EP3421171B1 - Roues de turbine, moteurs de turbine les comprenant et procédés de fabrication de roues de turbine à géométrie de ligne de liaison améliorée - Google Patents
Roues de turbine, moteurs de turbine les comprenant et procédés de fabrication de roues de turbine à géométrie de ligne de liaison améliorée Download PDFInfo
- Publication number
- EP3421171B1 EP3421171B1 EP18179420.7A EP18179420A EP3421171B1 EP 3421171 B1 EP3421171 B1 EP 3421171B1 EP 18179420 A EP18179420 A EP 18179420A EP 3421171 B1 EP3421171 B1 EP 3421171B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- blade
- rotor disk
- blade mount
- bonding surface
- turbine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000000034 method Methods 0.000 title claims description 28
- 238000001816 cooling Methods 0.000 claims description 70
- 239000000463 material Substances 0.000 claims description 26
- 238000004519 manufacturing process Methods 0.000 claims description 21
- 230000001788 irregular Effects 0.000 claims description 3
- 239000007789 gas Substances 0.000 description 14
- 238000013461 design Methods 0.000 description 9
- 238000005219 brazing Methods 0.000 description 5
- 238000005266 casting Methods 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 3
- 239000012530 fluid Substances 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000004323 axial length Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 239000012809 cooling fluid Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000001513 hot isostatic pressing Methods 0.000 description 1
- -1 i.e. Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
- B23P15/006—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass turbine wheels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D5/00—Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
- F01D5/02—Blade-carrying members, e.g. rotors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D5/00—Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
- F01D5/02—Blade-carrying members, e.g. rotors
- F01D5/025—Fixing blade carrying members on shafts
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D5/00—Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
- F01D5/02—Blade-carrying members, e.g. rotors
- F01D5/08—Heating, heat-insulating or cooling means
- F01D5/085—Heating, heat-insulating or cooling means cooling fluid circulating inside the rotor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D5/00—Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
- F01D5/30—Fixing blades to rotors; Blade roots ; Blade spacers
- F01D5/3007—Fixing blades to rotors; Blade roots ; Blade spacers of axial insertion type
- F01D5/3015—Fixing blades to rotors; Blade roots ; Blade spacers of axial insertion type with side plates
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D5/00—Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
- F01D5/30—Fixing blades to rotors; Blade roots ; Blade spacers
- F01D5/3061—Fixing blades to rotors; Blade roots ; Blade spacers by welding, brazing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D5/00—Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
- F01D5/02—Blade-carrying members, e.g. rotors
- F01D5/08—Heating, heat-insulating or cooling means
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2220/00—Application
- F05D2220/30—Application in turbines
- F05D2220/32—Application in turbines in gas turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2230/00—Manufacture
- F05D2230/20—Manufacture essentially without removing material
- F05D2230/23—Manufacture essentially without removing material by permanently joining parts together
- F05D2230/232—Manufacture essentially without removing material by permanently joining parts together by welding
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2240/00—Components
- F05D2240/20—Rotors
- F05D2240/24—Rotors for turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2240/00—Components
- F05D2240/80—Platforms for stationary or moving blades
- F05D2240/81—Cooled platforms
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T50/00—Aeronautics or air transport
- Y02T50/60—Efficient propulsion technologies, e.g. for aircraft
Definitions
- the technical field generally relates to turbine wheels, turbine engines including the turbine wheels, and methods of fabricating the turbine wheels, and more particularly relates to turbine wheels having improved bond line geometry for bonded turbine blade/rotor disk configurations.
- Gas turbine engines are generally known for use in a wide range of applications such as aircraft engines and auxiliary power units for aircraft.
- the gas turbine engine includes a turbine section having a plurality of sets or rows of stator vanes and turbine blades disposed in an alternating sequence along an axial length of a hot gas flow path of generally annular shape.
- the turbine blades are coupled to a main engine shaft through one or more rotor disks.
- Hot combustion gases are delivered from an engine combustor to the annular hot gas flow path, resulting in rotary driving of the turbine rotor disks which, in turn, drives the compressors and gearbox.
- Advanced high performance gas turbine engines are constantly driven to achieve maximized thermodynamic efficiency, which is generally achieved by operating at higher rotor speeds and temperatures.
- the turbine blades are mounted at the periphery of the one or more rotor disks through a mechanical connection, e.g., through a dovetail-type connection or the like.
- the mechanical properties of the rotor disks and turbine blades may be inadequate to sustain induced loads during operation, even with selection of special materials and engineered cooling schemes. This may be especially true as efforts are made to maximize thermodynamic efficiency by maximizing rotor speeds and operating temperatures.
- One approach taken to maximize temperatures and load carrying capability in turbine blades and rotor disks, particularly in the high pressure turbine (HPT) section, is to employ dissimilar materials for the rotor disks and the turbine blades while removing the stress concentrations associated to mechanical connections.
- the respective rotor disks and turbine blades, including the dissimilar materials, are directly bonded together as opposed to relying upon a mechanical connection.
- the turbine blades may be operatively connected to blade mounts, e.g., by casting the turbine blades and blade mounts together, or by brazing or welding the turbine blades to the blade mounts.
- the blade mounts may be operatively connected to each other forming a blade ring, such as by casting a plurality of blade mounts together or by brazing or welding blade mounts together.
- the creation of an integral bonded rotor requires the release of hoop stress attributable to the thermal gradients and rotation of the rotor disk. The hoop stress can be broken by slotting the blade ring and rotor disk after bonding the blade ring and rotor disk together.
- radial stress at a bond line between the blade ring and the rotor disk is often a concern and can lead to structural failure of the bonded turbine blade/rotor disk.
- Various bond line geometries have been proposed to address assembly and bonding surface area considerations. However, radial stress is still a concern with such bond line geometries. Further, various configurations of turbine wheels exhibit areas of higher radial stress along the bond line due to particular features of the turbine wheels.
- Patent document number WO2010/088882A2 describes an integrally bladed rotor disk for a turbine comprising rotor blades, which are bonded to a disk element, and a sealing device for suppressing or reducing a transfer of cooling air from a high pressure side of the rotor disk through openings at the rotor disk to the low pressure side of the rotor disk.
- Turbine wheels, turbine engines, and methods of fabricating the turbine wheels are provided herein.
- a method of fabricating a turbine wheel is provided, where the turbine wheel includes a rotor disk and a plurality of turbine blades that are each operatively connected to the rotor disk through a blade mount.
- the method includes locating a cooling passage within a blade mount preliminary configuration and a cooling inlet on a surface of the blade mount preliminary configuration.
- a stress relief hole that passes through a rotor disk preliminary configuration is also located.
- a rotor disk bonding surface geometry of the rotor disk preliminary configuration and a blade mount bonding surface geometry of the blade mount preliminary configuration are designed based upon location of the cooling passage, the cooling inlet, and, optionally, the stress relief hole.
- the bonding surface geometries are further designed based upon a stress analysis of the turbine wheel.
- a rotor disk production configuration and a blade mount production configuration are generated based upon the respective rotor disk preliminary configuration having the rotor disk bonding surface geometry and the blade mount preliminary configuration having the blade mount bonding surface geometry.
- the blade mount is formed based upon the blade mount production configuration and the rotor disk is formed based upon the rotor disk production configuration, wherein the blade mount and the rotor disk are formed from dissimilar materials having different mechanical and/or thermal properties.
- a blade ring including a plurality of blade mounts is formed. The blade ring is bonded to the rotor disk to form a bond line.
- the bond line is located between the cooling passage and the optional stress relief hole, when present, and the bond line is spaced from the cooling inlet and the cooling passage.
- a turbine wheel in another embodiment, includes a rotor disk and a plurality of turbine blades.
- a stress relief hole passes through the rotor disk.
- Each turbine blade is operatively connected to the rotor disk through a blade mount.
- the blade mount is bonded to the rotor disk at a blade mount bonding surface of the blade mount and a rotor disk bonding surface of the rotor disk to form a bond line.
- the rotor disk bonding surface of the rotor disk and the blade mount bonding surface of the blade mount have a geometry to minimize radial stress at the bond line.
- the blade mount and the rotor disk have a fore surface on a higher pressure side thereof and an aft surface on a lower pressure side thereof.
- the blade mount includes a blade attachment surface extending between and connecting the fore surface and the aft surface thereof.
- the turbine blade extends from the blade attachment surface.
- a gap is defined between adjacent blade mounts, separating the blade mounts and extending into the rotor disk.
- a turbine engine in another embodiment, includes a turbine wheel.
- the turbine wheel includes a rotor disk and a plurality of turbine blades.
- the rotor disk has a stress relief hole passing through the rotor disk.
- Each turbine blade is operatively connected to the rotor disk through a blade mount.
- the blade mount is bonded to the rotor disk at a blade mount bonding surface of the blade mount and a rotor disk bonding surface of the rotor disk to form a bond line.
- the rotor disk bonding surface of the rotor disk and the blade mount bonding surface of the blade mount have a geometry to minimize radial stress at the bond line.
- the blade mount and the rotor disk have a fore surface on a higher pressure side thereof and an aft surface on a lower pressure side thereof.
- the blade mount includes a blade attachment surface extending between and connecting the fore surface and the aft surface thereof.
- the turbine blade extends from the blade attachment surface.
- a gap is defined between adjacent blade mounts, separating the blade mounts and extending into the rotor disk.
- a fore seal plate has a fore plate edge, and the fore plate edge abuts the fore surface of the blade mounts about a circumference of the turbine wheel.
- an aft seal plate is also present and has an aft plate edge that abuts the aft surface of the blade mounts about the circumference of the turbine wheel.
- Embodiments of the present disclosure are generally directed to turbine wheels, turbine engines, and methods of fabricating the turbine wheels.
- conventional techniques related to turbine engine design and fabrication may not be described in detail herein.
- the various tasks and process steps described herein may be incorporated into a more comprehensive procedure or process having additional steps or functionality not described in detail herein.
- turbine wheels, turbine engines, and methods of fabricating turbine wheels are well-known and so, in the interest of brevity, many conventional steps will only be mentioned briefly herein or will be omitted entirely without providing the well-known process details.
- turbine wheels As contemplated herein, turbine wheels, turbine engines including the turbine wheels, and methods of fabricating the turbine wheels are provided in which improved bond line geometry is achieved for minimizing radial stress at the bond line. More particularly, the turbine wheel includes a rotor disk and a plurality of turbine blades each operatively connected to the rotor disk through a blade mount.
- "Operatively connected,” as referred to herein, means that the referenced parts are connected by casting the parts together, by brazing or welding the parts together, by diffusion bonding or hot isostatic pressing (HIP), or by otherwise bonding the parts together in the absence of a mechanical connection such as dovetails, keyhole connections, or the like where physical contours or frictional forces maintain the connection between the parts.
- HIP hot isostatic pressing
- the blade mounts are portions of the turbine wheel that include a single turbine blade and that are directly bonded to the rotor disk.
- the blade mounts and rotor disk are formed from dissimilar materials, i.e., materials having a different mechanical and/or thermal properties such as different strength, fatigue, and crack growth capabilities, due to design and operating environment considerations.
- the blade mounts may be bonded or cast together to form a blade ring, followed by bonding the blade ring to the rotor disk. Due to bonding of the dissimilar materials, thermal gradients, and the rotation induced stress in the unbroken ring, hoop stress arises in the blade ring and the rotor disk.
- the blade ring and the rotor disk are slotted along a radius thereof, i.e., a common radius of the rotor disk and the blade mount, to thereby form a gap between adjacent blade mounts, with the gap separating the blade mounts and extending into the rotor disk.
- a rotor disk bonding surface geometry of a rotor disk preliminary configuration and a blade mount bonding surface geometry of a blade mount preliminary configuration are designed based upon location of the cooling passage, the cooling inlet, and further based upon a stress analysis of the turbine wheel.
- the rotor disk bonding surface geometry and the blade mount bonding surface geometry can be configured to minimize blade mount material between the blade mount bonding surface and the cooling passage at areas of greatest radial stress, based upon the stress analysis.
- the rotor disk bonding surface geometry and the blade mount bonding surface geometry can also be configured based upon clearance of other features in the blade mount and/or rotor disk to minimize radial stress. In this matter, improved bond line geometry can be achieved whereby radial stress at the bond line is minimized.
- the turbine wheels may be useful in any gas turbine engine, and may be particularly useful in HPT sections of the gas turbine engines.
- the turbine wheel and turbine engines may be used in many industries including aerospace and industrial such as for applications including electricity generation, naval propulsion, pumping sets for gas and oil transmission, aircraft propulsion, automobile engines, and stationary power plants.
- FIG. 1 a partial, cross-sectional view of an exemplary turbine engine 100 is shown with the remaining portion of the turbine engine 100 being axisymmetric about a longitudinal axis 140, which also includes an axis of rotation for the gas turbine engine 100.
- the turbine engine 100 is a multi-spool turbofan gas turbine jet engine 100 within an aircraft 99, although other arrangements and uses may be provided.
- Components of the gas turbine engine 100 may be, for example, also found in an auxiliary power unit ("APU").
- APU auxiliary power unit
- the turbine engine 100 includes a fan section 102, a compressor section 104, a combustor section 106, a turbine section 108, and an exhaust section 110.
- the fan section 102 includes a fan 112 mounted on a rotor 114 that draws air into the gas turbine engine 100 and accelerates it. A fraction of the accelerated air exhausted from the fan 112 is directed through an outer (or first) bypass duct 116 and the remaining fraction of air exhausted from the fan 112 is directed into the compressor section 104.
- the outer bypass duct 116 is generally defined by an inner casing 118 and an outer casing 144.
- the compressor section 104 includes an intermediate pressure compressor 120 and a high pressure compressor 122.
- the number of compressors in the compressor section 104 may vary.
- the intermediate pressure compressor 120 and the high pressure compressor 122 sequentially raise the pressure of the air and direct a majority of the high pressure air into the combustor section 106.
- a fraction of the compressed air bypasses the combustor section 106 and is used to cool, among other components, turbine blades in the turbine section 108 via an inner bypass duct.
- the high pressure air is mixed with fuel and combusted.
- the high-temperature combusted air is then directed into the turbine section 108.
- the turbine section 108 includes three turbines disposed in axial flow series, namely, a high pressure turbine 126, an intermediate pressure turbine 128, and a low pressure turbine 130.
- the number of turbines, and/or the configurations thereof may vary.
- the high-temperature combusted air from the combustor section 106 expands through and rotates each turbine 126, 128, and 130.
- each drives equipment in the gas turbine engine 100 via concentrically disposed shafts or spools.
- the high pressure turbine 126 drives the high pressure compressor 122 via a high pressure shaft 134
- the intermediate pressure turbine 128 drives the intermediate pressure compressor 120 via an intermediate pressure shaft 136
- the low pressure turbine 130 drives the fan 112 via a low pressure shaft 138.
- the turbine engine 100 that includes a turbine wheel 12 and a fore seal plate 14 will now be described in detail.
- the turbine wheel 12 and the fore seal plate 14 may be located in the high pressure turbine 126 of the turbine engine 100.
- the turbine engine 100 further includes an aft seal plate 16, although it is to be appreciated that the aft seal plate 16 may be omitted in other embodiments.
- the fore seal plate 14 which is located on an upstream, a higher pressure side of the turbine wheel 12 hereinafter referred to as the "fore side,” has a fore plate edge 18 that abuts a fore surface 30 of the blade mounts 20 about the circumference of the turbine wheel 12.
- the fore seal plate 14 and the turbine wheel 12 define a cooling cavity 22 therebetween.
- the cooling cavity 22 is in fluid communication with a cooling fluid source (not shown) that is isolated from a gaseous environment surrounding the turbine blades 24 during operation of the turbine engine 100.
- the cooling cavity 22 is sealed from gaseous communication between the cooling cavity 22 and the gaseous environment surrounding the turbine blades 24, e.g., by the fore plate edge 18 in cooperation with the fore surface 30 of the blade mounts 20.
- the optional aft seal plate 16 has an aft plate edge 19 that abuts an aft surface 32 of the blade mounts 20 about the circumference of the turbine wheel 12, on a downstream, lower pressure side of the turbine wheel 12 hereinafter referred to as the "aft side.”
- the turbine wheel 12 includes a rotor disk 26 and a plurality of the turbine blades 24.
- Each turbine blade 24 is operatively connected to the rotor disk 26 through a respective blade mount 20, with the bond between the rotor disk 26 and the respective blade mounts 20 shown at bond line 37.
- the bond line 37 is described in further detail below.
- the turbine wheel 12 may be formed by providing the turbine blades 24 operatively connected to the respective blade mounts 20, e.g., by casting the turbine blades 24 and blade mounts 20 together, or by brazing or welding the turbine blades 24 to the blade mounts 20.
- the turbine blades 24 and respective blade mounts 20 are unitary and do not rely upon a mechanical connection to remain joined.
- a plurality of the blade mounts 20 are operatively connected to form a blade ring, e.g., by casting the blade mounts 20 together to form the blade ring or brazing or welding the blade mounts 20 together.
- the blade mount 20 and the rotor disk 26 have the fore surface 30, which is on the fore side of the turbine wheel 12, and the blade mount 20 and the rotor disk 26 have the aft surface 32, which is on the aft side of the turbine wheel 12.
- the fore surface 30 and the aft surface 32 are opposite and generally parallel to each other.
- the blade mount 20 further includes a blade attachment surface 34 that extends between and connects the fore surface 30 and the aft surface 32.
- the turbine blade 24 extends from the blade attachment surface 34 of each blade mount 20.
- a gap 36 is defined between adjacent blade mounts 20.
- the gap 36 separates the blade mounts 20 and extends into the rotor disk 26.
- the gap 36 is an interface between surfaces of adjacent blade mounts 20, and the surfaces of the adjacent blade mounts 20 may be in direct physical contact at various points therealong, but are not bonded to each other.
- the gap 36 may be formed by slotting a blade ring of blade mounts 20 after bonding the blade ring to the rotor disk 26 during formation of the turbine wheel 12 to release hoop stress.
- the gap 36 further includes a stress relief hole 48 passing through the rotor disk 26.
- the stress relief hole 48 is defined by and within the rotor disk 26.
- the stress relief hole 48 has a stress relief hole opening 50 in the fore surface 30.
- the stress relief hole 48 is exclusively defined by and within the rotor disk 26, i.e., no portion of the stress relief hole 48 is defined by the blade mount 20.
- the stress relief hole 48 and the stress relief hole opening 50 are shown in the Figures with generalized configurations, various alternative configurations are also possible such as a "J" slot or more complex geometries rather than a linear bore.
- the stress relief hole 48 and the stress relief hole opening 50 can be above, extend to, or can be below the bond line 37.
- the cooling cavity 22 is defined on both the fore side and the aft side of the turbine wheel 12, with fluid communication between the fore side and the aft side facilitated through the stress relief hole 48.
- the blade mount 20 further includes a cooling passage 33 within the blade mount 20 and a cooling inlet 35 on a surface, e.g., the fore surface 30, of the blade mount 20.
- the cooling inlet may be located on the aft surface 32 instead of the fore surface 30.
- the cooling passage 33 is in fluid communication with the cooling passage 33 for providing entry of cooling air from the cooling cavity 22 into the cooling passage 33.
- the cooling passage 33 is entirely contained within the blade mount 20 and, optionally, the associated turbine blade 24, i.e., the cooling passage 33 is not defined in or by the rotor disk 26.
- the blade mount 20 is bonded to the rotor disk 26 at the bond line 37. More specifically, the blade mount 20 is bonded to the rotor disk 26 at a blade mount bonding surface of the blade mount 20 and a rotor disk bonding surface of the rotor disk 26 to form the bond line 37.
- the bond line 37 is enumerated in place of the separate blade mount bonding surface and rotor disk bonding surface, although it is to be appreciated that those surfaces meet and are brazed or otherwise bonded together at the bond line 37.
- the rotor disk bonding surface of the rotor disk 26 and the blade mount bonding surface of the blade mount 20 have a geometry to minimize radial stress at the bond line 37.
- the rotor disk bonding surface and the blade mount bonding surface of the blade mount have the geometry to minimize radial stress at the bond line 37 along an entire length of the bond line 137, with the entire bond line 37 designed with consideration of radial stress at all portions of the bond line 37. In other embodiments, only portions of the bond line 37 are designed with consideration of radial stress, e.g., with areas of high radial stress factored in during design of the mount bonding surface of the blade mount 20 and the rotor disk bonding surface of the rotor disk 26.
- the rotor disk bonding surface of the rotor disk 26 and the blade mount bonding surface of the blade mount 20 have the geometry to minimize thickness of blade mount material between the blade mount bonding surface and the cooling passage 33 along an entire length of the bond line 37. Methodology for designing the bonding surfaces is described in further detail below.
- the considerations of radial stress and location of the cooling passage optionally along with consideration of location of additional features in the rotor disk 26 and/or the blade mount 20, give rise to various bond line geometries.
- the bond line 37 generally follows the contours of lowermost boundaries of the cooling passage 33 and the cooling inlet 35, allowing for sufficient thickness of the blade mount material to enable operable connection between the rotor disk bonding surface and the blade mount bonding surface without compromising physical integrity of the blade mount 20.
- additional features in the rotor disk 26 and/or the blade mount 20 may also factor into bond line geometry for the embodiment shown in FIG. 2 .
- location of the stress relief hole opening 50, when present, and a location on the aft surface 32 where the aft plate edge 19 abuts the blade mounts 20 about the circumference of the turbine wheel 12 may also be considered in design of the rotor disk bonding surface and the blade mount bonding surface.
- the rotor disk bonding surface and the blade mount bonding surface have complementary shapes that still enable ingress/egress of the rotor disk 26 and the blade ring during assembly such that the rotor disk 26 can engage the blade mounts 20 that are formed into the blade ring during fabrication.
- the rotor disk bonding surface and the blade mount bonding surface may have circumferentially irregular geometries relative to the rotational axis of the turbine wheel 12, resulting in the bond line 37 that is irregular at the fore surface 30 and aft surface 32 of the turbine wheel 12. More specifically, the geometries meander in the circumferential direction relative to the axis (not shown), with portions of the resulting bond line 37 closer to the rotational axis of the turbine wheel 12 than other portions of the bond line 37. In this manner, mass of the blade mount 20 on the side of the bond line 37 that is radially opposite the turbine wheel axis of rotation can be further reduced to alleviate radial stress at the bond line 37.
- FIGS. 3A-3F Various alternative configurations of the blade mount bonding surface of the blade mount 20 and the rotor disk bonding surface of the rotor disk 26 are shown in FIGS. 3A-3F , illustrated at the various bond lines 37, 137, 237, 337, 437 in the respective Figures.
- FIGS. 2 , 3A, and 3C-3F show the bond lines 37, 137, 237, 337, 437 sloped from the fore surface 30 to the aft surface in a direction radially outward from the axis of rotation of the turbine wheel 12, it is to be appreciated that in other embodiments and as shown in FIG. 3B the bond line may be sloped radially inward from the fore surface 30 to the aft surface 32.
- the bond lines generally follow the lowermost boundaries of the cooling passage 33 and the cooling inlet 35, with the particular geometry developed based upon radial stress analysis.
- the bond line 37 may have a constant slope from one surface of the turbine wheel 12, e.g., the fore surface 30, to the opposing surface, e.g., the aft surface 32.
- FIGS. 3A and 3C-3F illustrate the cooling inlet 35 on a fore surface of the turbine wheel, it is to be appreciated that in other embodiments, and as shown in FIG. 3B , the cooling inlet may alternatively be located on the aft surface.
- the bond line 137, 237, 337, 437 may have a variable slope, in these instances with a greater slope in a central area of the turbine wheel 12, optionally with planar, unsloped portions of the bond line 237 as shown in FIG. 3D , to address areas of higher radial stress. For example, as shown in FIG.
- the central area of the turbine wheel 12 may exhibit higher radial stress such that configuration of the bond line 37, 137, 237, 337, 437 in the central area of the turbine wheel 12 may be particularly relevant to radial stress alleviation.
- location of ledge 39 may be limiting for the geometry of the respective blade mount bonding surface and rotor disk bonding surface.
- the gap 36 includes a pre-formed pocket 38 defined in and between adjacent blade mounts to enable effective release of the hoop stress through slotting, with the pre-formed pocket formed prior to slotting.
- the pocket 38 has a fore opening 40 in the fore surface 30 and, optionally, an aft opening 42 in an aft surface of the blade mounts.
- the turbine engine includes a fore seal plate 14 having a fore plate edge 18 abutting the blade mounts about the circumference of the turbine wheel.
- the fore opening 40 is located in a contact area where the fore plate edge 18 of the fore seal plate 14 meets the blade mount 20.
- Each pocket 38 is defined in and between adjacent blade mounts 20.
- blade ring may be slotted through the pocket 38 of adjacent blade mounts 20.
- the pocket 38 is fully contained within and between adjacent blade mounts 20, i.e., the pocket is not defined in any way by the rotor disk 26.
- only the fore opening 40 and, optionally, the aft opening 42 lead to the pocket 38.
- the pocket 38 is free from an opening in the blade attachment surface 34 of the blade mount 20. In this example, while the gap 36 between the adjacent blade mounts 20 opens to the blade attachment surface 34, the pocket 38 has no opening to the blade attachment surface 34.
- the gap 36 formed at the interface between adjacent blade mounts 20 leads to the pocket 38, the gap 36 is not an opening for purposes herein.
- the rotor disk bonding surface and the blade mount bonding surface are designed to account for the pocket 38, with a minimal thickness of blade mount material present between the lowermost boundary of the pocket 38 and the blade mount bonding surface.
- the turbine wheel includes the features as set forth above, including the rotor disk 26 and the plurality of turbine blades 24 each operatively connected to the rotor disk 26 through the blade mount 20 with the cooling passage 33 located within the blade mount 20 and the cooling inlet 35 also located on the surface of the blade mount 20.
- a blade mount preliminary configuration and a rotor disk preliminary configuration are provided.
- the "preliminary configurations", as referred to herein, are plans of the blade mount 20 and the rotor disk 26 prior to design of a rotor disk bonding surface geometry and a blade mount bonding surface geometry.
- the preliminary configurations may include some features of the respective blade mount 20 and the rotor disk 26, and may further include a preliminary blade mount bonding surface geometry and a preliminary rotor disk bonding surface geometry. More specifically, the preliminary geometries may represent stock or existing configurations of the blade mount bonding surface geometry and the rotor disk bonding surface geometry prior to designing such geometries in accordance with the methods described herein. It is contemplated that the preliminary configurations are generated by executing computer software using a microprocessor (not shown), with the preliminary configurations stored in a non-transitory computer-readable medium (not shown).
- the cooling passage 33 and the cooling inlet 35 are located, or identified, within the blade mount preliminary configuration for purposes of determining boundaries of a potential blade mount bonding surface geometry.
- a lowermost boundary of an additional feature in the blade mount preliminary configuration is located, wherein the opposing feature is located on an opposite surface of the blade mount preliminary configuration from the surface having the cooling inlet 35.
- the additional feature can be the location where the seal plates 14, 16 contact the turbine wheel 12, the pre-formed pocket 38, or the like.
- the lowermost boundary of the additional feature is located radially outward from lowermost boundaries of the cooling passage 33, the cooling inlet 35, or both the cooling passage 33 and the cooling inlet 35.
- the stress relief hole 48 that passes through the rotor disk preliminary configuration is also located, or identified, for purposes of determining boundaries of potential rotor disk bonding surface geometry.
- the stress relief hole 48 that passes through the rotor disk preliminary configuration may be designed after designing the rotor disk bonding surface geometry of the rotor disk preliminary configuration and the blade mount bonding surface geometry of the blade mount preliminary configuration, with the location of the stress relief hole 48, when present, dependent on the the rotor disk bonding surface geometry of the rotor disk preliminary configuration and the blade mount bonding surface geometry of the blade mount preliminary configuration.
- no stress relief hole may be needed.
- the aforementioned features can be located by using the computer software as executed by the microprocessor as described above.
- a rotor disk bonding surface geometry of the rotor disk preliminary configuration and a blade mount bonding surface geometry of the blade mount preliminary configuration are designed based upon location of the cooling passage 33, the cooling inlet 35, and, optionally, the stress relief hole 48, and further based upon a stress analysis of the turbine wheel 12.
- Designing can include generating the surface geometries where no preliminary geometries are provided, or can include modifying, reconfiguring, or adjusting preliminary geometries in the preliminary configurations.
- the aforementioned features can be designed by using the computer software as executed by the microprocessor as described above, with design rules applied by the software to design the aforementioned features.
- radial stress i.e., stress in the radial direct from the axis of rotation of the turbine wheel 12 between the blade mount 20 and the rotor disk 26 that is attributable to blade pull.
- the bonding surface geometries are then designed to minimize radial stress along the bond line 37 as compared to calculated stress.
- the bonding surface geometries may be designed with a decrease in material on a blade mount side of the bond line 37 in areas of higher stress, subject to minimum material thickness constraints between the blade mount bonding surface geometry and the cooling passage 33.
- the bonding surface geometries are further designed to provide a minimal thickness of blade mount material between the cooling passage 33 and the blade mount bonding surface geometry provided that the thickness of the blade mount material between the cooling passage 33 and the blade mount bonding surface is sufficient to avoid stress failure during operation of the turbine wheel 12.
- radial stress levels may be analyzed relative to potential flaw size and crack growth life. For example, and referring to FIG. 4 for illustrative purposes only, local peak stress may be examined and thickness of the blade mount material between the cooling passage 33 and the blade mount bonding surface geometry may be adjusted based upon the local peak stress and material capability.
- minimum material thickness constraints can also be considered between the blade mount bonding surface geometry and/or the rotor disk bonding surface geometry and additional features, e.g., the stress relief hole 48, the location where the seal plates 14, 16 contact the turbine wheel 12, the pre-formed pocket 38, and the like.
- the bonding surface geometries are further designed to provide that the blade ring and the rotor disk can still fit together with the surfaces in contact to facilitate formation of the bond line 37. Specific bonding surface geometries are described in detail above and shown in FIGS. 2 and 3A-3E in regards to the bond lines 37, 137, 237, 337, 437.
- a rotor disk production configuration and a blade mount production configuration are generated based upon the respective rotor disk preliminary configuration and the blade mount preliminary configuration.
- the rotor disk production configuration and the blade mount production configuration may be generated by using the computer software as executed by the microprocessor as described above.
- the method may proceed with production of the turbine wheel 12 through conventional techniques. More specifically, the blade mount 20 is formed based upon the blade mount production configuration and the rotor disk 26 is formed based upon the rotor disk production configuration.
- the blade mounts 20 and the rotor disk 26 are formed from dissimilar materials that have different mechanical and/or thermal properties, e.g., different strength, fatigue, and crack growth capabilities.
- the blade ring is bonded to the rotor disk 26 to form the bond line 137, with the bond line 137 located between the cooling passage 33 and the stress relief hole 48, when present.
- the bond line 37 is spaced from the cooling inlet 35 and the cooling passage 33 based upon the design of the rotor disk bonding surface geometry and the blade mount bonding surface geometry.
- the blade ring and the rotor disk 26 may be slotted along a radius thereof to thereby form the gap 36 between adjacent blade mounts, wherein the gap 36 separates the blade mounts and extends into the rotor disk 26.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Turbine Rotor Nozzle Sealing (AREA)
Claims (10)
- Procédé de fabrication d'une roue de turbine (12) comprenant un disque de rotor (26) et une pluralité d'aubes de turbine (24) dont chacune est reliée fonctionnellement au disque de rotor (26) par l'intermédiaire d'un support d'aube (20), le procédé comprenant :le placement d'un passage de refroidissement (33) dans une configuration préliminaire de support d'aube et d'une entrée de refroidissement (35) sur une surface de la configuration préliminaire de support d'aube ;le placement éventuel d'un trou de détente (48) traversant une configuration préliminaire de disque de rotor ;le procédé étant caractérisé en ce que :la conception d'une géométrie de surface de liaison de disque de rotor de la configuration préliminaire de disque de rotor (26) et d'une géométrie de surface de liaison de support d'aube de la configuration préliminaire de support d'aube (20) est basée sur l'emplacement du passage de refroidissement (33), de l'entrée de refroidissement (35) et, éventuellement, du trou de détente (48) et en outre basée sur une analyse des contraintes de la roue de turbine (12) ;la production d'une configuration de production de disque de rotor et d'une configuration de production de support d'aube en fonction de la configuration préliminaire de disque respectif de rotor ayant la géométrie de surface de liaison de disque de rotor et de la configuration préliminaire de support d'aube ayant la géométrie de surface de liaison de support d'aube ;la formation du support d'aube (20) basée sur la configuration de production de support d'aube et du disque de rotor (26) basée sur la configuration de production de disque de rotor, le support d'aube (20) et le disque de rotor (26) étant formés de matériaux différents ayant différents propriétés mécaniques et/ou thermiques ;la formation d'un aubage comprenant une pluralité de supports d'aube (20) ; etla liaison de l'aubage au disque de rotor (26) pour former une ligne de liaison (137), la ligne de liaison (137) étant située entre le passage de refroidissement (33) et l'éventuel trou de détente (48), lorsqu'il est présent, et la ligne de liaison (137) étant espacée de l'entrée de refroidissement (35) et du passage de refroidissement (33).
- Procédé selon la revendication 1, dans lequel la conception des géométries de surface de liaison en fonction de l'analyse des contraintes comprend la production des géométries de surface de liaison en fonction d'une contrainte radiale calculée entre le support d'aube (20) et le disque de rotor (26), attribuable à la traction de l'aube.
- Procédé selon la revendication 2, dans lequel la conception des géométries de surface de liaison comprend la conception des géométries de surface de liaison pour réduire au minium la contrainte radiale le long de la ligne de liaison (137) par rapport à la contrainte calculée.
- Procédé selon la revendication 3, dans lequel la conception des géométries de surface de liaison comprend la conception des géométries de surface de liaison avec une diminution du matériau sur un côté support d'aube de la ligne de liaison (137) dans les zones de contrainte supérieure, sous réserve de contraintes minimales en matière d'épaisseur de matériau entre la géométrie de surface de liaison de support d'aube et le passage de refroidissement (33).
- Procédé selon la revendication 1, dans lequel la conception des géométries de surface de liaison comprend en outre la conception de la géométrie de surface de liaison de support d'aube avec une épaisseur minimale de matériau de support d'aube entre le passage de refroidissement (33) et la géométrie de la surface de liaison de support d'aube, à condition que l'épaisseur de matériau de support d'aube entre le passage de refroidissement (33) et la géométrie de surface de liaison de support d'aube soit suffisante pour éviter une rupture par contrainte pendant le fonctionnement de la roue de turbine (12).
- Procédé selon la revendication 1, comprenant en outre le placement d'une limite la plus basse d'un élément supplémentaire dans la configuration préliminaire de support d'aube, l'élément opposé étant situé sur une surface opposée de la configuration préliminaire de support d'aube à partir de la surface comportant l'entrée de refroidissement (35), dans lequel la limite la plus basse de l'élément supplémentaire est située radialement vers l'extérieur à partir des limites les plus basses du passage de refroidissement (33) et de l'entrée de refroidissement (35) et dans lequel la conception de la géométrie de surface de liaison de support d'aube comprend la conception de la géométrie de surface de liaison de support d'aube avec une épaisseur minimale du matériau de support d'aube entre la limite la plus basse de l'élément supplémentaire et la géométrie de surface de liaison de support d'aube.
- Procédé selon la revendication 1, dans lequel la liaison de l'aubage au disque de rotor (26) comprend la liaison du support d'aube (20) au disque de rotor (26), le support d'aube (20) et le disque de rotor (26) présentant une surface avant sur un côté à pression supérieure de ceux-ci, une surface arrière sur un côté à pression inférieure de ceux-ci, le support d'aube (20) comprenant une surface de fixation d'aube (34) s'étendant entre la surface avant et sa surface arrière et reliant celles-ci et dans lequel le l'aube de turbine s'étend depuis la surface de fixation d'aube (34).
- Procédé selon la revendication 1, dans lequel la conception de la géométrie de surface de liaison de disque de rotor et de la géométrie de surface de liaison de support d'aube comprend la conception de la géométrie de surface de liaison de disque de rotor et de la géométrie de surface de liaison de support d'aube avec les géométries circonférentiellement irrégulières par rapport à un axe de rotation de la roue de turbine.
- Roue de turbine (12) comprenant :un disque de rotor (26) ayant éventuellement un trou de détente (48) qui traverse le disque de rotor (26) ;une pluralité d'aubes de turbine (24), chaque aube de turbine étant reliée fonctionnellement au disque de rotor par l'intermédiaire d'un support d'aube (20), le support d'aube (20) étant lié au disque de rotor (26) au niveau d'une surface de liaison de support d'aube du support d'aube (20) et d'une surface de liaison de disque de rotor du disque de rotor (26) pour former une ligne de liaison (137), caractérisée en ce que ;la surface de liaison de disque de rotor du disque de rotor (26) et la surface de liaison de support d'aube du support d'aube ont une géométrie permettant de réduire au minimum la contrainte radiale au niveau de la ligne de liaison (137), la roue de turbine étant caractérisée en ce quele support d'aube (20) et le disque de rotor (26) présentent une surface avant sur un côté de pression supérieure de ceux-ci, une surface arrière sur un côté de pression inférieure de ceux-ci, le support d'aube (20) comprenant une surface de fixation d'aube (34) s'étendant entre la surface avant et la surface arrière de celui-ci et reliant ces dernières, l'aube de turbine s'étendant depuis la surface de fixation d'aube (34) ; etun espace (36) est défini entre les supports d'aubes adjacents, séparant les supports d'aubes (20) et s'étendant dans le disque de rotor (26).
- Moteur de turbine, comprenant :
une roue de turbine (12), selon la revendication 9, la roue de turbine (12) comprenant :une plaque d'étanchéité avant (14) ayant un bord de plaque avant (18) venant en butée contre la surface avant des supports d'aube autour d'une circonférence de la roue de turbine (12) ; etéventuellement une plaque arrière d'étanchéité (16) comportant un bord de plaque arrière (19) qui vient en butée contre la surface arrière des supports d'aube autour de la circonférence de la roue de turbine (12).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/639,061 US10751843B2 (en) | 2017-06-30 | 2017-06-30 | Turbine wheels, turbine engines including the same, and methods of fabricating turbine wheels with improved bond line geometry |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3421171A1 EP3421171A1 (fr) | 2019-01-02 |
EP3421171B1 true EP3421171B1 (fr) | 2020-08-05 |
Family
ID=62778715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18179420.7A Not-in-force EP3421171B1 (fr) | 2017-06-30 | 2018-06-22 | Roues de turbine, moteurs de turbine les comprenant et procédés de fabrication de roues de turbine à géométrie de ligne de liaison améliorée |
Country Status (2)
Country | Link |
---|---|
US (2) | US10751843B2 (fr) |
EP (1) | EP3421171B1 (fr) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110394599B (zh) * | 2019-07-03 | 2024-05-28 | 苏州锦美川自动化科技有限公司 | 水泵涡轮焊接流水线一体成型设备 |
JP7341969B2 (ja) * | 2020-09-30 | 2023-09-11 | 三菱重工業株式会社 | タービンの設計及び製造方法 |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4903887A (en) | 1988-12-21 | 1990-02-27 | United Technologies Corporation | Inertia weld improvements through the use of staggered wall geometry |
US5106266A (en) | 1989-07-25 | 1992-04-21 | Allied-Signal Inc. | Dual alloy turbine blade |
US5161950A (en) | 1989-10-04 | 1992-11-10 | General Electric Company | Dual alloy turbine disk |
JP4240808B2 (ja) * | 1997-10-27 | 2009-03-18 | シーメンス パワー ジェネレイション インコーポレイテッド | タービン翼の製造方法 |
GB2387203B (en) | 2002-04-02 | 2005-10-05 | Rolls Royce Plc | Rotor disc for gas turbine engine |
US6666653B1 (en) | 2002-05-30 | 2003-12-23 | General Electric Company | Inertia welding of blades to rotors |
US7766623B2 (en) | 2006-11-08 | 2010-08-03 | General Electric Company | System for manufacturing a rotor having an MMC ring component and an airfoil component having monolithic airfoils |
US7832986B2 (en) | 2007-03-07 | 2010-11-16 | Honeywell International Inc. | Multi-alloy turbine rotors and methods of manufacturing the rotors |
US8206117B2 (en) | 2007-12-19 | 2012-06-26 | Honeywell International Inc. | Turbine components and methods of manufacturing turbine components |
FR2939833B1 (fr) | 2008-12-17 | 2015-06-05 | Turbomeca | Dispositif de ventilation de fond de logement de disque de turbine |
DE102009007468A1 (de) | 2009-02-04 | 2010-08-19 | Mtu Aero Engines Gmbh | Integral beschaufelte Rotorscheibe für eine Turbine |
US8187724B2 (en) | 2009-02-24 | 2012-05-29 | Honeywell International Inc. | Method of manufacture of a dual alloy impeller |
US8480368B2 (en) | 2010-02-05 | 2013-07-09 | General Electric Company | Welding process and component produced therefrom |
FR2960589B1 (fr) | 2010-05-28 | 2014-05-02 | Snecma | Roue a aubes pour une turbomachine, telle qu'un turboreacteur ou un turbopropulseur d'avion |
US8801388B2 (en) | 2010-12-20 | 2014-08-12 | Honeywell International Inc. | Bi-cast turbine rotor disks and methods of forming same |
US8918996B2 (en) | 2011-05-04 | 2014-12-30 | General Electric Company | Components and processes of producing components with regions having different grain structures |
US8408446B1 (en) | 2012-02-13 | 2013-04-02 | Honeywell International Inc. | Methods and tooling assemblies for the manufacture of metallurgically-consolidated turbine engine components |
US9724780B2 (en) | 2014-06-05 | 2017-08-08 | Honeywell International Inc. | Dual alloy turbine rotors and methods for manufacturing the same |
US20160146024A1 (en) | 2014-11-24 | 2016-05-26 | Honeywell International Inc. | Hybrid bonded turbine rotors and methods for manufacturing the same |
US9850760B2 (en) | 2015-04-15 | 2017-12-26 | Honeywell International Inc. | Directed cooling for rotating machinery |
DE102015111750A1 (de) | 2015-07-20 | 2017-01-26 | Rolls-Royce Deutschland Ltd & Co Kg | Gekühltes Turbinenlaufrad für ein Flugtriebwerk |
US9951632B2 (en) | 2015-07-23 | 2018-04-24 | Honeywell International Inc. | Hybrid bonded turbine rotors and methods for manufacturing the same |
-
2017
- 2017-06-30 US US15/639,061 patent/US10751843B2/en active Active
-
2018
- 2018-06-22 EP EP18179420.7A patent/EP3421171B1/fr not_active Not-in-force
-
2020
- 2020-07-28 US US16/940,927 patent/US20200353577A1/en not_active Abandoned
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
EP3421171A1 (fr) | 2019-01-02 |
US10751843B2 (en) | 2020-08-25 |
US20200353577A1 (en) | 2020-11-12 |
US20190001448A1 (en) | 2019-01-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4569950B2 (ja) | ガスタービンエンジンロータの先端隙間を制御するための方法及び装置 | |
US20180223668A1 (en) | Spoked rotor for a gas turbine engine | |
US9476305B2 (en) | Impingement-cooled turbine rotor | |
US8961132B2 (en) | Secondary flow arrangement for slotted rotor | |
US10718270B2 (en) | Hydrostatic non-contact seal with dual material | |
EP2586992B1 (fr) | Étanchéité d'une aube tournante comportant des passages d'air de refroidissement | |
US9394915B2 (en) | Seal land for static structure of a gas turbine engine | |
EP3418610B1 (fr) | Joint hydrostatique sans contact comportant une poche de réduction de poids | |
US9790792B2 (en) | Asymmetrically slotted rotor for a gas turbine engine | |
EP2000631A2 (fr) | Rotor aubagé et procédé de fabrication associé | |
EP2484867B1 (fr) | Composant rotatif de moteur à turbine | |
EP2971693B1 (fr) | Dispositif d'étanchéité de disque de rotor de turbine à gaz | |
US11143048B2 (en) | Labyrinth seal with variable tooth heights | |
EP2586968B1 (fr) | Agencement d'écoulement secondaire pour rotor rainuré | |
US20200353577A1 (en) | Turbine wheels, turbine engines including the same, and methods of fabricating turbine wheels with improved bond line geometry | |
EP2586970B1 (fr) | Espaceur de disque échelé pour un moteur à turbine à gaz | |
EP4119771A1 (fr) | Rotor de turbine radiale pour moteur à turbine à gaz | |
US11015472B2 (en) | Turbine wheels, turbine engines including the same, and methods of forming turbine wheels with improved seal plate sealing | |
KR102499042B1 (ko) | 냉각 핀들을 갖도록 제공되는 케이스를 구비하는 가스 터빈 기관 | |
US20230139869A1 (en) | Turbine blade | |
CN114761669A (zh) | 压力捕获罐 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20180622 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20190806 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20200331 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1298043 Country of ref document: AT Kind code of ref document: T Effective date: 20200815 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018006593 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20200805 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1298043 Country of ref document: AT Kind code of ref document: T Effective date: 20200805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201105 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201106 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201105 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201207 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201205 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602018006593 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
26N | No opposition filed |
Effective date: 20210507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20210630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210622 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210630 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20220628 Year of fee payment: 5 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20220622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230526 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20180622 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602018006593 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240103 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200805 |