EP3560109A1 - Bandwidth reduction with beamforming and data compression - Google Patents
Bandwidth reduction with beamforming and data compressionInfo
- Publication number
- EP3560109A1 EP3560109A1 EP17794949.2A EP17794949A EP3560109A1 EP 3560109 A1 EP3560109 A1 EP 3560109A1 EP 17794949 A EP17794949 A EP 17794949A EP 3560109 A1 EP3560109 A1 EP 3560109A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- beams
- subset
- data
- energy
- received
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013144 data compression Methods 0.000 title abstract description 41
- 230000009467 reduction Effects 0.000 title abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 56
- 238000012545 processing Methods 0.000 claims description 41
- 230000015654 memory Effects 0.000 claims description 35
- 230000005540 biological transmission Effects 0.000 claims description 19
- 238000004590 computer program Methods 0.000 claims description 7
- 238000013468 resource allocation Methods 0.000 claims description 4
- 230000000670 limiting effect Effects 0.000 abstract description 3
- 238000004891 communication Methods 0.000 description 17
- 230000011664 signaling Effects 0.000 description 14
- 238000007906 compression Methods 0.000 description 13
- 230000006835 compression Effects 0.000 description 12
- 230000008569 process Effects 0.000 description 12
- 238000004422 calculation algorithm Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 8
- 238000013459 approach Methods 0.000 description 7
- 230000003044 adaptive effect Effects 0.000 description 6
- 230000001934 delay Effects 0.000 description 6
- 238000013139 quantization Methods 0.000 description 6
- 230000002829 reductive effect Effects 0.000 description 6
- 230000006837 decompression Effects 0.000 description 4
- 230000003068 static effect Effects 0.000 description 4
- 238000009826 distribution Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000003287 optical effect Effects 0.000 description 3
- 238000010187 selection method Methods 0.000 description 3
- 238000012935 Averaging Methods 0.000 description 2
- 230000002776 aggregation Effects 0.000 description 2
- 238000004220 aggregation Methods 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 2
- 238000003491 array Methods 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 2
- 230000001413 cellular effect Effects 0.000 description 2
- 238000006731 degradation reaction Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- GVVPGTZRZFNKDS-JXMROGBWSA-N geranyl diphosphate Chemical compound CC(C)=CCC\C(C)=C\CO[P@](O)(=O)OP(O)(O)=O GVVPGTZRZFNKDS-JXMROGBWSA-N 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000007781 pre-processing Methods 0.000 description 2
- 230000001902 propagating effect Effects 0.000 description 2
- 230000002441 reversible effect Effects 0.000 description 2
- 239000004065 semiconductor Substances 0.000 description 2
- 230000008054 signal transmission Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 1
- 244000046052 Phaseolus vulgaris Species 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005562 fading Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000010606 normalization Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000003595 spectral effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/046—Wireless resource allocation based on the type of the allocated resource the resource being in the space domain, e.g. beams
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0686—Hybrid systems, i.e. switching and simultaneous transmission
- H04B7/0695—Hybrid systems, i.e. switching and simultaneous transmission using beam selection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/24—Cell structures
- H04W16/28—Cell structures using beam steering
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/06—Optimizing the usage of the radio link, e.g. header compression, information sizing, discarding information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
- H04W72/044—Wireless resource allocation based on the type of the allocated resource
- H04W72/0446—Resources in time domain, e.g. slots or frames
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/08—Access point devices
- H04W88/085—Access point devices with remote components
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B7/00—Radio transmission systems, i.e. using radiation field
- H04B7/02—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
- H04B7/04—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
- H04B7/06—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
- H04B7/0613—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
- H04B7/0615—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
- H04B7/0617—Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal for beam forming
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Definitions
- the described invention relates to beamforming in wireless communications, and are particularly valuable for systems with a high number of antennas such as are anticipated for 5G and C-RAN systems now under development.
- the front haul is defined as that transmission link between the BBU and the RRH, and is shown at FIG. 1 which is a schematic overview of an example radio environment.
- This link 25 is referred to as front-haul regardless of the direction the data moves to distinguish it from the backhaul link that goes between the BBU and the core network.
- the BBU 20 may or may not be co-located with a serving radio access node termed a gNB whose coverage area is delineated by the dotted line.
- the illustrated UE 10 is in direct communication with the RRH 30, which in the 5G system would be operating as a transmission/reception point (TRP) of the gNB itself.
- TRP transmission/reception point
- the RRH 30 will not have sufficient hardware to process radio-frequency (RF) signaling to baseband and vice versa.
- the RRH will typically contain the base station's RF circuitry plus analog-to-digital/digital-to-analog converters, up/down converters, amplifiers filters and the like.
- the BBU For downlink data the BBU translates the data stream coming from the core network to a form that is suitable for transmission over the air, or close to it depending on the hardware and processing capacity of the RRH. The reverse is true on the uplink where the RRH does minimal signal processing, though in some deployments the RRH may have partial though incomplete baseband processing capability.
- This is the form of the data sent over the FH link 25.
- the FH link 25 is termed a Common Public Radio Interface (CPRI) and it is standardized (see www.cpri.in.fo, last visited 12/7/2016) to facilitate inter-operability of BBUs and RRHs from different manufacturers.
- CPRI Common Public Radio Interface
- the CPRI specification uses the terms radio equipment control (REC) and radio equipment (RE) in place of BBU and RRH, respectively, but these teachings are not limited to C-RAN and 5G systems so will use the more generic terms BBU and RRH.
- the C-RAN and 5G systems are to use a much larger number of antennas than currently deployed systems such as 4G/LTE.
- the FH link 25 will therefore require a very large bandwidth when more and more antennas are added to the system to improve performance. For example, if a traditional LTE system has 8 transmit (TX) and 8 receive (RX) antennas, increasing this to 128 antennas will increase the bandwidth required for transmission of data between the BBU 20 and the RRH 30 by a factor of 16, all else being equal.
- the 5G system is expected to use even more than this number of antennas making the bandwidth problem even more acute. Bandwidth reduction on the FH link 25 is a challenge for C-RAN and 5G.
- Beamforming may reduce the bandwidth requirements, where the transmission between from the RRH to the BBU is beam-space data after a number of beams are properly selected.
- Many beamforming techniques are known: static cell-specific; adaptive cell-specific; averaged user- specific; instantaneous user-specific; and the like. For example, for static cell-specific beamforming each cell forms a number of orthogonal beams depending on how many antennas this cell has; this is a simple technique to implement.
- One key challenge in any beamforming technique involves choosing the proper beams.
- Another bandwidth reduction technique is data compression which reduces the number of bits in the data transmission between the BBU and RRH. With traditional data compression thee is nearly always some performance degradation, most acutely for lower numbers of bits.
- data compression techniques reduce bit-rate by identifying and eliminating either statistical redundancy or unnecessary information bits. These are widely used for audio and video data, but traditional data compression methods cannot be directly applied for the FH link bandwidth reduction problem because the frequency domain data is white noise such that there is no statistical redundancy and all of the bits are equally important.
- Typical prior art data compression methods are ⁇ -law and A-law compression that reduce dynamic range of signal, primarily using eight bits. To reduce FH bandwidth with beamforming one needs to do so on the BBU ⁇ RRH link without an appreciable performance degradation.
- FIG. 1 illustrates, in a practical deployment of C-RAN and 5G typically there will be several or many RRHs per BBU or group of BBUs. Increasing the number of RRHs as well as the number of antennas on those RRHs rapidly increases the amount of data to be transmitted via the front haul links 25. This increased data can create a limitation to the overall system if the front haul link is not ideal, and further can increase power consumption of the radio system.
- a computer readable memory storing computer program instructions that, when executed by one or more processors, cause a host apparatus such as a RRH or BBU to perform actions comprising: a) for a given user equipment, selecting a subset of a plurality of beams based on received energies of the plurality of beams; and b) transmitting on a front haul link only data from the selected subset of beams.
- an apparatus such as a RRH or BBU for transmitting data over a front haul link.
- the apparatus comprises at least one computer readable memory storing computer program instructions and at least one processor.
- the computer readable memory with the computer program instructions is configured, with the at least one processor, to cause the apparatus to perform actions comprising: for a given user equipment, select a subset of a plurality of beams based on received energies of the plurality of beams; and transmit on a front haul link only data from the selected subset of beams.
- FIG. 1 is a schematic diagram illustrating an example radio environment in which embodiments of these teachings may be practiced.
- FIG. 2 is a schematic diagram showing the front-haul architecture of a cloud-based radio access network (C-RAN) with beamforming and data compression.
- C-RAN cloud-based radio access network
- FIGs. 3A-C illustrate schematically three different types of C-RANs, each with different signal processing capabilities at the remote radio head (RRH).
- RRH remote radio head
- FIG. 4A is a process flow diagram summarizing certain of the teachings herein from the perspective of the RRH for reducing bandwidth requirements on the link between the RRH and the BBU.
- FIG. 4B is similar to FIG. 4A but describes these teachings more broadly.
- FIG. 5 A is a data plot of simulation results showing the impact on performance of different levels of compressing data according to the techniques described herein.
- FIG. 5B is a bar chart and tabular data comparing average system throughput in megabytes when the beam selection is by SINR, by energy, and by channel estimates, each with no data compression.
- FIG. 5C is similar to FIG. 5B except the FIG. 5C data is cell edge throughput in kilobytes.
- FIG. 6 is a schematic diagram illustrating major signal processing functionality between the antenna and the traditional backhaul to the core network for a C-RAN system.
- FIG. 7 is similar as FIG. 6 but specifically for processing U-plane data and showing data rates at the various processing blocks for 2 antennas and for 8 antennas.
- FIG. 8 is a high level schematic view of the processing architecture for a massive MIMO system with adaptive beam selection for 5G radio access networks.
- FIG. 9 is a schematic diagram illustrating fixed beam pre-processing for reducing bandwidth requirements on the FH link by energy-based beam selection.
- FIG. 10A is a more detailed view of processing blocks for the C-RAN architecture of FIG. 6, with no beamforming.
- FIG. 10B is similar to 10A except the FFT processing is moved from the BBU to the RRH to reduce bandwidth requirements on the FH link.
- FIG. IOC is similar to FIG. 10B with the fixed beamformer from FIG. 9 added to the FFH side of the FH link.
- FIG. 11 A is a plan view of three cells with only one UE.
- FIG. 1 IB is a plan view illustrating that cell's antenna beam pattern.
- FIG. l lC is similar to FIG. 11A but showing the UE received beam patterns after beamforming.
- FIG. 1 ID are data plots of beam energy from FIG. 1 ID.
- FIG. HE plots energy of the same beams where beamforming is not used, as a comparison against FIG. 1 ID.
- FIG. 12 plots tabular data comparing bandwidth savings for two different cell scenarios.
- FIG. 13 is a high level schematic block diagram illustrating certain apparatus/devices that are suitable for practicing certain of these teachings.
- Embodiments of these teachings do not require channel estimates on the FH link. Not only does this avoid extra delays on this link between the BBU and the RRH, it significantly reduces deployment costs for the system.
- a more specific non-limiting embodiment further reduces the front-haul bandwidth requirement by what is described below as aperture selection, in which the beams selection is not fixed but dynamically changed for each user.
- each RRH can make the selection of which of the beams should be transmitted to the central module, which is the BBU in FIG. 1. So for example if we assume the LTE upper limit of 8 antennas, in this aspect instead of sending 8 beams the RRH may select the 3 strongest beams and send those to the central module. Different from prior art beamforming techniques, this beam selection does not require the transmission of DMRSs or the computation of any channel estimates on the front-haul link, but instead can be based on the strongest received energy of the beams per user.
- the data compression aspect of these teachings is particularly adapted for the link from the RRH to the BBU in that this compression does not appreciably degrade the data being transmitted. It deals with the beam-space data, and more specifically chooses a gain offset value for each of the selected beams based on that beam's receive energy. This selected gain offset value corresponds to the minimum quantization error. In an embodiment this gain offset value also depends on the number of bits used for the data compression, so for example there will be a higher gain offset value if 8 bits are used for compressing the data and a lower gain offset value if 4 bits are used for compressing the data.
- FIG. 2 illustrates a schematic view of the RRH 30 and BBU 20 shown at Fig. 1 but showing certain of the relevant functionality.
- the RRH 30 has the antennas that communicate directly with the UE 10. Data uplink from the UE enters FIG. 2 from the left at the RRH 30 via layer 1 (LI) signaling.
- the RRH 30 performs a fast Fourier Transform (FFT) 30a, selects beams 30b and if data compression according to these teachings is employed the RRH 30 compresses 30c the uplink data from the selected beams.
- FFT fast Fourier Transform
- the RRH 30 sends this compressed data to the BBU 20 over the FH link 25, where it is then decompressed 20a.
- FIG. 1 fast Fourier Transform
- FIG. 2 represents the front haul architecture of a C-RAN system as currently under development, and of course data can flow in both directions on the link 25.
- the C-RAN deployment can have varying degrees of centralization in the BBU.
- FIGs. 3A-C illustrate three different types of C-RANs, each with the RRH at the right and the BBU at the left.
- the RRH is little more than an amplifier and the FH link to the BBU is analog carrying the RF signals of each of the RRH's antenna.
- FIG. 1A is not very practical for wide scale deployment due to its very large bandwidth requirements on the FH link.
- the RRH additionally has a radio frequency front end RF FE as well as digital-to-analog converter (DAC) and analog-to-digital converter (ADC) so the signal the RRH sends to the BBU is digital in-phase and quadrature bits.
- the partially centralized C-RAN at FIG. 3C has the RRH with some (but incomplete) baseband digital signal processing (DSP) capabilities; in this case the signal on the FH link to the BBU can be in the form of encoded symbols as shown.
- DSP baseband digital signal processing
- the RRH is limited to processing, to varying extents, of only LI signaling while the BBU handles all layer-2/layer-3 (L2/L3) processing.
- the C-RANs of FIGs. 3B-C have some processing capability at the RRH which allows flexibility in addressing bandwidth issues on the FH/BH link.
- IQ data compression can do this as at FIG. 3B, but the IQ-sample data can be reduced at the cost of distortion in reconstruction of baseband signals and additional complexity both in the BBU pool and RRHs.
- MIMO multiple- input-multiple-output
- RF radio frequency
- Beamforming by selecting the best beams from among a plurality of beams is sometimes referred to as a switched beam system (SBS) that assumes a base station is using multiple beams to cover the whole cell, for example 3 beams each with bandwidth 120° or six beams each with bandwidth 60°, where each beam is treated as a separate cell once the base station's whole cell is divided into sectors.
- SBS switched beam system
- These multiple beams are formed by a SBS system that has a beamformer which forms the multiple non-adaptive beams, a sniffer which determines which beam has the best SINR for a given receiver, and a switch that selects the one or two best beams for that receiver.
- Embodiments of these teachings dynamically select a number of beams for each user based on the received energy of each beam after cell-specific beamforming. This does not require channel estimates and pilot information of each user and therefore does not introduce extra delays in the data transmission between the RRH 30 and the BBU 20. Selecting a reduced number of beams can significantly reduce the bandwidth requirements for the FH link 25. For example, no matter how many antennas there are per cell, the required bandwidth could be the same as the maximum LTE number of 8Tx/8Rx antennas without beamforming where a fixed 8 beams are selected for each user. If there are 128 antennas per cell in a C-RAN or 5G deployment this would mean a 16x bandwidth reduction.
- Data compression can add to this bandwidth reduction.
- all the antenna data received at the RRH 30 can be transformed to beam space data after the RRH 30 performs a FFT.
- the proper beams are selected for each user as above (or by any other beamforming technique) and each selected beam is then compressed before being sent on the BH link.
- From the BBU's perspective the received beam space data is firstly de-compressed, followed by conventional receiver signal processing such as channel estimating, data combining for all the beams and decoding.
- embodiments of these teachings provide a variety of technical effects. Due to the simple beam selection method deployments of these teachings do not introduce additional delays in the signal transmission between the BBU and the RRH since no channel estimates are needed; channel estimates are associated with a high computational complexity.
- the beams are dynamically selected, and different numbers of best beams can be dynamically selected, based on different user locations (that is, close to the cell center or nearer the cell edge) where that location is reflected by the received beam energy. This implies a more effective bandwidth reduction and better system performance. With this beamforming technique, the received energy is very likely to be different among the selected beams of a given user, and prior art data compression techniques are not well suited for compressing data received on beams with different energy.
- FIG. 4A is a process flow diagram that outlines some of the major steps for implementing both the beamforming and data compression aspects of these teachings to reduce bandwidth requirements on the FH link.
- the RRH 30 receives data from a given UE 10 on multiple beams and forwards this data, after the processing described at FIG. 4A, to the RRH 20 for further processing there.
- FIG. 4A reads from the perspective of the RRH 30.
- FIG. 4A includes both beamforming and data compression
- either of these aspects of these teachings can be employed separate and distinct from one another; for example in one deployment the RRH can perform the beamforming described herein to reduce bandwidth requirements on the FH link without also using the data compression aspects, while in another deployment a different RRH can perform the data compression described herein to reduce bandwidth requirements on the FH link while not also utilizing the beamforming aspects detailed herein (in this latter deployment the RRH may for example use any beamforming technique or none at all).
- FIG. 4A where the process begins at block 402 in which the RRH 30 performs static cell-specific beamforming with all antennas per cell. For example, if a cell has 16 antennas, we will have 16 beams where each beam is orthogonal to each other and those 16 beams together cover all users in the cell. For example these 16 antennas are statically beamformed by each covering 22.5° of the 2-dimensional 360° cell (note that at least for 5G beamforming may be in 3 -dimensions where there is a vertical element to the antenna/beam coverage region).
- the static beamforming can have each antenna covering some portion of a given 120° sector even if each is not an identical 7.5° sweep.
- the number of antennas/sector can be different; for example with a 3 -dimensional cell there can be a vertical split in which some antennas cover an inner portion of the cell/sector while others cover an outer portion of the cell/sector.
- an active antenna can be used instead of separate antennas to create multiple beams.
- the RRH calculates the averaged receive energy of each beam across all scheduled physical resource blocks (PRBs) in one transmission time interval (TTI).
- TTI transmission time interval
- Bock 406 has the beams reordered from highest energy to lowest. For the 16 beam example above, for this step they may considered as being placed in a list that is rank-ordered by average received energy. Because this is for all 16 beams neither the list nor the ordering is specific to any user but reflects all users in the cell since the rank-order lists all beams in the cell.
- the beam selection on a per user/UE basis based on the normalized energy per beam as block 410 states. This is done in different ways for different embodiments.
- there is a fixed/pre-defined number of beams to select per user for example 3 beams.
- the RRH 30 would select that predefined number of beams based on normalized energy of each beam: the first selected beam will correspond to the largest normalized receive energy for this user; the second selected beam will correspond to the second normalized receive energy for this user, and so on. Note this is per user, so in the example list of 16 beams the highest energy beam on the list will not be selected unless that particular beam is carrying data from this user.
- this selection is based on the received energy of each beam (after averaging and normalizing), it does not require any pilot information of each user and the RRH does not need to perform any channel estimate as would be the case for prior art beamforming selection techniques. It is this feature that greatly reduces the cost of implementing the FH link between the RRH 30 and BBU 20 as well as avoiding added delays on that link.
- the RRH 30 dynamically selects a number of beams for each user that satisfies a predefined normalized total receive energy.
- aperture selection in which the RRH 30 dynamically selects a number of beams for each user that satisfies a predefined normalized total receive energy.
- the RRH has the normalized list from block 408 and so for each given user it selects a number of beams such that the sum of all normalized energy of the beams selected for a given user is greater than or equal to 80 percent of that predefined value (that is, select the minimum number of beams per user to meet this criteria).
- this aperture selection technique it may be that in a given TTI an individual RRH 30 serving 4 users selects two beams for user 1, two beams for user 2, four beams for user 3 and three beams for user 4, all while using the same value for the predefined normalized total receive energy to make those beam selections.
- this aperture selection method also is based on received energy of each beam and so does not require any pilot information of each user and the RRH 30 need not perform channel estimates.
- data compression is performed at block 412 to further reduce front-haul bandwidth requirement.
- conventional data compression techniques are not well suited to the data received on multiple beams with different energies.
- these teachings provide a data compression technique that relies on minimizing quantization error of the data where that minimizing depends on the energy of the received beam.
- a gain offset value such that the corresponded quantization error is minimum.
- the gain offset values can be calculated offline to form a table stored at the RRH so as to minimize computations the RRH needs to perform dynamically. For example, this table is ordered from the lowest receive energy to the largest receive energy. For actual observed receive energy, a nearest gain offset value in the table can be identified.
- These gain offset values further depend on number of bits used for data compression, so for example an 8-bit data compression would yield larger gain offset values than a 7-bit that is larger than 6-bit which is larger than 5 -bit and so on, for data compression. For a look-up table implementation this means there would effectively be different tables for different bit-number compressions. Table 1 below is an example assuming six different beam energies.
- Table 1 example gain offset values per beam energy, per compression level
- the RRH has a beam whose normalized averaged energy (from the list at block 408 of FIG. 4A) is nearest to E4, it will choose from Table 1 above the gain offset value j for that beam because this is the value that yields the least quantization error when data at energy level E4 is compressed with 8 bits.
- the RRH will find the appropriate gain value of each of the beams selected at block 410 of FIG. 4A.
- the table look up implementation can significantly reduce computational complexity to search for the minimum quantization error that results from data compression, as compared to dynamically doing the computations for the actual beam energy since multiple computations would be required to asses which gain yields the minimum error.
- Such dynamic computations may impose a delay in sending the data on the FH link, a delay the look up table easily avoids.
- Exactly what data is most appropriately compressed together can depend on the specific radio access technology. For LTE it is advantageous to perform data compression for each PRB pair; that is, for every different user's PRB pair a different gain offset value is selected depending on the actual observed signal value which may differ among the different user's PRB pairs. This will result in better performance due to the different fading for different user's PRB pairs.
- the selected gain offset value is applied to the corresponding signal by dividing each I and Q data before performing the actual data compression / quantization.
- the selected gain offset value needs to be transmitted with the compressed data at block 414 of FIG. 4A.
- the gain offset values utilized by the RRH 30 will be sent to the BBU 20 for its use in decompressing the data.
- there is a fixed number of bits used to compress the data of each scheduled user and this fixed number of bits does not depend on the average PRB beam energy but is signaled between the BBU and RRH by means of the gain offset value.
- This additional signaling of the gain offset values will add a very small overhead that is negligible as compared to the overhead of traditional data compression. For example, for 8-bit compression this overhead is around 8 bits for every PRB pair.
- Data decompression is performed at the receiver side, the BBU in the FIG. 4A example.
- This data decompression is a reverse process of data compression described above, where the transmitted gain offset value of each PRB pair is applied in the BBU 20 by multiplying after regular decompression.
- the BBU will continue the process with the beam space signals.
- the data compression can be done with beam selection techniques other than based on the average energy per beam as detailed for FIG. 4A above.
- SINR signal to interference plus noise ratio
- the process would be similar to that described for FIG. 4A, except the SINR would be based on results of channel estimating (which are done from demodulation references signals DMRSs transmitted per beam, or some other pilot information for making channel estimates) and the SINR value and average value for all beams across all scheduled PRBs of a TTI would be done at block 404 instead of averaged energy.
- FIG. 4B is similar to FIG. 4A but describes these teachings more broadly.
- K beams a subset of a plurality of beams
- M beams a plurality of beams
- Data from only the selected subset of beams is transmitted on a front haul link at block 454.
- the number of beams in the subset is dynamically calculated.
- the subset at block 452 is selected by a) normalizing the received energy of each of the plurality of beams; and b) selecting for the subset only those beams for which a sum of their respective normalized received energy satisfies a predefined normalized total received energy.
- Another way to describe this dynamic subset selection is a) calculating averaged receive energy of each of the plurality of beams where the average is across one TTI; b) normalizing the calculated averaged received energies; and c) selecting for the given UE the subset of beams based on the normalized calculated averaged received energies.
- the data at block 454 from the selected subset of beams is uplink data that is transmitted on the FH link as beam-space data to a BBU for baseband processing. That same process can be performed by the BBU in which case the data at block 454 from the selected subset of beams is downlink data that is transmitted on the FH link to a RRH for transmission over the air to the given UE.
- the beam selection results based on the uplink data can be applied on the downlink.
- the BBU will know from uplink data it received which are the selected beams and can use that knowledge for its downlink data to this same user.
- the UE can be configured to send sounding signals when setting up its connection to receive the call, which can be used to inform the BBU of the appropriate beam selection.
- the uplink data over the FH link 25 is to be in the beam formed format, for different deployments across different systems the downlink data actually carried over the FH link 25 may differ according to how the LI ' functionality is split between the BBU and RRH. Once at the RRH this downlink data will typically be mapped to all the antennas in the system for beam transmission over the air, regardless of beam selection for the given UE. Regardless, the FH link bandwidth savings for downlink data comes generally from the compression technique described herein.
- one embodiment of the data compression aspect of these teachings uses the received energies of each beam of the subset of beams at block 452 by the following steps: a) for each beam of the subset of beams, select one minimum gain offset value from a set of pre- computed minimum gain offset values stored in a local memory, where the selected gain offset value has an associated energy value that most closely corresponds with the received energy of the respective beam of the subset of beam; b) compress the respective data associated with each respective beam of the subset of beams after dividing I and Q portions of the respective data by the respectively selected one minimum gain offset value; and c) send indications of all of the selected one minimum gain offset values with the compressed data on the FH link.
- FIG. 5A is a data plot of simulation results of the impact data compression after beam selection has on performance when the beam selection is based on beam energy.
- the number of bits used for data compression starting from 16 bits that is 16 bits for In-phase and 16 bits for Quadrature such that there is a total of 32 bits for each IQ data
- the number of bits used for data compression starting from 16 bits that is 16 bits for In-phase and 16 bits for Quadrature such that there is a total of 32 bits for each IQ data
- 8 bits With 8 bits, the performance is almost the same as that without data compression, while for progressively fewer number of compression bits the performance gradually decreases as can be expected.
- ⁇ -law compression primarily only uses 8 bits for uplink with some overhead that is slightly more than the negligible amount described above for these teachings. For example, a 20 MHz LTE system using post FFT 8-bit ⁇ -law data compression requires a bandwidth of 291.2 Mbps while the above-described compression techniques needs 269.6 Mbps for each beam.
- FIG. 5B is a bar chart with tabular data below comparing average system throughput in megabytes when the beam selection is by SINR (data set 1 plotted leftmost in each bar chart triple), by energy (data set 2 plotted in the middle of each bar chart triple), and channel estimates (CE, data set 3 plotted rightmost in each bar chart triple). All of these assume 32 antennas per cell and the performance is based on the selected number of beams dynamically changing from one beam to four beams based on the threshold (and without data compression).
- the eight data sets at FIG. 5B use thresholds 60% (data set 1), 65% (data set 2), 70%> (data set 3), and up to 95% (data set 8).
- FIG. 5C is similar to FIG. 5B except FIG. 5C the data is cell edge user throughput, in kilobytes.
- the SINR channel selection technique is best, but the energy based beam selection described herein performs very nearly as well at the lower thresholds 60% (data set 1) and 65%> (data set 2). While FIGs.
- the energy based beam selection approach does not outperform the others in all cases
- the CE approach is not seen to be a viable option for systems with a bandwidth-constrained FH link
- the SINR approach is seen to impose some inherent delays in transferring the data over that FH link as compared to the energy based beam selection approach.
- the energy based beam selection described herein is seen to be the better beamforming choice for systems that do have a bandwidth-constrained FH link.
- FIGs. 5B-C demonstrate that this new approach to beam selection provides good performance, in addition to reducing computational requirements as compared to prior techniques and to reducing the bandwidth needed for transmission such as may be necessary in systems constrained by a BBU-RRH link.
- the 5G radio access technology is to adopt a high order adaptive antenna system (AAS), which is critical especially for mm Wave technology due to such very high frequency signals being susceptible of line of sight (LOS) blocking.
- AAS adaptive antenna system
- LOS line of sight
- FIG. 6 is a schematic diagram illustrating major signal processing functionality between the antenna at the left and the traditional backhaul to the core network on the right for a C-RAN system.
- the standardized CPRI link is disposed between the RF and the FFT; LI signaling takes the user data between the FFT and the equalization (EQ)/turbo-coding processing blocks, mixed L1/L2 signaling takes it between the scheduler (SCH) and the media-access control (MAC) layer processing, and layer 2 signaling takes what is now bursty packets to the packet data convergence protocol (PDCP) radio link control (RLC) for transport on the actual backhaul link.
- PDCP packet data convergence protocol
- RLC radio link control
- HARQ hybrid automatic repeat request
- FIG. 7 illustrates similar as FIG. 6 but specifically for processing user (U-plane) data.
- baseline data rates at the various processing blocks for 2 antennas (2 TX and 2 RX), as compared to increased throughput for 8 antennas.
- the IQ-compressed data needs a bandwidth on the CPRI of 829 Mbps, performing a FFT on that IQ-compressed data reduces the bandwidth requirement to 470 Mbps, equalizing and turbo-coding reduces the bandwidth requirement further to 152 Mbps, which is finally reduced to 30 Mbps when packetized for MAC layer transport. Similar reductions can be seen for the much larger data amounts on the 8x8 antenna systems.
- FIG. 8 is a schematic view of the processing architecture for a massive MIMO (mMIMO) system with adaptive beam selection which is likely how 5G radio access networks will be implemented.
- the antennas are at the top of the drawing and are integrated with RF circuitry and the data from multiple antenna arrays is sent in layer 1 signaling via a common LI front-end (hardware). This can be considered as the RRH detailed above.
- L2/L3 signaling is in the cloud, but baseband processing is centralized at what would be the BBU described above. Between them is the front haul as labelled and it is considered a switching layer. But note the scalability built into the 5G architecture.
- the front haul bandwidth is not scalable in any efficient way, and neither are the RF/DFE chains or the BBU processing power due to the fact that the data volume grows non-linearly with additional antennas.
- 4G was not designed for the massive scalability that is being designed into 5G as FIG. 8 attests, and C-RAN is a recent addition on top of the pre-existing 4G architecture.
- FIG. 9 is a schematic view illustrating fixed beam pre-processing that addresses bandwidth limits on the FH link by energy-based beam selection.
- the UE is at the left and the cell, a RRH in this case, receives at its antenna array a total of M beams from this user.
- the data will ultimately be sent over the FH link shown to a receiver (baseband) for detection and decoding.
- baseband baseband
- Given the bandwidth limits what is needed is a signal representation basis that keeps all or at least most of the signal energy but in fewer than those M dimensions. Observing this bandwidth limit will also better align the data to be processed with the amount of BBU processing power that is provisioned for a given RRH in the C-RAN system, since a single BBU is expected to serve multiple RRHs.
- FIG. 9 finds those 'look' directions by selecting some smaller subset of K beams from the total M beams for this user, and it makes that selection based on received beam energy since it is a RRH and we want to avoid having to make channel estimates. In this regard using SINR for selecting the K beams is also possible.
- FIG. 10A is a more detailed view of processing blocks for the C-RAN architecture of FIG. 6, with no beamforming.
- the FH link is at the CPRI, and the IQ compressed data for all M antennas is sent over that FH link. All beamforming occurs at the BBU side of the FH link as shown (channel estimation + SINR estimation, antenna selection, and interference rejection combining IRC).
- the data at FIG. 7 shows this IQ compression alone is not enough of a reduction for transport on the FH link.
- the data at FIG. 7 also show that the FFT reduces the data volume, so FIG. 10B is similar to 10A except the FFT processing is moved from the BBU to the RRH and the FH link is now carrying the data after FFT processing.
- FIG. 9 Plugging the FIG. 9 fixed beamformer at the RF front end into the C-RAN architecture from FIG. 10B gives the schematic block diagram at FIG. IOC, where the bandwidth reduction on the FH link occurs from a) reducing the total M beams to only K selected beams; b) performing the FFT processing at the RRH side of the FH link; and c) IQ-compressing the data prior to sending it to the BBU. If the BBU is to do full beamforming in FIG. IOC still there will be required some additional signaling from the FFH since it is the FFH that performed the FFT on the data, but in this case the addition is far less than that of FIG. 10B because the additional signaling is only relevant for the K selected beams rather than all M beams.
- FIG. 11 A is a plan view of three cells with only one UE which is located at the end of the arrow. There are a total of eight beams from a 10x8 rectangular antenna array with cell specific beamforming in the horizontal with a 15° down tilt angle. The UE is about 210m from the array and the path loss is about -95dB.
- FIG. 1 IB is a plan view illustrating that cell's antenna beam pattern
- FIG. 11C is received beam patterns of the UE after beamforming. Beam strength is indicated by the extent of the node, and Beam 1, Beam 2 and Beam 3 are labelled in FIG. 11C as the three strongest received beams. Quantitative data per beam are plotted at FIG.
- FIG. 1 ID for this beamforming, where beams 1 through 3 are noticeably higher energy than the remaining five beams.
- Beam strength is based on the UE's location and channel condition so if the UE were at a different location different beams would be strongest.
- FIG. 1 IE plots energy of the same beams where beamforming is not used and signal strength on each antenna is at the same level.
- the 3-cell 8-beam deployment detailed above for FIG. 1 1A is considered case 1.
- a more advanced case 2 with 21 cells and a total of 32 beams from a 10x32 rectangular antenna array serving 40 UEs per cell, also with cell specific horizontal-only beamforming on a 15° down-tilt angle. Tabular data comparing these two cases are shown at FIG.
- bandwidth savings expressed as a percentage of the no-beamforming bandwidth requirements.
- beamforming according to these teachings can reduce the bandwidth requirements for the 32-beam case 2 down to that required for the non-beamformed 8-antenna case 1 , a 75% reduction.
- the data shows further reductions beyond that, which may become necessary for very large antenna arrays with beam numbers in the thousands as is anticipated for 5G, and in fact it is possible to achieve a 90% reduction when there are more than 100 beams.
- FIG. 12 data assumes FFT and IQ-compression at the RRH prior to transport over the FH link, as noted at the left 'baseline' column.
- the beam selection can be by SINR or by energy.
- SINR based beam selection requires a higher overhead and a higher computational load on the RRH, though it does offer slightly better overall performance as FIGs. 5B-C show.
- SINR j 1 n (X%) of SINR ⁇ for each UEn.
- the beam energy selection can also be done by selecting the threshold based on the maximum received beam energy for each UE allocation (as opposed to total beam energy per UE allocation above).
- the beam selection algorithm could proceed as follows:
- the overhead and computational load are essentially identical to the total received energy algorithm.
- FIG 13 is a high level diagram illustrating some relevant components of various communication entities that may implement various portions of these teachings, including a base station identified generally as a baseband unit BBU 20, a remote radio head RRH 30 which is not co-located with the BBU 20, and a user equipment (UE) 10.
- a communications network 935 is adapted for communication over a wireless link 932 with an apparatus, such as a mobile communication device which may be referred to as a UE 10, via a RRH 30.
- the network 935 includes the BBU 20 that performs signal processing and provides connectivity via the radio core network with other and/or broader networks such as a publicly switched telephone network and/or a data communications network (e.g., the internet 938).
- the UE 10 includes a controller, such as a computer or a data processor (DP) 914 (or multiple ones of them), a computer-readable memory medium embodied as a memory (MEM) 916 (or more generally a non-transitory program storage device) that stores a program of computer instructions (PROG) 918, and a suitable wireless interface, such as radio frequency (RF) transceiver or more generically a radio 912, for bidirectional wireless communications with the radio network access node 20 via one or more antennas.
- a controller such as a computer or a data processor (DP) 914 (or multiple ones of them), a computer-readable memory medium embodied as a memory (MEM) 916 (or more generally a non-transitory program storage device) that stores a program of computer instructions (PROG) 918, and a suitable wireless interface, such as radio frequency (RF) transceiver or more generically a radio 912, for bidirectional wireless communications with the radio network access node 20 via one or more antennas.
- the various embodiments of the UE 10 can include, but are not limited to, mobile user equipments or devices, cellular telephones, smartphones, wireless terminals, personal digital assistants (PDAs) having wireless communication capabilities, portable computers having wireless communication capabilities, image capture devices such as digital cameras having wireless communication capabilities, gaming devices having wireless communication capabilities, music storage and playback appliances having wireless communication capabilities, Internet appliances permitting wireless Internet access and browsing, as well as portable units or terminals that incorporate combinations of such functions.
- PDAs personal digital assistants
- portable computers having wireless communication capabilities
- image capture devices such as digital cameras having wireless communication capabilities
- gaming devices having wireless communication capabilities
- music storage and playback appliances having wireless communication capabilities
- Internet appliances permitting wireless Internet access and browsing, as well as portable units or terminals that incorporate combinations of such functions.
- the RRH 30 also includes a controller, such as a computer or a data processor (DP) 924 (or multiple ones of them), a computer-readable memory medium embodied as a memory (MEM) 926 that stores a program of computer instructions (PROG) 928, and a suitable wireless interface, such as a RF transceiver or radio 922, for communication with the UE 10 via one or more antennas.
- the RRH 30 is coupled via a data/control path 25 to the BBU 20.
- the path 25 may be implemented as a front-haul interface.
- the BBU 20 may also be coupled to other RRHs via other front-haul links. Whatever processing the RRH 30 is capable of, for the UE 10 it does not take uplink signals to baseband and it does not receive baseband signals from the BBU 20 on the FH link 25.
- the BBU 20 includes a controller, such as a computer or a data processor (DP) 944 (or multiple ones of them), a computer-readable memory medium embodied as a memory (MEM) 946 that stores a program of computer instructions (PROG) 948.
- the BBU 20 receives signals on the FH link 25 and converts them to baseband, and receives baseband signals from the core network and upconverts them from baseband prior to sending them to the RRH 30 on the FH link 25.
- DP data processor
- PROG program of computer instructions
- At least one of the PROGs 928, 948 is assumed to include program instructions that, when executed by the associated one or more DPs, enable the device to operate in accordance with exemplary embodiments of this invention. That is, various exemplary embodiments of this invention may be implemented at least in part by computer software executable by the DP 924 of the RRH 30; and/or by the DP 944 of the BBU 20; and/or by hardware, or by a combination of software and hardware (and firmware).
- the UE 10 and the RRH 30 may also include dedicated processors 915 and 925 respectively.
- the BBU 20 may also have a dedicated processor.
- the computer readable MEMs 916, 926 and 946 may be of any memory device type suitable to the local technical environment and may be implemented using any suitable data storage technology, such as semiconductor based memory devices, flash memory, magnetic memory devices and systems, optical memory devices and systems, fixed memory and removable memory.
- the DPs 914, 924 and 944 may be of any type suitable to the local technical environment, and may include one or more of general purpose computers, special purpose computers, microprocessors, digital signal processors (DSPs) and processors based on a multicore processor architecture, as non-limiting examples.
- the wireless interfaces e.g., RF transceivers 912 and 922
- a computer readable medium may be a computer readable signal medium or a non- transitory computer readable storage medium/memory.
- a non-transitory computer readable storage medium/memory does not include propagating signals and may be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any suitable combination of the foregoing.
- Computer readable memory is non-transitory because propagating mediums such as carrier waves are memoryless.
- the computer readable storage medium/memory would include the following: an electrical connection having one or more wires, a portable computer diskette, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or Flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
- a communications system and/or a network node/base station may comprise a network node or other network elements implemented as a server, host or node operationally coupled to a remote radio head. At least some core functions may be carried out as software run in a server (which could be in the cloud) and implemented with network node functionalities in a similar fashion as much as possible (taking latency restrictions into consideration). This is called network virtualization. "Distribution of work” may be based on a division of operations to those which can be run in the cloud, and those which have to be run in the proximity for the sake of latency requirements. In macro cell/small cell networks, the "distribution of work" may also differ between a macro cell node and small cell nodes.
- Network virtualization may comprise the process of combining hardware and software network resources and network functionality into a single, software-based administrative entity, a virtual network.
- Network virtualization may involve platform virtualization, often combined with resource virtualization.
- Network virtualization may be categorized as either external, combining many networks, or parts of networks, into a virtual unit, or internal, providing network-like functionality to the software containers on a single system.
- E-UTRAN evolved UMTS radio access network
- L3 layer 3 (radio resource control/non-access stratum)
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
- Radio Transmission System (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/384,877 US10194441B2 (en) | 2016-12-20 | 2016-12-20 | Bandwidth reduction with beamforming and data compression |
PCT/EP2017/078315 WO2018114112A1 (en) | 2016-12-20 | 2017-11-06 | Bandwidth reduction with beamforming and data compression |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3560109A1 true EP3560109A1 (en) | 2019-10-30 |
EP3560109B1 EP3560109B1 (en) | 2020-12-23 |
Family
ID=60269821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17794949.2A Active EP3560109B1 (en) | 2016-12-20 | 2017-11-06 | Bandwidth reduction with beamforming and data compression |
Country Status (4)
Country | Link |
---|---|
US (1) | US10194441B2 (en) |
EP (1) | EP3560109B1 (en) |
CN (1) | CN110235388B (en) |
WO (1) | WO2018114112A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021225485A1 (en) * | 2020-05-07 | 2021-11-11 | Telefonaktiebolaget Lm Ericsson (Publ) | Beam-index based data distribution for scalable distributed radio systems |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019087929A (en) * | 2017-11-09 | 2019-06-06 | 富士通株式会社 | Wireless communication device and antenna filtering method |
CN111566946B (en) * | 2018-01-19 | 2024-03-29 | 联想(新加坡)私人有限公司 | Channel compression matrix parameters |
US10849148B2 (en) | 2018-03-21 | 2020-11-24 | Qualcomm Incorporated | Group common control channel and bandwidth part management in wireless communications |
US10484063B1 (en) | 2018-05-04 | 2019-11-19 | At&T Intellectual Property I, L.P. | Transmission of beamforming weight coefficients from digital baseband unit to remote radio unit |
US10862599B2 (en) * | 2018-05-14 | 2020-12-08 | Apple Inc. | Systems and methods for applying 4Rx capable UE tests to an 8Rx capable UE |
US10382245B1 (en) * | 2018-06-27 | 2019-08-13 | Rohde & Schwarz Gmbh & Co. Kg | Method for compressing IQ measurement data |
WO2020005296A1 (en) * | 2018-06-29 | 2020-01-02 | Brent Elliott | Millimeter wave beam tracking and beam sweeping |
US10367568B1 (en) | 2018-08-08 | 2019-07-30 | At&T Intellectual Property I, L.P. | Determining precoding coefficients for fronthaul links in a cloud radio access network |
CN112534863A (en) * | 2018-08-10 | 2021-03-19 | 索尼公司 | Wireless communication apparatus and communication control method |
US20210185604A1 (en) * | 2018-08-10 | 2021-06-17 | Sony Corporation | Wireless communication apparatus and communication control method |
WO2020031710A1 (en) * | 2018-08-10 | 2020-02-13 | ソニー株式会社 | Wireless communication device and communication control method |
EP3935915A4 (en) * | 2019-03-06 | 2022-12-07 | CommScope Technologies LLC | Flexible interface between a baseband controller and remote units of a c-ran |
CN110234128B (en) * | 2019-06-12 | 2020-10-20 | 苏州大学 | Energy consumption optimization method and system for wireless access spectrum flexible optical network |
US11329700B2 (en) | 2019-10-28 | 2022-05-10 | Hon Lin Technology Co., Ltd. | Method and apparatus for downlink transmission in a cloud radio access network |
EP4059316B1 (en) * | 2019-11-13 | 2024-03-06 | Telefonaktiebolaget Lm Ericsson (Publ) | Method for data packet transferring based on packet loss prediction |
WO2022006106A1 (en) | 2020-06-30 | 2022-01-06 | Commscope Technologies Llc | Open radio access network with unified remote units supporting multiple functional splits, multiple wireless interface protocols, multiple generations of radio access technology, and multiple radio frequency bands |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7065383B1 (en) * | 2002-04-16 | 2006-06-20 | Omri Hovers | Method and apparatus for synchronizing a smart antenna apparatus with a base station transceiver |
US7242955B2 (en) * | 2003-12-18 | 2007-07-10 | Motorola, Inc. | Method and apparatus for optimal multiple beam transmit weightings for beam to beam handoff in a switched beam system |
KR101002877B1 (en) * | 2007-03-06 | 2010-12-21 | 한국과학기술원 | A method and Apparatus for scheduling Multiple Users In communication |
US8174428B2 (en) * | 2008-05-21 | 2012-05-08 | Integrated Device Technology, Inc. | Compression of signals in base transceiver systems |
US8565193B2 (en) * | 2008-10-16 | 2013-10-22 | Elektrobit Wireless Communications Oy | Beam forming method, apparatus and system |
CN103702363B (en) * | 2012-09-27 | 2017-02-08 | 上海贝尔股份有限公司 | Method for compressing signals from frequencies and downlink signal compressing system |
US9729215B2 (en) * | 2014-06-23 | 2017-08-08 | Samsung Electronics Co., Ltd. | OFDM signal compression |
JP2016163267A (en) * | 2015-03-04 | 2016-09-05 | Kddi株式会社 | Radio base station device, base station system and baseband unit |
CN105007106B (en) * | 2015-06-15 | 2019-03-12 | 大唐移动通信设备有限公司 | A kind of compression method, BBU and its distributed base station system |
-
2016
- 2016-12-20 US US15/384,877 patent/US10194441B2/en active Active
-
2017
- 2017-11-06 WO PCT/EP2017/078315 patent/WO2018114112A1/en unknown
- 2017-11-06 CN CN201780085003.1A patent/CN110235388B/en active Active
- 2017-11-06 EP EP17794949.2A patent/EP3560109B1/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021225485A1 (en) * | 2020-05-07 | 2021-11-11 | Telefonaktiebolaget Lm Ericsson (Publ) | Beam-index based data distribution for scalable distributed radio systems |
US12040872B2 (en) | 2020-05-07 | 2024-07-16 | Telefonaktiebolaget Lm Ericsson (Publ) | Beam-index based data distribution for scalable distributed radio systems |
Also Published As
Publication number | Publication date |
---|---|
EP3560109B1 (en) | 2020-12-23 |
US20180176898A1 (en) | 2018-06-21 |
CN110235388A (en) | 2019-09-13 |
CN110235388B (en) | 2022-11-22 |
WO2018114112A1 (en) | 2018-06-28 |
US10194441B2 (en) | 2019-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10194441B2 (en) | Bandwidth reduction with beamforming and data compression | |
CN110537337B (en) | Multi-site MIMO communication system with hybrid beamforming in L1 split architecture | |
JP5382391B2 (en) | Wireless network and method for adaptive optimistic clustering for interference placement in a wireless network | |
US9602182B2 (en) | Baseband processing apparatus in radio communication system and radio communication | |
US11064380B2 (en) | Method and device in UE and base station for wireless communication | |
CA2742574A1 (en) | Wireless communication clustering method and system for coordinated multi-point transmission and reception | |
WO2019154259A1 (en) | Wireless communication method and device in base station and user equipment | |
US20210045113A1 (en) | Method and device used for wireless communication in ue and base station | |
CN112956270B (en) | Segmentation-based reference signals | |
EP3085141A1 (en) | System and method for beamforming for coordinated multipoint communications | |
US20240244612A1 (en) | Systems and Methods for PTRS and DMRS Port Association for Transmission of PUSCH on Multiple Beams | |
US20190386729A1 (en) | Method and device for multi-antenna transmission in ue and base station | |
US20240137962A1 (en) | Method and device in ue and base station for wireless communication | |
WO2018171786A1 (en) | Information transmission method and device | |
CN111183665B (en) | User equipment, method and device in base station for wireless communication | |
CN110167166B (en) | Method and device for wireless communication in base station and user equipment | |
WO2023050449A1 (en) | Enhanced csi reporting for multi-trp operation | |
EP3520344A1 (en) | Method for adapting the length of null cyclic prefix for a frequency-domain null cyclic prefix single carrier communication system | |
WO2023241215A1 (en) | Communication method and device | |
CN104125043B (en) | A kind of interference alignment schemes and equipment of K custom systems | |
US9065498B1 (en) | Dynamic assignment of MIMO modes for a wireless communication device | |
WO2024031428A1 (en) | System and method for enhancement on ul tx switching | |
US20230055553A1 (en) | Method and device in a node used for wireless communication | |
WO2024036019A1 (en) | Systems and methods for the support of multiple transmit uplink transmissions | |
CN111049561A (en) | Adaptive scheduling method for broadband electrically-tuned antenna of LTE (Long term evolution) system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190722 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20200331 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20200729 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017030144 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1348726 Country of ref document: AT Kind code of ref document: T Effective date: 20210115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210324 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210323 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1348726 Country of ref document: AT Kind code of ref document: T Effective date: 20201223 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210323 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210423 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017030144 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210423 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
26N | No opposition filed |
Effective date: 20210924 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20211018 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210423 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211106 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211130 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20211130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211130 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20171106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221130 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20231006 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20230929 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 |