EP4058338C0 - Dispositif et procédé de planification d'entretien pour une roue de train - Google Patents
Dispositif et procédé de planification d'entretien pour une roue de trainInfo
- Publication number
- EP4058338C0 EP4058338C0 EP20804544.3A EP20804544A EP4058338C0 EP 4058338 C0 EP4058338 C0 EP 4058338C0 EP 20804544 A EP20804544 A EP 20804544A EP 4058338 C0 EP4058338 C0 EP 4058338C0
- Authority
- EP
- European Patent Office
- Prior art keywords
- train wheel
- maintenance planning
- planning
- maintenance
- train
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012423 maintenance Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/50—Trackside diagnosis or maintenance, e.g. software upgrades
- B61L27/53—Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/40—Handling position reports or trackside vehicle data
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/50—Trackside diagnosis or maintenance, e.g. software upgrades
- B61L27/57—Trackside diagnosis or maintenance, e.g. software upgrades for vehicles or trains, e.g. trackside supervision of train conditions
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH14482019 | 2019-11-15 | ||
PCT/EP2020/081802 WO2021094401A1 (fr) | 2019-11-15 | 2020-11-11 | Dispositif et procédé de planification d'entretien pour une roue de train |
Publications (3)
Publication Number | Publication Date |
---|---|
EP4058338A1 EP4058338A1 (fr) | 2022-09-21 |
EP4058338C0 true EP4058338C0 (fr) | 2023-12-13 |
EP4058338B1 EP4058338B1 (fr) | 2023-12-13 |
Family
ID=73344076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20804544.3A Active EP4058338B1 (fr) | 2019-11-15 | 2020-11-11 | Dispositif et procédé de planification d'entretien pour une roue de train |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP4058338B1 (fr) |
WO (1) | WO2021094401A1 (fr) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023166110A1 (fr) * | 2022-03-04 | 2023-09-07 | Konux Gmbh | Système et procédé de surveillance des propriétés et de la qualité de maintenance d'un train |
CN114971034A (zh) * | 2022-05-31 | 2022-08-30 | 中国铁路广州局集团有限公司广州动车段 | 一种车轮剩余寿命预测的分析算法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070043486A1 (en) * | 2005-08-18 | 2007-02-22 | Moffett Jeffrey P | Rail wheel measurement |
EP2937241B1 (fr) * | 2014-04-24 | 2017-03-08 | Hitachi, Ltd. | Estimation des dommages de véhicule ferroviaire |
US10513279B2 (en) * | 2017-03-24 | 2019-12-24 | Canadian Pacific Railway Company | Condition based maintenance of railcar roller bearings using predictive wayside alerts based on acoustic bearing detector measurements |
-
2020
- 2020-11-11 WO PCT/EP2020/081802 patent/WO2021094401A1/fr active Search and Examination
- 2020-11-11 EP EP20804544.3A patent/EP4058338B1/fr active Active
Also Published As
Publication number | Publication date |
---|---|
WO2021094401A1 (fr) | 2021-05-20 |
EP4058338A1 (fr) | 2022-09-21 |
EP4058338B1 (fr) | 2023-12-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ZA202106137B (en) | System and method for inspecting a rail using machine learning | |
PL3469304T3 (pl) | Sposób i system konserwacji toru dla pojazdów szynowych | |
PL3820758T3 (pl) | Sposób i system monitorowania odcinka toru kolejowego | |
SG11202008372PA (en) | Railway train operation control method and system | |
SG11202012505SA (en) | System and method for training a damage identification model | |
EP3903069C0 (fr) | Procédé et système de planification d'un trajet | |
EP3798574C0 (fr) | Procédé et système de planification de trajet en temps réel | |
SG10202000837QA (en) | Systems and methods for inspecting a railroad | |
PL3481999T3 (pl) | System i sposób pomiaru toru | |
EP4027113A4 (fr) | Procédé et appareil de planification de déplacement | |
PL3746346T3 (pl) | Pojazd szynowy i sposób pomiaru odcinka toru | |
HUE057400T2 (hu) | Eljárás és berendezés vasúti átjáró biztosítására | |
EP3860890C0 (fr) | Essieu monté et système d'entraînement pour un véhicule ferroviaire | |
EP4058338C0 (fr) | Dispositif et procédé de planification d'entretien pour une roue de train | |
EP3823879C0 (fr) | Système et procédé de construction et de gestion de composition de train | |
EP3763887C0 (fr) | Dispositif et procédé de surveillance d'une bouche d'incendie | |
GB2596724B (en) | Method, system and apparatus for a rail track | |
PL4010215T3 (pl) | Sposób eksploatowania pojazdu szynowego i pojazd szynowy | |
GB201909098D0 (en) | A method and system for deriving train travel information | |
GB2580902B (en) | Rail-free train and method for operating thereof | |
EP3823876C0 (fr) | Procédé et système de reconnaissance d'une roue de véhicule ferroviaire | |
PL3891334T3 (pl) | Urządzenie i sposób układania podkładów na podsypce kolejowej | |
PL3580114T3 (pl) | Sposób i urządzenie do wytyczania co najmniej jednej drogi przebiegu instalacji kolejowej | |
ZA201906768B (en) | Track part and method for producing a track part | |
SI3591118T1 (sl) | Naprava in postopek za obnovo podlage železniške proge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20220609 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602020022813 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: B61L0027000000 Ipc: B61L0027400000 Ref country code: DE Ref legal event code: R079 Free format text: PREVIOUS MAIN CLASS: B61L0027000000 Ipc: B61L0027400000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230521 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 27/57 20220101ALI20230523BHEP Ipc: B61L 27/53 20220101ALI20230523BHEP Ipc: B61L 27/40 20220101AFI20230523BHEP |
|
INTG | Intention to grant announced |
Effective date: 20230627 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602020022813 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
U01 | Request for unitary effect filed |
Effective date: 20240110 |
|
P04 | Withdrawal of opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20240115 |
|
U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI Effective date: 20240118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240314 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240313 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240413 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240413 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231213 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |