laboratory device 1 and the cooled laboratory device 101 can each be designed to carry out the method according to the invention, in particular to carry it out automatically.
  • an optional upstream control step SCK it is checked whether a power supply for further devices to be supplied with electrical power is properly deactivated.
  • the other facilities to be supplied with electrical power can be e.g. B. be a drive motor 5 and / or a compressor 7 or a display or an electrical opening mechanism of a lid of the cooled laboratory device.
  • control step SCK it can be checked whether a fan speed detection is functioning properly, for example by checking whether a fan speed signal is initially equal to zero.
  • a preliminary step SC0 it is checked whether the fan reaches a predefined minimum speed for safe ventilation or whether this predefined minimum speed is exceeded. If this is not the case, the cooled laboratory device can be aborted and switched off automatically.
  • a first step SC1 an interior area (for example the interior area 3) of the cooled laboratory device is ventilated over a first period of time.
  • the fan is controlled via a first control device (e.g. the first control device ST1), which can in particular be hardware-based.
  • the first period is selected such that at a first predefined fan speed, the interior of the cooled laboratory device is completely or almost completely freed of any refrigerant that may be present.
  • a second step SC2 checks whether a first predefined criterion (e.g. reaching a fan speed of at least 2500 revolutions per minute over 8 seconds, this fan speed can be referred to as the first predefined speed) has been met is, for example using a simply constructed checking device, for example the first checking device UEP1.
  • a simply constructed checking device for example the first checking device UEP1.
  • successful ventilation can alternatively or additionally be carried out using a more complex checking device, for example the UEP checking device.
  • Any refrigerant that may be present inside is now completely or almost completely removed, so that other devices of the laboratory device that are to be supplied with electrical power do not pose a danger due to spark formation, before they are supplied with electrical power.
  • a third step SC3 if the control of the fan was successful (indicated by a check mark), the control of the fan is transferred to a second control device, for example using the transfer device UEG.
  • the second control device can in particular be a software or firmware-based control device and have stored control commands and/or characteristics.
  • the procedure can be terminated.
  • the cooled laboratory device can be switched off automatically, as indicated by the symbol "O".
  • a fourth step SC4 using a second predefined criterion (e.g. the fan must not fall below a predefined minimum speed for long-term safe ventilation, this speed can be referred to as the second predefined fan speed) it is checked whether the control of the fan is successful is.
  • a second predefined criterion e.g. the fan must not fall below a predefined minimum speed for long-term safe ventilation, this speed can be referred to as the second predefined fan speed
  • a third predefined criterion is not violated (e.g. the fan speed drops below a predefined critical speed, which can be referred to as the third predefined fan speed, whereby this speed no longer ensures safe operation in the presence of a leak ensured)
  • the control in an optional additional step SC4B, the control can be briefly transferred to the first control device, which causes a brief fan speed increase (boost) towards the maximum speed of the fan.
  • the fourth step SC4 can then be carried out again.
  • the optional additional step SC4b can be carried out a limited number of times. If the second predefined criterion is still not met, an abort can occur, e.g. B. switching off the cooled laboratory device (not shown).
  • Checking whether the control of the fan is successful can be done using a checking device (e.g. checking device UPE or second checking device UEP2).
  • a checking device e.g. checking device UPE or second checking device UEP2.
  • the further devices to be supplied with electrical power are activated, possibly with a time delay (indicated by a clock symbol), in a fifth step SC5, for example with the help of an activation device - that This means that normal operation of the cooled laboratory device can begin.

Description

Die Erfindung betrifft ein Verfahren zum Betreiben eines mittels eines entflammbaren Kältemittels gekühlten Laborgeräts sowie ein Laborgerät, das mittels eines entflammbaren Kältemittels gekühlt ist.The invention relates to a method for operating a laboratory device cooled by means of a flammable refrigerant and a laboratory device which is cooled by means of a flammable refrigerant.

Gekühlte Laborgeräte müssen verschiedenen sicherheitstechnischen Anforderungen genügen. In der Norm DIN EN 61010-2-011 werden beispielsweise Sicherheitsbestimmungen für elektrische Mess-, Steuer-, Regel- und Laborgeräte vorgegeben. Es soll insbesondere sichergestellt werden, dass der Entwurf und der Aufbau von Kühlgeräten einen ausreichenden Schutz vor bestimmten Gefährdungen für Benutzer, Nebenstehende, geschultes Service-Personal und die umgebenden Flächen vor den speziellen Gefährdungen, die von gekühlten Systemen ausgehen können, bietet.Refrigerated laboratory equipment must meet various safety requirements. For example, the DIN EN 61010-2-011 standard specifies safety regulations for electrical measuring, control, regulation and laboratory devices. In particular, it should be ensured that the design and construction of cooling devices provides sufficient protection against certain hazards for users, bystanders, trained service personnel and the surrounding areas from the specific hazards that can arise from cooled systems.

In der Norm DIN EN 378 wird der Lebenszyklus von Kälteanlagen betrachtet, insbesondere in Bezug auf die Anlagen-/Gerätesicherheit, aber auch zum Beispiel in Bezug auf Aufstellungsbereiche der Anlagen, Grenzwerte von Kältemitteln oder den Schutz von Personen in Kühlräumen. In der Norm werden insbesondere die Brennbarkeitsklassen 1 (keine Flammenausbreitung), 2L (gering brennbar), 2 (brennbar), 3 (hoch brennbar) für Kältemittel thematisiert, die in der Norm ISO 817 definiert werden. Beispiele für Kältemittel sind z. B.: Propan, (Iso-)Butan (Brennbarkeitsklasse 3); R152a (Brennbarkeitsklasse 2); R1234yf (Brennbarkeitsklasse 2L); R410A, R22 (Brennbarkeitsklasse 1).The DIN EN 378 standard considers the life cycle of refrigeration systems, particularly with regard to system/equipment safety, but also, for example, with regard to installation areas of the systems, limit values for refrigerants or the protection of people in cold rooms. The standard specifically addresses the flammability classes 1 (no flame spread), 2L (low flammability), 2 (flammable), 3 (highly flammable) for refrigerants, which are defined in the ISO 817 standard. Examples of refrigerants include: E.g.: propane, (iso-)butane (flammability class 3); R152a (flammability class 2); R1234yf (flammability class 2L); R410A, R22 (flammability class 1).

Gerade hoch brennbare Kohlenwasserstoffe, insbesondere Propan und (Iso-)Butan weisen jedoch günstige Umwelteigenschaften auf. So liegt beispielsweise der Wert des Ozonabbaupotentials ("ODP", Englisch: "Ozone Depletion Potential") für die genannten Kältemittel jeweils bei 0, das Treibhauspotential ("GWP", Englisch: "Global Warming Potential") oder CO2-Äquivalent liegt jeweils bei lediglich 3.However, highly flammable hydrocarbons, especially propane and (iso)butane, have favorable environmental properties. For example, the value of the ozone depletion potential ("ODP") for the refrigerants mentioned is 0, while the global warming potential ("GWP") or CO2 equivalent is 0 only 3.

Es ist erstrebenswert, in heutigen gekühlten Laborgeräten Kältemittel zu verwenden, die günstige Umwelteigenschaften aufweisen. In Bezug auf die genannten Kältemittel Propan und (Iso-)Butan sind hierfür erweiterte Sicherheitsvorkehrungen notwendig. Insbesondere ist eine sichere Umgebung innerhalb der Maschine notwendig. Die Umgebung muss insbesondere auch dann sicher bleiben, wenn ein brennbares Kältemittel austritt, zum Beispiel im Falle einer Leckage, Beschädigung, oder Fehlfunktion.It is desirable to use refrigerants that have favorable environmental properties in today's refrigerated laboratory equipment. With regard to the mentioned refrigerants propane and (iso)butane, extended safety precautions are necessary. In particular, a safe environment within the machine is necessary. In particular, the environment must remain safe even if a flammable refrigerant escapes, for example in the event of a leak, damage or malfunction.

WO 2019/238891 A1 beschreibt eine Zentrifuge und Verfahren zur Verhinderung einer Zündung von brennbaren Temperierungsmedien in Zentrifugen, insbesondere nach einem Crash des Zentrifugenrotors. Dabei erfolgt eine Überwachung daraufhin, ob der Druck im Verdampfer unter einem vorgegebenen Minimaldruck und/oder über einem vorgegebenen Maximaldruck liegt. WO 2019/238891 A1 describes a centrifuge and methods for preventing ignition of flammable temperature control media in centrifuges, especially after a crash of the centrifuge rotor. Monitoring is carried out to determine whether the pressure in the evaporator is below a predetermined minimum pressure and/or above a predetermined maximum pressure.

Aus DE 10 2012 103 211 A1 ist eine Zentrifuge mit einem Kühlgerät bekannt, welches ausgelegt ist, eine Kammer der Zentrifuge zu kühlen. Das Kühlgerät enthält einen Verdichter. Eine Steuervorrichtung des Verdichter-Motors führt eine stoßweise Steuerung zum EIN-AUS-Umschalten der Kühlfunktion des Verdichters durch, wenn die Drehzahl des Verdichter-Motors kleiner als eine vorbestimmte Drehzahl ist.Out of DE 10 2012 103 211 A1 a centrifuge with a cooling device is known, which is designed to cool a chamber of the centrifuge. The cooling device contains a compressor. A controller of the compressor motor performs intermittent control to switch ON-OFF the cooling function of the compressor when the speed of the compressor motor is less than a predetermined speed.

Gemäß US 5 261 252 A wird die Geräuschemission eines Zentrifugenkühlsystems und insbesondere des darin befindlichen Kondensatorlüfters minimiert, indem die Zeitdauer, in der der Kühlkompressor aktiviert ist, überwacht und die Drehzahl des Kondensatorlüfters entsprechend der Zeitdauer der Kompressoraktivierung gesteuert werden.According to US 5,261,252 A The noise emission of a centrifuge cooling system and in particular the condenser fan therein is minimized by monitoring the period of time in which the refrigeration compressor is activated and the speed of the condenser fan is controlled according to the period of time that the compressor is activated.

Der vorliegenden Erfindung liegt das technische Problem zu Grunde, die Betriebssicherheit von gekühlten Laborgeräten, die mittels eines entflammbaren Kältemittels gekühlt werden, zu verbessern. Ein weiteres, der vorliegenden Erfindung zugrundeliegendes technisches Problem ist es, eine besonders ausfallsichere und zuverlässige Lüftersteuerung zu realisieren und Defekte eines Lüfters besonders früh und zuverlässig zu erkennen.The present invention is based on the technical problem of improving the operational safety of cooled laboratory equipment that is cooled using a flammable refrigerant. Another technical problem on which the present invention is based is to implement a particularly fail-safe and reliable fan control and to detect defects in a fan particularly early and reliably.

Gemäß einem Grundgedanken der vorliegenden Erfindung wird vorgeschlagen, einen Innenbereich eines gekühlten Laborgeräts nach dem Einschalten zunächst mit einem Lüfter zu durchlüften, gesteuert mithilfe einer ersten Steuereinrichtung, die insbesondere eine hardwarebasierte Steuereinrichtung sein kann. Ein solcher Durchlüftungsvorgang kann insbesondere eine definierte Mindestdauer aufweisen. Ein erster Testbetrieb (mittels dessen zum Beispiel eine ordnungsgemäße Funktionsfähigkeit des Lüfters überprüft werden kann) und/oder ein erster Sicherheitsbetrieb (mittels dessen zum Beispiel Kältemittel durch den Lüfter aus dem Innenraum entfernt werden kann) des Lüfters kann/können so durchgeführt werden. Die erste Steuereinrichtung und/oder der Lüfter können eine Stromversorgung aufweisen, die unabhängig von anderen Stromversorgungen weiterer Komponenten oder Einrichtungen des gekühlten Laborgeräts sein kann und/oder unabhängig von den anderen Stromversorgungen aktivierbar und/oder separat ausgestaltet sein kann. Die Stromversorgung kann insbesondere zum Beispiel einen separaten Kabelstrang aufweisen.According to a basic idea of the present invention, it is proposed to first ventilate an interior area of a cooled laboratory device with a fan after switching it on, controlled using a first control device, which can in particular be a hardware-based control device. Such a ventilation process can in particular have a defined minimum duration. A first test operation (by means of which, for example, proper functionality of the fan can be checked) and/or a first safety operation (by means of which, for example, refrigerant can be removed from the interior by the fan) of the fan can/can be carried out in this way. The first control device and/or the fan can have a power supply that can be independent of other power supplies of other components or devices of the cooled laboratory device and/or can be activated independently of the other power supplies and/or can be designed separately. The power supply can in particular, for example, have a separate cable harness.

Die erste Steuereinrichtung kann insbesondere einen besonders einfachen Aufbau besitzen. "Hardwarebasiert" kann insbesondere bedeuten, dass alle Steuerbefehle hardwareseitig in der ersten Steuereinrichtung vorgegeben, definiert und/oder umgesetzt sind - also zum Beispiel durch Verwendung von elektrischen oder elektronischen Bauelementen. "Hardwarebasiert" kann alternativ oder zusätzlich insbesondere bedeuten, dass eine Funktion der ersten Steuereinrichtung durch eine diskret aufgebaute Schaltung erreicht werden kann und/oder dass eine Funktion der ersten Steuereinrichtung durch eine Verwendung von Standardbauteilen (insbesondere können dies elektrische oder elektronische Standardbauteile sein) erreicht werden kann. Insbesondere kann die erste Steuereinrichtung eine Steuereinrichtung ohne Datenschnittstelle und/oder ohne Datenspeicher sein. Die erste Steuereinrichtung kann auch zum Beispiel lediglich einen ROM-Speicher aufweisen. "Hardwarebasiert" kann in Bezug auf die erste Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die erste Steuereinrichtung keine Software oder keine Firmware aufweist. "Hardwarebasiert" kann in Bezug auf die erste Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die erste Steuereinrichtung keinen Chip oder Speicher, auf dem Software oder Firmware hinterlegt ist, aufweist. "Hardwarebasiert" kann in Bezug auf die erste Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die erste Steuereinrichtung keine Steueralgorithmen oder Steuerbefehle, die auf einem Chip oder in einem Speicher gespeichert sind, aufweist.The first control device can in particular have a particularly simple structure. “Hardware-based” can mean in particular that all control commands are specified, defined and/or implemented on the hardware side in the first control device - for example by using electrical or electronic components. “Hardware-based” can alternatively or additionally mean in particular that a function of the first control device can be achieved by a discretely constructed circuit and/or that a function of the first control device can be achieved by using standard components (in particular these can be standard electrical or electronic components). can. In particular, the first control device can be a control device without a data interface and/or without a data memory. The first control device can also, for example, only have a ROM memory. “Hardware-based” in relation to the first control device can alternatively or additionally mean that the first control device has no software or no firmware. “Hardware-based” in relation to the first control device can alternatively or additionally mean that the first control device does not have a chip or memory on which software or firmware is stored. “Hardware based” can be in Reference to the first control device alternatively or additionally means that the first control device does not have any control algorithms or control commands that are stored on a chip or in a memory.

Die erste Steuereinrichtung kann insbesondere einen Ein-/Ausschalter aufweisen oder in einer besonders einfachen Ausführungsform aus einem Ein-/Ausschalter bestehen, der mit einem Ein-/Ausschalter des Laborgeräts gekoppelt sein kann. Wird beispielsweise der Ein-/Ausschalter des Laborgeräts eingeschaltet, kann auch die erste Steuereinrichtung automatisch derart eingeschaltet werden, dass der Lüfter ein Belüften des Innenbereichs vornimmt.The first control device can in particular have an on/off switch or, in a particularly simple embodiment, consist of an on/off switch which can be coupled to an on/off switch of the laboratory device. For example, if the on/off switch of the laboratory device is switched on, the first control device can also be switched on automatically in such a way that the fan ventilates the interior area.

Das Belüften kann als Testlauf des Lüfters dienen und zudem Kältemittel aus dem Innenbereich entfernen. Andere (oder alle anderen) mit elektrischem Strom zu versorgenden Einrichtungen des Laborgeräts können mindestens ausgeschaltet bleiben, - bis automatisch festgestellt wird, dass das Belüften erfolgreich war und/oder - bis ein Steuern des Lüfters an eine zweite Steuereinrichtung übergeben worden ist und automatisch festgestellt wird, dass das Steuern des Lüfters durch die zweite Steuereinrichtung erfolgreich ist.Venting can serve as a test run for the fan and also remove refrigerant from the interior. Other (or all other) devices of the laboratory device that are to be supplied with electrical power can remain switched off at least - until it is automatically determined that the ventilation was successful and / or - until control of the fan has been handed over to a second control device and is automatically determined that the control of the fan by the second control device is successful.

Hierdurch kann insbesondere eine Gefahr vermieden werden, dass sich im Innenbereich des gekühlten Laborgeräts Funken bilden, die bei einem Vorhandensein des entflammbaren Kältemittels in dem Innenbereich eine Entzündung des Kältemittels verursachen könnten.This can in particular avoid the risk of sparks forming in the interior of the cooled laboratory device, which could cause the refrigerant to ignite if the flammable refrigerant is present in the interior.

Die zweite Steuereinrichtung kann insbesondere eine Steuereinrichtung sein, die eine software- und/oder firmwarebasierte Steuereinrichtung ist. Sie kann zum Beispiel einen Speicher (z. B. einen wiederbeschreibbaren Speicherchip oder eine Festplatte), zum Beispiel mit hinterlegten Programmbefehlen und/oder eine Messsensorik (z. B. einen Temperaturfühler oder eine Messsonde für eine Konzentration des Kältemittels) aufweisen und/oder ein drehzahlvariables Steuern des Lüfters, zum Beispiel mittels Pulsweitenmodulation, mithilfe von entsprechenden Einrichtungen ermöglichen, zum Beispiel mithilfe von hinterlegten Kennlinien, die zum Beispiel Werte des Temperaturfühlers oder der Messsonde mit Drehzahlen verbinden können. Ist die zweite Steuereinrichtung firmwarebasiert, können Programmbefehle insbesondere auf einem ROM-Speicher hinterlegt sein. Ist die zweite Steuereinrichtung softwarebasiert, können Programmbefehle insbesondere auf einem Schreib-Lese-Speicher hinterlegt sein. Die zweite Steuereinrichtung kann ausgestaltet sein, den Lüfter auch im normalen Betrieb des gekühlten Laborgeräts zu steuern. Ein normaler Betrieb des gekühlten Laborgerät kann an das erfindungsgemäße Verfahren anschließen bzw. danach erfolgen.The second control device can in particular be a control device that is a software and/or firmware-based control device. It can, for example, have a memory (e.g. a rewritable memory chip or a hard drive), for example with stored program commands and/or a measuring sensor system (e.g. a temperature sensor or a measuring probe for a concentration of the refrigerant) and/or a enable variable-speed control of the fan, for example by means of pulse width modulation, with the help of appropriate devices, for example with the help of stored characteristic curves, which can, for example, connect values of the temperature sensor or measuring probe with speeds. If the second control device is firmware-based, program commands can in particular be stored in a ROM memory. If the second control device is software-based, program commands can in particular be stored in a read-write memory. The second control device can be designed to also activate the fan during normal operation of the cooled laboratory device steer. Normal operation of the cooled laboratory device can follow or follow the method according to the invention.

'Softwarebasiert" kann in Bezug auf die zweite Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die zweite Steuereinrichtung Software aufweist. "Softwarebasiert" kann in Bezug auf die zweite Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die zweite Steuereinrichtung einen Chip oder einen Speicher, auf dem Software hinterlegt ist, aufweist. "Softwarebasiert" kann in Bezug auf die zweite Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die zweite Steuereinrichtung Steueralgorithmen oder Steuerbefehle, die auf einem Chip oder in einem Speicher gespeichert sind (insbesondere auf einem Schreib-Lese-Speicher), aufweist.“Software-based” in relation to the second control device can alternatively or additionally mean that the second control device has software. “Software-based” in relation to the second control device can alternatively or additionally mean that the second control device has a chip or a memory on which software "Software-based" can alternatively or additionally mean in relation to the second control device that the second control device has control algorithms or control commands that are stored on a chip or in a memory (in particular on a read-write memory). .

"Firmwarebasiert" kann in Bezug auf die zweite Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die zweite Steuereinrichtung Firmware aufweist. "Firmwarebasiert" kann in Bezug auf die zweite Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die zweite Steuereinrichtung einen Chip oder einen Speicher, auf dem Firmware hinterlegt ist, aufweist. "Firmwarebasiert" kann in Bezug auf die zweite Steuereinrichtung alternativ oder zusätzlich bedeuten, dass die zweite Steuereinrichtung Steueralgorithmen oder Steuerbefehle, die auf einem Chip oder in einem Speicher gespeichert sind (insbesondere auf einem Nur-Lese-Speicher), aufweist.“Firmware-based” in relation to the second control device can alternatively or additionally mean that the second control device has firmware. In relation to the second control device, “firmware-based” can alternatively or additionally mean that the second control device has a chip or a memory on which firmware is stored. “Firmware-based” in relation to the second control device can alternatively or additionally mean that the second control device has control algorithms or control commands that are stored on a chip or in a memory (in particular on a read-only memory).

Die zweite Steuereinrichtung kann eine Steuereinrichtung sein, bei der die Sicherheit und/oder die Zuverlässigkeit und/oder die korrekte Funktion erst durch ein Zulassungsverfahren oder Zertifizierungsverfahren nachgewiesen werden muss. Ein solches Verfahren kann sehr zeitaufwendig und kostenintensiv sein. Zudem können selbst kleine nachträgliche Änderungen deshalb mit hohem Aufwand verbunden sein. Zum Beispiel können selbst kleine nachträgliche Änderungen ein eigenes Zulassungsverfahren oder Zertifizierungsverfahren erfordern.The second control device can be a control device in which the safety and/or reliability and/or correct function must first be proven through an approval process or certification process. Such a process can be very time-consuming and expensive. In addition, even small subsequent changes can therefore involve a lot of effort. For example, even small subsequent changes may require their own approval process or certification process.

Die zweite Steuereinrichtung kann allgemein mit einer geräteseitigen Steuereinrichtung verbunden sein, die das gekühlte Laborgerät (und insbesondere einen Lüfter des gekühlten Laborgeräts) im Betrieb steuert. Die zweite Steuereinrichtung kann diese geräteseitige Steuereinrichtung oder ein Teil dieser geräteseitigen Steuereinrichtung sein oder mit ihr verbunden oder in sie integriert sein. Es ist gleichwohl nicht ausgeschlossen, dass die zweite Steuereinrichtung eine von der geräteseitigen Steuereinrichtung separate Steuereinrichtung sein kann.The second control device can generally be connected to a device-side control device which controls the cooled laboratory device (and in particular a fan of the cooled laboratory device) during operation. The second control device can be this device-side control device or a part of this device-side control device or can be connected to it or integrated into it. However, it is not excluded that the second control device can be a control device that is separate from the device-side control device.

Insbesondere wird vorgeschlagen einIn particular, one is proposed

Verfahren zum Betreiben eines mittels eines entflammbaren Kältemittels gekühlten Laborgeräts, aufweisend:

  • Belüften eines Innenbereichs des gekühlten Laborgeräts mithilfe eines Lüfters, wobei ein Steuern des Lüfters über einen ersten Zeitraum durch eine erste Steuereinrichtung ausgeführt wird;
  • Überprüfen mithilfe eines ersten vordefinierten Kriteriums, ob das Belüften erfolgreich war;
  • Übergeben des Steuerns des Lüfters an eine zweite Steuereinrichtung, wenn das Belüften über den ersten Zeitraum erfolgreich war;
  • Überprüfen mithilfe eines zweiten vordefinierten Kriteriums, ob der Lüfter durch die zweite Steuereinrichtung erfolgreich gesteuert wird;
  • Aktivieren einer Stromversorgung für mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung des gekühlten Laborgeräts, wenn der Lüfter durch die zweite Steuereinrichtung erfolgreich gesteuert wird.
Method for operating a laboratory device cooled using a flammable refrigerant, comprising:
  • Ventilating an interior area of the cooled laboratory device using a fan, controlling the fan over a first period of time by a first control device;
  • Checking whether ventilation was successful using a first predefined criterion;
  • transferring control of the fan to a second control device if ventilation was successful over the first period of time;
  • Checking whether the fan is successfully controlled by the second control device using a second predefined criterion;
  • Activating a power supply for at least one further device of the cooled laboratory device to be supplied with electrical power when the fan is successfully controlled by the second control device.

Das entflammbare Kältemittel kann insbesondere ein Kältemittel der Brennbarkeitsklasse 2L, 2 oder 3 sein. Das entflammbare Kältemittel kann insbesondere zum Beispiel Propan oder Butan oder Isobutan sein (Brennbarkeitsklasse 3). Andere Kältemittel, auch Kältemittel der Brennbarkeitsklassen 2L und 2, sind nicht ausgeschlossen.The flammable refrigerant can in particular be a refrigerant of flammability class 2L, 2 or 3. The flammable refrigerant can in particular be, for example, propane or butane or isobutane (flammability class 3). Other refrigerants, including refrigerants with flammability classes 2L and 2, are not excluded.

Das gekühlte Laborgerät kann ein Gerät sein, dass im Betrieb eine Kühlfunktion aufweist, zum Beispiel für Proben. Das gekühlte Laborgerät kann insbesondere einen Kältekreislauf aufweisen, in dem das Kältemittel verwendet wird. Der Kältekreislauf kann insbesondere einen Verdampfer, einen Verdichter (z. B. einen Kompressor), einen Verflüssiger (z. B. einen Kondensator) und/oder ein Drosselorgan aufweisen. Weiterhin kann der Kältekreislauf insbesondere Verbindungselemente, Dichtungen und/oder Rohrleitungen aufweisen. Die weitere mit elektrischem Strom zu versorgende Einrichtung kann zum Beispiel eine Komponente des Kältekreislaufs sein, zum Beispiel der Verdichter, der als elektrisch betriebener Kompressor ausgeführt sein kann oder zum Beispiel ein Motor (z. B. eines Zentrifugenrotors). Das gekühlte Laborgerät kann insbesondere zum Beispiel eine Laborzentrifuge oder ein Laborfreezer sein. Andere Geräte und Gerätetypen sind nicht ausgeschlossen.The cooled laboratory device can be a device that has a cooling function during operation, for example for samples. The cooled laboratory device can in particular have a refrigeration circuit in which the refrigerant is used. The refrigeration circuit can in particular have an evaporator, a compressor (e.g. a compressor), a condenser (e.g. a condenser) and/or a throttle element. Furthermore, the refrigeration circuit can in particular have connecting elements, seals and/or pipes. The further device to be supplied with electrical power can be, for example, a component of the refrigeration circuit, for example the compressor, which can be designed as an electrically operated compressor, or for example a motor (e.g. of a centrifuge rotor). The cooled laboratory device can in particular, for example, one Be a laboratory centrifuge or a laboratory freezer. Other devices and device types are not excluded.

Das Belüften des Innenbereichs kann insbesondere ein Durchlüften des Innenbereichs sein, insbesondere, sodass möglicherweise vorhandenes entflammbares Kältemittel vollständig oder größtenteils aus dem Innenbereich entfernt wird. Entflammbares Kältemittel könnte in Situationen in dem Innenbereich vorhanden sein, in denen zum Beispiel eine Leckage oder eine Undichtigkeit des Kältekreislaufs oder einer Komponente des Kältekreislaufs auftritt und hierdurch das entflammbare Kältemittel anteilig in den Innenbereich gelangt ist.Ventilating the interior area can in particular be ventilating the interior area, in particular so that any flammable refrigerant that may be present is completely or largely removed from the interior area. Flammable refrigerant could be present in the interior area in situations in which, for example, a leak or a leak in the refrigeration circuit or a component of the refrigeration circuit occurs and as a result the flammable refrigerant has partially reached the interior area.

Der Innenbereich kann zum Beispiel ein Innenbereich eines Gehäuses oder eines Gehäuseteils oder ein Innenbereich unter, an, bei oder innerhalb einer Abdeckung oder einer Innenwand oder einer Außenwand des gekühlten Laborgeräts sein. Der Innenbereich kann zum Beispiel mindestens eine Komponente oder alle Komponenten des Kältekreislaufs enthalten und/oder an mindestens eine Komponente oder alle Komponenten des Kältekreislaufs angrenzen und/oder nahe an mindestens einer Komponente des Kältekreislaufs angeordnet sein. Der Innenbereich kann auch weitere Komponenten des gekühlten Laborgeräts enthalten, zum Beispiel Elektronik oder einen Motor. Der Innenbereich kann zum Beispiel mindestens eine Öffnung nach außen aufweisen, vorzugsweise mehrere Öffnungen, um einen Luftaustausch mit einem Raum außerhalb des Innenbereichs zu gewährleisten, insbesondere einem Außenbereich und/oder einer Umgebung.The interior area can be, for example, an interior area of a housing or a housing part or an interior area under, on, near or within a cover or an inner wall or an outer wall of the cooled laboratory device. The interior region can, for example, contain at least one component or all components of the refrigeration circuit and/or be adjacent to at least one component or all components of the refrigeration circuit and/or be arranged close to at least one component of the refrigeration circuit. The interior can also contain other components of the cooled laboratory device, for example electronics or a motor. The interior area can, for example, have at least one opening to the outside, preferably several openings, to ensure air exchange with a space outside the interior area, in particular an outdoor area and/or an environment.

Der Lüfter kann insbesondere ein Ventilator sein oder einen Ventilator aufweisen. Der Lüfter kann zum Beispiel ein Axiallüfter oder ein Axialgebläse sein oder einen Axiallüfter oder ein Axialgebläse aufweisen. Der Lüfter kann insbesondere in seiner Drehzahl steuerbar sein, sodass verschiedene Lüfterdrehzahlen möglich sind, zum Beispiel mittels Pulsweitenmodulation (Der Begriff der Pulsweitenmodulation kann als Synonym zum Begriff der Pulsdauermodulation verstanden werden). Der Lüfter kann sich zum Beispiel an der Öffnung nach außen befinden. Der Lüfter kann bevorzugt insbesondere in das gekühlte Laborgerät integriert sein. Es ist nicht ausgeschlossen, dass der Lüfter als externe Einheit ausgeführt ist.The fan can in particular be a fan or have a fan. The fan can, for example, be an axial fan or an axial blower or have an axial fan or an axial blower. The speed of the fan can in particular be controllable, so that different fan speeds are possible, for example by means of pulse width modulation (the term pulse width modulation can be understood as a synonym for the term pulse duration modulation). The fan can be located, for example, at the opening to the outside. The fan can preferably be integrated in particular into the cooled laboratory device. It is not excluded that the fan is designed as an external unit.

Das Steuern des Lüfters über den ersten Zeitraum kann in einer einfachen Ausführung bedeuten, dass der Lüfter eingeschaltet wird und über den ersten Zeitraum eingeschaltet bleibt. Der Lüfter kann zum Beispiel derart gesteuert werden, dass er über den ersten Zeitraum eine erste vordefinierte Lüfterdrehzahl erreichen und/oder nicht unterschreiten soll. Der Lüfter kann eine Drehzahlbestimmungsvorrichtung (z. B. einen Hall-Geber) zur Bestimmung eines Tachosignals und/oder einer Umdrehungszahl pro Zeiteinheit aufweisen oder mit einer solchen Drehzahlbestimmungsvorrichtung verbunden sein.Controlling the fan over the first period can, in a simple implementation, mean that the fan turns on and stays on for the first period. The fan can, for example, be controlled in such a way that it should reach and/or not fall below a first predefined fan speed over the first period of time. The fan can have a speed determining device (e.g. a Hall sensor) for determining a tachometer signal and/or a number of revolutions per unit of time or can be connected to such a speed determining device.

Der erste Zeitraum kann zum Beispiel eine vordefinierte Zeitdauer sein, zum Beispiel 3-20 Sekunden, bevorzugt 5-15 Sekunden, besonders bevorzugt 8-10 Sekunden. Der erste Zeitraum kann insbesondere abhängig von einem Innenraumvolumen und einem Volumenstrom eines verwendeten Lüfters sein. Eine Zählung oder Messung des ersten Zeitraums kann automatisch mithilfe einer Zeitmessvorrichtung erfolgen, die einen Zeitmesser enthält. Die Zählung oder die Messung des ersten Zeitraums kann alternativ oder zusätzlich mithilfe eines analogen oder digitalen Zeitglieds realisiert werden. Eine Zählung oder Messung des ersten Zeitraums kann in einer einfachen Ausführungsform beginnen, sobald der Lüfter eingeschaltet wird oder läuft. Alternativ oder zusätzlich kann eine Zählung oder Messung - insbesondere der Beginn einer Zählung oder Messung - an eine Bedingung geknüpft sein. Zum Beispiel kann der erste Zeitraum oder eine Zeitmessung beginnen, sobald der Lüfter eingeschaltet ist und eine bestimmte Lüfterdrehzahl erreicht hat.The first period can, for example, be a predefined time period, for example 3-20 seconds, preferably 5-15 seconds, particularly preferably 8-10 seconds. The first period can be dependent in particular on an interior volume and a volume flow of a fan used. A count or measurement of the first period can be done automatically using a timing device that includes a timer. The counting or measurement of the first period can alternatively or additionally be implemented using an analog or digital timer. In a simple embodiment, a count or measurement of the first period can begin as soon as the fan is switched on or running. Alternatively or additionally, a count or measurement - in particular the start of a count or measurement - can be linked to a condition. For example, the first period or a time measurement can begin as soon as the fan is turned on and has reached a certain fan speed.

Die erste Steuereinrichtung kann zum Beispiel einen Ein-/Ausschalter aufweisen. Der Ein-/Ausschalter kann zum Beispiel betätigt werden, wenn das Laborgerät eingeschaltet wird. Der Ein-/Ausschalter kann mit einem Ein-/Ausschalter des Laborgeräts gekoppelt sein oder der Ein-/Ausschalter des Laborgeräts sein. Die Durchführung des Belüftens kann ein Teil des Einschaltvorgangs des Laborgeräts sein. Die Durchführung des Belüftens kann insbesondere durchgeführt werden, bevor die weitere mit elektrischem Strom zu versorgende Einrichtung des gekühlten Laborgeräts (oder mehrere oder alle mit elektrischem Strom zu versorgende weiteren Einrichtungen des gekühlten Laborgeräts) eingeschaltet oder mit Strom versorgt werden. Die Durchführung des Belüftens kann insbesondere automatisch erfolgen. Dies kann insbesondere bedeuten, dass ein Zutun eines menschlichen Nutzers zur Durchführung des Belüftens nicht erforderlich ist. Ein menschlicher Nutzer kann auf Wunsch einen Einschaltvorgang des gekühlten Laborgeräts initiieren, zum Beispiel durch Betätigen des Ein-/Ausschalters des Laborgeräts.The first control device can, for example, have an on/off switch. The on/off switch can be activated, for example, when the laboratory device is switched on. The on/off switch can be coupled to an on/off switch of the laboratory device or can be the on/off switch of the laboratory device. Carrying out the ventilation can be part of the switching on process of the laboratory device. The ventilation can be carried out in particular before the further device of the cooled laboratory device to be supplied with electrical power (or several or all other devices of the cooled laboratory device to be supplied with electric power) are switched on or supplied with power. The ventilation can in particular be carried out automatically. This can mean in particular that the intervention of a human user is not required to carry out the ventilation. If desired, a human user can initiate a switch-on process of the cooled laboratory device, for example by pressing the on/off switch of the laboratory device.

Die erste Steuereinrichtung kann insbesondere einen besonders einfachen Aufbau besitzen. Insbesondere kann sie hardwarebasiert sein. Auf die obigen Erklärungen hierzu wird Bezug genommen. Die erste Steuereinrichtung kann insbesondere eine einfache, hardwaretechnisch umgesetzte Steuerlogik aufweisen, die ein Betreiben des Lüfters bei einer bestimmten Lüfterdrehzahl, die eine Maximaldrehzahl des Lüfters oder eine bestimmte Lüfterdrehzahl sein kann, ermöglicht. Komplexere Ausführungen der ersten Steuereinrichtung sind nicht ausgeschlossen. Die erste Steuereinrichtung und/oder der Lüfter kann/können über eine Stromversorgungseinrichtung/Stromversorgungseinrichtungen (zum Beispiel kann dies ein Kabel, ein Anschluss, und/oder ein Netzteil sein) verfügen, die separat und/oder unabhängig und/oder räumlich getrennt von weiteren Stromversorgungseinrichtungen weiterer Einrichtungen des gekühlten Laborgeräts ist/sind. Die Stromversorgungseinrichtung/-en kann/können zum Beispiel eine separate Leitung/separate Leitungen und/oder einen separaten Außenanschluss/separate Außenanschlüsse am gekühlten Laborgerät oder einen separaten Kabelstrang oder Anschluss/separate Kabelstränge oder Anschlüsse innerhalb des gekühlten Laborgeräts aufweisen. Die Stromversorgungseinrichtung/-en können unabhängig von den weiteren Stromversorgungseinrichtungen anschaltbar sein.The first control device can in particular have a particularly simple structure. In particular, it can be hardware-based. Reference is made to the above explanations in this regard. The first control device can in particular have a simple, hardware-implemented control logic that enables the fan to be operated at a specific fan speed, which can be a maximum speed of the fan or a specific fan speed. More complex versions of the first Control devices are not excluded. The first control device and/or the fan can have a power supply device/devices (for example, this can be a cable, a connection, and/or a power supply unit), which are separate and/or independent and/or spatially separated from other power supply devices other facilities of the cooled laboratory device is/are. The power supply device/s can, for example, have a separate line/separate lines and/or a separate external connection/separate external connections on the cooled laboratory device or a separate cable harness or connection/separate cable harnesses or connections within the cooled laboratory device. The power supply device(s) can be connected independently of the other power supply devices.

Wenn lediglich die erste Steuereinrichtung und/oder der Lüfter anfänglich bei einem Einschaltvorgang des gekühlten Laborgeräts während des Vorgangs des Belüftens eingeschaltet ist/sind und weitere Einrichtungen des gekühlten Laborgeräts (noch) nicht mit elektrischem Strom versorgt werden, ist die Gefahr einer Funkenbildung, insbesondere in dem Innenbereich des gekühlten Laborgeräts, verringert. Entflammbares Kältemittel, falls vorhanden, kann so durch den Vorgang des Belüftens zunächst entfernt werden. Weitere Einrichtungen, an denen möglicherweise bei einer Stromversorgung Funken entstehen könnten, werden erst später eingeschaltet, wenn kein entflammbares Kältemittel mehr vorhanden ist.If only the first control device and / or the fan is initially switched on when the cooled laboratory device is switched on during the ventilation process and other devices of the cooled laboratory device are not (yet) supplied with electrical power, there is a risk of sparks forming, especially in the interior of the cooled laboratory device. Flammable refrigerant, if present, can first be removed through the venting process. Other devices that could potentially generate sparks during a power supply will only be switched on later when there is no longer any flammable refrigerant present.

Das erste vordefinierte Kriterium kann insbesondere mithilfe einer Überprüfungseinrichtung überprüft werden. In einer einfachen Ausführungsform kann die Überprüfungseinrichtung zum Beispiel einen Schwellwertschalter aufweisen. Ein solcher Schwellwertschalter kann einen elektrischen Kondensator aufweisen, der geladen wird, sobald eine bestimmte Lüfterdrehzahl erreicht wird) und/oder einen alternativen Zeitgeber oder Zeitzähler. Sobald, zum Beispiel nach dem ersten Zeitraum, ein bestimmter Ladungswert des elektrischen Kondensators erreicht ist und somit ein bestimmter Spannungswert an dem elektrischen Kondensator, kann das Vorliegen des Spannungswerts als Signal verwendet werden, dass das Überprüfen mithilfe des ersten vordefinierten Kriteriums erfolgreich ist. Wird hingegen die bestimmte Lüfterdrehzahl unterschritten, kann der elektrische Kondensator wieder entladen werden. Erst, wenn die bestimmte Lüfterdrehzahl über einen bestimmten Zeitraum (zum Beispiel der erste Zeitraum) erreicht wird, kann der Spannungswert so hoch sein, dass das erste vordefinierte Kriterium als erfolgreich erfüllt gilt. Die Überprüfungseinrichtung kann in einer komplexeren Ausführungsform alternativ oder zusätzlich eine Überprüfungslogik aufweisen, zum Beispiel realisiert mithilfe einer Recheneinrichtung (z. B. eines Prozessors) und entsprechender Befehle, Steuerregeln und/oder Kennlinien. Die Überprüfungseinrichtung kann auch einen Zeitmesser aufweisen.The first predefined criterion can be checked in particular using a checking device. In a simple embodiment, the checking device can have a threshold switch, for example. Such a threshold switch may include an electrical capacitor that is charged as soon as a certain fan speed is reached) and/or an alternative timer or time counter. As soon as, for example after the first period of time, a certain charge value of the electrical capacitor is reached and thus a certain voltage value on the electrical capacitor, the presence of the voltage value can be used as a signal that the checking using the first predefined criterion is successful. However, if the fan speed falls below a certain level, the electrical capacitor can be discharged again. Only when the specific fan speed is reached over a specific period of time (for example the first period of time) can the voltage value be so high that the first predefined criterion is considered to have been successfully met. In a more complex embodiment, the checking device can alternatively or additionally have checking logic, for example implemented using a computing device (e.g. a processor). and corresponding commands, control rules and/or characteristics. The checking device can also have a timer.

Die Überprüfungseinrichtung kann alternativ oder zusätzlich zum Beispiel einen Wechselspannungsverstärker aufweisen, der bei Flankenwechseln eines Tachosignals (entsprechend einem Lüfterdrehzahlsignal) Energie in den elektrischen Kondensator lädt. Ist eine Frequenz der Flankenwechsel (und somit die Lüfterdrehzahl) ausreichend hoch (also z. B. gleich oder oberhalb der bestimmten Lüfterdrehzahl), gelangt eine höhere elektrische Leistung in den elektrischen Kondensator, als ihm entzogen wird. Die Überprüfungseinrichtung kann weiterhin alternativ oder zusätzlich zum Beispiel einen integrierten Schaltkreis wie zum Beispiel einen retriggerbaren, monostabilen Multivibrator oder einen Monoflop aufweisen.The checking device can alternatively or additionally, for example, have an AC voltage amplifier which charges energy into the electrical capacitor when the edges of a tachometer signal (corresponding to a fan speed signal) change. If a frequency of the edge changes (and thus the fan speed) is sufficiently high (e.g. equal to or above the specific fan speed), a higher electrical power enters the electrical capacitor than is withdrawn from it. The checking device can also alternatively or additionally, for example, have an integrated circuit such as a retriggerable, monostable multivibrator or a monoflop.

Die Überprüfungseinrichtung kann weiterhin alternativ oder zusätzlich z. B. einen Counter oder Zähler aufweisen, der in Form einer definierten Taktdauer eine Mindestzeit für eine Belüftung (die der erste Zeitraum sein kann) definiert. Bei einem Unterschreiten der bestimmten Lüfterdrehzahl kann der Counter oder Zähler zurückgesetzt werden, sodass ein Zählvorgang des Counters oder Zählers von neuem beginnen muss.The checking device can also alternatively or additionally z. B. have a counter or counter that defines a minimum time for ventilation (which can be the first period) in the form of a defined cycle duration. If the fan speed falls below the specified speed, the counter or counter can be reset, so that the counting process of the counter or counter must begin again.

Wie bereits erwähnt kann der Lüfter eine Drehzahlmessvorrichtung zur Messung eines Tachosignals und/oder einer Umdrehungszahl pro Zeiteinheit aufweisen oder mit einer solchen Drehzahlmessvorrichtung verbunden sein. Ausführungsformen für Drehzahlmessvorrichtungen sind im Stand der Technik bekannt, zum Beispiel ist eine Drehzahlmessung mittels Hall-Sensor möglich. Die Überprüfungseinrichtung kann Teil der ersten Steuereinrichtung sein oder mit ihr verbunden sein. Eine Stromversorgung der Überprüfungseinrichtung kann mit einer Stromversorgung der ersten Steuereinrichtung verbunden sein. Die Stromversorgung der Überprüfungseinrichtung kann mithilfe einer Stromversorgungseinrichtung durchgeführt werden, die separat und/oder unabhängig und/oder räumlich getrennt von weiteren Stromversorgungseinrichtungen weiterer Einrichtungen des gekühlten Laborgeräts ist.As already mentioned, the fan can have a speed measuring device for measuring a tachometer signal and/or a number of revolutions per unit of time or can be connected to such a speed measuring device. Embodiments for speed measuring devices are known in the prior art; for example, speed measurement using a Hall sensor is possible. The checking device can be part of the first control device or connected to it. A power supply of the checking device can be connected to a power supply of the first control device. The power supply of the checking device can be carried out using a power supply device that is separate and/or independent and/or spatially separated from other power supply devices of other devices of the cooled laboratory device.

Das erste vordefinierte Kriterium kann zum Beispiel eine Bedingung in Bezug auf eine Lüfterdrehzahl und/oder in Bezug auf eine Zeitdauer, in der der Lüfter zum Beispiel bei einer bestimmten Lüfterdrehzahl arbeiten soll, aufweisen. Das erste vordefinierte Kriterium kann - konkreter- zum Beispiel lauten, dass eine bestimmte Lüfterdrehzahl, die auch zum Beispiel als erste vordefinierte Lüfterdrehzahl bezeichnet werden kann, erreicht und/oder nicht unterschritten werden darf. Ein Erreichen und/oder ein Nicht-Unterschreiten der ersten vordefinierten Lüfterdrehzahl kann über einen bestimmten Zeitraum, der der erste Zeitraum sein kann, durch das erste vordefinierte Kriterium gefordert sein. Die Bedingung, dass eine bestimmte Lüfterdrehzahl (die die erste vordefinierte Lüfterdrehzahl sein kann) über einen bestimmten Zeitraum (der der erste Zeitraum sein kann) erreicht werden muss, kann derart ausgestaltet sein, dass bei der bestimmten Lüfterdrehzahl und dem bestimmten Zeitraum erfahrungsgemäß sichergestellt ist, dass in dem Innenbereich befindliches entflammbares Kältemittel vollständig oder nahezu vollständig aus dem Innenbereich entfernt ist. Das Belüften kann insbesondere dann als erfolgreich gelten, wenn das erste vordefinierte Kriterium erfüllt wurde.The first predefined criterion may, for example, have a condition related to a fan speed and/or related to a period of time in which the fan should operate, for example, at a specific fan speed. The first predefined criterion can - more specifically - be, for example, that a certain fan speed, which can also be referred to as the first predefined fan speed, for example, must be reached and/or not fallen below. Achieving and/or not falling below the first predefined fan speed can occur over a certain period of time, which is the first period of time can be required by the first predefined criterion. The condition that a specific fan speed (which can be the first predefined fan speed) must be achieved over a specific period of time (which can be the first period of time) can be designed in such a way that experience has shown that at the specific fan speed and the specific period of time, that flammable refrigerant located in the interior area is completely or almost completely removed from the interior area. Ventilation can be considered successful in particular if the first predefined criterion has been met.

Wie bereits erwähnt, kann die zweite Steuereinrichtung insbesondere eine Steuereinrichtung sein, die eine software- und/oder firmwarebasierte Steuereinrichtung ist. Auf die obigen Bemerkungen zur zweiten Steuereinrichtung wird verwiesen. Zum Beispiel kann die zweite Steuereinrichtung ausgestaltet sein, eine bedarfsgerechte Steuerung des Lüfters zu realisieren. Zum Beispiel kann die zweite Steuereinrichtung eine Messsensorik (z. B. einen Temperaturfühler zur Ermittlung eines Temperaturwerts in dem Innenbereich und/oder in einem Außenbereich oder eine Messsonde für eine Konzentration des Kältemittels) aufweisen, mithilfe derer ein Lüftungsbedarf- zum Beispiel mittels integrierter, software-/firmwareseitig definierter Regeln und/oder Kennlinien - und eine entsprechende Lüfterdrehzahl ermittelt werden kann.As already mentioned, the second control device can in particular be a control device that is a software and/or firmware-based control device. Reference is made to the above comments regarding the second control device. For example, the second control device can be designed to implement demand-based control of the fan. For example, the second control device can have a measuring sensor system (e.g. a temperature sensor for determining a temperature value in the indoor area and/or in an outdoor area or a measuring probe for a concentration of the refrigerant), with the help of which a ventilation requirement can be determined - for example using integrated software -/firmware-defined rules and/or characteristics - and a corresponding fan speed can be determined.

Ein Übergeben des Steuerns des Lüfters kann zum Beispiel ein Übergeben einer Kontrolle oder Steuerung über eine Stromversorgung des Lüfters sein, zum Beispiel mithilfe einer Übergabeeinrichtung, die zum Bespiel ein entsprechender Schalter (z. B. ein RS-Flipflop) sein kann oder einen entsprechenden Schalter (z. B. ein RS-Flipflop) aufweisen kann, der einen entsprechenden Schaltvorgang auslöst. Der Schalter kann zum Beispiel ausgelöst werden, wenn an dem elektrischen Kondensator ein Signal oder ein Spannungswert ausgegeben wird oder vorliegt, der darauf hindeutet, dass das Belüften erfolgreich war. Die Übergabeeinrichtung kann auch eine elektronische Steuerung und/oder eine Recheneinrichtung (z. B. einen Prozessor) und/oder ein Relais aufweisen.Handing over control of the fan can, for example, be handing over control over a power supply of the fan, for example using a transfer device, which can be, for example, a corresponding switch (e.g. an RS flip-flop) or a corresponding switch (e.g. an RS flip-flop) that triggers a corresponding switching process. The switch can be triggered, for example, if a signal or a voltage value is output or is present at the electrical capacitor which indicates that the ventilation was successful. The transfer device can also have an electronic control and/or a computing device (e.g. a processor) and/or a relay.

Das Übergeben kann insbesondere vorgenommen werden, wenn das erste vordefinierte Kriterium erfolgreich erfüllt worden ist. Falls das erste vordefinierte Kriterium nicht erfolgreich erfüllt worden ist oder das Belüften nicht erfolgreich war, kann insbesondere Konsequenz sein, dass das Übergeben nicht ausgeführt wird. In diesem Fall kann zum Beispiel ein Betrieb des gekühlten Laborgeräts beendet bzw. verhindert werden, zum Beispiel anhand eines vordefinierten Ausschaltkriteriums, zum Beispiel, wenn nach einem vordefinierten Zeitraum es nicht erreicht wurde, dass das erste vordefinierte Kriterium erfüllt wurde. Wenn das Belüften nicht erfolgreich war, kann das gekühlte Laborgerät automatisch abgeschaltet bzw. gar nicht erst eingeschaltet werden.The handover can be carried out in particular when the first predefined criterion has been successfully met. If the first predefined criterion has not been successfully met or the ventilation was not successful, the particular consequence may be that the transfer is not carried out. In this case, for example, operation of the cooled laboratory device can be stopped or prevented, for example based on a predefined switch-off criterion, for example if after a predefined period of time the first predefined criterion has not been met. If If the ventilation was not successful, the cooled laboratory device can be switched off automatically or not switched on at all.

Die zweite Steuereinrichtung kann allgemein, insbesondere, wenn sie software- und/oder firmwarebasiert ist, komplexer aufgebaut sein als die erste Steuereinrichtung. Die erste Steuereinrichtung kann, da sie besonders einfach aufgebaut ist, besonders zuverlässig oder ausfallsicher sein, insbesondere zuverlässiger oder ausfallsicherer oder weniger fehleranfällig als die zweite Steuereinrichtung. Die erste Steuereinrichtung ist daher gut geeignet, den Innenbereich anfänglich zu belüfteten, um möglicherweise vorhandenes entflammbares Kältemittel besonders zuverlässig aus dem Innenbereich zu entfernen. Zusätzlich ist vorteilhaft, dass eine Gefahr der Funkenbildung reduziert ist, wie oben erklärt.The second control device can generally have a more complex structure than the first control device, particularly if it is software and/or firmware-based. Since it has a particularly simple structure, the first control device can be particularly reliable or fail-safe, in particular more reliable or fail-safe or less error-prone than the second control device. The first control device is therefore well suited to initially ventilate the interior area in order to particularly reliably remove any flammable refrigerant that may be present from the interior area. In addition, it is advantageous that the risk of sparking is reduced, as explained above.

Ob das zweite vordefinierte Kriterium erfüllt worden ist, kann insbesondere mithilfe einer weiteren Überprüfungseinrichtung kontrolliert werden, zum Beispiel aufweisend eine Recheneinrichtung (z. B. einen Prozessor) und Befehle, Steuerregeln und/oder Kennlinien zur Überprüfung des Tachosignals des Lüfters und/oder einen Zeitmesser. Es ist alternativ oder zusätzlich nicht ausgeschlossen, dass die Überprüfungseinrichtung, mithilfe derer das erste vordefinierte Kriterium überprüft wird, zusätzlich überprüft, ob das zweite vordefinierte Kriterium erfüllt worden ist.Whether the second predefined criterion has been met can be checked in particular using a further checking device, for example comprising a computing device (e.g. a processor) and commands, control rules and/or characteristics for checking the tacho signal of the fan and/or a timer . Alternatively or additionally, it is not excluded that the checking device with which the first predefined criterion is checked additionally checks whether the second predefined criterion has been met.

Die weitere Überprüfungseinrichtung kann Teil der zweiten Steuereinrichtung sein oder mit ihr verbunden sein. Eine Stromversorgung der weiteren Überprüfungseinrichtung kann mit einer Stromversorgung der zweiten Steuereinrichtung verbunden sein. Die Stromversorgung der weiteren Überprüfungseinrichtung kann mithilfe einer Stromversorgungseinrichtung durchgeführt werden, die separat und/oder unabhängig und/oder räumlich getrennt von weiteren Stromversorgungseinrichtungen weiterer Einrichtungen des gekühlten Laborgeräts ist.The further checking device can be part of the second control device or connected to it. A power supply of the further checking device can be connected to a power supply of the second control device. The power supply of the further checking device can be carried out using a power supply device that is separate and/or independent and/or spatially separated from further power supply devices of other devices of the cooled laboratory device.

Das zweite vordefinierte Kriterium kann zum Beispiel eine Bedingung in Bezug auf eine Lüfterdrehzahl und/oder in Bezug auf eine Zeitdauer, in der der Lüfter zum Beispiel bei einer bestimmten Lüfterdrehzahl arbeiten soll, aufweisen. Das zweite vordefinierte Kriterium kann - konkreter- zum Beispiel lauten, dass eine bestimmte Lüfterdrehzahl, die auch zum Beispiel als zweite vordefinierte Lüfterdrehzahl bezeichnet werden kann, erreicht und/oder nicht unterschritten werden darf. Ein Erreichen und/oder ein Nicht-Unterschreiten der zweiten vordefinierten Lüfterdrehzahl kann über einen bestimmten Zeitraum durch das zweite vordefinierte Kriterium gefordert sein.The second predefined criterion may, for example, have a condition related to a fan speed and/or related to a period of time in which the fan should operate, for example, at a specific fan speed. The second predefined criterion can - more concretely - be, for example, that a certain fan speed, which can also be referred to, for example, as a second predefined fan speed, must be reached and/or not fallen below. Reaching and/or not falling below the second predefined fan speed can be required by the second predefined criterion over a certain period of time.

Das Aktivieren der Stromversorgung für die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung kann zum Beispiel mithilfe einer Aktivierungseinrichtung erfolgen, zum Beispiel aufweisend eine Recheneinrichtung (z. B. einen Prozessor) und entsprechende Befehle. Das Aktivieren kann nach einer gewissen Verzögerungszeit erfolgen, die aus Sicherheitsgründen seit dem Übergeben vergangen sein muss. Die Verzögerungszeit kann zum Beispiel bei 5 Sekunden, oder 10 Sekunden liegen. Die Verzögerungszeit kann auch zum Beispiel kürzer sein, z. B. 5-1 Sekunden. Die Aktivierungseinrichtung kann alternativ oder zusätzlich insbesondere einen Schalter, zum Beispiel ein Relais, zum Aktivieren einer Stromversorgung für die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung aufweisen, oder mit einem solchen Schalter verbunden sein. Das Aktivieren kann insbesondere vorgenommen werden, wenn das zweite vordefinierte Kriterium erfolgreich erfüllt worden ist. Der Begriff der weiteren mit elektrischem Strom zu versorgende Einrichtung ist so zu verstehen, dass der Lüfter selbst von diesem Begriff nicht umfasst ist.The power supply for the at least one further device to be supplied with electrical power can be activated, for example, using an activation device, for example comprising a computing device (e.g. a processor) and corresponding commands. Activation can take place after a certain delay time, which for security reasons must have passed since the handover. The delay time can be, for example, 5 seconds or 10 seconds. The delay time can also be shorter, for example, e.g. B. 5-1 seconds. The activation device can alternatively or additionally in particular have a switch, for example a relay, for activating a power supply for the at least one further device to be supplied with electrical power, or can be connected to such a switch. Activation can be carried out in particular when the second predefined criterion has been successfully met. The term “further device to be supplied with electrical power” is to be understood in such a way that the fan itself is not included in this term.

Die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung kann jeglicher weiterer Bestandteil des gekühlten Laborgeräts sein, der mit elektrischem Strom versorgt wird. Insbesondere kann es sich um einen Bestandteil des Kältekreislaufs handeln, zum Beispiel den Verdichter (der zum Beispiel ausgeführt sein kann als Kompressor), einen Antriebsmotor (zum Beispiel, wenn das gekühlte Laborgerät eine Zentrifuge ist), ein Display oder ein Steuergerät. Das Aktivieren der Stromversorgung für die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung kann auch bedeuten, dass das gekühlte Laborgerät - zum Beispiel vollständig - angeschaltet wird, sodass ein Betrieb des gekühlten Laborgeräts (zum Beispiel, wenn es sich um eine Zentrifuge handelt, ein Arbeitsgang) beginnen kann.The at least one further device to be supplied with electrical power can be any other component of the cooled laboratory device that is supplied with electrical power. In particular, it can be a component of the refrigeration circuit, for example the compressor (which can be designed as a compressor, for example), a drive motor (for example if the cooled laboratory device is a centrifuge), a display or a control device. Activating the power supply for the at least one further device to be supplied with electrical power can also mean that the cooled laboratory device is switched on - for example completely - so that operation of the cooled laboratory device (for example, if it is a centrifuge) is stopped operation) can begin.

Das Verfahren kann derart ausgestaltet sein, dass das Aktivieren der Stromversorgung für die mindestens eine Komponente nicht oder zum Beispiel nicht in einem vordefinierten Zeitraum oder nicht vor einem Abschalten und erneuten Einschalten des gekühlten Laborgeräts durchgeführt wird, wenn die Steuerung durch die zweite Steuereinrichtung oder das zweite Steuerverfahren nicht erfolgreich ist.The method can be designed in such a way that the activation of the power supply for the at least one component is not carried out or, for example, not in a predefined period of time or not before the cooled laboratory device is switched off and switched on again, if the control is carried out by the second control device or the second Tax procedure is not successful.

Alle genannten Schritte des Verfahrens können automatisch erfolgen oder ausgeführt werden. Auf den Schritt des Belüftens des Innenbereichs kann der Schritt des Überprüfens mithilfe des ersten vordefinierten Kriteriums folgen. Auf den Schritt des Überprüfens mithilfe des ersten vordefinierten Kriteriums kann das Übergeben des Steuerns folgen. Auf den Schritt des Übergebens kann das Überprüfen mithilfe des zweiten vordefinierten Kriteriums folgen. Auf den Schritt des Überprüfens mithilfe des zweiten vordefinierten Kriteriums kann der Schritt des Aktivierens folgen. Das Verfahren kann ausgestaltet sein, dass der jeweils nächste Schritt erst dann folgt, wenn der vorherige Schritt jeweils abgeschlossen ist.All of the steps mentioned in the process can occur or be carried out automatically. The step of ventilating the indoor area can be followed by the step of checking using the first predefined criterion. The step of checking using the first predefined criterion can be followed by passing control. The passing step can be checked using the second predefined criterion consequences. The step of checking using the second predefined criterion can be followed by the step of activating. The method can be designed so that the next step only follows when the previous step has been completed.

Das vorgestellte Verfahren bietet eine einfache und kostengünstige Möglichkeit, die Betriebssicherheit von gekühlten Laborgeräten, die mittels eines entflammbaren Kältemittels gekühlt werden, zu verbessern. Bevor eine Gefahr durch Funkenbildung in Bezug auf das entflammbare Kältemittel besteht, wird durch ein Belüften des Innenbereichs möglicherweise vorhandenes entflammtes Kältemittel aus ihm entfernt. Weiterhin wird ein Testlauf des Lüfters durchgeführt, um eine Fehlfunktion des Lüfters frühzeitig zu erkennen. Vorteilhaft ist neben dem Umstand des Belüftens als solchem und der schon hierdurch erhöhten Betriebssicherheit zudem, dass eine besonders ausfallsichere und unabhängige hardwarebasierte Steuerung (sofern die erste Steuereinrichtung derart ausgestaltet ist) das Belüften steuert und ein Defekt des Lüfters (zum Beispiel eine mechanische Blockade oder ein Kontaktproblem) früh und zuverlässig erkannt werden kann, insbesondere bereits, bevor Funkenquellen innerhalb des gekühlten Laborgeräts aktiviert sind.The presented method offers a simple and cost-effective way to improve the operational safety of refrigerated laboratory equipment that is cooled using a flammable refrigerant. Before there is a risk of sparking from the flammable refrigerant, venting the interior will remove any flammable refrigerant that may be present. Furthermore, a test run of the fan is carried out in order to detect a malfunction of the fan at an early stage. In addition to the fact of ventilation as such and the increased operational reliability that this brings, it is also advantageous that a particularly fail-safe and independent hardware-based control (if the first control device is designed in this way) controls the ventilation and a defect in the fan (for example a mechanical blockage or a Contact problem) can be detected early and reliably, especially before spark sources within the cooled laboratory device are activated.

Vorteilhaft ist weiterhin, dass ein Problem der zweiten Steuereinrichtung separat erkannt werden kann, wobei die zweite Steuereinrichtung eine bedarfsgerechte Lüfterdrehzahl realisieren kann, insbesondere mittels Pulsweitenmodulation, sofern sie entsprechend ausgestaltet ist. Die zweite Steuereinrichtung wird ggf. in vorteilhafter Weise erst aktiviert, wenn ein Defekt des Lüfters ausgeschlossen werden kann. Da die erste Steuereinrichtung grundsätzlich zuverlässiger ist als die zweite Steuereinrichtung, wird zudem - durch den anfänglichen Einsatz der ersten Steuereinrichtung - einer möglicherweise schädlichen Lüfterfehlfunktion direkt nach einem Einschalten des gekühlten Laborgeräts besonders effektiv vorgebeugt.It is also advantageous that a problem in the second control device can be recognized separately, with the second control device being able to realize a fan speed that meets requirements, in particular by means of pulse width modulation, provided it is designed accordingly. If necessary, the second control device is only activated in an advantageous manner when a defect in the fan can be ruled out. Since the first control device is fundamentally more reliable than the second control device, a potentially harmful fan malfunction directly after switching on the cooled laboratory device is particularly effectively prevented - through the initial use of the first control device.

Vorteilhaft ist weiterhin, dass eine anfängliche Belüftungskontrolle, die insbesondere hardwarebasiert sein kann, geringen Aufwand bei Entwicklung und Zulassung benötigt. Andere, konstruktiv aufwendigere und/oder teurere Kontroll- bzw. Schutzmaßnahmen (z. B. Drucksensoren) werden überflüssig.Another advantage is that an initial ventilation control, which can in particular be hardware-based, requires little effort in development and approval. Other, more structurally complex and/or more expensive control or protective measures (e.g. pressure sensors) become unnecessary.

Die vorliegende Erfindung ist grundsätzlich für alle Geräte geeignet, die einen Kältekreislauf mit brennbarem Kältemittel enthalten. Auch auf sonstige Geräte, die gefährliche Gase oder andere die Gesundheit gefährdende Ausdünstungen aufweisen oder erzeugen, kann die vorliegende Erfindung angewendet werden.The present invention is fundamentally suitable for all devices that contain a refrigeration circuit with flammable refrigerant. The present invention can also be applied to other devices that contain or produce dangerous gases or other fumes that are hazardous to health.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens wird vor dem Belüften des Innenbereichs eine Stromversorgung für den Lüfter hergestellt, insbesondere unmittelbar vor dem Belüften.In an advantageous embodiment of the method according to the invention, a power supply for the fan is produced before the interior area is ventilated, in particular immediately before the ventilation.

Die Stromversorgung kann bevorzugt insbesondere mithilfe eines Ein-/Ausschalters des gekühlten Laborgeräts hergestellt werden. Das gekühlte Laborgerät kann ausgestaltet sein, dass der Ein-/Ausschalter zu Beginn eines Betriebes des gekühlten Laborgeräts als einziger Schalter betätigt werden braucht. Das Belüften des Innenbereichs kann dann automatisch begonnen werden. Die Stromversorgung kann auch, weniger bevorzugt, mithilfe eines separaten Ein-/Ausschalters hergestellt werden.The power supply can preferably be produced in particular using an on/off switch of the cooled laboratory device. The cooled laboratory device can be designed so that the on/off switch is the only switch that needs to be pressed at the start of operation of the cooled laboratory device. Ventilation of the interior can then begin automatically. Power can also, less preferably, be provided using a separate on/off switch.

"Unmittelbar vor dem Belüften" kann heißen, dass das Belüften sich unmittelbar an ein Herstellen der Stromversorgung - zum Beispiel mithilfe des Ein-/Ausschalters des gekühlten Laborgeräts - anschließt, zum Beispiel bevorzugt innerhalb von 5 Sekunden, oder innerhalb von 10 Sekunden oder 20 Sekunden oder einer Minute.“Immediately before ventilating” can mean that ventilating immediately follows the establishment of the power supply - for example using the on/off switch of the cooled laboratory device - for example preferably within 5 seconds, or within 10 seconds or 20 seconds or a minute.

Die vorgestellte Ausgestaltung erlaubt einen einfachen und benutzerfreundlichen Einschaltvorgang. Insbesondere, wenn die Stromversorgung unmittelbar vor dem Belüften hergestellt wird, kann der Einschaltvorgang gleichsam besonders sicher sein, da ein Zeitraum, in dem der Lüfter vor dem Belüften des Innenbereichs mit elektrischem Strom versorgt wird, sehr gering ist und so die Gefahr einer Funkenbildung am Lüfter selbst minimiert wird.The presented design allows a simple and user-friendly switching process. In particular, if the power supply is established immediately before ventilation, the switch-on process can be particularly safe, as it were, since the period of time in which the fan is supplied with electrical power before the interior is ventilated is very small and so there is a risk of sparks forming on the fan itself is minimized.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens wird die Stromversorgung für den Lüfter durch einen Einschaltvorgang des gekühlten Laborgeräts hergestellt. Das kann insbesondere heißen, dass die Stromversorgung für den Lüfter automatisch hergestellt wird, wenn das gekühlte Laborgerät eingeschaltet wird, zum Beispiel mithilfe eines Ein-/Ausschalters des gekühlten Laborgeräts. Der Einschaltvorgang kann nach einem Herstellen der Stromversorgung für den Lüfter weitere Schritte umfassen. Weitere Schritte des Einschaltvorgangs - insbesondere das Übergeben des Steuerns des Lüfters und das Aktivieren der Stromversorgung für mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung des gekühlten Laborgeräts - können danach folgen.In an advantageous embodiment of the method according to the invention, the power supply for the fan is produced by switching on the cooled laboratory device. This can mean in particular that the power supply for the fan is automatically established when the cooled laboratory device is switched on, for example using an on/off switch of the cooled laboratory device. The power-on process may include additional steps after power is supplied to the fan. Further steps of the switch-on process - in particular the transfer of control of the fan and the activation of the power supply for at least one further device of the cooled laboratory device to be supplied with electrical power - can then follow.

Die vorgestellte Ausgestaltung erlaubt einen besonders einfachen und benutzerfreundlichen Einschaltvorgang.The presented embodiment allows a particularly simple and user-friendly switching process.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens ist die erste Steuereinrichtung eine hardwarebasierte Steuereinrichtung.In an advantageous embodiment of the method according to the invention, the first control device is a hardware-based control device.

Auf die obigen Bemerkungen in Bezug auf die hardwarebasierte Steuereinrichtung und den Begriff "hardwarebasiert" wird verwiesen. Die hardwarebasierte Steuereinrichtung kann besonders einfach aufgebaut sowie unabhängig von weiteren Einrichtungen des gekühlten Laborgeräts sein und daher besonders zuverlässig und ausfallsicher sein. Ein Defekt des Lüfters, zum Beispiel eine Blockade oder ein Kontaktproblem, können erkannt werden, bevor weitere Einrichtungen des gekühlten Laborgeräts Schaden nehmen können. Wenn der Lüfter defekt ist, kann weiterhin ein Betrieb des gekühlten Laborgeräts ohnehin ausgeschlossen sein. Eine dahingehende Feststellung eines solchen Defekts kann in vorteilhafter Weise bereits dann getroffen werden, bevor eine Gefahr einer Entzündung des Kältemittels durch weitere, potentiell funkenbildende Einrichtungen des gekühlten Laborgeräts, deren Einschalten im Falle eines defekten Lüfters ohnehin zwecklos und ggf. schädlich wäre, besteht.Reference is made to the above comments regarding the hardware-based controller and the term “hardware-based”. The hardware-based control device can have a particularly simple structure and can be independent of other devices of the cooled laboratory device and can therefore be particularly reliable and fail-safe. A defect in the fan, for example a blockage or a contact problem, can be detected before other components of the cooled laboratory device can be damaged. If the fan is defective, operation of the cooled laboratory device may still be impossible. A determination of such a defect can advantageously be made before there is a risk of the refrigerant being ignited by other, potentially spark-generating devices of the cooled laboratory device, the switching of which would be pointless and possibly harmful in the event of a defective fan.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens ist die zweite Steuereinrichtung eine softwarebasierte oder eine firmwarebasierte Steuereinrichtung.In an advantageous embodiment of the method according to the invention, the second control device is a software-based or a firmware-based control device.

Auf die obigen Bemerkungen in Bezug auf die softwarebasierte oder firmwarebasierte Steuereinrichtung und die Begriffe "softwarebasiert" und "firmwarebasiert" wird verwiesen. Die softwarebasierte oder firmwarebasierte Steuereinrichtung ist vorteilhaft, weil sie insbesondere eine bedarfsgerechte Steuerung des Lüfters, insbesondere eine bedarfsgerechte Steuerung der Lüfterdrehzahl ermöglichen kann. Ist der Belüftungsbedarf, zum Beispiel wegen einer ohnehin geringen Temperatur im Innenbereich, gering, kann eine niedrige Lüfterdrehzahl ausreichend sein. Erst bei hohem Belüftungsbedarf, zum Beispiel bei einer erhöhten Temperatur im Innenbereich, kann eine hohe Lüfterdrehzahl einzustellen sein. Eine Umsetzung kann zum Beispiel mithilfe von Kennlinien oder Kennfeldern erfolgen. Diese Ausgestaltung erlaubt einen geringen Energieverbrauch durch den Lüfter, eine geringe Abnutzung und hohe Lebensdauer des Lüfters, geringeren Wartungsaufwand, geringe Verschmutzung, zum Beispiel durch Staub in dem Innenbereich, sowie eine geringere Geräuschentwicklung.Reference is made to the above comments regarding the software-based or firmware-based controller and the terms "software-based" and "firmware-based". The software-based or firmware-based control device is advantageous because it can enable, in particular, needs-based control of the fan, in particular needs-based control of the fan speed. If the ventilation requirement is low, for example due to an already low temperature indoors, a low fan speed may be sufficient. Only when there is a high need for ventilation, for example when there is an increased temperature indoors, can a high fan speed be set. Implementation can be done, for example, using characteristic curves or maps. This configuration allows low energy consumption by the fan, low wear and a long service life of the fan, lower maintenance requirements, low contamination, for example from dust in the interior, and lower noise.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens ist oder umfasst das erste Kriterium ein Nicht-Unterschreiten oder ein Erreichen einer ersten vordefinierten Lüfterdrehzahl.In an advantageous embodiment of the method according to the invention, the first criterion is or includes not falling below or reaching a first predefined fan speed.

Ein Nicht-Unterschreiten kann insbesondere ein Nicht-Unterschreiten über einen bestimmten Zeitraum bedeuten. Der bestimmte Zeitraum kann insbesondere zum Beispiel der erste Zeitraum sein. Der bestimmte Zeitraum kann ein Zeitraum sein, der in Verbindung mit der ersten vordefinierten Lüfterdrehzahl das Belüften derart ermöglicht, dass entflammbares Kältemittel aus dem Innenbereich vollständig oder näherungsweise vollständig entfernt ist. Die erste vordefinierte Lüfterdrehzahl kann demgemäß gewählt sein, dass sie das Belüften derart ermöglicht, dass entflammbares Kältemittel aus dem Innenbereich innerhalb des bestimmten Zeitraums vollständig oder näherungsweise vollständig entfernt ist.Not falling below the limit can in particular mean not falling below the limit over a certain period of time. The specific period can in particular be, for example, the first period. The specific period of time may be a period of time which, in conjunction with the first predefined fan speed, enables ventilation such that flammable refrigerant is completely or approximately completely removed from the interior. The first predefined fan speed may be selected to enable ventilation such that flammable refrigerant is completely or approximately completely removed from the interior within the specific period of time.

Wie lang der bestimmte Zeitraum sein muss und welche Lüfterdrehzahl hierzu erforderlich sein muss, kann zum Beispiel versuchsweise und/oder mithilfe von Simulationen ermittelt werden. Die erste vordefinierte Lüfterdrehzahl kann alternativ eine (z. B. vordefinierte) Maximaldrehzahl bei einer bestimmten Spannung (z. B. 12 V) oder eine Nenndrehzahl des Lüfters sein.How long the specific period of time must be and what fan speed must be required can, for example, be determined experimentally and/or with the help of simulations. The first predefined fan speed can alternatively be a (e.g. predefined) maximum speed at a specific voltage (e.g. 12 V) or a nominal speed of the fan.

Auch ein Erreichen einer ersten vordefinierten Lüfterdrehzahl ist als erstes Kriterium denkbar. Das Erreichen kann zum Beispiel innerhalb eines bestimmten Zeitraums gefordert sein. So kann zum Beispiel gemessen werden, ob die erste vordefinierte Lüfterdrehzahl ordnungsgemäß erreicht wird und/oder ob sie innerhalb einer Zeitspanne erreicht wird. Die Zeitspanne kann zum Beispiel eine typische Beschleunigungszeit des Lüfters sein, zum Beispiel im Intervall von 0,1 bis 3 Sekunden. Ist die Beschleunigung zu langsam, wird also die erste vordefinierte Lüfterdrehzahl nicht innerhalb der Zeitspanne erreicht, kann dies auf einen Defekt des Lüfters hindeuten.Reaching a first predefined fan speed is also conceivable as a first criterion. Achievement can, for example, be required within a certain period of time. For example, it can be measured whether the first predefined fan speed is reached properly and/or whether it is reached within a period of time. The time period can be, for example, a typical acceleration time of the fan, for example in the interval of 0.1 to 3 seconds. If the acceleration is too slow, i.e. the first predefined fan speed is not reached within the time period, this may indicate a defect in the fan.

Die erste vordefinierte Lüfterdrehzahl kann selbst ein veränderlicher Wert sein. Zum Beispiel kann die erste vordefinierte Lüfterdrehzahl von einer Temperatur, zum Beispiel einer Temperatur in dem Innenbereich oder einer Außentemperatur, oder von einem Zeitraum abhängen, in dem das gekühlte Laborgerät nicht in Betrieb war.The first predefined fan speed can itself be a variable value. For example, the first predefined fan speed may depend on a temperature, for example an indoor temperature or an outdoor temperature, or on a period of time during which the cooled laboratory device was not in operation.

Die vorgestellte Ausgestaltung erlaubt es, auf einfache und einfach umzusetzende Art und Weise mit geringem steuerungstechnischem und prüftechnischem Aufwand eine sichere Beurteilung der Funktionsfähigkeit des Lüfters umzusetzen. Insbesondere kann auf einfachem Wege getestet werden, ob der Lüfter selbst ordnungsgemäß funktionsfähig ist. Sollte zum Beispiel eine ordnungsgemäße Steuerung durch die zweite Steuereinrichtung fehlschlagen, kann so bereits ausgeschlossen werden, dass ein Fehler im Lüfter selbst liegt (zum Beispiel Blockade, mechanischer defekt, Kontaktprobleme etc.).The presented embodiment makes it possible to carry out a reliable assessment of the functionality of the fan in a simple and easy-to-implement manner with little control and testing effort. In particular, it is easy to test whether the fan itself is functioning properly. If, for example, proper control by the second control device fails, it can be ruled out that there is an error in the fan itself (e.g. blockage, mechanical defect, contact problems, etc.).

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens ist oder umfasst das zweite Kriterium ein Nicht-Unterschreiten einer zweiten vordefinierten Lüfterdrehzahl.In an advantageous embodiment of the method according to the invention, the second criterion is or includes not falling below a second predefined fan speed.

Ein Nicht-Unterschreiten kann insbesondere ein Nicht-Unterschreiten über einen weiteren bestimmten Zeitraum bedeuten. Der weitere bestimmte Zeitraum kann zum Beispiel ein Zeitraum in der Größenordnung von Sekunden (z. B. im Intervall von 2-20 Sekunden befindlich) sein.Not falling below the limit can in particular mean not falling below the limit over a further specific period of time. The further specific period of time can, for example, be a period of the order of seconds (e.g. located in the interval of 2-20 seconds).

Die zweite vordefinierte Lüfterdrehzahl kann eine Lüfterdrehzahl sein, bei der in einem (gewöhnlichen) Betrieb des gekühlten Laborgeräts eine sichere Belüftung gewährleistet ist. "Sicher" kann sich hier zum Beispiel auf eine Temperatur, zum Beispiel eine Temperatur in dem Innenbereich, beziehen, die aus Sicherheitsgründen gehalten werden soll, oder zum Beispiel auf einen Kältemittelaustritt, zum Beispiel im Falle einer Leckage. Hier kann "sicher" zum Beispiel bedeuten, dass der Kältemittelaustritt bei der Lüfterdrehzahl sicher durch Abtransport mittels Belüftens kompensiert werden kann. Die zweite vordefinierte Lüfterdrehzahl kann auch oberhalb einer minimalen Lüfterdrehzahl (die auch als Zwangsbelüftungsdrehzahl bezeichnet werden kann) liegen, bei der in einem (gewöhnlichen) Betrieb des gekühlten Laborgeräts eine sichere Belüftung gerade noch gewährleistet ist.The second predefined fan speed can be a fan speed at which safe ventilation is guaranteed during (normal) operation of the cooled laboratory device. "Safe" here can refer, for example, to a temperature, for example a temperature in the interior, that should be maintained for safety reasons, or for example to a refrigerant leak, for example in the event of a leak. Here, “safe” can mean, for example, that the refrigerant leakage at the fan speed can be safely compensated for by transporting it away using ventilation. The second predefined fan speed can also be above a minimum fan speed (which can also be referred to as forced ventilation speed) at which safe ventilation is just guaranteed in (normal) operation of the cooled laboratory device.

Die zweite vordefinierte Lüfterdrehzahl kann selbst ein veränderlicher Wert sein. Zum Beispiel kann die zweite vordefinierte Lüfterdrehzahl von einer Temperatur, zum Beispiel einer Temperatur in dem Innenbereich oder einer Außentemperatur, abhängen.The second predefined fan speed can itself be a variable value. For example, the second predefined fan speed may depend on a temperature, for example an indoor temperature or an outdoor temperature.

Die vorgestellte Ausgestaltung erlaubt es, auf einfache und einfach umzusetzende Art und Weise mit geringem steuerungstechnischem und prüftechnischem Aufwand eine sichere Beurteilung der Funktionsfähigkeit der zweiten Steuereinrichtung (und auch des Lüfters) umzusetzen. Hierdurch kann Schaden von anderen Einrichtungen des gekühlten Laborgeräts ferngehalten werden. Eine Simulation von typischen Lüftungssituationen des gekühlten Laborgeräts - wie sie in einem gewöhnlichen Betrieb des gekühlten Laborgeräts auftreten - kann schon vor dem eigentlichen Beginn eines gewöhnlichen Betriebs vorgenommen werden.The presented embodiment allows a reliable assessment of the functionality of the second control device (and also of the fan) to be implemented in a simple and easy-to-implement manner with little control and testing effort. This can prevent damage to other equipment in the cooled laboratory device. A simulation of typical ventilation situations of the cooled laboratory device - as they occur in normal operation of the cooled laboratory device - can be carried out before the actual start of normal operation.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens erfolgt, wenn die zweite vordefinierte Lüfterdrehzahl unterschritten wird, eine kurzzeitige Drehzahlerhöhung des Lüfters durch die erste Steuereinrichtung.In an advantageous embodiment of the method according to the invention, if the fan speed falls below the second predefined speed, the fan speed is briefly increased by the first control device.

Die kurzzeitige Drehzahlerhöhung kann auch als "Boost" bezeichnet werden. Die kurzzeitige Drehzahlerhöhung kann insbesondere dann vorgenommen werden, wenn die zweite vordefinierte Lüfterdrehzahl geringfügig unterschritten wird. In solchen Fällen kann zum Beispiel anzunehmen sein, dass zum Beispiel ein mechanisches Problem am Lüfter vorliegt, das möglicherweise durch einen kurzen Boost gelöst werden kann. Hierbei kann es sich zum Beispiel um Staubablagerungen am Lüfter handeln. Die kurzzeitige Drehzahlerhöhung kann vom Zeitraum her zum Beispiel in einem Intervall von 0,5 bis 5 Sekunden liegen, bevorzugt bei 1 bis 2 Sekunden. Die kurzzeitige Drehzahlerhöhung kann mehrmals hintereinander durchgeführt werden, wenn die zweite vordefinierte Lüfterdrehzahl mehrmals hintereinander unterschritten wird.The short-term increase in speed can also be referred to as a “boost”. The short-term increase in speed can be carried out in particular if the second predefined fan speed is slightly below the speed limit. In such cases, it can be assumed, for example, that there is a mechanical problem with the fan, which can possibly be solved with a short boost. This could be, for example, dust deposits on the fan. The short-term increase in speed can, for example, be in an interval of 0.5 to 5 seconds, preferably 1 to 2 seconds. The short-term speed increase can be carried out several times in a row if the fan speed falls below the second predefined speed several times in a row.

Die kurzzeitige Drehzahlerhöhung kann auch dazu führen, dass eine mögliche Fehlfunktion der zweiten Steuereinrichtung, die einen Drehzahlabfall des Lüfters verursacht, behoben wird.The short-term increase in speed can also lead to a possible malfunction of the second control device, which causes a drop in speed of the fan, being eliminated.

Die vorgestellte Ausgestaltung ermöglicht es, bei einer zu niedrigen Lüfterdrehzahl eine zugrunde liegende Ursache auf einfache Art und Weise zu beheben. Die Ursache kann insbesondere mechanischer Natur sein oder ihren Ursprung in der zweiten Steuereinrichtung haben. Insbesondere ist die Ausgestaltung benutzerfreundlich, da ein mögliches Deaktivieren eines Hauptschalters des gekühlten Laborgeräts und/oder ein erneutes Aus- und Einschalten und/oder sogar Reparaturen des gekühlten Laborgeräts vermieden werden können.The presented embodiment makes it possible to easily eliminate an underlying cause if the fan speed is too low. The cause can in particular be of a mechanical nature or have its origin in the second control device. In particular, the design is user-friendly, since a possible deactivation of a main switch of the cooled laboratory device and/or switching the cooled laboratory device off and on again and/or even repairs of the cooled laboratory device can be avoided.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens erfolgt ein dauerhaftes oder zeitweises Deaktivieren der Stromversorgung für die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung, falls ein drittes vordefiniertes Kriterium verletzt wird.In an advantageous embodiment of the method according to the invention, the power supply for the at least one further device to be supplied with electrical power is permanently or temporarily deactivated if a third predefined criterion is violated.

Das dritte vordefinierte Kriterium kann insbesondere ein Nicht-Unterschreiten einer dritten vordefinierten Lüfterdrehzahl sein. Die dritte vordefinierte Lüfterdrehzahl kann eine minimale Lüfterdrehzahl sein (die auch als Zwangsbelüftungsdrehzahl bezeichnet werden kann), bei der in einem (gewöhnlichen) Betrieb des gekühlten Laborgeräts eine sichere Belüftung gerade noch gewährleistet ist. Die dritte vordefinierte Lüfterdrehzahl kann unterhalb der zweiten vordefinierten Lüfterdrehzahl (falls vorgesehen) liegen.The third predefined criterion can in particular be not falling below a third predefined fan speed. The third predefined fan speed can be a minimum fan speed (which can also be referred to as forced ventilation speed) at which safe ventilation is just guaranteed in (normal) operation of the cooled laboratory device. The third predefined fan speed may be below the second predefined fan speed (if provided).

Das dauerhafte Deaktivieren kann insbesondere ein Deaktivieren eines Schalters, zum Beispiel eines Relais, für die Stromversorgung der mindestens einen weiteren mit elektrischem Strom zu versorgenden Einrichtung sein. Der Schalter oder das Relais kann eine Hauptstromversorgung des gekühlten Laborgeräts betreffen, die deaktiviert wird. Das Deaktivieren kann zum Beispiel bis zu einem nachfolgenden erneuten Einschaltvorgang des gekühlten Laborgeräts oder über einen vordefinierten Zeitraum aufrechterhalten werden.The permanent deactivation can in particular deactivate a switch, for example a relay, for the power supply of the at least one further device to be supplied with electrical power. The switch or relay may involve a main power supply to the refrigerated laboratory equipment being deactivated. The deactivation can, for example, be maintained until the cooled laboratory device is switched on again or over a predefined period of time.

Die vorgestellte Ausgestaltung erhöht die Betriebssicherheit, weil ein Betrieb des gekühlten Laborgeräts bei einer Fehlfunktion der zweiten Steuereinrichtung und/oder des Lüfters im Vorfeld vermieden werden kann. Insbesondere wird die Fehlfunktion bereits vor Beginn des Betriebs erkannt, sodass Beschädigungen weiterer Einrichtungen des gekühlten Laborgeräts oder gefährliche Situationen, in denen ein Abtransport von Kältemittel nicht oder nicht ausreichend erfolgt, vermieden werden kann/können.The presented embodiment increases operational reliability because operation of the cooled laboratory device can be avoided in advance in the event of a malfunction of the second control device and/or the fan. In particular, the malfunction is detected before operation begins, so that damage to other equipment of the cooled laboratory device or dangerous situations in which refrigerant is not removed or is not removed sufficiently can be avoided.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens erfolgt das Aktivieren der Stromversorgung für die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung erst nach Ablauf eines zweiten Zeitraums, der mit oder nach dem Übergeben der Lüftersteuerung an die zweite Steuereinrichtung beginnt.In an advantageous embodiment of the method according to the invention, the power supply for the at least one further device to be supplied with electrical current is activated only after a second period of time has elapsed, which begins with or after the fan control is transferred to the second control device.

Der zweite Zeitraum kann zum Beispiel als Mindestzeitraum verstanden werden, in dem das Überprüfen mithilfe des zweiten vordefinierten Kriteriums in jedem Fall stattfinden muss. Hierdurch werden die Aussagefähigkeit und die Aussagegüte des Überprüfens mithilfe des zweiten vordefinierten Kriteriums und somit die Betriebssicherheit des gekühlten Laborgeräts weiter erhöht.The second period can, for example, be understood as the minimum period during which checking using the second predefined criterion must always take place. This further increases the informative value and quality of the checking using the second predefined criterion and thus the operational reliability of the cooled laboratory device.

In einer vorteilhaften Ausgestaltung des erfindungsgemäßen Verfahrens wird vor dem Belüften des Innenbereichs des gekühlten Laborgeräts kontrolliert, ob die Stromversorgung für die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung deaktiviert ist und/oder ob eine Lüfterdrehzahlerfassung ordnungsgemäß funktioniert.In an advantageous embodiment of the method according to the invention, before ventilating the interior of the cooled laboratory device, it is checked whether the power supply for the at least one further device to be supplied with electrical power is deactivated and/or whether a fan speed detection is functioning properly.

Durch die genannten Maßnahmen wird vermieden, dass im Zuge des Belüftens des Innenbereichs bzw. im Zuge des erfindungsgemäßen Verfahrens allgemein die mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung z. B. aufgrund einer Fehlfunktion doch mit elektrischem Strom versorgt wird und somit eine Gefahrenquelle aufgrund einer möglichen Funkenbildung darstellt. Zum Beispiel kann überprüft werden, wenn die weitere mit elektrischem Strom zu versorgende Einrichtung mittels eines Relais mit Strom versorgt werden kann, ob das Relais ordnungsgemäß deaktiviert ist.The measures mentioned prevent the at least one further device to be supplied with electrical power, e.g. B. is supplied with electrical power due to a malfunction and therefore represents a source of danger due to the possible formation of sparks. For example, if the further device to be supplied with electrical power can be supplied with power by means of a relay, it can be checked whether the relay is properly deactivated.

Eine ordnungsgemäße Funktion der Lüfterdrehzahlerfassung kann zum Beispiel derart ausgestaltet sein, dass überprüft wird, ob noch vor dem Belüften des Innenbereichs der noch stillstehende Lüfter ordnungsgemäß ein Signal ausgibt, dass seine Drehzahl bei null liegt.A proper function of the fan speed detection can, for example, be designed in such a way that it is checked whether the fan, which is still stationary, properly outputs a signal that its speed is at zero before the interior area is ventilated.

Sollte eine Kontrolle, ob die Stromversorgung deaktiviert ist und/oder ob eine Lüfterdrehzahlerfassung ordnungsgemäß funktioniert, nicht erfolgreich sein, kann ein Durchführen weiterer Schritte des erfindungsgemäßen Verfahrens, insbesondere des Belüftens, unterbunden werden. Dies erhöht die Betriebssicherheit weiter. Insbesondere eine korrekte Lüfterdrehzahlerfassung erhöht weiterhin die Wahrscheinlichkeit, dass weitere Verfahrensschritte ordnungsgemäß und korrekt vorgenommen werden können, insbesondere, wenn das erste vordefinierte Kriterium und/oder das zweite vordefinierte Kriterium (und ggf. das dritte vordefinierte Kriterium) jeweils von Lüfterdrehzahlen abhängen.If a check as to whether the power supply is deactivated and/or whether a fan speed detection is functioning properly is not successful, carrying out further steps of the method according to the invention, in particular ventilation, can be prevented. This further increases operational safety. In particular, correct fan speed detection further increases the probability that further method steps can be carried out properly and correctly, in particular if the first predefined criterion and / or the second predefined criterion (and possibly the third predefined criterion) each depend on fan speeds.

Weiterhin wird vorgeschlagen ein mittels eines entflammbaren Kältemittels gekühltes Laborgerät, aufweisend:

  • einen Lüfter, ausgestaltet zur Lüftung eines Innenbereichs des gekühlten Laborgeräts;
  • eine erste Steuereinrichtung, ausgestaltet, ein Steuern des Lüfters derart auszuführen, dass ein Belüften des Innenbereichs über einen ersten Zeitraum durchgeführt wird;
  • eine Überprüfungseinrichtung, ausgestaltet zur Überprüfung mithilfe eines ersten vordefinierten Kriteriums, ob das Belüften über den ersten Zeitraum erfolgreich war;
  • eine zweite Steuereinrichtung, die ausgestaltet ist, den Lüfter zu steuern;
  • eine Übergabeeinrichtung, ausgestaltet zum Übergeben des Steuerns des Lüfters an die zweite Steuereinrichtung, wenn das Belüften über den ersten Zeitraum erfolgreich war;
  • eine Aktivierungseinrichtung, ausgestaltet, eine Stromversorgung für mindestens eine weitere mit elektrischem Strom zu versorgende Einrichtung des gekühlten Laborgeräts zu aktivieren, wenn der Lüfter durch die zweite Steuereinrichtung erfolgreich gesteuert wird;
wobei die Überprüfungseinrichtung zusätzlich ausgestaltet ist, mithilfe eines zweiten vordefinierten Kriteriums zu überprüfen, ob der Lüfter durch die zweite Steuereinrichtung erfolgreich gesteuert wird, oder das gekühlte Laborgerät eine weitere Überprüfungseinrichtung aufweist, die ausgestaltet ist, mithilfe eines zweiten vordefinierten Kriteriums zu überprüfen, ob der Lüfter durch die zweite Steuereinrichtung erfolgreich gesteuert wird.Furthermore, a laboratory device cooled by means of a flammable refrigerant is proposed, comprising:
  • a fan designed to ventilate an interior area of the cooled laboratory device;
  • a first control device, designed to control the fan in such a way that the interior area is ventilated over a first period of time;
  • a checking device designed to check using a first predefined criterion whether the ventilation was successful over the first period of time;
  • a second control device configured to control the fan;
  • a transfer device designed to transfer control of the fan to the second control device if ventilation was successful over the first period of time;
  • an activation device, designed to activate a power supply for at least one further device of the cooled laboratory device to be supplied with electrical power when the fan is successfully controlled by the second control device;
wherein the checking device is additionally designed to use a second predefined criterion to check whether the fan is successfully controlled by the second control device, or the cooled laboratory device has a further checking device that is designed to use a second predefined one Criterion to check whether the fan is successfully controlled by the second control device.

Das gekühlte Laborgerät kann insbesondere ausgestaltet sein, das erfindungsgemäße Verfahren in mindestens einer der dargelegten Ausgestaltungen auszuführen, insbesondere automatisch auszuführen. In Bezug auf das gekühlte Laborgerät sowie Ausgestaltungen des gekühlten Laborgeräts wird vollinhaltlich Bezug genommen auf Erläuterungen zum erfindungsgemäßen Verfahren und zu den Ausgestaltungen des erfindungsgemäßen Verfahrens. Insbesondere (aber nicht ausschließlich) wird hierbei Bezug genommen auf Erläuterungen zum gekühlten Laborgerät, zum entflammbaren Kältemittel, zum Lüfter, zum Innenbereich, zur ersten Steuereinrichtung, zum ersten Zeitraum, zur Überprüfungseinrichtung, zum ersten vordefinierten Kriterium, zum zweiten vordefinierten Kriterium, zum Belüften, zur zweiten Steuereinrichtung, zur Übergabeeinrichtung, zum Steuern des Lüfters und zum Übergeben des Steuerns, zur Aktivierungseinrichtung, zur weiteren mit elektrischem Strom zu versorgenden Einrichtung und zur weiteren Überprüfungseinrichtung.The cooled laboratory device can in particular be designed to carry out the method according to the invention in at least one of the embodiments set out, in particular to carry it out automatically. With regard to the cooled laboratory device and configurations of the cooled laboratory device, reference is made in full to explanations of the method according to the invention and to the configurations of the method according to the invention. In particular (but not exclusively) reference is made here to explanations on the cooled laboratory device, on the flammable refrigerant, on the fan, on the interior, on the first control device, on the first period of time, on the checking device, on the first predefined criterion, on the second predefined criterion, on ventilation, to the second control device, to the transfer device, for controlling the fan and for transferring the control, to the activation device, to the further device to be supplied with electrical power and to the further checking device.

Insbesondere die erste Steuereinrichtung, die Überprüfungseinrichtung, die zweite Steuereinrichtung, die Übergabeeinrichtung, die Aktivierungseinrichtung und/oder die weitere Übergabeeinrichtung können in das gekühlte Laborgerät integrierte Einheiten sein. Die genannten Einrichtungen können jeweils, zumindest teilweise oder allesamt mindestens ein elektronisches Bauelement und/oder eine programmierbare Recheneinrichtung umfassen und/oder eine programmierbare Recheneinrichtung nutzen bzw. gemeinsam nutzen. Bevorzugt weist die erste Steuereinrichtung keine programmierbare Recheneinrichtung auf und/oder ist nicht oder nur mittelbar mit einer programmierbaren Recheneinheit verbunden.In particular, the first control device, the checking device, the second control device, the transfer device, the activation device and/or the further transfer device can be units integrated into the cooled laboratory device. The devices mentioned can each, at least partially or all, comprise at least one electronic component and/or a programmable computing device and/or use or share a programmable computing device. Preferably, the first control device does not have a programmable computing device and/or is not or only indirectly connected to a programmable computing unit.

Das gekühlte Laborgerät kann in einer Ausgestaltung insbesondere ein Laborfreezer oder eine Zentrifuge sein.In one embodiment, the cooled laboratory device can in particular be a laboratory freezer or a centrifuge.

Ausführungsbeispiele der Erfindung werden nun unter Bezugnahme auf die beigefügte Zeichnung beschrieben. Die einzelnen Figuren der Zeichnung zeigen:

  • Fig. 1: Eine schematisch dargestellte Ausgestaltung eines erfindungsgemäßen gekühlten Laborgeräts;
  • Fig. 2: Eine schematisch dargestellte weitere Ausgestaltung eines erfindungsgemäßen gekühlten Laborgeräts;
  • Fig. 3: Eine schematisch dargestellte Ausgestaltung des erfindungsgemäßen Verfahrens.
Embodiments of the invention will now be described with reference to the accompanying drawings. The individual figures in the drawing show:
  • Fig. 1 : A schematically illustrated embodiment of a cooled laboratory device according to the invention;
  • Fig. 2 : A schematically illustrated further embodiment of a cooled laboratory device according to the invention;
  • Fig. 3 : A schematically illustrated embodiment of the method according to the invention.

In verschiedenen Ausführungsbeispielen werden gleiche Bezugszeichen für funktionsgleiche Einrichtungen, Schritte, Instanzen und Elemente verwendet. Dies bedeutet jedoch nicht zwangsläufig, dass es sich bei den Ausführungsbeispielen um dasselbe Ausführungsbeispiel oder Teile desselben Ausführungsbeispiels handelt.In various exemplary embodiments, the same reference numbers are used for functionally identical devices, steps, instances and elements. However, this does not necessarily mean that the exemplary embodiments are the same exemplary embodiment or parts of the same exemplary embodiment.

In Fig. 1 wird ein erfindungsgemäßes gekühltes Laborgerät 1 gezeigt, das als Laborzentrifuge ausgestaltet ist. Die Erfindung ist jedoch nicht auf Laborzentrifugen beschränkt. Beispielsweise könnte das gekühlte Laborgerät 1 auch ein Laborfreezer sein. Das gekühlte Laborgerät 1 weist einen Lüfter 2 auf. Am Lüfter 2, genauer an einer Lüfterwelle, sind ein Drehzahlgeber 22 und ein Lüftermotor 21 vorgesehen. Der Drehzahlgeber 22 und der Lüftermotor 21 können als Teile des Lüfters 2 verstanden werden. Der Lüfter 2 befindet sich an einer ersten Öffnung OE1 eines Gehäuses 11 des gekühlten Laborgeräts 1. Das Gehäuse 11 kann eine Abdeckung, die geöffnet werden kann, aufweisen, (nicht dargestellt), um Zugang zu einem Zentrifugenrotor 4 herzustellen. Der Zentrifugenrotor 4 kann über einen im Gehäuse integrierten Antriebsmotor 5 in Rotation versetzt werden. Der Zentrifugenrotor 4 ist weiterhin über im Gehäuse integrierte Rotorlager 52, die zum Beispiel als Wälzlager ausgeführt sein können, drehbar gelagert. Eine zweite Öffnung OE2 ist auf der der ersten Öffnung OE1 gegenüberliegenden Seite des Gehäuses 11 vorgesehen, um ein Durchlüften durch den Innenbereich 3 zu ermöglichen. Weitere Öffnungen (nicht gezeigt) können vorgesehen sein.In Fig. 1 A cooled laboratory device 1 according to the invention is shown, which is designed as a laboratory centrifuge. However, the invention is not limited to laboratory centrifuges. For example, the cooled laboratory device 1 could also be a laboratory freezer. The cooled laboratory device 1 has a fan 2. A speed sensor 22 and a fan motor 21 are provided on the fan 2, more precisely on a fan shaft. The speed sensor 22 and the fan motor 21 can be understood as parts of the fan 2. The fan 2 is located at a first opening OE1 of a housing 11 of the cooled laboratory device 1. The housing 11 may have a cover that can be opened (not shown) to provide access to a centrifuge rotor 4. The centrifuge rotor 4 can be set in rotation via a drive motor 5 integrated in the housing. The centrifuge rotor 4 is also rotatably mounted via rotor bearings 52 integrated in the housing, which can be designed as roller bearings, for example. A second opening OE2 is provided on the side of the housing 11 opposite the first opening OE1 in order to enable ventilation through the interior region 3. Additional openings (not shown) may be provided.

Das gekühlte Laborgerät 1 weist einen Innenbereich 3 auf. Der Innenbereich 3 erstreckt sich im Wesentlichen unterhalb des Zentrifugenrotors 4, das heißt, abgewandt von der Oberseite des Zentrifugenrotors mit schrägen Einführungsbereichen für Probenröhren, und reicht bis zur Unterseite des gekühlten Laborgeräts 1. Innerhalb des Innenbereichs 3 befindet sich im gezeigten Zustand des gekühlten Laborgeräts 1 eine geringe Menge Kältemittel KM - zum Beispiel aufgrund einer kleinen Leckage am Kältekreislauf KM und einer langen Standzeit des gekühlten Laborgeräts ohne Benutzung. Das Kältemittel KM ist ein entflammbares Kältemittel, zum Beispiel Propan.The cooled laboratory device 1 has an interior area 3. The interior area 3 extends essentially below the centrifuge rotor 4, that is, facing away from the top of the centrifuge rotor with oblique insertion areas for sample tubes, and extends to the underside of the cooled laboratory device 1. Inside the interior area 3 is the cooled laboratory device 1 in the state shown a small amount of refrigerant KM - for example due to a small leak in the refrigeration circuit KM and a long downtime of the cooled laboratory device without use. The refrigerant KM is a flammable refrigerant, for example propane.

Das gekühlte Laborgerät 1 weist einen Kältekreislauf KAE auf. Der Kältekreislauf KAE weist mehrere Verdampfer 6 (also Kälteerzeuger) auf. Sie dienen insbesondere zur Kühlung des Zentrifugenrotors 4, der Umgebung des Zentrifugenrotors 4, des Antriebsmotors 5 und der Rotorlager 52. Der Kältekreislauf KAE weist weiterhin einen Verdichter 7 (z. B. einen Kompressor), einen außerhalb des Gehäuses 11 liegenden Kondensator 8 (der ein Verflüssiger sein kann), und eine Drossel 9 auf. Der Verdichter 7 ist mit einer Stromleitung 73 verbunden, die zur Stromversorgung des Verdichters 7 dient. Der Antriebsmotor 5 ist mit einer Stromleitung 53 verbunden, die zur Stromversorgung des Antriebsmotors 5 dient. Der Verdichter 7 und der Antriebsmotor 5 können im Lichte der allgemeinen Beschreibung als weitere mit elektrischem Strom zu versorgende Einrichtungen des gekühlten Laborgeräts 1 verstanden werden.The cooled laboratory device 1 has a KAE refrigeration circuit. The KAE refrigeration circuit has several evaporators 6 (i.e. cold generators). They serve in particular to cool the centrifuge rotor 4, the surroundings of the centrifuge rotor 4, the drive motor 5 and the rotor bearings 52. The refrigeration circuit KAE also has a compressor 7 (e.g. a compressor), a capacitor 8 located outside the housing 11 (the can be a condenser), and a throttle 9. The compressor 7 is with a power line 73 connected, which is used to power the compressor 7. The drive motor 5 is connected to a power line 53, which serves to power the drive motor 5. In the light of the general description, the compressor 7 and the drive motor 5 can be understood as further devices of the cooled laboratory device 1 to be supplied with electrical power.

Das gekühlte Laborgerät 1 wird über eine externe Stromversorgung EX (die einen Netzstecker und ggf. ein Netzteil aufweisen kann) und ein Netzkabel EXN mit elektrischem Strom versorgt. Das Netzkabel EXN dockt an einen Ein-/Ausschalter 10 des gekühlten Laborgeräts an. Der Ein-/Ausschalter 10 verfügt über einen (hier angedeuteten) Druckknopf zum Ein-/Ausschalten. Der Ein-/Ausschalter 10 erlaubt ein Fließen von elektrischen Strom, wenn er eingeschaltet ist, über eine Stromleitung 103, eine Stromleitung ST13, eine Stromleitung UEP3 und eine Stromleitung ST23. Die Stromleitungen, durch die jeweils Stromkreisläufe hergestellt werden können, werden im Folgenden näher erläutert.The cooled laboratory device 1 is supplied with electrical power via an external power supply EX (which can have a power plug and possibly a power supply unit) and a power cable EXN. The EXN power cable docks into an on/off switch 10 of the cooled laboratory device. The on/off switch 10 has a push button (indicated here) for switching on/off. The on/off switch 10 allows electric current to flow when turned on through a power line 103, a power line ST13, a power line UEP3, and a power line ST23. The power lines through which circuits can be created are explained in more detail below.

Die Stromleitung ST13 verläuft von dem Ein-/Ausschalter 10 bis zu einer ersten Steuereinrichtung ST1. Die Stromleitung ST23 verläuft von dem Ein-/Ausschalter 10 bis zu einer zweiten Steuereinrichtung ST2.Die Stromleitung 103 verläuft von dem Ein-/Ausschalter 10 bis zu einer Aktivierungseinrichtung AKE. Die Stromleitung UEP3 verläuft von dem Ein-/Ausschalter 10 bis zu einer Überprüfungseinrichtung UEP.The power line ST13 runs from the on/off switch 10 to a first control device ST1. The power line ST23 runs from the on/off switch 10 to a second control device ST2. The power line 103 runs from the on/off switch 10 to an activation device AKE. The power line UEP3 runs from the on/off switch 10 to a checking device UEP.

Die erste Steuereinrichtung ST1 ist ausgestaltet, ein Belüften des Innenbereichs 3 des Lüfters 2 über einen ersten Zeitraum, der beispielsweise 8-10 Sekunden dauern kann, zu ermöglichen. Hierbei kann eine Spannung am Lüfter 2 anliegen, die dazu führt, dass der Lüfter 2 mit einer Maximaldrehzahl betrieben wird, zum Beispiel bei mindestens 2500 Umdrehungen pro Minute.The first control device ST1 is designed to enable ventilation of the interior area 3 of the fan 2 over a first period of time, which can last, for example, 8-10 seconds. Here, a voltage can be present on the fan 2, which causes the fan 2 to be operated at a maximum speed, for example at least 2500 revolutions per minute.

Die erste Steuereinrichtung ST1 ist hardwarebasiert. Sie weist einen Schalter auf, der eine Stromversorgung zum Lüfter 2 (genauer: zum Lüftermotor 21) herstellen kann, kommend von der Stromleitung ST13, die letztlich sowohl den Lüfter 2 als auch die erste Steuereinrichtung ST1 selbst mit elektrischem Strom versorgen kann. Der Schalter kann zu Beginn eines Betriebs des gekühlten Laborgeräts 1 grundsätzlich eingeschaltet sein oder ausgestaltet sein, automatisch eingeschaltet zu werden oder automatisch für den ersten Zeitraum eingeschaltet zu werden. In Bezug auf den Begriff "hardwarebasiert" wird auch auf die Erläuterungen im allgemeinen Teil der Beschreibung verwiesen.The first control device ST1 is hardware-based. It has a switch that can produce a power supply to the fan 2 (more precisely: to the fan motor 21), coming from the power line ST13, which can ultimately supply both the fan 2 and the first control device ST1 itself with electrical power. The switch can basically be switched on at the start of operation of the cooled laboratory device 1 or can be designed to be switched on automatically or to be switched on automatically for the first period of time. With regard to the term “hardware-based” reference is also made to the explanations in the general part of the description.

Es ist grundsätzlich im Rahmen der vorliegenden Erfindung nicht ausgeschlossen, dass die erste Steuereinrichtung ST1 alternativ oder zusätzlich eine Steuerung durch einen Chip oder Prozessor aufweist, und Steuerbefehle aufweist, die den Lüfter 2 (den Lüftermotor 21) oder eine Stromversorgung des Lüfters 2 (des Lüftermotors 21) steuern können. Es ist nicht ausgeschlossen, dass die erste Steuereinrichtung ST1 ausgestaltet ist, zum Beispiel mittels Pulsweitenmodulation eine Drehzahl des Lüfters 2 (des Lüftermotors 21) einstellen zu können. Grundsätzlich ist jedoch bevorzugt, dass die erste Steuereinrichtung ST1 einfach aufgebaut ist und zum Beispiel ihre Funktionalität mithilfe des erwähnten Schalters (der ein Ein-/Ausschalter sein kann) erreicht.In principle, it is not excluded within the scope of the present invention that the first control device ST1 alternatively or additionally has a control by a chip or processor, and has control commands that control the fan 2 (the fan motor 21) or a power supply for the fan 2 (the fan motor 21) can control. It is not excluded that the first control device ST1 is designed to be able to adjust a speed of the fan 2 (of the fan motor 21), for example by means of pulse width modulation. In principle, however, it is preferred that the first control device ST1 has a simple structure and, for example, achieves its functionality using the switch mentioned (which can be an on/off switch).

Zwecks Steuerns und/oder Energieversorgung des Lüfters 2 (des Lüftermotors 21) wird eine Schnittstelle ST1-UEG genutzt. Die Schnittstelle ST1-UEG kann ausgestaltet sein, elektrische Energie (und/oder alternativ oder zusätzlich Steuerbefehle) von der ersten Steuereinrichtung ST1 an eine Übergabeeinrichtung UEG zu übermitteln oder zu leiten. Die Schnittstelle ST1-UEG kann also eine Stromleitung, die einen Stromkreislauf herstellen kann, aufweisen, und ggf. zusätzlich auch eine Datenleitung. Die Übergabeeinrichtung UEG ist ausgestaltet, das Steuern des Lüfters 2 (des Lüftermotors 21) von der ersten Steuereinrichtung ST1 an die zweite Steuereinrichtung ST2 zu übergeben oder umgekehrt von der zweiten Steuereinrichtung ST2 an die erste Steuereinrichtung ST1. Hierzu kann die Übergabeeinrichtung UEG einen Schalter aufweisen, der insbesondere einen Wechsel in der Stromversorgung des Lüftermotors 21 zwischen der ersten Steuereinrichtung ST1 und der zweiten Steuereinrichtung ST2 vollziehen kann. Von der Übergabeeinrichtung zum Lüfter 2 (zum Lüftermotor 21) führt eine Schnittstelle UEG-2, die eine Stromleitung (die einen Stromkreis herstellen kann) aufweist, um eine Stromversorgung des Lüftermotors 21 zu ermöglichen. Es ist nicht ausgeschlossen, dass die Schnittstelle UEG-2 auch eine Datenleitung aufweist, falls zum Beispiel der Lüfter 2 entsprechend ausgestaltet ist (falls er beispielsweise eine eigene weitere Steuereinrichtung aufweist).An interface ST1-UEG is used to control and/or supply energy to the fan 2 (the fan motor 21). The interface ST1-UEG can be designed to transmit or route electrical energy (and/or alternatively or additionally control commands) from the first control device ST1 to a transfer device UEG. The ST1-UEG interface can therefore have a power line that can create a power circuit, and possibly also a data line. The transfer device UEG is designed to transfer the control of the fan 2 (of the fan motor 21) from the first control device ST1 to the second control device ST2 or, conversely, from the second control device ST2 to the first control device ST1. For this purpose, the transfer device UEG can have a switch which, in particular, can carry out a change in the power supply of the fan motor 21 between the first control device ST1 and the second control device ST2. An interface UEG-2, which has a power line (which can create a circuit), leads from the transfer device to the fan 2 (to the fan motor 21) in order to enable the fan motor 21 to be supplied with power. It is not excluded that the UEG-2 interface also has a data line if, for example, the fan 2 is designed accordingly (if, for example, it has its own additional control device).

Weiterhin ist die Überprüfungseinrichtung UEP vorgesehen. Sie ist ausgestaltet, mithilfe eines ersten vordefinierten Kriteriums zu überprüfen, ob das Belüften des Innenbereichs über den ersten Zeitraum erfolgreich war. Das erste vordefinierte Kriterium kann lauten, dass eine erste vordefinierte Lüfterdrehzahl (z. B. 2500 Umdrehungen pro Minute) über einen Mindestzeitraum (entsprechend dem ersten Zeitraum, er kann zum Beispiel 8 Sekunden lang sein) zum sicheren Belüften erreicht und gehalten wird. Andere Ausgestaltungen des ersten vordefinierten Kriteriums sind nicht ausgeschlossen.The UEP checking device is also provided. It is designed to use a first predefined criterion to check whether the ventilation of the interior area was successful over the first period of time. The first predefined criterion can be that a first predefined fan speed (e.g. 2500 revolutions per minute) is reached and maintained over a minimum period of time (corresponding to the first period of time, it can be 8 seconds long, for example) for safe ventilation. Other configurations of the first predefined criterion are not excluded.

Die Überprüfungseinrichtung UEP ist in der vorgestellten Ausgestaltung des erfindungsgemäßen gekühlten Laborgeräts 1 derart ausgestaltet, dass sie eine Recheneinrichtung (z. B. einen Prozessor) und entsprechende Befehle aufweist. Es ist nicht ausgeschlossen, dass die Überprüfungseinrichtung UEP anders, insbesondere einfacher, aufgebaut ist, zum Beispiel als elektrischer Kondensator ausgestaltet ist, der aufgeladen wird, sobald eine bestimmte Lüfterdrehzahl erreicht ist, und der (frühestens) nach Ablauf des ersten Zeitraums einen bestimmten Spannungswert (Schwellwertschalter) erreicht hat, der ein Umschalten an der Übergabeeinrichtung UEG auslöst.In the presented embodiment of the cooled laboratory device 1 according to the invention, the checking device UEP is designed in such a way that it has a computing device (e.g. a processor) and corresponding commands. It cannot be ruled out that the checking device UEP is constructed differently, in particular more simply, for example as an electrical capacitor which is charged as soon as a certain fan speed is reached and which reaches a certain voltage value (at the earliest) after the first period of time has elapsed ( Threshold switch) has been reached, which triggers a switchover at the transfer device UEG.

Alternativ oder zusätzlich ist ebenfalls nicht ausgeschlossen, dass die Überprüfungseinrichtung UEP eine Einrichtung zur Zeitzählung aufweist, die einen Zeitmessvorgang beginnt, sobald die erste vordefinierte Lüfterdrehzahl erreicht ist, und, sobald der erste Zeitraum abgelaufen ist, das Umschalten an der Übergabeeinrichtung UEG auslöst.Alternatively or additionally, it is also not excluded that the checking device UEP has a device for time counting, which begins a time measuring process as soon as the first predefined fan speed is reached and, as soon as the first period of time has expired, triggers the switchover at the transfer device UEG.

Die Überprüfungseinrichtung UEP ist über eine Schnittstelle 22-UEP mit dem Drehzahlgeber 22 verbunden und kann daher ein Lüfterdrehzahlsignal zwecks Überprüfung, ob das erste vordefinierte Kriterium erfüllt ist, empfangen. Die Schnittstelle 22-UEP ist insoweit ausgestaltet, das Lüfterdrehzahlsignal von dem Drehzahlgeber 22 (der z. B. als Hall-Geber ausgestaltet sein kann) zu übertragen, sodass es empfangen und zum Überprüfen, ob das Belüften des Innenbereichs über den ersten Zeitraum erfolgreich war, interpretiert werden kann. Das Empfangen und Interpretieren erfolgt durch die Überprüfungseinrichtung UEP. Alle erwähnten Schnittstellen, so auch die Schnittstelle 22-UEP, können z. B. ein Stromkabel und/oder ein Datenkabel aufweisen.The checking device UEP is connected to the speed sensor 22 via an interface 22-UEP and can therefore receive a fan speed signal for the purpose of checking whether the first predefined criterion is met. The interface 22-UEP is designed to transmit the fan speed signal from the speed sensor 22 (which can be designed, for example, as a Hall sensor), so that it is received and used to check whether the ventilation of the interior area was successful over the first period of time , can be interpreted. Receiving and interpreting is carried out by the checking device UEP. All interfaces mentioned, including the 22-UEP interface, can e.g. B. have a power cable and / or a data cable.

Weiterhin ist die Überprüfungseinrichtung UEP über eine optionale Schnittstelle UEP-ST1 mit der ersten Steuereinrichtung ST1 verbunden. Über die optionale Schnittstelle UEP-ST1 kann durch die Überprüfungseinrichtung UEP im Rahmen des Überprüfens, ob das Belüften erfolgreich war, zum Beispiel geprüft werden, ob der Schalter der ersten Steuereinrichtung ST1 während des ersten Zeitraums ordnungsgemäß geschaltet war.Furthermore, the checking device UEP is connected to the first control device ST1 via an optional interface UEP-ST1. Via the optional interface UEP-ST1, the checking device UEP can, for example, check whether the switch of the first control device ST1 was switched correctly during the first period of time as part of checking whether the ventilation was successful.

Weiterhin ist die Überprüfungseinrichtung UEP über eine Schnittstelle UEP-UEG mit der Übergabeeinrichtung UEG verbunden. Wenn das erste vordefinierte Kriterium erfüllt war, das Belüften des Innenbereichs 3 also erfolgreich war, wird über die Schnittstelle UEP-UEG ein Signal an die Übergabeeinrichtung UEG gesendet, dass von der ersten Steuereinrichtung ST1 (und von der Schnittstelle ST1-UEG) an die zweite Steuereinrichtung ST2 (und die Schnittstelle ST2-UEG) umgeschaltet werden kann, also zum Beispiel ein Umschalten des Schalters der Übergabeeinrichtung UEG erfolgen kann. Der Schalter der Übergabeeinrichtung UEG kann dafür anhand dieses Signals umschaltbar ausgestaltet sein.Furthermore, the checking device UEP is connected to the transfer device UEG via an interface UEP-UEG. If the first predefined criterion was met, i.e. the ventilation of the interior area 3 was successful, a signal is sent to the transfer device UEG via the UEP-UEG interface, which is sent from the first control device ST1 (and from the ST1-UEG interface) to the second Control device ST2 (and the interface ST2-UEG) can be switched, for example switching the Switch of the transfer device UEG can be done. The switch of the transfer device UEG can be designed to be switchable based on this signal.

Die zweite Steuereinrichtung ST2 ist ausgestaltet, das Steuern des Lüfters 2 zu ermöglichen, zum Beispiel mittels Pulsweitenmodulation (PWM). Die zweite Steuereinrichtung ST2 ist firmwarebasiert. Das kann insbesondere bedeuten, dass sie einen Speicher, zum Beispiel einen ROM-Speicher aufweist, der Steuerungsbefehle enthält, zum Beispiel funktionale Zusammenhänge oder (vorgegebene) Kennlinien, die ein bedarfsgerechtes Steuern des Lüfters 2 (des Lüftermotors 21) ermöglichen, zum Beispiel basierend auf Temperaturwerten, die ein Temperaturfühler (nicht dargestellt) im Innenbereich 3 und/oder ein Temperaturfühler außerhalb des Innenbereichs 3 messen kann. Es ist nicht ausgeschlossen, dass die zweite Steuereinrichtung ST2 alternativ oder zusätzlich softwarebasiert ist, zum Beispiel einen Schreib-Lese-Speicher aufweist, der solche Steuerungsbefehle enthält, die angepasst werden können. Die zweite Steuereinrichtung ST2 enthält weiterhin eine Recheneinrichtung, z. B. einen Prozessor, zur Umsetzung und Interpretation der Steuerungsbefehle.The second control device ST2 is designed to enable the fan 2 to be controlled, for example by means of pulse width modulation (PWM). The second control device ST2 is firmware-based. This can mean in particular that it has a memory, for example a ROM memory, which contains control commands, for example functional relationships or (predetermined) characteristics that enable the fan 2 (the fan motor 21) to be controlled as required, for example based on Temperature values that a temperature sensor (not shown) in the interior 3 and / or a temperature sensor outside the interior 3 can measure. It is not excluded that the second control device ST2 is alternatively or additionally software-based, for example having a read-write memory that contains control commands that can be adapted. The second control device ST2 also contains a computing device, e.g. B. a processor for implementing and interpreting the control commands.

Die zweite Steuereinrichtung ST2 kann ausgestaltet sein, den Lüfter 2 auch im normalen Betrieb des gekühlten Laborgeräts zu steuern.The second control device ST2 can be designed to control the fan 2 even during normal operation of the cooled laboratory device.

Zwecks Steuerns und/oder Stromversorgung des Lüfters 2 (des Lüftermotors 21) wird eine Schnittstelle ST2-UEG genutzt. Die Schnittstelle ST2-UEG kann ausgestaltet sein, elektrische Energie und/oder Steuerbefehle von der zweiten Steuereinrichtung ST2 an die Übergabeeinrichtung UEG zu übermitteln oder zu leiten. Die Schnittstelle ST2-UEG kann eine Stromleitung, die einen Stromkreislauf herstellen kann, aufweisen, und ggf. zusätzlich auch eine Datenleitung. Die Übergabeeinrichtung UEG ist ausgestaltet, das Steuern des Lüfters 2 (des Lüftermotors 21) an die zweite Steuereinrichtung ST2 zu übergeben. Wenn das Übergeben erfolgt ist, wird der Lüfter 2 (der Lüftermotor 21) über die Schnittstelle ST2-UEG und die weitere Schnittstelle UEG-2 mit elektrischem Strom versorgt.An interface ST2-UEG is used to control and/or power the fan 2 (the fan motor 21). The interface ST2-UEG can be designed to transmit or route electrical energy and/or control commands from the second control device ST2 to the transfer device UEG. The ST2-UEG interface can have a power line that can create a power circuit, and possibly also a data line. The transfer device UEG is designed to transfer the control of the fan 2 (the fan motor 21) to the second control device ST2. When the transfer has taken place, the fan 2 (the fan motor 21) is supplied with electrical power via the interface ST2-UEG and the further interface UEG-2.

In der vorgestellten Ausgestaltung des gekühlten Laborgeräts 1 ist die Überprüfungseinrichtung UEP ausgestaltet, mithilfe eines zweiten vordefinierten Kriteriums zu überprüfen, ob der Lüfter 2 durch die zweite Steuereinrichtung ST2 erfolgreich gesteuert wird. Das zweite vordefinierte Kriterium, dass erfüllt sein muss, lautet, dass über einen zweiten Zeitraum die Lüfterdrehzahl nicht unter eine vorgegebene Mindestdrehzahl zur sicheren Grundbelüftung (zweite vordefinierte Lüfterdrehzahl) fallen darf. Der zweite Zeitraum kann zum Beispiel 5 Sekunden lang sein. Die zweite vordefinierte Lüfterdrehzahl kann zum Beispiel bei 1100 Umdrehungen pro Minute liegen.In the presented embodiment of the cooled laboratory device 1, the checking device UEP is designed to use a second predefined criterion to check whether the fan 2 is successfully controlled by the second control device ST2. The second predefined criterion that must be met is that the fan speed must not fall below a specified minimum speed for safe basic ventilation (second predefined fan speed) over a second period of time. The second period can be, for example, 5 seconds long. The second predefined fan speed can be, for example, 1100 revolutions per minute.

Die Überprüfungseinrichtung UEP ist über eine Schnittstelle 22-UEP mit dem Drehzahlgeber 22 verbunden und kann daher ein Lüfterdrehzahlsignal zwecks Überprüfung, ob das zweite vordefinierte Kriterium erfüllt ist, empfangen. Die Überprüfungseinrichtung UEP kann außerdem eine Zeitmesseinrichtung aufweisen.The checking device UEP is connected to the speed sensor 22 via an interface 22-UEP and can therefore receive a fan speed signal for the purpose of checking whether the second predefined criterion is met. The checking device UEP can also have a time measuring device.

Die Schnittstelle 22-UEP ist ausgestaltet, das Lüfterdrehzahlsignal von dem Drehzahlgeber 22 zu übertragen, sodass es empfangen und zum Überprüfen, ob das Steuern über den zweiten Zeitraum erfolgreich war, interpretiert werden kann. Das Empfangen und Interpretieren erfolgt durch die Überprüfungseinrichtung UEP.The interface 22-UEP is configured to transmit the fan speed signal from the speed sensor 22 so that it can be received and interpreted to check whether control over the second period was successful. Receiving and interpreting is carried out by the checking device UEP.

Weiterhin ist die Überprüfungseinrichtung UEP über eine optionale Schnittstelle UEP-ST2 mit der zweiten Steuereinrichtung ST2 verbunden. Über die optionale Schnittstelle UEP-ST2 kann durch die Überprüfungseinrichtung UEP im Rahmen des Überprüfens, ob das Steuern über den zweiten Zeitraum erfolgreich war, zum Beispiel zusätzlich geprüft werden, ob das Steuern des Lüfters 2 durch die zweite Steuereinrichtung ST2 während des zweiten Zeitraums ordnungsgemäß erfolgt ist.Furthermore, the checking device UEP is connected to the second control device ST2 via an optional interface UEP-ST2. Via the optional interface UEP-ST2, the checking device UEP can, for example, additionally check whether the control of the fan 2 by the second control device ST2 is carried out properly during the second period of time as part of checking whether the control over the second period of time was successful is.

Wenn das Steuern über den zweiten Zeitraum erfolgreich war, das zweite vordefinierte Kriterium also erfüllt ist, dann erfolgt ein Signal über eine Schnittstelle UEP-AKE an die Aktivierungseinrichtung AKE, dass Stromversorgungen für den Verdichter 7 (über die Stromleitung 73) und den Antriebsmotor 5 (über die Stromleitung 53) aktiviert werden können. Die Aktivierungseinrichtung 103 weist insbesondere einen Schalter auf, zum Beispiel ein Relais, der bei Vorliegen eines entsprechenden Signals die Stromversorgungen herstellen kann.If the control over the second period of time was successful, i.e. the second predefined criterion is met, then a signal is sent via an interface UEP-AKE to the activation device AKE that power supplies for the compressor 7 (via the power line 73) and the drive motor 5 ( can be activated via the power line 53). The activation device 103 in particular has a switch, for example a relay, which can produce the power supplies when a corresponding signal is present.

Das gekühlte Laborgerät 1 ist gezeigt in einem Zustand, in dem Kältemittel KM sich im Innenbereich 3 befindet. Bereits das Steuern durch die erste Steuereinrichtung ST1 - das Belüften des Innenbereichs 3 über den ersten Zeitraum - entfernt das Kältemittel KM vollständig aus dem Innenbereich 3, sodass es beim Aktivieren potentiell funkenbildender weiterer mit elektrischem Strom zu versorgender Einrichtungen des gekühlten Laborgeräts 1 (Verdichter 7 und Antriebsmotor 5) nicht mehr vorhanden ist und keine Gefahr mehr darstellt. Zum Zeitpunkt des Aktivierens ist auch das Steuern des Lüfters 2 mithilfe der zweiten Steuereinrichtung ST2 auf ordnungsgemäße Funktion überprüft. Die zweite Steuereinrichtung ST2 steuert den Lüfter auch im normalen Betrieb des gekühlten Laborgeräts 1, der sich anschließen kann.The cooled laboratory device 1 is shown in a state in which refrigerant KM is located in the interior 3. Already the control by the first control device ST1 - the ventilation of the interior area 3 over the first period of time - removes the refrigerant KM completely from the interior area 3, so that when potentially sparking further devices of the cooled laboratory device 1 (compressor 7 and Drive motor 5) is no longer present and no longer poses a danger. At the time of activation, the control of the fan 2 is also checked for proper function using the second control device ST2. The second control device ST2 also controls the fan during normal operation of the cooled laboratory device 1, which can be connected.

Die Überprüfungseinrichtung UEP kann optional zusätzlich ausgestaltet sein, eine kurzzeitige Drehzahlerhöhung durch die erste Steuereinrichtung ST1 zu initiieren, wenn die Lüfterdrehzahl innerhalb des zweiten vordefinierten Zeitraums die zweite vordefinierte Lüfterdrehzahl (Mindestdrehzahl zur sicheren Grundbelüftung im Betrieb) unterschreitet. Die Überprüfungseinrichtung UEP kann ausgestaltet sein (insbesondere kann sie entsprechende Steuerbefehle aufweisen), in diesem Fall die Übergabeeinrichtung UEG zu instruieren, einen Umschaltvorgang auf die erste Steuereinrichtung ST1 vorzunehmen. Die kurzzeitige Drehzahlerhöhung kann zum Beispiel über einen kurzen Zeitraum (z. B. von 1 Sekunde) erfolgen, bis zurückgeschaltet wird. Die Überprüfungseinrichtung UEP kann derart ausgestaltet sein, dass der zweite Zeitraum nach der kurzzeitigen Drehzahlerhöhung von neuem begonnen wird zwecks Überprüfung, ob das Steuern durch die zweite Steuereinrichtung ST2 erfolgreich ist.The checking device UEP can optionally be additionally designed to initiate a short-term speed increase by the first control device ST1 if the fan speed falls below the second predefined fan speed (minimum speed for safe basic ventilation during operation) within the second predefined period of time. The checking device UEP can be designed (in particular, it can have corresponding control commands), in this case to instruct the transfer device UEG to carry out a switching process to the first control device ST1. The short-term increase in speed can, for example, take place over a short period of time (e.g. 1 second) until a switch is made. The checking device UEP can be designed in such a way that the second period of time is started again after the short-term increase in speed in order to check whether the control by the second control device ST2 is successful.

Die Überprüfungseinrichtung UEP kann optional zusätzlich ausgestaltet sein, den Schalter (der z. B. ein Relais sein kann) der Aktivierungseinrichtung AKE, der Stromversorgungen für den Verdichter 7 (über die Stromleitung 73) und den Antriebsmotor 5 (über die Stromleitung 53) ermöglichen kann, für einen bestimmten Zeitraum oder dauerhaft (z. B. bis zu einem erneuten Einschaltvorgang des gekühlten Laborgeräts 1) zu deaktivieren oder zu sperren, wenn eine dritte vordefinierte (kritische) Lüfterdrehzahl unterschritten wird, welche einen sicheren Betrieb im Falle einer Leckage nicht mehr gewährleisten würde. Die dritte vordefinierte Lüfterdrehzahl kann z. B. bei 500 Umdrehungen pro Minute liegen.The checking device UEP can optionally be additionally designed to include the switch (which can be a relay, for example) of the activation device AKE, which can enable power supplies for the compressor 7 (via the power line 73) and the drive motor 5 (via the power line 53). , for a certain period of time or permanently (e.g. until the cooled laboratory device 1 is switched on again) to deactivate or block if a third predefined (critical) fan speed is undershot, which no longer guarantees safe operation in the event of a leak would. The third predefined fan speed can e.g. B. be at 500 revolutions per minute.

Die Überprüfungseinrichtung UEP kann optional zusätzlich ausgestaltet sein, ein Signal des Drehzahlgebers 22 und/oder den korrekten Zustand der Aktivierungseinrichtung AKE noch vor dem ersten Zeitraum zu überprüfen, also vor dem Beginn des Belüftens des Innenbereichs 3. Hierzu kann die Überprüfungseinrichtung UEP entsprechende Steuerbefehle aufweisen. Das Signal des Drehzahlgebers (das auch Tachosignal genannt werden kann) sollte zu Beginn einer Lüfterdrehzahl von null entsprechen. Der Schalter der Aktivierungseinrichtung AKE sollte deaktiviert sein. Die Überprüfungseinrichtung UEP kann ausgestaltet sein, falls mindestens eines dieser Kriterien nicht erfüllt ist, den Schalter (der z. B. ein Relais sein kann) der Aktivierungseinrichtung AKE, der Stromversorgungen für den Verdichter 7 (über die Stromleitung 73) und den Antriebsmotor 5 (über die Stromleitung 53) ermöglichen kann, für einen bestimmten Zeitraum oder dauerhaft (z. B. bis zu einem erneuten Einschaltvorgang des gekühlten Laborgeräts 1) zu deaktivieren oder zu sperren.The checking device UEP can optionally be additionally designed to check a signal from the speed sensor 22 and/or the correct state of the activation device AKE before the first period of time, i.e. before the start of ventilation of the interior area 3. For this purpose, the checking device UEP can have corresponding control commands. The signal from the speed sensor (which can also be called a tachometer signal) should initially correspond to a fan speed of zero. The AKE activation device switch should be deactivated. If at least one of these criteria is not met, the checking device UEP can be designed to include the switch (which can be a relay, for example) of the activation device AKE, the power supplies for the compressor 7 (via the power line 73) and the drive motor 5 ( via the power line 53) can enable deactivation or blocking for a certain period of time or permanently (e.g. until the cooled laboratory device 1 is switched on again).

In Fig. 2 wird eine weitere Ausgestaltung des erfindungsgemäßen gekühlten Laborgeräts 101 gezeigt. Das nun gezeigte gekühlte Laborgerät 101 weist jedoch im Unterschied zum gekühlten Laborgerät 101 eine erste Überprüfungseinrichtung UEP1 und eine zweite Überprüfungseinrichtung UEP2 auf. Die (gemeinsame) Überprüfungseinrichtung UEP ist nicht vorhanden.In Fig. 2 a further embodiment of the cooled laboratory device 101 according to the invention is shown. However, the cooled laboratory device 101 now shown has, in contrast to cooled laboratory device 101 has a first checking device UEP1 and a second checking device UEP2. The (joint) verification facility UEP does not exist.

Die Bemerkungen zu der ersten vorgestellten Ausgestaltung des gekühlten Laborgeräts 1 gelten entsprechend, abgesehen von den folgenden Bemerkungen, die die erste Überprüfungseinrichtung UPE1 und die zweite Überprüfungseinrichtung UEP2 sowie die Schnittstellen 22-UEP1, 22-UEP2, UEP2-ST2, UEP2-AKE und UEP2-UEG sowie die Stromleitung UEP23 betreffen. Die Stromleitung UEP23 verläuft von dem Ein-/Ausschalter 10 bis zu der zweiten Überprüfungseinrichtung UEP2.The comments on the first presented embodiment of the cooled laboratory device 1 apply accordingly, apart from the following comments, which include the first checking device UPE1 and the second checking device UEP2 as well as the interfaces 22-UEP1, 22-UEP2, UEP2-ST2, UEP2-AKE and UEP2 -UEG and the UEP23 power line. The power line UEP23 runs from the on/off switch 10 to the second checking device UEP2.

Die erste Überprüfungseinrichtung UEP1 ist ausgestaltet, mithilfe eines ersten vordefinierten Kriteriums zu überprüfen, ob das Belüften des Innenbereichs über den ersten Zeitraum erfolgreich war. Das erste vordefinierte Kriterium lautet, dass erste vordefinierte Lüfterdrehzahl (z. B. 2500 Umdrehungen pro Minute) über einen Mindestzeitraum (entsprechend dem ersten Zeitraum, er kann zum Beispiel 8 Sekunden lang sein) zum sicheren Belüften erreicht und gehalten wird. So kann ein möglicherweise vorliegendes gefährliches Gemisch innerhalb des gekühlten Laborgeräts neutralisiert werden. Andere Ausgestaltungen des ersten vordefinierten Kriteriums sind nicht ausgeschlossen.The first checking device UEP1 is designed to use a first predefined criterion to check whether the ventilation of the interior area was successful over the first period of time. The first predefined criterion is that the first predefined fan speed (e.g. 2500 revolutions per minute) is reached and maintained over a minimum period of time (corresponding to the first period, it can be 8 seconds long, for example) for safe ventilation. In this way, any potentially dangerous mixture within the cooled laboratory device can be neutralized. Other configurations of the first predefined criterion are not excluded.

Die erste Überprüfungseinrichtung UEP1 weist einen Schwellwertschalter (z. B. einen elektrischen Kondensator der aufgeladen wird, sobald die erste vordefinierte Lüfterdrehzahl erreicht ist). Alternativ oder zusätzlich kann sie eine Einrichtung zur Zeitzählung aufweisen, die einen Zeitmessvorgang beginnt, sobald die erste vordefinierte Lüfterdrehzahl erreicht ist.The first checking device UEP1 has a threshold switch (e.g. an electrical capacitor that is charged as soon as the first predefined fan speed is reached). Alternatively or additionally, it can have a time counting device that begins a time measurement process as soon as the first predefined fan speed is reached.

Die erste Überprüfungseinrichtung UEP1 ist über die Schnittstelle 22-UEP1 mit dem Drehzahlgeber 22 verbunden und kann daher ein Lüfterdrehzahlsignal zwecks Überprüfung, ob das erste vordefinierte Kriterium erfüllt ist, empfangen.The first checking device UEP1 is connected to the speed sensor 22 via the interface 22-UEP1 and can therefore receive a fan speed signal for the purpose of checking whether the first predefined criterion is met.

Über die Schnittstelle UEP1-UEG wird der Übergabeeinrichtung UEG die Information übermittelt, dass der bestimmte Spannungswert des elektrischen Kondensators erreicht ist oder der Zeitmessvorgang den Mindestzeitraum erreicht hat. Diese Information kann bedeuten, dass das Belüften des gekühlten Laborgeräts erfolgreich war.The information is transmitted to the transfer device UEG via the UEP1-UEG interface that the specific voltage value of the electrical capacitor has been reached or that the time measurement process has reached the minimum period. This information may mean that ventilation of the refrigerated laboratory equipment was successful.

Hierdurch wird ein Umschalten an der Übergabeeinrichtung UEG ausgelöst, dass von der ersten Steuereinrichtung ST1 (und von der Schnittstelle ST1-UEG) an die zweite Steuereinrichtung ST2 (und die Schnittstelle ST2-UEG) umgeschaltet werden kann, also ein Umschalten des Schalters der Übergabeeinrichtung UEG erfolgen kann. Der Schalter der Übergabeeinrichtung UEG ist dafür anhand der Information umschaltbar ausgestaltet.This triggers a switchover at the transfer device UEG, which can be switched from the first control device ST1 (and from the interface ST1-UEG) to the second control device ST2 (and the interface ST2-UEG), i.e. a Switching the switch of the transfer device UEG can take place. The switch of the transfer device UEG is designed to be switchable based on the information.

Die Schnittstelle 22-UEP1 ist insoweit ausgestaltet, das Lüfterdrehzahlsignal von dem Drehzahlgeber 22 (der z. B. als Hall-Geber ausgestaltet sein kann) zu übertragen, sodass der Schwellwertschalter (z. B. ein elektrischer Kondensator, der aufgeladen wird) oder ein alternativer Zeitgeber/-zähler der ersten Überprüfungseinrichtung UEP1 zwecks Überprüfung, ob das erste vordefinierte Kriterium erfüllt ist, genutzt werden kann.The interface 22-UEP1 is designed to transmit the fan speed signal from the speed sensor 22 (which can be designed, for example, as a Hall sensor), so that the threshold switch (e.g. an electrical capacitor that is being charged) or a alternative timer/counter of the first checking device UEP1 can be used to check whether the first predefined criterion is met.

In der vorgestellten Ausgestaltung des gekühlten Laborgeräts 101 ist die zweite Überprüfungseinrichtung UEP2 ausgestaltet, mithilfe eines zweiten vordefinierten Kriteriums zu überprüfen, ob der Lüfter 2 durch die zweite Steuereinrichtung ST2 erfolgreich gesteuert wird. Das zweite vordefinierte Kriterium, dass erfüllt sein muss, lautet, dass über einen zweiten Zeitraum die Lüfterdrehzahl nicht unter eine zweite vordefinierte Lüfterdrehzahl (dies kann eine vorgegebene Mindestdrehzahl zur sicheren Grundbelüftung sein) fallen darf. Der zweite Zeitraum kann zum Beispiel 5 Sekunden lang sein. Die zweite vordefinierte Lüfterdrehzahl kann zum Beispiel bei 1100 Umdrehungen pro Minute liegen.In the presented embodiment of the cooled laboratory device 101, the second checking device UEP2 is designed to use a second predefined criterion to check whether the fan 2 is successfully controlled by the second control device ST2. The second predefined criterion that must be met is that the fan speed must not fall below a second predefined fan speed (this can be a predefined minimum speed for safe basic ventilation) over a second period of time. The second period can be, for example, 5 seconds long. The second predefined fan speed can be, for example, 1100 revolutions per minute.

Die zweite Überprüfungseinrichtung UEP2 ist über eine Schnittstelle 22-UEP2 mit dem Drehzahlgeber 22 verbunden und kann daher ein Lüfterdrehzahlsignal zwecks Überprüfung, ob das zweite vordefinierte Kriterium erfüllt ist, empfangen.The second checking device UEP2 is connected to the speed sensor 22 via an interface 22-UEP2 and can therefore receive a fan speed signal for the purpose of checking whether the second predefined criterion is met.

Die Schnittstelle 22-UEP2 ist ausgestaltet, das Lüfterdrehzahlsignal von dem Drehzahlgeber 22 zu übertragen, sodass es empfangen und zum Überprüfen, ob das Steuern über den zweiten Zeitraum erfolgreich war, interpretiert werden kann. Das Empfangen und Interpretieren erfolgt durch die zweite Überprüfungseinrichtung UEP2.The interface 22-UEP2 is configured to transmit the fan speed signal from the speed sensor 22 so that it can be received and interpreted to check whether control over the second period was successful. The reception and interpretation is carried out by the second checking device UEP2.

Weiterhin ist die zweite Überprüfungseinrichtung UEP2 über eine optionale Schnittstelle UEP-ST2 mit der zweiten Steuereinrichtung ST2 verbunden. Über die optionale Schnittstelle UEP-ST2 kann durch die zweite Überprüfungseinrichtung UEP2 im Rahmen des Überprüfens, ob das Steuern über den zweiten Zeitraum erfolgreich war, zum Beispiel geprüft werden, ob das Steuern des Lüfters 2 durch die zweite Steuereinrichtung ST2 ordnungsgemäß erfolgt ist. Es ist nicht ausgeschlossen, dass die zweite Überprüfungseinrichtung UEP und die zweite Steuereinrichtung ST2 als gemeinsame Einheit ausgestaltet sind.Furthermore, the second checking device UEP2 is connected to the second control device ST2 via an optional interface UEP-ST2. Via the optional interface UEP-ST2, the second checking device UEP2 can, for example, check whether the control of the fan 2 was carried out properly by the second control device ST2 as part of checking whether the control over the second period of time was successful. It is not excluded that the second checking device UEP and the second control device ST2 are designed as a common unit.

Wenn das Steuern über den zweiten Zeitraum erfolgreich war, das zweite vordefinierte Kriterium also erfüllt ist, dann erfolgt ein Signal über eine Schnittstelle UEP2-AKE an die Aktivierungseinrichtung AKE, dass Stromversorgungen für den Verdichter 7 (über die Stromleitung 73) und den Antriebsmotor 5 (über die Stromleitung 53) aktiviert werden können. Die Aktivierungseinrichtung 103 weist insbesondere einen Schalter auf, zum Beispiel ein Relais, der bei Vorliegen eines entsprechenden Signals die Stromversorgungen herstellen kann.If the control over the second period of time was successful, i.e. the second predefined criterion is met, then a signal is sent via an interface UEP2-AKE to the activation device AKE that power supplies for the compressor 7 (via the power line 73) and the drive motor 5 ( can be activated via the power line 53). The activation device 103 in particular has a switch, for example a relay, which can produce the power supplies when a corresponding signal is present.

Über die Schnittstelle UEP2-UEG kann die zweite Überprüfungseinrichtung UEP2 mit der Übergabeeinrichtung UEG Informationen austauschen. So kann beispielsweise die zweite Überprüfungseinrichtung UEP2 optional zusätzlich ausgestaltet sein, eine kurzzeitige Drehzahlerhöhung durch die erste Steuereinrichtung ST1 zu initiieren, wenn die Lüfterdrehzahl die zweite vordefinierte Lüfterdrehzahl (vorgegebene Mindestdrehzahl zur sicheren Grundbelüftung im Betrieb) unterschreitet. Die zweite Überprüfungseinrichtung UEP2 kann ausgestaltet sein (insbesondere kann sie entsprechende Steuerbefehle aufweisen), in diesem Fall die Übergabeeinrichtung UEG zu instruieren, einen Umschaltvorgang auf die erste Steuereinrichtung ST1 vorzunehmen. Die kurzzeitige Drehzahlerhöhung kann kurzzeitig (zum Beispiel über einen Zeitraum von 1 Sekunde) erfolgen, bis zurückgeschaltet wird (kurzer Boost des Lüfters 2, um eine kritische untere Drehzahl zu vermeiden). Die zweite Überprüfungseinrichtung UEP2 kann derart ausgestaltet sein, dass der zweite Zeitraum nach der kurzzeitigen Drehzahlerhöhung von neuem begonnen wird zwecks erneuter Überprüfung, ob das Steuern durch die zweite Steuereinrichtung ST2 erfolgreich ist.The second checking device UEP2 can exchange information with the transfer device UEG via the UEP2-UEG interface. For example, the second checking device UEP2 can optionally be additionally designed to initiate a short-term speed increase by the first control device ST1 when the fan speed falls below the second predefined fan speed (predetermined minimum speed for safe basic ventilation during operation). The second checking device UEP2 can be designed (in particular, it can have corresponding control commands), in this case to instruct the transfer device UEG to carry out a switching process to the first control device ST1. The short-term increase in speed can occur briefly (for example over a period of 1 second) until switching back (brief boost of fan 2 to avoid a critical lower speed). The second checking device UEP2 can be designed in such a way that the second period of time is started again after the short-term increase in speed in order to check again whether the control by the second control device ST2 is successful.

Die zweite Überprüfungseinrichtung UEP2 kann optional zusätzlich ausgestaltet sein, den Schalter (der z. B. ein Relais sein kann) der Aktivierungseinrichtung AKE, der Stromversorgungen für den Verdichter 7 (über die Stromleitung 73) und den Antriebsmotor 5 (über die Stromleitung 53) ermöglichen kann, für einen bestimmten Zeitraum oder dauerhaft (z. B. bis zu einem erneuten Einschaltvorgang des gekühlten Laborgeräts 101) zu deaktivieren oder zu sperren, wenn eine dritte vordefinierte Lüfterdrehzahl unterschritten wird, welche einen sicheren Betrieb im Falle einer Leckage nicht mehr gewährleisten würde. Die dritte vordefinierte Lüfterdrehzahl kann z. B. bei 500 Umdrehungen pro Minute liegen.The second checking device UEP2 can optionally be additionally designed to enable the switch (which can be a relay, for example) of the activation device AKE, which enables power supplies for the compressor 7 (via the power line 73) and the drive motor 5 (via the power line 53). can be deactivated or blocked for a certain period of time or permanently (e.g. until the cooled laboratory device 101 is switched on again) if a third predefined fan speed is undershot, which would no longer ensure safe operation in the event of a leak. The third predefined fan speed can e.g. B. be at 500 revolutions per minute.

Die zweite Überprüfungseinrichtung UEP2 kann optional zusätzlich ausgestaltet sein, ein Signal des Drehzahlgebers 22 und/oder den korrekten Zustand der Aktivierungseinrichtung AKE noch vor dem ersten Zeitraum zu überprüfen, also vor dem Beginn des Belüftens des Innenbereichs 3. Hierzu kann die zweite Überprüfungseinrichtung UEP2 entsprechende Steuerbefehle aufweisen. Das Signal des Drehzahlgebers (das auch Tachosignal genannt werden kann) sollte zu Beginn einer Lüfterdrehzahl von null entsprechen, der Schalter der Aktivierungseinrichtung AKE sollte deaktiviert sein.The second checking device UEP2 can optionally be additionally designed to check a signal from the speed sensor 22 and/or the correct state of the activation device AKE before the first period of time, i.e. before the start of ventilation of the interior area 3. For this purpose, the second checking device UEP2 can do the corresponding Have control commands. The signal from the speed sensor (which can also be called a tachometer signal) should initially correspond to a fan speed of zero, the switch of the activation device AKE should be deactivated.

Die zweite Überprüfungseinrichtung UEP2 kann ausgestaltet sein, falls mindestens eines dieser Kriterien nicht erfüllt ist, den Schalter (der z. B. ein Relais sein kann) der Aktivierungseinrichtung AKE, der Stromversorgungen für den Verdichter 7 (über die Stromleitung 73) und den Antriebsmotor 5 (über die Stromleitung 53) ermöglichen kann, für einen bestimmten Zeitraum oder dauerhaft (z. B. bis zu einem erneuten Einschaltvorgang des gekühlten Laborgeräts 101) zu deaktivieren oder zu sperren.If at least one of these criteria is not met, the second checking device UEP2 can be designed to include the switch (which can be a relay, for example) of the activation device AKE, the power supplies for the compressor 7 (via the power line 73) and the drive motor 5 (via the power line 53) can enable deactivation or blocking for a certain period of time or permanently (e.g. until the cooled laboratory device 101 is switched on again).

In Fig. 3 wird eine Ausgestaltung des erfindungsgemäßen Verfahrens zum Betreiben eines mittels eines entflammbaren Kältemittels gekühlten Laborgeräts (zum Beispiel eine Laborzentrifuge oder ein Laborfreezer) gezeigt. Das gekühlte Laborgerät kann zum Beispiel das gekühlte Laborgerät 1 oder das gekühlte Laborgerät 101 sein. Auf die obigen Erläuterungen zu Ausgestaltungen des erfindungsgemäßen gekühlten Laborgeräts wird vollinhaltlich verwiesen, soweit zutreffend, wobei auf die diesbezüglichen Bemerkungen verwiesen wird. Das gekühlte Laborgerät 1 und das gekühlte Laborgerät 101 können jeweils ausgestaltet sein, das erfindungsgemäße Verfahren auszuführen, insbesondere automatisch auszuführen.In Fig. 3 an embodiment of the method according to the invention for operating a laboratory device cooled by means of a flammable refrigerant (for example a laboratory centrifuge or a laboratory freezer) is shown. The cooled laboratory device can be, for example, the cooled laboratory device 1 or the cooled laboratory device 101. Reference is made in full to the above explanations of embodiments of the cooled laboratory device according to the invention, where applicable, with reference being made to the relevant comments. The cooled laboratory device 1 and the cooled laboratory device 101 can each be designed to carry out the method according to the invention, in particular to carry it out automatically.

In einem optionalen vorgelagerten Kontrollschritt SCK wird kontrolliert, ob eine Stromversorgung für weitere mit elektrischem Strom zu versorgende Einrichtungen ordnungsgemäß deaktiviert ist. Es kann sich bei den weiteren mit elektrischem Strom zu versorgenden Einrichtungen z. B. um einen Antriebsmotor 5 und/oder einen Verdichter 7 oder ein Display oder einen elektrischen Öffnungsmechanismus eines Deckels des gekühlten Laborgeräts handeln.In an optional upstream control step SCK, it is checked whether a power supply for further devices to be supplied with electrical power is properly deactivated. The other facilities to be supplied with electrical power can be e.g. B. be a drive motor 5 and / or a compressor 7 or a display or an electrical opening mechanism of a lid of the cooled laboratory device.

Zusätzlich kann innerhalb des Kontrollschritts SCK kontrolliert werden, ob eine Lüfterdrehzahlerfassung ordnungsgemäß funktioniert, zum Beispiel, indem überprüft wird, ob ein Lüfterdrehzahlsignal zu Beginn gleich Null ist.In addition, within the control step SCK it can be checked whether a fan speed detection is functioning properly, for example by checking whether a fan speed signal is initially equal to zero.

In einem Vorschritt SC0 wird überprüft, ob der Lüfter eine vordefinierte Mindestdrehzahl zum sicheren Belüften erreicht bzw. diese vordefinierte Mindestdrehzahl überschritten wird. Falls dies nicht der Fall ist, kann ein Abbruch und ein automatisches Ausschalten des gekühlten Laborgeräts erfolgen.In a preliminary step SC0, it is checked whether the fan reaches a predefined minimum speed for safe ventilation or whether this predefined minimum speed is exceeded. If this is not the case, the cooled laboratory device can be aborted and switched off automatically.

Nach Durchführung des Vorschritts wird in einem ersten Schritt SC1 ein Innenbereich (zum Beispiel der Innenbereich 3) des gekühlten Laborgeräts über einen ersten Zeitraum belüftet. Hierbei erfolgt ein Steuern des Lüfters über eine erste Steuereinrichtung (z. B. die erste Steuereinrichtung ST1), die insbesondere hardwarebasiert sein kann. Der erste Zeitraum ist derart gewählt, dass bei einer ersten vordefinierten Lüfterdrehzahl der Innenbereich des gekühlten Laborgeräts vollständig oder nahezu vollständig von möglicherweise vorhandenem Kältemittel befreit wird.After carrying out the preliminary step, in a first step SC1, an interior area (for example the interior area 3) of the cooled laboratory device is ventilated over a first period of time. The fan is controlled via a first control device (e.g. the first control device ST1), which can in particular be hardware-based. The first period is selected such that at a first predefined fan speed, the interior of the cooled laboratory device is completely or almost completely freed of any refrigerant that may be present.

Nachdem das Belüfteten durchgeführt worden ist, wird in einem zweiten Schritt SC2 überprüft, ob ein erstes vordefiniertes Kriterium (z. B. Erreichen einer Lüfterdrehzahl von mindestens 2500 Umdrehungen pro Minute über 8 Sekunden, diese Lüfterdrehzahl kann als erste vordefinierte Drehzahl bezeichnet werden) erfüllt worden ist, zum Beispiel mithilfe einer einfach aufgebauten Überprüfungseinrichtung, zum Beispiel der ersten Überprüfungseinrichtung UEP1. Das erfolgreiche Belüften kann wie erwähnt alternativ oder zusätzlich mithilfe einer komplexeren Überprüfungseinrichtung, zum Beispiel der Überprüfungseinrichtung UEP, erfolgen.After the ventilation has been carried out, a second step SC2 checks whether a first predefined criterion (e.g. reaching a fan speed of at least 2500 revolutions per minute over 8 seconds, this fan speed can be referred to as the first predefined speed) has been met is, for example using a simply constructed checking device, for example the first checking device UEP1. As mentioned, successful ventilation can alternatively or additionally be carried out using a more complex checking device, for example the UEP checking device.

Möglicherweise im Innenbereich vorhandenes Kältemittel ist nun vollständig oder nahezu vollständig entfernt, sodass weitere mit elektrischem Strom zu versorgende Einrichtungen des Laborgeräts keine Gefahr aufgrund von Funkenbildung darstellen, und zwar, bevor sie mit elektrischem Strom versorgt werden.Any refrigerant that may be present inside is now completely or almost completely removed, so that other devices of the laboratory device that are to be supplied with electrical power do not pose a danger due to spark formation, before they are supplied with electrical power.

In einem dritten Schritt SC3 wird, sofern das Steuern des Lüfters erfolgreich war (angedeutet durch einen Haken), das Steuern des Lüfters an eine zweite Steuereinrichtung übergeben, zum Beispiel mithilfe der Übergabeeinrichtung UEG. Die zweite Steuereinrichtung kann insbesondere eine software- oder firmwarebasierte Steuereinrichtung sein und hinterlegte Steuerbefehle und/oder Kennlinien aufweisen.In a third step SC3, if the control of the fan was successful (indicated by a check mark), the control of the fan is transferred to a second control device, for example using the transfer device UEG. The second control device can in particular be a software or firmware-based control device and have stored control commands and/or characteristics.

Falls das Steuern des Lüfters nicht erfolgreich war (angedeutet durch ein "x"), kann das Verfahren beendet werden. Insbesondere kann das gekühlte Laborgerät automatisch ausgeschaltet werden, wie durch das Symbol "O" angedeutet wird.If controlling the fan was not successful (indicated by an “x”), the procedure can be terminated. In particular, the cooled laboratory device can be switched off automatically, as indicated by the symbol "O".

In einem vierten Schritt SC4 wird mithilfe eines zweiten vordefinierten Kriteriums (z. B. darf der Lüfter nicht unter eine vordefinierte minimale Drehzahl für eine dauerhafte sichere Belüftung fallen, diese Drehzahl kann als zweite vordefinierte Lüfterdrehzahl bezeichnet werden) überprüft, ob das Steuern des Lüfters erfolgreich ist.In a fourth step SC4, using a second predefined criterion (e.g. the fan must not fall below a predefined minimum speed for long-term safe ventilation, this speed can be referred to as the second predefined fan speed) it is checked whether the control of the fan is successful is.

Falls dies nicht der Fall ist, aber ein drittes vordefiniertes Kriterium nicht verletzt wird (z. B. Abfall der Lüfterdrehzahl unter eine vordefinierte kritische Drehzahl, die als dritte vordefinierte Lüfterdrehzahl bezeichnet werden kann, wobei diese Drehzahl einen sicheren Betrieb bei Vorliegen einer Leckage nicht mehr gewährleistet), kann in einem optionalen zusätzlichen Schritt SC4B eine kurzzeitige Übergabe der Steuerung an die erste Steuereinrichtung erfolgen, die eine kurzzeitige Lüfterdrehzahlerhöhung (Boost), Richtung Maximaldrehzahl des Lüfters, veranlasst. Hiernach kann der vierte Schritt SC4 erneut durchgeführt werden. Der optionale zusätzliche Schritt SC4b kann eine begrenzte Anzahl an Durchgängen ausgeführt werden. Falls das zweite vordefinierte Kriterium trotzdem nicht erfüllt wird, kann ein Abbruch erfolgen, z. B. ein Ausschalten des gekühlten Laborgeräts (nicht dargestellt).If this is not the case, but a third predefined criterion is not violated (e.g. the fan speed drops below a predefined critical speed, which can be referred to as the third predefined fan speed, whereby this speed no longer ensures safe operation in the presence of a leak ensured), in an optional additional step SC4B, the control can be briefly transferred to the first control device, which causes a brief fan speed increase (boost) towards the maximum speed of the fan. The fourth step SC4 can then be carried out again. The optional additional step SC4b can be carried out a limited number of times. If the second predefined criterion is still not met, an abort can occur, e.g. B. switching off the cooled laboratory device (not shown).

Das Überprüfen, ob das Steuern des Lüfters erfolgreich ist, kann mithilfe einer Überprüfungseinrichtung (z. B. Überprüfungseinrichtung UPE oder zweite Überprüfungseinrichtung UEP2) erfolgen.Checking whether the control of the fan is successful can be done using a checking device (e.g. checking device UPE or second checking device UEP2).

Wenn das Belüften erfolgreich ist (angedeutet durch einen Haken), erfolgt, ggf. auch zeitverzögert (angedeutet durch ein Uhr-Symbol), eine Aktivierung der weiteren mit elektrischem Strom zu versorgenden Einrichtungen in einem fünften Schritt SC5, zum Beispiel mithilfe einer Aktivierungseinrichtung - das heißt, ein normaler Betrieb des gekühlten Laborgeräts kann beginnen.If the ventilation is successful (indicated by a check mark), the further devices to be supplied with electrical power are activated, possibly with a time delay (indicated by a clock symbol), in a fifth step SC5, for example with the help of an activation device - that This means that normal operation of the cooled laboratory device can begin.

Bezugszeichenliste:List of reference symbols:

  • 1: gekühltes Laborgerät1: refrigerated laboratory device
  • 10: Ein-/Ausschalter10: On/Off switch
  • 101: gekühltes Laborgerät101: refrigerated laboratory equipment
  • 103: Stromleitung103: Power line
  • 11: Gehäuse11: Housing
  • 2: Lüfter2: Fan
  • 21: Lüftermotor21: Fan motor
  • 22: Drehzahlgeber22: Speed sensor
  • 22-UEP: Schnittstelle zwischen Drehzahlgeber und Überprüfungseinrichtung22-UEP: Interface between speed sensor and checking device
  • 22-UEP1: Schnittstelle zwischen Drehzahlgeber und erster Überprüfungseinrichtung22-UEP1: Interface between speed sensor and first checking device
  • 22-UEP2: Schnittstelle zwischen Drehzahlgeber und zweiter Überprüfungseinrichtung22-UEP2: Interface between speed sensor and second checking device
  • 3: Innenbereich3: Indoor area
  • 4: Zentrifugenrotor4: Centrifuge rotor
  • 5: Antriebsmotor5: Drive motor
  • 51: Rotorwelle51: Rotor shaft
  • 52: Rotorlager52: Rotor bearing
  • 53: Stromleitung für den Antriebsmotor53: Power line for the drive motor
  • 6: Verdampfer (Kälteerzeuger)6: Evaporator (refrigerator)
  • 7: Verdichter (z. B. Kompressor)7: Compressor (e.g. compressor)
  • 73: Stromleitung für den Verdichter73: Power line for the compressor
  • 8: Kondensator (Verflüssiger)8: Condenser (Condenser)
  • 9: Drossel9: Throttle
  • AKE: AktivierungseinrichtungAKE: Activation facility
  • EX: externe StromversorgungEX: external power supply
  • EXN: NetzkabelEXN: Power cord
  • KAE: KältekreislaufKAE: refrigeration cycle
  • KM: KältemittelKM: Refrigerant
  • OE1: erste ÖffnungOE1: first opening
  • OE2: zweite ÖffnungOE2: second opening
  • ST1: erste SteuereinrichtungST1: first control device
  • SC1: erster SchrittSC1: first step
  • ST13: Stromleitung für die erste SteuereinrichtungST13: Power line for the first control device
  • ST1-UEG: Schnittstelle zwischen erster Steuereinrichtung und ÜbergabeeinrichtungST1-UEG: Interface between the first control device and the transfer device
  • ST2: zweite SteuereinrichtungST2: second control device
  • SC2: zweiter SchrittSC2: second step
  • ST23: Stromleitung für die zweite SteuereinrichtungST23: Power line for the second control device
  • ST2-UEG: Schnittstelle zwischen zweiter Steuereinrichtung und ÜbergabeeinrichtungST2-UEG: Interface between second control device and transfer device
  • SC3: dritter SchrittSC3: third step
  • SC4: vierter SchrittSC4: fourth step
  • SC4B: zusätzlicher SchrittSC4B: additional step
  • SC5: fünfter SchrittSC5: fifth step
  • SCK: KontrollschrittSCK: control step
  • UEG: ÜbergabeeinrichtungUEG: transfer facility
  • UEG-2: Schnittstelle zwischen Übergabeeinrichtung und LüfterUEG-2: Interface between transfer device and fan
  • UEP: ÜberprüfungseinrichtungUEP: verification facility
  • UEP1: erste ÜberprüfungseinrichtungUEP1: first verification facility
  • UEP2: zweite ÜberprüfungseinrichtungUEP2: second verification facility
  • UEP23: Stromleitung für die zweite ÜberprüfungseinrichtungUEP23: Power line for the second verification device
  • UEP2-AKE: Schnittstelle zwischen zweiter Überprüfungseinrichtung undUEP2-AKE: Interface between second verification device and
  • AktivierungseinrichtungActivation facility
  • UEP2-ST2 Schnittstelle zwischen zweiter Überprüfungseinrichtung und zweiter SteuereinrichtungUEP2-ST2 Interface between second checking device and second control device
  • UEP2-UEG: Schnittstelle zwischen zweiter Überprüfungseinrichtung und ÜbergabeeinrichtungUEP2-UEG: Interface between second verification device and transfer device
  • UEP3: Stromleitung für die ÜberprüfungseinrichtungUEP3: Power line for the verification facility
  • UEP-AKE: Schnittstelle zwischen Überprüfungseinrichtung und AktivierungseinrichtungUEP-AKE: Interface between verification facility and activation facility
  • UEP-ST1: Schnittstelle zwischen Überprüfungseinrichtung und erster SteuereinrichtungUEP-ST1: Interface between checking device and first control device
  • UEP-ST2: Schnittstelle zwischen Überprüfungseinrichtung und zweiter SteuereinrichtungUEP-ST2: Interface between checking device and second control device
  • UEP-UEG: Schnittstelle zwischen Überprüfungseinrichtung und ÜbergabeeinrichtungUEP-UEG: Interface between verification facility and transfer facility

Claims (13)

  1. A method for operating a laboratory apparatus (1; 101) that is cooled by means of a flammable refrigerant (KM), comprising:
    - Ventilating an internal area (3) of the cooled laboratory apparatus (1; 101) with the aid of a fan (2), wherein control of the fan (2) is carried out over a first period of time by a first control device (ST1);
    - checking by means of a first predefined criterion whether the ventilation was successful;
    - transferring control of the fan (2) to a second control device (ST2) if the ventilation was successful over the first time period;
    - checking by means of a second predefined criterion whether the fan (2) is successfully controlled by the second control device (ST2);
    - activating a power supply for at least one further device (5, 7) of the cooled laboratory apparatus (1; 101) to be supplied with electric current if the fan (2) is successfully controlled by the second control device (ST2).
  2. Method according to claim 1, characterized in that a power supply for the fan (2) is established before ventilating the inner area (3), in particular immediately before ventilating.
  3. Method according to claim 2, characterized in that the power supply for the fan (2) is established by a switch-on process of the cooled laboratory apparatus (1; 101).
  4. Method according to any one of claims 1-3, characterized in that the first control device (ST1) is a hardware-based control device.
  5. Method according to any one of claims 1-4, characterized in that the second control device (ST2) is a software-based or a firmware-based control device.
  6. Method according to any one of claims 1-5, characterized in that the first criterion is or comprises not falling below or reaching a first predefined fan speed.
  7. Method according to any one of claims 1-6, characterized in that the second criterion is or comprises not falling below a second predefined fan speed.
  8. Method according to claim 7, characterized in that, if the second predefined fan speed is undershot, a brief speed increase of the fan (2) is effected by the first control device (ST1).
  9. Method according to one of claims 1-8, characterized in that a permanent or temporary deactivation of the power supply for the at least one further device (5, 7) to be supplied with electric current takes place if a third predefined criterion is violated.
  10. Method according to one of the claims 1-9, characterized in that the activation of the power supply for the at least one further device (5, 7) to be supplied with electrical current takes place only after the expiry of a second time period which begins with or after the transfer of the fan control to the second control device (ST2).
  11. Method according to one of the claims 1-10, characterized in that, before ventilating the inner area (3) of the cooled laboratory apparatus (1; 101), it is checked whether the power supply for the at least one further device (5, 7) to be supplied with electric current is deactivated and/or whether a fan speed detection is functioning properly.
  12. Laboratory apparatus (1; 101) cooled by means of a flammable refrigerant (KM), comprising:
    - a fan (2) configured to ventilate an interior region (3) of the cooled laboratory apparatus (1; 101);
    - a first control device (ST1) configured to perform control of the fan (2) such that ventilation of the interior region (3) is performed over a first period of time;
    - a verification means (UEP; UEP1) configured to verify, by means of a first predefined criterion, whether the ventilation has been successful over the first period of time;
    - second control means (ST2) adapted to control the fan (2);
    - a transfer device (UEG) adapted to transfer control of the fan (2) to the second control device (ST2) to the second control means (ST2) when the ventilation has been successful over the first period of time;
    - an activating means (AKE) adapted to activate a power supply for at least one further device (5, 7) of the cooled laboratory apparatus (1; 101) to be supplied with electric current when the fan (2) is successfully controlled by the second control means (ST2);
    wherein the checking device (UEP) is additionally designed to check with the aid of a second predefined criterion whether the fan (2) is successfully controlled by the second control device ST2, or the cooled laboratory apparatus (1; 101) has a further checking device (UEP2) which is designed to check with the aid of a second predefined criterion whether the fan (2) is successfully controlled by the second control device (ST2).
  13. Laboratory apparatus (1; 101) according to claim 12, characterized in that the laboratory apparatus (1; 101) is a laboratory freezer or a centrifuge.
EP21213227.8A 2021-12-08 2021-12-08 Method for operating a laboratory apparatus cooled by means of a flammable refrigerant Active EP4194096B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP21213227.8A EP4194096B1 (en) 2021-12-08 2021-12-08 Method for operating a laboratory apparatus cooled by means of a flammable refrigerant
JP2022187076A JP7481415B2 (en) 2021-12-08 2022-11-24 Method of operating experimental equipment using flammable refrigerant and experimental equipment
US18/074,666 US20230175755A1 (en) 2021-12-08 2022-12-05 Method For Operating An Item of Laboratory Equipment Cooled By Means Of A Flammable Refrigerant
CN202211562021.3A CN116242091A (en) 2021-12-08 2022-12-07 Method for operating objects of laboratory equipment cooled by means of flammable refrigerants

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP21213227.8A EP4194096B1 (en) 2021-12-08 2021-12-08 Method for operating a laboratory apparatus cooled by means of a flammable refrigerant

Publications (2)

Publication Number Publication Date
EP4194096A1 EP4194096A1 (en) 2023-06-14
EP4194096B1 true EP4194096B1 (en) 2024-03-06

Family

ID=78828156

Family Applications (1)

Application Number Title Priority Date Filing Date
EP21213227.8A Active EP4194096B1 (en) 2021-12-08 2021-12-08 Method for operating a laboratory apparatus cooled by means of a flammable refrigerant

Country Status (4)

Country Link
US (1) US20230175755A1 (en)
EP (1) EP4194096B1 (en)
JP (1) JP7481415B2 (en)
CN (1) CN116242091A (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5261252A (en) * 1992-10-09 1993-11-16 E. I. Du Pont De Nemours And Company Noise reduction systems for a refrigerated centrifuge instrument
JP2005306203A (en) 2004-04-21 2005-11-04 Sanden Corp Air conditioning system for vehicle
JP5861988B2 (en) * 2011-04-15 2016-02-16 日立工機株式会社 centrifuge
CN202565643U (en) 2012-02-09 2012-11-28 天津开发区兰顿油田服务有限公司 Positive-pressure air exhaust control device for flame-proof shell
DE102018114450A1 (en) 2018-06-15 2019-12-19 Eppendorf Ag Temperature-controlled centrifuge with crash protection

Also Published As

Publication number Publication date
JP2023085219A (en) 2023-06-20
US20230175755A1 (en) 2023-06-08
CN116242091A (en) 2023-06-09
EP4194096A1 (en) 2023-06-14
JP7481415B2 (en) 2024-05-10

Similar Documents

Publication Publication Date Title
EP3255360B1 (en) Air conditioning system and method for leakage detection in an air conditioning system
DE3037135A1 (en) MICROCOMPUTER-BASED ERROR DETECTION AND DISPLAY CONTROL SYSTEM
DE202017107917U1 (en) Refrigerant leakage detection by using a fluid additive
DE3517222C2 (en)
EP1344003B1 (en) Method for conducting a cooking process with a cooking process probe
DE112008001492B4 (en) Start control device and method for an electric scroll compressor
DE69533303T2 (en) fridge
DE102004044990A1 (en) System and method for detecting coolant leaks
DE102012209794B4 (en) Method for identifying a fault in a vehicle air conditioning system
DE102012024975A1 (en) Extractor hood and method for controlling the operation of an extractor hood
CH708482A2 (en) System enclosure ventilation monitoring system.
EP4194096B1 (en) Method for operating a laboratory apparatus cooled by means of a flammable refrigerant
DE102018109604A1 (en) Control cabinet arrangement with safety function and a corresponding method
EP2688757B1 (en) Method and diagnostic tester for detecting a fault in a cooling circuit of a motor vehicle
DE4113170C2 (en)
DE4211681C2 (en) Method for controlling the burning of a fuel gas
DE102018110315B4 (en) Electronic control unit
DE102007001452A1 (en) Refrigerant e.g. carbon dioxide, under-filling determination method for air conditioning system of vehicle, involves determining difference of values based on identification of filling level, and determining measure for change of difference
DE102011008219B4 (en) Method and device for determining a mass air flow flowing through a ram air duct
EP3721124B1 (en) Valve monitoring system for a coaxial dual-safety valve
EP1703137B1 (en) Ventilator
DE102021114157A1 (en) Method for monitoring a flame of a heating device, computer program, storage medium, regulation and control device, heating device and use of a positioning device
DE4102179A1 (en) Operating refrigeration machine used e.g. in air conditioning system - blocking refrigerant circuit behind condenser as seen by compressor with coolant leaks
DE102019110198A1 (en) Cooking device and method for detecting a fault condition of a cooking device
DE102018106261A1 (en) Decentralized air treatment device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20221101

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230921

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502021002898

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN