EP3406750A1 - Einstückig verlängerte ringlippe(lipskin) mit laminarem fluss - Google Patents
Einstückig verlängerte ringlippe(lipskin) mit laminarem fluss Download PDFInfo
- Publication number
- EP3406750A1 EP3406750A1 EP18173837.8A EP18173837A EP3406750A1 EP 3406750 A1 EP3406750 A1 EP 3406750A1 EP 18173837 A EP18173837 A EP 18173837A EP 3406750 A1 EP3406750 A1 EP 3406750A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- metal workpiece
- shaped metal
- workpiece
- shaped
- roughly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910052751 metal Inorganic materials 0.000 claims abstract description 614
- 239000002184 metal Substances 0.000 claims abstract description 614
- 238000000034 method Methods 0.000 claims abstract description 442
- 238000003756 stirring Methods 0.000 claims description 51
- 229910000838 Al alloy Inorganic materials 0.000 claims description 37
- 230000007704 transition Effects 0.000 claims description 27
- 238000009792 diffusion process Methods 0.000 claims description 25
- 229910052782 aluminium Inorganic materials 0.000 claims description 24
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 24
- 238000003483 aging Methods 0.000 claims description 17
- 230000032683 aging Effects 0.000 claims description 16
- 238000004880 explosion Methods 0.000 claims description 14
- 238000005096 rolling process Methods 0.000 claims description 7
- 239000004411 aluminium Substances 0.000 claims 1
- 230000000717 retained effect Effects 0.000 abstract description 6
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 14
- 239000000956 alloy Substances 0.000 description 12
- 229910045601 alloy Inorganic materials 0.000 description 11
- 239000002360 explosive Substances 0.000 description 11
- 238000007493 shaping process Methods 0.000 description 10
- 238000010438 heat treatment Methods 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 150000002739 metals Chemical class 0.000 description 5
- 238000000137 annealing Methods 0.000 description 3
- 238000001816 cooling Methods 0.000 description 3
- 238000005474 detonation Methods 0.000 description 3
- 238000002844 melting Methods 0.000 description 3
- 230000008018 melting Effects 0.000 description 3
- 238000010791 quenching Methods 0.000 description 3
- 230000000171 quenching effect Effects 0.000 description 3
- LYCAIKOWRPUZTN-UHFFFAOYSA-N Ethylene glycol Chemical compound OCCO LYCAIKOWRPUZTN-UHFFFAOYSA-N 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 238000005304 joining Methods 0.000 description 2
- 230000014759 maintenance of location Effects 0.000 description 2
- 229910001092 metal group alloy Inorganic materials 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 238000004881 precipitation hardening Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 230000035882 stress Effects 0.000 description 2
- 238000009966 trimming Methods 0.000 description 2
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 1
- 229910001141 Ductile iron Inorganic materials 0.000 description 1
- 235000015842 Hesperis Nutrition 0.000 description 1
- 235000012633 Iberis amara Nutrition 0.000 description 1
- RTAQQCXQSZGOHL-UHFFFAOYSA-N Titanium Chemical compound [Ti] RTAQQCXQSZGOHL-UHFFFAOYSA-N 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 235000011089 carbon dioxide Nutrition 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- WGCNASOHLSPBMP-UHFFFAOYSA-N hydroxyacetaldehyde Natural products OCC=O WGCNASOHLSPBMP-UHFFFAOYSA-N 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005555 metalworking Methods 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000002250 progressing effect Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000001953 recrystallisation Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000010583 slow cooling Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000005482 strain hardening Methods 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 239000010936 titanium Substances 0.000 description 1
- 229910052719 titanium Inorganic materials 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/04—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D35/00—Combined processes according to or processes combined with methods covered by groups B21D1/00 - B21D31/00
- B21D35/002—Processes combined with methods covered by groups B21D1/00 - B21D31/00
Definitions
- the present invention relates generally to the field of fabricating metal structures. More specifically, the present disclosure of the invention relates to manufacturing a metal structure or component comprising shaping the metal structure or component while in specified heat-treatment conditions, and introducing a friction stir weld into the metal structure or component with the friction stir weld being maintained in the finished component. Still more specifically, the present disclosure of the invention relates to the manufacture of components and assemblies used to make lipskins for aircraft engine nacelles.
- Laminar flow is the smooth, uninterrupted flow of air over the contour of wings, fuselages, or other parts of an aircraft in flight. Laminar flow is most often found at the front of a streamlined body. If the smooth flow of air is interrupted, turbulence is created, which can result in drag acting on the body. Increases in deviation away from optimal laminar flow at aircraft surfaces can result in an increase in fuel consumption, and therefore a commensurate increase in cost of operation.
- nacelles include a lipskin at the leading edge, or inlet, of the nacelle. While some large structures have been formed in a unitary fashion to reduce transverse weld lines or other couplings that could impact laminar flow, such unitary forming processes (e.g. spin-forming, etc.) are time-consuming, expensive and difficult or impractical in terms of size limitations for producing spin-formed lipskins of a desired, large size. Further, spin-formed lipskins may exhibit undesirable waves or ripples that could adversely affect laminar flow, leading to undesirable turbulence, increased fuel consumption, and/or increased cost of operation.
- unitary forming processes e.g. spin-forming, etc.
- spin-formed lipskins may exhibit undesirable waves or ripples that could adversely affect laminar flow, leading to undesirable turbulence, increased fuel consumption, and/or increased cost of operation.
- aspects of the present disclosure of the present invention are directed to methods for forming metal lipskins for engine nacelles and the lipskins and nacelles so formed, as well as structures comprising the nacelles that comprise the lipskins, where the introduction of at least one "fly-away” weld (including without limitation, one friction stir weld), and forming processes of a metal lipskin occurs in specified conditions of the metal such that the "fly-away” weld is maintained in the finished lipskin.
- at least one "fly-away” weld including without limitation, one friction stir weld
- An aspect of the present disclosure of the invention is directed to a method according to the invention for making a heat-treated structure formed of metal, the method preferably comprising performing a first heat-treating process on a roughly-shaped metal workpiece in an annealed condition, to transition the roughly-shaped metal workpiece from an annealed condition to a first hardened condition, with the roughly-shaped metal workpiece comprising at least one friction stir weld; forming the roughly-shaped metal workpiece into a shaped metal workpiece while the roughly-shaped metal workpiece is in the first hardened condition, with the shaped metal workpiece comprising one of a near-finally-shaped metal workpiece or a finally-shaped metal workpiece; and performing a second heat-treating process on the shaped workpiece to transition the shaped metal workpiece from the first hardened condition to a second hardened condition.
- the step of forming the roughly-shaped metal workpiece into a shaped metal workpiece preferably comprises using at least one forming process to shape the roughly-shaped metal workpiece into the shaped metal workpiece.
- the shaped metal workpiece can be a near-finally-shaped metal workpiece, with a method preferably further comprising forming the near-finally-shaped metal workpiece into the finally-shaped metal workpiece while the near-finally-shaped metal workpiece is in the second hardened condition.
- the shaped metal workpiece can comprise a finally-shaped metal workpiece, with a method preferably further comprising using a plurality of forming processes to shape the roughly-shaped metal workpiece into the finally-shaped metal workpiece.
- the forming process preferably includes a super-plastic forming process; a super-plastic/diffusion bond forming process; a form-die forming process; an explosion forming process and combinations thereof.
- the disclosure is also directed to a method according to the invention for making a heat-treated structure formed of metal, the method preferably comprising performing a first heat-treating process on a roughly-shaped metal workpiece to transition the roughly-shaped metal workpiece into a first hardened condition to produce a first-hardened metal workpiece, the roughly-shaped metal workpiece being in an annealed condition and comprising at least one friction stir weld; performing a second heat-treating process on the first-hardened metal workpiece to transition the first-hardened metal workpiece to a second hardened condition to produce a second-hardened metal workpiece; forming the second-hardened metal workpiece into a shaped metal workpiece, said shaped metal workpiece being in one of a near-finally-shaped metal workpiece or a finally-shaped metal workpiece.
- the steps of performing the first heat-treating process and second heat-treating process preferably further comprise performing at least one age-hardening process on the roughly-shaped metal workpiece in the first hardened condition; and performing at least one age-hardening process on the shaped metal workpiece in the second hardened condition, wherein the first hardened condition comprises a first age-hardened condition and the second hardened condition comprises a second age-hardened condition.
- the shaped metal workpiece preferably comprises a friction stir weld.
- the shaped metal workpiece can comprise a near-finally-shaped workpiece, the method preferably further comprising forming the near-finally-shaped metal workpiece into a finally-shaped metal workpiece while the near-finally-shaped metal workpiece is in the second hardened condition.
- the shaped metal workpiece can comprise a near-finally-shaped metal workpiece the method preferably further comprising the step of using a plurality of forming processes to shape the near-finally-shaped metal workpiece into the finally-shaped workpiece while the near-finally-shaped metal workpiece is in the second hardened condition.
- the shaped metal workpiece can comprise a near-finally-shaped metal workpiece and preferably further comprises the step of using at least one explosion forming process to shape the near-finally-shaped metal workpiece into the finally-shaped workpiece while the near-finally-shaped metal workpiece is in the second hardened condition.
- a metal sheet is preferably formed into the roughly-shaped metal workpiece while the metal sheet is in the annealed condition.
- the step of forming a metal sheet preferably further comprises rolling the metal sheet into the roughly-shaped metal workpiece.
- the step of forming a metal sheet preferably further comprises forming the metal sheet, while the metal sheet is in the annealed condition; and using at least one forming process forming process to form the metal sheet, with the forming process including a super-plastic forming process; a super-plastic/diffusion bond forming process; a form-die forming process; an explosion forming process or combinations thereof.
- the step of forming a metal sheet into the roughly-shaped metal workpiece while the metal sheet is in the annealed condition preferably further comprises forming the sheet into a conical or frusto-conical metal workpiece.
- the steps of performing the first heat-treating process and second heat-treating process preferably comprise performing at least one age-hardening process on the roughly-shaped metal workpiece in the first hardened condition; and/or preferably performing at least one age-hardening process on the on the shaped metal workpiece in the second hardened condition; wherein the first hardened condition comprises a first age-hardened condition, and the second hardened condition comprises a second age-hardened condition.
- the step of performing a first heat-treating process preferably comprises performing a natural aging process on the roughly-shaped metal workpiece.
- the step of performing a first heat-treating process preferably comprises solution heat-treating the metal and natural aging the roughly-shaped metal workpiece.
- the step of performing a first heat-treating process preferably further comprising performing a T-4 heat-treating process on the roughly-shaped metal workpiece.
- Performing a second heat-treating process preferably comprises performing an artificial aging process on the shaped metal workpiece.
- Performing the second heat-treating process preferably comprises performing a solution heat-treating process on the shaped metal workpiece; and performing an artificial aging process on the shaped metal workpiece.
- Performing the second heat-treating process preferably comprises performing a T-6 heat-treating process.
- Forming the roughly-shaped metal workpiece into the shaped workpiece preferably comprises using at least one forming process selected from the group consisting of a super-plastic forming process; a super-plastic/diffusion bond forming process; a form-die forming process; and an explosion forming process to shape the roughly-shaped metal workpiece into the shaped workpiece.
- the shaped workpiece can be a near-finally-shaped metal workpiece, the method preferably further comprising forming the near-finally-shaped metal workpiece into a finally-shaped metal workpiece while the near-finally-shaped metal workpiece is in the second hardened condition.
- the shaped metal workpiece can be a finally-shaped metal workpiece and further preferably comprises forming the roughly-shaped metal workpiece into a finally-shaped metal workpiece using at least one forming process including a super-plastic forming process; a super-plastic/diffusion bond forming process; a form-die forming process; an explosion forming process and combinations thereof.
- a further aspect of the present disclosure of the invention is directed to a metal structure according to the present invention that is formed according to any of the aforementioned methods.
- the metal preferably comprises aluminum or an aluminum alloy.
- the metal structure can be annularly-shaped.
- the metal structure is preferably a lipskin for use in an engine nacelle assembly.
- the metal structure is a heat-treated structure in the second hardened condition.
- the present disclosure is further directed to a metal structure for use on an aircraft comprising a metal that has been heat-treated, with the metal structure comprising at least one friction stir weld.
- a further aspect of the present disclosure of the invention is directed to a nacelle assembly according to the invention for use on an aircraft, the assembly comprising a lipskin made from a metal that has been heat-treated, with the lipskin comprising at least one friction stir weld.
- a further aspect of the present application is directed to structures comprising the lipskin made from a metal that has been heat-treated, with the lipskin comprising at least one friction stir weld, the structures including, without limitation, manned and unmanned aircraft, manned and unmanned rotorcraft, manned and unmanned spacecraft, manned and unmanned terrestrial vehicles, manned and unmanned surface water borne vehicles, manned and unmanned sub-surface waterborne vehicles, rockets, missiles, etc.
- the disclosure also includes the following examples:
- the methods and apparatuses disclosed herein provide a lightweight, efficient, reproducible and high-performance engine nacelle lipskin made from a heat-treatable metal that has been shaped and tempered according to specified protocols that facilitate unitary formation of a large contoured metal structure without requiring introduction of additional components to structurally reinforce areas of the unitary structure where welds occur. That is, in the structures and methods according to aspects of the present application, the welds made in the structures are retained in the finished structure.
- the shaping of the metals used to make the lipskins is predominantly conducted and accomplished while the metal is in the annealed condition.
- the order of shaping in the annealed condition can allow for weld retention in a finished product due to internal metal stresses being managed in a predetermined way that obviates the need to remove such welds and introduce additional reinforcing components that would complicate the manufacturing process and add weight to a structure comprising the lipskin.
- heat-treatable metals refer to heat-treatable metals that include aluminum and the 2000-, 4000-, 6000-, and 7000-series aluminum alloys.
- a metal workpiece in the annealed state can be formed into a roughly-shaped metal workpiece by being subjected to at least one forming process.
- forming processes super-plastic processes, super-plastic/diffusion bond processes, form-die processes, and explosive-forming processes are examples of a forming process and may be equivalently and interchangeably referred to as "forming processes".
- Explosive-forming processes may be equivalently and interchangeably referred to as “explosion-molding", “explosive molding”, “explosion-forming” or “high-energy hydroforming” (HEHF) processes.
- An explosive-forming process is a metalworking process where an explosive charge is used to supply the compressive force (e.g. a shockwave) to a metal workpiece against a form (e.g. a mold) otherwise referred to as a "die”. Explosive-forming is typically conducted on materials and structures of a size too large for forming such structures using a punch or press to accomplish the required compressive force.
- a metal workpiece up to several inches thick, is placed over or proximate to a die, with the intervening space, or cavity, optionally evacuated by a vacuum pump.
- the entire apparatus is submerged into an underwater basin or tank, with a charge having a predetermined force potential detonated at a predetermined distance from the metal workpiece to generate a predetermined shockwave in the water.
- the water then exerts a predetermined dynamic pressure on the workpiece against the die at a rate on the order of milliseconds.
- the die can be made from any material of suitable strength to withstand the force of the detonated charge such as, for example, concrete, ductile iron, etc.
- the tooling should have higher yield strength than the metal workpiece being formed.
- Explosive forming processes are sometimes divided into two groups, depending upon the position of the explosive charge relative to the workpiece.
- a workpiece is placed over a die with the intervening space evacuated by a vacuum, with the entire assembly immersed under water, preferably in a basin or tank.
- the explosive material is then placed at a predetermined distance from the assembly and detonated.
- an explosive charge is placed in direct contact with the workpiece and the detonation produces interface pressures on the workpiece surface up to several million pounds per square inch (psi).
- Superplastic forming is a forming process that typically uses high temperature and gas pressure to form particular materials onto a single step mold.
- Superplastic forming can create very detailed metal parts including aluminum and titanium.
- Superplasticity is the ability of a material to experience extremely high elongations on the order of 200% or more.
- For a material to elicit superplastic behavior there are typical criteria including, for example, an extremely fine grain size (a few micrometers or less), with generally uniform and equiaxed grain structure; high temperatures (usually on the order of half the melting temperature); low strain rates (e.g. on order of 10 -2 /seconds or lower).
- Friction stir welding refers to a process for the solid-state joining of two workpieces using a non-consumable tool without melting the material of the workpiece(s). Heat is generated by friction between a rotating tool and the workpiece, resulting in a softened region proximate to the FSW tool. As the FSW tool proceeds along a desired joining line, the tool mechanically intermixes the material of the workpieces to be joined. In this way, hot and softened metal of the workpieces is forged by the mechanical pressure that is applied by the FSW tool, resulting in a solid state deformation of dynamic recrystallization of the workpiece materials without melting the workpieces.
- any type of welds can be "fly-away welds".
- “fly-away welds” refer to welds in components and parts that remain in the part or component as used in flight. In other words, “fly-away welds” are retained in the finished structures as opposed to being removed from the structures before use.
- a heat-treated structure is a structure, preferably a metal structure, that is exposed to heat-treating.
- Heat-treating for metals manipulates the properties of the metal by controlling rates of diffusion and the rate of cooling within a metal's microstructure. Heat-treating predictably alters the mechanical properties of a metal, manipulating properties including hardness, strength, ductility, elasticity, etc.
- the present specification discloses first heat-treating processes and second heat-treating processes to achieve metal workpieces having a particular "state” or heat-treatment "condition".
- the heat-treatment conditions include an annealed condition, a first hardened condition, and a second hardened condition.
- the annealed condition is used to describe alloys used for sheet workpieces made by some shaping processes.
- the annealed condition is the lowest strength condition for a metal alloy workpiece.
- Annealing is a heat treatment that alters the physical properties of a material to increase ductility and reduce hardness, making the material more "workable”.
- atoms migrate in a material's crystalline lattice, with the number of dislocations decreasing, leading to a change in ductility and hardness.
- a dislocation refers to the primarily linear defects present throughout a material's crystalline structure and the internal stresses caused thereby.
- Annealing conditions for aluminum alloys vary according to individual aluminum alloys, but generally require exposing the aluminum alloy to a temperature of from about 650°F (343.3°C) to about 770°F (410°C) for 2 to 3 hours, followed by slow cooling to about 500°F (260°C) followed by uncontrolled cooling rates to room temperature. Specific temperatures, times, cooling rates, etc. can differ from the examples above, depending upon which metal (e.g. aluminum alloy) is being treated.
- the "T" temper designation for heat-treated (e.g. heat-treatable) aluminum and aluminum alloys includes a number that indicates a basic type of treatment.
- the T4 and T6 conditions are the T4 and T6 conditions.
- the T4 condition is an example of a "first hardened condition”.
- a T4 condition indicates that the T4 treated alloy has incurred a solution heat treatment and, has naturally aged to a stable condition.
- the T6 condition is an example of a "second hardened condition”.
- a T6 condition indicates that the T6 treated alloy has been solution heat treated and, without any significant cold working, has been artificially aged to achieve additional precipitation hardening to become stable metalurgically.
- an aluminum alloy may be provided in the annealed condition as a sheet of material (i.e., the "O" condition) with either partial or full anneal cycles intermittently conducted on the aluminum alloy.
- the annealed aluminum alloy is brought to the first hardened condition, such as the T4 condition, via a solution heat treatment, and bringing the aluminum alloy sheet to a temperature above 900°F (482.2°C) for a time that is dependent on the particular alloy and the thickness of the sheet) followed by quenching in water or glycol.
- the aluminum alloys selected are precipitation age-hardenable, allowing the alloys to naturally age at room temperature.
- the aging in the T4 condition may be tailored by placing the alloy in the T4 condition in dry ice or in a freezer.
- the alloy sheet in the first hardened condition (e.g., the T4 condition) may then be formed into a roughly-shaped metal workpiece that includes introducing at least one friction stir weld introduced in the annealed condition to shape the metal workpiece as desired.
- the alloy in the annealed condition is shaped and friction stir welded to a roughly-shaped metal workpiece, and then the alloy in the first hardened condition is shaped or to a near-finally-shaped metal workpiece or finally-shaped workpiece.
- the alloy is subjected to at least one forming process that includes, for example, an explosive forming process, to create the near-finally-shaped metal workpiece or the finally-shaped metal workpiece.
- at least one forming process that includes, for example, an explosive forming process
- most of the forming of the aluminum alloy into the near-finally-shaped metal workpiece is conducted with the alloy in the first hardened condition (e.g., the T4 condition).
- the near-finally-shaped metal workpiece is then brought to a second hardened condition (i.e. T6 condition) by artificially aging the metal workpiece.
- T6 condition i.e. T6 condition
- Figures 1-7 are flowcharts describing aspects of the present disclosure of the invention. Consistent with particular aspects of the present disclosure, figure 1 is directed to a method 10 for making a heat-treated structure formed of metal.
- the method 10 includes forming 12 a metal sheet into a roughly-shaped metal workpiece having a friction stir weld while the metal sheet is in an annealed condition.
- One example of the roughly-shaped metal workpiece is the metal workpiece 90 having at least one friction stir weld 92 as shown in figure 9 , which is described in more detail below.
- Method 10 includes step 12 performed in a manner consistent with aspects of the present disclosure of the invention using forming processes such as rolling or other physical shaping means suitable to physically transform and shape a metal from a first, or initial, orientation to a subsequent orientation. Further forming processes to transform metal to a roughly-shaped metal workpiece, as contemplated by aspects of the present disclosure, may take place in step 12 including subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- forming processes such as rolling or other physical shaping means suitable to physically transform and shape a metal from a first, or initial, orientation to a subsequent orientation.
- Further forming processes to transform metal to a roughly-shaped metal workpiece may take place in step 12 including subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- the roughly-shaped state of the metal workpiece therefore contemplates the state of the metal work-piece between the initial form of a metal (e.g., a metal sheet that may be substantially planar) and a shaped (i.e., near-finally-shaped or finally-shaped) metal workpiece that has been subjected to subsequent forming processes after attaining the roughly-shaped metal workpiece.
- a metal e.g., a metal sheet that may be substantially planar
- a shaped metal workpiece i.e., near-finally-shaped or finally-shaped
- the method 10 further includes performing 14 a first heating-treating process on the roughly-shaped metal workpiece to transition the roughly-shaped metal workpiece from an annealed condition to a first hardened condition.
- the roughly-shaped metal workpiece includes the at least one friction stir weld (e.g., friction stir weld 92 shown in figure 9 ).
- the first hardened condition is the T4 condition.
- the method 10 includes forming 16 the roughly-shaped metal workpiece into a shaped metal workpiece while the roughly-shaped metal workpiece is in the first hardened condition.
- the shaped metal workpiece is the metal workpiece 114b, 114c, 114d, 114e, and 120 as shown in figure 9 and figures 11B, 11C, 11D , 11E , and FIG 12 , which is described in more detail below.
- the shaped metal workpiece retain and includes the friction stir weld 92 introduced to the roughly-shaped metal workpiece as shown in figure 9 .
- the shaped metal workpiece comprises one of a near-finally-shaped metal workpiece or a finally-shaped metal workpiece.
- method 10 includes forming 16 processes used to transform a roughly-shaped metal workpiece into the shaped (i.e., near-finally-shaped or finally-shaped) metal workpieces include subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- the explosive-forming process also includes the quenching step of the first heat-treating process.
- aspects of the method 10 include performing 18 a second heat-treating process on the shaped workpiece to transition the shaped metal workpiece from the first hardened condition to produce a second hardened condition.
- the second hardened condition is a T6 condition.
- At least one forming process can be performed while the metal is in the second hardened condition.
- all of the forming processes on the roughly-shaped workpiece e.g., forming the roughly-shaped metal workpiece into the shaped metal workpiece
- figure 2 is directed to a method 20 for making a heat-treated structure formed of metal.
- the method described in figure 2 is similar to the method outlined in figure 1 , except the method 20 contemplates starting with a roughly-shaped metal workpiece rather than, for example, a flat sheet of metal.
- the method 20 includes performing 22 a first heat-treating process on a roughly-shaped metal workpiece in an annealed condition to transition the roughly-shaped metal workpiece from an annealed condition to a first hardened condition, with the roughly-shaped metal workpiece comprising at least one friction stir weld introduced to the metal workpiece in the annealed condition.
- the roughly-shaped metal workpiece is the metal workpiece 90 having at least one friction stir weld 92 as shown in figure 9 , which is described in more detail below.
- the first hardened condition of the metal is in the T4 condition when the metal workpiece is aluminum or an aluminum alloy.
- the method 20 further includes forming 24 the roughly-shaped metal workpiece into a shaped metal workpiece while the roughly-shaped metal workpiece is in the first hardened condition, with the shaped metal workpiece being one of a near-finally-shaped metal workpiece or a finally-shaped metal workpiece.
- the forming process(es) 24 used to transform a roughly-shaped metal workpiece into the shaped (i.e., near-finally-shaped or finally-shaped) metal workpiece includes subjecting the roughly-shaped metal workpiece to at least one forming process that includes super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- the shaped metal workpiece is the metal workpiece 114b, 114c, 114d, 114e, and 120, as shown in figures. 11B, 11C, 11D, 11E , and FIG 12 , and which is described in more detail below.
- the shaped metal workpiece retains and includes the friction stir weld 92 introduced to the roughly-shaped metal workpiece as shown in figure 9 .
- the explosive-forming process also includes the quenching step of the first heat-treating process.
- the method 20 further includes performing 26 a second heat-treating process on the shaped workpiece to transition the shaped metal workpiece from the first hardened condition to produce a second hardened condition.
- the second hardened condition is the T6 condition.
- At least one forming process can be performed while the metal is in the second hardened condition.
- all of the forming processes on the roughly shaped metal workpiece e.g., forming the roughly-shaped metal workpiece into the shaped metal workpiece
- figure 3 is directed to a method 30 for making a heat-treated structure formed of metal.
- FIGs 1 and 2 outline methods, 10 and 20 respectively, where the roughly-shaped metal workpiece is formed into a shaped metal workpiece in the first hardened condition, as shown in figure 3 , a method 30 is further defined such that at least some forming of the metal workpiece into the shaped metal workpiece occurs after the metal workpiece is in the second hardened condition.
- the method 30 includes performing 32 a first heat-treating process on a roughly-shaped metal workpiece in an annealed condition (with the workpiece in an annealed condition including at least one friction stir weld) to transition the roughly-shaped metal workpiece into a first hardened condition to produce a first-hardened metal workpiece.
- a roughly-shaped metal workpiece is the metal workpiece 90 having at least one friction stir weld 92 as shown in figure 9 , which is described in more detail below.
- the first hardened condition of the metal is the T4 condition when the metal workpiece is aluminum or an aluminum alloy.
- the method 30 further includes performing 34 a second heat-treating process on the first-hardened metal workpiece to transition the first-hardened workpiece a second hardened condition to produce a second-hardened metal workpiece.
- the second hardened condition is the T6 condition.
- the method 30 further includes forming 36 the second-hardened metal workpiece into a shaped metal workpiece, with the shaped metal workpiece being in one of a near-finally-shaped metal workpiece or a finally-shaped workpiece.
- An example of the shaped metal workpiece is the metal workpiece 114b, 114c, 114d, 114e, and 120 as shown in figures. 11B, 11C, 11D, 11E , and FIG 12 , which is described in more detail below.
- the shaped metal workpiece retains and includes the friction stir weld 92 introduced to the roughly-shaped metal workpiece as shown in figure 9 .
- forming processes 36 used to transform a roughly-shaped metal workpiece into the shaped (i.e. near-finally-shaped or finally-shaped) metal workpiece includes subjecting the metal workpiece to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- all of the forming processes on the roughly shaped metal workpiece e.g. forming the roughly-shaped metal workpiece into the shaped metal workpiece
- figure 4 is directed to a method 40 for making a heat-treated structure formed of metal.
- figuress 1 and 2 outline methods, 10 and 20 respectively, where the roughly-shaped metal workpiece is formed into a shaped metal workpiece in the first hardened condition, as shown in figure 4 , a method 40 is further defined such that at least some forming of the metal workpiece into the shaped metal workpiece occurs after the metal workpiece is in the second hardened condition.
- the metal workpiece is formed into a near-finally-shaped and finally-shaped metal workpiece while the metal workpiece is in the second hardened condition.
- the method 40 includes performing 32 a first heat-treating process on a roughly-shaped metal workpiece (with the workpiece in an annealed condition including at least one friction stir weld) to transition the roughly-shaped metal workpiece into a first hardened condition to produce a first-hardened metal workpiece.
- a roughly-shaped metal workpiece is the metal workpiece 90 having at least one friction stir weld 92 as shown in figure 9 , which is described in more detail below.
- the first hardened condition of the metal is the T4 condition when the metal workpiece is aluminum or an aluminum alloy.
- the method 40 further includes performing 34 a second heat-treating process on the first-hardened metal workpiece to transition the first-hardened workpiece to a second hardened condition to produce a second-hardened metal workpiece.
- the second hardened condition is the T6 condition.
- the method 40 further includes forming 37 the second-hardened metal workpiece into a near-finally-shaped metal workpiece.
- a near-finally-shaped metal workpiece is the metal workpiece 114d as shown in figure 11D , which is described in more detail below.
- the shaped metal workpiece retains and includes the friction stir weld 92 introduced to the roughly-shaped metal workpiece as shown in figure 9 .
- the method 40 in step 37 the forming processes used to transform a roughly-shaped metal workpiece into the near-finally-shaped metal workpiece includes subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- the method 40 further includes forming 42 the near-finally shaped metal workpiece into the finally-shaped metal workpiece while the near-finally-shaped metal workpiece is in the second hardened condition.
- the method 40 forming processes 42 used to transform a roughly-shaped metal workpiece into the shaped (i.e. near-finally-shaped or finally-shaped) metal workpiece including subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- An example of the finally-shaped metal workpiece is the metal workpiece 114e and 120 as shown in figure 11E and figure 12 , which is described in more detail below.
- all of the forming processes on the roughly shaped metal workpiece may be completed while the metal is in the second hardened condition
- figure 5 is directed to a method 50 for making a heat-treated structure formed of metal.
- Figures 1 and 2 outline methods, 10 and 20 respectively, where the roughly-shaped metal workpiece is formed into a shaped metal workpiece in the first hardened condition.
- the metal workpiece is formed into a shaped ( figure 5 ) or near-finally-shaped ( figure 4 ) metal workpiece while the metal workpiece is in the second hardened condition.
- Figure 5 further specifies, in step 52, using a plurality of forming processes to form the shaped metal workpiece into a finally-shaped metal workpiece while in the second hardened condition.
- the method 50 includes performing 32 a first heat-treating process on a roughly-shaped metal workpiece in an annealed condition (with the workpiece in an annealed condition including at least one friction stir weld) to transition the roughly-shaped metal workpiece into a first hardened condition to produce a first-hardened metal workpiece.
- a roughly-shaped metal workpiece is the metal workpiece 90 having at least one friction stir weld 92 as shown in figure 9 , which is described in more detail below.
- the first hardened condition of the metal is the T4 condition when the metal workpiece is aluminum or an aluminum alloy.
- the method 50 further includes performing 34 a second heat-treating process on the first-hardened metal workpiece to transition the first-hardened workpiece to a second hardened condition to produce a second-hardened metal workpiece.
- the second hardened condition is the T6 condition.
- the method 50 further includes forming 36 the second-hardened metal workpiece into a shaped metal workpiece, with the shaped metal workpiece being in one of a near-finally-shaped metal workpiece or a finally-shaped workpiece.
- An example of the shaped metal workpiece is the metal workpiece 114b, 114c, 114d, 114e, and 120 as shown in figures 11B, 11C, 11D, 11E , and figure 12 , which is described in more detail below.
- forming processes 36 used to transform a roughly-shaped metal workpiece into the shaped (i.e., near-finally-shaped or finally-shaped) metal workpiece includes subjecting the metal workpiece to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- all of the forming processes on the roughly shaped metal workpiece e.g., forming the roughly-shaped metal workpiece into the shaped metal workpiece
- the method 50 further includes using 52 a plurality of forming processes to form the shaped metal workpiece into the finally-shaped metal workpiece while the shaped metal workpiece is in the second hardened condition, with the forming processes set forth above for use in step 36 also contemplated as available forming methods in step 52.
- An example of the finally-shaped metal workpiece is the metal workpiece 114e and 120 as shown in figure 11E and figure 12 , which is described in more detail below.
- figure 6 is directed to a method 60 for making a heat-treated structure formed of metal.
- Method 60 is similar to method 50 outlined in figure 50, but includes forming 62 a metal sheet into a roughly-shaped metal workpiece including a friction stir weld, while the metal sheet is in the annealed condition.
- One example of the roughly-shaped metal workpiece is the metal workpiece 90 having at least one friction stir weld 92 as shown in figure 9 , which is described in more detail below.
- the roughly-shaped state of the metal workpiece therefore contemplates the state of the metal work-piece between the initial form of a metal (e.g., a metal sheet that may be substantially planar) and a shaped (i.e., near-finally-shaped, or finally-shaped) metal workpiece that has been subjected to subsequent forming processes after attaining the roughly-shaped metal workpiece.
- a metal e.g., a metal sheet that may be substantially planar
- a shaped metal workpiece i.e., near-finally-shaped, or finally-shaped
- the method 60 further includes performing 32 a first heat-treating process on the roughly-shaped metal workpiece in an annealed condition (with the workpiece in an annealed condition comprising at least one friction stir weld) to transition the roughly-shaped metal workpiece into a first hardened condition to produce a first-hardened metal workpiece.
- the first hardened condition of the metal is the T4 condition when the metal workpiece is aluminum or an aluminum alloy.
- the method 60 further includes performing 34 a second heat-treating process on the first-hardened metal workpiece to transition the first-hardened workpiece a second hardened condition to produce a second-hardened metal workpiece.
- the second hardened condition is the T6 condition.
- the method 60 further includes forming 36 the second-hardened metal workpiece into a shaped metal workpiece, with the shaped metal workpiece being in one of a near-finally-shaped metal workpiece or a finally-shaped workpiece.
- An example of the shaped metal workpiece is the metal workpiece 114b, 114c, 114d, 114e, and 120 as shown in figures 11B, 11C, 11D, 11E , and figure 12 , which is described in more detail below.
- the forming processes in the method 60 used to transform a roughly-shaped metal workpiece into the shaped (i.e., near-finally-shaped or finally-shaped) metal workpiece includes subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- Method 60 further includes using 52 a plurality of forming processes to form the near-finally shaped metal workpiece into the finally-shaped metal workpiece while the near-finally-shaped metal workpiece is in the second hardened condition, with the forming processes set forth above for use in step 36 also contemplated as available forming methods in step 52.
- An example of the finally-shaped metal workpiece is the metal workpiece 114e and 120 as shown in figure 11E and figure 12 , which is described in more detail below.
- figure 7 is directed to a method 70 for making a heat-treated structure formed of metal.
- the method 70 described in figure 7 is similar to the method outlined in figure 1 , except the method 70 contemplates 72 performing at least one age-hardening process on the roughly-shaped metal workpiece in the first hardened condition, and performing 74 at least one age-hardening process on the shaped metal workpiece in the second hardened condition.
- Method 70 therefore includes forming 12 a metal sheet into a roughly-shaped metal workpiece having a friction stir weld while the metal sheet is in an annealed condition.
- Step 12 is performed in a manner consistent with aspects of the present disclosure of the invention using forming processes including forming processes such as rolling or other physical shaping means suitable to physically transform and shape a metal from a first, or initial, orientation to a subsequent orientation. Further forming processes to transform metal to a roughly-shaped metal workpiece, as contemplated by aspects of the present disclosure of the invention, may take place in step 12 including subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- One example of the roughly-shaped metal workpiece is the metal workpiece 90 having at least one friction stir weld 92 as shown in figure 9 , which is described in more detail below.
- the roughly-shaped state of the metal workpiece therefore contemplates the state of the metal workpiece between the initial form of a metal (e.g., a metal sheet that may be substantially planar) and a shaped (i.e., near-finally-shaped or finally-shaped) metal workpiece that has been subjected to subsequent forming processes after attaining the roughly-shaped metal workpiece.
- a metal e.g., a metal sheet that may be substantially planar
- a shaped metal workpiece i.e., near-finally-shaped or finally-shaped
- Method 70 further includes performing 14 a first heat-treating process on the roughly-shaped metal workpiece to transition the roughly-shaped metal workpiece from an annealed condition comprising at least one friction stir weld to produce a first hardened condition, with the roughly-shaped metal workpiece comprising at least one friction stir weld.
- the first hardened condition is the T4 condition.
- the method 70 further includes performing 72 at least one age-hardening process on the roughly-shaped metal workpiece in the first hardened condition.
- the age-hardening process can be a natural aging process to age the metal workpiece to a stable condition.
- the method 70 further includes forming 16 the roughly-shaped metal workpiece into a shaped metal workpiece while the roughly-shaped metal workpiece is in the first hardened condition.
- the shaped metal workpiece is one of a near-finally-shaped metal workpiece or a finally-shaped metal workpiece.
- An example of the shaped metal workpiece is the metal workpiece 114b, 114c, 114d, 114e, and 120 as shown in figures. 11B, 11C, 11D, 11E , and FIG 12 , which is described in more detail below.
- step 16 the forming processes used to transform a roughly-shaped metal workpiece into the shaped (i.e., near-finally-shaped or finally-shaped) metal workpiece includes subjecting the metal sheet to super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes, and combinations thereof.
- Method 70 further includes performing 18 a second heat-treating process on the shaped workpiece to transition the shaped metal workpiece from the first hardened condition to produce a second hardened condition.
- the second hardened condition is the T6 condition.
- the method 70 further includes performing 74 at least one age-hardening process on the shaped metal workpiece in the second-hardened hardened condition.
- the age-hardening process can be an artificial aging process to age the metal workpiece to achieve precipitation hardening.
- At least one forming process can be performed while the metal is in the second hardened condition.
- all of the forming processes on the roughly-shaped workpiece e.g., forming the roughly-shaped metal workpiece into the shaped metal workpiece
- FIGS 8A, 8B, and 8C show a series in progression of exemplary drawings illustrating how a workpiece may be formed during an explosive forming process that can be used in the forming processes 16, 24, 36, 37, 42, and 52.
- a tank 82 contains an amount of water 83.
- a die 84 defines a cavity 85 and a vacuum line 87 extends from the cavity 85 through the die 84 to a vacuum (not shown).
- Workpiece 86a is held in position in the die 84 via a hold-down ring or other retaining device (not shown).
- An explosive charge 88 is shown suspended in the water 83 via a charge detonation line 89, with charge detonation line 19a connected to a detonator (not shown).
- the charge 88 (shown in figure 8A ) has been detonated in explosive forming assembly 80b creating a shock wave "A" emanating from a gas bubble "B", with the shock wave "A” causing the deformation of the workpiece 86b into cavity 85 until the workpiece 86c is driven against (e.g., immediately proximate to and in contact with) the inner surface of die 84 as shown in figure 8C .
- figure 9 is a perspective drawing of a metal workpiece 90 in an annealed condition and, for the purpose of the present disclosure, in a roughly-shaped condition or state.
- workpiece 90 has been shaped into a substantially frusto-conical shape.
- Friction stir welds 92 are shown in workpiece 90, and are introduced into the metal workpiece before, after and/or during the forming of the metal workpiece into the roughly-shaped condition. While friction stir welds are shown, the present disclosure of the invention contemplates any welds that collectively can be referred to as "fly-away" welds as described herein.
- workpiece 90 is a metal workpiece that is preferably made from aluminum or an aluminum alloy or alloys.
- Workpiece 90 can be shaped into the frusto-conical orientation by forming processes, including forming processes such as rolling or other physical shaping means suitable to physically transform and shape a metal from a first, or initial, orientation (e.g., a metal sheet) to a subsequent roughly-shaped orientation, such as shown in figure 9 .
- figure 10 is a perspective view of a forming station 100. As shown in figure 10 , workpiece 90 is introduced into forming block 102 that has a forming block cavity 104.
- the forming station 100 is non-specific as to any particular forming process that can be used to shape metal workpieces.
- Representative forming processes include forming processes used to transform a roughly-shaped metal workpiece into the shaped (i.e., near-finally-shaped or finally-shaped) metal workpiece such as super-plastic processes, super-plastic/diffusion bond processes, form-die processes, explosive-forming processes (such as the process shown in figures 8A-8C ), and combinations thereof, and include a forming block or die against which, by a force, a metal workpiece can be driven to achieve a predetermined shape.
- figures 11A, 11B, 11C, 11D, and 11E are cross-sectional side views showing a section of a workpiece within forming blocks, and showing the progressive forming and shaping of a workpiece from a roughly-shaped workpiece 90 as shown in figures 9 and 10 into a near-finally and/or finally-shaped workpiece.
- Figure 11A shows a cross-sectional side view of forming block 102 taken across line "A" of forming block 102 as shown in figure 10 .
- figure 11A in step 110a, shows cross-section of roughly-shaped metal workpiece 90 resting within the cavity of forming block 112a (a cross-section of forming block 102 taken along line "A" as shown in figure 10 ).
- figure 11B shows step 110b, wherein roughly-shaped metal workpiece 90 is now shown as 114b having been shaped such that the roughly-shaped metal workpiece rests substantially proximate to the wall 113a of cavity 115.
- the roughly-shaped workpiece 90 is thus transformed into shaped workpiece 114b.
- Shaped workpiece 114c is shown as having been further shaped as compared to the shaped workpiece 114b shown in figure 11B .
- FIG 11C shaped workpiece 114b has been further shaped into workpiece 114c by trimming workpiece end 114c' of workpiece 114c.
- Figure 11D shows a second forming block 112b having a wall 113b with a contour that is different from the contour of wall 113a of forming block 112a.
- the wall 113b defines a cavity of the second forming block 112b.
- forming block 112b has a different cavity configuration as compared to the cavity of forming block 112a.
- the workpiece 114c has now been subjected to a further forming process and further shaped into a workpiece configuration shown as workpiece 114d.
- Figure 11E shows step 110e wherein workpiece 114d has been further shaped by a further forming process followed by a trimming operation to shape workpiece end 114e' of workpiece 114e.
- workpieces 90, 114b, and 114c can be considered to be a roughly-shaped workpiece, while workpieces 114d and 114e are shown to be a nearly-finally shaped workpiece.
- workpieces 114d and/or 114e may be considered to be finally-shaped workpieces, depending upon the desired and predetermined configuration of the workpiece according to the final workpiece configuration needed in use.
- additional forming steps may be used, requiring additional forming blocks, if desired.
- Figure 12 is a perspective view of a nacelle lipskin according to an aspect of the present disclosure of the invention. As shown in figure 12 , a lipskin 120 is fabricated according to methods disclosed herein, and ready for installation to an aircraft engine nacelle 132 on an aircraft 130 as shown in figure 13 .
- the forming processes are conducted while the metal workpiece is in the first hardened condition.
- the present disclosure of the invention further contemplates aspects where some of the forming processes may be conducted while the metal workpiece is in the second hardened condition.
- such forming of the workpiece in the second hardened condition will be finished forming and shaping; in some cases modifying the metal workpiece less than about 3% of the forming conducted on the metal workpiece as compared with the forming conducted on the workpiece when the workpiece is in conditions other than the second hardened condition.
- the present disclosure of the invention therefore contemplates forming the metal workpiece via forming processes conducted: 1) in the annealed and first hardened conditions; 2) in the annealed and in either the first hardened or second hardened conditions; and 3) in the annealed and both the first hardened and second hardened conditions.
- friction stir welds that are incurred in the metal workpieces produced according to the methods presented herein are retained in the near-finally-shaped and/or finally-shaped metal workpieces.
- the friction stir weld(s) made in the metal workpieces are not removed in finishing steps.
- the need for couplers or other reinforcing component parts e.g. rivets, fasteners, etc. is obviated according to aspects of the present disclosure of the invention.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/603,899 US10766626B2 (en) | 2017-05-24 | 2017-05-24 | Single-piece extended laminar flow inlet lipskin |
NL1042437A NL1042437B1 (en) | 2017-05-24 | 2017-06-21 | Single-piece extended laminar flow inlet lipskin |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3406750A1 true EP3406750A1 (de) | 2018-11-28 |
EP3406750B1 EP3406750B1 (de) | 2023-04-05 |
Family
ID=62165503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18173837.8A Active EP3406750B1 (de) | 2017-05-24 | 2018-05-23 | Einstückig verlängerte ringlippe(lipskin) mit laminarem fluss |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3406750B1 (de) |
CN (1) | CN109234650B (de) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3115221A1 (fr) * | 2020-10-21 | 2022-04-22 | Safran Nacelles | Fabrication d’une lèvre d’entrée d’air avec zones à épaisseur réduite |
FR3115223A1 (fr) * | 2020-10-21 | 2022-04-22 | Safran Nacelles | Fabrication d’une lèvre d’entrée d’air ou d’un secteur annulaire de lèvre d’entrée d’air intégrant des ouvertures à bord rentré |
FR3115222A1 (fr) * | 2020-10-21 | 2022-04-22 | Safran Nacelles | Fabrication de secteurs annulaires pour la réalisation d’une lèvre d’entrée d’air |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8323427B1 (en) * | 2009-09-14 | 2012-12-04 | The Boeing Company | Engineered shapes from metallic alloys |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9090950B2 (en) * | 2010-10-13 | 2015-07-28 | The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration | Abnormal grain growth suppression in aluminum alloys |
US8997545B1 (en) * | 2013-09-19 | 2015-04-07 | The Boeing Company | Method and apparatus for impacting metal parts for aerospace applications |
-
2018
- 2018-05-18 CN CN201810485227.8A patent/CN109234650B/zh active Active
- 2018-05-23 EP EP18173837.8A patent/EP3406750B1/de active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8323427B1 (en) * | 2009-09-14 | 2012-12-04 | The Boeing Company | Engineered shapes from metallic alloys |
Non-Patent Citations (7)
Title |
---|
"Review of Explosive (chemical) Forming", DDC REPORT, April 1965 (1965-04-01), pages 80, XP055798906 |
D.E. STROHECKER ET AL.: "Explosive forming of metals", DMIC REPORT 203, 8 May 1964 (1964-05-08), pages 11, XP055798898 |
DANIEL SANDERS ET AL.: "Superplastically Formed Friction Stir Welded Tailored Aluminum and Titanium Blanks for Aerospace Applications", 6TH EUROSPF CONFERENCE, 3 September 2008 (2008-09-03) - 5 September 2008 (2008-09-05), pages 1 - 9, XP055798891 |
N.N.: "Custom Machines Create Engine Lip Skins on Boeing Aircraft", 1 December 2016 (2016-12-01), XP055487595, Retrieved from the Internet <URL:https://www.techbriefs.com/component/content/article/tb/features/application-briefs/26069> [retrieved on 20180625] * |
PRADIP K. SAHA: "AEROSPACE MANUFACTURING PROCESSES", 19 September 2016, pages: 251, XP055798890 |
VICTOR GHIZDAVU ET AL.: "Explosive forming - economical technology for aerospace structures", INCAS BULLETIN, vol. 2, no. 4, 10 December 2010 (2010-12-10), pages 107 - 117, XP055798903 |
YUAN S J ET AL: "Formability and microstructural stability of friction stir welded Al alloy tube during subsequent spinning and post weld heat treatment", MATERIALS SCIENCE AND ENGINEERING: A, vol. 558, 19 August 2012 (2012-08-19), pages 586 - 591, XP028938841, ISSN: 0921-5093, DOI: 10.1016/J.MSEA.2012.08.056 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3115221A1 (fr) * | 2020-10-21 | 2022-04-22 | Safran Nacelles | Fabrication d’une lèvre d’entrée d’air avec zones à épaisseur réduite |
FR3115223A1 (fr) * | 2020-10-21 | 2022-04-22 | Safran Nacelles | Fabrication d’une lèvre d’entrée d’air ou d’un secteur annulaire de lèvre d’entrée d’air intégrant des ouvertures à bord rentré |
FR3115222A1 (fr) * | 2020-10-21 | 2022-04-22 | Safran Nacelles | Fabrication de secteurs annulaires pour la réalisation d’une lèvre d’entrée d’air |
WO2022084628A1 (fr) * | 2020-10-21 | 2022-04-28 | Safran Nacelles | Fabrication de secteurs annulaires pour la realisation d'une levre d'entree d'air |
WO2022084629A1 (fr) * | 2020-10-21 | 2022-04-28 | Safran Nacelles | Fabrication d'une levre d'entree d'air ou d'un secteur annulaire de levre d'entree d'air integrant des ouvertures a bord rentre |
WO2022084630A1 (fr) * | 2020-10-21 | 2022-04-28 | Safran Nacelles | Fabrication d'une levre d'entree d'air avec zones a epaisseur reduite |
US11872617B2 (en) | 2020-10-21 | 2024-01-16 | Safran Nacelles | Manufacture of annular sectors for producing an air intake lip |
US12129793B2 (en) | 2020-10-21 | 2024-10-29 | Safran Nacelles | Manufacture of an air inlet lip or ring sector of an air inlet lip incorporating openings with turned-in edges |
Also Published As
Publication number | Publication date |
---|---|
CN109234650A (zh) | 2019-01-18 |
EP3406750B1 (de) | 2023-04-05 |
CN109234650B (zh) | 2021-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10766626B2 (en) | Single-piece extended laminar flow inlet lipskin | |
US11020815B2 (en) | Single-piece extended laminar flow inlet lipskin | |
US4882823A (en) | Superplastic forming diffusion bonding process | |
EP3406750B1 (de) | Einstückig verlängerte ringlippe(lipskin) mit laminarem fluss | |
US5226982A (en) | Method to produce hollow titanium alloy articles | |
JPS6350414B2 (de) | ||
US20160214429A1 (en) | Methods and apparatus to produce high performance axisymmetric components | |
JP4776866B2 (ja) | アルミニウム合金からなる構造の成形方法 | |
EP3946773A1 (de) | Verfahren zur herstellung einer hochenergetischen hydrogeformten struktur aus einer legierung der 2xxx-serie | |
WO2020049027A1 (en) | Method of producing a high-energy hydroformed structure from a 7xxx-series alloy | |
NL2023971B1 (en) | Method of producing a high-energy hydroformed structure from a 7xxx-series alloy | |
Fridlyander | Modern Aluminum and Magnesium Alloys and Composite Materials Based on Them. | |
US4811766A (en) | Explosively bonded expanded structure | |
EP3887073B1 (de) | Verfahren zur herstellung einer hochenergetisch hydrogeformten struktur aus einer al-mg-sc-legierung | |
CN113226585B (zh) | 由7xxx系列合金制备高能液压成形结构的方法 | |
NL2023765B1 (en) | Method of producing a high-energy hydroformed structure from a 2xxx-series alloy | |
Watkins | The shaping of metals | |
Turner | Spot impact welding of aluminum sheet | |
EP3296039A1 (de) | Verfahren zur herstellung einer komponente aus einer nickelbasierten superlegierung | |
Islamoff | Metal-forming techniques | |
Tardif | High-energy rate forming of metals |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20180523 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20220809 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTC | Intention to grant announced (deleted) | ||
INTG | Intention to grant announced |
Effective date: 20230125 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: THE BOEING COMPANY |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018047964 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1558303 Country of ref document: AT Kind code of ref document: T Effective date: 20230415 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230526 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20230526 Year of fee payment: 6 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20230405 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1558303 Country of ref document: AT Kind code of ref document: T Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230807 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230705 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230805 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230706 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602018047964 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20230531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230523 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230531 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230531 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
26N | No opposition filed |
Effective date: 20240108 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230523 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230523 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230405 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230531 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240527 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240530 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240527 Year of fee payment: 7 |