EP3938578A1 - Method for compacting a ballast bed of a track - Google Patents

Method for compacting a ballast bed of a track

Info

Publication number
EP3938578A1
EP3938578A1 EP20705332.3A EP20705332A EP3938578A1 EP 3938578 A1 EP3938578 A1 EP 3938578A1 EP 20705332 A EP20705332 A EP 20705332A EP 3938578 A1 EP3938578 A1 EP 3938578A1
Authority
EP
European Patent Office
Prior art keywords
tamping
track
ballast
layer
ballast layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP20705332.3A
Other languages
German (de)
French (fr)
Other versions
EP3938578B1 (en
EP3938578C0 (en
Inventor
Gerard Lintz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Original Assignee
Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Plasser und Theurer Export Von Bahnbaumaschinen GmbH filed Critical Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Publication of EP3938578A1 publication Critical patent/EP3938578A1/en
Application granted granted Critical
Publication of EP3938578B1 publication Critical patent/EP3938578B1/en
Publication of EP3938578C0 publication Critical patent/EP3938578C0/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • E01B27/17Sleeper-tamping machines combined with means for lifting, levelling or slewing the track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/12Tamping devices

Definitions

  • the invention relates to a method for compacting a layer by layer
  • Ballast bed of a track by means of one moving on the track
  • a generic method is known with which a ballast bed of a track is compacted in layers.
  • a compaction unit is used in which horizontally aligned compaction plates are lowered between sleepers of the track. There the compaction plates press on an exposed lower ballast layer and compact it. Then an upper layer of gravel is applied and compacted by a tamping process. In this way, ballast is gradually applied, leveled and compacted under the raised track.
  • the invention is based on the object of providing a method, which is simplified compared to the prior art, for compacting a layer by layer
  • the tamping unit arranged on the track construction machine is lowered in such a way that the tamping ax arranged at the free ends
  • Penetrating tamping plates penetrate into the lower gravel layer and are kept vibrating in position there for a predetermined period of time, and that in the second compaction step, the vibrating tamping tine with the
  • the structure of the gravel grains is compacted, but not shifted.
  • the structure of the ballast grains in the upper layer is compacted and shifted during the second compaction step. In this way one results for the entire ballast layer located below the sleepers
  • the present invention is particularly useful in the area of switches because there the simultaneous introduction of the ballast layers reduces the technical effort.
  • Compaction step further ballast is introduced into the track. This additional ballast is initially deposited between and on the sleepers. During the second compression step, the from the
  • An advantageous development of the invention provides that during the second compression step the track is held in a target position by means of a lifting / straightening unit. In this way, the track position is corrected. This creates cavities under the sleepers during a lifting process. The provision of the vibrating tamping ax causes the ballast to be shifted into these cavities.
  • Ballast layer with a total layer height of at least 200 mm.
  • the lower and upper gravel layers each reach a height of approximately 100 mm. With these layer heights, the present method delivers particularly good compaction results.
  • the tamping tine plates penetrate completely into the lower ballast layer up to at least 100 mm below the lower edge of the sleeper. This ensures that the entire compaction energy acts on the ballast grains of the lower ballast layer.
  • Another improvement of the first compression step provides that the vibrating tamping tines are held in position for a period of time between 1 second and 2 seconds in the lowered state.
  • the duration of the vibrating tamping ax is then sufficient to optimally compact the gravel structure in the lower gravel layer.
  • the tampons vibrate at a higher frequency when penetrating than in the lowered position.
  • the ballast bed is compacted after the second compaction step in a further compaction process by means of a stabilization unit.
  • the stabilization process shakes the track grid consisting of sleepers and rails into the
  • Processing is driving on the track with a higher
  • the method is particularly effective when the track-laying machine is operated in association with a cleaning machine and when the lower ballast layer and the upper ballast layer are connected to one another
  • the result of the treatment with the cleaning machine is a soft ballast bed that is continuously compacted with the two compaction steps.
  • Fig. 1 track construction machine
  • the track construction machine 1 shown in FIG. 1 can be moved on rails 3 of a track 4 by means of rail bogies 2.
  • the rails 3 are attached to sleepers 6 mounted in a ballast bed 5.
  • the track construction machine 1 comprises a tamping unit 7.
  • a lifting / straightening unit 8 and a measuring system 9 are arranged for a track position correction.
  • Tamping unit 7 longer tamping pick 10 on.
  • the tampons 10 are
  • a hydraulic cylinder serves as the height adjustment drive 13.
  • the swivel arms 11, which are arranged like pliers, are coupled to a vibration generator 15 via a respective auxiliary cylinder 14. This
  • Vibration generator 15 comprises, for example, an eccentric shaft driven in rotation. To transmit a vibration, the respective Additional cylinder 14 connected on the one hand to the eccentric shaft and on the other hand to an upper end of the associated swivel arm 11.
  • a tampon plate 16 is arranged there at the end of a narrow tampon shaft. The respective tamper plate 16 is aligned normal to the direction of a vibratory movement 17. In this way, during the first compression step, all of the
  • Tamping pick plate 16 captured gravel grains set in vibration.
  • Vibration movement 17 is superimposed on a positioning movement 18.
  • the vibrating tamping pick plates 16 are moved towards one another, as a result of which the captured ballast grains are set in vibration and additionally displaced.
  • An exemplary process sequence begins with 4 ballast being introduced into a track. This happens either when the track 4 is re-laid or when the ballast is cleaned using a cleaning machine.
  • the ballast is introduced below the sleepers 6 with a
  • the lower ballast layer 20 and the upper ballast layer 21 are introduced into the track 4 at the same time before the compaction.
  • the first compression step then takes place.
  • the simultaneous introduction of both ballast layers 20, 21 is advantageous.
  • the track grid cannot be laid on the lower ballast layer 20 before the upper ballast layer 21 is introduced, as is the case with a line track, in order to make this layer 20 in
  • the tamping unit 7 is positioned above a threshold 6 (middle threshold in FIG. 2).
  • the vibrating tamping ax 10 are lowered and dive into the ballast bed 5.
  • the tamping tines ideally vibrate at a frequency of approx. 45 Hz. With this frequency, those in
  • a first countersinking depth 22 is specified in such a way that the tamping tine plates 16 pass entirely into the lower gravel layer 20.
  • the tamping tines 7 with the tool carrier 12 raised are shown as a reference above the right sill 6.
  • a control device 23 From the known heights of the sleepers 6 and the rails 3 as well as the geometry of the track construction machine 1, a corresponding specification for controlling the height adjustment drive 13 results for a control device 23.
  • the first lowering depth 22 is limited by a formation protection layer 24, which may be located under the lower one
  • the formation protection layer 24 is not damaged by the tamping ax 10.
  • the ballast grains arrange themselves under the load of the upper ballast layer 21 to form a denser structure.
  • the specified time span is approx. 1.5 seconds. A sufficient degree of compaction of the ballast structure is then achieved and the tamping picks 10 are pulled out of the ballast bed 5 by acting on the height adjustment drive 13.
  • This first compression step is for all sleepers 6 of the to
  • track 4 is ballasted if necessary. This introduction of additional ballast is particularly useful if the track grid is to be raised in the subsequent second compaction step.
  • the second compression step begins with a positioning of the
  • the tool carrier 12 is lowered until the tamping tine plates 16 reach a second lowering depth 25.
  • the distance between the upper edge of the respective tamping plate 16 and the lower edge of the respective threshold 6 is a few centimeters (e.g. 20 cm).
  • This second lowering depth 25 can also be predetermined for the control device 23 on the basis of the known threshold height, the rail height and the machine geometry.
  • ballast grains in the area below the threshold 6 The result of the ballast grains set in vibration and displaced is a compacted ballast structure. In this way, with the already compacted lower gravel layer 20, overall a stable support for the respective sleeper 6 is created.
  • Ballast layer 21 immersed and provided to one another. Such a repetition is decided by an operator or by recording the state of the ballast by means of sensors arranged on the track construction machine 1. For example, counterforces acting on the tamping ax 10 are used to determine a parameter for the ballast compaction.
  • DVS dynamic track stabilizer

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention relates to a method for compacting a ballast bed (5) of a track (4) in layers by means of a track construction machine (1) travelling on the track (4), wherein ballast located below sleepers (6) of the track (4) are compacted in at least two layers (20, 21) lying on top of one another, whereby a lower ballast layer (20) is compacted in a first compacting step and subsequently an upper ballast layer (21) above the lower ballast layer (20) is compacted by a tamping process in a second compacting step. Before the compacting, the lower ballast layer (20) and the upper ballast layer (21) are introduced onto the track (4) together, wherein in the first compacting step, vibrating tamping tines (10) of a tamping assembly (7) arranged on the track construction machine (1) are lowered in such a way that tamping tine plates (16) arranged on the free ends of the tamping tines (10) penetrate into the lower ballast layer (20) and held there, vibrating in position, for a predefined time period, and wherein in the second compacting step, the vibrating tamping tines (10) with the tamping tine plates (16) penetrate into the upper ballast layer (21) and are moved towards one another. In this way, a consistently good compacting can be provided for the entire ballast layer located below the sleepers (6).

Description

Besch reibu ng Description
Verfahren zum Verdichten eines Schotterbettes eines Gleises Method for compacting a ballast bed of a track
Gebiet der Technik Field of technology
[01] Die Erfindung betrifft ein Verfahren zum schichtweisen Verdichten eines [01] The invention relates to a method for compacting a layer by layer
Schotterbettes eines Gleises mittels einer auf dem Gleis fahrenden Ballast bed of a track by means of one moving on the track
Gleisbaumaschine, wobei unterhalb von Schwellen des Gleises befindlicher Schotter in zumindest zwei übereinander liegenden Schichten verdichtet wird, indem in einem ersten Verdichtungsschritt eine untere Schotterschicht verdichtet wird und danach in einem zweiten Verdichtungsschritt eine über der unteren Schotterschicht liegende obere Schotterschicht durch einen Stopfvorgang verdichtet wird. Track construction machine, where ballast located below sleepers of the track is compacted in at least two superimposed layers by compacting a lower ballast layer in a first compacting step and then in a second compacting step an upper ballast layer lying above the lower ballast layer is compacted by a tamping process.
Stand der Technik State of the art
[02] Aus der AT 518324 A1 ist ein gattungsgemäßes Verfahren bekannt, mit dem ein Schotterbett eines Gleises schichtweise verdichtet wird. Dabei kommt in einem ersten Verdichtungsschritt ein Verdichtungsaggregat zum Einsatz, bei dem horizontal ausgerichtete Verdichtungsplatten zwischen Schwellen des Gleises abgesenkt werden. Dort drücken die Verdichtungsplatten auf eine frei liegende untere Schotterschicht und verdichten diese. Dann wird eine obere Schotterschicht aufgebracht und durch einen Stopfvorgang verdichtet. Auf diese Weise wird Schotter schrittweise unter dem angehobenen Gleis aufgebracht, planiert und verdichtet. From AT 518324 A1 a generic method is known with which a ballast bed of a track is compacted in layers. In a first compaction step, a compaction unit is used in which horizontally aligned compaction plates are lowered between sleepers of the track. There the compaction plates press on an exposed lower ballast layer and compact it. Then an upper layer of gravel is applied and compacted by a tamping process. In this way, ballast is gradually applied, leveled and compacted under the raised track.
Zusammenfassung der Erfindung Summary of the invention
[03] Der Erfindung liegt die Aufgabe zugrunde, ein gegenüber dem Stand der Technik vereinfachtes Verfahren zum schichtweisen Verdichten eines [03] The invention is based on the object of providing a method, which is simplified compared to the prior art, for compacting a layer by layer
Schotterbettes anzugeben. To indicate the ballast bed.
[04] Erfindungsgemäß wird diese Aufgabe gelöst durch die Merkmalskombination gemäß Anspruch 1. Abhängige Ansprüche geben vorteilhafte Ausgestaltungen der Erfindung an. [05] Dabei ist vorgesehen, dass vor dem Verdichten die untere Schotterschicht und die obere Schotterschicht gemeinsam in das Gleis eingebracht werden, dass im ersten Verdichtungsschritt vibrierende Stopfpickel eines an der According to the invention, this object is achieved by the combination of features according to claim 1. Dependent claims indicate advantageous embodiments of the invention. [05] It is provided that before compaction, the lower ballast layer and the upper ballast layer are introduced together into the track, that in the first compression step vibrating tamping picks are placed on the
Gleisbaumaschine angeordneten Stopfaggregats in der Weise abgesenkt werden, dass an den freien Enden der Stopfpickel angeordnete The tamping unit arranged on the track construction machine is lowered in such a way that the tamping ax arranged at the free ends
Stopfpickelplatten in die untere Schotterschicht eindringen und dort für eine vorgegebene Zeitspanne vibrierend in Position gehalten werden, und dass im zweiten Verdichtungsschritt die vibrierenden Stopfpickel mit den Penetrating tamping plates penetrate into the lower gravel layer and are kept vibrating in position there for a predetermined period of time, and that in the second compaction step, the vibrating tamping tine with the
Stopfpickelplatten in die obere Schotterschicht eindringen und zueinander beigestellt werden. Wesentlich ist dabei, dass eine Bestellbewegung während des ersten Verdichtungsschrittes unterbleibt. Dabei wird das Gefüge der Schotterkörner verdichtet, aber nicht verschoben. Gleichzeitig verdichtet und verschoben wird das Gefüge der Schotterkörner in der oberen Schicht während des zweiten Verdichtungsschrittes. Auf diese Weise ergibt sich für die gesamte unterhalb der Schwellen befindliche Schotterschicht eine Tamping picks penetrate the upper layer of ballast and are placed together. It is essential that there is no order movement during the first compression step. The structure of the gravel grains is compacted, but not shifted. At the same time, the structure of the ballast grains in the upper layer is compacted and shifted during the second compaction step. In this way one results for the entire ballast layer located below the sleepers
durchgehend gute Verdichtung. Insbesondere im Bereich von Weichen ist die vorliegende Erfindung sinnvoll, weil dort das gleichzeitige Einbringen der Schotterschichten den technischen Aufwand reduziert. consistently good compression. The present invention is particularly useful in the area of switches because there the simultaneous introduction of the ballast layers reduces the technical effort.
[06] Dabei ist es von Vorteil, wenn zwischen erstem und zweitem [06] It is advantageous if between the first and the second
Verdichtungsschritt weiterer Schotter in das Gleis eingebracht wird. Dieser weitere Schotter lagert sich zunächst zwischen und auf den Schwellen ab. Währen des zweiten Verdichtungsschrittes werden damit die aus der Compaction step further ballast is introduced into the track. This additional ballast is initially deposited between and on the sleepers. During the second compression step, the from the
Schotterverdichtung resultierenden Volumenänderungen in den Ballast compaction resulting volume changes in the
Schotterschichten ausgeglichen. Ballast layers balanced.
[07] Eine vorteilhafte Weiterbildung der Erfindung sieht vor, dass während des zweiten Verdichtungsschrittes das Gleis mittels eines Hebe-/Richtaggregats in einer Sollposition gehalten wird. Auf diese Weise erfolgt eine Korrektur der Gleislage. Dabei entstehen während eines Hebevorgangs unterhalb der Schwellen Hohlräume. Die Beistellung der vibrierenden Stopfpickel bewirkt, dass Schotter in diese Hohlräume verschoben wird. [07] An advantageous development of the invention provides that during the second compression step the track is held in a target position by means of a lifting / straightening unit. In this way, the track position is corrected. This creates cavities under the sleepers during a lifting process. The provision of the vibrating tamping ax causes the ballast to be shifted into these cavities.
[08] Bei Gleisneulagen oder generell bei einem weichen Schotterbett kann es [08] It can be the case with new track layers or generally with a soft ballast bed
sinnvoll sein, wenn während des zweiten Verdichtungsschrittes die Stopfpickel zweimal hintereinander abgesenkt werden. Dabei erfolgt jedes Mal ein Bestellen der vibrierenden Stopfpickel. Eine solche Stopfzykluswiederholung ist angebracht wenn mit nur einem Stopfzyklus keine optimale make sense if the tamping tines are lowered twice in a row during the second compaction step. Each time a Order the vibrating tampons. Such repetition of the stuffing cycle is appropriate when only one stuffing cycle is not optimal
Packungsdichte des Schotters erreicht wird. Packing density of the ballast is achieved.
[09] Vorteilhafterweise werden die untere Schotterschicht und die obere [09] The lower ballast layer and the upper
Schotterschicht mit einer Gesamtschichthöhe von mindesten 200 mm eingebracht. Die untere und obere Schotterschicht erreichen dabei jeweils eine Höhe von ungefähr 100 mm. Bei diesen Schichthöhen liefert das vorliegende Verfahren besonders gute Verdichtungsergebnisse. Ballast layer with a total layer height of at least 200 mm. The lower and upper gravel layers each reach a height of approximately 100 mm. With these layer heights, the present method delivers particularly good compaction results.
[10] Beim ersten Verdichtungsschritt ist es günstig, wenn die Stopfpickelplatten zur Gänze bis mindestens 100 mm unterhalb einer Schwellenunterkante in die untere Schotterschicht eindringen. Damit ist sichergestellt, dass die gesamte Verdichtungsenergie auf die Schotterkörner der unteren Schotterschicht ein wirkt. In the first compaction step, it is beneficial if the tamping tine plates penetrate completely into the lower ballast layer up to at least 100 mm below the lower edge of the sleeper. This ensures that the entire compaction energy acts on the ballast grains of the lower ballast layer.
[11] Eine weitere Verbesserung des ersten Verdichtungsschrittes sieht vor, dass die vibrierenden Stopfpickel im abgesenkten Zustand für eine Zeitspanne zwischen 1 Sekunde und 2 Sekunden in Position gehalten werden. Die [11] Another improvement of the first compression step provides that the vibrating tamping tines are held in position for a period of time between 1 second and 2 seconds in the lowered state. The
Einwirkungsdauer der vibrierenden Stopfpickel ist dann jedenfalls ausreichend, um das Schottergefüge in der unteren Schotterschicht optimal zu verdichten. The duration of the vibrating tamping ax is then sufficient to optimally compact the gravel structure in the lower gravel layer.
[12] Zudem ist es von Vorteil, wenn beim ersten Verdichtungsschritt die [12] It is also advantageous if the
Stopfpickel mit einer Frequenz in einem Bereich von 35Hz bis 45Hz vibrieren. Dieser Frequenzbereich liefert die besten Verdichtungsergebnisse. Vibrate tampons at a frequency in the range 35Hz to 45Hz. This frequency range delivers the best compaction results.
Günstigerweise vibrieren die Stopfpickel beim Eindringen mit einer höheren Frequenz als in abgesenkter Position. Dabei weist der mit der höheren Advantageously, the tampons vibrate at a higher frequency when penetrating than in the lowered position. The one with the higher points
Frequenz in Schwingung versetzte Schotter einen geringeren Gravel vibrated at a lower frequency
Eindringwiderstand auf. Resistance to penetration.
[13] Bei einer vorteilhaften Erweiterung des Verfahrens wird das Schotterbett nach dem zweiten Verdichtungsschritt in einem weiteren Verdichtungsvorgang mittels eines Stabilisationsaggregats verdichtet. Der Stabilisierungsvorgang rüttelt den aus Schwellen und Schienen bestehende Gleisrost in das In an advantageous extension of the method, the ballast bed is compacted after the second compaction step in a further compaction process by means of a stabilization unit. The stabilization process shakes the track grid consisting of sleepers and rails into the
Schotterbett. Damit werden nach dem Stopfvorgang auftretende Setzungen des Gleisrostes vorweggenommen. Unmittelbar nach einer derartigen Gravel bed. In this way, subsidence of the track grid that occurs after the tamping process is anticipated. Immediately after one of these
Bearbeitung ist das Befahren der Gleisstrecke mit einer höheren Processing is driving on the track with a higher
Geschwindigkeit zulässig. [14] Besonders effektiv ist das Verfahren, wenn die Gleisbaumaschine in einem Verband mit einer Reinigungsmaschine betrieben wird und wenn die untere Schotterschicht und die obere Schotterschicht mit einer an der Speed allowed. The method is particularly effective when the track-laying machine is operated in association with a cleaning machine and when the lower ballast layer and the upper ballast layer are connected to one another
Reinigungsmaschine angeordneten Abwurfvorrichtung eingebracht werden. Resultat der Bearbeitung mittels der Reinigungsmaschine ist ein weiches Schotterbett, das mit den beiden Verdichtungsschritten durchgehend verdichtet wird. Cleaning machine arranged throwing device are introduced. The result of the treatment with the cleaning machine is a soft ballast bed that is continuously compacted with the two compaction steps.
Kurze Beschreibung der Zeichnungen Brief description of the drawings
[15] Die Erfindung wird nachfolgend in beispielhafter Weise unter Bezugnahme auf die beigefügten Figuren erläutert. Es zeigen in schematischer Darstellung: [15] The invention is explained below in an exemplary manner with reference to the accompanying figures. It shows in a schematic representation:
Fig. 1 Gleisbaumaschine Fig. 1 track construction machine
Fig. 2 Stopfaggregat Fig. 2 tamping unit
Beschreibung der Ausführungsformen Description of the embodiments
[16] Die in Fig. 1 dargestellte Gleisbaumaschine 1 ist mittels Schienenfahrwerke 2 auf Schienen 3 eines Gleises 4 verfahrbar. Die Schienen 3 sind auf in einem Schotterbett 5 gelagerten Schwellen 6 befestigt. Zur Durchführung des vorliegenden Verfahrens umfasst die Gleisbaumaschine 1 ein Stopfaggregat 7. Zudem sind für eine Gleislagekorrektur ein Hebe-/Richtaggregat 8 und ein Messsystem 9 angeordnet. The track construction machine 1 shown in FIG. 1 can be moved on rails 3 of a track 4 by means of rail bogies 2. The rails 3 are attached to sleepers 6 mounted in a ballast bed 5. To carry out the present method, the track construction machine 1 comprises a tamping unit 7. In addition, a lifting / straightening unit 8 and a measuring system 9 are arranged for a track position correction.
[17] Gegenüber herkömmlichen Stopfaggregaten weist das vorliegende [17] Compared to conventional tamping units, the present
Stopfaggregat 7 längere Stopfpickel 10 auf. Die Stopfpickel 10 sind Tamping unit 7 longer tamping pick 10 on. The tampons 10 are
gegenüberliegend angeordnet, um bei einem Verdichtungsschritt beidseits einer Schwelle 6 in das Schotterbett 5 einzudringen. Dazu sind die arranged opposite one another in order to penetrate the ballast bed 5 on both sides of a sleeper 6 during a compression step. These are the
gegenüberliegenden Stopfpickel 10 mit zugeordneten Schwenkarmen 11 an einem höhenverstellbaren Werkzeugträger 12 gelagert. Als Höhenstellantrieb 13 dient zum Beispiel ein Hydraulikzylinder. opposite tamping ax 10 with associated swivel arms 11 mounted on a height-adjustable tool carrier 12. A hydraulic cylinder, for example, serves as the height adjustment drive 13.
[18] Die zangenmäßig angeordneten Schwenkarme 11 sind über einen jeweiligen Beistellzylinder 14 mit einem Vibrationserzeuger 15 gekoppelt. Dieser The swivel arms 11, which are arranged like pliers, are coupled to a vibration generator 15 via a respective auxiliary cylinder 14. This
Vibrationserzeuger 15 umfasst beispielsweise eine rotierend angetriebene Exzenterwelle. Zur Übertragung einer Vibration ist der jeweilige Beistellzylinder 14 einerseits an die Exzenterwelle und andererseits an ein oberes Ende des zugeordneten Schwenkarms 11 angeschlossen. Vibration generator 15 comprises, for example, an eccentric shaft driven in rotation. To transmit a vibration, the respective Additional cylinder 14 connected on the one hand to the eccentric shaft and on the other hand to an upper end of the associated swivel arm 11.
[19] Im erfindungsgemäßen ersten Verdichtungsschritt dient der jeweilige In the first compression step according to the invention, the respective
Beistellzylinder lediglich als starres Übertragungselement. Im Verhältnis der Hebelarmlängen des jeweiligen Schwenkarms 11 resultiert aus der Exzentrizität der Exzenterwelle eine Vibrationsamplitude am freien Ende des zugeordneten Stopfpickels 10. Dort ist am Ende eines schmalen Stopfpickelschaftes eine Stopfpickelplatte 16 angeordnet. Die jeweilige Stopfpickel platte 16 ist normal zur Richtung einer Vibrationsbewegung 17 ausgerichtet. Auf diese Weise werden während des ersten Verdichtungsschrittes alle von der Additional cylinder only as a rigid transmission element. In the ratio of the lever arm lengths of the respective swivel arm 11, the eccentricity of the eccentric shaft results in a vibration amplitude at the free end of the associated tampon 10. A tampon plate 16 is arranged there at the end of a narrow tampon shaft. The respective tamper plate 16 is aligned normal to the direction of a vibratory movement 17. In this way, during the first compression step, all of the
Stopfpickelplatte 16 erfassten Schotterkörner in Vibration versetzt. Tamping pick plate 16 captured gravel grains set in vibration.
[20] Erst im zweiten Verdichtungsschritt werden die Beistellzylinder 14 betätigt. [20] The auxiliary cylinders 14 are only actuated in the second compression step.
Durch Beaufschlagung des jeweiligen Beistellzylinders 14 wird der By acting on the respective auxiliary cylinder 14, the
Vibrationsbewegung 17 eine Beistellbewegung 18 überlagert. Dabei werden die vibrierenden Stopfpickelplatten 16 aufeinander zubewegt, wodurch die erfassten Schotterkörner in Vibration versetzt und zusätzlich verschoben werden. Vibration movement 17 is superimposed on a positioning movement 18. In the process, the vibrating tamping pick plates 16 are moved towards one another, as a result of which the captured ballast grains are set in vibration and additionally displaced.
[21] Ein beispielhafter Verfahrensablauf beginnt damit, dass in ein Gleis 4 Schotter eingebracht wird. Das geschieht entweder bei einer Neuverlegung des Gleises 4 oder bei einer Schotterreinigung mittels einer Reinigungsmaschine. Die Schottereinbringung erfolgt unterhalb der Schwellen 6 mit einer [21] An exemplary process sequence begins with 4 ballast being introduced into a track. This happens either when the track 4 is re-laid or when the ballast is cleaned using a cleaning machine. The ballast is introduced below the sleepers 6 with a
Gesamtschichthöhe 19, bei der ein gewöhnlicher Stopfvorgang keine ausreichende Verdichtung bewirkt. Deshalb werden zuerst eine untere Total layer height 19 at which a normal tamping process does not produce sufficient compaction. Therefore a lower one first
Schotterschicht 20 und anschließend eine obere Schotterschicht 21 verdichtet. Ballast layer 20 and then an upper ballast layer 21 compacted.
[22] Erfindungsgemäß werden vor dem Verdichten die untere Schotterschicht 20 und die obere Schotterschicht 21 gleichzeitig in das Gleis 4 eingebracht. According to the invention, the lower ballast layer 20 and the upper ballast layer 21 are introduced into the track 4 at the same time before the compaction.
Anschließend erfolgt der erste Verdichtungsschritt. Insbesondere bei Weichen oder Kreuzungen ist die gleichzeitige Einbringung beider Schotterschichten 20, 21 vorteilhaft. Bei Weichen oder Kreuzungen kann der Gleisrost nicht wie bei einem Streckengleis vor Einbringung der oberen Schotterschicht 21 auf der unteren Schotterschicht 20 abgelegt werden, um diese Schicht 20 in The first compression step then takes place. In particular in the case of switches or crossings, the simultaneous introduction of both ballast layers 20, 21 is advantageous. In the case of switches or crossings, the track grid cannot be laid on the lower ballast layer 20 before the upper ballast layer 21 is introduced, as is the case with a line track, in order to make this layer 20 in
herkömmlicher Weise zu verdichten. [23] Zu Beginn des ersten Verdichtungsschrittes wird das Stopfaggregat 7 über einer Schwelle 6 positioniert (mittlere Schwelle in Fig. 2). Mittels des conventional way to compact. At the beginning of the first compression step, the tamping unit 7 is positioned above a threshold 6 (middle threshold in FIG. 2). Using the
Höhenstellantriebs 13 werden die vibrierenden Stopfpickel 10 abgesenkt und tauchen in das Schotterbett 5 ein. Dabei vibrieren die Stopfpickel idealerweise mit einer Frequenz von ca. 45 Hz. Mit dieser Frequenz gleichen die in Height adjustment drive 13, the vibrating tamping ax 10 are lowered and dive into the ballast bed 5. The tamping tines ideally vibrate at a frequency of approx. 45 Hz. With this frequency, those in
Vibration versetzten Schotterkörner einem fließenden Medium, wodurch eine deutliche Reduktion des Eindringwiderstands bewirkt wird. Gravel grains vibrated in a flowing medium, which significantly reduces the penetration resistance.
[24] Eine erste Absenktiefe 22 ist dabei so vorgegeben, dass die Stopfpickelplatten 16 zur Gänze in die untere Schotterschicht 20 gelangen. In Fig. 2 sind als Referenz über der rechten Schwelle 6 die Stopfpickel 7 bei angehobenem Werkzeugträger 12 eingezeichnet. Beim Erreichen der ersten Absenktiefe 22 beträgt der Abstand zwischen einer Oberkante der jeweiligen A first countersinking depth 22 is specified in such a way that the tamping tine plates 16 pass entirely into the lower gravel layer 20. In FIG. 2, the tamping tines 7 with the tool carrier 12 raised are shown as a reference above the right sill 6. When the first lowering depth 22 is reached, the distance between an upper edge of the respective
Stopfpickelplatte 16 und einer Unterkante der jeweiligen Schwelle 6 beispielsweise 100 mm. Aus den bekannten Höhen der Schwellen 6 und der Schienen 3 sowie der Geometrie der Gleisbaumaschine 1 ergibt sich für eine Steuerungseinrichtung 23 eine entsprechende Vorgabe zur Ansteuerung des Höhenstellantriebs 13. Begrenzt wird die erste Absenktiefe 22 durch eine Planumsschutzschicht 24, die sich gegebenenfalls unter der unteren Tamping pick plate 16 and a lower edge of the respective threshold 6, for example 100 mm. From the known heights of the sleepers 6 and the rails 3 as well as the geometry of the track construction machine 1, a corresponding specification for controlling the height adjustment drive 13 results for a control device 23. The first lowering depth 22 is limited by a formation protection layer 24, which may be located under the lower one
Schotterschicht 20 befindet. Es ist darauf zu achten, dass die Gravel layer 20 is located. Care should be taken that the
Planumsschutzschicht 24 durch die Stopfpickel 10 nicht beschädigt wird. The formation protection layer 24 is not damaged by the tamping ax 10.
[25] Sobald die vorgegebene erste Absenktiefe 22 erreicht ist, werden die As soon as the predetermined first lowering depth 22 is reached, the
vibrierenden Stopfpickel 10 für eine vorgegebene Zeitspanne in Position gehalten. Dabei wird die Vibration mit einer Frequenz von ca. 35 Hz auf die umgebenden Schotterkörner übertragen. Beispielsweise wird dazu die Umdrehungsgeschwindigkeit der Exzenterwelle entsprechend angepasst. In diesem vibrierenden Zustand ordnen sich die Schotterkörner unter der Last der oberen Schotterschicht 21 zu einem dichteren Gefüge. Idealerweise beträgt die dafür vorgegebene Zeitspanne ca. 1,5 Sekunden. Dann ist ein ausreichender Verdichtungsgrad des Schottergefüges erreicht und die Stopfpickel 10 werden durch Beaufschlagung des Höhenstellantriebs 13 aus dem Schotterbett 5 gezogen. vibrating tamping ax 10 held in position for a predetermined period of time. The vibration is transmitted to the surrounding gravel with a frequency of approx. 35 Hz. For example, the speed of rotation of the eccentric shaft is adapted accordingly. In this vibrating state, the ballast grains arrange themselves under the load of the upper ballast layer 21 to form a denser structure. Ideally, the specified time span is approx. 1.5 seconds. A sufficient degree of compaction of the ballast structure is then achieved and the tamping picks 10 are pulled out of the ballast bed 5 by acting on the height adjustment drive 13.
[26] Dieser erste Verdichtungsschritt wird für alle Schwellen 6 der zu [26] This first compression step is for all sleepers 6 of the to
bearbeitenden Gleisstrecke, Weiche oder Kreuzung wiederholt. Anschließend wird das Gleis 4 gegebenenfalls eingeschottert. Dieses Einbringen von zusätzlichem Schotter ist insbesondere dann sinnvoll, wenn im nachfolgenden zweiten Verdichtungsschritt eine Anhebung des Gleisrostes vorgesehen ist. processed track section, switch or crossing repeatedly. Subsequently track 4 is ballasted if necessary. This introduction of additional ballast is particularly useful if the track grid is to be raised in the subsequent second compaction step.
[27] Der zweite Verdichtungsschritt beginnt mit einer Positionierung des The second compression step begins with a positioning of the
Stopfaggregats 7 über einer Schwelle 6 mit bereits verdichteter unterer Schotterschicht 20 (linke Schwelle in Fig. 2). Falls eine Korrektur der Gleislage vorgesehen ist, wird das Hebe-/Richtaggregat 8 aktiviert. Der Gleisrost wird in eine vorgegebene Lage gehoben und gegebenenfalls seitlich verschoben. Die Fixierung dieser korrigierten Lage erfolgt unmittelbar darauf mittels des Stopfaggregats 7. Tamping unit 7 above a threshold 6 with an already compacted lower gravel layer 20 (left threshold in FIG. 2). If a correction of the track position is planned, the lifting / straightening unit 8 is activated. The track grid is lifted into a predetermined position and shifted to the side if necessary. This corrected position is then fixed immediately by means of the tamping unit 7.
[28] Der Werkzeugträger 12 wird abgesenkt, bis die Stopfpickelplatten 16 eine zweiten Absenktiefe 25 erreichen. Der Abstand zwischen der Oberkante der jeweiligen Stopfpickelplatte 16 und der Unterkante der jeweiligen Schwelle 6 beträgt dabei wenige Zentimeter (z.B. 20cm). Auch diese zweite Absenktiefe 25 ist der Steuerungseinrichtung 23 anhand der bekannten Schwellenhöhe, der Schienenhöhe und der Maschinengeometrie vorgebbar. The tool carrier 12 is lowered until the tamping tine plates 16 reach a second lowering depth 25. The distance between the upper edge of the respective tamping plate 16 and the lower edge of the respective threshold 6 is a few centimeters (e.g. 20 cm). This second lowering depth 25 can also be predetermined for the control device 23 on the basis of the known threshold height, the rail height and the machine geometry.
[29] Nach Erreichen der zweiten Absenktiefe 25 werden die gegenüberliegenden Stopfpickelplatten 16 zueinander beigestellt. Die mit der Vibrationsbewegung 17 kombinierte Beistellbewegung 18 bewirkt eine Verschiebung der [29] After the second lowering depth 25 has been reached, the tamping tine plates 16 opposite one another are placed together. The positioning movement 18 combined with the vibration movement 17 causes a displacement of the
Schotterkörner in den Bereich unterhalb der Schwelle 6. Ergebnis der in Vibration versetzten und verschobenen Schotterkörner ist ein verdichtetes Schottergefüge. Auf diese Weise entsteht mit der bereits verdichteten unteren Schotterschicht 20 insgesamt eine stabile Auflage für die jeweilige Schwelle 6. Ballast grains in the area below the threshold 6. The result of the ballast grains set in vibration and displaced is a compacted ballast structure. In this way, with the already compacted lower gravel layer 20, overall a stable support for the respective sleeper 6 is created.
[30] Bei einer Gleisneulage kann es Vorkommen, dass nach einem ersten [30] In the case of a new track, it can happen that after an initial
Bestellvorgang noch keine optimale Verdichtung der oberen Schotterschicht 21 vorliegt. Dann werden die Stopfpickel 10 erneut in die obere Ordering process there is still no optimal compression of the upper ballast layer 21. Then the tampons 10 are again in the upper
Schotterschicht 21 eingetaucht und zueinander beigestellt. Entschieden wird eine solche Wiederholung durch eine Bedienperson oder durch Erfassung des Schotterzustandes mittels an der Gleisbaumaschine 1 angeordneter Sensoren. Beispielsweise werden auf die Stopfpickel 10 wirkende Gegenkräfte zur Bestimmung einer Kenngrößen für die Schotterverdichtung herangezogen. Ballast layer 21 immersed and provided to one another. Such a repetition is decided by an operator or by recording the state of the ballast by means of sensors arranged on the track construction machine 1. For example, counterforces acting on the tamping ax 10 are used to determine a parameter for the ballast compaction.
[31] Der beschriebene Arbeitsablauf wird gegebenenfalls durch den Einsatz eines sogenannten Dynamischen Gleisstabilisators (DGS) abgeschlossen. Dazu ist beispielsweise auf derselben Gleisbaumaschine 1 ein Stabilisationsaggregat angeordnet. Alternativ dazu wird das Gleis 4 mittels einer separaten Stabilisationsmaschine befahren. [31] The workflow described is completed by using a so-called dynamic track stabilizer (DGS). Is to For example, a stabilization unit is arranged on the same track construction machine 1. Alternatively, track 4 is driven on by means of a separate stabilization machine.

Claims

Patenta nsprüche Patent claims
1. Verfahren zum schichtweisen Verdichten eines Schotterbettes (5) eines Gleises (4) mittels einer auf dem Gleis (4) fahrenden Gleisbaumaschine (1), wobei unterhalb von Schwellen (6) des Gleises (4) befindlicher Schotter in zumindest zwei übereinander liegenden Schichten (20, 21) verdichtet wird, indem in einem ersten 1. A method for layer-by-layer compression of a ballast bed (5) of a track (4) by means of a track construction machine (1) moving on the track (4), with ballast located below sleepers (6) of the track (4) in at least two superimposed layers (20, 21) is condensed by adding a first
Verdichtungsschritt eine untere Schotterschicht (20) verdichtet wird und danach in einem zweiten Verdichtungsschritt eine über der unteren Schotterschicht (20) liegende obere Schotterschicht (21) durch einen Stopfvorgang verdichtet wird, d ad u rch geken nzeich net, dass vor dem Verdichten die untere Schotterschicht (20) und die obere Schotterschicht (21) gemeinsam in das Gleis (4) eingebracht werden, dass im ersten Verdichtungsschritt vibrierende Stopfpickel (10) eines an der Gleisbaumaschine (1) angeordneten Stopfaggregats (7) in der Weise abgesenkt werden, dass an den freien Enden der Stopfpickel (10) angeordnete Stopfpickelplatten (16) in die untere Schotterschicht (20) eindringen und dort für eine vorgegebene Zeitspanne vibrierend in Position gehalten werden, und dass im zweiten Verdichtungsschritt die vibrierenden Stopfpickel (10) mit den Stopfpickelplatten (16) in die obere Schotterschicht (21) eindringen und zueinander beigestellt werden. Compacting step, a lower ballast layer (20) is compacted and then in a second compacting step an upper ballast layer (21) lying above the lower ballast layer (20) is compacted by a tamping process, which means that the lower ballast layer prior to compaction (20) and the upper ballast layer (21) are introduced together into the track (4) that in the first compression step vibrating tamping picks (10) of a tamping unit (7) arranged on the track construction machine (1) are lowered in such a way that the free ends of the tamping tines (10) arranged tamping tine plates (16) penetrate into the lower gravel layer (20) and are kept vibrating in position there for a predetermined period of time, and that in the second compaction step the vibrating tamping tine (10) with the tamping tine plates (16) in penetrate the upper gravel layer (21) and be provided to each other.
2. Verfahren nach Anspruch 1, d ad u rch geken nzeich net, dass zwischen erstem und zweitem Verdichtungsschritt weiterer Schotter in das Gleis (4) eingebracht wird. 2. The method according to claim 1, d ad u rch geken nzeich net that further ballast is introduced into the track (4) between the first and second compression step.
3. Verfahren nach Anspruch 1 oder 2, d ad u rch geken nzeich net, dass während des zweiten Verdichtungsschrittes das Gleis (4) mittels eines Hebe-/Richtaggregats (8) in einer Sollposition gehalten wird. 3. The method according to claim 1 or 2, d ad u rch geken nzeich net that the track (4) is held in a target position by means of a lifting / straightening unit (8) during the second compression step.
4. Verfahren nach einem der Ansprüche 1 bis 3, d ad u rch geken nzeich net, dass während des zweiten Verdichtungsschrittes die Stopfpickel (10) zweimal 4. The method according to any one of claims 1 to 3, d ad u rch geken nzeich net that the tamping pick (10) twice during the second compaction step
hintereinander abgesenkt werden. be lowered one after the other.
5. Verfahren nach einem der Ansprüche 1 bis 4, d ad u rch geken nzeich net, dass die untere Schotterschicht (20) und die obere Schotterschicht (21) mit einer 5. The method according to any one of claims 1 to 4, d ad u rch geken nzeich net that the lower ballast layer (20) and the upper ballast layer (21) with a
Gesamtschichthöhe (19) von mindesten 200 mm eingebracht werden. Total layer height (19) of at least 200 mm must be introduced.
6. Verfahren nach einem der Ansprüche 1 bis 5, d ad u rch geken nzeich net, dass beim ersten Verdichtungsschritt die Stopfpickelplatten (16) zur Gänze bis mindestens 100 mm unterhalb einer Schwellenunterkante in die untere Schotterschicht (20) eindringen. 6. The method according to any one of claims 1 to 5, d ad u rch geken nzeich net that in the first compression step the tamping plates (16) completely penetrate up to at least 100 mm below a threshold lower edge in the lower gravel layer (20).
7. Verfahren nach einem der Ansprüche 1 bis 6, d ad u rch geken nzeich net, dass beim ersten Verdichtungsschritt die vibrierenden Stopfpickel (10) im abgesenkten Zustand für eine Zeitspanne zwischen 1 Sekunde und 2 Sekunden in Position gehalten werden. 7. The method according to any one of claims 1 to 6, d ad u rch geken nzeich net that during the first compression step the vibrating tamping tines (10) are held in position in the lowered state for a period of time between 1 second and 2 seconds.
8. Verfahren nach einem der Ansprüche 1 bis 7, d ad u rch geken nzeich net, dass beim ersten Verdichtungsschritt die Stopfpickel (10) mit einer Frequenz in einem Bereich von 35Hz bis 45Hz vibrieren. 8. The method according to any one of claims 1 to 7, d ad u rch geken nzeich net that during the first compression step, the tamping tines (10) vibrate at a frequency in a range from 35Hz to 45Hz.
9. Verfahren nach einem der Ansprüche 1 bis 8, d ad u rch geken nzeich net, dass das Schotterbett (5) nach dem zweiten Verdichtungsschritt in einem weiteren 9. The method according to any one of claims 1 to 8, d ad u rch geken nzeich net that the ballast bed (5) after the second compaction step in a further
Verdichtungsvorgang mittels eines Stabilisationsaggregats verdichtet wird. Compaction process is compacted by means of a stabilization unit.
10. Verfahren nach einem der Ansprüche 1 bis 9, d ad u rch geken nzeich net, dass die Gleisbaumaschine (1) in einem Verband mit einer Reinigungsmaschine betrieben wird und dass die untere Schotterschicht (20) und die obere Schotterschicht (21) mit einer an der Reinigungsmaschine angeordneten Abwurfvorrichtung eingebracht werden. 10. The method according to any one of claims 1 to 9, d ad u rch geken nzeich net that the track construction machine (1) is operated in association with a cleaning machine and that the lower ballast layer (20) and the upper ballast layer (21) with a be introduced to the cleaning machine arranged throwing device.
EP20705332.3A 2019-03-14 2020-02-12 Method for compacting a ballast bed of a track Active EP3938578B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ATA99/2019A AT522237B1 (en) 2019-03-14 2019-03-14 Method for compacting a ballast bed of a track
PCT/EP2020/053516 WO2020182393A1 (en) 2019-03-14 2020-02-12 Method for compacting a ballast bed of a track

Publications (3)

Publication Number Publication Date
EP3938578A1 true EP3938578A1 (en) 2022-01-19
EP3938578B1 EP3938578B1 (en) 2023-11-22
EP3938578C0 EP3938578C0 (en) 2023-11-22

Family

ID=69591630

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20705332.3A Active EP3938578B1 (en) 2019-03-14 2020-02-12 Method for compacting a ballast bed of a track

Country Status (3)

Country Link
EP (1) EP3938578B1 (en)
AT (1) AT522237B1 (en)
WO (1) WO2020182393A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT17648U1 (en) 2021-03-15 2022-10-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Method for cleaning a ballast bed of a track

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH314243A (en) * 1953-12-16 1956-06-15 Matisa Materiel Ind Sa Ballast tamper for at least one sleeper on a railway track
DE952644C (en) * 1954-02-23 1956-11-22 Mannesmann Meer Ag Method and device for machine tamping of tracks
CH652430A5 (en) * 1981-01-23 1985-11-15 Canron Inc Crissier TRACKING MACHINE.
AT500972B1 (en) * 2004-10-29 2006-05-15 Plasser Bahnbaumasch Franz METHOD FOR SUBSTITUTING THRESHOLD
AT505909B1 (en) * 2007-11-27 2009-05-15 Plasser Bahnbaumasch Franz METHOD AND MACHINE FOR COMPACING SCOTTER OF A JOINT
AT518324B1 (en) 2016-02-16 2018-04-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Track construction machine and method for compacting a ballast bed
AT520040B1 (en) * 2017-06-06 2021-01-15 Swietelsky Ag Rail vehicle for track superstructure renovation
AT520117B1 (en) * 2017-07-11 2019-11-15 Hp3 Real Gmbh Method for compacting a ballast bed of a track

Also Published As

Publication number Publication date
EP3938578B1 (en) 2023-11-22
WO2020182393A1 (en) 2020-09-17
AT522237B1 (en) 2024-05-15
EP3938578C0 (en) 2023-11-22
AT522237A1 (en) 2020-09-15

Similar Documents

Publication Publication Date Title
AT500972B1 (en) METHOD FOR SUBSTITUTING THRESHOLD
DE2330102A1 (en) METHOD AND MACHINE FOR COMPACTING THE BALLBED BED OF A TRACK, IN PARTICULAR AT THE SAME TIME MOVING THIS TRACK TO THE TARGET ALTITUDE
DE2331915A1 (en) METHOD AND DEVICE FOR PLUGGING AND LEVELING A TRACK
EP3384090A1 (en) Tamping machine and method for correcting the position of a track
EP2217761B1 (en) Method and machine for compressing ballast of a rail track
WO2017097390A1 (en) Tamping unit having an angle sensor for determining the tamping tool position
WO2017140408A1 (en) Track construction machine and method for compacting a ballast bed
DE3132708C2 (en) Track pot leveling and straightening machine with stabilization unit and method for compacting the ballast bed of a track to be corrected
EP0499018B1 (en) Cleaning machine
DE2231670A1 (en) METHOD OF PLUGGING A TRACK BED AND DEVICE FOR ITS PAD
EP3938578B1 (en) Method for compacting a ballast bed of a track
AT391904B (en) TRACK CONSTRUCTION MACHINE WITH TRACK STABILIZER
DE3148044C2 (en)
AT522456B1 (en) Tamping unit for tamping under sleepers of a track
AT521990B1 (en) Method and track-laying machine for processing a ballasted track
DE2550382A1 (en) METHOD AND DEVICE FOR LEVELING AND BED SHOULDER COMPACTION
DE3132870C2 (en) Track tamping, leveling and straightening machine with track stabilization unit
EP3653789A1 (en) Method and tamping unit for tamping a track
EP4176132A1 (en) Method and machine comprising a tamping assembly
DE2608372C2 (en) Mobile track-laying machine for compacting the ballast beneath the sleepers of a track
AT524861B1 (en) Method and machine for tamping a track
AT18243U1 (en) Tamping unit and method for tamping a group of adjacent sleepers of a track
WO2022002522A1 (en) Method and machine for tamping a track
DE2462104C3 (en) Mobile track tamping machine with at least one device preventing the ballast from swelling up
DE4329277A1 (en) Method and apparatus for loosening and compacting the ballast of track installations

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20211014

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230302

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230530

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20230706

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502020006116

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

U01 Request for unitary effect filed

Effective date: 20231123

P04 Withdrawal of opt-out of the competence of the unified patent court (upc) registered

Effective date: 20231128

U07 Unitary effect registered

Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI

Effective date: 20231130

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231222

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240322

U20 Renewal fee paid [unitary effect]

Year of fee payment: 5

Effective date: 20240229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231122

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240322

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240223

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231122

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20240301

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231122

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231122

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240222

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231122