EP3717751A1 - System and method for accomodating thermal displacement in a power generation plant - Google Patents
System and method for accomodating thermal displacement in a power generation plantInfo
- Publication number
- EP3717751A1 EP3717751A1 EP18811516.6A EP18811516A EP3717751A1 EP 3717751 A1 EP3717751 A1 EP 3717751A1 EP 18811516 A EP18811516 A EP 18811516A EP 3717751 A1 EP3717751 A1 EP 3717751A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- header
- boiler
- outlet
- steam
- turbine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/006—Auxiliaries or details not otherwise provided for
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/42—Applications, arrangements or dispositions of alarm or automatic safety devices
- F22B37/47—Applications, arrangements or dispositions of alarm or automatic safety devices responsive to abnormal temperature, e.g. actuated by fusible plugs
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B13/00—Steam boilers of fire-box type, i.e. boilers where both combustion chambers and subsequent flues or fire tubes are arranged within the boiler body
- F22B13/14—Component parts thereof; Accessories therefor
- F22B13/16—Stay-bolt connections, e.g. rigid connections
- F22B13/18—Flexible connections, e.g. of ball-and-socket type
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/10—Water tubes; Accessories therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/10—Water tubes; Accessories therefor
- F22B37/104—Connection of tubes one with the other or with collectors, drums or distributors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/42—Applications, arrangements or dispositions of alarm or automatic safety devices
- F22B37/44—Applications, arrangements or dispositions of alarm or automatic safety devices of safety valves
- F22B37/446—Safety devices responsive to overpressure
Definitions
- Embodiments of the invention relate generally to power generation and, more particularly, to a system and method for accommodating thermal displacement in a power generation plant.
- thermodynamic efficiency in a steam turbine -based power plant depends at least in part on the temperature and pressure of the steam, specifically, the higher the temperature and pressure of the steam, the greater the potential efficiency. Consequently, there has been a move in recent years to employ even higher steam temperatures and pressures than in the past. This trend has led to the development of new classes of power plants including a so-called“ultra-supercritical power plant” (which uses steam cycles at temperatures greater than about 600°C and steam pressures in excess of 240 bar), and the advanced ultra-supercritical power plant (which uses steam cycles at even greater temperatures, in the range of about 700°C to about 760°C).
- the steam generator (boiler) can often be in excess of 100 meters tall, and the main steam outlet and hot reheat outlet are typically located in a top portion of the boiler (i.e., well above ground level). Relatively long lengths of main steam piping and hot reheat piping are therefore necessary to connect the main steam outlet headers and hot reheat outlet headers at the top portion of the boiler to the turbines (e.g., the high-pressure turbine and intermediate pressure turbine, respectively), which are typically located at ground level.
- the turbines e.g., the high-pressure turbine and intermediate pressure turbine, respectively
- expansion loops are typically fabricated from standard pipes and elbows, having the same wall thickness and inside diameter of the pipes of the boiler piping system and are conventionally employed to absorb temperature expansion and contraction in steel pipes.
- the use of such expansion loops results in the need for additional pipe length (e.g., to form the expansion loops) and material costs.
- a system for a power generation plant includes a boiler having a superheater, a first header fluidly coupled to an outlet of the superheater and being configured to receive steam from the superheater.
- a turbine is positioned generally adjacent to the outlet of the superheater, and a main steam piping system extends from the first header to the turbine and is arranged to direct a flow of the steam from the first header to the turbine.
- the system also includes a first flexible portion upstream from the first header, fluidly coupled between the first header and the boiler.
- a system for a power generation plant includes a boiler having a superheater and a reheater.
- a main steam outlet header is fluidly coupled to an outlet of the superheater and is arranged to receive steam from the superheater.
- a hot reheat outlet header is fluidly coupled to an outlet of the reheater and is arranged to receive steam from the reheater.
- the system further includes a high-pressure turbine adjacent to the outlet of the superheater, and an intermediate -pressure turbine adjacent to the outlet of the reheater.
- a main steam piping system extends from the main steam outlet header to the high-pressure turbine and is configured to direct a flow of the steam from the main steam piping system to the high- pressure turbine.
- a hot reheat piping system extends from the hot reheat outlet header to the intermediate -pressure turbine and is configured to direct a flow of the steam from the hot reheat piping system to the intermediate -pressure turbine.
- the system includes a first flexible portion upstream from the main steam outlet header which is operative to flex with respect to the main steam outlet header and the boiler in response to a thermal displacement of the boiler; and the system further includes a second flexible portion upstream from the hot reheat outlet header which is operative to flex with respect to the hot reheat outlet header and the boiler in response to the thermal displacement of the boiler.
- FIG. 1 is a schematic illustration of a coal-fired power generation plant, according to an embodiment of the invention.
- FIG. 2 is a perspective view of a main steam piping arrangement and hot reheat piping arrangement of the coal-fired power generation plant of FIG. 1 , according to an embodiment of the invention.
- FIG. 3 is a detailed perspective view of the main steam piping
- FIG. 4 is a detailed perspective view of the hot reheat piping arrangement of FIG. 2.
- FIG. 5 is a cross-sectional view of the main steam piping arrangement and hot reheat piping arrangement of FIG. 2.
- connection refers to a connection, which may be direct or indirect.
- the connection is not necessarily a mechanical attachment.
- “fluidly coupled” or“fluid communication” refers to an arrangement of two or more features such that the features are connected in such a way as to permit the flow of fluid between the features and permits fluid transfer.
- Embodiments of the invention relate to a system and method for accommodating thermal displacements of components in a power generation plant.
- the system includes a boiler having a superheater, a first header fluidly coupled to an outlet of the superheater and being configured to receive steam from the superheater, a turbine elevated to a location generally adjacent to the outlet of the superheater, and a main steam piping system extending from the first header to the turbine and being configured to direct a flow of the steam from the first header to the turbine.
- the system further includes a flexible portion upstream from the first header allowing located between the first header and the boiler and operative to flex in response to to thermal displacement of the boiler.
- the flexible portion may comprise a plurality of flexible or bendable tubes that operatively couple corresponding tubes of the superheater in fluid communication with the first header.
- the system 10 includes a coal fired pressurized boiler 12 to which lead a feedwater line 14 and a steam line 16 are input.
- the boiler 12 may take any configuration known in the art and includes, among other things, a reheater 13, an evaporator, and a superheater 15 for heating steam at high pressure.
- the reheater, evaporator and superheater are formed as tube bundles (i.e., each inherently comprising a plurality of individual tubes) within the boiler 12 and each have an inlet and an outlet, as known in the art. As illustrated in FIG.
- the outlet of the reheater 13 is fluidly coupled to a hot reheat outlet header 21 positioned outside the boiler body on a front side thereof, while the outlet of the superheater 15 is fluidly coupled to a main steam outlet header 19 which is likewise positioned outside the boiler body on a front side thereof.
- Main steam piping 18 and hot reheat piping 20 (also referred to herein as“main steam pipe system” and“hot reheat pipe system”, respectively) lead from the main steam outlet header 19 and the hot reheat outlet header 21 , respectively, to a high- temperature high-pressure steam turbine HP 1 and a high-temperature intermediate- pressure steam turbine IP 1 , respectively.
- a further piping system 22 feeds exhaust gas from boiler 12 to a high- pressure gas turbine HPT.
- the three turbines HPT, HP1 and IP1 together with a high-pressure compressor HPC and a generator Gl , on rotor 25, form a turbo train which is arranged vertically and parallel with boiler 12.
- the high-temperature steam turbines HP1, IP land high-pressure gas turbine HPT operate at high temperatures since their components are manufactured from nickel-based or other specialty alloy materials.
- Main steam piping system 18, hot reheat piping system 20, and piping system 22, are also manufactured from nickel-based or other specialty alloy materials.
- These piping systems 18, 20, 22 each comprise a plurality of pipes that may be run over a minimal length due to the vertical arrangement of the turbines parallel with the boiler. Their minimal length provides a significant cost saving in view of the high costs of the nickel-based or other specialty alloy materials.
- the turbines may simply be elevated from the ground level so as to be in close association with the steam outlets of the boiler (namely, the outlets of the headers from which the turbines are fed).
- feedwater is fed via line 14 into boiler 12, and is there heated in the evaporator and superheater to a temperature in excess of, for example, 700° C at a pressure of 350 bar and, more particularly, to a temperature between about 700° C and 820° C at a pressure of between about 350 bar and 425 bar.
- the superheated steam is fed to the main steam piping system 18 via the header 19, and to high temperature high pressure steam turbine HP1 , where the steam is expanded.
- the expanded steam which still has a temperature in excess of at least 600° C., for example, is then fed via a line 24 to a conventional high-pressure steam turbine HP2.
- a conventional low-pressure steam turbine LP2 and a second generator G2 this forms a conventional turbo train arranged on a second rotor 26.
- the steam expanded in conventional high-pressure steam turbine HP2 is returned via a line 16 (e.g., cold reheat piping) to boiler 12, where it is again heated in the reheater 13.
- This reheated steam is fed to the hot reheat piping system 20 via the header 21 , into high temperature intermediate pressure steam turbine IP 1.
- the steam expanded in IP 1 is fed via a line 28 to conventional intermediate -pressure steam turbine IP2 and there further expanded and further expanded in the series connected low-pressure steam turbine LP2. Finally, the steam is fed to a condensation and feedwater heating facility 50.
- Piping system 22 feeds exhaust gas from boiler 12 via a high -temperature filter 30 to high pressure gas turbine HPT, in which the exhaust gas is expanded.
- the expanded exhaust gas is then fed to a series connected controllable low-pressure gas turbine LPT arranged on a separate rotor.
- the exhaust gas is further expanded therein and then fed to a selective catalytic reducer SCR in order to reduce nitrogen oxides.
- the exhaust gas may then be fed to a series of exhaust gas heated feedwater heaters (not shown).
- FIGS. 2-5 detailed views of the main steam piping system 18 and hot reheat piping system 20 is shown.
- the turbine e.g., high-pressure high temperature steam turbine HP1
- HP1 high-pressure high temperature steam turbine
- the intermediate -pressure turbine IP1 may be elevated so that the hot reheat inlet to the turbine IP 1 is generally adj acent to the hot reheat outlet header 21.
- the main steam outlet header 19 and hot reheat outlet header 21 are therefore positioned on the front side of the boiler such that the outlets of the headers and the inlets of the turbine are in close proximity to one another.
- the turbines may be configured to rotate about a substantially horizontal axis 40, although the vertical arrangement described above may also be utilized without departing from the broader aspects of the invention.
- the turbine may be rotated 90 degrees relative to the conventional arrangement (i.e., rotation axis 40 in the direction of boiler, as shown in FIG. 2) to further position the inlet of the turbine closer to the boiler 12, and to achieve a symmetrical arrangement.
- the turbines are disposed elevated with respect to the ground so that the length of the main steam piping 18 and hot reheat piping 20 (which fluidly connects the main steam outlet header 19 and hot reheat outlet header 21 to the turbine) can be minimized.
- the main steam piping system 18 and hot reheat piping system 20 may be outfitted with main steam bypass valves 42 and hot reheat bypass valves 44 to selectively control the flow of steam therethrough, as shown in FIGS. 2-4.
- the main steam outlet header 19 and hot reheat outlet header 21 are separated from the boiler, and fluidly coupled to the heat exchanger tubing of the superheater 15 and reheater 13, respectively, within the boiler (which absorb heat from the combustion gases passing through the boiler to generate steam) to receive steam and exhaust gasses therefrom.
- the system 100 includes header connecting tube arrays 46 and 48 that fluidly couple the tube bundles of the superheater 15 and the tube bundles of the reheater 13, respectively, to the main steam outlet header 19 and hot reheat outlet header 21 , respectively.
- the connecting tube arrays 46, 48 each comprise plurality of relatively thin- walled, small diameter tubes 45, 47 (in contrast to the thick- walled, relatively large diameter pipes of the main steam piping 18 and hot reheat piping 20).
- the tubes 45, 47 of the connecting tube arrays 45, 48 may be arranged to comprise respective horizontal tube portions 52 in fluid communication with respective vertical tube portions 54.
- the respective horizontal tube portions 52 of the tubes 45, 47 will be elongate, defining a generally horizontal longitudinal axis therethrough; and the respective vertical tube portions 54 of tubes 45, 47 will be elongate and define a generally vertical longitudinal axis therethrough.
- the tubes 45, 47 of the tube arrays 46, 48 will have thinner walls and smaller diameters than the headers 19, 21 and the piping 18, 20, 22, and therefore the tubes 45, 47 of the tube arrays 46, 48 will be more readily flexible in response to heating and cooling of the system 10 than the headers 19, 21 and the piping 18, 20, 22.
- the connecting tubes 45, 47 of the connecting tube arrays 46, 48 are arranged extending from, and in fluid communication with,
- corresponding heat exchanger tubes of the superheater 15 and reheater 13 for example by welding or mechanically coupling, and may generally have the same wall thickness and diameter as the heat exchanger tubes of the superheater and reheater.
- the tubes 45, 47 of the connecting tube arrays 46, 48 may each include a generally horizontal tube portion 52 and a generally vertical tube portion 54.
- the generally horizontal tube portion 52 and the generally vertical tube portion 54 cooperatively define at least one flexible coupling tube portion 56 of system 10.
- the positions of the main steam outlet headers 19 and hot reheat outlet headers 21 are illustrated in relation to a conventional position of the main steam outlet headers 19 and hot reheat outlet headers 21 , which are indicated by reference numerals 60 and 70, respectively.
- this arrangement allows for relatively short lengths to be used for the main steam piping 18 and hot reheat piping 20, while at the same time accommodating, or allowing for, thermal expansion during boiler operation, as discussed hereinafter.
- the headers 19, 21 are located outside the main steel structure of the boiler 12, and are thus essentially‘decoupled’ or separated from the boiler 12.
- the connecting tube arrays 46, 48 extend from the heat exchanger tube bundles within the boiler 12 (e.g., the superheater 15 and reheater 13, respectively), and are fluidly connected to the headers 19, 21 outside the main structure of the boiler 12.
- connecting tube arrays 46, 48 comprise relatively thin-walled tubes having small diameters (e.g., about 1.5 inches in one embodiment)
- these tubes 45, 47 are operative to more readily elastically bend and flex than typical piping having thicker walls and larger diameters that is conventionally fluidly coupled to the heat exchanger tube bundles.
- the horizontal header connecting tube portions 52 of the connecting tube arrays 46, 48 allow for thermal expansion of the boiler in the vertical direction, as they are able to deflect upwardly and downwardly as the boiler expands and contracts in the vertical direction.
- the vertical header connecting tube portions 54 of the connecting tube arrays 46, 48 allow for thermal expansion of the boiler in the horizontal direction and for thermal expansions from the turbine(s), piping 18, 20, and outlet headers 19, 21, as they are able to deflect laterally as these components expand and contract laterally.
- the outlet headers 19, 21 may be supported on z- stops, but they are otherwise able to expand horizontally towards the boiler due to the thermal expansion of the turbine and piping 18, 20.
- the main steam outlet header 19 and/or hot reheat outlet header 21 are moved outside of the main enclosing walls of the boiler 12 and fixedly integrated with the main steam piping system 18 and hot reheat piping 20 system, respectively.
- the system 10 includes a first flexible coupling tube portion 56 disposed upstream from the first header 19 is fluidly coupled between the first header 19 and the boiler 12 operative to flex relative the first header 19 and the boiler 12 in response to a thermal displacement of the boiler.
- system 10 may include a second flexible coupling tube portion 56 upstream from the second header 21 operative to flex relative the second header 21 and the boiler 12 in response to a thermal displacement of the boiler.
- the flexure provided by relatively small diameter tubes 45, 47 of the tube arrays 46, 48 accommodate thermal expansion and contraction of system components, minimizing or preventing the buildup of stresses in the piping 18, 20 system.
- the configuration of the system of the invention namely, the particular arrangement of the main steam piping system, hot reheat piping system, outlet headers and connecting tube arrays discussed above, allows the headers 19, 21 , critical piping systems and turbines to move/expand relative to the boiler 12, and vice versa.
- this configuration arranges at least one flexible coupling tube portion 56 of the system located upstream from the headers 19, 21 (between the superheater/reheater and the headers 19, 21 , indicated generally by flexible coupling tube portion 56 in FIG.
- header connecting tubes have been described herein as being able to bend or flex to provide flexibility to the system to accommodate relative movement between the boiler and headers as a result of their relatively thin-walled and/or smaller diameter construction as compared to the relatively thick- walled and/or larger diameter main steam and hot reheat piping, it is contemplated that the ability to provide relative movement between the boiler and headers may be achieved by other means as well.
- a greater flexing or bending ability may be provided in the header connecting tubes as compared to the main steam and hot reheat piping by varying the parameters of the header connecting tubes as compared to the main steam and hot reheat piping. Varying the parameters may include for example, providing the header connecting tubes with thinner walls, smaller diameter, different material selection, or other different material properties that facilitate bending as compared to the main steam and hot reheat piping.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Control Of Turbines (AREA)
- Turbine Rotor Nozzle Sealing (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201762591471P | 2017-11-28 | 2017-11-28 | |
| PCT/EP2018/082856 WO2019106019A1 (en) | 2017-11-28 | 2018-11-28 | System and method for accomodating thermal displacement in a power generation plant |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP3717751A1 true EP3717751A1 (en) | 2020-10-07 |
Family
ID=64559689
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP18811516.6A Withdrawn EP3717751A1 (en) | 2017-11-28 | 2018-11-28 | System and method for accomodating thermal displacement in a power generation plant |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20200284428A1 (en) |
| EP (1) | EP3717751A1 (en) |
| CN (1) | CN111295499A (en) |
| WO (1) | WO2019106019A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115711385A (en) * | 2022-10-27 | 2023-02-24 | 西安热工研究院有限公司 | Connecting pipe system structure of boiler outlet header and steam turbine |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CH577117A5 (en) * | 1974-04-29 | 1976-06-30 | Sulzer Ag | |
| EP0601262B1 (en) * | 1992-12-10 | 1997-11-19 | Asea Brown Boveri Ag | Pipe subjected to differential dilatations |
| EP1577507A1 (en) * | 2004-03-01 | 2005-09-21 | Alstom Technology Ltd | Coal fired power plant |
| DE102006007238A1 (en) * | 2006-02-15 | 2006-07-27 | Rwe Power Ag | Pipe line assembly and guide on steam generator involves laying pipelines in loops on each other so that temperature-conditioned changes in length act against one another and loops are mutually supported on one another |
| DE102006007239C5 (en) * | 2006-02-15 | 2015-12-17 | Rwe Power Ag | Fastening device for shifting pipelines |
| CN101042058B (en) * | 2007-04-27 | 2011-12-07 | 冯伟忠 | Novel steam-electric generating set |
| US7559294B2 (en) * | 2007-04-26 | 2009-07-14 | Babcock & Wilcox Power Generation Group Inc. | End support configuration for steam tubes of a superheater or reheater |
| CN107091127A (en) * | 2017-04-22 | 2017-08-25 | 冯煜珵 | A kind of plumbing connection system of machine stove compact Layout |
-
2018
- 2018-11-28 WO PCT/EP2018/082856 patent/WO2019106019A1/en not_active Ceased
- 2018-11-28 CN CN201880071351.8A patent/CN111295499A/en active Pending
- 2018-11-28 US US16/765,201 patent/US20200284428A1/en not_active Abandoned
- 2018-11-28 EP EP18811516.6A patent/EP3717751A1/en not_active Withdrawn
Also Published As
| Publication number | Publication date |
|---|---|
| US20200284428A1 (en) | 2020-09-10 |
| CN111295499A (en) | 2020-06-16 |
| WO2019106019A1 (en) | 2019-06-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7874162B2 (en) | Supercritical steam combined cycle and method | |
| EP2507483B1 (en) | Direct evaporator system and method for organic rankine cycle systems | |
| KR101984438B1 (en) | A water supply method, a water supply system that executes this method, and a steam generation facility having a water supply system | |
| EP1752617A2 (en) | Combined cycle power plant | |
| US20140033676A1 (en) | Unique method of solar integration in combined cycle power plant | |
| US20130047611A1 (en) | Solar power plant part of a solar thermal power plant and solar thermal power plant provided with solar collector surfaces for a heat transfer medium and working medium | |
| US9404393B2 (en) | Combined cycle power plant | |
| JP7696705B2 (en) | HEAT EXCHANGER WITH HEAT EXCHANGE TUBES MOVEABLE BETWEEN ALIGNED AND UNALIGNED POSITIONS - Patent application | |
| EP2604821B1 (en) | System and method for thermal control in a gas turbine engine | |
| CN102364244A (en) | An ultra-supercritical boiler with parameters above 700°C with double reheating | |
| WO2018192525A1 (en) | Turbogenerator set | |
| Arpit et al. | A state-of-the-art review of heat recovery steam generators and waste heat boilers | |
| KR20190052118A (en) | Heat exchange systems, cooling systems and cooling methods for gas turbines and gas turbine systems | |
| US10590807B2 (en) | Combined cycle power plant | |
| US20200284428A1 (en) | System and method for accomodating thermal displacement in a power generation plant | |
| US10287922B2 (en) | Steam turbine plant, combined cycle plant provided with same, and method of operating steam turbine plant | |
| US9726154B2 (en) | Steam power plant with integrated solar receiver | |
| US20240133341A1 (en) | Combined cycle power plant having reduced parasitic pumping losses | |
| CN101809252A (en) | Steam turbine equipment | |
| EP3318733B1 (en) | Feedwater bypass system for a desuperheater | |
| KR20170124570A (en) | Reheating the working fluid inside the turbine system for power generation | |
| JP7143107B2 (en) | Combined power plant | |
| CN202303319U (en) | Ultra supercritical boiler with secondary reheating parameters above 700 DEG C | |
| US12031457B2 (en) | Combined cycle power plant having reduced parasitic pumping losses | |
| JPH06294305A (en) | Exhaust heat recovery boiler |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20200521 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: GENERAL ELECTRIC TECHNOLOGY GMBH |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20220805 |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: PIPLICA, TIHOMIR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20221216 |