EP3861498A1 - Systems and methodology for construction management and equipment positioning via building information modeling - Google Patents
Systems and methodology for construction management and equipment positioning via building information modelingInfo
- Publication number
- EP3861498A1 EP3861498A1 EP19883168.7A EP19883168A EP3861498A1 EP 3861498 A1 EP3861498 A1 EP 3861498A1 EP 19883168 A EP19883168 A EP 19883168A EP 3861498 A1 EP3861498 A1 EP 3861498A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- anchor
- coupler
- locking plate
- cover
- elongate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 97
- 238000009430 construction management Methods 0.000 title description 2
- 238000010276 construction Methods 0.000 claims abstract description 75
- 238000009434 installation Methods 0.000 claims abstract description 56
- 230000015654 memory Effects 0.000 claims abstract description 21
- 238000012545 processing Methods 0.000 claims abstract description 14
- 239000004567 concrete Substances 0.000 claims description 101
- 238000004873 anchoring Methods 0.000 claims description 67
- 230000008878 coupling Effects 0.000 claims description 37
- 238000010168 coupling process Methods 0.000 claims description 37
- 238000005859 coupling reaction Methods 0.000 claims description 37
- 230000000007 visual effect Effects 0.000 claims description 21
- 238000004590 computer program Methods 0.000 claims description 15
- 238000004519 manufacturing process Methods 0.000 claims description 12
- 238000003860 storage Methods 0.000 claims description 10
- 238000000151 deposition Methods 0.000 claims description 7
- 238000009428 plumbing Methods 0.000 description 15
- 210000001331 nose Anatomy 0.000 description 9
- 238000004891 communication Methods 0.000 description 8
- 239000000463 material Substances 0.000 description 8
- 230000006870 function Effects 0.000 description 7
- 230000007246 mechanism Effects 0.000 description 7
- 239000004568 cement Substances 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 6
- 238000004458 analytical method Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000009408 flooring Methods 0.000 description 3
- 238000009415 formwork Methods 0.000 description 3
- 239000011120 plywood Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 239000003086 colorant Substances 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 210000003128 head Anatomy 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 235000019687 Lamb Nutrition 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000013523 data management Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000009436 residential construction Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K19/00—Record carriers for use with machines and with at least a part designed to carry digital markings
- G06K19/06—Record carriers for use with machines and with at least a part designed to carry digital markings characterised by the kind of the digital marking, e.g. shape, nature, code
- G06K19/067—Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components
- G06K19/07—Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components with integrated circuit chips
- G06K19/0723—Record carriers with conductive marks, printed circuits or semiconductor circuit elements, e.g. credit or identity cards also with resonating or responding marks without active components with integrated circuit chips the record carrier comprising an arrangement for non-contact communication, e.g. wireless communication circuits on transponder cards, non-contact smart cards or RFIDs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B5/00—Near-field transmission systems, e.g. inductive or capacitive transmission systems
- H04B5/70—Near-field transmission systems, e.g. inductive or capacitive transmission systems specially adapted for specific purposes
- H04B5/77—Near-field transmission systems, e.g. inductive or capacitive transmission systems specially adapted for specific purposes for interrogation
Definitions
- the present disclosure relates to a construction system, and, in particular, relates to a system for installation of building equipment via a Building Information Modeling (BIM).
- BIM Building Information Modeling
- the present disclosure further relates to a system for installation of one or more anchor apparatuses utilizing BIM software in conjunction with one or more positioning systems.
- the one or more positioning systems enable precise installation of the anchoring apparatuses at selected positions within the building structure in accordance with the BIM software.
- the present disclosure further permits gathering of data pertaining to each anchoring apparatus either before or after installation.
- the data includes, but is not limited to lot number, manufacturer, installer, date installed and any other data or metadata which may be tracked for current or historical purposes.
- the present disclosure further relates to an anchor apparatus.
- the anchor apparatus is mountable relative to a form used to create a concrete support structure.
- the concrete is deposited in the form and cures whereby the one or more anchor apparatuses becomes embedded with the concrete support structure.
- the embedded anchor apparatus is readily accessible to be coupled with, or to support, construction supplies or equipment such as ductwork, electrical cables, plumbing, sprinklers, safety lines or fences, etc. within a construction site.
- a plurality of anchor apparatuses may be mounted relative to the concrete form to create a system for organizing the construction materials in a manner which facilitates all phases of construction, enhances efficiency and organization, and substantially reduces costs and work hours.
- the anchoring system, apparatus, and methodology for implementation will substantially impact current commercial and residential construction practices which incorporate concrete support structures in the form of beams, flooring, ceilings, roofing, etc.
- the present disclosure is directed to a novel system, apparatus and methodology to assist contractors in residential and commercial construction.
- the system and associated methodology will substantially impact the current construction industry. More specifically, the system and methodology employ one or more anchor apparatuses which are positioned within the form, a wood, plywood or any material form, used to create the support structure before, e.g., depositing the concrete within the form. Upon curing of the concrete support structure, the form is removed and the anchor apparatuses, which are now embedded in the support structure, are readily exposed to be utilized in a plurality of ways, including, but not limited to, supporting electrical lines, plumbing, sprinklers, ductwork, safety straps, safety nets etc.
- a number of anchor apparatuses may be positioned within the form to accommodate the contractor’s needs, and may be strategically positioned within the forms prior to pouring concrete to assist the contractor in organizing the layout of the particular equipment or supplies.
- Each anchor apparatus may be coupled through, e.g., an additional coupling, to an unlimited number of construction materials with relative ease to“run”, e.g., the electrical, plumbing or safety equipment (e.g., safety straps, hooks, perimeter cable systems) as desired.
- Each contractor e.g., an electrician or a plumber, may install their own system of anchor apparatuses on a single concrete form without any risk of interference with the other contractors.
- a method includes generating a building model of a building to be constructed at a construction site, identifying within the building model positional locations for installation of one or more anchor apparatuses within structural elements of the building model, transmitting the building model to a portable computing device at the construction site and identifying the location of the portable computing device relative to a given positional location.
- the generating, identifying, transmitting and identifying steps are implemented via at least one processing device comprising a processor and a memory.
- the method may further include installing one anchor apparatus at the given positional location.
- the method may include identifying the location of a second given positional location and further include installing one anchor apparatus at the second given positional location.
- the structural elements may include at least one of beams, columns, girders, floors and ceilings, and may be formed of concrete or cement.
- generating a model includes utilizing a building information modeling module of a server.
- identifying within the building model positional locations includes utilizing a positional indicator module within the portable computing device to indicate a location of the portable computing device relative to a given positional location on the model.
- utilizing the positional indicator includes utilizing at least one component or sensor of the portable computing device to assist in identifying the location of the portable computing device relative to the given positional location.
- utilizing at least one component or sensor of the portable computing device includes receiving feedback from one or more of WIFI, Bluetooth, a camera, a GPS sensor, a gyroscope, a magnetometer, an accelerometer, a proximity sensor or an RFID sensor of the personal computing device.
- the method may further include scanning visual indicia data on the one or more anchoring apparatuses to ascertain information pertaining to an attribute of manufacture of the one or more anchoring apparatuses or an attribute of installation of the one or more anchoring apparatuses.
- the method further includes transmitting the visual indicia data to one of the portable computing device or a server associated with the portable computing device.
- the attribute of manufacture may include at least one of manufacture, distributer, lot or model of the one or more anchoring apparatuses.
- the attribute of manufacture includes at least one of installer, installation date or supervisor.
- Scanning visual indicia data may include utilizing the RFID sensor of the personal computing device to scan RFID tags on components of the one or more anchor apparatuses.
- a computer program product including a non-transitory computer-readable storage medium encoded with computer program code that, when executed on a processor of a computer, causes the computer to implement various steps is also envisioned.
- a system is also provided.
- the system includes one or more processors operatively coupled to one or more memories configured to generate a building model of a building to be constructed at a construction site, identify within the building model positional locations for installation of one or more anchor apparatuses within structural elements of the building model, transmitting the building model to a portable computing device at the construction site and identify the location of the portable computing device to a given positional location.
- an anchoring system for installation within support structure includes at least one anchoring apparatus having a locking plate configured for securement relative to a form board a form board used to form the concrete support, an elongate anchor with a connector segment at one end for connecting with a construction tool, a coupler mounted to the elongate anchor and a cover mounted about the elongate anchor and movable for positioning over the coupler and the locking plate.
- the coupler is manipulable to be coupled to the locking plate to at least partially secure the elongate anchor to the locking plate.
- the coupler defines a central opening configured to at least partially receive the connector segment of the elongate anchor, and wherein the coupler and the connecting segment include cooperating structure to releasably secure the coupler and the elongate anchor.
- the coupler defines an internal thread at least partially circumscribing the opening and wherein the connector segment of the anchor includes an external thread configured to threadably engage with the internal thread of the couple to releasably secure the coupler and the elongate anchor.
- the locking plate and the coupler include cooperating structure configured to secure the coupler to the locking plate.
- the locking plate may define a plate aperture and at least one keyed slot adjacent the plate aperture.
- the coupler includes a central segment defining the coupler opening and at least one wing depending from the central segment. The central segment and the at least one wing are respectively receivable within the plate aperture and the at least one keyed slots of the locking plate when in a first rotational orientation of the coupler and the locking plate, whereby relative rotational movement of the coupler and the locking plate to a second rotational orientation thereof at least partially secures the coupler to the locking plate.
- the locking plate may define two opposed keyed slots and wherein the coupler includes two opposed wings correspondingly dimensioned to be received within the two opposed keyed slots when in the first rotational orientation of the coupler and the locking plate.
- the cover defines a cover passage for reception of the connector segment of the elongate anchor.
- the cover defines an inner thread circumscribing the cover passage with the inner thread configured to cooperate with the threaded segment of the elongate anchor to advance the cover relative to the elongate anchor.
- the locking plate may include at least one fastener opening configured to receive a fastener for securing the locking plate to the form board.
- the system may include a plurality of anchor apparatuses.
- a method of construction includes anchoring at least one anchor apparatus to a form utilized to create a concrete support structure, by:
- Depositing concrete may include establishing an isolated internal cavity within the cover with the at least the portion of the external thread of the anchor extending within the internal cavity.
- Coupling the elongate anchor may include mounting a coupler of the at least one anchor apparatus about the external thread of the elongate anchor and connecting the coupler to the locking plate.
- the coupler includes an internal thread and wherein mounting the coupler includes threadably engaging the coupler with the external thread of the anchor.
- the locking plate defines a plate aperture and at least one keyed slot adjacent the plate aperture and the coupler includes a central segment defining the coupler opening and at least one wing depending from the central segment, where the method further includes positioning the central segment and the at least one wing respectively within the plate aperture and the at least one keyed slot of the locking plate and rotating the coupler to secure the coupler and the anchor relative to the locking plate.
- the cover may define a cover passage with an internal thread and wherein advancing the cover includes threadably coupling the internal thread of the cover with the external thread of the elongate anchor.
- the method may further includes attaching a tool relative to the at least a portion of the external thread of the anchor subsequent to removing the board.
- the tool may include a threaded segment and wherein attaching the tool includes threadably coupling the tool with the portion of the external thread of the anchor.
- the method may further include supporting construction equipment, materials, supplies, safety hooks, perimeter fall cables with the tool.
- the tool may be an anchor clamp.
- the method may also include anchoring a plurality of anchor apparatuses to the form.
- an anchoring system for installation in a concrete support comprises at least one anchoring apparatus, including a locking plate configured for securement relative to a form board used to form a concrete support, an elongate anchor including a connector segment at one end for connecting with a construction tool, a coupler mounted to the elongate anchor and being manipulable to be coupled to the locking plate to at least partially secure the elongate anchor to the locking plate, a cover mounted about the elongate anchor and movable for positioning over the coupler and the locking plate and an anchor clamp engageable with the connector segment of the elongate anchor.
- FIG. 1 is an exploded perspective view of the construction anchoring system in accordance with the principles of the present disclosure illustrating one anchor apparatus including an elongate anchor, a cover, a coupler and a locking plate;
- FIG. 2 is a perspective view illustrating the cover and the coupler mounted relative to the elongate anchor with the locking plate separated from the other components;
- FIGS. 3A, 3B and 3C are perspective, top plan and bottom plan views, respectively, of the locking plate
- FIGS. 4A and 4B are perspective and top plan views, respectively, of the coupler
- FIGS. 5A, 5B and 5C are top perspective, bottom plan and bottom perspective views, respectively, of the cover
- FIG. 6 is a perspective view illustrating securing of the locking plate to a form board of a concrete form in accordance with one exemplary use of the system of FIGS. 1-5C;
- FIG. 7 is a perspective view illustrating the elongate anchor with mounted coupler being introduced within the locking plate in accordance with one exemplary methodology of use of the system;
- FIG. 8 is a perspective view illustrating the coupler mounted within the locking plate in accordance with one exemplary methodology of use of the system
- FIG. 8A is a perspective view illustrating the central segment and the wings of the coupler received within the plate aperture and the keyed slots of the plate segment of the locking plate in accordance with one exemplary methodology of use of the system;
- FIG. 9 is a view similar to the view of FIG. 8 A illustrating the coupler rotated within the locking plate to secure the wings beneath the locking plate thereby securing the coupler to the locking plate in accordance with one exemplary methodology of use of the system;
- FIG. 9A is a cross-sectional view taken along the lines 9A-9A of FIG. 9 illustrating the coupler secured relative to the locking plate and the cover being advanced along the elongate anchor in accordance with one exemplary methodology of use of the system;
- FIG. 10 is a cross-sectional view illustrating the cover secured against the locking plate through rotation of the cover about the elongate anchor in accordance with one exemplary methodology of use of the system;
- FIG. 11 is a view illustrating the anchor apparatus of the system secured to the form board of the concrete form in accordance with one exemplary methodology of use of the system;
- FIG. 12 is a perspective view illustrating a plurality of anchor apparatuses of the anchoring system secured to the form board of the concrete form in accordance with one exemplary methodology of use of the system;
- FIG. 13 is a view similar to the view of FIG. 12 illustrating concrete deposited in the concrete form with the anchor apparatuses embedded within the concrete in accordance with one exemplary methodology of use of the system;
- FIG. 14 is a cross-sectional view illustrating one anchor apparatus embedded within the concrete structure with the cover and the external thread of the elongate anchor exposed upon removal of the form board in accordance with one exemplary methodology of use of the system;
- FIG. 15 is a perspective view further illustrating the cover and the external thread exposed upon removal of the form board from the concrete structure in accordance with one exemplary methodology of use of the system;
- FIG. 16 is a perspective view illustrating the coupling tool and support hook being secured to one elongate anchor in accordance with one exemplary methodology of use of the system;
- FIG. 17 is a perspective view illustrating a plurality of anchor apparatuses of the system within the concrete structure and further illustrating a coupling tool and a support hook mounted to each elongate anchor in accordance with one exemplary methodology of use of the system;
- FIG. 18 is an enlarged view of the area of isolation depicted in FIG. 17 illustrating the coupling tool and the support hook secured to a single elongate anchor of the anchor apparatus in accordance with one exemplary methodology of use of the system;
- FIGS. 19-21 are front elevation, side and perspective views of an anchor clamp for use with illustrate one exemplary anchor clamp to be secured to the anchor in accordance with one exemplary apparatus and methodology of use of the system;
- FIG. 22 is a view illustrating the anchor clamp of FIGS. 19-21 mounted to an anchor of an anchor apparatus in accordance with one exemplary methodology of use of the system;
- FIG. 23 is a side elevation view of another embodiment of a locking plate for use with the anchor apparatus of the present disclosure;
- FIG. 24 is a perspective view of the locking plate of FIG. 23;
- FIG. 25 is a top plan view of the locking plate of FIGS. 23-24;
- FIG. 26 is a bottom plan view of the locking plate of FIGS. 23-25;
- FIGS. 27-29 are first and second perspective views and a cross-sectional view, respectively, of an embodiment of a mount of the present disclosure
- FIG. 29A illustrates a ring support mounted to the anchor apparatus
- FIG. 30 illustrates a computer system for installation of the anchor apparatuses in accordance with which one or more embodiments of the invention can be implemented illustrating the server and the portable computing device in communication with the server;
- FIG. 31 illustrates the portable computing device of the system of FIG. 30
- FIG. 32 is a flow chart illustrating a system and methodology for use in conjunction with the computing system for installation of the anchor apparatuses
- FIG. 33 illustrates a visual display of the portable computing device identifying locations for installation of the anchor apparatuses
- FIG. 34 illustrates an exemplary embodiment of an actuator used in installation of the anchor apparatuses
- FIG. 35 illustrates a distributed communications/computing network in accordance with which one or more embodiments of the present disclosure can be implemented
- FIGS. 36A-C illustrate another anchor apparatus in accordance with the principles of the present disclosure illustrating the anchor rod, lock plate and the cover;
- FIGS. 37A-C illustrate the anchor rod of the anchor apparatus of FIGS. 36A-36C;
- FIGS. 38A-D illustrate the lock plate of the anchor apparatus of FIGS. 36A-36C;
- FIGS. 39 A-D illustrate the escutcheon of the anchor apparatus of FIGS. 36A-36C;
- FIGS. 40A-C illustrate another embodiment of an anchor apparatus according to the principles of the present disclosure
- FIGS. 41 A-C illustrate the anchor rod of the anchor apparatus of FIGS. 40A-40C;
- FIGS. 42A-D illustrates the column anchor of the anchor apparatus of FIGS. 40A-40C.
- FIGS. 43 A-D illustrates the anchor tool of the anchor apparatus of FIGS. 40A-40C.
- FIG. 44 is a flow chart depicting illustrative use of the anchor apparatus.
- the anchoring system 10 includes one or more, e.g., a plurality of anchor apparatuses 100, depending on the needs of construction personnel.
- Each anchor apparatus 100 includes four components, namely, an anchor 102, a locking plate 104, a coupler 106 and a cover 108.
- the anchor 102 may take a variety of shapes or configurations.
- the anchor 102 is monolithically formed including a L-shaped rod, e.g., having a handle 110 and an elongate anchor rod 112 depending from the handle 110.
- the elongate anchor rod 112 includes a connector segment, e.g., in the form of an external thread 114 extending to the end 116 of the elongate anchor rod 112 remote from the handle 110. As best depicted in FIG. 2, when assembled, the elongate anchor rod 112 is positionable within the cover 108 and has the coupler 106 disposed on the external thread 114 adjacent the remote end 116. The mounted coupler 106 is thereafter introduced and secured within the locking plate 104 as will be discussed in greater detail hereinbelow.
- the locking plate 104 may assume a variety of shapes or configurations. Although referred to as a“plate”, the locking plate 104 does not necessarily require a plate like appearance, but could be any three-dimensional unit including a box, a dome, a bowl etc.
- the locking plate 104 defines a plate segment 118 having a central plate aperture 120 and at least one keyed slot 122, e.g., two diametrically opposed keyed slots 122, each communicating with the central plate aperture 120. As best depicted in FIG.
- the locking plate 104 defines an interior space 124 at least partially confined within the outer wall 126 or boundary of the locking plate 104 beneath the plate segment 118.
- the outer wall 126 may be tapered as shown.
- Opposed vertical walls or stops 128 at least partially define the interior space 124.
- the vertical stops 128 limit rotational movement of the coupler 106 within the locking plate 104.
- At least one fastener opening 130 e.g., two fastener openings 130, extend(s) through the locking plate 104 for reception of a fastener such as a screw or nail utilized to secure the locking plate 104 relative to a form board of a concrete or concrete form.
- the coupler 106 includes a central coupler segment 132 defining a coupler opening 134 and an internal coupler thread 136 circumscribing the coupler opening 134.
- the internal coupler thread 136 of the coupler 106 threadably engages the external thread 114 of the elongate anchor rod 112 to mount the coupler 106 to the anchor 102.
- the coupler 106 further includes at least one, e.g., two, diametrically opposed wings 138 depending from the central coupler segment 132.
- the central coupler segment 132 and the wings 138 are cooperatively dimensioned to be respectively received within the central plate aperture 120 and the keyed slots 122 of the locking plate 104.
- the cover 108 may be in the shape of a frustum; however, other shapes are also envisioned.
- the cover 108 includes a central cover passage 140 for reception and passage of the elongate anchor rod 112 of the anchor 102.
- the cover 108 further defines an internal cover thread 142 for threadably engaging the external thread 114 of the anchor 102.
- the cover 108 includes an outer cover wall 144 defining an internal cavity 146 dimensioned for positioning over the locking plate 104 and the coupler 106.
- the cover 108 may include supports in the form of internal ribs 148 or the like to increase the stability of the cover 108.
- the outer cover wall 144 of the cover 108 is dimensioned to form a tight tolerance relative to the outer wall 126 of the locking plate 104 to establish a fluid tight fit or seal with the outer wall 126 of the locking plate 104 - the significance of which will be discussed in greater detail hereinbelow.
- the outer wall 126 of the locking plate 104 and the outer cover wall 144 of the cover 108 have similar tapered arrangements.
- the cover 108 also may include an RFID tag or bar code schematically depicted as reference numeral 109.
- the cover 108 defines an external surface taper of the outer cover wall 144 relative to the longitudinal axis of the cover ranging from about 3° to about 1 1°, or about 7°.
- This tapered arrangement establishes an effective shoulder fit with the concrete upon its curing.
- the tapered arrangement of the cover 108 also mat create a Morse taper effect between the outer cover wall 144 and the cured concrete further enhancing retention of the cover 108 within the cured concrete until such time the cover 108 is removed.
- Each of the components of the anchor apparatus 100 may be formed of a suitable rigid polymeric material or a metallic material.
- at least the anchor 102 is formed of a suitable metal such as stainless steel or the like.
- At least some or potentially all of the components include an RFID tag or bar-code or other machine-readable indicia to be scanned via a scanning device, for example an RFID scanner or bar code reader to provide information of the product installed or the installation parameters as discussed hereinbelow.
- At least the cover 108 may be made in a variety of colors, e.g., color-coded, to correspond to the tradesman or construction personnel who intend to use the particular anchor apparatus 100. More specifically, a particular color may be associated with specific construction personnel to assist said personnel in identifying the anchor apparatuses 100 which will be associated with his/her equipment.
- the anchoring system 10 is intended for use with concrete or concrete support structures in connection with residential or commercial building construction.
- the anchoring system 10 may be embedded within horizontal or vertical beams, flooring or ceilings.
- the following discussion will focus on use of the anchoring system 10 in its application with a horizontal beam constructed during a phase of a construction.
- the anchoring system 10 has many applications inclusive of those mentioned above and in many other applications.
- a form for the concrete beam is constructed with the use of, e.g., plywood, or any other suitable materials.
- the form includes a lower horizontal form board and two vertical form boards depending upwardly from the horizontal form board.
- FIG. 6 only the horizontal form board“h” is shown for illustrative purposes.
- the locking plate 104 is secured to the inside surface of the horizontal form board“h”, i.e., the surface which will be in contact with and support the poured concrete.
- the locking plate 104 is secured to the horizontal form board“h” with the use of nails, fasteners or screws“f” which are introduced within the fastener openings 130 of the locking plate 104 and secured to the horizontal form board“h” as depicted in FIG. 6.
- the coupler 106 is threaded onto the remote end 116 of the anchor rod 112 and the cover passage 140 of the cover 108 is positioned over the handle 110 of the anchor 102 and slid down the anchor rod 112 as shown.
- the anchor 102 and the coupler 106 are advanced toward the locking plate 104 as shown by the directional arrows“d” in FIG. 7.
- the coupler 106 is introduced within the plate segment 118 of the locking plate 104 by aligning the central coupler segment 132 and the coupler wings 138 with the central plate aperture 120 and keyed slots 122 respectively of the plate segment 118 of the locking plate 104 corresponding to a first relative rotational orientation of the coupler 106 and the locking plate 104.
- FIG. 8 A illustrates the central coupler segment 132 and the wings 138 received within the central plate aperture 120 and the keyed slots 122, and disposed within the interior space 124 of the locking plate 104 beneath the plate segment 118.
- the coupler 106 is rotated through a predetermined angular sector of rotation via rotation of the handle 110 of the anchor 102 in the direction of directional arrows“r” to a second relative rotational orientation of the coupler 106 and the locking plate 104 whereby the wings 138 of the coupler 106 are displaced from the keyed slots 122 and are disposed beneath the plate segment 118 of the locking plate 104 engaging the vertical stops 128 within the interior space 124 of the locking plate 104 thereby coupling the coupler 106 and the anchor 102 to the locking plate 104.
- the cover 108 is threaded along the external thread 114 (through the threaded engagement of the internal cover thread 142 and the external thread 114 of the anchor rod 112) until it engages the horizontal form board“h” as depicted in FIG. 10.
- the anchor 102 and the coupler 106 may also retract (in the direction of directional arrows“k”) relative to the locking plate 104 whereby the wings 138 of the coupler engage the downwardly depending wall defining the central plate aperture 120 to further secure or lock the coupler 106, and thus, the anchor 102 relative to the locking plate 104.
- the outer cover wall 144 of the cover 108 fits precisely over the outer wall 126 of the locking plate 104, i.e., with a tight tolerance, and in embodiments, establishes a substantial fluid tight seal with the outer wall 126 of the locking plate 104. This will minimize or prevent any concrete from entering within the internal cavity 146 of the cover 108 when the concrete is poured and during curing of the concrete.
- FIG. 11 illustrates the anchor apparatus 100 mounted relative to the horizontal form board“h”.
- a plurality of anchor apparatuses 100 as part of the anchoring system 10 is installed to the horizontal form board“h” at predetermined locations as selected by the contractor. As noted above, these locations preferably correspond to the locations where the equipment, e.g., electrical lines, plumbing, safety cables, safety hooks etc. are to“run” or to be positioned in the structure.
- the concrete form“m” is shown with the vertical form boards“v” and the horizontal form board“h”, and further illustrates the anchor apparatuses 100 disposed within the interior of the concrete form“m”.
- FIG. 13 illustrates the horizontal beam“b” formed upon curing of the concrete and depicts in phantom the anchor apparatuses 100 permanently embedded within the horizontal beam“b”. In FIG. 13, the horizontal and vertical form boards“h”,“v” are removed.
- the locking plate 104 and the coupler 106 are removed relative to the external thread 114 of the anchor rod 112.
- the locking plate 104 and the coupler 106 may be removed simply by rotating the coupler 106 and the locking plate 104 simultaneously until the internal coupler thread 136 of the coupler 106 disengages from the external thread 114 of the anchor rod 112. (See, e.g., FIG. 9A).
- the locking plate 104 can be disengaged from the coupler 106 by rotating the locking plate 104 to align the keyed slots 122 of the locking plate 104 with the wings 138 of the coupler 106 (FIG. 8 A), and then unscrewing the coupler 106 from the external thread 114 of the anchor rod 112.
- the cover 108 upon removal of the form boards“h”,“v”, the locking plate 104 and the coupler 106, the cover 108 remains within the horizontal beam“b”. This is due to the shoulder fit of the cover 108 or the Morse taper created between the outer cover wall 144 and the cured concrete. As mentioned, the cover 108 prevents ingress of concrete within its internal cavity 146 during curing of the concrete thereby forming an accessible cavity in the horizontal beam“b” through which the end portion of the external thread 114 of the anchor rod 112 extends. Specifically, the external thread 114 is accessible to be coupled to an additional coupling tool, construction tool, mount, safety hook, safety cable or the like.
- the cover 108 may be removed or pried from the horizontal beam“b” if desired. In other embodiments, the cover 108 may remain in the cured concrete.
- FIG. 16 illustrates an internal threaded coupling tool 200 being engaged with the external thread 114 of the anchor 102 and a support or safety hook 300 being threadably engaged with the coupling tool 200.
- FIGS. 17-18 illustrate the coupling tool 200 and the hook 300 secured relative to the anchor apparatus(es) 100. As shown in FIG.
- a plurality of anchors 102 and hooks 300 may be secured along the horizontal support beam“b” to support materials, supplies, or safety equipment (e.g., perimeter cable) each identified schematically as reference numeral 400, which, again, is inclusive of electrical lines, plumbing, sprinklers, ductwork, safety cable, safety hooks or netting etc.
- reference numeral 400 which, again, is inclusive of electrical lines, plumbing, sprinklers, ductwork, safety cable, safety hooks or netting etc.
- separate rows of anchors 102 may be positioned for utilization by different construction personnel, e.g., row“rl” of the anchor apparatuses 100 may be used by the electrician, row“r2” of the anchor apparatuses 100 may be used by the plumber, etc.
- the covers 108 could be color-coded, e.g., "red to identify electric, blue for plumbing, orange HVAC, etc.” This also enhances usability and the organizational capabilities of the anchoring system.
- FIGS. 19-21 there is illustrated an exemplary anchor clamp for use with the anchor apparatus 100 of the present disclosure.
- the anchor clamp 500 may be used in lieu of the coupler 200 described in connection with the discussion of FIG. 12-17.
- the anchor clamp 500 is dimensioned and adapted to support materials, supplies, or safety equipment (e.g., perimeter cable) including electrical lines, plumbing, sprinklers, ductwork, safety cable, safety hooks or netting etc.
- the anchor clamp 500 is utilized to support electrical cables or lines when one or more of the anchor clamps 500 are secured to respective ones or more of the construction apparatuses 100.
- the anchor clamp 500 includes a main body 502 having at one end a pair of levers or grips 504 at one end and, at its other end, an anchor coupler 506.
- the grips 504 are interconnected by a bridge 508.
- the anchor coupler 506 is segmented to define two opposed coupler segments 506a which may move in a radial direction towards and away from each other upon corresponding relative movement of the grips 504.
- movement of the grips 504 in a radial inward direction designated by directional arrows GRi
- GRi a radial inward direction
- directional arrows CRo corresponding radial outward movement
- the grips 504 and coupler segments 506a pivot or articulate about the bridge 508 generally, e.g., at the junctures of the bridge 508 and the respective grips 504.
- the anchor coupler 506 may include internal structure 510 such as ribs, threads, protrusions, bumps, knurling etc. to assist in engaging the external thread 114 of the elongate anchor rod 112 thereby securing the anchor coupler 506 to the anchor rod 112.
- the internal structure 510 is in the form of alternating ribs and recesses as shown in FIG. 21.
- the internal structure may include threading.
- the anchor clamp 500 may be made of any suitable material.
- the anchor clamp 500 is formed of two half sections secured to each other via conventional means including screws, adhesives, snap fit, etc.
- the anchor clamp 500 may be monolithically formed of a polymeric material.
- the anchor clamp 500 In its initial or at rest condition, the anchor clamp 500 assumes the condition depicted in FIGS. 19-21.
- the anchor coupler 506 of the anchor clamp defines an internal dimension at least equal to or less than the diameter of the external thread 114 of the anchor apparatus 100 to establish a secured relation with the external thread 114 of the anchor apparatus 100.
- the secured relation is enhanced via engagement of the internal structure 510 (e.g., the ribs, recesses and/or threading) with the external thread 114 of the anchor apparatus 100.
- the coupler segments 506a are displaced (directional arrows CRo) to increase the internal dimension of the anchor coupler 506 for placement about the external thread 114 of the anchor rod 112.
- Release of the grips 504 causes the anchor clamp to move towards its initial condition with the internal structure 510 of the anchor coupler 506 locking onto the external thread 114 of the anchor 102.
- the main body 502 of the anchor clamp 500 defines a passage 512 extending between the bridge 508 and the anchor coupler 506.
- the passage 512 may receive electrical cables or lines therethrough thereby securing the cables along the ceiling, wall or column to which the anchor apparatuses 100 are secured as discussed hereinabove.
- FIG. 22 illustrates the anchor clamp 500 secured to the external threading 114 of the anchor rod 102 of one anchor apparatus. Also shown schematically is an electrical cable/lines 600 extending through the passage of the anchor clamp 500.
- the anchor clamp 500 initially may be secured to the external threading 114 of the anchor rod 102 and the cable 600 passed through the passage 512.
- the cable 600 may be passed through the passage 512 followed by mounting of the anchor clamp 500 to the anchor rod 102.
- a multitude of anchor clamps 500 may be secured to an anchoring system such as that disclosed in connection with the discussion of FIGS. 12-17 to run electrical cables along columns, ceilings, walls, etc.
- the anchor clamp 500 obviates the need for the coupling tool 200.
- the anchor clamp 500 may be secured directly to the anchor rod 102 of each anchor apparatus 100.
- the anchor coupler 506 may include an internal thread as the internal structure, which is dimensioned to threadably engage, via relative rotation of the anchor clamp 500 about the external thread 114 of the anchor 102, to secure the anchor clamp 500 to the anchor 102.
- the locking plate 700 is similar to the locking plate of FIGS. 3A-3C, but includes an internal threaded aperture 702.
- the internal threaded aperture 702 extends at least partially through the locking plate. In embodiments, the internal threaded aperture 702 extends completely through the locking plate 700
- the internal threaded aperture 702 directly cooperates with the external thread 114 of the elongate anchor rod 112 to secure the elongate anchor rod 112 to the locking plate 700.
- the keyed slots 122 present in the locking plate 104 of FIGS. 3A-3C are not required.
- the coupler 106 there is also no need for the coupler 106 in that the anchor rod 112 is secured through the threaded cooperation of its external thread 114 with the threaded aperture 702 of the locking plate 700.
- the elongate anchor rod 112 will screw down through the threaded aperture 702 to abut the form board.
- the elongate anchor rod 112 will be rotated such that the external thread 114 at least partially penetrates the form board.
- the locking plate 700 further includes four fastener openings 704 extending through the locking plate 700 for reception of respective fasteners such as screws or nails utilized to secure the locking plate 700 relative to a form board of a concrete or concrete form.
- the locking plate 700 may include an RFID tag, either active or passive, and identified schematically as reference numeral 708.
- the RFID tag 708 will assist in tracking information regarding the installed anchor apparatus 100 and other installation parameters as discussed hereinbelow. In the alternative, or additionally a bar code may be utilized.
- the locking plate 700 may be removed subsequent to curing of the concrete by rotating the locking plate 700 off the external thread 114 of the anchor rod 112 to permit access to the external thread 114 for subsequent mounting of a tool such as coupling tool 200 or anchor clamp 500 in the manner discussed hereinabove.
- FIGS. 27-29 another embodiment of a device 750 for mounting to the exposed external thread 114 of the elongate anchor rod 112 subsequent to pouring and curing of the concrete column is illustrated.
- the device 750 will be used in lieu of, or prior to, use of the coupling tool 200 or the anchor clamp 500 discussed hereinabove.
- the device 750 includes a head 752 (for example, a hexagonal shaped head), a collar 754 and an internally threaded cylinder 756.
- the device is mounted to the external thread 114 of the elongate anchor rod 112 through threaded engagement of the internal thread 758 of the threaded cylinder 756.
- the device 750 may be color coded to identify the type of equipment (e.g.., electrical, plumbing, ductwork, etc.), to be coupled to the anchor apparatus as discussed hereinabove.
- the device 750 may also protect the external thread 114 of the anchor rod 112 prior to mounting another coupling tool or an anchor clamp such as, for example, the coupling tool 200 or the anchor clamp 500 discussed hereinabove.
- the device 750 may be used to secure various coupling tools to the external thread 114 of the anchor rod 112.
- the device 150 may be used to secure a ring support 760 to the anchor apparatus 100.
- a lock washer 762 may be utilized to facilitate securement of the ring support 760 relative to the external thread 114 of the anchor apparatus 100.
- the ring support 760 may assume various configurations including, but not limited to, semi-circular, oval ring, etc. designs. It is envisioned that various cables, plumbing equipment, HVAC components may be passed through the openings of the ring support 760.
- the elongated anchor rod 112 may include an internal thread as opposed to an external thread.
- the internal thread may couple with external threaded coupling tool, anchors or devices much in the same manner as the prior embodiments.
- other connection mechanisms for the anchor rod 112 and a coupling tool are envisioned including, but not limited to, bayonet couplings, snap fit connections, friction tolerances etc. and as appreciated by one skilled in the art.
- FIG. 30 there is illustrated framework of a comprehensive system and methodology for installation of equipment at a construction site in accordance with one or more embodiments of the present disclosure.
- the system and methodology 800 will be discussed in conjunction with the installation of any of the anchor apparatuses 100 of the present disclosure described hereinabove.
- the system and methodology 800 may have different applications, and can be implemented in the installation of any type of construction equipment.
- the system and methodology include utilizing Building Information Modeling (BML) to develop a model, for example, a 2-D or 3-D model, of the building to be constructed or which is in a partial construction phase, as a template to assist construction personnel in the proper positional installation of the anchor apparatuses 100.
- BML Building Information Modeling
- the model will be utilized to ensure the accurate installation of a plurality of anchor apparatuses 100 at predetermined locations within the construction site as set forth in accordance with the plan, design, existing build codes, OSHA requirements, etc.
- the model will be available through a wireless connection and/or the Internet to be accessed by a portable computing device including, for example, a smartphone, tablet, portable computer, iPhone, etc. (hereinafter, referred to as a PCD) carried by construction personnel, mounted to an actuator or mounted to a telerobot, to assist in identifying the proper location for installation of all anchor apparatuses 100 for any of the equipment installation applications mentioned hereinabove.
- a portable computing device including, for example, a smartphone, tablet, portable computer, iPhone, etc. (hereinafter, referred to as a PCD) carried by construction personnel, mounted to an actuator or mounted to a telerobot, to assist in identifying the proper location for installation of all anchor apparatuses 100 for any of the equipment installation applications mentioned hereinabove.
- the software for generating the model with positional indicators for the anchor apparatuses may be available as a downloaded application on a subscription basis.
- the positional indicators of the respective anchor apparatuses 100 to be installed will be incorporated into the model as input subsequent to the generation of the model as, for example, an overlay, or initially incorporated as data used to generate the original model.
- the model may be continuously updated in response to input from the field, for example, based on data obtained by the PCD at the construction site.
- the system and methodology 800 comprise a main server 802 and the aforementioned PCD 900.
- the main server 800 including a controller or processor 804 having memory 806 with software or logic programmed to perform the various functions associated with the afore-described detection and positional processes.
- the server 802 includes a visual or graphical display 808, a user input 810 such as a computer keyboard and/or mouse and a media interface 812 (e.g., wireless or electrical/mechanical connection such as a USB port or a CD-ROM) to permit import of program instructions in accordance with embodiments of the present application.
- a media interface 812 e.g., wireless or electrical/mechanical connection such as a USB port or a CD-ROM
- the system further includes a Building Information Management (BIM) data management module 814 coupled to a BIM database 816.
- BIM Building Information Management
- the BIM database 816 includes the data utilized in the development of the models or maps, including 2-D or 3-D modeling of the building, to be constructed or developed, or which may be in a partial construction phase.
- the model to be generated by the BIM module 814 is typically detailed with respect to the design, development and construction documentation of building assemblies, systems, equipment and components including heating, HVAC, plumbing, electrical, concrete construction columns, steel I-Beams, flooring, etc.
- the constructed model or models are as complete as possible to include all building assemblies, systems, equipment and components.
- the model or models generated by the BIM module 814 include the locations of all the anchoring apparatuses 100 to be installed at the construction site for all equipment applications.
- the data pertaining to the positional indicators for anchor apparatus location may be available as data within the BIM database 816 when the model is first generated by the BIM module 814. Alternatively, or additionally, this data can be input via the user input and/or interface 810 and incorporated subsequently into the model.
- feedback received from the PCD 900 may be incorporated into the model to update the model as the installation of the anchor apparatuses progresses.
- the server 802 furthers include a network interface I/F 818 which enables communication, wireless or wired, between the server 802 and the PCD 900 at the construction site.
- the network I/F 818 will direct the data to be received and potentially displayed by the PCD 900, and will receive data from the PCD 900.
- the data may be inclusive of only certain portions of the model(s) of interest to construction personnel, e.g., the areas of the building requiring installation of the anchor apparatuses, or include model(s) of the entire building to be constructed.
- the network I/F (which can include, for example, modems, routers and Ethernet cards) enables the system to couple to other data processing systems or devices (such as remote displays or other computing and storage devices) through intervening private or public computer networks (wired and/or wireless).
- processor refers to one or more individual processing devices including, for example, a central processing unit (CPU), a microprocessor, a microcontroller, an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other type of processing circuitry, as well as portions or combinations of such circuitry elements.
- CPU central processing unit
- microprocessor a microcontroller
- ASIC application-specific integrated circuit
- FPGA field programmable gate array
- the term“memory” refers to memory associated with a processor, such as, for example, random access memory (RAM), read only memory (ROM), a removable memory device, a fixed memory device, and/or a flash memory.
- Media interface I/F 812 may be an example of removable memory, while the other types of memory mentioned may be examples of memory 806.
- the terms“memory” and“media” may be viewed as examples of what are more generally referred to as a“computer program product.”
- a computer program product is configured to store computer program code (i.e., software, microcode, program instructions, etc.).
- computer program code when loaded from memory 806 and/or media interface I/F 818 and executed by processor 804 causes the device to perform functions associated with one or more of the components and techniques of system 800.
- processor 804 causes the device to perform functions associated with one or more of the components and techniques of system 800.
- One skilled in the art would be readily able to implement such computer program code given the teachings provided herein.
- the components and techniques described herein may be implemented via a computer program product that includes computer program code stored in a“computer readable storage medium.”
- Other examples of computer program products embodying embodiments of the invention may include, for example, optical or magnetic disks.
- computer program code may be downloaded from a network I/F 918 executed by the system.
- the I/O interface formed by devices 1106 and 1108 may be used for inputting data to the processor 804 and for providing initial, intermediate and/or final results associated with the processor 804.
- the PCD 900 will include the requisite hardware components to communicate or interact with the server 802.
- the PCD includes a network interface I/F 902 having wireless capabilities (e.g., 4G or 5G) to enable wireless communication with the network I/F 818 of the server 802 or any wireless systems installed at the construction site.
- the connection to the server 802 may be through a wired network utilizing Ethernet cables, multiple routers, switches etc. to transfer data.
- the PCD 900 includes a conventional processor 904 and a memory 906 which stores software instructions that are executable by the processor 904.
- the PCD 900 further includes a display 908 such as a LED or LCD screen to display the model data and a user input 910 in the form of, for example, a mouse, keyboard or touchscreen to input data.
- the PCD 900 further includes a position indicator module 912 configured to determine the location or position of the PCD 900 relative to the model generated by the BIM model module 814 of the construction building/site.
- the position indicator module PCD 912 requires installation of a proprietary application downloaded by a user to the memory 906 of the PCD 900, for example, on a subscription basis.
- access to the application may be tiered, i.e., certain tiers may have higher functionality than other tiers resulting in a higher subscription price for the higher function tiers.
- an existing web browser hosting the application may be available.
- the position indicator module 912 can include any type of software capable of receiving input from various sensors or components associated with the PCD 900 to determine the location of the PCD 900 relative to the construction or building site model.
- any conventional outdoor and/or indoor positioning systems as components of the position indicator module 912 are contemplated, and can be incorporated into the position indicator module 912 to determine the precise location of the PCD 802.
- the PCD 900 further includes a plurality of sensors or components which may be utilized individually, or in combination as positioning systems, to track the location of the PCD 900 relative to the generated building model and to provide data relevant to the anchor installation process back to the server.
- sensors include, but are not limited to WIFI 914, Bluetooth 916, a camera 918, a Global Position System (GPS) sensor 920, a gyroscope 922, a magnetometer 924, an accelerometer 926, a proximity sensor 928 and a radio frequency identifier device or sensor (RFID) 930.
- GPS Global Position System
- RFID radio frequency identifier device or sensor
- the GPS sensor 920 is utilized in a conventional manner.
- the GPS sensor 920 is effective in open construction where a direct line of sight to the PCD 900 is available.
- Cellular-based triangulation methodologies with GPS are also envisioned.
- a WIFI positioning methodology such as WPS or Wipes/WFPS may be utilized with the WIFI 914, individually, or in combination with the GPS capabilities, by tracking the location of the PCD 900 relative to nearby known Wi-Fi hotspot(s), one or more of which may be installed at the commercial site.
- Bluetooth Low Energy (BLE) technology may be utilized where signals from reference beacons disposed at the commercial site are at the core of the indoor location technology.
- the PCD 900 detects the signal from the beacon with the Bluetooth 916 and can calculate roughly the distance to the beacon and hence estimate the location of the PCD 900. This data is sent along with the location signal to the reader. Active RFID location tracking systems utilizing active or passive RFID tags positioned as known refence points detectable by the RFID or module 930 are also envisioned.
- the magnetometer 924 of the PCD 900 may be utilized individually or to augment the other methodologies where a“fingerprinting” technology is used to map the magnetic fields at the construction site and then the magnetometer 924 can use that map to find the location of the PCD 900 relative to the generated map.
- an inertial navigation methodology may be utilized that incorporates the accelerometer 926 and the gyroscope 922 of the PCD 900 to continuously calculate the position, the orientation, and the velocity (direction and speed of movement) of the PCD 900 based on an initial reference or known starting point.
- a visual positioning methodology including the camera 918 of the PCD 900 can determine the location of a PCD 900 by decoding location coordinates from visual reference markers which are encoded with the marker’s location coordinates.
- an infrared (IR) sensor station may be mounted to, for example, a tripod and calibrated. Light is emitted from an IR LED reflects off, for example, the PCD 900 or a component to which the PCD is mounted and is captured by a detecting photodiode to produce a signal that is a function of the distance between the sensor and the surface.
- This technology can be used individually or in concert with the aforementioned GPS and position sensors discussed hereinabove to properly locate one or more subsequent anchor placement positions based on a previously stored reference anchor apparatus or some other known reference point within the construction site.
- the RFID sensor 930 of the PCD 900 may be utilized to scan RFID tags mounted to, or associated with, the components of the anchor apparatuses 100 such as tag or code 109 mounted to the cover 108 (FIGs. 5A-5C) or RFID tag 708 of the locking plate 700. Scanning of the RFID tags with the RFID sensor enables the system 900 to gather information and data concerning the anchor apparatuses that are installed or need to be installed.
- the data may include, but is not limited to, manufacturer of the components of the anchor apparatuses, lot numbers, manufacture date, installer, installation date and any other metadata which may be useful to track and forward installation and product details back to the server 802 or the PCD 900. This information would be invaluable for record keeping purposes, progression of anchor installation, etc.
- FIG. 32 a basic flow chart 1000 illustrating a method for installation of the anchoring apparatuses in accordance with an exemplary embodiment of the present disclosure is illustrated.
- a building model for example, a 3-D model, of the building is developed by the BIM Module 814 utilizing conventional building model techniques.
- data is input into the building model to indicate the locations of the sets of anchoring apparatuses to be installed in the building.
- each set of anchoring apparatuses may be assigned to a variety of construction equipment including, but not limited to heating, ventilating, HVAC, electrical, plumbing, safety fences, etc.
- the position indicators for the anchoring apparatuses may appear as an overlay on the map.
- the anchor position indicators may be built into the map in STEP 1002. It is further envisioned that STEP 1004 may be combined and data concerning anchor position indicators incorporated into the original model.
- Each set of anchoring apparatuses 100 may be located within the model of the building site, e.g., the structural concrete columns and supports, at any predefined locations thereby providing a mechanism to eventually install the equipment in an orderly manner without any concerns of misalignment, interference, etc. of the equipment.
- the layout of the equipment to be installed is readily visible via the generated model to personnel at the server 802 end and at the PCD 900 end.
- any adjustments are needed with respect to the location of any of the anchor apparatuses 100, this may be accomplished via the input at the server 802 end or alternatively at the PCA 900 end.
- STEP 1006 the user accesses the PCD and opens the model on the PCD 900 (STEP 1008) and visualizes the locations of the anchor apparatuses 100 the operator is responsible to install. Following the model or map, the operator proceeds to the set of anchoring apparatuses guided by any of the positioning systems discussed hereinabove. (STEP 1010).
- the visual display 908 of the PDA may present a 3-D model at least inclusive of the vertical boards“v” and the horizontal form board“h”, and the surrounding environment to the user.
- the visual display may be indexed, for example, with display cross-hairs“x” corresponding to the positional locations where anchor apparatuses are to be installed.
- the PCD 900 may provide in addition to visual indicia of the location of the visual indicators, an audible indicator (e.g., a beep, a voice indicator), vibrate, activate the light within the PCD 900 or any other means inclusive, but not limited to tactile or visual indicators when the PCD 900 is at the proper location at which the anchor apparatus needs to installed.
- an audible indicator e.g., a beep, a voice indicator
- vibrate activate the light within the PCD 900 or any other means inclusive, but not limited to tactile or visual indicators when the PCD 900 is at the proper location at which the anchor apparatus needs to installed.
- the installer then installs the anchoring apparatuses in the concrete form board as discussed hereinabove at least in connection with FIGS. 6-16. (STEP 1012).
- the data obtained by the RFID tag or bar code may be stored in the PCD 900 and/or transferred back to the server 802 either through instruction by the operator or automatically.
- the data obtained by the RFID scanner 930 provides at least two benefits: 1) provides the metadata associated with the installed anchor apparatus including manufacture, installer, installation date, lot number etc. for record keeping purposes: and 2) provides an indicator that the anchor apparatus at this location has been installed.
- the model is updated to include the information obtained by the RFID scanner 930.
- the operator then continues to install additional anchor apparatuses 100 following the original or the updated model to the next anchor position displayed on the model and installs an additional anchor apparatus 100 in the same manner.
- the operator proceeds to the subsequent position indicators for each of the anchoring apparatuses of the set and repeats at least STEPS 1010-1016 for each anchor apparatus 100.
- the procedure set forth in the flow chart of FIG. 32 may be repeated for each set of anchoring apparatuses 100.
- the first set may be installed to support electrical cable.
- the second set may be installed to support plumbing equipment, etc.
- the model may incorporate different colors as anchor position indicators to correspond with respective equipment to be installed. For example, red to identify electric, blue for plumbing, orange HVAC, etc.
- the model data forwarded from the server end may include only those anchor position indicators associated with installation of a particular equipment.
- the BIM model is updated (STEP 1018) to reflect the installation of the selected anchor apparatuses 100.
- the updated model may incorporate indicia distinguishing anchor locations where an anchor apparatus has been installed anchor apparatus 100 and those positions devoid of an installed anchor apparatus 100.
- an installed anchor apparatus 100 may be indicated as a green circle or dot around the anchor location position on the model and those anchor location positions without an installed anchor apparatus 100 would be labeled with a red circle or dot on the model, or alternatively an installed anchor apparatus 100 would be indicated as a solid circle while an uninstalled anchor apparatus 1000 would be an open circle.
- the flow chart of FIG. 32 includes STEPS that may be combined, may be performed in a different order than as outlined in the chart, and/or some of the STEPS may be omitted.
- an actuator 1100 is provided to automatically install the fasteners of the lock plate into the form work.
- FIG. 34 schematically illustrates one exemplary actuator 1100 in accordance with the present disclosure.
- This actuator 1100 may include any power drive mechanism 1102 coupled to a plunger 1104 adapted for reciprocal movement in the direction of directional arrows zl, z2.
- the drive mechanism 1100 may include, hydraulic, electric pneumatic, magnetic, mechanical, spring-based mechanisms.
- the PCD may be directly mounted to the actuator 1100.
- the actuator 1100 may have a self-feeding mechanism 1106 where locking plates 104, 700 with mounted fasteners are loaded into a chamber of the actuator 1100 and sequentially positioned on the form work at the desired anchor location position.
- the actuator 1100 may be initiated whereby the plunger 1104 coupled to the drive 1002 of the actuator 1100 advances in the direction“Zl” to deposit the locking plate 104, 700 at the anchor location and drives the fasteners through the fastener receiving apertures and into the form work.
- One apparatus which may be adapted to self-feed the locking plate and nails or fasteners is disclosed in ET.S. Patent No. 6,302,310 to Lamb, the entire contents of which are incorporated by reference herein.
- the actuator 1100 may include a processor 1108 coupled with memory 1110 and a battery 1112 for operating the actuator. In addition to controlling movement of the plunger 1104, the processor 1108 may monitor storage life of the battery 1012, number of anchor installations and control operation of an indicator such as a visual indicator apprising the operator of the state of the battery.
- the actuator 1000 includes an interface 1114 to transfer collected data to the server 802 or to the portable computer device 900.
- the actuator 1100 includes a laser depth or distance finder system 1118 adapted to assist the operator in properly locating the actuator apparatus 1100 relative to the anchor installation position. The laser distance system 1118 can properly identify the location between an installed anchor which is used as a reference and an anchor apparatus 100 to be installed knowing the desired distance between anchor apparatuses.
- the laser distance system 1016 may complement the aforementioned positioning systems in ensuring the anchor apparatus 100 is installed at the proper anchor location.
- the laser distance finder 1016 may be the only methodology used to determine the location of the next anchor location position by utilizing one or more prior installed anchors as a reference(s) and working off the reference anchor for subsequent placement of additional anchor apparatuses.
- the laser distance finder 1118 may include an alarm, for example, an audio or visual alarm when the actuator is at the appropriate installation location.
- An audible alarm may become progressively louder, for example, a beeping sound, when the actuator approaches the proper anchor insertion position, and then may provide a steady sound when the actuator is positioned precisely at the anchor insertion location.
- the actuator 1100 may further include a light source (LS) 1120 such as an incandescent or arc lamp, lamps based on discharge of gas, and light-emitting diodes.
- the light source 1120 may be utilized when the actuator 1100 is being used in dark conditions, at night, or when a loss of power occurs at the construction site, etc. It is envisioned that the light source could assist the operator in locating and illuminating the areas for anchor installation. In one embodiment, the light source is an LED.
- a power source (PS) 1122 either external to the actuator or an internal battery (e.g., rechargeable) is also provided to power the components of the actuator 1000.
- the actuator 1100 may be mobile, for example, a robot, a telerobot, a partially manned-robot, totable unmanned robot, etc.
- the movement module (schematically identified as mobile 1124 in FIG. 34) provides self-navigation capabilities to the actuator as controlled by the server 802 or the PCD 900 or a combination of both, memory loaded within the actuator 1100.
- the movement module 1124 would be controlled via signals sent by the server 802 or PCD 900.
- One skilled in the art could readily envision methodologies to control movement of the actuator based on the generated positional signals discussed hereinabove.
- FIG. 35 illustrates a distributed communications/computing network (processing platform) in accordance with which one or more embodiments of the invention can be implemented.
- FIG. 34 depicts a communication system 1200 that includes a plurality of computing devices 1204-1 through 1204-P (herein collectively referred to as computing devices 1204) configured to communicate with one another over a network 1202.
- the network 1202 may include, for example, a global computer network such as the Internet, a wide area network (WAN), a local area network (LAN), a satellite network, a telephone or cable network, or various portions or combinations of these and other types of networks (including wired and/or wireless networks).
- a global computer network such as the Internet
- WAN wide area network
- LAN local area network
- satellite network a telephone or cable network
- telephone or cable network a Globalstar network
- the computing devices 1204 may represent a large variety of devices.
- the computing devices 1204 can include the PDA 900 described hereinabove, a portable device such as a mobile telephone, a smart phone, tablet, computer, a client device, etc.
- the computing devices 1204 may alternatively include a desktop or laptop personal computer (PC), a server, a microcomputer, a workstation, a kiosk, a mainframe computer, or any other information processing device which can implement any or all of the techniques detailed in accordance with one or more embodiments of the invention.
- the server 802 and the PDA 900 may be incorporated as a single unit, and located at the construction site.
- One or more of the computing devices 1204 may also be considered a“user.”
- the term “user,” as used in this context, should be understood to encompass, by way of example and without limitation, a user device, a person utilizing or otherwise associated with the device, or a combination of both. An operation described herein as being performed by a user may therefore, for example, be performed by a user device, a person utilizing or otherwise associated with the device, or by a combination of both the person and the device, the context of which is apparent from the description.
- one or more modules, elements or components described in connection with embodiments of the invention can be located geographically-remote from one or more other modules, elements or components. That is, for example, the modules, elements or components shown and described in the context of FIGs. 30 through and 34 can be distributed in an Internet-based environment, a mobile telephony-based environment, a kiosk-based environment and/or a local area network environment. The system and methodology are not limited to any particular one of these implementation environments.
- the system is configured to enable a user to identify the proper installation for anchor installation at the PCD end (one of the computing devices 1204 in FIG. 35), and the image is transmitted to a remote server (another one of the computing devices 1204 in FIG. 35) for processing and analysis such as detailed herein. At least a portion of the processing and analysis may be performed at the user end.
- a device such as PCD 900 captures an image or enables a user to select an image, and the image is transmitted through either a wired or wireless connection to a server (another one of the computing devices 1204 in FIG. 35) for processing and analysis as described herein. Again, at least a portion of the processing and analysis may be performed at the user end.
- all image capture, processing and analysis can be performed by one or more computing devices (1204 in FIG. 35) that are locally coupled to the LAN.
- the computing system environment shown in FIG. 35 employs a cloud computing platform, where“cloud” refers to a collective computing infrastructure that implements a cloud computing paradigm.
- cloud computing is a model for enabling ubiquitous, convenient, on-demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, and services) that can be rapidly provisioned and released with minimal management effort or service provider interaction.
- Cloud- based computing platforms also sometimes referred to as data centers
- cloud service providers who provide a computing environment for customers (tenants) to run their application programs (e.g. business applications or otherwise).
- the applications are typically run on one or more computing devices (i.e., host devices or hosts), and write data to and read data from one or more storage devices (e.g., hard disk drives, flash drives, etc.).
- the storage devices may be remote from the host devices such that they are connected via a communication network. However, some or all of the storage devices may be part of the same computing devices that implement the hosts.
- the computing system environment shown in FIG. 35 employs blockchain/distributed ledger technology.
- blockchain distributed ledger
- the terms “blockchain,” “ledger” and “distributed ledger” may be used interchangeably.
- the blockchain or distributed ledger protocol is implemented via a distributed, decentralized computer network of compute nodes.
- a given one of the blockchain compute nodes (ledger nodes) resides on a client or the client otherwise has access to a blockchain compute node.
- the compute nodes are operatively coupled in a peer-to-peer communications protocol.
- each compute node is configured to maintain a blockchain which is a cryptographically secured record or ledger of data blocks that represent respective transactions within a given computational environment.
- each blockchain is secured through use of a cryptographic hash function.
- Each blockchain is thus a growing list of data records hardened against tampering and revision, and typically includes a timestamp, current transaction data, and information linking it to a previous block.
- each subsequent block in the blockchain is a data block that includes a given transaction(s) and a hash value of the previous block in the chain, i.e., the previous transaction. That is, each block is typically a group of transactions.
- each data block in the blockchain represents a given set of transaction data plus a set of all previous transaction data.
- the blockchain contains a record of all previous transactions that have occurred in the bitcoin network.
- the bitcoin system was first described in S. Nakamoto,“Bitcoin: A Peer to Peer Electronic Cash System,” 2008, the disclosure of which is incorporated by reference herein in its entirety.
- the locking plate may be magnetically secured at desired locations via use of a metallic locking plate and high strength magnets which may be positioned beneath the plywood form of the concrete form to be cured. This would remove the need to drive fasteners through the locking plate in that the locking plate will be held in the desired position by the respective magnet.
- the high strength magnets and/or the locking plates may be positioned relative to the concrete form by any of the positioning mechanisms discussed hereinabove.
- the use of the high strength magnets enables use of the system in construction methodologies utilizing steel beams in lieu of or in addition to the concrete columns, structures etc. More specifically, either the metallic locking plates or the magnets may be positioned relative to a steel or magnetic beam via any of the aforedescribed positioning systems. Once at their proper locations, either the magnets or the locking plates may be arranged adjacent their designated components. The magnetic forces between the components will maintain the components at the desired calculated locations without the use of fasteners. Thereafter, a drill is passed through the anchor plate to create an opening in the beam. The cover is slid down the anchor rod and the anchor rod is screwed into the cover in a similar manner as previously described.
- the anchor apparatus 2000 includes an anchor rod 2002 (FIGS. 37A-C), a lock plate 2004 (FIGS. 38A-D) and an escutcheon 2006 (FIGS. 39A-D).
- the anchor rod 2002 defines an L-shape similar to the anchor rod in the earlier embodiments.
- the anchor leg 2008 includes an internal thread 2010 extending for a portion of its length.
- the internal thread 2010 may be constant in internal diameter or may vary as shown in FIGS. 37A-C.
- the distal end of the internal thread 2010D defines an internal dimension greater than the proximal end 201 OP of the internal thread 2010.
- the distal internal thread 2010D may have a 3 ⁇ 4 inch internal dimension while the proximal internal thread 201 OP may have a 1 ⁇ 2 inch internal dimension.
- the anchor leg 2008 further includes an outer thread 2012 at its extreme distal end.
- the lock plate 2004 includes a round plate segment 2014 although other shapes are envisioned, and one or more fastener openings 2016 to receive fasteners for securement to the form board.
- the lock plate 2004 further includes an external thread 2018 depending proximally away from the plate segment 2014.
- the external thread 2018 cooperates with the distal internal thread 2010D of the anchor rod to secure the components to each other via a threaded coupling.
- Other methodologies are also envisioned including a bayonet coupling or the like.
- the escutcheon 2006 functions in a similar manner to the cover 108 of FIGS. 1.
- the escutcheon 2006 defines an internal thread 2020 which cooperates with the outer thread 2012 of the anchor rod 2002.
- the escutcheon 2006 prevents concrete from entering the internal area of the escutcheon 2006 and also preserves its inner cavity 2022 for access of the anchor rod 2002.
- the anchor apparatus is used in a similar manner to a prior embodiment.
- the lock plate 2004 is secured to the form board with the use of fasteners.
- the escutcheon 2006 is secured to the anchor rod 2002 via cooperate engagement of internal thread 2020 of the escutcheon 2006 and the outer thread 2012 of the anchor rod 2002.
- the anchor rod 2002 is secured to the lock plate 2004 through the threaded engagement of the external thread 2018 of the lock plate and the inner distal thread 2010D of the anchor rod 2002. (See FIGS. 36A-C).
- the whole assembly is secured relative to the form board. Concrete is formed and the escutcheon 2006 defines a cavity in the concreter to provide access to the anchor rod 2002.
- Anchor apparatus 4000 includes anchor rod 4002, first and second end pieces 4004 and anchor tool 4006. This system may be used in preparation of curved concrete forms, e.g., in a SonotubeTM form although the apparatus has application in straight support structures as well.
- the anchor rod 4002 is generally arcuate or sinusoidal in configuration to resist migration within the cured concrete.
- the anchor rod 4002 includes opposed external threads 4008 at opposite ends of the anchor rod 4002.
- the end pieces 4004 include a collar 4010 and a nose 4012.
- the nose 4012 defines a cylindrical segment 4014 and a generally tapered or conical section 4016.
- the internal passage of at least the nose is threaded 4015 illustrated schematically in one view of FIGS. 42A-D to threadably cooperate with the external threads 4008 of the anchor rod 4002 to couple the two components.
- the internal cavity 4018 of the end piece 4004 defines a circular surface 4020 which is interrupted by generally polygonal segments 4022.
- the anchor tool 4006 secures the end pieces 4004 onto the external threads 4008 of the anchor rod.
- the anchor tool includes an internal structure 4024 corresponding in dimension and configuration to the internal cavity of the end pieces 4004.
- the internal structure 4024 includes an inner peripheral circle 4026 interrupted by polygonal projections 4028 which precisely fit within the respective circular surface 4020 and polygonal segments 4022 of the end pieces 4004.
- the anchor tool 4006 also includes a handle 4028 and an inner socket 4030 remote from the internal structure (i.e., on the other side of the tool) to receive a socket wrench.
- the anchor apparatus 4000 may be utilized with a circular or column concrete form such as the commercially available SonotubeTM form used to make concrete circular columns.
- a circular or column concrete form such as the commercially available SonotubeTM form used to make concrete circular columns.
- opposing holes are drilled in the circular concrete form and one nose of an end piece, e.g., is secured onto the external thread 4008 of the anchor rod 4002.
- the free end of the anchor rod 4002 is passed through a first hole in the circular concrete form and advanced toward the second hole. Once adjacent the second hole the second end piece is introduced into the opposing hole in the circular concrete form and threaded onto the other threaded end 4008 of the anchor rod 4002.
- Both end pieces 4004 are secured against the circular concrete form busing the anchor tool 4006 in the aforedescribed manner, i.e., by engaging the internal structure 4024 including the inner peripheral circle 4026 and the polygonal projections 4028 with the internal cavity 4018 of the end piece 4004 including the circular surface 4020 and the polygonal segments 4022.
- the end pieces 4006 are secured relative to the circular concrete form whereby the conical nose is within the interior of the concrete form and the cylindrical section spans the thickness of the concrete form.
- the collar 4010 is external of the concrete form. Thereafter the concrete is poured into the formed and permitted to cure. Once cured, the end pieces 4006 may be removed with the anchor tool via engagement of the anchor tool with the end pieces and screwed off the external thread of the anchor rod 4002.
- a wrench may also be utilized and introduced within the socket recess 4030 to facilitate removal of the end pieces.
- the external threads 4008 of the anchor rod 4002 are exposed to be coupled with, or to support, construction supplies or equipment such as ductwork, electrical cables, plumbing, sprinklers, safety lines or fences, etc. within a construction site. etc.
- the conical noses 4012 each provides a cavity similar to that described above in connection with the prior embodiments to permit access to the external threads.
- the external threads 4010 will be disposed within the cavity formed by the conical of the nose of the end pieces confined within the outer boundary of the concrete column.
- FIG. 44 is a flow chart 5000 depicting the use of the anchor apparatus 4000.
- opposing holes are drilled into a concrete form, of, for example wood or plastic, and being circular, square etc. or any configuration.
- an end piece is attached to one threaded end of the anchor rod.
- the free end of the anchor rod is advanced within a first hole and advanced toward the opposing hole whereby the nose of the mount end piece enters the first hole and is disposed within the interior of the cement form.
- the nose of the other end piece is advanced within the opposing hole in the concrete form and coupled to the thread of the free end of the anchor rod.
- each end piece is tightened against the cement form.
- STEP 512 cement is poured into the form and let to cure.
- STEP 514 the end pieces are removed with the anchor tool to expose the threads. It is to be appreciated that some of these STEPS may be combined or performed out of sequence as presented herein. In addition, it is also possible that the end pieces may be secured to the anchor rod while the anchor rod is positioned within the cement form. Other variations are also envisioned.
- the present disclosure is directed to a method comprising generating a building model of a building to be constructed at a construction site, identifying within the building model positional locations for installation of one or more anchor apparatuses within structural elements of the building model, transmitting the building model to a portable computing device at the construction site and identifying the location of the portable computing device to a given positional location.
- At least the generating, identifying, transmitting and identifying steps are implemented via at least one processing device comprising a processor and a memory.
- the method may include installing one anchor apparatus at the given positional location.
- the method may further include identifying the location of a second given positional location and further including installing one anchor apparatus at the given positional location.
- the structural elements may include at least one of beams, columns, girders, floors and ceilings.
- the structural elements may include concrete or cement, e.g., initially poured concrete.
- Generating a model may include utilizing a building information modeling module of a server.
- the method may further include utilizing a portable computing device at the construction site to assist an operator to identify the corresponding positional locations of the building. Identifying within the building model positional locations may include utilizing a positional indicator module within the portable computing device to indicate a location of the portable computing device relative to a given positional location on the model. Utilizing the positional indicator may include utilizing at least one component or sensor of the portable computing device to assist in identifying the location of the portable computing device relative to the given positional location.
- Utilizing at least one component or sensor of the portable computing device may include receiving feedback from one or more of WIFI, Bluetooth, a camera, a GPS sensor, a gyroscope, a magnetometer, an accelerometer, a proximity sensor or an RFID sensor of the personal computing device.
- the method may further include scanning visual indicia data on the one or more anchoring apparatuses to ascertain information pertaining to an attribute of manufacture of the one or more anchoring apparatuses or an attribute of installation of the one or more anchoring apparatuses.
- the method may further include transmitting the visual indicia data to one of the portable computing device or a server associated with the portable computing device.
- the attribute of manufacture may include at least one of manufacture, distributer, lot or model of the one or more anchoring apparatuses.
- a computer program product including a non-transitory computer-readable storage medium encoded with computer program code that, when executed on a processor of a computer, causes the computer to implement the steps of the present disclosure.
- a system comprises one or more processors operatively coupled to one or more memories configured to: generate a building model of a building to be constructed at a construction site; identify within the building model positional locations for installation of one or more anchor apparatuses within structural elements of the building model; transmit the building model to a portable computing device at the construction site; and identify the location of the portable computing device to a given positional location.
- an anchoring system for installation in a concrete support comprises at least one anchoring apparatus, including a locking plate configured for securement relative to a form board used to form a concrete support, an elongate anchor including a connector segment at one end for connecting with a construction tool, a coupler mounted to the elongate anchor, the coupler manipulable to be coupled to the locking plate to at least partially secure the elongate anchor to the locking plate and a cover mounted about the elongate anchor and movable for positioning over the coupler and the locking plate.
- the coupler may define a central opening configured to at least partially receive the connector segment of the elongate anchor, and wherein the coupler and the connecting segment include cooperating structure to releasably secure the coupler and the elongate anchor.
- the coupler may define an internal thread at least partially circumscribing the opening and wherein the connector segment of the anchor includes an external thread configured to threadably engage with the internal thread of the couple to releasably secure the coupler and the elongate anchor.
- the locking plate and the coupler may include cooperating structure configured to secure the coupler to the locking plate.
- the locking plate may define a plate aperture and at least one keyed slot adjacent the plate aperture and the coupler may include a central segment defining the coupler opening and at least one wing depending from the central segment, whereby the central segment and the at least one wing respectively receivable within the plate aperture and the at least one keyed slot of the locking plate when in a first rotational orientation of the coupler and the locking plate, and whereby relative rotational movement of the coupler and the locking plate to a second rotational orientation thereof at least partially secures the coupler to the locking plate.
- the locking plate may define two opposed keyed slots and wherein the coupler includes two opposed wings correspondingly dimensioned to be received within the two opposed keyed slots when in the first rotational orientation of the coupler and the locking plate.
- the cover may define a cover passage for reception of the elongate anchor.
- the cover may further define an inner thread circumscribing the cover passage, the inner thread configured to cooperate with the external thread of the elongate anchor to advance the cover relative to the elongate anchor.
- the locking plate may include at least on fastener opening configured to receive a fastener for securing the locking plate to the form board.
- the anchoring system may include a plurality of anchor apparatuses.
- a method of construction comprises anchoring at least one anchor apparatus to a form utilized to create a concrete support structure, including: securing a locking plate of the at least one anchor apparatus to a board of the form; coupling an elongate anchor of the at least one anchor apparatus to the locking plate, the elongate anchor including an external thread; advancing a cover of the at least one anchor apparatus along the elongate anchor for positioning against the board; depositing concrete within the form to create the concrete support structure whereby the cover isolates at least a portion of the external thread of the elongate anchor from the concrete and removing the board to at least partially expose the cover and the at least the portion of the external thread of the elongate anchor.
- Depositing concrete may include establishing an isolated internal cavity within the cover with the at least the portion of the external thread of the anchor extending within the internal cavity.
- Coupling the elongate anchor may include mounting a coupler of the at least one anchor apparatus about the external thread of the elongate anchor and connecting the coupler to the locking plate.
- the coupler may include an internal thread and wherein mounting the coupler includes threadably engaging the coupler with the external thread of the anchor.
- the locking plate may define a plate aperture and at least one keyed slot adjacent the plate aperture and the coupler may include a central segment defining the coupler opening and at least one wing depending from the central segment and further including positioning the central segment and the at least one wing respectively within the plate aperture and the at least one keyed slot of the locking plate and rotating the coupler to secure the coupler and the anchor relative to the locking plate.
- the cover may define a cover passage with an internal thread and wherein advancing the cover includes threadably coupling the internal thread of the cover with the external thread of the elongate anchor.
- the method may further include attaching a tool relative to the at least a portion of the external thread of the anchor subsequent to removing the board.
- the tool may include a threaded segment and wherein attaching the tool includes threadably coupling the tool with the portion of the external thread of the anchor.
- the method may further include supporting construction equipment with the tool.
- the method may also include anchoring a plurality of anchor apparatuses to the form.
- the tool may be an anchor clamp.
- an anchoring system for installation in a concrete support which comprises at least one anchoring apparatus, including a locking plate configured for securement relative to a form board used to form a concrete support, an elongate anchor including a connector segment at one end for connecting with a construction tool, a coupler mounted to the elongate anchor and being manipulable to be coupled to the locking plate to at least partially secure the elongate anchor to the locking plate, a cover mounted about the elongate anchor and movable for positioning over the coupler and the locking plate and an anchor clamp engageable with the connector segment of the elongate anchor.
- construction site is not limited to commercial and residential buildings but includes all sites subject to buildings, repair, maintenance, etc. Such sites include but are not limited to commercial and residential buildings, tunnels, bridges, stadiums, schools, exterior fa ade systems, all precast concrete products and rigging points.
- the anchor apparatus may be installed horizontally, vertically and/or any other orientation encountered during construction at a construction site, and all wet cast applications.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Business, Economics & Management (AREA)
- Computer Hardware Design (AREA)
- Architecture (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Pure & Applied Mathematics (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- General Health & Medical Sciences (AREA)
- Electromagnetism (AREA)
- Health & Medical Sciences (AREA)
- Computer Networks & Wireless Communication (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Joining Of Building Structures In Genera (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/186,247 US10689841B2 (en) | 2018-11-09 | 2018-11-09 | Construction anchoring system, apparatus and methodology |
US201962794905P | 2019-01-21 | 2019-01-21 | |
US201962841217P | 2019-04-30 | 2019-04-30 | |
PCT/US2019/060653 WO2020097589A1 (en) | 2018-11-09 | 2019-11-09 | Systems and methodology for construction management and equipment positioning via building information modeling |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3861498A1 true EP3861498A1 (en) | 2021-08-11 |
EP3861498A4 EP3861498A4 (en) | 2022-10-19 |
Family
ID=70611205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19883168.7A Pending EP3861498A4 (en) | 2018-11-09 | 2019-11-09 | Systems and methodology for construction management and equipment positioning via building information modeling |
Country Status (11)
Country | Link |
---|---|
EP (1) | EP3861498A4 (en) |
JP (1) | JP2022506961A (en) |
KR (1) | KR20210090668A (en) |
CN (1) | CN113261018A (en) |
AU (2) | AU2019376170B2 (en) |
BR (1) | BR112021009060A2 (en) |
CA (1) | CA3119327A1 (en) |
IL (1) | IL283001A (en) |
MX (1) | MX2021005305A (en) |
WO (1) | WO2020097589A1 (en) |
ZA (1) | ZA202103082B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7489279B2 (en) | 2020-09-24 | 2024-05-23 | センクシア株式会社 | Anchor frame and mounting construction management system |
RU2769083C1 (en) * | 2021-03-11 | 2022-03-28 | Денис Олегович Кузнецов | Hardware and software complex for monitoring the processes of building and assembling structures using the bim technology |
CA3164740A1 (en) * | 2021-06-22 | 2022-12-22 | Builtspace Technologies Corp. | System for management of facility construction and maintenance |
CN113428785A (en) * | 2021-06-22 | 2021-09-24 | 筑友智造建设科技集团有限公司 | Hoisting positioning method, device and equipment for construction site component and storage medium |
CN114109039B (en) * | 2021-12-10 | 2023-03-17 | 广东天凛高新科技有限公司 | Mold fastening device and mold fastening method based on NFC passive control |
CN117939086B (en) * | 2024-03-19 | 2024-06-04 | 中通服建设有限公司 | Intelligent monitoring platform and method for digital building |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS423091Y1 (en) * | 1964-03-17 | 1967-02-23 | ||
JPH0340982Y2 (en) * | 1985-12-19 | 1991-08-28 | ||
JPH0414662Y2 (en) * | 1987-04-06 | 1992-04-02 | ||
US6302310B1 (en) | 1998-11-13 | 2001-10-16 | Frederick W. Lamb | Staple or nail gun assembly, cap feeding device for staple or nail gun, and cap assembly |
JP2001269916A (en) * | 2000-03-23 | 2001-10-02 | Flex Syst:Kk | Anchor embedded in concrete and method of manufacturing concrete products using it |
WO2005060421A2 (en) * | 2003-12-05 | 2005-07-07 | Building Construction Solutions, Inc. | Concrete anchor float |
US7103984B2 (en) * | 2004-02-26 | 2006-09-12 | Kastberg David J | Anchor bolt and setting template |
CN102884532B (en) * | 2010-03-09 | 2022-06-10 | 欧特克公司 | System and method for job site management and operation with building information modeling |
US9749780B2 (en) | 2011-02-05 | 2017-08-29 | Apple Inc. | Method and apparatus for mobile location determination |
CA3090083C (en) | 2011-03-18 | 2023-09-19 | Thomas M. Espinosa | Concrete anchor coupling assembly and anchor rod holder |
US9817839B2 (en) * | 2011-11-29 | 2017-11-14 | Trimble Inc. | Managing information at a construction site |
US9539164B2 (en) | 2012-03-20 | 2017-01-10 | Xerox Corporation | System for indoor guidance with mobility assistance |
FR2989196B1 (en) * | 2012-04-05 | 2015-01-30 | Vinci Construction Grands Projets | METHOD FOR GENERATING AN INTERACTIVE DATA DISPLAY INTERFACE. |
JP6567645B2 (en) * | 2014-07-16 | 2019-08-28 | エスアール システムズ リミテッド ライアビリティ カンパニー | Anchor bolt device |
EP3054404A1 (en) * | 2015-02-04 | 2016-08-10 | Hexagon Technology Center GmbH | Work information modelling |
SG11201804559QA (en) * | 2015-12-01 | 2018-06-28 | Vinci Construction | Method and system for assisting installation of elements in a construction work |
US11256833B2 (en) * | 2017-05-05 | 2022-02-22 | Nucor Corporation | System for on-site tracking, managing, planning and staging construction projects |
-
2019
- 2019-11-09 BR BR112021009060-6A patent/BR112021009060A2/en unknown
- 2019-11-09 JP JP2021525125A patent/JP2022506961A/en active Pending
- 2019-11-09 EP EP19883168.7A patent/EP3861498A4/en active Pending
- 2019-11-09 AU AU2019376170A patent/AU2019376170B2/en active Active
- 2019-11-09 CA CA3119327A patent/CA3119327A1/en active Pending
- 2019-11-09 MX MX2021005305A patent/MX2021005305A/en unknown
- 2019-11-09 WO PCT/US2019/060653 patent/WO2020097589A1/en unknown
- 2019-11-09 CN CN201980084867.0A patent/CN113261018A/en active Pending
- 2019-11-09 KR KR1020217017603A patent/KR20210090668A/en unknown
-
2021
- 2021-05-06 IL IL283001A patent/IL283001A/en unknown
- 2021-05-07 ZA ZA2021/03082A patent/ZA202103082B/en unknown
-
2024
- 2024-08-09 AU AU2024205658A patent/AU2024205658A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
MX2021005305A (en) | 2021-08-16 |
ZA202103082B (en) | 2022-12-21 |
EP3861498A4 (en) | 2022-10-19 |
CA3119327A1 (en) | 2020-05-14 |
IL283001A (en) | 2021-06-30 |
BR112021009060A2 (en) | 2021-08-10 |
CN113261018A (en) | 2021-08-13 |
KR20210090668A (en) | 2021-07-20 |
AU2019376170B2 (en) | 2024-05-09 |
AU2019376170A1 (en) | 2021-05-27 |
AU2024205658A1 (en) | 2024-08-29 |
JP2022506961A (en) | 2022-01-17 |
WO2020097589A1 (en) | 2020-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2019376170B2 (en) | Systems and methodology for construction management and equipment positioning via building information modeling | |
US11970871B2 (en) | Construction anchor apparatus and system and methodology of use | |
US10406645B2 (en) | Calibration approach for camera placement | |
US10300573B2 (en) | Measurement, layout, marking, firestop stick | |
US10341618B2 (en) | Infrastructure positioning camera system | |
US20120066019A1 (en) | Construction control system | |
CN109155671A (en) | Use the asset tracking of visible light communication | |
KR101798165B1 (en) | System and method for facilitate construction using an augmented realty | |
Akanmu et al. | Active monitoring and control of light fixtures during building construction and operation: Cyber-physical systems approach | |
RU2795736C2 (en) | Systems and methodology for construction management and equipment location using building information modelling | |
WO2021231613A1 (en) | Construction anchor apparatus and methodology of use | |
US20230228371A1 (en) | Construction anchor apparatus, system and methodology background | |
US10323504B2 (en) | Techniques for determining an angular offset between two objects | |
So et al. | LAN-based building maintenance and surveillance robot | |
US10502561B2 (en) | Techniques for determining an angular offset between two objects | |
US20110022293A1 (en) | Method of Locating and Managing Elements in the Built Environment | |
Saidi et al. | Development and use of the NIST intelligent and automated construction job site testbed | |
Seppänen et al. | Intelligent construction site (icons) project final report | |
EP3547173A1 (en) | Construction management system and method | |
NO344884B1 (en) | NFC Tag and NFC reader device for detecting an Point of Interest, PoI | |
US10689841B2 (en) | Construction anchoring system, apparatus and methodology | |
CN117967991A (en) | Distributed inspection method for water supply pipeline | |
EA040005B1 (en) | SYSTEM AND METHOD FOR AUTOMATIC PLANNING OF STRUCTURES |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20210507 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Free format text: PREVIOUS MAIN CLASS: G06Q0010060000 Ipc: G06F0030130000 |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20220919 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04B 5/00 20060101ALI20220913BHEP Ipc: G06Q 50/08 20120101ALI20220913BHEP Ipc: G06Q 10/06 20120101ALI20220913BHEP Ipc: E04B 1/41 20060101ALI20220913BHEP Ipc: G06F 30/13 20200101AFI20220913BHEP |