EP3368723A2 - Offshore apparatus and method - Google Patents

Offshore apparatus and method

Info

Publication number
EP3368723A2
EP3368723A2 EP16815708.9A EP16815708A EP3368723A2 EP 3368723 A2 EP3368723 A2 EP 3368723A2 EP 16815708 A EP16815708 A EP 16815708A EP 3368723 A2 EP3368723 A2 EP 3368723A2
Authority
EP
European Patent Office
Prior art keywords
rig
offshore
sheath arrangement
offshore platform
sheath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16815708.9A
Other languages
German (de)
French (fr)
Other versions
EP3368723B1 (en
Inventor
Michael Kannegaard
John Anthony GILL
Jeanne Mia LØNSTRUP
Meinte VAN DER BRUG
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Noble Drilling AS
Original Assignee
Maersk Olie og Gas AS
Maersk Drilling AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GBGB1522856.2A external-priority patent/GB201522856D0/en
Priority claimed from GBGB1601175.1A external-priority patent/GB201601175D0/en
Priority claimed from PCT/DK2016/000036 external-priority patent/WO2017071707A1/en
Application filed by Maersk Olie og Gas AS, Maersk Drilling AS filed Critical Maersk Olie og Gas AS
Publication of EP3368723A2 publication Critical patent/EP3368723A2/en
Application granted granted Critical
Publication of EP3368723B1 publication Critical patent/EP3368723B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/02Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0021Safety devices, e.g. for preventing small objects from falling into the borehole

Definitions

  • the plate arrangement may comprise at least one separation plate.
  • a separation plate may be configured to extend downwardly from the plate arrangement.
  • Such a separation plate may be configured to inhibit objects passing through the hatches to adjacent regions at the platform (e.g. adjacent wells). Further, such a separation plate may be configured to come into contact with a deck as the sheath arrangement is lowered, which may reduce or avoid impact of the sheath arrangement on wellheads.
  • Figure 5 is a diagrammatic illustration of a further example of an offshore platform ;
  • the hatches 472 allow operations to be carried out on the other wells 414 through the apertures 473 when the sheath arrangement 434 is above well 414a.
  • the hatches 472 also allow equipment to be passed through the plate arrangement 470 (e.g. when needed).
  • intervention operations e.g. wireline operations

Abstract

An offshore platform for use in combination with an offshore rig comprises an upper deck defining an upper deck aperture which is alignable with a rig aperture of the offshore rig, when said offshore rig extends over the upper deck, to permit objects to extend between the offshore rig and through the upper deck. The offshore platform further includes a sheath arrangement aligned with the upper deck aperture and extending upwardly relative to the upper deck to be alignable with the rig aperture, wherein the sheath arrangement defines a confinement zone for confining objects which pass downwardly from the offshore rig through the rig aperture.

Description

OFFSHORE APPARATUS AND METHOD
FIELD The present invention relates to offshore apparatus and methods, for example for use in the exploration and extraction of mineral resources from subterranean reservoirs.
BACKGROUND In the offshore oil and gas industry wellbores are drilled below the seabed using specialised drilling platforms or vessels, known colloquially as drilling "rigs". Multiple types of drilling rig exist, such as fixed platforms, jack-up rigs, mobile offshore drilling units (MODUs), semi-submersibles, drilling ships and the like. The particular type of rig used can depend on a number of factors, such as water depth, rig availability, expected longevity of the associated reservoir, and the like.
Once a well has been drilled and appraised, it will be completed with the appropriate downhole infrastructure to permit production (and/or injection), and then capped at the wellhead with a production tree, known as a X-mas tree. Such completion operations may be achieved from the same drilling rig, or may be achieved using a different service rig. Further, during the life of the well it may be necessary to perform workover or intervention operations, which again could be supported by the drilling rig, or alternatively with a different service or workover rig. The production tree may be located on a subsea wellhead, with a tie back to a surface production facility. In alternative arrangements the tree may be located at surface, on a surface or wellhead platform. Multiple wellbores will typically be present, such that a cluster of trees are provided on the wellhead platform. Surface tree systems will typically require rigs, such as drilling rigs, service rigs, workover rigs and the like to operate alongside the wellhead platform. For example, portions, such as cantilever portions, of a rig may extend over the wellhead platform. Like in all offshore operations, safety is paramount, and risk to personnel, the environment and equipment must be minimised. In many circumstances there is a risk of objects being dropped from height, for example between separate decks of a wellhead platform, or indeed from a rig operating alongside a wellhead platform. For safety reasons some operators may establish no-entry zones for personnel, for example in defined drop zones, such as below a rig cantilever portion. This may restrict or delay certain operations which cannot otherwise be performed while the rig cantilever portion is in position, or while inter-deck operations are being performed. Also, irrespective of personnel access, there will always be a risk of damage to equipment, such as production trees, from dropped objects and the like. This may be compounded by the close proximity of equipment in tree clusters on the production platform. SUMMARY
An aspect or embodiment relates to an offshore platform for use in combination with an offshore rig, comprising:
an upper deck defining an upper deck aperture which is alignable with a rig aperture of the offshore rig, when said offshore rig extends over the upper deck, to permit objects to extend between the offshore rig and through the upper deck; and
a sheath arrangement aligned with the upper deck aperture and extending upwardly relative to the upper deck to be alignable with the rig aperture, wherein the sheath arrangement defines a confinement zone for confining objects which pass downwardly from the offshore rig through the rig aperture.
In use, any objects passing, for example intentionally passing and/or accidentally passing (i.e., dropped), from the offshore rig may be confined within the confinement zone defined by the sheath arrangement. Such confinement provided by the sheath arrangement may thus minimise or eliminate the extent of a drop zone on the upper deck. This may provide a number of advantages. For example, the risk to personnel may be reduced, and may permit personnel to perform operations on the upper deck while the offshore rig is extended over the upper deck. Further, the risk of damage to equipment may be reduced, such as the risk of damage to wellheads and associated equipment (such as production trees) accommodated on the offshore platform.
In normal operations objects may extend form the offshore rig, through the upper deck of the offshore platform, to perform operations associated with the installation, intervention and/or decommissioning of an offshore well. Objects passing from the offshore rig may include tubing, conductor pipe, casing strings, liners, risers, drill strings, bottom hole assemblies, completion equipment, intervention equipment, tools and the like. While many objects may be intentionally passed, in some instances objects may be dropped from the offshore rig, such as tools, equipment and the like, and as noted above, the sheath arrangement assists to minimise risk from such dropped objects.
The offshore rig may define a drilling rig. The offshore rig may be operable adjacent, for example alongside, the offshore platform. The offshore rig may comprise a cantilever portion which is extendable over the offshore platform. The cantilever portion may comprise the rig aperture. The cantilever portion may comprise a BOP (Blow Out Preventor) enclosure.
The offshore rig may define a service rig, workover rig or the like.
The offshore rig may define a drill centre, wherein operations supported by the offshore rig, such as drilling, running equipment and the like, are provided along the drill centre. Accordingly, the rig aperture is provided on the drill centre. The offshore rig may be positioned over the offshore platform such that the drill centre is aligned with the upper deck aperture. Although the term "drill centre" is used, this is not intended to be limited only to drilling operations, or indeed to limit the rig to a drilling rig.
The offshore platform may define a wellhead platform. In such an arrangement the offshore platform may accommodate a terminating end of one or more surface wells, along with associated equipment, such as wellheads, production trees and the like.
Generally, a wellhead platform is a structure or structures, which support the upper end (opposite of the reservoir) of the well including any superstructures, one or more well processing stations or similar. Such a wellhead platform is typically a structure (such as a jacket based or gravity based platform) resting on the seabed ranging from very basic configurations to complex facilities. The offshore wellhead platform may comprise one or more well-processing stations. Alternatively, the offshore wellhead platform does not comprise any well-processing stations. In such cases, well-processing tasks such as drilling may be performed by a drilling rig placed next to the wellhead platform. The wellhead platform typically fulfils one or more of the following functions in supporting a well:
(i) shield the well from accidental impacts from ships and vessels;
(ii) keeping a completed surface well from otherwise tipping over;
(iii) provide structure where pipes can be mounted for connecting to a valve assembly or production tree mounted on each well and interfacing these pipes with various equipment or manifolds on and/or off the platform, such as pumps and storage tanks;
(iv) supporting production trees so that they are substantially static relative to the platform (at least during production) as the platform and/or well is exposed to forces from current, wind and wave.
The sheath arrangement may define a circumferential confinement zone. The sheath arrangement may comprise one or more tubulars.
The sheath arrangement may circumscribe the upper deck aperture. The sheath arrangement may extend upwardly from the level of the upper deck. That is, no gap between the upper deck and the sheath arrangement may be present. Such an arrangement may assist to minimise risk of objects being dropped from the upper deck and through the upper deck aperture downwardly to a lower deck.
The sheath arrangement may be securable around a peripheral region of the upper deck aperture. The sheath arrangement may be securable around a peripheral region of the rig aperture.
The sheath arrangement may extend through the upper deck aperture. This may assist to minimise the risk of objects being dropped from the upper deck and through the upper deck aperture downwardly to a lower deck. The sheath arrangement may extend through the rig aperture.
At least a portion of the sheath arrangement may be rigid.
At least a portion of the sheath arrangement may be flexible. At least a portion of the sheath arrangement may comprise a flexible material, such as a chain-link material. The sheath arrangement may define a sheath curtain. Such an arrangement may provide advantages in terms of installation, storage, and the like.
At least a portion of the sheath arrangement may be formed or comprise a metal or metal alloy material, composite material, plastic material or the like.
At least a portion of the sheath arrangement may be supported by the upper deck. At least a portion of the sheath arrangement may be secured to the upper deck. At least a portion of the sheath arrangement may be supported by the offshore rig. At least a portion of the sheath arrangement may be secured to, for example suspended from, the offshore rig.
At least a portion of the sheath arrangement may be provided on the offshore rig. For example, a portion of the sheath arrangement may be provided on the offshore rig, and a remaining portion of the sheath arrangement may be mated or otherwise arranged relative to the portion provided on the rig.
At least a portion of the sheath arrangement may be extended, for example lowered, from the offshore rig, for example through the rig aperture, during deployment of the sheath arrangement. The sheath arrangement may be deployed entirely from the offshore rig, for example by extending downwardly towards the platform.
At least a portion of the sheath arrangement may be extended, for example raised, from the offshore platform an upwardly towards the offshore rig during deployment of the sheath arrangement. The sheath arrangement may be deployed entirely from the platform, for example by extending upwardly towards the rig.
The sheath arrangement may comprise a load point or support on an outer surface thereof. The load point or support may permit connection of a load to the sheath arrangement. This may permit the sheath arrangement to at least partially support a connected load.
The sheath arrangement may comprise a support arrangement on an outer surface thereof. This may permit the sheath arrangement to be used as a structural support to facilitate offline (i.e., offset from the drill centre) operations such as slickline and wireline operations, hoisting operations such as during installation of production trees and the like. The support arrangement may comprise one or more arms, for example cantilever arms. The support arrangement may comprise one or more pulleys, sheaves or the like. The support arrangement may comprise a winch assembly.
The sheath arrangement may comprise a unitary component. Alternatively, the sheath arrangement may comprise multiple components. In one embodiment the sheath arrangement may comprise a first component connected or mounted to the offshore platform, and a second component connected or mounted to the offshore rig.
The sheath arrangement may be telescopic. For example, the sheath arrangement may comprise telescoping tubular structures. This may facilitate storage of the sheath arrangement when not in use. This may facilitate improved deployment of the sheath arrangement. Such a telescoping arrangement may provide a degree of movement compensation, for example to accommodate relative movement between the offshore platform and offshore rig.
The sheath arrangement may extend downwardly relative to the upper deck towards a first lower deck. The sheath arrangement may therefore define a confinement zone for confining objects passing between the upper and first lower decks. This may minimise or eliminate the extent of a drop zone on the first lower deck.
The offshore platform may accommodate equipment or apparatus associated with surface wells within the space defined between the first lower deck and upper deck. Such equipment or apparatus may comprise wellheads, production trees, pipework and the like. The provision of a confinement zone between the first lower and upper decks, in addition to reducing risk to personnel, may also reduce risk of damage to such sensitive equipment. The sheath arrangement may define a continuous confinement zone both above and below the upper deck.
The first lower deck may define a first lower deck aperture aligned with the upper deck aperture. The sheath arrangement may define an upper sheath portion extending upwardly relative to the upper deck and a lower sheath portion extending downwardly relative to the upper deck. At least part of the upper and lower sheath portions may be integrally formed. The sheath arrangement may terminate at the first lower deck. The sheath arrangement may terminate above the first lower deck. The sheath arrangement may extend through a lower deck aperture. The sheath arrangement may extend below the first lower deck, for example towards a second lower deck. The sheath arrangement, or portions thereof may define a permanent installation.
The sheath arrangement, or portions thereof, may be removable.
The offshore rig may be used to support a number of procedures or operations. For example, rig operations may include deploying and installing a conductor, drilling through a conductor, re-entering an existing well, deploying completion equipment and the like.
The offshore platform may accommodate multiple wells arranged in a cluster around the drill centre. The upper ends of the wells may be moveable to be aligned with the drill centre of the offshore rig. This may permit multiple wells to be established and accessed from a common drill centre. Such movement/alignment of the wells may be performed in accordance with desired operator procedures, such as those described in the applicant's co-pending patent applications DK PA2015 00668 and GB 1522856.2, the disclosure of which is incorporated herein by reference.
In one example, the offshore platform may be configured to selectively allow access to the wells. For example, the sheath arrangement itself, or indeed the platform, may comprise a plate arrangement. Such a plate arrangement may be configured to form a flange, when associated with the sheath arrangement, to selectively prevent objects or equipment from accessing the wells, (e.g. those wells not at the drill centre).
In some examples, the plate arrangement may comprise an operable hatch or otherwise opening. Such a hatch may permit, when opened, access to the wells (e.g. to permit intervention operations to be carried out on the other wells when the sheath arrangement is at the drill centre.) The plate arrangement may be configured to allow access to other wells when drilling operations are occurring through the sheath arrangement (e.g. even at times when the plate arrangement is associated with the sheath arrangement).
In some examples, the plate arrangement may comprise at least one separation plate. Such a separation plate may be configured to extend downwardly from the plate arrangement. Such a separation plate may be configured to inhibit objects passing through the hatches to adjacent regions at the platform (e.g. adjacent wells). Further, such a separation plate may be configured to come into contact with a deck as the sheath arrangement is lowered, which may reduce or avoid impact of the sheath arrangement on wellheads.
The sheath arrangement may comprise an access hatch. The access hatch may be arranged such that, when in situ, the access hatch is user accessible from a deck (e.g. the upper deck). Such an access hatch, when opened, may permit access to the equipment passing within the sheath arrangement.
The sheath arrangement may be configured to flex compliantly in order to accommodate relative movement between the offshore rig and upper deck, when in use. For example, the sheath arrangement, or at least a portion thereof, may be axially and/or longitudinally compliant in order to accommodate relative movement between the offshore rig and upper deck, when in use. In some examples, the sheath arrangement may comprise specific compliant portions, for example one or more flexible joints.
An aspect or embodiment relates to a method for confining objects extending between an offshore rig and an offshore platform, comprising extending a sheath arrangement upwardly relative to an upper deck of the offshore platform, wherein the sheath arrangement is aligned with a rig aperture of the offshore rig such that the sheath arrangement defines a confinement zone for confining objects which pass downwardly from the offshore rig through the rig aperture.
An aspect or embodiment relates to a sheath arrangement for use between an upper deck of an offshore platform and an offshore rig positioned over the offshore platform, wherein the sheath arrangement is alignable with a rig aperture provided on the rig and defines a confinement zone for confining objects which pass downwardly from the offshore rig through the rig aperture. The features defined in relation to one aspect may be provided in combination with any other aspect. BRIEF DESCRIPTION OF THE DRAWINGS
These and other aspects and examples will now be described, by way of example only, with reference to the accompanying drawings, in which: Figure 1 A is a diagrammatic illustration of a portion of an example offshore platform which includes a sheath arrangement, prior to positioning of a cantilever portion of a separate drilling rig;
Figure 1 B illustrates the platform of Figure 1 A, with the cantilever portion of the drilling rig aligned above the platform;
Figure 2 is a diagrammatic illustration of a modified example of an offshore platform;
Figure 3A is a diagrammatic illustration of a further example of an offshore platform during the process of deploying a sheath arrangement;
Figure 3B illustrates the offshore platform of Figure 4A, with the sheath arrangement deployed; Figure 4A is a diagrammatic illustration of a further example of an offshore platform prior to complete deployment of a sheath arrangement;
Figure 4B illustrates the offshore platform of Figure 5A, with the sheath arrangement fully deployed;
Figure 5 is a diagrammatic illustration of a further example of an offshore platform ;
Figure 6A is a diagrammatic illustration of a cross sectional view through a plate arrangement of Figure 6B; Figure 6B is a diagrammatic illustration of a further example of a sheath arrangement including the plate arrangement; and
Figure 6C illustrates the plate arrangement of Figure 6B.
DETAILED DESCRIPTION OF THE DRAWINGS
Figure 1 diagrammatically illustrates an offshore platform, specifically an offshore wellhead platform, generally identified by reference numeral 10, which extends above a sea surface 12. The platform 10 accommodates a number of well structures 14 which extend from their terminating upper ends 16, through the sea and into the seabed, to intercept a subterranean formation. As is known in the art, the well structures 14 will typically include an outer conductor pipe and a number of concentrically arranged casing strings cemented within the conductor pipe. Each well structure 14 terminates at a wellhead 18 and is capped with a production or X-mas tree 20.
The platform 10 includes a number of decks, including an upper deck 22, a first lower deck 24 and a second lower deck 26 arranged one above the other. Multiple terms are used in the art to define or classify each deck. For example, the upper deck 22 may be known as a weather deck. The first lower deck 24 may be defined as a wellhead or tree deck, in that, at least in the present example, the wellheads 18 and production trees 20 are located generally at the level of the first lower deck 24. The second lower deck 26 may be defined as a cellar deck. The upper deck 22 defines an upper deck aperture 28, and the first lower deck 24 defines a first lower deck aperture 30, wherein the respective apertures 28, 30 are aligned on a platform axis 32. The second lower deck 26 may also include a corresponding aperture, although this is not illustrated. In the example illustrated the wells 14 are arranged in a cluster around the platform axis. Whenever well access is required, for example during well construction, intervention or the like, the upper end 16 of the well 14 is moved into line with the platform axis 32, resulting in bending of the well 14, as exemplified by well 14a. Such movement may be performed as described in the applicant's co-pending patent applications DK PA2015 00668 and GB 1522856.2, the disclosure of which is incorporated herein by reference. The offshore platform 10 includes or is associated with a sheath arrangement 34 which is aligned on the platform axis 32 and includes an upper portion 36 which extends upwardly relative to the upper deck 22, and a lower portion 38 which extends downwardly relative to the upper deck 22 towards the lower deck 24. The lower portion 38 in the illustrated example terminates just above the first lower deck 24. The sheath arrangement 34 thus defines a confinement zone 40 above both the upper and first lower decks 22, 24.
In typical offshore operations a rig will be operated alongside a wellhead platform, to perform operations such as drilling, installing well infrastructure, performing workover or intervention operations, and the like. In Figure 1 a rig cantilever 42 is illustrated alongside the offshore platform 10. The rig cantilever 42 includes a BOP enclosure 44 which includes a rig floor 46 (which may be defined as a drill floor), with a rig aperture 48 defined in the rig floor 46. The rig cantilever 42 defines a drill centre 50 which is aligned with the rig aperture 48.
The rig cantilever 42 will be moved over the offshore platform 10, as illustrated in Figure 1 B, such that the drill centre 50 of the rig cantilever 42 is aligned with the platform axis 32. When the rig cantilever 42 is in place, the sheath arrangement 34 is thus aligned with the rig aperture 48, such that all operations from the rig cantilever 42 are performed through the sheath arrangement 34, specifically within the confinement zone 40 defined by the sheath arrangement 34, thus improving safety on the upper and first lower decks 22, 24. In the example illustrated in Figure 1 B a drilling operation is being performed through well 14a, using typical drilling equipment such as a drilling BOP 52, drilling riser 54 and the like.
In addition to normal operations through the sheath arrangement 34, the confinement zone 40 may also function to confine objects which are accidentally dropped through the rig aperture 48. In addition to improved personnel safety, this can also assist to minimise risk of damage to equipment, such as the wellheads 18 and production trees 20 accommodated on the platform 10.
In the embodiment illustrated in Figures 1 A and 1 B the sheath arrangement includes one or more rigid tubular bodies, which may be made from metal, such as steel. However, in other examples other material may be used, such as polymers, composite material or the like.
In a modified example, as illustrated in Figure 2, the sheath arrangement 34 may include a second lower section 56 (shown in broken outline) which extends below the first lower deck 24 towards the second lower deck 26.
Further, the sheath arrangement 34, and specifically the upper portion 36 of the sheath arrangement 34 includes supports in the form of cantilever support arms 60. Although two arms 60 are illustrated in Figure 2 more or less arms may be provided. The arms 60 may be used for a number of support operations, effectively permitting the sheath arrangement to act as a structural component for supporting load. In Figure 2 one arm 60 is illustrated in use as a hoisting point, permitting manipulation of a load, such as the illustrated production tree 20a, in combination with a wire 62 and associated winch 64.
Reference is now made to Figure 3A in which a further modified example of an offshore platform 1 10 is illustrated. The platform 1 10 is similar in many respects to platform 10 of Figures 1 A and 1 B and as such like features share like reference numerals, incremented by 100. Thus, the platform 1 10 includes an upper deck 122, a first lower deck 124 and a second lower deck 126, wherein the upper deck 122 defines an upper deck aperture 128, and the first lower deck 124 defines a first lower deck aperture 130.
In the present example a sheath arrangement 134 is also provided. However, in this example a lower section 138 of the sheath arrangement 134 is mounted on the upper deck 122, extending through the upper deck aperture 128 towards the first lower deck 124, with a short stub portion 138a extending upwardly from the upper deck 122. The sheath arrangement 134 includes a separate upper section 136, which in Figure 3A is shown being passed downwardly from a rig cantilever 142, through a rig aperture 148 formed in a rig floor 146.
When fully deployed from the rig cantilever 142, as illustrated in Figure 3B, the upper sheath section 136 is received over the stub portion 138a of the lower sheath section 138, thus creating a confinement zone 140 for confining objects passing downwardly through the rig aperture 148. A further modified example of an offshore platform 210 is illustrated in Figure 4A. The platform 210 is similar in many respects to platform 1 10 of Figures 3A and 3B and as such like features share like reference numerals, incremented by 100. Thus, the platform 210 includes an upper deck 222, a first lower deck 224 and a second lower deck 226, wherein the upper deck 222 defines an upper deck aperture 228, and the first lower deck 224 defines a first lower deck aperture 230.
In the present example a sheath arrangement 234 is also provided, with a lower section 238 of the sheath arrangement 234 mounted on the upper deck 222, extending through the upper deck aperture 228 towards the first lower deck 224, with a short stub portion 238a extending upwardly from the upper deck 222. The sheath arrangement 234 includes a separate upper section 236, which is provided in the form of a flexible curtain suspended from the floor 246 of a rig cantilever 242, around the periphery of a rig aperture 248. The flexible curtain may be formed from a chain-link material, for example.
In Figure 4A the upper sheath section 236 is shown in a retracted, or folded, state. When fully deployed from the rig cantilever 242, as illustrated in Figure 4B, the upper sheath section 236 is received over the stub portion 238a of the lower sheath section 238, thus creating a confinement zone 240 for confining objects passing downwardly through the rig aperture 248. The lower end of the flexible upper sheath section 236 may be tethered or otherwise secured to the upper deck 222.
In the examples provided above the rig cantilever includes a single drill centre. However, in other examples an offshore platform may be provided which is operational with a rig cantilever which includes multiple drill centres, such as in the example illustrated in Figure 5. In this example the offshore platform 310 includes a number of decks, including an upper deck 322, a first lower deck 324 and a second lower deck 326 arranged one above the other. The upper deck 322 defines two upper deck apertures 328a, 328b, and the first lower deck 324 defines two first lower deck apertures 330a, 330b, wherein the respective apertures 328a, 328b, 330a, 330b are aligned on first and second platform axes 332a, 332b. In the example illustrated separate clusters of wells 14 are arranged around the platform axes 332a, 332b.
A rig cantilever 342 is operated over the platform 310, wherein the rig cantilever 342 includes first and second drill centres 350a, 350b which are aligned with the respective first and second platform axes 332a, 332b. The rig cantilever 342 includes first and second rig apertures 348a, 348b provided on the respective first and second drill centres 350a, 350b. A first sheath arrangement 334a is aligned on the first platform axis 332a, and includes an upper portion 336a which extends upwardly relative to the upper deck 322, and a lower portion 338a which extends downwardly relative to the upper deck 322 towards the lower deck 324. The first sheath arrangement 334a thus defines a first confinement zone 340a above both the upper and first lower decks 322, 324.
A second sheath arrangement 334b is aligned on the second platform axis 332b, and includes an upper portion 336b which extends upwardly relative to the upper deck 322, and a lower portion 338b which extends downwardly relative to the upper deck 322 towards the lower deck 324. The second sheath arrangement 334b thus defines a second confinement zone 340b above both the upper and first lower decks 322, 324.
The provision of the separate drill centres 350a, 350b may permit multiple operations to be performed simultaneously. For example, in the illustrated example of Figure 5 a drilling operation is being performed along the first drill centre 350a, whereas a conductor pipe 80 is being deployed along the second drill centre 350b.
Thus, during operations any objects passing, for example dropped, from the rig cantilever 342 will be confined within the first and second confinement zones 340a, 340b defined by the respective first and second sheath arrangements 334a, 334b.
Reference is now made to Figures 6A, 6B and 6C in which a further example of a sheath arrangement 434 is illustrated. The sheath arrangement 434 is similar in many respects to the sheath arrangement 34 shown in relation to platform 10 of Figures 1 A and 1 B and as such like features share like reference numerals, incremented by 400. Thus, the platform 410 (not shown) in which sheath arrangement 434 is to be used includes an upper deck 422, a first lower deck 424 and a second lower deck 426, wherein the upper deck 422 defines an upper deck aperture 428, and the first lower deck 424 defines a first lower deck aperture 430. The new features shown in relation to the sheath arrangement 434 in the example of the offshore platform 410 in Figures 6A, 6B and 6C are equally applicable to the offshore platform 1 10, 210 and 310 of previous examples. Figure 6A shows a cross sectional view through a plate arrangement 470 of Figure 6B (as will be explained). The plate arrangement 470 is configured to allow, or indeed prevent, access to a cluster of wells 414 around a platform axis 432. In this example, six wells 414 are shown but in other embodiments there could be more or fewer. In a similar manner to that explained for Figure 1 , well 414a has been bent into line with the platform axis 432 and is thus located centrally within the cluster of wells (e.g. at the drill centre). The sheath arrangement 434 (not shown) is aligned with the platform axis 432 and is also located centrally within the cluster of wells 414. In this example, the plate arrangement 470 is located at the bottom of the sheath arrangement 434. However in other examples, the sheath arrangement 434 can also extend below the plate arrangement 470.
Here, the plate arrangement 470 is located on the outside of the sheath arrangement 434 and can be considered to extend horizontally outwardly from the sheath arrangement 434 to form a flange that covers the area above the wells 414. While in some cases, the plate arrangement 470 may be positioned relative to the sheath arrangement 434 when use is desired, in this example the plate arrangement 470 may be considered to be attached to the sheath arrangement 434. The plate arrangement 470 is intended to be located between upper deck 422 and a first lower deck 424, i.e. directly above production trees 420 located above the first lower deck 424. In other embodiments, the plate arrangement 470 may be located above upper deck 422 or at another position along the sheath arrangement 434. In other embodiments, the plate arrangement 470 may cover only some of the wells 414.
A perspective view of the sheath arrangement 434 and the plate arrangement 470 is shown in Figure 6B with the sheath arrangement 434 extending both above and below the horizontal plane of the plate arrangement 470. Here, the plate arrangement 470 is provided with operable hatches 472 (shown in Figure 6B), which are openable and closable. The hatches 472 can be raised and lowered to open and close respectively by retaining members 475. In this example, there are six hatches 472, one for access to each well 414. In other embodiments, there may be fewer or more than six hatches 472 provided in the plate arrangement 470. When opened, the hatches 472 provide plate apertures 473 in the plate arrangement 470. The hatches 472 allow operations to be carried out on the other wells 414 through the apertures 473 when the sheath arrangement 434 is above well 414a. The hatches 472 also allow equipment to be passed through the plate arrangement 470 (e.g. when needed). For example, intervention operations (e.g. wireline operations) can be carried out in one or more wells 414 through the plate apertures 473 while drilling is occurring through the sheath arrangement 434 in well 414a.
Further, referring now to Figure 6C, separation plates 474 are provided in the example, which extend downwards from the plate arrangement 470. The separation plates 474 can also be seen in Figure 6A. Six separation plates 474 are provided in this example but more or fewer could be provided depending on the number of wells 414. The bottoms of the separation plates 474 come into contact with the first lower deck 424 before the plate arrangement 470 contacts the wellheads of the wells 14 when the sheath arrangement 434 is lowered. This may reduce impact on the wellheads of the wells 414. The separation plates 474 are configured to assist with safety by further confining objects that may be accidentally dropped through hatches 472. That is, objects dropped through the hatches 472 at an angle to the vertical will impact the separation plates 474 and thus be confined to an area between the separation plates 474 and those adjacent wells. In this embodiment, the separation plates 474 are straight and extend outwardly from the sheath arrangement 434 but, in other embodiments, they could be any other suitable shape. There are spaces between the separation plates 474 to allow movement of the wells 414 to the platform axis 432.
Further shown here is an access hatch 476, which is provided in the sheath arrangement 434 as shown by dotted lines in Figure 6B. The access hatch 476 allows access to the confinement zone 440 of the sheath arrangement 434. Although the access hatch 476 is intended in this example to be above the upper deck 422, it may be located in any position along the sheath arrangement 434, e.g. between the first lower deck 424 and the second lower deck 426. However, the access hatch 476 may be arranged such that, when in situ, the access hatch 476 is user accessible from a deck (e.g. the upper deck). Such an access hatch 476, when opened, may permit access to the equipment passing within the sheath arrangement 434.
It will readily be appreciated that in some examples it may be helpful for the sheath arrangement 434 to flex compliantly in order to accommodate relative movement between the offshore rig and upper deck 422, when in use. Compliance, in this regard may be considered to mean, for example, the sheath arrangement 434 may be axially and/or longitudinally compliant in order to accommodate some relative movement between the offshore rig and upper deck 422, when in use.
In some examples, that compliance may be provided by the structure of the sheath arrangement 434 itself. Otherwise, and in the example shown, the sheath arrangement 434 may comprise compliant portions, (e.g. one or more flex joints (not shown)). Here, the flex joint is provided by a portion of the sheath arrangement 434 that is flexible. That is, the flex joint is not rigid and can bend etc. to accommodate the difference in motion between the platform 410 and the rig cantilever 442.
While in some of the above examples, the various embodiments have been described using the sheath arrangement 434 together with the rig cantilever 442, it will be appreciated that the sheath arrangement 434 may be readily useable when also performing intervention operations, e.g. using wireline line setups. That is, while drilling is occurring in one well structure, wireline operations can be carried out in another well structure. A skilled reader will readily be able to implement these embodiments accordingly.
It should be understood the examples described above are indeed merely exemplary and that various modifications may be made thereto without departing from the scope of the invention.

Claims

CLAIMS:
1 . An offshore platform for use in combination with an offshore rig, comprising: an upper deck defining an upper deck aperture which is alignable with a rig aperture of the offshore rig, when said offshore rig extends over the upper deck, to permit objects to extend between the offshore rig and through the upper deck; and
a sheath arrangement aligned with the upper deck aperture and extending upwardly relative to the upper deck to be alignable with the rig aperture, wherein the sheath arrangement defines a confinement zone for confining objects which pass downwardly from the offshore rig through the rig aperture.
2. The offshore platform according to claim 1 , configured to accommodate an upper terminating end at least one well.
3. The offshore platform according to claim 1 or 2, wherein the sheath arrangement defines a circumferential confinement zone.
4. The offshore platform according to claim 1 , 2 or 3, wherein the sheath arrangement comprises at least one tubular.
5. The offshore platform according to any preceding claim, wherein the sheath arrangement circumscribes the upper deck aperture.
6. The offshore platform according to any preceding claim, wherein the sheath arrangement extends upwardly from the level of the upper deck.
7. The offshore platform according to any preceding claim, wherein the sheath arrangement is securable around a peripheral region of the upper deck aperture.
8. The offshore platform according to any preceding claim, wherein the sheath arrangement is securable around a peripheral region of the rig aperture.
9. The offshore platform according to any proceeding claim, wherein he sheath arrangement extends through the upper deck aperture.
10. The offshore platform according to any preceding claim, wherein the sheath arrangement extends through the rig aperture.
1 1 . The offshore platform according to any preceding claim, wherein at least a portion of the sheath arrangement is rigid.
12. The offshore platform according to any preceding claim, wherein at least a portion of the sheath arrangement is flexible to define a sheath curtain.
13. The offshore platform according to any preceding claim, wherein at least a portion of the sheath arrangement is supported by the upper deck.
14. The offshore platform according to any preceding claim, wherein at least a portion of the sheath arrangement is supported by the offshore rig.
15. The offshore platform according to any preceding claim, wherein at least a portion of the sheath arrangement is extended from the offshore rig during deployment of the sheath arrangement.
16. The offshore platform according to any preceding claim, wherein at least a portion of the sheath arrangement is extended from the offshore platform and upwardly towards the offshore rig during deployment of the sheath arrangement.
17. The offshore platform according to any preceding claim, wherein the sheath arrangement comprises a support arrangement on an outer surface thereof.
18. The offshore platform according to claim 17, wherein the support arrangement comprises at least one support arm.
19. The offshore platform according to claim 17 or 18, wherein the support arrangement comprises a hoisting support arrangement.
20. The offshore platform according to any preceding claim, wherein the sheath arrangement comprises a unitary component.
21 . The offshore platform according to any one of claims 1 to 19, wherein the sheath arrangement comprises multiple components.
22. The offshore platform according to claim 21 , wherein the sheath arrangement comprises a first component connected or mounted to the offshore platform, and a second component connected or mounted to the offshore rig.
23. The offshore platform according to any preceding claim, wherein the sheath arrangement comprises a compliant portion.
24. The offshore platform according to any preceding claim, wherein the sheath arrangement is telescopic.
25. The offshore platform according to any preceding claim, wherein the sheath arrangement extends downwardly relative to the upper deck towards a first lower deck to define a confinement zone for confining objects passing between the upper and first lower decks.
26. The offshore platform according to claim 25, wherein the sheath arrangement defines an upper sheath portion extending upwardly relative to the upper deck and a lower sheath portion extending downwardly relative to the upper deck.
27. The offshore platform according to claim 25 or 26, wherein the sheath arrangement terminates at the first lower deck.
28. The offshore platform according to claim 25 or 26, wherein the sheath arrangement terminates above the first lower deck.
29. The offshore platform according to any preceding claim, wherein the platform comprises a plate arrangement configured to form a flange when associated with the sheath arrangement.
30. The offshore platform according to claim 29, wherein the plate arrangement comprises a hatch.
31 . The offshore platform according to any preceding claim, wherein the sheath arrangement further comprises an access hatch arranged such that the access hatch is user accessible from a deck.
32. The offshore platform according to any preceding claim, wherein the sheath arrangement comprises a flex joint.
33. A method for confining objects extending between an offshore rig and an offshore platform, comprising extending a sheath arrangement upwardly relative to an upper deck of the offshore platform, wherein the sheath arrangement is aligned with a rig aperture of the offshore rig such that the sheath arrangement defines a confinement zone for confining objects which pass downwardly from the offshore rig through the rig aperture.
34. A sheath arrangement for use between an upper deck of an offshore platform and an offshore rig positioned over the offshore platform, wherein the sheath arrangement is alignable with a rig aperture provided on the offshore rig and defines a confinement zone for confining objects which pass downwardly from the offshore rig through the rig aperture.
EP16815708.9A 2015-10-29 2016-10-31 Offshore apparatus and method Active EP3368723B1 (en)

Applications Claiming Priority (10)

Application Number Priority Date Filing Date Title
DKPA201500668 2015-10-29
GBGB1522856.2A GB201522856D0 (en) 2015-12-23 2015-12-23 Offshore drilling and a configurable support structure for such
GBGB1601175.1A GB201601175D0 (en) 2016-01-21 2016-01-21 Offshore unit
GB201607104 2016-04-23
GB201607101 2016-04-23
GB201607102 2016-04-23
GB201607183 2016-04-25
GB201607180 2016-04-25
PCT/DK2016/000036 WO2017071707A1 (en) 2015-10-29 2016-10-06 Offshore drilling and a configurable support structure for the same
PCT/DK2016/000042 WO2017071711A2 (en) 2015-10-29 2016-10-31 Offshore apparatus and method

Publications (2)

Publication Number Publication Date
EP3368723A2 true EP3368723A2 (en) 2018-09-05
EP3368723B1 EP3368723B1 (en) 2022-05-18

Family

ID=58629895

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16815708.9A Active EP3368723B1 (en) 2015-10-29 2016-10-31 Offshore apparatus and method

Country Status (3)

Country Link
EP (1) EP3368723B1 (en)
DK (1) DK3368723T3 (en)
WO (1) WO2017071711A2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR7804645A (en) * 1978-07-19 1980-01-22 Petroleo Brasileiro Sa SELF-LIFTING PLATFORM FOR MARITIME DRILLING
US4703813A (en) * 1986-03-31 1987-11-03 Shell Offshore Inc. Cementing portion of conductor string
US6213045B1 (en) * 1998-08-27 2001-04-10 Steve J. Gaber Flotation system and method for off-shore platform and the like
WO2014108542A2 (en) * 2013-01-11 2014-07-17 A. P. Møller - Mærsk A/S Drilling rig
GB201500518D0 (en) * 2015-01-13 2015-02-25 Claxton Engineering Services Ltd Deck for offshore rig

Also Published As

Publication number Publication date
DK3368723T3 (en) 2022-07-25
EP3368723B1 (en) 2022-05-18
WO2017071711A2 (en) 2017-05-04
WO2017071711A3 (en) 2017-07-13

Similar Documents

Publication Publication Date Title
US9416600B2 (en) Conductor pipe support system for an off-shore platform
US8555564B2 (en) Drilling rig assembly method and apparatus
CN107654192B (en) Method and apparatus for drilling a plurality of subsea wells from an offshore platform at a single site
US9458680B2 (en) Drilling rig
WO1995017576A1 (en) Dual concentric string high pressure riser
US10227824B2 (en) Mobile offshore drilling unit, a method of using such a unit and a system comprising such a unit
NO20170062A1 (en) Flexible line installation and removal
US10907316B2 (en) Offshore apparatus and method
US11028549B2 (en) Offshore drilling and a configurable support structure for the same
US10151158B2 (en) Bail mounted guide
EP3368723A2 (en) Offshore apparatus and method
WO2017129475A1 (en) Method, system and adapter for performing a well operation
US20160290071A1 (en) Integral Self-Contained Drillstring Compensator
JPS6344918B2 (en)
NL2014765B1 (en) Drilling installation; Handling system, method for independent operations.
Pollock et al. First Subrigfloor HWO Intervention System for a Floating Vessel
KR20160077310A (en) Apparatus of BOP Working Platform

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180518

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MAERSK DRILLING A/S

Owner name: TOTAL S.A.

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20191030

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MAERSK DRILLING A/S

Owner name: TOTAL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

RIN1 Information on inventor provided before grant (corrected)

Inventor name: KANNEGAARD, MICHAEL

Inventor name: GILL, JOHN ANTHONY

Inventor name: LOENSTRUP, JEANNE MIA

Inventor name: VAN DER BRUG, MEINTE

RAP3 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MAERSK DRILLING A/S

Owner name: TOTAL E&P DANMARK A/S

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20211029

RAP3 Party data changed (applicant data changed or rights of an application transferred)

Owner name: TOTAL E&P DANMARK A/S

Owner name: MAERSK DRILLING A/S

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MAERSK DRILLING A/S

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016072274

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1493232

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220615

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20220722

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20220518

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1493232

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220919

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220819

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220818

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

REG Reference to a national code

Ref country code: NO

Ref legal event code: CHAD

Owner name: NOBLE DRILLING A/S, DK

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220918

RAP4 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: NOBLE DRILLING A/S

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016072274

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

26N No opposition filed

Effective date: 20230221

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602016072274

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20221031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221031

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230525

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221031

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221031

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230503

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221031

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20230915

Year of fee payment: 8

Ref country code: GB

Payment date: 20230907

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220518

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20231010

Year of fee payment: 8

Ref country code: DK

Payment date: 20231016

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20161031