EP3405388B1 - Vessel energy management system - Google Patents
Vessel energy management system Download PDFInfo
- Publication number
- EP3405388B1 EP3405388B1 EP17700662.4A EP17700662A EP3405388B1 EP 3405388 B1 EP3405388 B1 EP 3405388B1 EP 17700662 A EP17700662 A EP 17700662A EP 3405388 B1 EP3405388 B1 EP 3405388B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- power
- energy storage
- vessel
- motor
- prime mover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004146 energy storage Methods 0.000 claims description 81
- 239000003990 capacitor Substances 0.000 claims description 30
- 238000000034 method Methods 0.000 claims description 16
- 239000000126 substance Substances 0.000 claims description 10
- 238000007599 discharging Methods 0.000 claims description 4
- 238000012544 monitoring process Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 6
- 230000001276 controlling effect Effects 0.000 description 5
- 239000000446 fuel Substances 0.000 description 3
- 238000009499 grossing Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000002551 biofuel Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000003949 liquefied natural gas Substances 0.000 description 1
- 239000010762 marine fuel oil Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 239000004071 soot Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63H—MARINE PROPULSION OR STEERING
- B63H21/00—Use of propulsion power plant or units on vessels
- B63H21/21—Control means for engine or transmission, specially adapted for use on marine vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63H—MARINE PROPULSION OR STEERING
- B63H21/00—Use of propulsion power plant or units on vessels
- B63H21/12—Use of propulsion power plant or units on vessels the vessels being motor-driven
- B63H21/17—Use of propulsion power plant or units on vessels the vessels being motor-driven by electric motor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L3/00—Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L3/00—Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
- B60L3/0023—Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train
- B60L3/0061—Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train relating to electrical machines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L3/00—Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
- B60L3/0092—Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption with use of redundant elements for safety purposes
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/14—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2200/00—Type of vehicles
- B60L2200/32—Waterborne vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2220/00—Electrical machine types; Structures or applications thereof
- B60L2220/40—Electrical machine applications
- B60L2220/42—Electrical machine applications with use of more than one motor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63H—MARINE PROPULSION OR STEERING
- B63H21/00—Use of propulsion power plant or units on vessels
- B63H21/12—Use of propulsion power plant or units on vessels the vessels being motor-driven
- B63H21/17—Use of propulsion power plant or units on vessels the vessels being motor-driven by electric motor
- B63H2021/173—Use of propulsion power plant or units on vessels the vessels being motor-driven by electric motor making use of superconductivity
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63H—MARINE PROPULSION OR STEERING
- B63H21/00—Use of propulsion power plant or units on vessels
- B63H21/21—Control means for engine or transmission, specially adapted for use on marine vessels
- B63H2021/216—Control means for engine or transmission, specially adapted for use on marine vessels using electric control means
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/64—Electric machine technologies in electromobility
Definitions
- This invention relates to a vessel energy management system and method, in particular for a marine, or seagoing, vessel.
- US20100125383 describes a method of regulating energy producing devices, energy storage devices, drive motors and propellers in a marine vessel.
- a vessel energy management system for controlling power supply to and from a propulsion system of a vessel, the vessel propulsion system comprising a shaft, a propeller and a prime mover turning the shaft connected to the propeller, the energy management system comprising a frequency converter; an energy storage unit, a controller and a motor/generator unit, the motor/generator unit being coupled in series between the prime mover and the propeller; wherein the motor/generator unit is adapted to receive power from the prime mover of the vessel and supply power to the propeller through the motor/generator unit and the shaft, or take off power from the shaft to the energy storage unit; wherein the energy storage unit comprises one or more capacitors, super capacitors or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage; wherein the controller of the energy management system determines an instantaneous power requirement of the propulsion system and average power generated by the prime mover; a comparator to compare the instantaneous required power and average power;
- the system further comprises an input from a main switchboard of the vessel, whereby if the required power exceeds the average power, the motor/generator unit receives energy from an auxiliary generator via the main switchboard, in addition to energy from the prime mover, or energy storage unit.
- the system further comprises an input to a main switchboard of the vessel, whereby if the power requirement of the propulsion system is less than the average power, the main switchboard receives energy from the prime mover, or energy storage unit, via the energy management system.
- the energy storage unit further comprises a chopper to control the rate of charging and discharging of the capacitors, super capacitors or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage.
- a chopper to control the rate of charging and discharging of the capacitors, super capacitors or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage.
- the system further comprises a clutch on the shaft to disconnect the propeller if the prime mover is powering the main switchboard alone.
- a method of vessel energy management for controlling power supply to and from a propulsion system of a vessel, the vessel propulsion system comprising a prime mover turning a shaft connected to a propeller, the vessel comprising an energy management system comprising a frequency converter; an energy storage unit, a controller and a motor/generator unit, the motor generator unit being coupled in series between the prime mover and the propeller; comprises receiving at the motor/generator unit power from the prime mover of the vessel; and supplying power to the propeller through the motor/generator unit and the shaft, or taking off power from the shaft to the energy storage unit by determining a power requirement of the propulsion system of the vessel; determining average power generated by the prime mover; comparing the instantaneous required power and average power; if the required power exceeds the average power, causing the motor/generator unit to receive energy from capacitors, super capacitors, or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage of the energy
- the method further comprises receiving power at the motor/generator unit from an auxiliary generator via the main switchboard of the vessel, if the required power exceeds the average power.
- the energy management system can feed power from auxiliary generators connected to the main switchboard.
- the method further comprises inputting power from the prime mover to a main switchboard of the vessel, if the required power is less than the average power.
- the energy management system can feed power to the main switchboard, from one or both of the prime mover or the energy storage unit, so that the switchboard can supply its consumers.
- the method further comprises disconnecting a propeller of the propulsion system and supplying all power from the prime mover to the main switchboard of the vessel.
- Electric ferries having onboard batteries for storing energy when connected to a shore supply when docked, so that the ferry has a clean and quiet energy source in operation.
- an onboard generator is also provided, as a back-up if there is a greater than expected power requirement, or for assisting in charging the batteries when the shore supply is inadequate.
- the battery is discharged at a reasonably constant rate, over the course of the journey, then charged up again when the ferry docks.
- wave cycle power demand which may vary by several megawatts in the space of less than one minute, using batteries to smooth out the demand is not practical, as batteries do not respond well to receiving large amounts of charge and discharging by a similar amount shortly afterwards, as is required in this application.
- Fig.1 is a block diagram illustrating the main power generation and consumption elements for a marine vessel having a power control system according to the invention.
- the main engine 1 turns a shaft 2 connected to a propeller 3.
- An energy management system 4, comprising the shaft 2, a motor/generator unit 5, a single unit which is able to act as either motor or generator, according to the requirement, a frequency converter 6 and an energy storage unit 7, controls the supply of power to the propeller 3 and the supply of power to consumers, via a connection 13 to main switchgear 8 of the vessel, as well as controlling power storage.
- the energy management system includes a controller and comparator (not shown).
- the main switchgear 8 provides a power management system 9 for ship service power 10 and generators 11a, 11b, 11c which are connected to auxiliary engines 12a, 12b, 12c respectively.
- the combined motor/generator unit 5 may be mounted to the shaft 2, or connected via gearing, or directly connected, so that energy can be given to or taken from the propulsion system.
- the AC voltage taken off via the motor/generator unit 5 is fed to the frequency converter 6.
- the frequency converter 6 includes an inverter, chopper and an active front end. The inverter and active front end can convert AC to DC and vice versa.
- the chopper controls the energy being fed back and forth to capacitors, batteries, or flywheel energy storage in the energy storage unit.
- the input frequency from the motor/generator unit 5 is typically of the order of 9 Hz AC and is converted to a preferred onboard frequency, typically 50 or 60Hz AC, then transformed by a transformer (not shown) to the correct voltage level to feed the consumers 10, or supplied to the energy storage unit 7.
- the energy storage unit comprises capacitors, or more preferably, supercapacitors or ultracapacitors, or may comprise chemical energy storage, such as batteries, or flywheel energy storage.
- the energy storage unit may have a capacity of up to 20MWs, but below 10 MWs, and more typically 6.6MWs may be sufficient for providing the necessary boost, or energy storage.
- the use of capacitors means that excess energy is stored without a chemical reaction, which would be the case with conventional battery storage, thus allowing faster charging and discharging to cope with the variation in power demand as the vessel moves through the water.
- the use of batteries allows significant cost reduction. Flywheels have a good lifetime and relatively low maintenance requirement.
- Fig.2 illustrates the effect of standard operation 25 of a vessel on power demand with time and compares this with the smoothed out demand 23 achieved using a method according to the present invention.
- the graph of power against time indicates that for one wave period 22 in which the ship moves across one wavelength of water there is a time period within the cycle, which is less than the wave period, over which the power flow required from the main engine is less than that which is being produced and another time period, also less than the wave period, during which the power flow demanded from the main engine is greater than that being produced.
- the graph shows that the depth of the troughs and height of the peaks of power required from the main engine is greater without energy management 25, than with energy management 23.
- the actual average power required 21a over the cycle is typically a few percent more than the average power 21b indicted by the level where the demand changes from negative to positive and vice versa. In a well optimised system these losses may be reduced to a little less than 1%, but there will always be a small amount of loss.
- the depth of the troughs of power required from the main engine may be reduced and the height of the peaks of power required from the main engine may be reduced.
- the area between the standard operation graph 25 and the smoothed out demand graph 23 using the present invention is the power which may be stored for later use 20a, 20c, or the power which may be taken back from storage to augment 20b the actual power from the main engine.
- the additional power 22a, 22b taken from the main engine in periods of low demand is stored in the energy storage unit 7 as illustrated in the lower section of the graph.
- the energy storage unit 7 gives up energy to the motor/generator unit 5 to power the propeller 3 as indicated by area 24.
- the energy management system includes a wave estimator to estimate when to take power off the shaft and when to give power to the shaft. This process is typically coordinated with energy supplied from the shaft or from the auxiliary engines 12a, 12b, 12c to the main switchboard 8 and with the ship service power 10 requirement.
- One way of estimating the wave period and wave height is to use a Kalman filter which then provides an input to the energy management system to control the timing of power take off from the shaft, or power take on to the shaft.
- Figs.3 to 6 illustrate a number of embodiments of the invention.
- a prime mover or main engine 1 in this example with a maximum rating of 26 MW may be connected to a shaft 2.
- the main engine may capable of producing as much as 30 MW, but low to mid 20s MW is typical for a single screw vessel.
- a motor/generator unit 5, in this example with a rating of 5MW, may be connected to the shaft 2.
- the motor/generator unit rating may be suitably reduced.
- the connection may be made by mounting the motor/generator unit 5 onto the shaft 2 as illustrated, or by directly connecting a motor/generator unit 30 to the main engine 1.
- a propeller 3 is driven by the shaft. Optionally, this may be via a clutch 31. The location of the clutch allows the propeller to be disengaged whilst the main engine is still producing power which is diverted to consumers 10 or for charging the energy storage unit 7.
- the AC input to the frequency converter 6 is frequency converted in converter 6 to a suitable frequency for the main switchboard 8.
- the initial step of rectification to DC puts the input into a suitable form for supplying to the energy storage unit 7, or else, after converting back to AC at the appropriate frequency a transformer 32 transforms the output to a suitable voltage for the main switchboard 8.
- the energy storage system 7 gives up its stored energy to the DC bus in the converter which converts back to AC and augments the main engine in powering the shaft.
- the converter system may be installed within the shaft tunnel area of the vessel.
- the motor/generator unit 5, 30 may be shaft mounted onto the propulsion shaft 2, connected by gearing, or mounted directly on the prime mover shaft 81.
- the energy storage system can be charged from a shore connection 33, for example to provide energy for main engine start up, feeding auxiliary consumption, or a back-up during initial manoeuvring.
- Auxiliary motors 12a, 12b and corresponding generators 11a, 11b connected to the main switchboard may also provide power via transformer 32 and frequency converter 6 to the motor/generator unit 5 in certain operating modes.
- the auxiliary motors may be dual fuel motors, i.e. able to operate on marine fuel oil, or bio fuel, or liquefied natural gas.
- the subsidiary switchboards operate at different voltages and are connected to other switchboards via transformers to transform up or down accordingly.
- Cargo switchboards 38, 39 are at the same voltage as the main switchboard, in this example at 6.6kV, whilst auxiliary switchboards, 40, 41, 42, 43 and emergency switchboard 35 are an order of magnitude lower in voltage, in this example between 690V and 440V. In this example, further auxiliary switchboards 44, 45 and emergency switchboard 46 operate at 230V. Each switchboard is separated from its neighbour by a breaker, to protect against faults. The connection from the motor/generator unit 5 and energy storage system 7 is into the starboard main switchboard in this example and further distributed from there.
- the particular voltage on each of the different types of switchboard is not limited to the examples given, but may be adapted to the user's requirement.
- Fig.4 also for a new build vessel, the same reference numbers are used as in Fig.3 where the components and their function are the same and these will not be further described.
- the Fig.4 example differs from the Fig.3 embodiment in that it is for a twin screw vessel. Instead of all power transfer between the main engine and shaft and ship service power or auxiliary consumers being through one main switchboard (in the Fig.3 example, the starboard main switchboard), each screw has its own prime mover, main engine 1a, 1b and motor/generator unit 5a, 5b on its own shaft 2a, 2b.
- a twin screw vessel has two smaller engines, producing a similar amount of power to the single engine of the single screw vessel.
- engines 1a, 1b produce 13MW of power each.
- a smaller motor/generator unit 5a, 5b can be connected to each shaft.
- the motor/generator unit 5a, 5b can also be rated for half the power.
- a 2.5 MW motor/generator unit is provided on each shaft 2a, 2b.
- the apparent power at the input to each transformer 32a, 32b is reduced by a similar proportion and the transformer transforms to the main switchboard voltage as before.
- FIG.5 An alternative example for retrofitting the present invention to a single screw vessel is illustrated in Fig.5 .
- a prime mover in the form of main engine 51 is connected via clutch 50 to shaft 52.
- the use of a clutch is optional and could be before or after the motor according to the prime purpose.
- the clutch means that the shaft can still be run by directing energy from the energy storage unit 7, or auxiliary engines connected to the main switchboard. If the clutch is after the motor/generator unit, then it allows the main engine to act as a generator, without turning the propeller.
- a clutch 50 could be installed on the shaft 52 both before and after the motor to allow for either type of operation, but the cost and complexity are then increased.
- a motor/generator unit 55 is connected to the shaft and a propeller 53 is fitted to the shaft.
- the motor/generator unit 55 is coupled to a frequency converter 56 and through this to energy storage unit 57.
- a shore connection 33 may be provided. Excess power from the shaft 52 may be taken off by the motor/generator unit 55, frequency converted in converter 56 and either stored in the energy storage unit 57 or transformed to the main switchboard voltage in transformer 60 and supplied to the main switchboard 58, 59 via connection 13 and the starboard main switchboard 59.
- a 22MW main engine is provided, with a motor/generator unit 55 which is able to take off or take in up to 5.5 MW.
- the main switchboard is a 3.3kV switchboard, so the transformer 60 transforms from 690V to 3.3kV.
- a first connection 61 which simply connects the port and starboard switchboard when the breakers are closed and a second connection 62, to which an auxiliary power source, in this example a diesel generator 63, is connected.
- the auxiliary power source 63 is connected via generator 64 and design to be able to meet the majority of the power requirement of the main switchboard.
- each of the port and starboard switchboard may have an auxiliary generator 12 and motor 11 of a similar type to that in the Fig.3 and 4 examples, discussed above.
- FIG.6 A further example is illustrated in Fig.6 .
- a prime mover in the form of main engine 51a, 51b is connected to shaft 52a, 52b.
- a motor/generator unit 55a, 55b is connected to the shaft and a propeller 53a, 53b is fitted to the shaft, connected via a clutch 65a, 65b.
- a motor/generator unit 80, 80a, 80b may be directly connected to the main engine 51, 51a, 51b, or the motor generator 55, 55a, 55b, 80, 80a, 80b may be connected via a gearbox.
- the motor/generator unit 55a, 55b is coupled to a frequency converter 56a, 56b and through this to energy storage unit 57a, 57b.
- a shore connection 33 may be provided on one side, in this case only for the starboard side screw. Adding a shore connection on both sides is possible, but increases costs. Excess power from the shaft 52a, 52b may be taken off by the motor/generator unit 55a, 55b, frequency converted in converter 56a, 56b and either stored in the energy storage unit 57a, 57b or transformed to the main switchboard voltage in transformer 60a, 60b and supplied to the main switchboard 58, 59. In this example, the power from each side is supplied to the main switchboard 58, 59 on that side, i.e.
- each main engine has a lower maximum power.
- the power of each engine is 13MW, with a motor/generator unit 55a, 55b which is able to take off or take in up to 2.5 MW.
- the main switchboard is a 3.3kV switchboard, so the transformer 60a, 60b transforms from 690V to 3.3kV and the interconnections between the port and starboard main switchboards, as well as the auxiliary power sources and generators are the same as in the Fig.5 example.
- the energy management system 4 is able to operate in a number of different modes.
- peak shaving mode the energy storage unit 7 is used to boost energy to the main shaft 2, or to offload energy from the main shaft, to ensure stable operation for the main engine 1 when moving through the sea.
- booster mode when more propulsion power is needed than that which is available from the main engine 1, the motor/generator unit 5 acts as a motor with the required electrical power being generated by the auxiliary engines 12a, 12b supplying the main switchboard. If full power is not used, then booster mode also includes some peak shaving functionality. Alternator mode is used when there is more energy available from the main propulsion then is needed.
- the energy management system 4 takes off power to feed one or more auxiliary switchboards 40, 41, 42, 43, 44, 45, 46. Again, if full power is not used, then this mode also includes some peak shaving functionality.
- the energy management system 4 uses the auxiliary engines 12a, 12b, 12c to provide power to the energy management system, so that although the vessel has only limited power, it will still have some manoeuvring capability. Also the energy management system 4 may also be used to start the main engine 1 in case of failure of the primary start system 30.
- An auxiliary feed mode addresses the need for the auxiliary generators 12a, 12b, 63 to be run at high load sometimes. If the auxiliary engines are always run at low load, then they will tend to soot up, be inefficient and cause other problems. For this reason it is desired to load the auxiliary at close to full load. This may lead to overload of power if the load is fluctuating.
- the energy management system may work as a short term power backup and smoothing device, until new generator sets are brought online if needed.
- the energy storage unit may also assist in a transient startup sequence for heavy start consumers.
- Fig.7 illustrates an example of the energy storage unit in more detail.
- the energy storage unit 7 may be disconnected from the frequency converter by means of breaker 66.
- a DC to DC chopper 67 adapts the DC voltage from frequency converter to DC Bus voltage and controls energy storage power flow to prevent overloading or overcharging of the capacitors.
- the chopper is connected to one or more capacitors, supercapcitors, or ultracapacitors 68 which are able to store and release energy in large amounts and in short timescales and controls the voltage and power flow to and from the capacitors, supercapacitors, or ultracapcitors.
- the chopper circuit may also be used for controlling chemical energy storage, such as batteries, or flywheel energy storage.
- Fig.8 is a flow diagram of a method of operating a power control system of the present invention.
- the energy management system 4 and/or the power management system 9 determine 71 the power required from the main engine for propulsion when under way. If the power required for propulsion is less than the power generated by the main engine, additional power is diverted 72 to the energy storage unit 7, or consumers 10. If the energy storage unit is being used, AC voltage generated from the motor/generator unit, whether directly connected to the prime mover shaft, mounted on the propeller shaft, or connected via a gearbox, is converted 73 to DC voltage for the energy storage unit.
- the main engine If the power required for propulsion exceeds the power generated by the main engine, additional power is extracted 74 from the energy storage unit 7, or supplied by auxiliary engines 12a, 12b via the main switchboard. If the energy storage unit is being used, DC voltage from the energy storage unit 7 is converted 75 to AC voltage to supply power to the motor/generator unit and the shaft.
- the energy and power management systems 4, 9 continue to monitor 76 both predicted wave behaviour and special operating conditions that may occur on board the vessel in order to adapt the storage and extraction of energy accordingly.
- the operation of the main engine is more efficient if it can be kept generating at a substantially constant rate, which would not necessarily mean running at full power, but generally below.
- the prime mover Rather than keep changing the engine power output to cope with peaks and troughs of demand in rough seas, the prime mover generates a steady output, typically chosen to be sufficient to provide the actual average power required and the peaks and trough in demand are handled by the energy storage unit storing energy generated by the prime mover which exceeds the instantaneous required power and supplying energy to the shaft when the instantaneous power demand exceeds the power generated by the prime mover.
- Operating the system of the present invention may reduce fuel consumption and emissions; reduce wear and tear on the equipment and so reduce maintenance and down-time, increasing up-time and performance.
- Optimising the vessel in this way may reduce installed engine power, giving direct and indirect cost savings, as well as reducing weight and space requirements.
- the interconnections with stored energy and auxiliary power sources improve safety by maintaining propulsion, for at least a short time, in case of the loss of the main engine.
- the system may be manufactured in a modular fashion and suitable modules chosen over a range of capacities, typically in the range of up to 5 MW of intermittent capacity for between 20MW and 30MW of overall capacity.
- the system is flexible enough to provide a boost in performance of power taken in, for example for a heavy load start and supply that boost in a short time scale, of the order of milliseconds.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Power Engineering (AREA)
- Sustainable Energy (AREA)
- Life Sciences & Earth Sciences (AREA)
- Transportation (AREA)
- Sustainable Development (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Control Of Eletrric Generators (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
- This invention relates to a vessel energy management system and method, in particular for a marine, or seagoing, vessel.
- Ships of all types try to reduce operating costs as much as possible in order to be competitive. The main engine operates most efficiently if it has a sufficient and substantially constant power demand, but this is difficult to achieve, other than in calm conditions. In increased sea states, the energy required to move the vessel varies between the peaks and troughs of the waves, or swell, often in a cyclical manner, similar to a sine wave. The ship needs to have sufficient power to cope with the maximum expected power requirement, but at other parts of the cycle, that power is not used.
-
US20100125383 describes a method of regulating energy producing devices, energy storage devices, drive motors and propellers in a marine vessel. - In accordance with a first aspect of the present invention a vessel energy management system for controlling power supply to and from a propulsion system of a vessel, the vessel propulsion system comprising a shaft, a propeller and a prime mover turning the shaft connected to the propeller, the energy management system comprising a frequency converter; an energy storage unit, a controller and a motor/generator unit, the motor/generator unit being coupled in series between the prime mover and the propeller; wherein the motor/generator unit is adapted to receive power from the prime mover of the vessel and supply power to the propeller through the motor/generator unit and the shaft, or take off power from the shaft to the energy storage unit; wherein the energy storage unit comprises one or more capacitors, super capacitors or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage; wherein the controller of the energy management system determines an instantaneous power requirement of the propulsion system and average power generated by the prime mover; a comparator to compare the instantaneous required power and average power; wherein if the instantaneous required power exceeds the average power, the motor/generator unit receives energy from the energy storage unit; and, wherein if the instantaneous required power is less than the average power, the motor/generator unit supplies power from the prime mover to the energy storage unit.
- Smoothing for peaks and troughs in demand allows the main engine to be operated more efficiently and reduces the wear and tear.
- Preferably, the system further comprises an input from a main switchboard of the vessel, whereby if the required power exceeds the average power, the motor/generator unit receives energy from an auxiliary generator via the main switchboard, in addition to energy from the prime mover, or energy storage unit.
- If needed, additional energy can be supplied from auxiliary generators.
- Preferably, the system further comprises an input to a main switchboard of the vessel, whereby if the power requirement of the propulsion system is less than the average power, the main switchboard receives energy from the prime mover, or energy storage unit, via the energy management system.
- If there is excess energy from the prime mover or energy storage unit, then this can be supplied to the main switchboard.
- Preferably, the energy storage unit further comprises a chopper to control the rate of charging and discharging of the capacitors, super capacitors or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage.
- Preferably, the system further comprises a clutch on the shaft to disconnect the propeller if the prime mover is powering the main switchboard alone.
- In accordance with a second aspect of the present invention, a method of vessel energy management for controlling power supply to and from a propulsion system of a vessel, the vessel propulsion system comprising a prime mover turning a shaft connected to a propeller, the vessel comprising an energy management system comprising a frequency converter; an energy storage unit, a controller and a motor/generator unit, the motor generator unit being coupled in series between the prime mover and the propeller; comprises receiving at the motor/generator unit power from the prime mover of the vessel; and supplying power to the propeller through the motor/generator unit and the shaft, or taking off power from the shaft to the energy storage unit by determining a power requirement of the propulsion system of the vessel; determining average power generated by the prime mover; comparing the instantaneous required power and average power; if the required power exceeds the average power, causing the motor/generator unit to receive energy from capacitors, super capacitors, or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage of the energy storage unit; if the required power is less than the average power, causing the motor/generator unit to supply power from the prime mover to capacitors, super capacitors, or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage of the energy storage unit; monitoring the instantaneous power required and average power in varying sea conditions and adapting accordingly .
- Preferably, the method further comprises receiving power at the motor/generator unit from an auxiliary generator via the main switchboard of the vessel, if the required power exceeds the average power.
- If more energy is needed by the propulsion system than that available from the prime mover, or energy storage unit, then the energy management system can feed power from auxiliary generators connected to the main switchboard.
- Preferably, the method further comprises inputting power from the prime mover to a main switchboard of the vessel, if the required power is less than the average power.
- If the energy requirement of the propulsion system is less than the power available from the prime mover, then the energy management system can feed power to the main switchboard, from one or both of the prime mover or the energy storage unit, so that the switchboard can supply its consumers.
- Preferably, the method further comprises disconnecting a propeller of the propulsion system and supplying all power from the prime mover to the main switchboard of the vessel.
- An example of a vessel energy management system in accordance with the present invention will now be described with reference to the accompanying drawings in which:
-
Figure 1 is a block diagram illustrating the main power generation and consumption elements for a marine vessel having an energy management system according to the invention; -
Figure 2 is a graph of change in power demand with time for a conventional vessel and for a vessel having an energy management system according to the invention; -
Figure 3 is a single line diagram for a first embodiment of an energy managment system according to the invention, for a single screw vessel; -
Figure 4 shows the embodiment ofFig.3 for a twin screw vessel; -
Figure 5 is a single line diagram for a second embodiment of an energy management system according to the invention; -
Figure 6 shows the embodiment ofFig.5 for a twin screw vessel; -
Figure 7 illustrates more detail of the energy storage system in the embodiments ofFigs.3 to 6 and, -
Figure 8 is a flow diagram illustrating a method according to the present invention for controlling power on a vessel. - Electric ferries are known, having onboard batteries for storing energy when connected to a shore supply when docked, so that the ferry has a clean and quiet energy source in operation. Typically, an onboard generator is also provided, as a back-up if there is a greater than expected power requirement, or for assisting in charging the batteries when the shore supply is inadequate. The battery is discharged at a reasonably constant rate, over the course of the journey, then charged up again when the ferry docks. However, for seagoing vessels, responding to wave cycle power demand which may vary by several megawatts in the space of less than one minute, using batteries to smooth out the demand is not practical, as batteries do not respond well to receiving large amounts of charge and discharging by a similar amount shortly afterwards, as is required in this application.
-
Fig.1 is a block diagram illustrating the main power generation and consumption elements for a marine vessel having a power control system according to the invention. The main engine 1 turns ashaft 2 connected to apropeller 3. An energy management system 4, comprising theshaft 2, a motor/generator unit 5, a single unit which is able to act as either motor or generator, according to the requirement, afrequency converter 6 and anenergy storage unit 7, controls the supply of power to thepropeller 3 and the supply of power to consumers, via aconnection 13 tomain switchgear 8 of the vessel, as well as controlling power storage. The energy management system includes a controller and comparator (not shown). Themain switchgear 8 provides apower management system 9 forship service power 10 andgenerators auxiliary engines generator unit 5 may be mounted to theshaft 2, or connected via gearing, or directly connected, so that energy can be given to or taken from the propulsion system. The AC voltage taken off via the motor/generator unit 5 is fed to thefrequency converter 6. Thefrequency converter 6 includes an inverter, chopper and an active front end. The inverter and active front end can convert AC to DC and vice versa. The chopper controls the energy being fed back and forth to capacitors, batteries, or flywheel energy storage in the energy storage unit. The input frequency from the motor/generator unit 5 is typically of the order of 9 Hz AC and is converted to a preferred onboard frequency, typically 50 or 60Hz AC, then transformed by a transformer (not shown) to the correct voltage level to feed theconsumers 10, or supplied to theenergy storage unit 7. - In the present invention, fuel consumption on the vessels may be reduced by cycling power between the main engine 1 and the
energy storage unit 7. The energy storage unit comprises capacitors, or more preferably, supercapacitors or ultracapacitors, or may comprise chemical energy storage, such as batteries, or flywheel energy storage. The energy storage unit may have a capacity of up to 20MWs, but below 10 MWs, and more typically 6.6MWs may be sufficient for providing the necessary boost, or energy storage. The use of capacitors means that excess energy is stored without a chemical reaction, which would be the case with conventional battery storage, thus allowing faster charging and discharging to cope with the variation in power demand as the vessel moves through the water. The use of batteries allows significant cost reduction. Flywheels have a good lifetime and relatively low maintenance requirement. -
Fig.2 illustrates the effect ofstandard operation 25 of a vessel on power demand with time and compares this with the smoothed outdemand 23 achieved using a method according to the present invention. The graph of power against time indicates that for onewave period 22 in which the ship moves across one wavelength of water there is a time period within the cycle, which is less than the wave period, over which the power flow required from the main engine is less than that which is being produced and another time period, also less than the wave period, during which the power flow demanded from the main engine is greater than that being produced. The graph shows that the depth of the troughs and height of the peaks of power required from the main engine is greater withoutenergy management 25, than withenergy management 23. - Due to losses in the system, the actual average power required 21a over the cycle is typically a few percent more than the
average power 21b indicted by the level where the demand changes from negative to positive and vice versa. In a well optimised system these losses may be reduced to a little less than 1%, but there will always be a small amount of loss. By applying the method of the present invention, the depth of the troughs of power required from the main engine may be reduced and the height of the peaks of power required from the main engine may be reduced. The area between thestandard operation graph 25 and the smoothed outdemand graph 23 using the present invention is the power which may be stored forlater use additional power energy storage unit 7 as illustrated in the lower section of the graph. During periods of higher demand, than supply from the main engine 1, theenergy storage unit 7 gives up energy to the motor/generator unit 5 to power thepropeller 3 as indicated byarea 24. - The energy management system includes a wave estimator to estimate when to take power off the shaft and when to give power to the shaft. This process is typically coordinated with energy supplied from the shaft or from the
auxiliary engines main switchboard 8 and with theship service power 10 requirement. One way of estimating the wave period and wave height is to use a Kalman filter which then provides an input to the energy management system to control the timing of power take off from the shaft, or power take on to the shaft. -
Figs.3 to 6 illustrate a number of embodiments of the invention. InFig.3 , an example of an energy management system for installation on a new build single screw vessel is illustrated. A prime mover or main engine 1, in this example with a maximum rating of 26 MW may be connected to ashaft 2. The main engine may capable of producing as much as 30 MW, but low to mid 20s MW is typical for a single screw vessel. A motor/generator unit 5, in this example with a rating of 5MW, may be connected to theshaft 2. For a lower power main engine, the motor/generator unit rating may be suitably reduced. The connection may be made by mounting the motor/generator unit 5 onto theshaft 2 as illustrated, or by directly connecting a motor/generator unit 30 to the main engine 1. Another option is to connect the motor/generator unit 30 via agearbox 70. Using a gearbox allows the motor/generator unit 30 to run at a much higher rate than the shaft speed, which typically turns quite slowly, for example at only 80 rpm. Although not specifically shown, in each case the motor/generator unit frequency converter 6. The examples are given for a shaft mounted motor/generator, but the alternatives may be substituted as required and this description should be read as covering any of the options. Apropeller 3 is driven by the shaft. Optionally, this may be via a clutch 31. The location of the clutch allows the propeller to be disengaged whilst the main engine is still producing power which is diverted toconsumers 10 or for charging theenergy storage unit 7. - Power up to the maximum rating of the motor/
generator unit 5, which may be as much as 5.5 MW, more typically 2.5 MW and in this example, 5 MW, may be given to or taken from the shaft through the motor/generator unit 5. In the case of an oversupply of energy to the shaft, energy from the motor/generator unit 5, the AC input to thefrequency converter 6 is frequency converted inconverter 6 to a suitable frequency for themain switchboard 8. The initial step of rectification to DC puts the input into a suitable form for supplying to theenergy storage unit 7, or else, after converting back to AC at the appropriate frequency atransformer 32 transforms the output to a suitable voltage for themain switchboard 8. In the case of an undersupply of energy from the main engine 1, theenergy storage system 7 gives up its stored energy to the DC bus in the converter which converts back to AC and augments the main engine in powering the shaft. The converter system may be installed within the shaft tunnel area of the vessel. The motor/generator unit propulsion shaft 2, connected by gearing, or mounted directly on theprime mover shaft 81. - When docked, the energy storage system can be charged from a
shore connection 33, for example to provide energy for main engine start up, feeding auxiliary consumption, or a back-up during initial manoeuvring.Auxiliary motors corresponding generators transformer 32 andfrequency converter 6 to the motor/generator unit 5 in certain operating modes. The auxiliary motors may be dual fuel motors, i.e. able to operate on marine fuel oil, or bio fuel, or liquefied natural gas. - Interconnections between the various switchboards and the
transformer 32, or for low voltage switchboards operating at a voltage in accordance with thefrequency converter 6, then directly connected, rather than through the transformer, allow for a variety of consumers to be supplied from their switchboards, or for an emergency motor andgenerator 34 to be connected to anemergency switchboard 35, or to any of themain switchboards Cargo switchboards emergency switchboard 35 are an order of magnitude lower in voltage, in this example between 690V and 440V. In this example, furtherauxiliary switchboards emergency switchboard 46 operate at 230V. Each switchboard is separated from its neighbour by a breaker, to protect against faults. The connection from the motor/generator unit 5 andenergy storage system 7 is into the starboard main switchboard in this example and further distributed from there. The particular voltage on each of the different types of switchboard is not limited to the examples given, but may be adapted to the user's requirement. - In the example of
Fig.4 , also for a new build vessel, the same reference numbers are used as inFig.3 where the components and their function are the same and these will not be further described. TheFig.4 example differs from theFig.3 embodiment in that it is for a twin screw vessel. Instead of all power transfer between the main engine and shaft and ship service power or auxiliary consumers being through one main switchboard (in theFig.3 example, the starboard main switchboard), each screw has its own prime mover,main engine generator unit own shaft engines generator unit Fig.4 is rated at half the power of the prime mover in the single screw example ofFig.3 , so the motor/generator unit shaft transformer generator units Fig.4 are shown direct to theprime mover shaft Fig.3 example. - An alternative example for retrofitting the present invention to a single screw vessel is illustrated in
Fig.5 . A prime mover in the form ofmain engine 51 is connected via clutch 50 toshaft 52. As before, the use of a clutch is optional and could be before or after the motor according to the prime purpose. In this example, if the main engine fails, the clutch means that the shaft can still be run by directing energy from theenergy storage unit 7, or auxiliary engines connected to the main switchboard. If the clutch is after the motor/generator unit, then it allows the main engine to act as a generator, without turning the propeller. In theory, a clutch 50 could be installed on theshaft 52 both before and after the motor to allow for either type of operation, but the cost and complexity are then increased. A motor/generator unit 55 is connected to the shaft and apropeller 53 is fitted to the shaft. The motor/generator unit 55 is coupled to afrequency converter 56 and through this toenergy storage unit 57. Ashore connection 33 may be provided. Excess power from theshaft 52 may be taken off by the motor/generator unit 55, frequency converted inconverter 56 and either stored in theenergy storage unit 57 or transformed to the main switchboard voltage intransformer 60 and supplied to themain switchboard connection 13 and the starboardmain switchboard 59. In this example, a 22MW main engine is provided, with a motor/generator unit 55 which is able to take off or take in up to 5.5 MW. The main switchboard is a 3.3kV switchboard, so thetransformer 60 transforms from 690V to 3.3kV. There are two connections available between the port andstarboard switchboards first connection 61, which simply connects the port and starboard switchboard when the breakers are closed and asecond connection 62, to which an auxiliary power source, in this example adiesel generator 63, is connected. Theauxiliary power source 63 is connected viagenerator 64 and design to be able to meet the majority of the power requirement of the main switchboard. In addition, each of the port and starboard switchboard may have anauxiliary generator 12 andmotor 11 of a similar type to that in theFig.3 and4 examples, discussed above. - A further example is illustrated in
Fig.6 . This is similar to theFig.5 example, but for a twin screw vessel. For each screw, a prime mover in the form ofmain engine shaft generator unit Fig.5 andFig.6 examples, a motor/generator unit main engine motor generator generator unit frequency converter energy storage unit shore connection 33 may be provided on one side, in this case only for the starboard side screw. Adding a shore connection on both sides is possible, but increases costs. Excess power from theshaft generator unit converter energy storage unit transformer main switchboard main switchboard port transformer 60a is connected to the portmain switchboard 58 viaconnection 13a and thestarboard transformer 60b is connected to the starboardmain switchboard 59 viaconnection 13b. For a similar sized twin screw vessel, as compared with a single screw vessel, each main engine has a lower maximum power. For this example, the power of each engine is 13MW, with a motor/generator unit transformer Fig.5 example. - The energy management system 4 is able to operate in a number of different modes. In peak shaving mode, the
energy storage unit 7 is used to boost energy to themain shaft 2, or to offload energy from the main shaft, to ensure stable operation for the main engine 1 when moving through the sea. In booster mode, when more propulsion power is needed than that which is available from the main engine 1, the motor/generator unit 5 acts as a motor with the required electrical power being generated by theauxiliary engines auxiliary switchboards - Emergency mode is used if the main engine 1 is out of service for some reason. The energy management system 4 uses the
auxiliary engines primary start system 30. An auxiliary feed mode addresses the need for theauxiliary generators -
Fig.7 illustrates an example of the energy storage unit in more detail. Theenergy storage unit 7 may be disconnected from the frequency converter by means ofbreaker 66. A DC toDC chopper 67 adapts the DC voltage from frequency converter to DC Bus voltage and controls energy storage power flow to prevent overloading or overcharging of the capacitors. The chopper is connected to one or more capacitors, supercapcitors, orultracapacitors 68 which are able to store and release energy in large amounts and in short timescales and controls the voltage and power flow to and from the capacitors, supercapacitors, or ultracapcitors. The chopper circuit may also be used for controlling chemical energy storage, such as batteries, or flywheel energy storage. -
Fig.8 is a flow diagram of a method of operating a power control system of the present invention. The energy management system 4 and/or thepower management system 9 determine 71 the power required from the main engine for propulsion when under way. If the power required for propulsion is less than the power generated by the main engine, additional power is diverted 72 to theenergy storage unit 7, orconsumers 10. If the energy storage unit is being used, AC voltage generated from the motor/generator unit, whether directly connected to the prime mover shaft, mounted on the propeller shaft, or connected via a gearbox, is converted 73 to DC voltage for the energy storage unit. If the power required for propulsion exceeds the power generated by the main engine, additional power is extracted 74 from theenergy storage unit 7, or supplied byauxiliary engines energy storage unit 7 is converted 75 to AC voltage to supply power to the motor/generator unit and the shaft. The energy andpower management systems 4, 9 continue to monitor 76 both predicted wave behaviour and special operating conditions that may occur on board the vessel in order to adapt the storage and extraction of energy accordingly. The operation of the main engine is more efficient if it can be kept generating at a substantially constant rate, which would not necessarily mean running at full power, but generally below. Rather than keep changing the engine power output to cope with peaks and troughs of demand in rough seas, the prime mover generates a steady output, typically chosen to be sufficient to provide the actual average power required and the peaks and trough in demand are handled by the energy storage unit storing energy generated by the prime mover which exceeds the instantaneous required power and supplying energy to the shaft when the instantaneous power demand exceeds the power generated by the prime mover. - Operating the system of the present invention may reduce fuel consumption and emissions; reduce wear and tear on the equipment and so reduce maintenance and down-time, increasing up-time and performance. Optimising the vessel in this way may reduce installed engine power, giving direct and indirect cost savings, as well as reducing weight and space requirements. The interconnections with stored energy and auxiliary power sources improve safety by maintaining propulsion, for at least a short time, in case of the loss of the main engine. The system may be manufactured in a modular fashion and suitable modules chosen over a range of capacities, typically in the range of up to 5 MW of intermittent capacity for between 20MW and 30MW of overall capacity. The system is flexible enough to provide a boost in performance of power taken in, for example for a heavy load start and supply that boost in a short time scale, of the order of milliseconds.
Claims (9)
- A vessel energy management system (4) for controlling power supply to and from a propulsion system of a vessel, the vessel propulsion system comprising a shaft (2), a propeller (3) and a prime mover (1) turning the shaft (2) connected to the propeller (3), the energy management system comprising a frequency converter (6); an energy storage unit (7), a controller and a motor/generator unit (5), the motor/generator unit being coupled in series between the prime mover (1) and the propeller, wherein the motor/generator unit is adapted to receive power from the prime mover of the vessel and supply power to the propeller through the motor/generator unit (5) and the shaft (2), or take off power from the shaft (2) to the energy storage unit; wherein the energy storage unit comprises one or more capacitors, super capacitors or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage; wherein the controller of the energy management system (4) determines an instantaneous power requirement of the propulsion system and average power generated by the prime mover; a comparator to compare the instantaneous required power and average power; wherein if the instantaneous required power exceeds the average power, the motor/generator unit receives energy from the energy storage unit; and, wherein if the instantaneous required power is less than the average power, the motor/generator unit (5) supplies power from the prime mover (1) to the energy storage unit (7).
- A system according to claim 1, wherein the system (4) further comprises an input from a main switchboard of the vessel, whereby if the required power exceeds the average power, the motor/generator unit (5) receives energy from an auxiliary generator via the main switchboard, in addition to energy from the prime mover, or energy storage unit.
- A system according to claim 1 or claim 2, wherein the system (4) further comprises an input to a main switchboard of the vessel, whereby if the power requirement of the propulsion system is less than the average power, the main switchboard receives energy from the prime mover (1), or energy storage unit (7), via the energy management system.
- A system according to any preceding claim, wherein the energy storage unit (7) further comprises a chopper (67) to control the rate of charging and discharging of the capacitors, super capacitors or ultra capacitors, or of the chemical energy storage, such as batteries, or flywheel energy storage.
- A system according to any preceding claim, further comprising a clutch (31) on the shaft (2) to disconnect the propeller if the prime mover (1) is powering the main switchboard alone.
- A method of vessel energy management for controlling power supply to and from a propulsion system of a vessel, the vessel propulsion system comprising a prime mover (1) turning a shaft (2) connected to a propeller (3), the vessel comprising an energy management system (4) comprising a frequency converter (6); an energy storage unit (7), a controller and a motor/generator unit (5), the motor generator unit being coupled in series between the prime mover (1) and the propeller; the method comprising receiving at the motor/generator unit power from the prime mover of the vessel; and supplying power to the propeller through the motor/generator unit and the shaft, or taking off power from the shaft to the energy storage unit by determining (71) a power requirement of the propulsion system of the vessel; determining average power generated by the prime mover; comparing the instantaneous required power and average power; if the required power exceeds the average power, causing (74, 75) the motor/generator unit to receive energy from capacitors, super capacitors, or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage, of the energy storage unit; if the required power is less than the average power, causing (72, 73) the motor/generator unit to supply power from the prime mover to capacitors, super capacitors, or ultra capacitors, chemical energy storage, such as batteries, or flywheel energy storage, of the energy storage unit; monitoring (76) the instantaneous power required and average power in varying sea conditions and adapting accordingly .
- A method according to claim 6, further comprising receiving power at the motor/generator unit (5) from an auxiliary generator (12a, 12b, 12c) via the main switchboard of the vessel, if the required power exceeds the average power.
- A method according to claim 6 or claim 7, further comprising inputting power from the prime mover (1) to a main switchboard of the vessel, if the required power is less than the average power.
- A method according to claim 8, further comprising disconnecting a propeller (2) of the propulsion system and supplying all power from the prime mover (1) to the main switchboard of the vessel.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP16152131 | 2016-01-20 | ||
GBGB1607785.1A GB201607785D0 (en) | 2016-05-04 | 2016-05-04 | Vessel energy management system |
PCT/EP2017/050826 WO2017125359A1 (en) | 2016-01-20 | 2017-01-16 | Vessel energy management system |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3405388A1 EP3405388A1 (en) | 2018-11-28 |
EP3405388B1 true EP3405388B1 (en) | 2020-03-04 |
Family
ID=57838381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17700662.4A Active EP3405388B1 (en) | 2016-01-20 | 2017-01-16 | Vessel energy management system |
Country Status (10)
Country | Link |
---|---|
US (1) | US10974802B2 (en) |
EP (1) | EP3405388B1 (en) |
KR (1) | KR102670422B1 (en) |
CN (1) | CN108495784B (en) |
AU (1) | AU2017208431B2 (en) |
CY (1) | CY1122915T1 (en) |
DK (1) | DK3405388T3 (en) |
ES (1) | ES2792077T3 (en) |
SG (1) | SG11201805733UA (en) |
WO (1) | WO2017125359A1 (en) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110831849B (en) * | 2017-07-06 | 2022-02-18 | 瓦锡兰芬兰有限公司 | Method for starting an internal combustion engine of a hybrid propulsion system in a marine vessel and hybrid propulsion system in a marine vessel |
GB2574039B (en) * | 2018-05-24 | 2021-04-14 | Caterpillar Inc | A power distribution system for a marine vessel |
US10919408B2 (en) * | 2018-12-10 | 2021-02-16 | GM Global Technology Operations LLC | Controlling operation of device with rechargeable energy storage pack based on propulsion loss assessment |
CN113382923B (en) * | 2018-12-14 | 2024-04-19 | Abb瑞士股份有限公司 | Driving arrangement, cycloidal marine propulsion unit and method for operating a driving arrangement |
AU2020218818B2 (en) * | 2019-02-07 | 2022-11-10 | Shell Internationale Research Maatschappij B.V. | Method and system for reducing vessel fuel consumption |
CN109878687B (en) * | 2019-02-28 | 2021-05-11 | 哈尔滨工程大学 | Double-engine three-propeller type ship hybrid power system with composite energy storage function |
CN109878683A (en) * | 2019-02-28 | 2019-06-14 | 哈尔滨工程大学 | A kind of pneumoelectric series parallel type ship hybrid power system with composite energy storage |
KR102705011B1 (en) * | 2019-05-31 | 2024-09-10 | 시엔에이전기 주식회사 | Power Supply System of Ship equipped with Liquefied Gas Regasification System |
JP2021011202A (en) * | 2019-07-08 | 2021-02-04 | ヤンマーパワーテクノロジー株式会社 | Propulsion system |
GB2585679B (en) | 2019-07-10 | 2024-04-10 | Maersk Line As | Power control for a container vessel |
KR102205453B1 (en) * | 2019-08-26 | 2021-01-20 | 주식회사 빈센 | Modular electric propulsion apparatus for boat |
US11040762B2 (en) | 2019-10-18 | 2021-06-22 | Caterpillar Inc. | Marine parallel propulsion system |
US10938215B1 (en) * | 2019-11-25 | 2021-03-02 | Thrustmaster of Texas, Inc. | Power booster energy storage system (ESS) with skimming device for operating a vessel |
KR102334344B1 (en) * | 2020-03-04 | 2021-12-06 | 한국조선해양 주식회사 | Method for driving shaft generator of ship |
KR102315027B1 (en) * | 2020-04-10 | 2021-10-21 | 대우조선해양 주식회사 | Electric Power Management System And Method For Ship |
WO2022221432A1 (en) | 2021-04-15 | 2022-10-20 | Spoc Automation Inc. | Naturally load balanced redundant power conversion system |
SE2151299A1 (en) * | 2021-10-25 | 2023-04-26 | Berg Propulsion Production Ab | Electrical power for marine vessels |
CN114590384B (en) * | 2022-03-28 | 2024-04-02 | 四川摩比斯智能物联科技有限公司 | Cooperative control method and device for outboard motor with different power |
Family Cites Families (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU856894A1 (en) * | 1979-11-16 | 1981-08-23 | Ленинградский Ордена Ленина Электротехнический Институт Им. В.И.Ульянова(Ленина) | Control system for ship power plant main engines and for controllable-pitch propeller |
DE19737791C2 (en) * | 1997-08-29 | 2000-11-09 | Daimler Chrysler Ag | Method for operating a parallel motor vehicle hybrid drive |
US6645017B1 (en) * | 2002-06-11 | 2003-11-11 | General Motors Corporation | Marine powertrain and accessory power system with flywheel motor generator unit |
GB2443002A (en) * | 2006-10-16 | 2008-04-23 | Converteam Ltd | dc power distribution system |
US7980905B2 (en) * | 2007-11-25 | 2011-07-19 | C-Mar Holdings, Ltd. | Method and apparatus for providing power to a marine vessel |
EP2225118B1 (en) * | 2007-12-12 | 2016-06-22 | Foss Maritime Company | Hybrid propulsion systems |
US20100039054A1 (en) * | 2008-08-14 | 2010-02-18 | General Electric Company | Vehicle, system and method |
US8159082B2 (en) | 2008-09-05 | 2012-04-17 | General Electric Company | Systems and methods for providing an uninterruptible power supply to a ship-service bus of a marine vessel |
CA2643878A1 (en) | 2008-11-14 | 2010-05-14 | Pierre Caouette | An electronic method of controlling propulsion & regeneration for electric, hybrid-electric and diesel-electric marine crafts |
DE102009017157B4 (en) * | 2009-04-15 | 2011-02-17 | Siemens Aktiengesellschaft | Method for supplying an electrical ship's electrical system with external energy, ship with such a foreign energy supply and retrofit method for this |
NO332138B2 (en) * | 2009-11-09 | 2016-04-11 | Rolls Royce Marine As Power Electric Systems Bergen | Hybrid propulsion system for a vessel |
KR20170120203A (en) * | 2010-04-09 | 2017-10-30 | 지멘스 악티엔게젤샤프트 | Power supply system for marine drilling vessel |
WO2012092503A2 (en) * | 2010-12-29 | 2012-07-05 | Pierre Caouette | Electronic system and method of automating, controlling, and optimizing the operation of one or more energy storage units and a combined serial and parallel hybrid marine propulsion system |
CN103415439A (en) * | 2010-12-31 | 2013-11-27 | Abb有限公司 | Propulsion system |
CN103732490B (en) * | 2011-06-22 | 2016-03-09 | 瓦锡兰芬兰有限公司 | Ship advances the improvement of engine fuel efficiency |
WO2013003640A1 (en) * | 2011-06-28 | 2013-01-03 | Liquid Robotics Inc. | Watercraft that harvest both locomotive thrust and electrical power from wave motion |
DE102011122130B4 (en) * | 2011-12-22 | 2017-09-14 | Peter Andersen | Energy supply and propulsion system for ships and offshore units |
JP6044922B2 (en) * | 2012-03-30 | 2016-12-14 | 国立研究開発法人 海上・港湾・航空技術研究所 | Ship hybrid operation system and hybrid operation ship |
FR2999147B1 (en) * | 2012-12-11 | 2015-06-26 | Mediterranee Const Ind | AUTOMOTIVE VESSEL INTENDED TO INTERVENE ON FIXED FACILITIES AT SEA, SUCH AS WIND TURBINES AT SEA |
US9096295B2 (en) * | 2012-12-31 | 2015-08-04 | General Electric Company | Hybrid power and propulsion system |
CN103332284B (en) * | 2013-06-27 | 2016-04-13 | 上海海事大学 | A kind of energy management of hybrid ship electric power propelling system and control method |
JP5735061B2 (en) * | 2013-08-12 | 2015-06-17 | 株式会社東芝 | Train power supply system |
US20160020720A1 (en) * | 2014-07-15 | 2016-01-21 | IPH + Limited | Drive control system and drive control method |
US9667232B2 (en) * | 2015-05-13 | 2017-05-30 | Raytheon Company | System and method for parallel configuration of hybrid energy storage module |
CN104859828B (en) | 2015-06-05 | 2017-02-01 | 武汉理工大学 | Diesel-electric hybrid power ship propulsion system and energy management method of diesel-electric hybrid power ship propulsion system |
EP3391165B1 (en) * | 2015-12-18 | 2020-02-05 | ABB Schweiz AG | Control system for operating a vessel |
-
2017
- 2017-01-16 US US16/068,937 patent/US10974802B2/en active Active
- 2017-01-16 KR KR1020187020769A patent/KR102670422B1/en active IP Right Grant
- 2017-01-16 SG SG11201805733UA patent/SG11201805733UA/en unknown
- 2017-01-16 EP EP17700662.4A patent/EP3405388B1/en active Active
- 2017-01-16 CN CN201780007638.XA patent/CN108495784B/en active Active
- 2017-01-16 WO PCT/EP2017/050826 patent/WO2017125359A1/en active Application Filing
- 2017-01-16 ES ES17700662T patent/ES2792077T3/en active Active
- 2017-01-16 AU AU2017208431A patent/AU2017208431B2/en active Active
- 2017-01-16 DK DK17700662.4T patent/DK3405388T3/en active
-
2020
- 2020-05-13 CY CY20201100446T patent/CY1122915T1/en unknown
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
US10974802B2 (en) | 2021-04-13 |
AU2017208431A1 (en) | 2018-07-12 |
CN108495784B (en) | 2024-07-26 |
ES2792077T3 (en) | 2020-11-10 |
EP3405388A1 (en) | 2018-11-28 |
SG11201805733UA (en) | 2018-08-30 |
DK3405388T3 (en) | 2020-05-18 |
WO2017125359A1 (en) | 2017-07-27 |
CN108495784A (en) | 2018-09-04 |
AU2017208431B2 (en) | 2021-10-14 |
KR102670422B1 (en) | 2024-05-28 |
US20190023369A1 (en) | 2019-01-24 |
KR20180104622A (en) | 2018-09-21 |
CY1122915T1 (en) | 2021-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3405388B1 (en) | Vessel energy management system | |
KR101877095B1 (en) | Improvement in ship propulsion engine fuel efficiency | |
EP3412558B1 (en) | Ship power system | |
KR101089905B1 (en) | Method for operation of a marine-vessel propulsion system with waste-heat recovery, as well as a marine-vessel propulsion system with waste-heat recovery | |
US9550556B2 (en) | Power system for vessels | |
EP2225118A1 (en) | Hybrid propulsion systems | |
CN113056853B (en) | Energy supply system for wading facilities | |
US20240239466A1 (en) | Fully integrated hybrid power generation system for a vessel | |
CN113169550A (en) | Energy supply system for wading device with different connection areas | |
CN111409807A (en) | Diesel-electric hybrid electric propulsion system for ship alternating current-direct current networking | |
CN113169551A (en) | Energy supply system for a wading installation having a first and a second winding system of a generator system for feeding different direct voltage busbars | |
CN216508978U (en) | Unmanned ship direct current network deployment electric propulsion system | |
WO2021175695A1 (en) | Vessel energy management system | |
Zadeh et al. | Shipboard DC Hybrid Power Systems: Pathway to Electrification and Decarbonization | |
CN212332947U (en) | Diesel-electric hybrid electric propulsion system for ship alternating current-direct current networking | |
CN116707039A (en) | Hybrid power station system of bulk carrier and control method | |
AU2008334928B2 (en) | Hybrid propulsion systems | |
CN113196607A (en) | Energy supply system for a wading installation having a plurality of regions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20180628 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20190925 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1240074 Country of ref document: AT Kind code of ref document: T Effective date: 20200315 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017012555 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20200511 |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: FGE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20200304 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200605 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200604 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200729 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200704 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2792077 Country of ref document: ES Kind code of ref document: T3 Effective date: 20201110 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1240074 Country of ref document: AT Kind code of ref document: T Effective date: 20200304 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017012555 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602017012555 Country of ref document: DE Owner name: SIEMENS ENERGY AS, NO Free format text: FORMER OWNER: SIEMENS AKTIENGESELLSCHAFT, 80333 MUENCHEN, DE Ref country code: DE Ref legal event code: R081 Ref document number: 602017012555 Country of ref document: DE Owner name: SIEMENS ENERGY GLOBAL GMBH & CO. KG, DE Free format text: FORMER OWNER: SIEMENS AKTIENGESELLSCHAFT, 80333 MUENCHEN, DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: SIEMENS ENERGY GLOBAL GMBH & CO. KG |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |
|
26N | No opposition filed |
Effective date: 20201207 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG, CH |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210116 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20210131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210131 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210116 |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: PCE Owner name: SIEMENS ENERGY GLOBAL GMBH & CO. KG Ref country code: FI Ref legal event code: PCE Owner name: SIEMENS ENERGY AS |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210131 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: CREP Representative=s name: ONSAGERS AS, POSTBOKS 1813, VIKA, 0123 OSLO, NORGE Ref country code: NO Ref legal event code: CHAD Owner name: SIEMENS ENERGY AS, NO |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: PD Owner name: SIEMENS ENERGY AS; NO Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), ASSIGNMENT; FORMER OWNER NAME: SIEMENS AKTIENGESELLSCHAFT Effective date: 20220726 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20220728 AND 20220803 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: PC2A Owner name: SIEMENS ENERGY AS Effective date: 20220819 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602017012555 Country of ref document: DE Owner name: SIEMENS ENERGY GLOBAL GMBH & CO. KG, DE Free format text: FORMER OWNER: SIEMENS ENERGY GLOBAL GMBH & CO. KG, 81739 MUENCHEN, DE Ref country code: DE Ref legal event code: R081 Ref document number: 602017012555 Country of ref document: DE Owner name: SIEMENS ENERGY AS, NO Free format text: FORMER OWNER: SIEMENS ENERGY GLOBAL GMBH & CO. KG, 81739 MUENCHEN, DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20170116 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20231228 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240125 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240209 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240129 Year of fee payment: 8 Ref country code: GB Payment date: 20240123 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20240118 Year of fee payment: 8 Ref country code: IT Payment date: 20240123 Year of fee payment: 8 Ref country code: FR Payment date: 20240125 Year of fee payment: 8 Ref country code: DK Payment date: 20240125 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CY Payment date: 20240117 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200304 |