EP3559578A1 - A lance tube - Google Patents

A lance tube

Info

Publication number
EP3559578A1
EP3559578A1 EP17818592.2A EP17818592A EP3559578A1 EP 3559578 A1 EP3559578 A1 EP 3559578A1 EP 17818592 A EP17818592 A EP 17818592A EP 3559578 A1 EP3559578 A1 EP 3559578A1
Authority
EP
European Patent Office
Prior art keywords
lance tube
alloy
outer layer
tube according
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP17818592.2A
Other languages
German (de)
French (fr)
Other versions
EP3559578B1 (en
Inventor
Olle Eriksson
Henrik HÄLL
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alleima AB
Original Assignee
Sandvik Intellectual Property AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sandvik Intellectual Property AB filed Critical Sandvik Intellectual Property AB
Publication of EP3559578A1 publication Critical patent/EP3559578A1/en
Application granted granted Critical
Publication of EP3559578B1 publication Critical patent/EP3559578B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/02Shaft or like vertical or substantially vertical furnaces with two or more shafts or chambers, e.g. multi-storey
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/46Details or accessories
    • C21C5/4606Lances or injectors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories or equipment specially adapted for furnaces of these types
    • F27B1/16Arrangements of tuyeres
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories or equipment specially adapted for furnaces of these types
    • F27B1/20Arrangements of devices for charging
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/16Introducing a fluid jet or current into the charge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/18Charging particulate material using a fluid carrier
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/16Introducing a fluid jet or current into the charge
    • F27D2003/168Introducing a fluid jet or current into the charge through a lance
    • F27D2003/169Construction of the lance, e.g. lances for injecting particles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/18Charging particulate material using a fluid carrier
    • F27D2003/185Conveying particles in a conduct using a fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D99/00Subject matter not provided for in other groups of this subclass
    • F27D99/0001Heating elements or systems
    • F27D99/0033Heating elements or systems using burners
    • F27D2099/0036Heating elements or systems using burners immersed in the charge

Definitions

  • the present disclosure relates to a lance tube accordi ng to the preamble of clai m 1 .
  • the disclosure relates to a lance tube i ntended for use i n a lime kiln furnace.
  • the lance tube may also be i ntended for use in e.g . a pulverized coal injection lance for blast furnaces.
  • a lime kiln is used for the calcination process.
  • the most com monly used lime kiln is the parallel flow regenerative (P FR) shaft kiln, consisting of two vertical shafts and a connecting crossover channel . While li mestone is calcined in a combustion zone in one of the shafts, the other shaft preheats the limestone. The hot combustion gases are transferred from the calcining shaft throug h the crossover channel to the non-calcini ng shaft, where they preheat the li mestone in an upper area of the shaft. The flow direction of the gases is reversed at regular intervals.
  • Fuel is delivered into the calcining shaft via lances protruding into the combustion zone. Since the calcination process requires high temperatures of around 1 000°C, the lance has to be heat resistant.
  • the lance comprises a lance tube, which is subjected to severe high-temperature corrosion conditions due to the high temperature, corrosive elements i n the fuel and erosion from the limestone.
  • the main corrosion mechanisms in lime kilns are oxidation, sulphidation and erosion-corrosion.
  • the most severe corrosion com monly occurs about 50-1 00 cm from the lower end of the lance tube, delivering the fuel into the combustion zone. Corrosion may in this area lead to that the lance breaks and is thereby shortened. Since the shortening alters the kiln combustion parameters and reduces its efficiency, broken lances need to be replaced.
  • lance tube i nclude chromiu m oxide formi ng steel alloys such as the ferritic stainless steel alloy ASTM 446, and the austenitic stainless steel alloys UNS S3531 5, UNS S3081 5, ASTM 31 0 and ASTM 31 6.
  • the life time of a lance tube is typically about six months to two years.
  • FeCrAI iron chromium alumi nium
  • a lance tube which is in at least some aspect improved with respect to known lance tubes.
  • a lance tube for use in lime kilns or for use i n a lime furnace burner, i n blast furnace coal powder injection and i n sootblower elements, that has an i mproved life time in comparison with known lance tubes.
  • the annular outer layer of a hig h temperature corrosion resistant alloy provides increased corrosion resistance at the crucial portion of the lance tube. I n a lime kiln, this portion will be located at the bottom of the kil n, where the hig hest temperatures will be experienced.
  • the improved corrosion resistance is achieved without having to compromise the mechanical properties and high temperature wear resistance of the lance tube.
  • the metallic bond between the annular inner and outer layers ensures that there is no air gap between the layers which may lead to reduced thermal conductivity. Thus, a good thermal conductivity of the lance tube is achieved even though two different alloys (alloys having different compositions) are used.
  • the metallic bond between the layers should be formed in a main portion of an interface between the annular inner and outer layers, but there may be smaller portions of the interface in which no metallic bond is present.
  • the metallic bond is formed by means of hot worki ng such as hot extrusion , hot drawing , hot rolling or hot pierci ng , or other suitable techniques.
  • the mechanical interlocking is provided before hot working to achieve the metallic bond.
  • the mechanical i nterlock will form a seal preventi ng oxygen from entering between the layers during the hot worki ng process, and it will additionally keep the annular inner and outer layers together duri ng hot working , i .e. prevent them from sliding .
  • the mechanical interlock thereby makes it possible to achieve the proposed lance tube without having to weld a base component and an outer component together before hot working .
  • the lance tube can be made from two alloys that are normally difficult to Tro n by means of welding .
  • the combination of a mechanical interlock and a metallic bond between the layers is beneficial for the ability of the lance tube to withstand high forces.
  • the hot working as described herei nabove or hereinafter is hot extrusion .
  • the annular inner layer and the annular outer layer are mechanically interlocked by means of a helically extending thread formed i n an interface between the annular inner layer and the annular outer layer.
  • the helically extending thread forms an efficient i nterlock and also increases the interfacial area, which will thereby contribute to an improved distribution of forces applied to the lance tube i n comparison with a lance tube without such a helically extendi ng thread.
  • the lance tube will be able to withstand higher load in the interface between the layers.
  • the mono-layered main portion extends along a major part of the lance tube as measured along the longitudi nal axis.
  • the mono-layered portion may extend along more than half of the length of the lance tube, or along more than 75 % of the length of the lance tube.
  • the double-layered portion is thus relatively short and only covers the crucial part of the lance tube, where additional high temperature corrosion resistance is needed. If an expensive first alloy is used for the outer layer, this reduces the total cost of the lance tube without compromising its life time.
  • the double-layered portion may typically extend along at least 70-1 50 cm of the lance tube, intended to form the lower part of the tube from which fuel is delivered.
  • the length of the lance tube as measured in the axial direction may be several meters.
  • the second alloy is selected from a stainless steel alloy or a carbon steel .
  • Stainless steel alloys and carbon steels that have desired mechanical strength and high temperature wear resistance are suitable choices for the mai n portion and the inner layer of the lance tube.
  • An example of a suitable carbon steel is a carbon steel according to standard DI N 1 71 35A, this carbon steel comprises from 0.1 to 0.3 C and 0.1 to 2.0 Mn and balance Fe and unavoidable i mpurities.
  • the second alloy is selected from a ferritic stainless steel alloy or an austenitic stainless steel alloy. Suitable alloys but not li mited to are e.g .
  • the ferritic stainless steel alloy ASTM 446- 1 and the austenitic stainless steel alloys UNS S3531 5, U NS S3081 5, U NS N0881 0/N0881 1 , ASTM 31 0, and ASTM 31 6/31 6H .
  • These alloys will provide both the desired mechanical properties and sufficient hig h temperature corrosion resistance and wear resistance for the main portion of the lance tube and are suitable choices in e.g . lime kiln applications.
  • the first alloy is an alumi na forming alloy.
  • Alumina forming alloys form a protective alumina scale on the outer surface of the annular outer layer which will provide excellent high temperature corrosion resistance.
  • Suitable alu mina formi ng alloys include iron chromium aluminium (FeCrAI) alloys as well as other alumina forming alloys.
  • the alu mina forming alloy is an iron chromium aluminium alloy.
  • FeCrAI alloys such as FeCrAI alloys sold under the trademark Kanthal® APM and Kanthal® APMT, have suitable hig h temperature corrosion resistance for use as the outer layer. I n order to achieve improved creep strength , it is possible to use an oxide dispersion-strengthened alloy produced by means of powder metallurgy. However, the alloy can also be conventionally manufactured using melting and casti ng techniques.
  • the first alloy comprises :
  • the first alloy comprises 20-25 wt. % Cr and 5-7 wt. % Al, the balance being Fe and normally occurring impurities. In another embodiment, the first alloy comprises 20-25 wt. % Cr, 5- 7 wt. % Al and 1 to 4 Mo the balance being Fe and normally occurring impurities.
  • the first alloy is a stainless steel alloy comprising cerium, such as a chromium oxide forming austenitic stainless steel alloy comprising cerium. The addition of cerium stabilises the chromium oxide at high temperatures and thereby improves the high temperature corrosion properties as well as provides a good structural stability at high temperatures.
  • Suitable alloys are e.g. UNS S30815 and UNS S35315, which alloys comprise C 0.04 to 0.10, Mn 1 to 2, Cr 20 to 26, Ni 10 to 12 or 34 to 36, N 0.12 to 0.20, Ce 0.03 to 0.08, balance Fe and unavoidable impurities.
  • the annular outer layer has a thickness within the interval 5-50 % of a total wall thickness.
  • the thickness should be sufficient to achieve the desired high temperature corrosion resistance without risking that the annular outer layer cracks or is otherwise discontinued.
  • the annular outer layer has a thickness within the interval 10-40 % of a total wall thickness, such as to ensure sufficient corrosion resistance at a reasonable cost.
  • the lance tube has a total wall thickness within the interval 3-20 m m .
  • the wall thickness depends on e.g . the dimension of the lance tube. For example, for outer diameters of approximately 60 mm , 50 mm , 40 m m , 30 mm and 1 2 mm , wall thicknesses of approxi mately 1 0 mm , 9 mm , 6 mm and 3 mm , respectively, may be suitable.
  • an outer diameter of the lance tube as measured at each of the mono-layered main portion and the double-layered end portion is identical or essentially identical .
  • an i nner diameter of the lance tube as measured at each of the mono-layered main portion and the double-layered end portion is identical or essentially identical . This is beneficial for the flow characteristics of the lance tube.
  • the disclosure also relates to use of the proposed lance tube as a lance tube in a lime kiln .
  • the proposed lance tube may also be used i n other applications requiring hig h temperature corrosion resistance i n combination with mechanical strength , such as i n a lime furnace burner, in blast furnace coal powder i njection and in sootblower elements.
  • a lance tube is herein to be understood as a tube having a relatively small diameter compared to its length , which is intended for use in lime kilns or for use in a lime furnace burner, in blast furnace coal powder injection and in sootblower elements.
  • the lance tube is used for fuel transfer from a first end of the lance tube to a second end of the lance tube, wherein the first end is connected to a fuel supply system and the second end is open.
  • the lance tube is not pressurized .
  • Fig . 1 schematically shows a perspective view of a lance tube accordi ng to an embodiment
  • Fig . 2 schematically shows a lance tube according to another embodiment i n cross section ,
  • Fig . 3a-c schematically shows a base component and an outer component for manufacturing a lance tube
  • Fig . 4 schematically shows a longitudinal cross section of parts of a base component and an inner component for manufacturing a lance tube
  • Fig . 5 schematically shows a longitudinal cross section of parts of a work piece for manufacturing a lance tube
  • Fig . 6 shows a longitudi nal cross sectional picture of an interface withi n a lance tube.
  • Fig . 1 schematically, and not to scale, shows a lance tube 1 according to an embodi ment of the present disclosure.
  • the lance tube has a relatively short double-layered end portion 2 and a mono-layered main portion 3.
  • the double-layered end portion 2 has an annular outer layer 4 of a first alloy and an annular i nner layer 5 of a second alloy.
  • the mono-layered mai n portion 3 is entirely formed of the second alloy that the inner layer 5 of the double-layered end portion 2 is formed of .
  • Fig . 2 schematically shows a straig ht lance tube 1 i n a cross section taken along a longitudinal axis A of the lance tube.
  • a helically extending thread 6 extends in an interface between the annular outer layer 4 and the annular inner layer 5.
  • the helically extending thread 6 serves to mechanically interlock the two layers 4, 5.
  • the layers 4, 5 are also bound by a metallic bond formed in the interface by means of hot worki ng , e.g . hot extrusion.
  • a lance tube accordi ng to the present disclosure may be manufactured from components shown in figs. 3a-c.
  • the components i n clude a base component 301 of the second alloy, which is to form the inner layer 5 of the lance tube 1 , and an outer component 401 of the first alloy, which is to form the outer layer 4 of the lance tube 1 .
  • the base component 301 is a tube of circular cross section, having a central through-hole extendi ng along a longitudinal axis A.
  • An externally threaded section 302 is provided , havi ng a helical thread 306 (see fig . 3b) formed in an outer peripheral surface of an end portion of the base component 301 .
  • the shown base component 301 has a non-threaded section 303 adjacent the threaded section 302.
  • An inner diameter d of the base component is constant or essentially constant along the longitudinal axis, but an outer diameter D 1 of the non-threaded section 303 is larger than an outer diameter D2 of the threaded section 302.
  • the outer component 401 is also a tube of circular cross section , having a central throug h-hole extending along the longitudi nal axis A. I n the shown embodiment, the outer component 401 has a length in the longitudinal direction corresponding to a length of the threaded section 302 of the base component 301 .
  • the outer component 401 has an internally threaded section 402, in the shown embodiment extending along the entire length of the outer component 401 . I n other words, a helical thread 406 (see fig . 3c) is formed i n an inner peripheral surface of the outer component 401 .
  • the outer component 401 is thereby configured for threaded engagement with the externally threaded section 302 of the base component 301 .
  • An outer diameter D3 of the outer component 401 is equal to or essentially equal to the outer diameter D 1 of the non-threaded section 303 of the base component 301 , while an inner diameter d2 of the outer component 401 matches the outer diameter D2 of the threaded section 302 of the base component 301 .
  • a tubular work piece is formed by mounti ng the outer component 401 around the base component 301 such that the internally threaded section 402 of the outer component 401 is in engagement with the externally threaded section 302 of the base component 301 , i .e. by threadi ng the outer component 401 onto the threaded end portion of the base component 301 .
  • a mechanical interlock is thereby formed between the threaded sections 302, 402.
  • the work piece is thereafter hot worked, e.g . by means of hot extrusion.
  • Duri ng hot working such as hot extrusion, a metallic bond is formed between the threaded sections 302, 402 while the mechanical interlock is maintained.
  • An outer diameter of the work piece is also reduced and the length is increased.
  • Straightening and/or pickli ng may be carried out before the resulti ng lance tube 1 is cut i nto its final length and, if needed, formed to a desired shape.
  • the components 301 , 401 shown in fig . 3a are adapted for hot extrusion by pushi ng the work piece through an extrusion die with a leading end first, wherein the leading end is the end at which the outer component 401 is mounted.
  • a transition surface 308 between the externally threaded section 302 of the base component 301 and the non-threaded section 303 is smooth , without sharp edges.
  • the transition surface 308 is shown i n more detail i n fig . 3b, showing a magnification of the encircled area B from fig . 3a.
  • the transition surface is in cross section shaped as an inverted S with a concave portion 304 closest to the threaded section 302, and a convex portion 305 closest to the non-threaded section 303.
  • the outer component 401 has an end surface 408 with a corresponding S-shape with a convex portion 404 close to the i nternal thread 406, and a concave portion 405 close to an outer peripheral surface 407 of the outer component 401 as shown in fig . 3c showing a mag nification of the encircled area C from fig . 3a.
  • the concave portion 405 of the end surface 408 will thereby overlap with the convex portion 305 of the transition surface 308, which prevents separation and penetration of oxygen during the extrusion process.
  • the base component 301 is formed with a C- shaped concave transition surface 308, such that it floats over a rounded annular end surface 408 of the outer component 401 during extrusion and forms a seal .
  • An outer peripheral surface 307 of the base component 301 thus overlaps the outer peripheral surface 407 of the outer component 401 when the components 301 , 401 are mounted to form the work piece.
  • Fig . 5 shows a cross sectional view of parts of a work piece 501 adapted for hot extrusion by pushing the work piece 501 through an extrusion die with a leadi ng end 502 first, wherei n the leading end 502 is the end at which the outer component 401 is mounted.
  • the ends on which the outer components 401 are mounted have been machined to form rounded end surfaces 503.
  • the desig n of the transition surfaces 308, 408 of the base component 301 and the outer component 401 respectively, differs in this embodiment somewhat from the design shown i n figs. 3a-c.
  • the transition surface 308 of the base component 301 includes, as seen in the cross section, a first straight portion 309 perpendicular to the longitudinal axis A, and a second straight portion 31 0 which is inclined at an angle a of 30° with respect to the longitudinal axis A.
  • a curved surface connects the two straight portions 309, 31 0. The angle a may of course be varied.
  • the transition surface 408 of the outer component 401 is formed to engage and overlap with the transition surface 308, such that a seal is formed .
  • the first straight portion 309 extends over a thickness h .
  • the second alloy was a ferritic stainless steel accordi ng to ASTM 446- 1 havi ng a composition in wt.% as disclosed in Table I I .
  • Each base component had a total length of 400 mm, an outer diameter D1 of 164 mm and an inner diameter d of 41 mm.
  • An externally threaded section having a length of 95 mm and an outer diameter D2 of 154 mm was formed by cutting machining.
  • the outer components each had a length of 95 mm and an inner diameter d2 of 154 mm and were provided with an internal helical thread.
  • the components had the transitional design shown in fig. 5.
  • a wall thickness t of the outer component was 5 mm and the thickness h was 1.8 mm.
  • the helical thread had a pitch of 2 mm.
  • the components were degreased using ethanol.
  • the outer components 401 were thereafter threaded onto the base components 301 to form work pieces such as shown fig.5.
  • the work pieces were thereafter heated to 900°C and hot extruded at temperatures shown in table III.
  • the work pieces were extruded with the end on which the outer component was mounted as the leading end.
  • the formed tubes were straightened and blasted using steel sand .
  • the lengths of the double-layered portions of the manufactured lance tubes were fou nd to be between 70 cm and 1 20 cm .
  • a thickness of the outer layer was measured in test samples using optical and electron microscopy and was fou nd to be between 600-900 pm .
  • FIG. 6 shows a cross sectional picture of a part of the interface between the inner layer 5 and the outer layer 4 of the double- layered portion of a manufactured lance tube accordi ng to an embodiment.
  • the picture is taken at a foremost portion of the lance tube, correspondi ng to the leading end of the work piece.
  • a helically extending thread 6 is clearly seen.
  • the di mensions of the components used may of course be varied depending on the desired dimensions of the fi nal lance tube, as well as the alloys used and the parameters used during hot worki ng , e.g . hot extrusion.
  • Various other processing steps may also be included, such as pre-heati ng and cold pilgering .
  • the desig n of the base component and the outer component can be varied dependi ng on the requirements on the final lance tube.
  • the proposed lance tube may be shaped to suit the requirements of the lime kil n or other application in which it is to be used.
  • the desig n of the lance tube may be varied, for example by letting all or part of the double-layered portion have an outer diameter which is different than , for example smaller than , the outer diameter of the main portion.
  • the double-layered end portion of the lance tube may also include a portion entirely made of the first alloy that the outer layer is made of, so that the high temperature corrosion resistant first alloy covers the end of the lance tube.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Metallurgy (AREA)
  • Materials Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Organic Chemistry (AREA)
  • Furnace Charging Or Discharging (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
  • Blast Furnaces (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The disclosure relates to a lance tube (1) having a central through-hole extending along a longitudinal axis (A). The lance tube has a double-layered end portion (2) having an annular outer layer (4) of a high temperature corrosion resistant first alloy and an annular inner layer (5) of a second alloy, wherein the inner layer and the outer layer are mechanically interlocked, and wherein a metallic bond has been formed between the inner layer and the outer layer by means of hot working, and a mono-layered main portion (3) of the second alloy. The lance tube is suitable for use in a lime kiln.

Description

A lance tube
TECHN ICAL FI ELD
The present disclosure relates to a lance tube accordi ng to the preamble of clai m 1 . I n particular, but not exclusively, the disclosure relates to a lance tube i ntended for use i n a lime kiln furnace. The lance tube may also be i ntended for use in e.g . a pulverized coal injection lance for blast furnaces. BACKG ROU N D AN D PRIOR ART
I n the production of quicklime (calcium oxide) from limestone (calcium carbonate) , a lime kiln is used for the calcination process. The most com monly used lime kiln is the parallel flow regenerative (P FR) shaft kiln, consisting of two vertical shafts and a connecting crossover channel . While li mestone is calcined in a combustion zone in one of the shafts, the other shaft preheats the limestone. The hot combustion gases are transferred from the calcining shaft throug h the crossover channel to the non-calcini ng shaft, where they preheat the li mestone in an upper area of the shaft. The flow direction of the gases is reversed at regular intervals. This allows regenerative preheating of the li mestone to take place and this type of lime kiln is therefore energy efficient. Fuel is delivered into the calcining shaft via lances protruding into the combustion zone. Since the calcination process requires high temperatures of around 1 000°C, the lance has to be heat resistant.
The lance comprises a lance tube, which is subjected to severe high-temperature corrosion conditions due to the high temperature, corrosive elements i n the fuel and erosion from the limestone. The main corrosion mechanisms in lime kilns are oxidation, sulphidation and erosion-corrosion. The most severe corrosion com monly occurs about 50-1 00 cm from the lower end of the lance tube, delivering the fuel into the combustion zone. Corrosion may in this area lead to that the lance breaks and is thereby shortened. Since the shortening alters the kiln combustion parameters and reduces its efficiency, broken lances need to be replaced.
Common materials used for the lance tube i nclude chromiu m oxide formi ng steel alloys such as the ferritic stainless steel alloy ASTM 446, and the austenitic stainless steel alloys UNS S3531 5, UNS S3081 5, ASTM 31 0 and ASTM 31 6. The life time of a lance tube is typically about six months to two years.
Attempts have previously been made to use alu mina forming alloys, such as e.g . iron chromium alumi nium ( FeCrAI) , in lance tube applications. Such alloys form a protective alumina scale and are known to be very corrosion resistant at high temperatures. However, in addition to being relatively expensive, FeCrAI alloys are brittle at low temperature and are also difficult to weld. SUMMARY
I n view of the above-mentioned problems, it is desirable to provide a lance tube which is in at least some aspect improved with respect to known lance tubes. I n particular, it is desirable to provide a lance tube for use in lime kilns or for use i n a lime furnace burner, i n blast furnace coal powder injection and i n sootblower elements, that has an i mproved life time in comparison with known lance tubes. This is achieved by the initially defined lance tube, which comprises:
- a double-layered end portion having an annular outer layer of a hig h temperature corrosion resistant first alloy and an annular inner layer of a second alloy, wherein the annular inner layer and the annular outer layer are mechanically interlocked, and wherein a metallic bond has been formed between the annular inner layer and the annular outer layer by means of hot working , and
- a mono-layered main portion of the second alloy.
At the double-layered end portion, intended to form the lower end of the lance tube, the annular outer layer of a hig h temperature corrosion resistant alloy provides increased corrosion resistance at the crucial portion of the lance tube. I n a lime kiln, this portion will be located at the bottom of the kil n, where the hig hest temperatures will be experienced. The improved corrosion resistance is achieved without having to compromise the mechanical properties and high temperature wear resistance of the lance tube. The metallic bond between the annular inner and outer layers ensures that there is no air gap between the layers which may lead to reduced thermal conductivity. Thus, a good thermal conductivity of the lance tube is achieved even though two different alloys (alloys having different compositions) are used. The metallic bond between the layers should be formed in a main portion of an interface between the annular inner and outer layers, but there may be smaller portions of the interface in which no metallic bond is present. The metallic bond is formed by means of hot worki ng such as hot extrusion , hot drawing , hot rolling or hot pierci ng , or other suitable techniques.
The mechanical interlocking is provided before hot working to achieve the metallic bond. The mechanical i nterlock will form a seal preventi ng oxygen from entering between the layers during the hot worki ng process, and it will additionally keep the annular inner and outer layers together duri ng hot working , i .e. prevent them from sliding . The mechanical interlock thereby makes it possible to achieve the proposed lance tube without having to weld a base component and an outer component together before hot working . Thus, the lance tube can be made from two alloys that are normally difficult to joi n by means of welding . Furthermore, the combination of a mechanical interlock and a metallic bond between the layers is beneficial for the ability of the lance tube to withstand high forces.
According to one embodiment, the hot working as described herei nabove or hereinafter is hot extrusion .
According to one embodiment, the annular inner layer and the annular outer layer are mechanically interlocked by means of a helically extending thread formed i n an interface between the annular inner layer and the annular outer layer. The helically extending thread forms an efficient i nterlock and also increases the interfacial area, which will thereby contribute to an improved distribution of forces applied to the lance tube i n comparison with a lance tube without such a helically extendi ng thread. Thus, the lance tube will be able to withstand higher load in the interface between the layers.
According to one embodiment, the mono-layered main portion extends along a major part of the lance tube as measured along the longitudi nal axis. The mono-layered portion may extend along more than half of the length of the lance tube, or along more than 75 % of the length of the lance tube. The double-layered portion is thus relatively short and only covers the crucial part of the lance tube, where additional high temperature corrosion resistance is needed. If an expensive first alloy is used for the outer layer, this reduces the total cost of the lance tube without compromising its life time. The double-layered portion may typically extend along at least 70-1 50 cm of the lance tube, intended to form the lower part of the tube from which fuel is delivered. The length of the lance tube as measured in the axial direction may be several meters.
According to one embodiment, the second alloy is selected from a stainless steel alloy or a carbon steel . Stainless steel alloys and carbon steels that have desired mechanical strength and high temperature wear resistance are suitable choices for the mai n portion and the inner layer of the lance tube. An example of a suitable carbon steel is a carbon steel according to standard DI N 1 71 35A, this carbon steel comprises from 0.1 to 0.3 C and 0.1 to 2.0 Mn and balance Fe and unavoidable i mpurities. According to one embodiment, the second alloy is selected from a ferritic stainless steel alloy or an austenitic stainless steel alloy. Suitable alloys but not li mited to are e.g . the ferritic stainless steel alloy ASTM 446- 1 , and the austenitic stainless steel alloys UNS S3531 5, U NS S3081 5, U NS N0881 0/N0881 1 , ASTM 31 0, and ASTM 31 6/31 6H . These alloys will provide both the desired mechanical properties and sufficient hig h temperature corrosion resistance and wear resistance for the main portion of the lance tube and are suitable choices in e.g . lime kiln applications.
According to one embodiment, the first alloy is an alumi na forming alloy. Alumina forming alloys form a protective alumina scale on the outer surface of the annular outer layer which will provide excellent high temperature corrosion resistance. Suitable alu mina formi ng alloys include iron chromium aluminium (FeCrAI) alloys as well as other alumina forming alloys.
According to one embodiment, the alu mina forming alloy is an iron chromium aluminium alloy. FeCrAI alloys, such as FeCrAI alloys sold under the trademark Kanthal® APM and Kanthal® APMT, have suitable hig h temperature corrosion resistance for use as the outer layer. I n order to achieve improved creep strength , it is possible to use an oxide dispersion-strengthened alloy produced by means of powder metallurgy. However, the alloy can also be conventionally manufactured using melting and casti ng techniques.
According to one embodi ment, the first alloy comprises :
9-25 wt. % Cr, 2.5-8 wt. % Al,
the balance being Fe and normally occurring impurities, and optionally other intentionally added alloying elements. In one embodiment, the first alloy comprises 20-25 wt. % Cr and 5-7 wt. % Al, the balance being Fe and normally occurring impurities. In another embodiment, the first alloy comprises 20-25 wt. % Cr, 5- 7 wt. % Al and 1 to 4 Mo the balance being Fe and normally occurring impurities. According to one embodiment, the first alloy is a stainless steel alloy comprising cerium, such as a chromium oxide forming austenitic stainless steel alloy comprising cerium. The addition of cerium stabilises the chromium oxide at high temperatures and thereby improves the high temperature corrosion properties as well as provides a good structural stability at high temperatures. Suitable alloys are e.g. UNS S30815 and UNS S35315, which alloys comprise C 0.04 to 0.10, Mn 1 to 2, Cr 20 to 26, Ni 10 to 12 or 34 to 36, N 0.12 to 0.20, Ce 0.03 to 0.08, balance Fe and unavoidable impurities.
According to one embodiment, the annular outer layer has a thickness within the interval 5-50 % of a total wall thickness. The thickness should be sufficient to achieve the desired high temperature corrosion resistance without risking that the annular outer layer cracks or is otherwise discontinued.
According to one embodiment, the annular outer layer has a thickness within the interval 10-40 % of a total wall thickness, such as to ensure sufficient corrosion resistance at a reasonable cost.
According to one embodiment, the lance tube has a total wall thickness within the interval 3-20 m m . The wall thickness depends on e.g . the dimension of the lance tube. For example, for outer diameters of approximately 60 mm , 50 mm , 40 m m , 30 mm and 1 2 mm , wall thicknesses of approxi mately 1 0 mm , 9 mm , 6 mm and 3 mm , respectively, may be suitable.
According to one embodiment, an outer diameter of the lance tube as measured at each of the mono-layered main portion and the double-layered end portion is identical or essentially identical . According to one embodiment, an i nner diameter of the lance tube as measured at each of the mono-layered main portion and the double-layered end portion is identical or essentially identical . This is beneficial for the flow characteristics of the lance tube. The disclosure also relates to use of the proposed lance tube as a lance tube in a lime kiln . The proposed lance tube may also be used i n other applications requiring hig h temperature corrosion resistance i n combination with mechanical strength , such as i n a lime furnace burner, in blast furnace coal powder i njection and in sootblower elements.
Other advantageous features as well as advantages of the proposed lance tube and method of manufacturing will appear from the following description. DEFI N ITIONS
A lance tube is herein to be understood as a tube having a relatively small diameter compared to its length , which is intended for use in lime kilns or for use in a lime furnace burner, in blast furnace coal powder injection and in sootblower elements. The lance tube is used for fuel transfer from a first end of the lance tube to a second end of the lance tube, wherein the first end is connected to a fuel supply system and the second end is open. The lance tube is not pressurized .
BRI EF DESCRI PTION OF TH E DRAWI NGS
Embodiments of the proposed lance tube and a method of manufacturing , not to be interpreted as limiting , will in the following be described with reference to the appended drawings, in which
Fig . 1 schematically shows a perspective view of a lance tube accordi ng to an embodiment,
Fig . 2 schematically shows a lance tube according to another embodiment i n cross section ,
Fig . 3a-c schematically shows a base component and an outer component for manufacturing a lance tube, Fig . 4 schematically shows a longitudinal cross section of parts of a base component and an inner component for manufacturing a lance tube,
Fig . 5 schematically shows a longitudinal cross section of parts of a work piece for manufacturing a lance tube, and Fig . 6 shows a longitudi nal cross sectional picture of an interface withi n a lance tube.
DETAI LED DESC RI PTION
Fig . 1 schematically, and not to scale, shows a lance tube 1 according to an embodi ment of the present disclosure. The lance tube has a relatively short double-layered end portion 2 and a mono-layered main portion 3. The double-layered end portion 2 has an annular outer layer 4 of a first alloy and an annular i nner layer 5 of a second alloy. The mono-layered mai n portion 3 is entirely formed of the second alloy that the inner layer 5 of the double-layered end portion 2 is formed of .
Fig . 2 schematically shows a straig ht lance tube 1 i n a cross section taken along a longitudinal axis A of the lance tube. As can be seen in the magnification of the marked area, a helically extending thread 6 extends in an interface between the annular outer layer 4 and the annular inner layer 5. The helically extending thread 6 serves to mechanically interlock the two layers 4, 5. However, the layers 4, 5 are also bound by a metallic bond formed in the interface by means of hot worki ng , e.g . hot extrusion.
A lance tube accordi ng to the present disclosure may be manufactured from components shown in figs. 3a-c. The components i nclude a base component 301 of the second alloy, which is to form the inner layer 5 of the lance tube 1 , and an outer component 401 of the first alloy, which is to form the outer layer 4 of the lance tube 1 . The base component 301 is a tube of circular cross section, having a central through-hole extendi ng along a longitudinal axis A. An externally threaded section 302 is provided , havi ng a helical thread 306 (see fig . 3b) formed in an outer peripheral surface of an end portion of the base component 301 . The shown base component 301 has a non-threaded section 303 adjacent the threaded section 302. An inner diameter d of the base component is constant or essentially constant along the longitudinal axis, but an outer diameter D 1 of the non-threaded section 303 is larger than an outer diameter D2 of the threaded section 302.
The outer component 401 is also a tube of circular cross section , having a central throug h-hole extending along the longitudi nal axis A. I n the shown embodiment, the outer component 401 has a length in the longitudinal direction corresponding to a length of the threaded section 302 of the base component 301 . The outer component 401 has an internally threaded section 402, in the shown embodiment extending along the entire length of the outer component 401 . I n other words, a helical thread 406 (see fig . 3c) is formed i n an inner peripheral surface of the outer component 401 . The outer component 401 is thereby configured for threaded engagement with the externally threaded section 302 of the base component 301 . An outer diameter D3 of the outer component 401 is equal to or essentially equal to the outer diameter D 1 of the non-threaded section 303 of the base component 301 , while an inner diameter d2 of the outer component 401 matches the outer diameter D2 of the threaded section 302 of the base component 301 . A tubular work piece is formed by mounti ng the outer component 401 around the base component 301 such that the internally threaded section 402 of the outer component 401 is in engagement with the externally threaded section 302 of the base component 301 , i .e. by threadi ng the outer component 401 onto the threaded end portion of the base component 301 . A mechanical interlock is thereby formed between the threaded sections 302, 402.
The work piece is thereafter hot worked, e.g . by means of hot extrusion. Duri ng hot working , such as hot extrusion, a metallic bond is formed between the threaded sections 302, 402 while the mechanical interlock is maintained. An outer diameter of the work piece is also reduced and the length is increased. Straightening and/or pickli ng may be carried out before the resulti ng lance tube 1 is cut i nto its final length and, if needed, formed to a desired shape. The components 301 , 401 shown in fig . 3a are adapted for hot extrusion by pushi ng the work piece through an extrusion die with a leading end first, wherein the leading end is the end at which the outer component 401 is mounted. A transition surface 308 between the externally threaded section 302 of the base component 301 and the non-threaded section 303 is smooth , without sharp edges. The transition surface 308 is shown i n more detail i n fig . 3b, showing a magnification of the encircled area B from fig . 3a. The transition surface is in cross section shaped as an inverted S with a concave portion 304 closest to the threaded section 302, and a convex portion 305 closest to the non-threaded section 303. The outer component 401 has an end surface 408 with a corresponding S-shape with a convex portion 404 close to the i nternal thread 406, and a concave portion 405 close to an outer peripheral surface 407 of the outer component 401 as shown in fig . 3c showing a mag nification of the encircled area C from fig . 3a. The concave portion 405 of the end surface 408 will thereby overlap with the convex portion 305 of the transition surface 308, which prevents separation and penetration of oxygen during the extrusion process.
Another option is to let the leadi ng end in the extrusion process be the end on which no outer component is mou nted . I n this case, shown in fig . 4, the base component 301 is formed with a C- shaped concave transition surface 308, such that it floats over a rounded annular end surface 408 of the outer component 401 during extrusion and forms a seal . An outer peripheral surface 307 of the base component 301 thus overlaps the outer peripheral surface 407 of the outer component 401 when the components 301 , 401 are mounted to form the work piece.
Fig . 5 shows a cross sectional view of parts of a work piece 501 adapted for hot extrusion by pushing the work piece 501 through an extrusion die with a leadi ng end 502 first, wherei n the leading end 502 is the end at which the outer component 401 is mounted. The ends on which the outer components 401 are mounted have been machined to form rounded end surfaces 503. The desig n of the transition surfaces 308, 408 of the base component 301 and the outer component 401 , respectively, differs in this embodiment somewhat from the design shown i n figs. 3a-c. The transition surface 308 of the base component 301 includes, as seen in the cross section, a first straight portion 309 perpendicular to the longitudinal axis A, and a second straight portion 31 0 which is inclined at an angle a of 30° with respect to the longitudinal axis A. A curved surface connects the two straight portions 309, 31 0. The angle a may of course be varied.
The transition surface 408 of the outer component 401 is formed to engage and overlap with the transition surface 308, such that a seal is formed . Of a total wall thickness t of the outer component, the first straight portion 309 extends over a thickness h . Example
I n a production trial , ten lance tubes according to the embodiment shown in fig . 1 were manufactured . Ten outer components of a first alloy and ten base components of a second alloy were formed. The first alloy was in this case an iron chromium alumi nium (FeCrAI) alloy known under the trademark Kanthal® APM. The composition of the first alloy as measured i n percent by weight (wt.%) is disclosed in Table I .
Table I The second alloy was a ferritic stainless steel accordi ng to ASTM 446- 1 havi ng a composition in wt.% as disclosed in Table I I . c Si Mn P S Cr N Fe
<0.20 0.5 0.8 <0.030 <0.015 26.5 0.2 balance
Table II
Each base component had a total length of 400 mm, an outer diameter D1 of 164 mm and an inner diameter d of 41 mm. An externally threaded section having a length of 95 mm and an outer diameter D2 of 154 mm was formed by cutting machining. The outer components each had a length of 95 mm and an inner diameter d2 of 154 mm and were provided with an internal helical thread. The components had the transitional design shown in fig. 5. A wall thickness t of the outer component was 5 mm and the thickness h was 1.8 mm. The helical thread had a pitch of 2 mm.
The components were degreased using ethanol. The outer components 401 were thereafter threaded onto the base components 301 to form work pieces such as shown fig.5.
The work pieces were thereafter heated to 900°C and hot extruded at temperatures shown in table III. The work pieces were extruded with the end on which the outer component was mounted as the leading end.
Work piece Extrusion temp. (°C)
S1 1120
S2 1120
S3 1120
S4 1120
S5 1120 S6 1 090
S7 1 090
S8 1 070
S9 1 070
S1 0 1 050
Table III
After hot extrusion, the formed tubes were straightened and blasted using steel sand .
The lengths of the double-layered portions of the manufactured lance tubes were fou nd to be between 70 cm and 1 20 cm . A thickness of the outer layer was measured in test samples using optical and electron microscopy and was fou nd to be between 600-900 pm .
Using energy-dispersive X-ray spectroscopy, it was also investigated whether a protective aluminium oxide scale had been formed on the outer layer of the double-layered portion duri ng the heat treatment and whether a metallic bond had been formed between the i nner and outer layers. It was found that an alumi nium oxide scale had been formed on the surface of the outer layer and that aluminiu m nitride precipitates had formed in the outer layer, indicati ng nitrogen diffusion from the inner layer of the second alloy ASTM 446- 1 i nto the outer layer of the first alloy sold u nder the trademark Kanthal® APM , which in turn indicates formation of a metallic bond. Fig . 6 shows a cross sectional picture of a part of the interface between the inner layer 5 and the outer layer 4 of the double- layered portion of a manufactured lance tube accordi ng to an embodiment. The picture is taken at a foremost portion of the lance tube, correspondi ng to the leading end of the work piece. A helically extending thread 6 is clearly seen. Thus, while a metallic bond has been formed in the interface, the inner and outer layers are still also mechanically bound together. The di mensions of the components used may of course be varied depending on the desired dimensions of the fi nal lance tube, as well as the alloys used and the parameters used during hot worki ng , e.g . hot extrusion. Various other processing steps may also be included, such as pre-heati ng and cold pilgering . The desig n of the base component and the outer component can be varied dependi ng on the requirements on the final lance tube.
The proposed lance tube may be shaped to suit the requirements of the lime kil n or other application in which it is to be used. The desig n of the lance tube may be varied, for example by letting all or part of the double-layered portion have an outer diameter which is different than , for example smaller than , the outer diameter of the main portion. The double-layered end portion of the lance tube may also include a portion entirely made of the first alloy that the outer layer is made of, so that the high temperature corrosion resistant first alloy covers the end of the lance tube.
The proposed lance tube is not li mited to the embodiments described above, but many possibilities to modifications thereof would be apparent to a person with skill in the art without departing from the scope of the appended claims.

Claims

CLAI MS
1 . A lance tube ( 1 ) having a central through-hole extending along a longitudinal axis (A) ,
characterised in
that the lance tube ( 1 ) comprises:
- a double-layered end portion (2) having an annular outer layer (4) of a high temperature corrosion resistant first alloy and an annular inner layer (5) of a second alloy, wherei n the annular inner layer (5) and the annular outer layer (4) are mechanically i nterlocked , and wherein a metallic bond has been formed between the annular i nner layer (5) and the annular outer layer (4) by means of hot working , and
- a mono-layered main portion (3) of the second alloy.
2. The lance tube according to claim 1 , wherein the metallic bond has been formed between the annular inner layer (5) and the annular outer layer (4) by means of hot extrusion.
3. The lance tube according to claim 1 or claim 2, wherein the annular inner layer (5) and the annular outer layer (4) are mechanically interlocked by means of a helically extendi ng thread (6) formed in an i nterface between the inner layer (5) and the outer layer (4) .
4. The lance tube according to any one of claims 1 to 3, wherein the mono-layered main portion (3) extends along a major part of the lance tube ( 1 ) as measured along the longitudinal axis (A) .
5. The lance tube according to any one of claims 1 -4, wherein the second alloy is selected from a stai nless steel alloy or a carbon steel .
6. The lance tube according to any one of the preceding claims, wherein the second alloy is selected from a ferritic stainless steel alloy or an austenitic stainless steel alloy.
7. The lance tube according to any one of the preceding claims, wherein the first alloy is an alumina forming alloy.
8. The lance tube according to claim 7, wherein the alumina formi ng alloy is an iron chromium alu miniu m alloy.
9. The lance tube according to any one of the preceding claims, wherein the first alloy comprises:
9-25 wt. % Cr,
2.5-8 wt. % Al ,
the balance bei ng Fe and normally occurri ng impurities, and optionally other intentionally added alloying elements.
1 0. The lance tube accordi ng to any one of the precedi ng claims, wherein the annular outer layer (4) has a thickness within the i nterval 5-50 % of a total wall thickness.
1 1 . The lance tube according to any one of the preceding claims, wherein the annular outer layer (4) has a thickness within the i nterval 1 0-40 % of a total wall thickness.
12. The lance tube according to any one of the preceding claims, wherein the lance tube (1) has a total wall thickness within the interval 3-20 mm.
13. The lance tube according to any one of the preceding claims, wherein an outer diameter of the lance tube (1) as measured at each of the mono-layered main portion (3) and the double-layered end portion (2) is identical or essentially identical.
14. The lance tube according to any one of the preceding claims, wherein an inner diameter of the lance tube as measured at each of the mono-layered main portion and the double-layered end portion is identical or essentially identical.
15. Use of a lance tube (1) according to any one of the preceding claims as a lance tube in a lime kiln, in a lime furnace burner, in blast furnace coal powder injection and in sootblower elements.
EP17818592.2A 2016-12-23 2017-12-22 A lance tube Not-in-force EP3559578B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP16206888 2016-12-23
PCT/EP2017/084517 WO2018115503A1 (en) 2016-12-23 2017-12-22 A lance tube

Publications (2)

Publication Number Publication Date
EP3559578A1 true EP3559578A1 (en) 2019-10-30
EP3559578B1 EP3559578B1 (en) 2022-06-22

Family

ID=57758454

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17818592.2A Not-in-force EP3559578B1 (en) 2016-12-23 2017-12-22 A lance tube

Country Status (4)

Country Link
EP (1) EP3559578B1 (en)
CN (1) CN110088550B (en)
ES (1) ES2921231T3 (en)
WO (1) WO2018115503A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12605721B2 (en) 2023-07-06 2026-04-21 Honda Motor Co., Ltd. Coating lance

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3122178A1 (en) * 1981-06-04 1983-01-20 Ottmar 6600 Saarbrücken Mengelkoch Detachable and replaceable heat and splash protection for oxygen lances for steel production
JPH09257167A (en) * 1996-03-19 1997-09-30 Daiwa House Ind Co Ltd Structure of joint part of piping and its manufacture
TW548334B (en) * 1997-08-20 2003-08-21 Jgc Corp Heating furnace and method of manufacturing the same
CN2357304Y (en) * 1998-12-07 2000-01-05 冶金工业部钢铁研究总院 Coal powder lance for blast furnace
DK200201498A (en) * 2002-10-07 2004-04-08 Man B & W Diesel As An atomizer for a fuel valve in a diesel engine, and a method for producing an atomizer
SE528189C2 (en) * 2004-12-21 2006-09-19 Sandvik Intellectual Property Method and pipe joint for joining components comprising or made of a material which is difficult to weld

Also Published As

Publication number Publication date
WO2018115503A1 (en) 2018-06-28
CN110088550A (en) 2019-08-02
CN110088550B (en) 2022-04-26
ES2921231T3 (en) 2022-08-22
EP3559578B1 (en) 2022-06-22

Similar Documents

Publication Publication Date Title
US11054065B2 (en) Method for manufacturing a composite tube
AU2020220106B2 (en) Process for producing a multilayer pipe having a metallurgical bond by drawing, and multilayer pipe produced by this process
CN101784685B (en) Boiler Low Thermal Expansion Ni-Based Superalloy Excellent in High-Temperature Strength, Boiler Parts Using It, and Manufacturing Method for Boiler Parts
CN104379786B (en) Ni-based alloy
KR101630096B1 (en) Ni-BASED HEAT-RESISTANT ALLOY
EP2330225B1 (en) Nickel based heat-resistant alloy
KR101632520B1 (en) Seamless austenite heat-resistant alloy tube
KR101809360B1 (en) METHOD FOR PRODUCING Ni-BASED HEAT-RESISTANT ALLOY WELDING JOINT AND WELDING JOINT OBTAINED BY USING THE SAME
CN104114730B (en) Double-layer pipe and welded structure using same
JP2019518608A (en) Tube, and method of making tube
CN104946932B (en) The manufacture method of Austenitic heat-resistant alloy pipe and the Austenitic heat-resistant alloy pipe using manufacture method manufacture
CN107709595A (en) Austenitic heat-resistant alloys and welded structural parts
WO2016009996A1 (en) TANDEM SUBMERGED ARC WELDING METHOD FOR HIGH Cr CSEF STEEL
CN107709596A (en) Austenitic heat-resistant alloy and welding structural element
RU2711168C2 (en) Method of making pipe device, pipe device and oven equipped with such pipe device
EP3345716B1 (en) Wire for submerged arc welding
EP3559578A1 (en) A lance tube
CN116507750A (en) Double pipe and welded joints
EP3170616B1 (en) Method of single submerged arc welding of high-cr csef steel
WO2014014069A1 (en) Method of manufacturing engine exhaust valve for large vessel
SU872130A1 (en) Composition of welding wire
Ziewiec Study of the Weldability of Austenitic PH Steel for Power Plants
JPH10146692A (en) Inert gas arc welding materials for Ni-base alloys
CN113969386B (en) Waste incinerator boiler tube applied to working condition at temperature lower than 400 ℃ and production method thereof
WO2005105362A1 (en) Method for joining dispersion-strengthened alloy

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190723

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: AB SANDVIK MATERIALS TECHNOLOGY

RIC1 Information provided on ipc code assigned before grant

Ipc: F27D 99/00 20100101ALI20211207BHEP

Ipc: F27B 1/16 20060101ALI20211207BHEP

Ipc: F27B 1/20 20060101ALI20211207BHEP

Ipc: F27D 3/16 20060101ALI20211207BHEP

Ipc: F27D 3/18 20060101ALI20211207BHEP

Ipc: C21C 5/46 20060101ALI20211207BHEP

Ipc: F27B 1/02 20060101AFI20211207BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220125

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1500012

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017058811

Country of ref document: DE

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2921231

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20220822

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220922

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220923

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220922

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1500012

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221024

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221022

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017058811

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20230323

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230526

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20221231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221231

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221222

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231102

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20231110

Year of fee payment: 7

Ref country code: IT

Payment date: 20231110

Year of fee payment: 7

Ref country code: FR

Payment date: 20231122

Year of fee payment: 7

Ref country code: DE

Payment date: 20231031

Year of fee payment: 7

Ref country code: CZ

Payment date: 20231128

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20171222

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20240112

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

REG Reference to a national code

Ref country code: ES

Ref legal event code: PC2A

Owner name: ALLEIMA TUBE AB

Effective date: 20240927

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602017058811

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241222

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20241222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20250701

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241231

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20260204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241223