EP3906751B1 - Managing bearer configuration of user equipment with en-dc capability - Google Patents
Managing bearer configuration of user equipment with en-dc capability Download PDFInfo
- Publication number
- EP3906751B1 EP3906751B1 EP20756308.1A EP20756308A EP3906751B1 EP 3906751 B1 EP3906751 B1 EP 3906751B1 EP 20756308 A EP20756308 A EP 20756308A EP 3906751 B1 EP3906751 B1 EP 3906751B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- network
- scg
- bearers
- mcg
- session
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 claims description 73
- 238000012546 transfer Methods 0.000 claims description 63
- 238000005259 measurement Methods 0.000 claims description 12
- 238000011084 recovery Methods 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 6
- 238000013473 artificial intelligence Methods 0.000 claims description 5
- 230000000977 initiatory effect Effects 0.000 claims description 4
- 230000002688 persistence Effects 0.000 claims description 4
- 230000011664 signaling Effects 0.000 claims description 4
- 238000001514 detection method Methods 0.000 claims 4
- 230000001960 triggered effect Effects 0.000 claims 2
- 238000004891 communication Methods 0.000 description 23
- 238000005516 engineering process Methods 0.000 description 15
- 230000007774 longterm Effects 0.000 description 15
- 230000009977 dual effect Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 3
- 230000009849 deactivation Effects 0.000 description 2
- VJYFKVYYMZPMAB-UHFFFAOYSA-N ethoprophos Chemical compound CCCSP(=O)(OCC)SCCC VJYFKVYYMZPMAB-UHFFFAOYSA-N 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 241000282412 Homo Species 0.000 description 1
- 101150014328 RAN2 gene Proteins 0.000 description 1
- 206010042135 Stomatitis necrotising Diseases 0.000 description 1
- 230000005856 abnormality Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 201000008585 noma Diseases 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0261—Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level
- H04W52/0274—Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level by switching on or off the equipment or parts thereof
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/10—Connection setup
- H04W76/15—Setup of multiple wireless link connections
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/0001—Arrangements for dividing the transmission path
- H04L5/0003—Two-dimensional division
- H04L5/0005—Time-frequency
- H04L5/0007—Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
- H04L5/001—Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signaling, i.e. of overhead other than pilot signals
- H04L5/0055—Physical resource allocation for ACK/NACK
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/10—Scheduling measurement reports ; Arrangements for measurement reports
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/0231—Traffic management, e.g. flow control or congestion control based on communication conditions
- H04W28/0236—Traffic management, e.g. flow control or congestion control based on communication conditions radio quality, e.g. interference, losses or delay
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
- H04W28/086—Load balancing or load distribution among access entities
- H04W28/0861—Load balancing or load distribution among access entities between base stations
- H04W28/0864—Load balancing or load distribution among access entities between base stations of different hierarchy levels, e.g. Master Evolved Node B [MeNB] or Secondary Evolved node B [SeNB]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
- H04W36/0055—Transmission or use of information for re-establishing the radio link
- H04W36/0069—Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/0005—Control or signalling for completing the hand-off
- H04W36/0055—Transmission or use of information for re-establishing the radio link
- H04W36/0069—Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink
- H04W36/00698—Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink using different RATs
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/24—Reselection being triggered by specific parameters
- H04W36/30—Reselection being triggered by specific parameters by measured or perceived connection quality data
- H04W36/305—Handover due to radio link failure
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W60/00—Affiliation to network, e.g. registration; Terminating affiliation with the network, e.g. de-registration
- H04W60/04—Affiliation to network, e.g. registration; Terminating affiliation with the network, e.g. de-registration using triggered events
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/10—Connection setup
- H04W76/19—Connection re-establishment
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/20—Manipulation of established connections
- H04W76/27—Transitions between radio resource control [RRC] states
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/30—Connection release
- H04W76/34—Selective release of ongoing connections
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W80/00—Wireless network protocols or protocol adaptations to wireless operation
- H04W80/08—Upper layer protocols
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0032—Distributed allocation, i.e. involving a plurality of allocating devices, each making partial allocation
- H04L5/0035—Resource allocation in a cooperative multipoint environment
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/10—Connection setup
- H04W76/15—Setup of multiple wireless link connections
- H04W76/16—Involving different core network technologies, e.g. a packet-switched [PS] bearer in combination with a circuit-switched [CS] bearer
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W8/00—Network data management
- H04W8/22—Processing or transfer of terminal data, e.g. status or physical capabilities
- H04W8/24—Transfer of terminal data
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W84/00—Network topologies
- H04W84/02—Hierarchically pre-organised networks, e.g. paging networks, cellular networks, WLAN [Wireless Local Area Network] or WLL [Wireless Local Loop]
- H04W84/04—Large scale networks; Deep hierarchical networks
- H04W84/042—Public Land Mobile systems, e.g. cellular systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W84/00—Network topologies
- H04W84/18—Self-organising networks, e.g. ad-hoc networks or sensor networks
- H04W84/20—Master-slave selection or change arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/02—Terminal devices
- H04W88/06—Terminal devices adapted for operation in multiple networks or having at least two operational modes, e.g. multi-mode terminals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/08—Access point devices
- H04W88/10—Access point devices adapted for operation in multiple networks, e.g. multi-mode access points
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W92/00—Interfaces specially adapted for wireless communication networks
- H04W92/02—Inter-networking arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W92/00—Interfaces specially adapted for wireless communication networks
- H04W92/04—Interfaces between hierarchically different network devices
- H04W92/10—Interfaces between hierarchically different network devices between terminal device and access point, i.e. wireless air interface
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Databases & Information Systems (AREA)
- Mobile Radio Communication Systems (AREA)
Description
- Embodiments herein relate to 5th Generation (5G) wireless communication systems, and more particularly to methods and systems for managing bearer configuration in Dual Connectivity (DC) systems
- To meet the demand for wireless data traffic having increased since deployment of 4G communication systems, efforts have been made to develop an improved 5G or pre-5G communication system. Therefore, the 5G or pre-5G communication system is also called a 'Beyond 4G Network' or a 'Post LTE System'. The 5G communication system is considered to be implemented in higher frequency (mmWave) bands, e.g., 60GHz bands, so as to accomplish higher data rates. To decrease propagation loss of the radio waves and increase the transmission distance, the beamforming, massive multiple-input multiple-output (MIMO), Full Dimensional MIMO (FD-MIMO), array antenna, an analog beam forming, large scale antenna techniques are discussed in 5G communication systems. In addition, in 5G communication systems, development for system network improvement is under way based on advanced small cells, cloud Radio Access Networks (RANs), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul, moving network, cooperative communication, Coordinated Multi-Points (CoMP), reception-end interference cancellation and the like. In the 5G system, Hybrid FSK and QAM Modulation (FQAM) and sliding window superposition coding (SWSC) as an advanced coding modulation (ACM), and filter bank multi carrier (FBMC), non-orthogonal multiple access(NOMA), and sparse code multiple access (SCMA) as an advanced access technology have been developed.
- The Internet, which is a human centered connectivity network where humans generate and consume information, is now evolving to the Internet of Things (IoT) where distributed entities, such as things, exchange and process information without human intervention. The Internet of Everything (IoE), which is a combination of the IoT technology and the Big Data processing technology through connection with a cloud server, has emerged. As technology elements, such as "sensing technology", "wired/wireless communication and network infrastructure", "service interface technology", and "Security technology" have been demanded for IoT implementation, a sensor network, a Machine-to-Machine (M2M) communication, Machine Type Communication (MTC), and so forth have been recently researched. Such an IoT environment may provide intelligent Internet technology services that create a new value to human life by collecting and analyzing data generated among connected things. IoT may be applied to a variety of fields including smart home, smart building, smart city, smart car or connected cars, smart grid, health care, smart appliances and advanced medical services through convergence and combination between existing Information Technology (IT) and various industrial applications.
- In line with this, various attempts have been made to apply 5G communication systems to IoT networks. For example, technologies such as a sensor network, Machine Type Communication (MTC), and Machine-to-Machine (M2M) communication may be implemented by beamforming, MIMO, and array antennas. Application of a cloud Radio Access Network (RAN) as the above-described Big Data processing technology may also be considered to be as an example of convergence between the 5G technology and the IoT technology.
-
WO 2018/182254 relates to a method for transmitting a secondary cell group (SCG) failure information message to one of a master node and a secondary node in a wireless communication network. - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and NR; Multi-connectivity; Stage 2 (Release 15)", 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 37.340, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20180925), vol. RAN WG2, no. V15.3.0, pages 1 - 59 is a 3GPP document providing an overview of the multi-connectivity operation using E-UTRA and NR radio access technologies.
-
US 2019/045568 relates to failure handling for communication between a secondary node and a UE. An embodiment is described for a UE supporting split bearers in a multi radio dual connectivity communication system wherein a UE can be configured to communicate an SCG failure indication message to a master node. -
WO 2018/228560 describes a method for reporting measurement information for a master node and a secondary node in a communication network supporting dual connectivity and split bearers. In the event of an SCG failure, an SCGFailureInformation message may be provided by the UE to the network via the master node. - QUALCOMM INCORPORATED, "SCG-RLF handling in EN-DC", vol. RAN WG2, no. Spokane, USA; 20170403 - 20170407, (20170403), 3GPP DRAFT; R2-1703569 SCG-RLF HANDLING IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP),
- http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20170403) is a 3GPP discussion document discussing the handling of secondary cell group radio link failure for split bearers in an E-UTRA-NR DC communication network.
- In 5th Generation (5G) Dual Connectivity (DC) technologies (such as Evolved-Universal Terrestrial Radio Access Network-New Radio (E-UTRAN-NR)-DC (EN-DC), New Generation-Radio Access Network (NG-RAN)-DC (NGEN-DC), and so on), User Equipment (LTE) can be enabled to simultaneously connect to 5G-NR and other networks (such as 4th Generation (4G) Long Term Evolution (LTE) networks). In an example, if a UE is configured to implement EN-DC capability, a flow of data between the UE and a Core Network (CN) (LTE or NR) can be split between the E-UTRAN and NG-RAN. In EN-DC, control of DC can be handled by an evolved Node B (eNB) in the E-UTRAN.
-
FIG. 1 illustrates an example flow of data between a UE and a CN through base stations in an E-UTRAN and an NG-RAN. As depicted inFIG. 1 , for an EN-DC system, the CN is an Evolved Packet Core (EPC). The E-UTRAN includes an eNB that connects the UE to the EPC. The NG-RAN includes a next generation Node B (gNB) that connects the UE to the EPC. An S 1-U interface can be used to transfer data between the EPC and the eNB, and the EPC and the gNB. The UE can receive data from either of the eNB, gNB, or both, based on a configuration (non-split bearer in eNB/gNB, split bearer eNB/gNB) for data transmission. An issue in the S 1-U interface between either of the EPC and the gNB, a Xx Link between the eNB and the gNB, and an air interface between the UE and the gNB, may necessitate the transfer of data (between the UE and EPC) through the eNB. - Currently, if the UE intends to disable NR radio capability, a Tracking Area Update (TAU) request is sent to the Mobility Management Entity (MME) of the EPC. However, the TAU request can be sent only when the UE is in idle mode, such that a RAN can update radio capabilities of the UE (by disabling the NR capability of the UE). The process of disabling the NR radio capability may be delayed if there is an active data connection existing between the UE and the eNB.
-
FIG. 2 is a sequence diagram illustrating a scenario in which there is loss of continuity of data transfer due to bearer deactivation. Consider that a UE with EN-DC capability has established a connection with a public data network (PDN) through an EN-DC network. The UE is receiving data packets without continuity. Dual Connectivity with NR may be unsuitable in this scenario. If the UE detects that data packets have not been received for a period of time, the UE can initiate a data recovery procedure. The procedure involves sending a PDN disconnect request to the EN-DC network. The PDN disconnect request is sent without ascertaining the interface (at the eNB or the gNB) in which there is an issue that is preventing data flow. In response to the PDN disconnect request, the EN-DC network can deactivate an Evolved Packet System (EPS) bearer. Thereafter, the connection with the PDN can be re-established and reception of data packets can resume. However, this can result in the loss of continuity of data reception. - If there are issues with the NR interface (at the gNB), then disconnecting the PDN connection may not resolve the issue and the UE may again experience a loss of continuity. In split bearer configuration, there can be issues in one of the interfaces (for example: NR) while data transmission through the other interface (for example: LTE) can occur smoothly. Currently, the interface in which the issue had occurred might not be located and there can be Transport Control Protocol (TCP) retransmissions. Thus, there might be degradation in data throughput.
- Embodiments of the disclosure relate to detect interface connection abnormalities connecting a NR network with an external entity (such as a Long Term Evolution (LTE) network, an Evolved Packet Core (EPC), and User Equipment (UE)); and connectivity issues in the UE itself, in which the UE determines whether the connectivity disruption is temporary, long term, or permanent.
- Embodiments of the disclosure relate to determine bearer configuration of the UE and update the bearer configuration based on the connectivity issues, in which the UE informs the LTE network about NR capability of the UE, to enable transfer of data through Master Cell Group (MCG) bearers in a current MCG Radio Resource Control (RRC) session and prevent addition of Secondary Cell Group (SCG) bearers, and in which the MCG bearers are associated with the LTE network and the SCG bearers are associated with the NR network, and in which the UE can continue to transfer data in a data session, which was affected due to the connectivity issues in the NR network, through the MCG bearers.
Embodiments of the disclosure relate to send Tracking Area Updates (TAUs) to indicate an enabling or a disabling of NR capability of the UE if the connectivity issues are long term or permanent. - The invention is defined in the claims.
- Accordingly, the embodiments provide managing bearer configuration of a User Equipment (UE) with Evolved-Universal Terrestrial Radio Access Network-New Radio-Dual Connectivity (E-UTRAN-NR-DC) (EN-DC) capability. According to an aspect, there is provided a method of managing bearer configuration of a User Equipment, UE, with Evolved-Universal Terrestrial Radio Access Network-New Radio-Dual Connectivity, E-UTRAN-NR-DC, EN-DC, capability, the method comprising: detecting, by the UE, an interruption of an ongoing data session due to occurrence of at least one connectivity issue in at least one interface associated with a Fifth Generation, 5G, network of the UE; determining, by the UE, a bearer configuration of the UE; and based on determining that the bearer configuration is one of a Master Cell Group, MCG, split bearer and a Secondary Cell Group, SCG, split bearer, signaling, by the UE, that the at least one connectivity issue is detected in the UE to a Fourth Generation, 4G, network to which the UE is connected; and characterized by: periodically performing, by the UE, 5G signal measurements, wherein the 5G measurements are performed with a periodicity of a first predefined time period; detecting whether the at least one connectivity issue continues to persist after the expiration of the first predefined time period, wherein persistence of the at least one connectivity issue is detected by at least one of the UE and the 4G network; determining, by the UE, a count of failed attempts to connect to the 5G network if the at least one connectivity issue continues to persist after the expiration of the first predefined time period, wherein the count is incremented if the at least one connectivity issue continues to persist; determining, by the UE, that the count is greater than a predefined threshold number of failed attempts; and performing, by the UE, at least one of: requesting the 4G network to prevent adding SCG bearers in a current MCG Radio Resource Control, RRC, session; requesting the 4G network to disable the SCG bearers; and sending a first Tracking Area Update, TAU, to the 4G network after releasing the current MCG RRC session if there is no ongoing transfer of priority data through the MCG bearers, wherein the first TAU indicates disabling of NR capability of the UE, and wherein the recovery of the ongoing data session is initiated in a new MCG RRC session.
- These and other aspects of the embodiments will be better appreciated and understood when considered in conjunction with the following description and the accompanying drawings. It should be understood, however, that the following descriptions, while indicating embodiments and numerous specific details thereof, are given by way of illustration and not of limitation.
- Embodiments of the disclosure relate to methods and systems for managing bearer configuration of a User Equipment (UE) with Evolved-Universal Terrestrial Radio Access Network-New Radio (E-UTRAN-NR)-Dual Connectivity (DC) (EN-DC) capability.
- Embodiments herein are taken in conjunction with the accompanying drawings, throughout which like reference letters indicate corresponding parts in the various figures. The embodiments herein will be better understood from the following description with reference to the drawings, in which:
-
FIG. 1 illustrates an example flow of data between a User Equipment (UE) and a Core Network (CN) through base stations in an Universal Terrestrial Radio Access Network (E-UTRAN) and a Next Generation Radio Access Network (NG-RAN); -
FIG. 2 is a sequence diagram depicting an existing scenario, in which there is loss of continuity of data transfer due to bearer deactivation; -
FIG. 3 illustrates various units of a UE with E-UTRAN-New Radio-Dual Connectivity (EN-DC) capability configured to manage bearer configuration while operating in an EN-DC mode, according to an embodiment; -
FIGS. 4A ,4B ,4C , and4D are a flowchart illustrating a method for managing bearer configuration of the UE with EN-DC capability, according to an embodiment; -
FIG. 5 is a flowchart illustrating a method for managing bearer configuration of the UE with EN-DC capability, according to an embodiment; -
FIG. 6 is a flowchart illustrating a method for managing bearer configuration of the UE with EN-DC capability, according to an embodiment; and -
FIG. 7 is a timing diagram illustrating a process of handling bearer configuration if there is an occurrence of a long term issue in interfaces associated with the 5G network, according to an embodiment. - The embodiments herein and the various features and advantageous details thereof are explained more fully with reference to the accompanying drawings and detailed in the following description. Descriptions of well-known components and processing techniques are omitted to avoid unnecessarily obscuring the embodiments. The examples used herein are intended merely to facilitate an understanding of ways in which the embodiments may be practiced and to further enable those of skill in the art to practice the embodiments herein. Accordingly, the examples should not be construed as limiting the scope of the embodiments herein.
- Embodiments herein relate to methods and systems for managing bearer configuration of a User Equipment (UE) with Evolved-Universal Terrestrial Radio Access Network-New Radio-Dual Connectivity (E-UTRAN-NR-DC) or (EN-DC) capability. Aspects of the embodiments include detecting issues in interfaces connecting a NR network with an external entity (such as a Long Term Evolution (LTE) network, an Evolved Packet Core (EPC), and the UE). The embodiments include determining a configuration of bearers used for transfer of data between the UE and the EPC through the LTE/NR network, in which the possible bearer configurations include a Master Cell Group (MCG) split bearer, a Secondary Cell Group (SCG) bearer, and a SCG split bearer. The MCG bearers are associated with the LTE network and the SCG bearers are associated with the NR network. The embodiments include determining whether the detected connectivity issues are temporary, long term, or a permanent issue, for example, by monitoring a time period for which the issues sustain. The embodiments include informing the LTE network about the detected connectivity issues, if the connectivity issues are temporary.
- In an embodiment, the LTE network can be informed about the inability to transfer data using NR, due to connectivity issues associated with NR interfaces. The LTE network can allow transfer of data through MCG bearers in a current MCG Resource Control (RRC) session for a predefined time period. The embodiments include enabling recovery of data session, through the MCG bearers.
- In an embodiment, the LTE network can be informed about the inability to transfer data using NR, due to connectivity issues associated with NR interfaces, by sending SCG failure information. This can indicate to the LTE network to allow transfer of data only through the MCG bearers and prevent addition of SCG bearers in the current MCG RRC session. In an embodiment, the LTE network can be informed about the lack of NR capability by sending UE assistance information. This can indicate to the LTE network to disable SCG bearers.
- In an embodiment, the current RRC session can be aborted by releasing the RRC connection. A Tracking Area Update (TAU) request can be sent to the LTE network to inform the LTE network about an inability to transfer data using interfaces associated with the NR network for a predefined period of time, due to issues in the NR interface. The embodiments include initiating data recovery using LTE data recovery methods, wherein lost data, if any, can be recovered through the MCG bearers in a new RRC session. The embodiments include informing the LTE network about enabling of NR, such that the LTE network can add SCG bearers in scenarios, such as expiration of the predefined period of time, detecting a movement of the UE, detecting that the UE is in a different Tracking Area (TA), and so on.
- The embodiments will now be referred to with respect to
FIGS. 3 through 7 . -
FIG. 3 illustrates various units of a UE 300 with EN-DC capability configured to manage bearer configuration while operating in an EN-DC mode, according to an embodiment. As depicted inFIG. 3 , the UE 300 may include aprocessor 301, amemory 302, and adisplay unit 303. Theprocessor 301 may be one or more of an application processor, a communication processor, and a data recovery unit. The UE 300 is capable of providing support for EN-DC and may be connected to an EPC through a next generation Node B (gNB) in a 5G RAN (NG-RAN)/NR or 5G network and an evolved Node B (eNB) in a 4G RAN (E-UTRAN)/LTE or 4G network. - The
processor 301 may be configured to detect connectivity issues in S1-U interface connecting the EPC and the gNB, in air interfaces (NR Uu) connecting the gNB and the UE 300, and Xx interface between the eNB and the gNB. Examples of the connectivity issues can be, but are not limited to, data stall, heating issues in the UE, issues with state of battery of the UE 300, user initiated disabling of NR, disabling of NR using Artificial Intelligence (AI), and so on. In an example, the Xx interface can be an X2 interface. - The
processor 301 may be configured to determine a bearer configuration for the UE 300. Examples of the bearer configurations may be, but are not limited to, MCG bearer, MCG split bearer, SCG split bearer, and SCG bearer. Data transfer between the UE 300 and the eNB/gNB can occur through the bearers. The control of DC is handled by the eNB. The MCG bearers are associated with the eNB and the SCG bearers are associated with the gNB. - The
processor 301 may be configured to disable the NR capability of the UE 300 without releasing the existing RRC session associated with the LTE network and a data session in the MCG split bearers/SCG split bearers/SCG bearers can be recovered using MCG bearers. - Consider that the
processor 301 detects that the connectivity issue is a data stall occurring in one of the interfaces associated with the gNB. As a result, the UE 300 is unable to receive data packets. The data stall is detected if there are frequent Radio Link (RL) failures, Packet Data Convergence Protocol (PDCP) errors, low data rate, Quality of Service (QoS) is not satisfied, Radio Link Control (RLC) Negative Acknowledgements (NACKS), and so on. If there is a data stall, the UE 300 may be unable to send or receive data using MCG split bearers/SCG split bearers/SCG bearers associated with the gNB. In such circumstances, theprocessor 301 is configured to disable NR capability of the UE 300 without releasing an existing RRC session associated with the LTE network and recover data in the SCG bearers using MCG bearers associated with the eNB. - Consider that the UE 300 receives priority data on MCG bearers (such as a Voice over LTE (VoLTE) call) and low priority data on MCG split bearers/SCG split bearers/SCG bearers. If the temperature of the UE 300 increases beyond a threshold value, the
processor 301 is configured to disable the NR capability of the UE 300. Consider that the State of Charge (SoC) of the battery of the UE 300 is below a threshold level. In this scenario, theprocessor 301 is configured to disable the NR capability of the UE 300. Consider that the user intends to disable NR capability. Theprocessor 301 can disable the NR capability based on the intention of the user. - In an embodiment, if the UE 300 is configured to implement machine learning and AI capability, the UE 300 can determine whether NR services are required. The UE 300 can monitor usage patterns and forecast time periods during which there will be requirement of NR services. The
processor 301 can either enable or disable the NR capability based on the requirements. - The following will describe the MCG split bearer/SCG split bearer configuration.
- If the bearer configuration is MCG split bearer or SCG split bearer and connectivity issues are detected in the interfaces associated with the gNB, the
processor 301 can determine whether the SCG includes priority bearers carrying priority data. If the SCG includes priority bearers, data transfer can continue through the priority bearers until the data session is completed. Once the data session is completed, RL link failure can be declared. Theprocessor 301 can also declare RL link failure to the eNB. The eNB can allow transfer of data through MCG bearers, if the SCG bearers are not carrying priority data. The eNB can allocate MCG bearers for transfer of data between the UE and the eNB and recover data session that was being carried on the SCG bearers. The allocation of the MCG bearers for transfer of data can take place without releasing the existing RRC session. - The
processor 301 can suspend performing 5G signal measurements for a first predefined time period. Theprocessor 301 can initialize a first timer for tracking whether the first predefined time period has expired. Theprocessor 301 can determine whether the connectivity issues in the interfaces associated with the gNB have been resolved on expiration of the first predefined time period. If SCG bearers are added and it is determined that the issues have not been resolved, then a counter can be initialized. Theprocessor 301 can again check whether the issues in the interfaces associated with the gNB have been resolved on expiration of the first predefined time period. Theprocessor 301 can increment the counter at each instance if it is determined that all the connectivity issues in the interfaces associated with the gNB have not been resolved after the expiration of the first predefined time period. If the value of the counter increases beyond a threshold, then theprocessor 301 determines that the issue is either a long term issue or a permanent issue. On the other hand, if theprocessor 301 determines that the issues have been resolved, the 5G signal measurements can be reinitiated. Theprocessor 301 can inform the eNB that the connectivity issues have been resolved. The eNB can add SCG bearers for transfer of data packets. - In an embodiment, if the connectivity issue is a long term issue or a permanent issue, the
processor 301 can check whether the MCG bearers are carrying priority data. If the MCG bearers are not carrying priority data, theprocessor 301 can release the RRC connection on the MCG bearers and send a TAU with Dual Connectivity New Radio (DCNR) bit set to 0. If the MCG bearers are carrying priority data, the processor can wait until the priority data transfer is completed. Once the data transfer is complete, theprocessor 301 can release the RRC connection and update the NR capability (not available) by sending a TAU with DCNR bit set to 0. Once a new RRC session is initialized, a data session that was ongoing using the SCG bearers can continue on the MCG bearers. - The
processor 301 can, thereafter, initialize a second timer for a second predefined time period. Theprocessor 301 can enable NR capability and request the eNB to add SCG bearers by sending a TAU after the expiration of the second predefined time period. The second timer tracks whether the second predefined time period has elapsed. If the TAU informing the eNB about the enablement of NR capability is sent prior to expiration of the second predefined time period and at least one issue in the interfaces associated with the gNB continue to persist, theprocessor 301 may need to again send a TAU to inform the eNB about NR disablement. Thus, there is likelihood of occurrence of a ping-pong scenario of TAU transmissions about enablement and disablement of the NR capability if TAUs are sent prior to expiration of the second predefined time period. - In an embodiment, if the connectivity issue is a long term issue or a permanent issue, the
processor 301 can request the eNB to not add SCG bearers in the existing RRC session. Theprocessor 301 can temporarily disable the NR capability of the UE 300. The embodiments include adding a failureType in ScgFailureInfo of SCGFailureInformationNR, to indicate the eNB about disablement of NR capability. - In an embodiment, if the connectivity issue is a long term connectivity issue or a permanent connectivity issue, the
processor 301 can informing the eNB to disable SCG bearers, such that the SCG bearers are not added in the existing RRC session. Theprocessor 301 can add a new cause in the UEAssistanceInformation Information Element (IE) to inform the eNB to disable the SCG bearers. - In an embodiment, the eNB can initialize a SCGFailureInformationNR counter. Each time SCG bearers are added and, if it is determined that the connectivity issues continue to persist; the eNB can increment the SCGFailureInformationNR counter. The SCGFailureInformationNR counter in the UE 300 can parallel the counter that tracks the persistence of connectivity issues in the interfaces associated with the gNB at each instance of expiration of the first predefined time period. If the value of the SCGFailureInformationNR counter increases beyond a threshold value, the eNB refrains from adding SCG bearers for a back-off period. The SCGFailureInformationNR counter can be reset on successful addition of SCG bearers after expiration of the back-off period, release of an existing RRC session, eNB handover, and so on.
- The
processor 301 can inform the eNB to add SCG bearers for transfer of data through the 5G network if the connectivity issues are resolved. Theprocessor 301 can inform the eNB by sending a TAU with the DCNR bit set to 1. In an embodiment, theprocessor 301 can inform the eNB, if theprocessor 301 determines that bandwidth requirements of the UE 300 may not be met through the LTE network alone. In an embodiment, theprocessor 301 can inform the eNB after the expiration of the second predefined time period. In an embodiment, theprocessor 301 can inform the eNB prior to the expiration of the second predefined time period, if theprocessor 301 detects movement of the UE 300. In an embodiment, theprocessor 301 can inform the eNB prior to or after expiration of the second predefined time period, if theprocessor 301 detects that the UE 300 is located in a different Tracking Area (TA). - The following will describe the SCG bearer configuration.
- If the bearer configuration is SCG bearer, the
processor 301 may be configured to determine whether the SCG bearers are carrying priority data through priority bearers, on detecting connectivity issues in the interfaces associated with the gNB. If SCG bearers are carrying priority data, then data transfer can continue through the priority bearers until the data session is completed. Once the data session is completed, the RRC connection on the MCG bearers can be released and a TAU can be sent with the DCNR bit set to 0. - If the SCG bearers are not carrying any priority data, in an embodiment, the RRC connection on the MCG bearers can be released and the TAU (with the DCNR bit set to 0) can be sent. Once a new RRC session is initialized, data session that was ongoing using the SCG bearers would continue on the MCG bearers. The
processor 301 can enable NR capability and request the eNB to add SCG bearers after the expiration of the second predefined time period. - If the SCG bearers are not carrying any priority data, in an embodiment, the
processor 301 can add a failureType in ScgFailureInfo of SCGFailureInformationNR. This can inform the eNB to allow data transfer only through MCG bearers and prevent addition of SCG bearers in the current RRC connection. Thereafter, data session that was ongoing using the SCG bearers would continue on the MCG bearers. Theprocessor 301 may not attempt to enable NR for a back-off time period. Theprocessor 301 may enable the NR capability and request the eNB to add SCG bearers after the expiration of the back-off time period. If the connectivity issues continue to persist in the interfaces associated with the gNB after the expiration of the back-off time period, the back-off time period can be increased. - If the SCG bearers are not carrying any priority data, in an embodiment, the
processor 301 may be configured to add a new cause in UEAssistanceInformation to inform the eNB to disable the SCG bearers. The data transfer can be enabled using MCG bearers. Theprocessor 301 may not attempt to enable NR for a back-off time period. Theprocessor 301 may enable the NR capability and request the eNB to add SCG bearers after the expiration of the back-off time period. If the connectivity issues continue to persist in the interfaces associated with the gNB after the expiration of the back-off time period, the back-off time period can be increased. -
FIG. 3 illustrates an exemplary configuration of the UE 300, but the artisan of ordinary skill will understand that the components may be modified, such that other components not illustrated or described could be included in the UE 300, which may be any cellular telephone or device including communication circuitry capable of connecting to a wireless communication network. Further, the labels or names of the components are used only for illustrative purpose and do not limit the scope of the disclosure. One or more components can be combined together to perform same or substantially similar function in the UE 300. -
FIGS. 4A ,4B ,4C , and4D are aflowchart 400 illustrating a method for managing bearer configuration of the UE 300 with EN-DC capability, according to an embodiment. Atstep 401, connectivity issues existing in interfaces associated with the 5G network may be detected. Examples of the connectivity issues can be, but are not limited to, data stall, heating issues in the UE, issues due to the battery of the UE 300, and so on. Addressing the connectivity issues requires disabling the NR capability of the UE 300. The NR capability may be disabled, if the user requests the disabling of the NR capability or if a request for disabling of the NR capability has been received using artificial intelligence (AI) systems in the UE 300. - At
step 402, the method includes determining the bearer configuration of the UE 300. The bearer configuration can be MCG bearer, MCG split bearer (403), SCG split bearer (404), and SCG bearer (405). As connectivity issues have been detected at the interfaces associated with the 5G network, ongoing data session in the SCG bearers can be recovered using the MCG bearers. - If the bearer configuration is MCG split bearer (403) and SCG split bearer (404), the method includes, at
step 406, determining whether the SCG includes priority bearers that are carrying priority data. If the SCG includes priority bearers, then the method includes, atstep 407, continuing transfer of data through the priority bearers until the data session is completed. Once the data session is completed, the method includes, atstep 408, informing the LTE network about failure of RLs in the 5G network. If the SCG does not include priority bearers, the method includes, atstep 408, informing the LTE network about the failure of the RLs in the 5G network. - At
step 409, the method includes enabling data transfer in current RRC session through the MCG bearers. The 4G network allows data transfer through the MCG bearers. The eNB in the 4G network may not add SCG bearers in the current RRC session for transfer of data and data transfer be enabled through the MCG bearers. Atstep 410, the method includes continuing transfer of data, which was ongoing using the SCG bearers, through the MCG bearers. The embodiments include resuming the transfer of data through the MCG bearers in the current MCG session. The transfer of data is, thus, resumed without releasing the RRC connection. - Referring to
FIG. 4A , while data is transferred in the current RRC session using the MCG bearers, the method includes, atstep 411, refraining from performing 5G signal measurement for the first predefined time period. Atstep 412, the method includes adding SCG bearers. Atstep 413, whether the connectivity issues in the interfaces associated with the 5G network continue to persist after expiration of the first predefined time period may be determined. As an example, the first predefined time period may be 2ms. - At
step 414, the method includes incrementing a counter initialized for counting the number of failed attempts to connect to the 5G network. The embodiments include configuring a threshold failure count. If the number of failed attempts is greater than or equal to the threshold failure count, then the connectivity issues can be considered to be either long term or permanent. Considering the example, if it is determined that the connectivity issues persist after 2ms, it may be considered that the first attempt to connect to the 5G network has failed and the number of failed attempts is incremented to 1. Each time an attempt to connect to the 5G network fails the number of failed attempts is incremented by 1. - At
step 415, the method includes determining whether the number of failed attempts is greater than the threshold failure count. As an example, the threshold failure count is 5. If the number of failed attempts is less than the threshold failure count, the embodiments include refraining (step 411) from performing 5G signal measurement for the first predefined time period. Thereafter, the embodiments include attempting to connect to the 5G network again after the expiration of the first predefined time period. - If the connectivity issues continue to persist for more than a threshold time, the method includes determining that the number of failed attempts is greater than the threshold failure count. The threshold time is the time taken to cross the threshold failure count. Considering the example, the threshold time is 10ms, as the second time is a product of first predefined time period (2ms) and threshold failure count (5). If the connectivity issues continue to persist for more than the second threshold time, it can be inferred that the number of failed attempts is greater than or equal to 5 and the connectivity issues are either permanent or long term issues.
- At
step 416, the method includes determining whether the MCG bearers are carrying priority data. If the MCG bearers are carrying priority data, then the method includes, atstep 417, waiting for the completion of priority data to be transferred. If it is determined that the MCG bearers are not carrying priority data, the method includes, atstep 418, releasing the RRC connection using an Evolved Packet System (EPS) Mobility Management (EMM) status message. - Referring to
FIG. 4C , the EMM status Non-Access Stratum (NAS) message can be used to request the EPC for releasing the RRC connection. This can be performed with prior coordination with at least one of an Original Equipment Manufacturer (OEM), an operator, and a core network vendor. In an example, a UE can send an EMM status message in connected mode to request the Mobility Management Entity (MME) to release the RRC connection. - At
step 419, the method includes sending a TAU with the DCNR bit set to 0. This can indicate to the eNB that the NR capability is disabled. In an embodiment herein, the UE 300 may be operating in only 4G mode. Atstep 420, the method includes refraining from sending a TAU indicating enabling of NR capability for a second predefined time period. After the expiration of the second predefined time period, a TAU with the DCNR bit set to 1 can be sent, for indicating the eNB that the UE 300 is operating in EN-DC mode is operating with NR capability. - Referring to
FIG. 4D , if the bearer configuration is a SCG bearer (405), the method includes performingstep 426, whereby it may be determined whether the SCG includes priority bearers carrying priority data. If the SCG includes priority bearers, then the method includes, atstep 427, continuing transfer of data through the priority bearers until the data session is completed. Once the data session is completed, the method includes performing steps the 428-430. If it is determined that the SCG does not include priority bearers, the method includes performing the steps 428-430. Ultimately, the RRC connection is released using the EMM status message instep 428. A TAU with the DCNR bit set to 0 is sent to the eNB indicate that the NR capability is disabled instep 429. The method includes refraining from sending a TAU indicating enablement of NR capability for a second predefined time period. Meanwhile, data transfer can continue through the 4G network using the MCG bearers instep 430. - Referring to
FIG. 4C , if it is determined (at step 415) that the number of failed attempts is greater than the threshold failure count, the method includes, atstep 421, requesting the 4G network to not add SCG bearers in the current RRC session for transfer of data. For example, adding a failureType in ScgFailureInfo of SCGFailureInformationNR, may be performed to indicate the 4G network about disabling of NR capability. Meanwhile, the data transfer can continue through the MCG bearers (step 423). - In an embodiment, if it is determined (at step 415) that the number of failed attempts is greater than the threshold failure count, the method includes, at
step 422, informing the 4G network to disable SCG bearers such that the SCG bearers are not added in the current RRC session for transfer of data. The embodiments include adding a new cause in the UEAssistanceInformation IE to inform the 4G network to disable the SCG bearers. Meanwhile, the data transfer can continue through the MCG bearers (step 424). - The various actions in the
flowchart 400 may be performed in the order presented, in a different order, or simultaneously. Further, in some embodiments, some actions listed inFIG. 4 may be omitted. -
FIG. 5 is aflowchart 500 illustrating a method for managing bearer configuration of the UE 300 with EN-DC capability, according to an embodiment. Atstep 501, the method includes detecting issues existing in interfaces associated with the 5G network. The issues may cause hindrance in transfer of data between the UE 300 and the 5G network. Atstep 502, the method includes determining if the bearer configuration is SCG bearer. Embodiments herein disable the NR capability of the UE 300 until all the connectivity issues in the interfaces have been resolved. Atstep 503, the method includes determining whether the SCG includes priority bearers carrying priority data. If the SCG includes priority bearers, the method includes, atstep 504, continuing data transfer through the priority bearers until the data session is completed. Once the data session is completed, the method includes, atstep 505, requesting the 4G network to enable data transfer in current RRC session through the MCG bearers and not to add SCG bearers in current RRC session. If it is determined that the SCG does not include any priority bearers, the method includes performingstep 505. - The embodiments include adding a failureType in ScgFailureInfo of SCGFailureInformationNR to indicate to the eNB that SCG bearers are not to be added in the current RRC session for transfer of data. At
step 506, the method includes continuing the transfer of data that was ongoing using the SCG bearers using MCG bearers. The embodiments include enabling the transfer of data through the MCG bearers. - The various actions in the
flowchart 500 may be performed in the order presented, in a different order, or simultaneously. Further, in some embodiments, some actions listed inFIG. 5 may be omitted. -
FIG. 6 is aflowchart 600 illustrating a method for managing bearer configuration of the UE 300 with EN-DC capability, according to an embodiment. Atstep 601, the method includes detecting connectivity issues existing in interfaces associated with the 5G network. The connectivity issues may cause hindrance in transfer of data between the UE 300 and the 5G network. Atstep 602, the method includes determining if the bearer configuration is SCG bearer. Embodiments herein disable the NR capability of the UE 300 until all the connectivity issues in the interfaces have been resolved. Atstep 603, the method includes determining whether the SCG includes priority bearers carrying priority data. If the SCG includes priority bearers, the method includes, atstep 604, continuing data transfer through the priority bearers until the data session is completed. Once the data session is completed, the method includes, atstep 605, informing the 4G network to enable data transfer in current RRC session through the MCG bearers in current RRC session and disable the SCG bearers. If it is determined that the SCG does not include any priority bearers, the method includes performingstep 605. - The embodiments add a new cause in the UEAssistanceInformation IE to inform the eNB to disable the SCG bearers. At
step 606, the method includes continuing the transfer of data that was ongoing using the SCG bearers. The embodiments include enabling the transfer of data through the MCG bearers. - The various actions in the
flowchart 600 may be performed in the order presented, in a different order, or simultaneously. Further, in some embodiments, some actions listed inFIG. 6 may be omitted. -
FIG. 7 is a timing diagram illustrating the process of handling bearer configuration, if there is an occurrence of a long term connectivity issue in interfaces associated with the 5G network, according to an embodiment. The timing diagram is applicable for MCG split bearer and SCG split bearer configuration. It is to be noted that the time intervals between the labeled time instants (t1, t2, t3, and so on) are not to be scaled. As depicted inFIG. 7 , at time t1, there is an occurrence of an issue in the interfaces associated with the 5G network. At time t2, the connectivity issue may be detected. The time period between t1 and t2 can be considered as a deadlock period. As long as the connectivity issue persists, the embodiments include changing the bearer configuration to MCG bearers. At time t3, data on the MCG bearers may be received and transfer of data (that was ongoing over the SCG bearers) using the MCG bearers in a current RRC session may be continued. Thus, transfer of data can be continued without disrupting the RRC session. The embodiments include informing the eNB about disabling of NR capability by triggering SCG failure. This can indicate to the network to prevent adding SCG bearers in the current RRC session. - At time t4, SCG bearers may be added. The time period between t3 and t4 can be considered as the first predefined time period. During this period, performing 5G signal measurements may be suspended. At time t5, continuing connectivity issues in the interfaces may be determined. The counter initialized to keep a track on the number of failure attempts is incremented. As an example, consider that the threshold number of failure attempts is 2. The steps as discussed above may be performed on determining that the connectivity issues still persist. At time t6, data on the MCG bearers may be received, thereby continuing the transfer of data using the MCG bearers. At time t7, SCG bearers may be added.
- The time period between t6 and t7 can also be considered as the first predefined time period. At time t8, it may be detected that the connectivity issues in the interfaces are still persisting. The counter is again incremented and the value becomes equal to the threshold number of failure attempts. Thereby, it may be determined that the detected connectivity issue is a long term connectivity issue.
- In an embodiment, at time t8, a TAU with the DCNR bit set to 0 may be transmitted to the eNB to indicate disabling of the NR capability. The TAU can be sent and consequently the RRC connection can be released once it is ensured that the MCG bearers do not carry any priority data. Otherwise the TAU can be sent after the completion of transfer of the priority data.
- In another embodiment, SCGFailureInformationNR can be sent to the eNB to indicate disabling of the NR capability. The embodiments include requesting the eNB to not add SCG bearers in a current RRC session for transfer of data.
- In yet another embodiment, UEAssistanceInformation can be sent to the eNB to indicate disabling of the NR capability. The embodiments allow the 4G network to disable SCG bearers.
- The embodiments disclosed herein can be implemented through at least one software program running on at least one hardware device and performing network management functions to control the network elements. For example, the methods described above may be executed under control of the processor 310 of the UE 300 illustrated in
FIG. 3 by executing software stored in and accessed from thememory 302. - The embodiments disclosed herein describe methods and systems for managing bearer configuration in EN-DC system. Therefore, it is understood that the scope of the protection is extended to such a program and in addition to a computer readable means having a message therein, such computer readable storage means contain program code means for implementation of one or more steps of the method, when the program runs on a server or mobile device or any suitable programmable device. The method is implemented in a preferred embodiment through or together with a software program written in e.g. Very high speed integrated circuit Hardware Description Language (VHDL) another programming language, or implemented by one or more VHDL or several software modules being executed on at least one hardware device. The hardware device can be any kind of portable device that can be programmed. The device may also include means which could be e.g. hardware means like e.g. an ASIC, or a combination of hardware and software means, e.g. an ASIC and an FPGA, or at least one microprocessor and at least one memory with software modules located therein. The method embodiments described herein could be implemented partly in hardware and partly in software. Alternatively, the invention may be implemented on different hardware devices, e.g. using a plurality of CPUs.
- The foregoing description of the specific embodiments will so fully reveal the general nature of the embodiments herein that others can, by applying current knowledge, readily modify and/or adapt for various applications such specific embodiments It is to be understood that the phraseology or terminology employed herein is for the purpose of description and not of limitation. Therefore, while the embodiments herein have been described in terms of preferred embodiments, those skilled in the art will recognize that the embodiments herein can be practiced with modification within the scope of the embodiments as described herein.
Claims (13)
- A method for managing bearer configuration of a User Equipment, UE, with Evolved-Universal Terrestrial Radio Access Network-New Radio-Dual Connectivity, E-UTRAN-NR-DC, EN-DC, capability, the method comprising:detecting, by the UE (300), an interruption of an ongoing data session due to occurrence of at least one connectivity issue in at least one interface associated with a Fifth Generation, 5G, network of the UE;determining, by the UE (300), a bearer configuration of the UE (300); andbased on determining that the bearer configuration is one of a Master Cell Group, MCG, split bearer and a Secondary Cell Group, SCG, split bearer, signaling, by the UE, that the at least one connectivity issue is detected in the UE (300) to a Fourth Generation, 4G, network to which the UE is connected; and characterized by:periodically performing, by the UE (300), 5G signal measurements, wherein the 5G measurements are performed with a periodicity of a first predefined time period;detecting whether the at least one connectivity issue continues to persist after the expiration of the first predefined time period, wherein persistence of the at least one connectivity issue is detected by at least one of the UE (300) and the 4G network;determining, by the UE (300), a count of failed attempts to connect to the 5G network if the at least one connectivity issue continues to persist after the expiration of the first predefined time period, wherein the count is incremented if the at least one connectivity issue continues to persist;determining, by the UE (300), that the count is greater than a predefined threshold number of failed attempts; andperforming, by the UE (300), at least one of:requesting the 4G network to prevent adding SCG bearers in a current MCG Radio Resource Control, RRC, session;requesting the 4G network to disable the SCG bearers; andsending a first Tracking Area Update, TAU, to the 4G network after releasing the current MCG RRC session if there is no ongoing transfer of priority data through the MCG bearers,wherein the first TAU indicates disabling of NR capability of the UE, and wherein the recovery of the ongoing data session is initiated in a new MCG RRC session.
- The method, as claimed in claim 1, wherein the signaling comprises the UE (300) informing the 4G network by indicating failure of at least one Radio Link, RL, associated with an SCG bearer of one of the MCG split bearer and the SCG split bearer, andwherein the SCG bearer is not carrying priority data,wherein the at least one connectivity issue comprises:
Packet Data Convergence Protocol, PDCP, error, RL failure, not meeting a predefined Quality of Service, QoS, requirement, temperature of UE (300) greater than a predefined threshold temperature, number of transmissions of Negative Acknowledgements, NACKS, in a Radio Link Control, RLC, layer greater than a predefined threshold, data rate is below a predefined threshold, State of Charge, SoC, of battery of the UE (300) below a predefined threshold, and reception of a NR disablement request triggered by at least one of an Artificial Intelligence, Al, engine of the UE (300) and a user. - The method, as claimed in claim 1, further comprising:receiving, by the UE (300), an update in the bearer configuration, wherein the update indicates transfer of data, between the 4G network and the UE (300), through MCG bearers in the current MCG RRC session; andinitiating, by the UE (300), recovery of the interruption of the ongoing data session, ongoing through one of the MCG split bearer and the SCG split bearer, through the MCG bearers in one of the current MCG RRC session and a new MCG RRC session.
- The method, as claimed in claim 1, further comprising requesting the 4G network to add SCG bearers for initiating data transfer through at least one of the MCG split bearer and the SCG split bearer on determining that the at least one connectivity issue is resolved.
- The method, as claimed in claim 1, further comprising:sending a second TAU to the 4G network to indicate enabling of the NR capability of the UE (300), wherein the second TAU is sent on fulfillment of at least one condition comprising:expiration of a second predefined time period, wherein the second predefined time period is initiated after sending the first TAU;bandwidth provided by the 4G network is not sufficient to meet bandwidth requirement of the UE (300);detection of movement of the UE (300); anddetection of change in Tracking Area, TA, of the UE (300),wherein the current MCG RRC session is released by sending an Evolved Packet System, EPS, Mobility Management, EMM, status message to the 4G network.
- The method, as claimed in claim 1, further comprising:signaling, by the UE (300), the 4G network to allow transfer of data between the 4G network and the UE through MCG bearers and prevent addition of SCG bearers in the current MCG RRC session; andinitiating, by the UE (300), recovery of the interruption of the ongoing data session through the MCG bearers in the current MCG RRC session.
- The method, as claimed in claim 6, further comprising requesting the 4G network to add SCG bearers after expiration of an SCG back-off period, andadding, by the 4G network, the SCG bearers after expiration of an SCG back-off period,wherein the SCG back-off period is initiated by the 4G network after being informed by the UE to prevent addition of the SCG bearers in the current MCG RRC session,wherein the SCG back-off period is initiated by the 4G network if a value of a counter, initialized by the 4G network, is greater than a threshold number of failures of adding the SCG bearers, andwherein the 4G network periodically attempts to add the SCG bearers after expiration of the current RRC session.
- A User Equipment, UE, (300), with Evolved-Universal Terrestrial Radio Access Network-New Radio-Dual Connectivity, E-UTRAN-NR-DC, EN-DC, capability, for managing bearer configuration of the UE, the UE comprising at least one processor configured to:detect interruption in an ongoing data session due to an occurrence of at least one connectivity issue in at least one interface associated with a Fifth Generation, 5G, network of the UE (300);determine a bearer configuration of the UE;based on determining that the bearer configuration is one of a Master Cell Group, MCG, split bearer and a Secondary Cell Group, SCG, split bearer, signal a Fourth Generation (4G) that the at least one connectivity issue is detected in the UE; and characterized in that the at least one processor further configured to:periodically perform 5G signal measurements, wherein the 5G measurements are performed with a periodicity of a first predefined time period;detect whether the at least one connectivity issue continues to persist after the expiration of the first predefined time period, wherein persistence of the at least one connectivity issue is detected by at least one of the UE (300) and the 4G network;determine a count of failed attempts to connect to the 5G network if the at least one connectivity issue continues to persist after the expiration of the first predefined time period, wherein the count is incremented if the at least one connectivity issue continues to persist;determine that the count is greater than a predefined threshold number of failed attempts; andperform at least one of:request the 4G network to prevent adding SCG bearers in a current MCG Radio Resource Control, RRC, session;request the 4G network to disable the SCG bearers; andsend a first Tracking Area Update, TAU, to the 4G network after releasing the current MCG RRC session if there is no ongoing transfer of priority data through the MCG bearers,wherein the first TAU indicates disabling of NR capability of the UE, and wherein the recovery of the ongoing data session is initiated in a new MCG RRC session.
- The UE, as claimed in claim 8, wherein the at least one processor is further configured to signal the 4G network by indicating failure of at least one Radio Link, RL, associated with an SCG bearer of one of the MCG split bearer and the SCG split bearer, andwherein the SCG bearer is not carrying priority data,wherein the at least one connectivity issue comprises:
Packet Data Convergence Protocol, PDCP, error, RL failure, not meeting a predefined Quality of Service, QoS, requirement, temperature of UE greater than a predefined threshold temperature, number of transmissions of Negative Acknowledgements, NACKS, in a Radio Link Control, RLC, layer greater than a predefined threshold, data rate is below a predefined threshold, State of Charge, SoC, of battery of the UE below a predefined threshold, and reception of a NR disablement request triggered by at least one of an Artificial Intelligence, Al, engine of the UE and a user. - The UE, as claimed in claim 8, wherein the at least one processor is further configured to:receive an update in the bearer configuration, wherein the update indicates transfer of data, between the 4G network and the UE, through MCG bearers in the current MCG RRC session; andinitiate recovery of the interruption of the ongoing data session, ongoing through one of the MCG split bearer and the SCG split bearer through the MCG bearers in one of the current MCG RRC session and a new MCG RRC session.
- The UE, as claimed in claim 8, wherein the at least one processor is further configured to request the 4G network to add SCG bearers to initiate data transfer through at least one of the MCG split bearer and the SCG split bearer on determining that the at least one connectivity issue is resolved.
- The UE, as claimed in claim 8, wherein the at least one processor is further configured to: wherein the at least one processor is further configured to send a second TAU to the 4G network to indicate enablement of the NR capability of the UE, wherein the second TAU is sent on fulfillment of at least one condition comprising:expiration of a second predefined time period, wherein the second predefined time period is initiated after sending the first TAU;bandwidth provided by the 4G network is not sufficient to meet bandwidth requirement of the UE;detection of movement of the UE; anddetection of change in Tracking Area, TA, of the UE,wherein the current MCG RRC session is released by sending an Evolved Packet System, EPS, Mobility Management, EMM, status message to the 4G network.
- The UE, as claimed in claim 8, wherein the at least one processor is further configured to: signal the 4G network to allow transfer of data between the 4G network and the UE through MCG bearers and prevent addition of SCG bearers in the current MCG RRC session; andinitiate recovery of the interruption of the ongoing data session through the MCG bearers in the current MCG RRC session,wherein the at least one processor is further configured to request the 4G network to add SCG bearers after expiration of an SCG back-off period, andwherein the SCG back-off period is initiated by the 4G network after the UE informs the 4G network to prevent addition of the SCG bearers in the current MCG RRC session,wherein the at least one processor is further configured to request the 4G network to add SCG bearers after expiration of an SCG back-off period, wherein the SCG back-off period is initiated by the 4G network if a value of a counter, initialized by the 4G network, is greater than a threshold number of failures of adding the SCG bearers, and wherein the 4G network periodically attempts to add the SCG bearers after expiration of the current RRC session.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN201941005541 | 2019-02-12 | ||
PCT/KR2020/001927 WO2020166948A1 (en) | 2019-02-12 | 2020-02-11 | Methods and systems for managing bearer configuration of user equipment with en-dc capability |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3906751A1 EP3906751A1 (en) | 2021-11-10 |
EP3906751A4 EP3906751A4 (en) | 2022-03-09 |
EP3906751B1 true EP3906751B1 (en) | 2023-10-04 |
Family
ID=71946589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20756308.1A Active EP3906751B1 (en) | 2019-02-12 | 2020-02-11 | Managing bearer configuration of user equipment with en-dc capability |
Country Status (3)
Country | Link |
---|---|
US (1) | US11310855B2 (en) |
EP (1) | EP3906751B1 (en) |
WO (1) | WO2020166948A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111386725B (en) * | 2017-09-28 | 2023-03-21 | 三星电子株式会社 | Method and system for processing PDCP operation in wireless communication system |
US11050610B2 (en) * | 2018-08-14 | 2021-06-29 | FG Innovation Company Limited | Reporting master node radio link failure |
EP3903542A4 (en) * | 2019-03-22 | 2022-02-16 | Samsung Electronics Co., Ltd. | Method and device for recovering connection failure to network in next generation mobile communication system |
WO2020256196A1 (en) * | 2019-06-21 | 2020-12-24 | 엘지전자 주식회사 | Electronic device for supporting endc and control method for electronic device |
CN114586405B (en) * | 2020-09-29 | 2024-03-26 | 华为技术有限公司 | Method and device for reporting measurement report |
KR20220132269A (en) * | 2021-03-23 | 2022-09-30 | 삼성전자주식회사 | Electronic device and method for controlling a connection to a communication network in the electronic device |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018029578A1 (en) | 2016-08-12 | 2018-02-15 | Nokia Technologies Oy | Long term evolution (lte) light connection enhancements for long term evolution (lte)-new radio access technology (nr) interworking |
CN110169192B (en) | 2017-01-06 | 2023-06-16 | 瑞典爱立信有限公司 | Radio network node, wireless device, and method performed therein for handling connections in a wireless communication network |
EP4114065A1 (en) | 2017-01-09 | 2023-01-04 | LG Electronics, Inc. | Method for interworking between networks in wireless communication system and apparatus therefor |
US10470199B2 (en) | 2017-01-10 | 2019-11-05 | Htc Corporation | Device and method of handling a PDU session in inter-system mobility between a LTE system and a NR/5G system |
US11219079B2 (en) * | 2017-03-27 | 2022-01-04 | Lg Electronics Inc. | Method and device for transmitting SCG failure information message in wireless communication system |
WO2018228560A1 (en) * | 2017-06-16 | 2018-12-20 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and apparatus for measurement report |
EP3422799B1 (en) | 2017-06-27 | 2020-08-05 | Nokia Solutions and Networks Oy | Lte-nr interworking procedure for scg split bearer configurations |
US10959276B2 (en) * | 2017-08-10 | 2021-03-23 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods responding to SCG failure in DC communications and related wireless terminals and network nodes |
US10785817B2 (en) * | 2017-09-28 | 2020-09-22 | Apple Inc. | Signaling radio bearer type 3 (SRB3) and secondary cell group (SCG) failure handling |
US11050610B2 (en) * | 2018-08-14 | 2021-06-29 | FG Innovation Company Limited | Reporting master node radio link failure |
-
2020
- 2020-02-11 EP EP20756308.1A patent/EP3906751B1/en active Active
- 2020-02-11 US US16/787,746 patent/US11310855B2/en active Active
- 2020-02-11 WO PCT/KR2020/001927 patent/WO2020166948A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
EP3906751A4 (en) | 2022-03-09 |
EP3906751A1 (en) | 2021-11-10 |
WO2020166948A1 (en) | 2020-08-20 |
US20200260515A1 (en) | 2020-08-13 |
US11310855B2 (en) | 2022-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3906751B1 (en) | Managing bearer configuration of user equipment with en-dc capability | |
US10736008B2 (en) | Method and apparatus for controlling handover in a wireless communication system | |
US10306495B2 (en) | Determining connection states of a mobile wireless device | |
US10952116B2 (en) | Communication system | |
US11665603B2 (en) | Method for handling conditional configuration stored in UE | |
EP4027748A1 (en) | Method for keeping mobile initiated connection only mode user equipment in connected mode | |
EP2741565B1 (en) | Methods of handling connection failures in device-to-device communication | |
WO2018019001A1 (en) | Terminal state conversion method and apparatus | |
TWI756725B (en) | Method for voice calls and mobile termination | |
KR20160048177A (en) | Method and system for random access procedure and radio link failure in inter-enb carrier aggregation | |
EP4287765A2 (en) | Method and apparatus for improving service reliability in wireless communication system | |
CN110381554B (en) | Communication method, device, system and computer storage medium | |
US20200092777A1 (en) | Method and apparatus for system information acquisition, beam failure recovery and cell reselection | |
EP2882129A2 (en) | Method for handling device-to-device communication | |
EP3735097A1 (en) | A method for handling control plane data in a wireless network | |
US8767660B2 (en) | Method and system for releasing resources and evolved node base | |
EP3485695B1 (en) | Controlling a user equipment | |
WO2019035616A1 (en) | Device and method for controlling network congestion with rrc inactive | |
US20230171619A1 (en) | Method and apparatus for informing changes in coverage enhancement usage in a network | |
US20190327646A1 (en) | Method and apparatus for managing bearer during x2 handover | |
US20230007705A1 (en) | Method and apparatus for receiving downlink data packets over n3gpp access | |
US20230397272A1 (en) | Method and apparatus for controlling secondary cell group in a multi-rat dual connectivity network | |
WO2023117080A1 (en) | Master cell group-failure recovery and uplink data transmission via deactivated secondary cell group for wireless networks | |
CN115842776A (en) | Hot backup method and device, computer readable storage medium and user equipment | |
CN115804175A (en) | Method and apparatus for additional reference signal monitoring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20210803 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20220203 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04W 88/06 20090101ALI20220128BHEP Ipc: H04W 24/08 20090101ALI20220128BHEP Ipc: H04W 76/30 20180101ALI20220128BHEP Ipc: H04W 76/16 20180101ALI20220128BHEP Ipc: H04W 76/18 20180101AFI20220128BHEP |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
REG | Reference to a national code |
Ref legal event code: R079 Ref document number: 602020018673 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: H04W0076180000 Ref country code: DE Ipc: H04L0005000000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04W 84/20 20090101ALN20230531BHEP Ipc: H04W 76/16 20180101ALN20230531BHEP Ipc: H04W 8/24 20090101ALN20230531BHEP Ipc: H04W 76/19 20180101ALI20230531BHEP Ipc: H04W 60/04 20090101ALI20230531BHEP Ipc: H04W 52/02 20090101ALI20230531BHEP Ipc: H04L 5/00 20060101AFI20230531BHEP |
|
INTG | Intention to grant announced |
Effective date: 20230705 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602020018673 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20231004 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1618920 Country of ref document: AT Kind code of ref document: T Effective date: 20231004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240105 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240204 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231004 |