EP3589045B1 - Procédé et appareil de démodulation à base d'agrégation de porteuses - Google Patents

Procédé et appareil de démodulation à base d'agrégation de porteuses Download PDF

Info

Publication number
EP3589045B1
EP3589045B1 EP17901465.9A EP17901465A EP3589045B1 EP 3589045 B1 EP3589045 B1 EP 3589045B1 EP 17901465 A EP17901465 A EP 17901465A EP 3589045 B1 EP3589045 B1 EP 3589045B1
Authority
EP
European Patent Office
Prior art keywords
demodulation
result
data
base station
pcc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP17901465.9A
Other languages
German (de)
English (en)
Other versions
EP3589045A1 (fr
EP3589045A4 (fr
Inventor
Qiuhua Zhang
Xulei XUE
Jifeng SUN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of EP3589045A1 publication Critical patent/EP3589045A1/fr
Publication of EP3589045A4 publication Critical patent/EP3589045A4/fr
Application granted granted Critical
Publication of EP3589045B1 publication Critical patent/EP3589045B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1829Arrangements specially adapted for the receiver end
    • H04L1/1835Buffer management
    • H04L1/1845Combining techniques, e.g. code combining
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • H04W72/1268Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L27/00Modulated-carrier systems
    • H04L27/26Systems using multi-frequency codes
    • H04L27/2601Multicarrier modulation systems
    • H04L27/2647Arrangements specific to the receiver only
    • H04L27/2649Demodulators
    • H04L27/2653Demodulators with direct demodulation of individual subcarriers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0023Systems modifying transmission characteristics according to link quality, e.g. power backoff characterised by the signalling
    • H04L1/0026Transmission of channel quality indication
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0036Systems modifying transmission characteristics according to link quality, e.g. power backoff arrangements specific to the receiver
    • H04L1/0038Blind format detection
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/004Arrangements for detecting or preventing errors in the information received by using forward error control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/004Arrangements for detecting or preventing errors in the information received by using forward error control
    • H04L1/0056Systems characterized by the type of code used
    • H04L1/0061Error detection codes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1812Hybrid protocols; Hybrid automatic repeat request [HARQ]
    • H04L1/1816Hybrid protocols; Hybrid automatic repeat request [HARQ] with retransmission of the same, encoded, message
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L27/00Modulated-carrier systems
    • H04L27/0012Modulated-carrier systems arrangements for identifying the type of modulation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • H04L5/001Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0044Arrangements for allocating sub-channels of the transmission path allocation of payload
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • H04L5/0057Physical resource allocation for CQI
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0091Signaling for the administration of the divided path
    • H04L5/0096Indication of changes in allocation
    • H04L5/0098Signalling of the activation or deactivation of component carriers, subcarriers or frequency bands
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/02Channels characterised by the type of signal
    • H04L5/06Channels characterised by the type of signal the signals being represented by different frequencies
    • H04L5/10Channels characterised by the type of signal the signals being represented by different frequencies with dynamo-electric generation of carriers; with mechanical filters or demodulators
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L2001/0092Error control systems characterised by the topology of the transmission link

Definitions

  • Embodiments of this application relate to the field of wireless communications technologies, and in particular, to a carrier aggregation-based demodulation method and apparatus.
  • CA Carrier Aggregation
  • LTE-A Long Term Evolution-Advanced
  • the CA technology can aggregate a plurality of consecutive or nonconsecutive component carriers (Component Carrier, CC), to form a wider spectrum for data transmission, thereby increasing a data transmission rate.
  • An aggregated carrier includes one primary component carrier (Primary Component Carrier, PCC) and one or more secondary component carriers (Secondary Component Carrier, SCC).
  • PCC Primary Component Carrier
  • SCC secondary component carriers
  • User equipment User Equipment
  • UE may send uplink data to a base station through an allocated PCC and SCC, and may report a periodic CQI (Channel Quality Indicator, channel quality indicator) to the base station.
  • CQI Channel Quality Indicator, channel quality indicator
  • three periodic CQI report mechanisms are specified in a CA scenario, including: 1. When uplink scheduling is performed on the PCC of the UE, a periodic CQI is sent on a physical uplink shared channel (Physical Uplink Shared Channel, PUSCH) of the PCC in a form of channel associated signaling, that is, there is periodic CQI channel associated signaling on the PUSCH of the PCC; 2. When no uplink scheduling is performed on the PCC of the UE but uplink scheduling is performed on the SCC of the UE, a periodic CQI is sent on a PUSCH of the SCC in a form of channel associated signaling, that is, there is periodic CQI channel associated signaling on the PUSCH of the SCC; and 3.
  • PUSCH Physical Uplink Shared Channel
  • a periodic CQI is sent on a physical uplink control channel (Physical Uplink Control Channel, PUCCH) of the PCC.
  • PUCCH Physical Uplink Control Channel
  • an inter-base station carrier aggregation scenario based on relaxed backhaul that is, a scenario in which there is a relatively high transmission delay
  • a transmission delay is greater than 2 ms
  • the secondary base station may not receive the PCC uplink scheduling result sent by the primary base station. Consequently, whether uplink scheduling is performed on the PCC cannot be determined, and whether there is periodic CQI channel associated signaling on the PUSCH of the SCC cannot be determined, either. Consequently, a correct demodulation format cannot be determined in advance.
  • the secondary base station when receiving, at the periodic CQI reporting moment, the uplink data transmitted on the SCC, the secondary base station does not learn a demodulation format used for demodulation.
  • the prior art provides an SCC scheduling avoidance method, that is, the secondary base station does not perform uplink scheduling on the SCC at the periodic CQI reporting moment, that is, the UE does not transmit uplink data on the SCC. Because uplink scheduling on the SCC is avoided at the periodic CQI reporting moment, the secondary base station does not need to demodulate the uplink data on the SCC at the periodic CQI reporting moment. However, in the method, a particular uplink scheduling opportunity is lost on the SCC, and consequently, an uplink data transmission rate is affected
  • embodiments of this application provide a carrier aggregation-based demodulation method and apparatus.
  • the present invention is set out in the independent claims whereas preferred embodiments and further implementations are outlined in the dependent claims, description and figures.
  • IP radio access network carrier aggregation IP Radio Access Network Carrier Aggregation, IPRAN CA
  • the inter-base station carrier aggregation scenario is a scenario in which carrier aggregation is performed based on component carriers of different base stations, including one primary base station and one or more secondary base stations.
  • the primary base station corresponds to a PCC, and is configured to perform uplink scheduling on the PCC.
  • the secondary base station corresponds to an SCC, and is configured to perform uplink scheduling on the SCC.
  • FIG. 1A is a schematic diagram of an inter-base station carrier aggregation scenario based on relaxed backhaul according to an embodiment of this application. As shown in FIG. 1A , the inter-base station carrier aggregation scenario includes a base station 11, a base station 12, and UE 13.
  • the base station 11 is a primary base station
  • the base station 12 is a secondary base station.
  • the two base stations can serve the UE 13 by using an inter-base station carrier aggregation technology. That is, the UE 13 may transmit uplink data to the base station 11 through a PCC scheduled by the base station 11, or may transmit uplink data to the base station 12 through an SCC scheduled by the base station 12; and when receiving the uplink data of the UE, the base station 12 may further send the uplink data to the base station 11, and the base station 11 processes the uplink data.
  • the base station 11 sends a PCC scheduling result to the base station 12, and the base station 12 cannot immediately receive the PCC scheduling result, and can receive the PCC scheduling result only after a transmission delay. Because of the transmission delay, after the secondary base station completes the uplink scheduling on the SCC, when needing to determine a demodulation format used for demodulating the uplink data on the SCC, the secondary base station may not receive an uplink scheduling result on the PCC that is sent by the primary base station, and consequently cannot determine a correct demodulation format in advance.
  • a maximum inter-base station unidirectional transmission delay is usually less than or equal to 4 ms.
  • the secondary base station when completing the uplink scheduling on the SCC at a CQI reporting moment, the secondary base station usually needs to determine, after 2 ms, the demodulation format used for demodulating the uplink data on the SCC, to prepare demodulation based on the determined demodulation format, and receives, after 2 ms, the uplink data that is sent by the UE on the scheduled SCC, and needs to perform demodulation based on the pre-determined demodulation format.
  • a time interval between the scheduling and determining of the demodulation format is 2 ms
  • a time interval between determining of the demodulation format and the demodulation is also 2 ms, and therefore, a time interval between the scheduling and the demodulation is 4 ms.
  • an inter-base station transmission delay is greater than 2 ms.
  • the primary base station completes the uplink scheduling on the PCC
  • the secondary base station completes the uplink scheduling on the SCC
  • the primary base station sends a PCC uplink scheduling result to the secondary base station.
  • the secondary base station needs to determine, based on the PCC scheduling result of the primary base station, the demodulation format used for demodulating the uplink data on the SCC, because a transmission delay between the primary base station and the secondary base station is greater than 2 ms, the secondary base station does not receive the PCC scheduling result of the primary base station at this time, and consequently, cannot determine the corresponding demodulation format in advance.
  • the secondary base station After 2 ms, when the secondary base station receives the uplink data that is transmitted by the UE on the scheduled SCC and needs to demodulate the uplink data, because the secondary base station does not determine the corresponding demodulation format in advance, the secondary base station cannot successfully demodulate the uplink data at this time, and consequently, cannot obtain, through the demodulation, the data that is transmitted by the UE on the SCC, leading to a data transmission failure.
  • the secondary base station includes a physical layer (LI) and a media access control (Media Access Control, MAC) layer (L2).
  • L2 is used to determine, based on the PCC scheduling result of the primary base station, the demodulation format used for demodulating the uplink data on the SCC, and send a demodulation indication to L1.
  • the demodulation indication carries the determined demodulation format, and is used to instruct L1 to perform demodulation based on the determined demodulation format.
  • L1 is used to receive the demodulation indication sent by the L2 layer, and demodulate the uplink data on the SCC based on the demodulation indication.
  • the secondary base station can receive the PCC uplink scheduling result sent by the primary base station, and may determine, through L2 based on the PCC scheduling result, the demodulation format used for demodulating the uplink data on the SCC, to send a demodulation indication to L1.
  • the demodulation indication is used to instruct L1 to demodulate the uplink data on the SCC based on a format used when there is no periodic CQI channel associated signaling on a PUSCH.
  • the secondary base station may demodulate the uplink data through L1 based on the scheduling indication and the format used when there is no periodic CQI channel associated signaling on the PUSCH.
  • the secondary base station when needing to determine the demodulation format used for demodulating the uplink data on the SCC, the secondary base station does not receive the PCC scheduling result sent by the primary base station, and consequently, cannot send a demodulation indication to L1 through L2. Consequently, when receiving the uplink data that is sent by the UE on the SCC, the secondary base station cannot demodulate the uplink data through L1 based on the demodulation indication.
  • an embodiment of this application provides a carrier aggregation-based demodulation method, to successfully demodulate the uplink data on the SCC at the periodic CQI moment, without a need to avoid uplink scheduling on the SCC, thereby increasing available resources for transmitting the uplink data by UE, and increasing an uplink data transmission rate.
  • FIG. 1B is a schematic structural diagram of a secondary base station 11 according to an embodiment of this application.
  • the secondary base station 11 mainly includes a transmitter 111, a receiver 112, a memory 113, a processor 114, and a communications bus 115.
  • a structure of the secondary base station 11 shown in FIG. 1B does not constitute a limitation on the secondary base station 11, and the secondary base station 11 may include more or fewer components than those shown in the figure, or combine some components, or have a different component arrangement. This is not limited in this embodiment of this application.
  • the transmitter 111 and the receiver 112 are configured to communicate with another device.
  • a PCC scheduling result of a primary base station may be received by using the receiver 112, or uplink data that is sent by UE on an SCC may be received by using the receiver 112, or an SCC scheduling result may be sent to a primary base station by using the transmitter 111.
  • the memory 113 may be configured to store data, for example, may be configured to store the PCC scheduling result sent by the primary base station or the uplink data sent by the UE.
  • the memory 113 may be configured to store one or more running programs and/or modules for performing the carrier aggregation-based demodulation method.
  • the processor 114 is a control center of the secondary base station 11.
  • the processor 114 may be a central processing unit (Central Processing Unit, CPU), a microprocessor, an application-specific integrated circuit (Application-Specific Integrated Circuit, ASIC), or one or more integrated circuits configured to control program execution of the solutions in this embodiment of this application.
  • the processor 114 may run or execute the software program and/or the module stored in the memory 113, and invoke data stored in the memory 113, to implement a carrier aggregation-based demodulation method provided in the following embodiment.
  • the communications bus 115 may include a path for transmitting information between the processor 114 and the memory 113.
  • FIG. 1C is a flowchart of a carrier aggregation-based demodulation method according to an embodiment of this application.
  • Interaction entities of the method include UE, a first base station, and a second base station.
  • the first base station may be a secondary base station, and the second base station may be a primary base station.
  • the method includes the following steps.
  • Step 101 When receiving uplink data that is sent by the UE based on a scheduled SCC, the first base station determines whether a current moment is a periodic CQI reporting moment.
  • the uplink data may be specifically sent on a PUSCH of the SCC, and the PUSCH is an uplink channel for data transmission.
  • a CQI is a communication quality indicator of a radio channel, and is used to indicate channel quality of a given channel; and a higher CQI value indicates better channel quality.
  • the UE needs to monitor each communications channel allocated to the UE, and needs to periodically report a CQI of each communications channel.
  • a CQI report period may be set through negotiation between the base station and the UE.
  • the UE may directly send to-be-sent target data on the SCC.
  • the UE needs to send not only the target data on the SCC but also a CQI.
  • the CQI may be sent on the SCC with the target data, or may be sent on a scheduled PCC.
  • the aperiodic CQI reporting moment is a moment other than the periodic CQI reporting moment, that is, a moment at which no CQI needs to be reported.
  • the second base station when the second base station completes uplink scheduling on the PCC, the second base station sends PCC uplink scheduling information to a corresponding UE; and when the first base station completes uplink scheduling on the SCC, the first base station also sends SCC uplink scheduling information to a corresponding UE.
  • the UE may first determine, based on the PCC uplink scheduling information and the SCC uplink scheduling information of the UE, whether uplink scheduling is performed on the PCC and the SCC of the UE at the CQI reporting moment, and determine, based on a determining result, whether to send a periodic CQI on the SCC with the target data. Specifically, if uplink scheduling is performed on both the PCC and the SCC, the UE sends the periodic CQI on the scheduled PCC; and in this case, the uplink data on the SCC includes only the target data without including the periodic CQI.
  • the UE sends both the target data and the periodic CQI through the scheduled SCC; and in this case, the uplink data on the SCC includes the target data and periodic CQI channel associated signaling.
  • the first base station may first determine whether the current moment is the periodic CQI reporting moment. If the current moment is not the periodic CQI reporting moment, the first base station directly demodulates the uplink data based on a demodulation format used when there is no periodic CQI channel associated signaling on the PUSCH of the SCC; or if the current moment is the periodic CQI reporting moment, the first base station performs the following step 102.
  • Step 102 If the first base station determines that the current moment is the periodic CQI reporting moment, and has not received, when needing to determine a demodulation format used for demodulating uplink data on the SCC before the current moment, a first PCC scheduling result that is of the UE and that is sent by the second base station, the first base station demodulates the uplink data respectively based on a first demodulation format and a second demodulation format, to obtain a first demodulation result, a second demodulation result, a first check result, and a second check result.
  • the first PCC scheduling result is used to indicate whether uplink scheduling is performed on the PCC of the UE at the periodic CQI reporting moment.
  • the first demodulation format is a demodulation format used when there is periodic CQI channel associated signaling on the PUSCH of the SCC.
  • the second demodulation format is a demodulation format used when there is no periodic CQI channel associated signaling on the PUSCH of the SCC.
  • the first demodulation result is a demodulation result obtained by demodulating the uplink data based on the first demodulation format.
  • the second demodulation result is a demodulation result obtained by demodulating the uplink data based on the second demodulation format.
  • the first check result is obtained by checking the first demodulation result in a cyclic redundancy check (Cyclic Redundancy Check, CRC) manner.
  • the second check result is obtained by checking the second demodulation result in the CRC manner.
  • a check result may be used to indicate whether a corresponding demodulation result is correct.
  • the first base station may first perform dual-demodulation on the uplink data, that is, perform the demodulation respectively based on the demodulation format used when there is periodic CQI channel associated signaling on the PUSCH of the SCC and the demodulation format used when there is no periodic CQI channel associated signaling on the PUSCH of the SCC.
  • a demodulation process includes a check processing step, that is, when a demodulation result is obtained through demodulation, a CRC check is further performed on the demodulation result, to obtain a check result. Therefore, when the demodulation is completed, both the demodulation result and the check result are obtained.
  • the CRC check is a most commonly used method for performing error detection on data transmission by using an error detection check code in the field of data communications, and can be used to check correctness and integrity of transmitted data. Therefore, the check result of the demodulation result may be used to indicate whether the corresponding demodulation result is correct.
  • the first base station when needing to determine the demodulation format used for demodulating the uplink data on the SCC before the current moment, the first PCC scheduling result that is of the UE and that is sent by the second base station is used for description.
  • the first base station may determine the demodulation format based on the first PCC scheduling result when needing to determine the demodulation format used for demodulating the uplink data on the SCC, and demodulate the uplink data based on the determined demodulation format.
  • the first base station may send a first demodulation indication to L1 through L2.
  • the first demodulation indication is used to instruct L1 to perform the dual-demodulation on the uplink data, that is, demodulate the uplink data respectively based on the first demodulation format and the second demodulation format.
  • the first base station may determine, through L2 based on the first PCC scheduling result, the demodulation format used for demodulating the uplink data, and send a second demodulation indication to L1 through L2.
  • the second demodulation indication carries the determined demodulation format, and is used to indicate, to L1, that the determined demodulation format is a correct demodulation format, so that L1 performs the demodulation based on the determined demodulation format.
  • Step 103 If the first base station already receives, when the demodulation is completed, the first PCC scheduling result sent by the second base station, the first base station determines, based on the first PCC scheduling result, the first demodulation result, the second demodulation result, the first check result, and the second check result, a demodulation result of correctly demodulating the uplink data.
  • the demodulation result of correctly demodulating the uplink data means that the uplink data is demodulated by using the correct demodulation format, to obtain complete data content, for example, the target data, or the target data and the periodic CQI, transmitted by the UE on the SCC.
  • the determining, by the first base station based on the first PCC scheduling result, the first demodulation result, the second demodulation result, the first check result, and the second check result, a demodulation result of correctly demodulating the uplink data includes either of the following manners:
  • the first base station determines, based on the second demodulation result and the second check result, the demodulation result of correctly demodulating the uplink data.
  • the first base station may determine, based on the second check result and the second demodulation result that is obtained by performing the demodulation based on the second demodulation format, the demodulation result of correctly demodulating the uplink data.
  • the determining, by the first base station based on the second demodulation result and the second check result, the demodulation result of correctly demodulating the uplink data includes either of the following manners:
  • the second demodulation data is data on which HARQ combination can be performed and that is obtained in a process of demodulating the uplink data based on the second demodulation format, and may be specifically data on which the HARQ combination can be performed and that is obtained before decoding processing in the demodulation process.
  • the HARQ retransmission indication is used to instruct the UE to send HARQ retransmission data based on the SCC.
  • the UE When it is determined, by using the second check result, that the second demodulation result is incorrect, it indicates that although the demodulation format is correct, a demodulation failure is also caused due to another interference factor (for example, a high interference scenario or a weak coverage scenario), and consequently, the second demodulation result obtained through the demodulation is incorrect.
  • the UE also needs to be instructed to retransmit data, the retransmitted data is combined with demodulation data in a previous demodulation process, and the demodulation result of correctly demodulating the uplink data is determined based on combined data.
  • a HARQ is a technology formed by combining forward error correction encoding (Forward Error Correction, FEC) and an automatic repeat request (Automatic Repeat Request, ARQ).
  • FEC Forward Error Correction
  • ARQ Automatic Repeat Request
  • a process in which the first base station determines, based on the HARQ retransmission data and the second demodulation data, the demodulation result of correctly demodulating the uplink data includes: when receiving the HARQ retransmission data sent by the UE, demodulating, by the first base station, the HARQ retransmission data respectively based on the first demodulation format and the second demodulation format, and obtaining, from a demodulation process, third demodulation data and fourth demodulation data on which HARQ combination can be performed; if the first base station already receives, during the demodulation, a second PCC scheduling result sent by the second base station, selecting, by the first base station, second target demodulation data from the third demodulation data and the fourth demodulation data based on the second PCC scheduling result; performing HARQ combination on the second demodulation data and the second target demodulation data, obtaining a combination demodulation result based on combined demodulation data, and checking the combination demodulation result; and
  • the second PCC scheduling result is used to indicate whether uplink scheduling is performed on the PCC of the UE at a HARQ retransmission data moment; and the second target demodulation result is demodulation data in the correct demodulation format that is indicated by the second PCC scheduling result.
  • the preset quantity may be set through negotiation between the first base station and the UE, and is usually 4, that is, the UE usually performs a maximum of four HARQ retransmissions.
  • the first base station stops sending a HARQ retransmission indication to the UE, and discards an obtained demodulation result.
  • the first base station if the first base station does not receive, during the demodulation, the second PCC scheduling result sent by the second base station, the first base station performs HARQ combination on the third demodulation data and the fourth demodulation data respectively with the second demodulation data, and decodes and checks combined demodulation data, to obtain two demodulation results and corresponding check results.
  • the first base station determines the correct checked demodulation result as the demodulation result of correctly demodulating the uplink data; or when determining, by using the corresponding check results, that there is no correct checked demodulation result in the two demodulation results, the first base station re-sends HARQ retransmission indication to the UE, until the quantity of times of sending a HARQ retransmission indication to the UE reaches a preset quantity.
  • the first base station determines, based on the first demodulation result and the first check result, the demodulation result of correctly demodulating the uplink data.
  • the first base station may determine, based on the first check result and the first demodulation result that is obtained by performing the demodulation based on the first demodulation format, the demodulation result of correctly demodulating the uplink data.
  • the implementation of determining, by the first base station based on the first demodulation result and the first check result, the demodulation result of correctly demodulating the uplink data is similar to the implementation of determining, by the first base station based on the second demodulation result and the second check result, the demodulation result of correctly demodulating the uplink data. Details are not described herein again.
  • the first base station when the first base station cannot receive, in advance, the PCC scheduling result sent by the second base station and determine the demodulation format, the first base station may directly perform the dual-demodulation on the uplink data on the SCC at the periodic CQI moment, that is, perform the demodulation respectively based on the two formats, namely, a format used when there is the periodic CQI channel associated signaling on the PUSCH of the SCC and a format used when there is no periodic CQI channel associated signaling on the PUSCH of the SCC, and when receiving the PCC scheduling result, determine a final demodulation result based on the PCC scheduling result and the demodulation results of the dual-demodulation, thereby increasing a demodulation success probability of the uplink data on the SCC at the periodic CQI moment.
  • the SCC at the periodic CQI moment can be allocated to the UE for transmitting the uplink data, without a need to avoid uplink scheduling on the SCC, thereby increasing available resources for transmitting the uplink data by the UE, and increasing an uplink data transmission rate.
  • FIG. 1D is a flowchart of another carrier aggregation-based demodulation method according to an embodiment of this application. As shown in FIG. 1D , the method further includes step 104 and step 105.
  • Step 101 When receiving uplink data that is sent by UE based on an SCC, a first base station determines whether a current moment is a periodic CQI reporting moment.
  • Step 102 If the first base station determines that the current moment is the periodic CQI reporting moment, and has not received, when needing to determine a demodulation format used for demodulating uplink data on the SCC before the current moment, a first PCC scheduling result that is of the UE and that is sent by a second base station, the first base station demodulates the uplink data respectively based on a first demodulation format and a second demodulation format, to obtain a first demodulation result, a second demodulation result, a first check result, and a second check result.
  • Step 104 If the first base station does not receive, when the demodulation is completed, the first PCC scheduling result sent by the second base station, the first base station determines, based on the first check result and the second check result, that there is a correct checked demodulation result in the first demodulation result and the second demodulation result.
  • the first base station may determine, based on the first check result, whether the first demodulation result is correct, and determine, based on the second check result, whether the second demodulation result is correct. If either of the demodulation results is correct, it may be determined whether there is a correct checked demodulation result in the first demodulation result and the second demodulation result; or if the two demodulation results are both incorrect, it may be determined that there is no correct checked demodulation result in the first demodulation result and the second demodulation result.
  • the first base station when the first base station receives the first PCC scheduling result that is of the UE and that is sent by the second base station, the first base station may determine, through L2 based on the first PCC scheduling result, the demodulation format used for demodulating the uplink data, and send a second demodulation indication to L1.
  • the second demodulation indication carries the determined demodulation format, and is used to indicate, to L1, that the determined demodulation format is a correct demodulation format of the uplink data. Therefore, if L1 of the first base station does not receive, when the demodulation is completed, the second demodulation indication sent by L2, L1 may determine whether there is a correct checked demodulation result in the first demodulation result and the second demodulation result.
  • Step 105 If the first base station determines that there is a correct checked demodulation result in the first demodulation result and the second demodulation result, the first base station determines the correct checked demodulation result as a demodulation result of correctly demodulating the uplink data on the SCC.
  • the first base station can directly determine, based on an indication of a PCC scheduling result that is sent by the second base station, the correct checked demodulation result as the demodulation result of correctly demodulating the uplink data on the SCC. For example, if the first demodulation result is correct, the first demodulation result is determined as the demodulation result of correctly demodulating the uplink data; or if the second demodulation result is correct, the second demodulation result is determined as the demodulation result of correctly demodulating the uplink data.
  • the first base station when the first base station cannot receive, in advance, the PCC scheduling result sent by the second base station and determine the demodulation format, the first base station may directly perform dual-demodulation on the uplink data on the SCC at the periodic CQI moment; and if the first base station does not receive the first PCC scheduling result when the demodulation is completed, the first base station may directly determine a correct checked demodulation result in demodulation results obtained through the dual-demodulation, as a final demodulation result, thereby increasing a demodulation success probability of the uplink data on the SCC at the periodic CQI moment.
  • the SCC at the periodic CQI moment can be allocated to the UE for transmitting the uplink data, without a need to avoid uplink scheduling on the SCC, thereby increasing available resources for transmitting the uplink data by the UE, and increasing an uplink data transmission rate.
  • the method may further include the following step 106 to step 111 and any branch after step 111.
  • Step 106 If the first base station determines that there is no correct checked demodulation result in the first demodulation result and the second demodulation result, the first base station determines first demodulation data and second demodulation data, where the first demodulation data is data on which HARQ combination can be performed and that is obtained in a process of demodulating the uplink data based on the first demodulation format, and the second demodulation data is data on which HARQ combination can be performed and that is obtained in a process of demodulating the uplink data based on the second demodulation format.
  • the demodulation data is data on which the HARQ combination can be performed and that is obtained before decoding processing in the demodulation process. Determining of the demodulation data is obtaining of data before the decoding processing in the demodulation process.
  • the data may be soft bit data to be decoded by a decoder.
  • Step 107 The first base station sends a hybrid automatic repeat request HARQ retransmission indication to the UE, and waits to receive the first PCC scheduling result sent by the second base station, where the HARQ retransmission indication is used to instruct the UE to send HARQ retransmission data based on the SCC.
  • a purpose of waiting to receive the first PCC scheduling result sent by the second base station is to determine, based on the first PCC scheduling result, demodulation data in the correct demodulation format in the first demodulation data and the second demodulation data, so as to perform HARQ combination subsequently.
  • Step 108 When receiving the first PCC scheduling result sent by the second base station, the first base station selects first target demodulation data from the first demodulation data and the second demodulation data based on the first PCC scheduling result, where the first target demodulation data is demodulation data in a correct demodulation format that is indicated by the first PCC scheduling result.
  • the first base station determines the second demodulation data as the first target demodulation data; or if the first PCC scheduling result is used to indicate that no uplink scheduling is performed on the PCC of the UE at the periodic CQI reporting moment, the first base station determines the first demodulation data as the first target demodulation data.
  • Step 109 When receiving the HARQ retransmission data sent by the UE, the first base station demodulates the HARQ retransmission data respectively based on the first demodulation format and the second demodulation format, and obtains, from a demodulation process, third demodulation data and fourth demodulation data on which HARQ combination can be performed.
  • the data obtained before the decoding processing in the demodulation process may be specifically obtained as the demodulation data, for example, soft bit data on which decoding processing is to be performed and that is sent to the decoder in the demodulation process is obtained as the demodulation data.
  • the third demodulation data is data on which HARQ combination can be performed and that is obtained in a process of demodulating the HARQ retransmission data based on the first demodulation format
  • the fourth demodulation data is data on which HARQ combination can be performed and that is obtained in a process of demodulating the HARQ retransmission data based on the second demodulation format.
  • Step 110 If the first base station does not receive, during the demodulation, a second PCC scheduling result sent by the second base station, the first base station performs HARQ combination on the third demodulation data and the fourth demodulation data respectively with the first target demodulation data, and determines a first combination demodulation result and a second combination demodulation result based on demodulation data obtained after the combination, where the second PCC scheduling result is used to indicate whether uplink scheduling is performed on the PCC of the UE at a HARQ retransmission data moment.
  • the HARQ combination is performed on the third demodulation data and the fourth demodulation data respectively with the first target demodulation data, to obtain first combination demodulation data and second combination demodulation data.
  • the determining a first combination demodulation result and a second combination demodulation result based on demodulation data obtained after the combination includes: performing decoding processing on the first combination demodulation data and the second combination demodulation data respectively, to obtain the first combination demodulation result and the second combination demodulation result.
  • the first base station when the first base station receives the second PCC scheduling result that is of the UE and that is sent by the second base station, the first base station may determine, through L2 based on the second PCC scheduling result, a demodulation format used for demodulating the HARQ retransmission data, and send a second demodulation indication to L1 through L2.
  • the second demodulation indication carries the determined demodulation format, and is used to indicate, to L1, that the determined demodulation format is a correct demodulation format of the HARQ retransmission data.
  • L1 of the first base station does not receive, when the HARQ retransmission data is demodulated, the second demodulation indication sent by L2, L1 may perform the HARQ combination on the third demodulation data and the fourth demodulation data respectively with the first target demodulation data, and determine the first combination demodulation result and the second combination demodulation result based on the demodulation data obtained after the combination.
  • Step 111 The first base station checks the first combination demodulation result and the second combination demodulation result respectively in a CRC manner.
  • the first base station may check the first combination demodulation result and the second combination demodulation result respectively in the CRC manner.
  • L1 of the first base station may perform the check.
  • step 112 When it is determined, through the check, that there is no correct checked demodulation result in the first combination demodulation result and the second combination demodulation result, the following step 112 may be performed; or when it is determined, through the check, that there is a correct checked demodulation result in the first combination demodulation result and the second combination demodulation result, the following step 113 may be performed.
  • Step 112 The first base station re-sends a HARQ retransmission indication to the UE, and waits to receive a PCC scheduling result sent by the second base station, until a quantity of times of sending a HARQ retransmission indication to the UE reaches a preset quantity.
  • the first base station may re-send the HARQ retransmission indication to the UE, and wait to receive the PCC scheduling result sent by the second base station, to determine, based on the subsequently received PCC scheduling result, combination demodulation data in the correct demodulation format from demodulation data obtained after previous retransmission and combination, combine, decode, and check the obtained combination demodulation data in the correct demodulation format and subsequent retransmission data, and determine a correct checked demodulation result as the demodulation result of correctly demodulating the uplink data on the SCC.
  • the HARQ retransmission indication is re-sent to the UE, and the PCC scheduling result sent by the second base station waits to be received, until the quantity of times of sending a HARQ retransmission indication to the UE reaches a preset quantity.
  • the preset quantity may be set through negotiation between the first base station and the UE, and is usually 4, that is, the UE usually performs a maximum of four HARQ retransmissions.
  • the first base station stops sending a HARQ retransmission indication to the UE, and discards an obtained demodulation result.
  • the preset quantity is 4, after fourth-time HARQ retransmission data is received, if there is still no correct checked demodulation result in demodulation results obtained from the fourth-time retransmission data and combination demodulation data obtained in a third retransmission, sending of a HARQ retransmission indication to the UE may be stopped, and an obtained demodulation result is discarded. However, if there is a correct checked demodulation result, the correct checked demodulation result may be determined as the demodulation result of correctly demodulating the uplink data.
  • Step 113 The first base station determines a correct checked demodulation result as the demodulation result of correctly demodulating the uplink data.
  • the first base station may directly determine the correct checked demodulation result as the demodulation result of correctly demodulating the uplink data, to obtain complete and accurate data content transmitted by the UE through the SCC, without a need to send a HARQ retransmission indication to the UE.
  • the first base station when the first base station cannot receive, in advance, the PCC scheduling result sent by the second base station and determine the demodulation format, the first base station may directly perform the dual-demodulation on the uplink data on the SCC at the periodic CQI moment; and if the first base station does not receive the first PCC scheduling result when the demodulation is completed, and there is no correct checked demodulation result in the demodulation results obtained through the dual-demodulation, the first base station may further send the retransmission indication to the UE, to determine the final demodulation result with reference to the demodulation results obtained through the dual-demodulation and the retransmission data, thereby increasing the demodulation success probability of the uplink data on the SCC at the periodic CQI moment.
  • the SCC at the periodic CQI moment can be allocated to the UE for transmitting the uplink data, without a need to avoid uplink scheduling on the SCC, thereby increasing available resources for transmitting the uplink data by the UE, and increasing an uplink data transmission rate.
  • the first base station may already receive, when demodulating the HARQ retransmission data respectively based on the first demodulation format and the second demodulation format, the second PCC scheduling result sent by the second base station. That is, as shown in FIG. IF, after step 109, the method may further include the following step 114 to step 116.
  • Step 114 If the first base station already receives, when demodulating the HARQ retransmission data respectively based on the first demodulation format and the second demodulation format, the second PCC scheduling result sent by the second base station, the first base station selects second target demodulation data from the third demodulation data and the fourth demodulation data based on the second PCC scheduling result, where the second target demodulation result is demodulation data in a correct demodulation format that is indicated by the second PCC scheduling result.
  • the second PCC scheduling result is used to indicate whether uplink scheduling is performed on the PCC of the UE at a HARQ retransmission data moment, and the first base station may determine, based on the second PCC scheduling result, the correct demodulation format used for demodulating the HARQ retransmission data, and then select demodulation data in the correct demodulation format from the third demodulation data and the fourth demodulation data, as the second target demodulation data.
  • the first base station when the first base station receives the second PCC scheduling result of the UE, the first base station may determine, through L2 based on the second PCC scheduling result, the demodulation format used for demodulating the HARQ retransmission data, and send a second demodulation indication to L1 through L2.
  • the second demodulation indication carries the determined demodulation format, and is used to indicate, to L1, that the determined demodulation format is a correct demodulation format of the HARQ retransmission data.
  • L1 of the first base station already receives, when the HARQ retransmission data is demodulated, the second demodulation indication sent by L2, L1 may select the demodulation data in the correct demodulation format from the third demodulation data and the fourth demodulation data based on the second demodulation indication, as the second target demodulation data.
  • Step 115 The first base station performs HARQ combination on the first target demodulation data and the second target demodulation data, and determines a third combination demodulation result based on demodulation data obtained after the combination.
  • the determining a third combination demodulation result based on demodulation data obtained after the combination includes: performing decoding processing on the demodulation data obtained after the combination, to obtain the third combination demodulation result.
  • Step 116 The first base station determines, based on the third combination demodulation result, the demodulation result of correctly demodulating the uplink data on the SCC.
  • the determining, by the first base station based on the third combination demodulation result, the demodulation result of correctly demodulating the uplink data on the SCC includes: checking, by the first base station, the third combination demodulation result in the CRC manner; and if it is determined, through the check, that the third combination demodulation result is correct, determining the third combination demodulation result as the demodulation result of correctly demodulating the uplink data; or if it is determined, through the check, that the third combination demodulation result is incorrect, re-sending a HARQ retransmission indication to the UE, until the quantity of times of sending a HARQ retransmission indication to the UE reaches the preset quantity.
  • the first base station when the first base station cannot receive, in advance, the PCC scheduling result sent by the second base station and determine the demodulation format, the first base station may directly perform the dual-demodulation on the uplink data on the SCC at the periodic CQI moment; and if the first base station does not receive the first PCC scheduling result when the demodulation is completed, and there is no correct checked demodulation result in the demodulation results obtained through the dual-demodulation, the first base station may further send the retransmission indication to the UE, to determine the final demodulation result with reference to the demodulation results obtained through the dual-demodulation and the retransmission data, thereby increasing the demodulation success probability of the uplink data on the SCC at the periodic CQI moment.
  • the SCC at the periodic CQI moment can be allocated to the UE for transmitting the uplink data, without a need to avoid uplink scheduling on the SCC, thereby increasing available resources for transmitting the uplink data by the UE, and increasing an uplink data transmission rate.
  • FIG. 2A is a schematic structural diagram of a carrier aggregation-based demodulation apparatus according to an embodiment of this application.
  • the carrier aggregation-based demodulation apparatus may be implemented by software, hardware, or a combination thereof.
  • the carrier aggregation-based demodulation apparatus may include:
  • the apparatus further includes:
  • the apparatus further includes:
  • the apparatus further includes:
  • the apparatus further includes: a fourth determining module 215, configured to perform an operation performed by the first base station in step 113.
  • the carrier aggregation-based demodulation apparatus may directly perform the dual-demodulation on the uplink data on the SCC at the periodic CQI moment; and if the carrier aggregation-based demodulation apparatus does not receive the first PCC scheduling result when the demodulation is completed, and there is no correct checked demodulation result in the demodulation results obtained through the dual-demodulation, the carrier aggregation-based demodulation apparatus may further send the retransmission indication to the UE, to determine the final demodulation result with reference to the demodulation results obtained through the dual-demodulation and the retransmission data, thereby increasing a demodulation success probability of the uplink data on the SCC at the periodic CQI moment.
  • the SCC at the periodic CQI moment can be allocated to the UE for transmitting the uplink data, without a need to avoid uplink scheduling on the SCC, thereby increasing available resources for transmitting the uplink data by the UE, and increasing an uplink data transmission rate.
  • the carrier aggregation-based demodulation apparatus provided in the foregoing embodiment implements the carrier aggregation-based demodulation method
  • division of the foregoing functional modules is used as an example for description.
  • the foregoing functions can be allocated to different functional modules and implemented according to a requirement, that is, an inner structure of the device is divided into different functional modules to implement all or some of the functions described above.
  • the carrier aggregation-based demodulation apparatus provided in the foregoing embodiment belongs to a same concept as the embodiment of the carrier aggregation-based demodulation method.
  • the method embodiment For a specific implementation process of the carrier aggregation-based demodulation apparatus, refer to the method embodiment. Details are not described herein again.
  • All or some of the foregoing embodiments may be implemented by using software, hardware, firmware, or any combination thereof.
  • the embodiments may be implemented completely or partially in a form of a computer program product.
  • the computer program product includes one or more computer instructions.
  • the computer may be a general-purpose computer, a dedicated computer, a computer network, or other programmable apparatuses.
  • the computer instructions may be stored in a computer-readable storage medium or may be transmitted from a computer-readable storage medium to another computer-readable storage medium.
  • the computer instructions may be transmitted from a website, a computer, a server, or a data center to another website, computer, server, or data center in a wired (for example, a coaxial cable, an optical fiber, or a digital subscriber line (Digital Subscriber Line, DSL)) or wireless (for example, infrared, radio, or microwave) manner.
  • the computer-readable storage medium may be any usable medium accessible by a computer, or a data storage device, such as a server or a data center, integrating one or more usable media.
  • the usable medium may be a magnetic medium (for example, a floppy disk, a hard disk, or a magnetic tape), an optical medium (for example, a digital versatile disc (Digital Versatile Disc, DVD)), a semiconductor medium (for example, a solid-state disk (Solid State Disk, SSD)), or the like.
  • a magnetic medium for example, a floppy disk, a hard disk, or a magnetic tape
  • an optical medium for example, a digital versatile disc (Digital Versatile Disc, DVD)
  • a semiconductor medium for example, a solid-state disk (Solid State Disk, SSD)
  • the program may be stored in a computer-readable storage medium.
  • the storage medium may include: a read-only memory, a magnetic disk, or an optical disc.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Detection And Prevention Of Errors In Transmission (AREA)

Claims (14)

  1. Procédé de démodulation à base d'agrégation de porteuses, dans lequel le procédé comprend :
    lors de la réception de données de liaison montante qui sont envoyées par un équipement utilisateur, UE, sur la base d'une porteuse composante secondaire, SCC, planifiée, la détermination, par une première station de base, de si un moment actuel est un moment de rapport d'indicateur de qualité de canal, CQI, périodique ;
    si la première station de base détermine que le moment actuel est le moment de rapport CQI périodique et n'a pas reçu, lors du besoin de déterminer un format de démodulation utilisé pour démoduler des données de liaison montante envoyées sur la SCC avant le moment actuel, un premier résultat de planification de porteuse composante primaire, PCC, qui est de l'UE et qui est envoyé par une seconde station de base, la démodulation, par la première station de base, des données de liaison montante respectivement sur la base d'un premier format de démodulation et d'un second format de démodulation, pour obtenir un premier résultat de démodulation, un second résultat de démodulation , un premier résultat de contrôle, et un second résultat de contrôle, dans lequel
    le premier résultat de planification PCC est utilisé pour indiquer si une planification de liaison montante est réalisée sur une PCC de l'UE au moment de rapport CQI périodique ; le premier format de démodulation est un format de démodulation utilisé lorsqu'il y a une signalisation associée à un canal CQI périodique sur un canal partagé de liaison montante physique, PUSCH, de la SCC ; le second format de démodulation est un format de démodulation utilisé lorsqu'il n'y a pas de signalisation associée à un canal CQI périodique sur le PUSCH de la SCC ; le premier résultat de contrôle est obtenu en contrôlant le premier résultat de démodulation d'une manière de contrôle de redondance cyclique, CRC ; et le second résultat de contrôle est obtenu en contrôlant le second résultat de démodulation de la manière CRC ; et
    si la première station de base reçoit déjà, lorsque la démodulation est achevée, le premier résultat de planification PCC envoyé par la seconde station de base, la détermination, par la première station de base sur la base du premier résultat de planification PCC, du premier résultat de démodulation, du second résultat de démodulation, du premier résultat de contrôle, et du second résultat de contrôle, d'un résultat de démodulation de la démodulation correcte des données de liaison montante.
  2. Procédé selon la revendication 1, dans lequel la détermination, sur la base du premier résultat de planification PCC, du premier résultat de démodulation, du second résultat de démodulation, du premier résultat de contrôle, et du second résultat de contrôle, d'un résultat de démodulation de la démodulation correcte des données de liaison montante comprend :
    lorsque le premier résultat de planification PCC indique que la planification de liaison montante est réalisée sur la PCC de l'UE au moment de rapport CQI périodique, la détermination, sur la base du second résultat de démodulation et du second résultat de contrôle, du résultat de démodulation de la démodulation correcte des données de liaison montante ; ou
    lorsque le premier résultat de planification PCC indique qu'aucune planification de liaison montante n'est réalisée sur la PCC de l'UE au moment de rapport CQI périodique, la détermination, sur la base du premier résultat de démodulation et du premier résultat de contrôle, du résultat de démodulation de la démodulation correcte des données de liaison montante.
  3. Procédé selon la revendication 1 ou 2, dans lequel le procédé comprend en outre :
    si la première station de base ne reçoit pas, lorsque la démodulation est achevée, le premier résultat de planification PCC envoyé par la seconde station de base, la détermination, par la première station de base sur la base du premier résultat de contrôle et du second résultat de contrôle, de s'il y a un résultat de démodulation contrôlé correct dans le premier résultat de démodulation et le second résultat de démodulation ; et
    si la première station de base détermine qu'il y a un résultat de démodulation contrôlé correct dans le premier résultat de démodulation et le second résultat de démodulation, la détermination, par la première station de base, du résultat de démodulation contrôlé correct comme le résultat de démodulation de la démodulation correcte des données de liaison montante sur la SCC.
  4. Procédé selon la revendication 3, dans lequel le procédé comprend en outre :
    si la première station de base détermine qu'il n'y a pas de résultat de démodulation contrôlé correct dans le premier résultat de démodulation et le second résultat de démodulation, la détermination, par la première station de base, de premières données de démodulation et de deuxièmes données de démodulation, dans lequel les premières données de démodulation sont des données sur lesquelles une combinaison HARQ peut être réalisée et qui sont obtenues dans un processus de démodulation des données de liaison montante sur la base du premier format de démodulation, et les deuxièmes données de démodulation sont des données sur lesquelles une combinaison HARQ peut être réalisée et qui sont obtenues dans un processus de démodulation des données de liaison montante sur la base du second format de démodulation ;
    l'envoi, par la première station de base, d'une indication de retransmission de demande de répétition automatique hybride, HARQ, à l'UE, et l'attente de recevoir le premier résultat de planification PCC envoyé par la seconde station de base, dans lequel l'indication de retransmission HARQ est utilisée pour donner pour instruction à l'UE d'envoyer des données de retransmission HARQ sur la base de la SCC ;
    lors de la réception du premier résultat de planification PCC envoyé par la seconde station de base, la sélection, par la première station de base, de premières données de démodulation cibles parmi les premières données de démodulation et les deuxièmes données de démodulation sur la base du premier résultat de planification PCC, dans lequel les premières données de démodulation cibles sont des données de démodulation dans un format de démodulation correct qui est indiqué par le premier résultat de planification PCC ;
    lors de la réception des données de retransmission HARQ envoyées par l'UE, la démodulation, par la première station de base, des données de retransmission HARQ respectivement sur la base du premier format de démodulation et du second format de démodulation, et l'obtention, à partir d'un processus de démodulation, de troisièmes données de démodulation et de quatrièmes données de démodulation sur lesquelles une combinaison HARQ peut être réalisée ;
    si la première station de base ne reçoit pas, pendant la démodulation, un second résultat de planification PCC envoyé par la seconde station de base, la réalisation, par la première station de base, d'une combinaison HARQ sur les troisièmes données de démodulation et les quatrièmes données de démodulation respectivement avec les premières données de démodulation cibles, et la détermination d'un premier résultat de démodulation de combinaison et d'un deuxième résultat de démodulation de combinaison sur la base de données de démodulation obtenues après la combinaison, dans lequel le second résultat de planification PCC est utilisé pour indiquer si une planification de liaison montante est réalisée sur la PCC de l'UE à un moment de données de retransmission HARQ ; et
    le contrôle, par la première station de base, du premier résultat de démodulation de combinaison et du deuxième résultat de démodulation de combinaison respectivement de la manière CRC, et lors de la détermination, par le biais du contrôle, qu'il n'y a pas de résultat de démodulation contrôlé correct dans le premier résultat de démodulation de combinaison et le deuxième résultat de démodulation de combinaison, le renvoi d'une indication de retransmission HARQ à l'UE, et l'attente de recevoir un résultat de planification PCC envoyé par la seconde station de base, jusqu'à ce qu'une quantité de fois d'envoi d'une indication de retransmission HARQ à l'UE atteigne une quantité prédéfinie.
  5. Procédé selon la revendication 4, dans lequel le procédé comprend en outre :
    si la première station de base reçoit déjà, pendant la démodulation, le second résultat de planification PCC envoyé par la seconde station de base, la sélection, par la première station de base, de secondes données de démodulation cibles parmi les troisièmes données de démodulation et les quatrièmes données de démodulation sur la base du second résultat de planification PCC, dans lequel le second résultat de démodulation cible est des données de démodulation dans le format de démodulation correct qui est indiqué par le second résultat de planification PCC ;
    la réalisation, par la première station de base, d'une combinaison HARQ sur les premières données de démodulation cibles et les secondes données de démodulation cibles, et la détermination d'un troisième résultat de démodulation de combinaison sur la base de données de démodulation obtenues après la combinaison ; et
    la détermination, par la première station de base sur la base du troisième résultat de démodulation de combinaison, du résultat de démodulation de la démodulation correcte des données de liaison montante sur la SCC.
  6. Procédé selon la revendication 4, dans lequel le procédé comprend en outre :
    lors de la détermination, par le biais du contrôle, qu'il y a un résultat de démodulation contrôlé correct dans le premier résultat de démodulation de combinaison et le deuxième résultat de démodulation de combinaison, la détermination, par la première station de base, du résultat de démodulation contrôlé correct comme le résultat de démodulation de la démodulation correcte des données de liaison montante.
  7. Appareil de démodulation à base d'agrégation de porteuses, appliqué à une première station de base, dans lequel l'appareil comprend :
    un premier module de jugement, configuré pour : lorsque des données de liaison montante qui sont envoyées par un équipement utilisateur, UE, sur la base d'une porteuse composante secondaire, SCC, planifiée sont reçues, déterminer si un moment actuel est un moment de rapport d'indicateur de qualité de canal, CQI, périodique ;
    un premier module de démodulation, configuré pour : si le moment actuel est le moment de rapport CQI périodique et qu'un premier résultat de planification de porteuse composante primaire, PCC, qui est de l'UE et qui est envoyé par une seconde station de base n'a pas été reçu lorsqu'un format de démodulation utilisé pour démoduler des données de liaison montante sur la SCC a besoin d'être déterminé avant le moment actuel, démoduler les données de liaison montante respectivement sur la base d'un premier format de démodulation et d'un second format de démodulation, pour obtenir un premier résultat de démodulation, un second résultat de démodulation, un premier résultat de contrôle, et un second résultat de contrôle, dans lequel
    le premier résultat de planification PCC est utilisé pour indiquer si une planification de liaison montante est réalisée sur une PCC de l'UE au moment de rapport CQI périodique ; le premier format de démodulation est un format de démodulation utilisé lorsqu'il y a une signalisation associée à un canal CQI périodique sur un canal partagé de liaison montante physique, PUSCH, de la SCC ; le second format de démodulation est un format de démodulation utilisé lorsqu'il n'y a pas de signalisation associée à un canal CQI périodique sur le PUSCH de la SCC ; le premier résultat de contrôle est obtenu en contrôlant le premier résultat de démodulation d'une manière de contrôle de redondance cyclique, CRC ; et le second résultat de contrôle est obtenu en contrôlant le second résultat de démodulation de la manière CRC ; et
    un premier module de détermination, configuré pour : si le premier résultat de planification PCC envoyé par la seconde station de base est déjà reçu lorsque la démodulation est achevée, déterminer, sur la base du premier résultat de planification PCC, du premier résultat de démodulation, du second résultat de démodulation, du premier résultat de contrôle, et du second résultat de contrôle, un résultat de démodulation de la démodulation correcte des données de liaison montante.
  8. Appareil selon la revendication 7, dans lequel le premier module de détermination est configuré pour :
    lorsque le premier résultat de planification PCC indique que la planification de liaison montante est réalisée sur la PCC de l'UE au moment de rapport CQI périodique, déterminer, sur la base du second résultat de démodulation et du second résultat de contrôle, le résultat de démodulation de la démodulation correcte des données de liaison montante ; ou
    lorsque le premier résultat de planification PCC indique qu'aucune planification de liaison montante n'est réalisée sur la PCC de l'UE au moment de rapport CQI périodique, déterminer, sur la base du premier résultat de démodulation et du premier résultat de contrôle, le résultat de démodulation de la démodulation correcte des données de liaison montante.
  9. Appareil selon la revendication 7 ou 8, dans lequel l'appareil comprend en outre :
    un second module de jugement, configuré pour : si le premier résultat de planification PCC envoyé par la seconde station de base n'est pas reçu lorsque la démodulation est achevée, déterminer, sur la base du premier résultat de contrôle et du second résultat de contrôle, s'il y a un résultat démodulation contrôlé correct dans le premier résultat de démodulation et le second résultat de démodulation ; et
    un deuxième module de détermination, configuré pour : s'il y a un résultat de démodulation contrôlé correct dans le premier résultat de démodulation et le second résultat de démodulation, déterminer le résultat de démodulation contrôlé correct comme le résultat de démodulation de la démodulation correcte des données de liaison montante sur la SCC.
  10. Appareil selon la revendication 9, dans lequel l'appareil comprend en outre :
    un troisième module de détermination, configuré pour : s'il n'y a pas de résultat de démodulation contrôlé correct dans le premier résultat de démodulation et le second résultat de démodulation, déterminer des premières données de démodulation et des deuxièmes données de démodulation, dans lequel les premières données de démodulation sont des données sur lesquelles une combinaison HARQ peut être réalisée et qui sont obtenues dans un processus de démodulation des données de liaison montante sur la base du premier format de démodulation, et les deuxièmes données de démodulation sont des données sur lesquelles une combinaison HARQ peut être réalisée et qui sont obtenues dans un processus de démodulation des données de liaison montante sur la base du second format de démodulation ;
    un premier module de retransmission, configuré pour : envoyer une indication de retransmission de demande de répétition automatique hybride, HARQ, à l'UE, et attendre de recevoir le premier résultat de planification PCC envoyé par la seconde station de base, dans lequel l'indication de retransmission HARQ est utilisée pour donner pour instruction à l'UE d'envoyer des données de retransmission HARQ sur la base de la SCC ;
    un premier module de sélection, configuré pour : lorsque le premier résultat de planification PCC est reçu, sélectionner des premières données de démodulation cibles parmi les premières données de démodulation et les deuxièmes données de démodulation sur la base du premier résultat de planification PCC, dans lequel les premières données de démodulation cibles sont des données de démodulation dans un format de démodulation correct qui est indiqué par le premier résultat de planification PCC ;
    un second module de démodulation, configuré pour : lorsque les données de retransmission HARQ envoyées par l'UE sont reçues, démoduler les données de retransmission HARQ respectivement sur la base du premier format de démodulation et du second format de démodulation, et obtenir, à partir d'un processus de démodulation, des troisièmes données de démodulation et des quatrièmes données de démodulation sur lesquelles une combinaison HARQ peut être réalisée ;
    un premier module de combinaison, configuré pour : si un second résultat de planification PCC envoyé par la seconde station de base n'est pas reçu pendant la démodulation, réaliser une combinaison HARQ sur les troisièmes données de démodulation et les quatrièmes données de démodulation respectivement avec les premières données de démodulation cibles, et déterminer un premier résultat de démodulation de combinaison et un deuxième résultat de démodulation de combinaison sur la base de données de démodulation obtenues après la combinaison, dans lequel le second résultat de planification PCC est utilisé pour indiquer si une planification de liaison montante est réalisée sur la PCC de l'UE à un moment de données de retransmission HARQ ; et
    un second module de retransmission, configuré pour : contrôler le premier résultat de démodulation de combinaison et le deuxième résultat de démodulation de combinaison respectivement de la manière CRC, et lorsqu'il est déterminé, par le biais du contrôle, qu'il n'y a pas de résultat de démodulation contrôlé correct dans le premier résultat de démodulation de combinaison et le deuxième résultat de démodulation de combinaison, renvoyer une indication de retransmission HARQ à l'UE, et attendre de recevoir un résultat de planification PCC envoyé par la seconde station de base, jusqu'à ce qu'une quantité de fois d'envoi d'une indication de retransmission HARQ à l'UE atteigne une quantité prédéfinie.
  11. Appareil selon la revendication 10, dans lequel l'appareil comprend en outre :
    un second module de sélection, configuré pour : si le second résultat de planification PCC envoyé par la seconde station de base est déjà reçu pendant la démodulation, sélectionner des secondes données de démodulation cibles parmi les troisièmes données de démodulation et les quatrièmes données de démodulation sur la base du second résultat de planification PCC, dans lequel le second résultat de démodulation cible est des données de démodulation dans le format de démodulation correct qui est indiqué par le second résultat de planification PCC ;
    un second module de combinaison, configuré pour : réaliser une combinaison HARQ sur les premières données de démodulation cibles et les secondes données de démodulation cibles, et déterminer un troisième résultat de démodulation de combinaison sur la base de données de démodulation obtenues après la combinaison ; et
    un troisième module de détermination, configuré pour déterminer, sur la base du troisième résultat de démodulation de combinaison, le résultat de démodulation de la démodulation correcte des données de liaison montante sur la SCC.
  12. Appareil selon la revendication 10, dans lequel l'appareil comprend en outre :
    un quatrième module de détermination, configuré pour : lorsqu'il est déterminé, par le biais du contrôle, qu'il y a un résultat de démodulation contrôlé correct dans le premier résultat de démodulation de combinaison et le deuxième résultat de démodulation de combinaison, déterminer le résultat de démodulation contrôlé correct comme le résultat de démodulation de la démodulation correcte des données de liaison montante.
  13. Stockage lisible par ordinateur comprenant des instructions qui, lorsqu'elles sont exécutées par un ordinateur, amènent l'ordinateur à effectuer le procédé selon l'une quelconque des revendications 1 à 6.
  14. Produit de programme informatique comprenant des instructions qui, lorsque le programme est exécuté par un ordinateur, amènent l'ordinateur à effectuer le procédé selon l'une quelconque des revendications 1 à 6.
EP17901465.9A 2017-03-21 2017-03-21 Procédé et appareil de démodulation à base d'agrégation de porteuses Active EP3589045B1 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/077562 WO2018170745A1 (fr) 2017-03-21 2017-03-21 Procédé et appareil de démodulation à base d'agrégation de porteuses

Publications (3)

Publication Number Publication Date
EP3589045A1 EP3589045A1 (fr) 2020-01-01
EP3589045A4 EP3589045A4 (fr) 2020-03-11
EP3589045B1 true EP3589045B1 (fr) 2021-05-12

Family

ID=63584810

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17901465.9A Active EP3589045B1 (fr) 2017-03-21 2017-03-21 Procédé et appareil de démodulation à base d'agrégation de porteuses

Country Status (6)

Country Link
US (1) US11006437B2 (fr)
EP (1) EP3589045B1 (fr)
JP (1) JP6797313B2 (fr)
KR (1) KR102264619B1 (fr)
CN (1) CN110431899B (fr)
WO (1) WO2018170745A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220046548A1 (en) * 2020-08-07 2022-02-10 Qualcomm Incorporated Secondary component carrier drop for power headroom

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2420023B1 (fr) * 2009-04-13 2014-08-27 Marvell World Trade Ltd. Format de trame de couche physique pour des systèmes de WLAN
CN102014480A (zh) * 2009-10-30 2011-04-13 大唐移动通信设备有限公司 一种上行同步处理方法及设备
JP5990815B2 (ja) * 2011-11-07 2016-09-14 シャープ株式会社 基地局、端末、通信システムおよび通信方法
US9295048B2 (en) * 2012-09-24 2016-03-22 Qualcomm Incorporated Method and apparatus for supporting hybrid carrier aggregation
CN103596278A (zh) * 2013-11-26 2014-02-19 中国联合网络通信集团有限公司 一种数据传输的方法、装置及系统
JP6584958B2 (ja) 2013-12-26 2019-10-02 シャープ株式会社 端末装置、基地局装置および通信方法
CN103874212B (zh) * 2014-03-07 2017-07-14 电信科学技术研究院 一种基于载波聚合的跨载波调度方法及装置
US10103855B2 (en) * 2014-03-28 2018-10-16 Qualcomm Incorporated Flexible channel state information feedback management
WO2017173594A1 (fr) * 2016-04-06 2017-10-12 华为技术有限公司 Dispositif et procédé de traitement d'informations

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP3589045A1 (fr) 2020-01-01
US20200022165A1 (en) 2020-01-16
CN110431899A (zh) 2019-11-08
JP6797313B2 (ja) 2020-12-09
JP2020515187A (ja) 2020-05-21
WO2018170745A1 (fr) 2018-09-27
EP3589045A4 (fr) 2020-03-11
CN110431899B (zh) 2021-08-20
KR20190129920A (ko) 2019-11-20
US11006437B2 (en) 2021-05-11
KR102264619B1 (ko) 2021-06-11

Similar Documents

Publication Publication Date Title
US11283554B2 (en) Method for partial retransmission
EP3639426B1 (fr) Procédures, équipements d'utilisateur et stations de base pour une transmission basée sur un groupe de blocs de code
US11677513B2 (en) Retransmission for punctured signals
US11716609B2 (en) Delaying transmission depending on transmission type and UE processing capabilities
US20200374043A1 (en) An indication for harq-ack feedback
US9749097B2 (en) Method for wireless communications testing using downlink and uplink transmissions between an access point and mobile terminals
CN110351020B (zh) 一种传输数据的方法、装置和系统
AU2017246954B2 (en) Radio-network node, wireless device and methods performed therein
US11005635B2 (en) Reliable channel assisted hybrid-arq
US20150043391A1 (en) Systems and methods for reconfiguration signaling
US20220006571A1 (en) Sidelink data packet acknowledgment
US20180160425A1 (en) Radio-Network Node, Wireless Device and Methods Performed Therein
US20200295884A1 (en) A Network Node And A Terminal Device, And Methods Of Operating The Same
US11006437B2 (en) Carrier aggregation-based demodulation method and apparatus
FI20195875A1 (en) Common link adaptation for a downlink control channel and data channel for wireless networks

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190924

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20200207

RIC1 Information provided on ipc code assigned before grant

Ipc: H04L 5/00 20060101ALI20200203BHEP

Ipc: H04L 27/00 20060101ALI20200203BHEP

Ipc: H04W 72/04 20090101AFI20200203BHEP

Ipc: H04W 24/10 20090101ALI20200203BHEP

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20201126

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017038671

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1393027

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210615

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1393027

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210512

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20210512

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210812

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210912

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210813

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210913

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210812

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017038671

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20220215

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210912

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220321

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220321

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210512

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240130

Year of fee payment: 8

Ref country code: GB

Payment date: 20240201

Year of fee payment: 8