EP3261917B1 - Floating vessel - Google Patents

Floating vessel Download PDF

Info

Publication number
EP3261917B1
EP3261917B1 EP16756028.3A EP16756028A EP3261917B1 EP 3261917 B1 EP3261917 B1 EP 3261917B1 EP 16756028 A EP16756028 A EP 16756028A EP 3261917 B1 EP3261917 B1 EP 3261917B1
Authority
EP
European Patent Office
Prior art keywords
storage
hull
floating production
offloading vessel
vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16756028.3A
Other languages
German (de)
French (fr)
Other versions
EP3261917A4 (en
EP3261917A1 (en
Inventor
Nicolaas Johannes Vandenworm
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jurong Shipyard Pte Ltd
Original Assignee
Jurong Shipyard Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/630,563 external-priority patent/US9266587B1/en
Application filed by Jurong Shipyard Pte Ltd filed Critical Jurong Shipyard Pte Ltd
Publication of EP3261917A1 publication Critical patent/EP3261917A1/en
Publication of EP3261917A4 publication Critical patent/EP3261917A4/en
Application granted granted Critical
Publication of EP3261917B1 publication Critical patent/EP3261917B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/04Fastening or guiding equipment for chains, ropes, hawsers, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/04Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with single hull
    • B63B1/041Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with single hull with disk-shaped hull
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • B63B43/02Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
    • B63B43/04Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability
    • B63B43/06Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability using ballast tanks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/015Non-vertical risers, e.g. articulated or catenary-type
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0007Equipment or details not covered by groups E21B15/00 - E21B40/00 for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/08Underwater guide bases, e.g. drilling templates; Levelling thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B2003/147Moon-pools, e.g. for offshore drilling vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/448Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]

Definitions

  • the disclosed technology relates to floating production, storage and offloading (FPSO) vessels and to hull designs and offloading systems for a floating drilling, production, storage and offloading (FDPSO) vessel.
  • FPSO floating production, storage and offloading
  • FDPSO floating drilling, production, storage and offloading
  • the principal elements which can be modified for improving the motion characteristics of a moored floating vessel are the draft, the water plane area, and its draft rate of change, location of the center of gravity (CG), the metacentric height about which small amplitude roll and pitching motions occur, the frontal area and shape on which winds, current and waves act, the system response of pipe and cables contacting the seabed acting as mooring elements, and the hydrodynamic parameters of added mass and damping.
  • the latter values can be determined by complex solutions of the potential flow equations integrated over the floating vessels detailed features and appendages and then simultaneously solved for the potential source strengths.
  • the prior art provides for an offshore floating facility with improved hydrodynamic characteristics and the ability to moor in extended depths thereby providing a satellite platform in deep water resulting in shorter flowline, cables, and umbilicals from the subsea trees to the platform facilities.
  • Previous designs incorporate a retractable center assembly which contains features to enhance the hydrodynamics and allows for the integral use of vertical separators in a quantity and size providing opportunity for individual full time well flow monitoring and extending retention times.
  • a principal feature of vessels of the industry is a retractable center assembly within the hull, which can be raised or lowered in the field to allow transit in shallow areas.
  • the retractable center assembly provides a means of pitch motion damping, a large volumetric space for the incorporation of optional ballast, storage, vertical pressure or storage vessels, or a centrally located moon pool for deploying diving or remote operated vehicle (ROV) video operations without the need for added support vessels.
  • ROV remote operated vehicle
  • Hydrodynamic motion improvements of vessels are provided by: the basic hull configuration; extended skirt and fins at the hull base; a (lowered at site) center assembly extending the retractable center section with the base and mid-mounted hydrodynamic skirts and fins, the mass of the separators below the hull deck that lowers the center of gravity; and attachment of the steel catenary risers, cables, umbilicals, and mooring lines near the center of gravity at the hull base.
  • the noted features improve vessel stability and provide increased added mass and damping, which improves the overall response of the system under environmental loading.
  • Prior art vessels can have hulls which are hexagonal in shape.
  • Floating production, storage and offloading vessel can have an octagonal hull.
  • Prior art floating production, storage, and offloading vessels have a polygonal exterior side wall configuration with sharp corners to cut ice sheets, resist and break ice, and move ice pressure ridges away from the vessel.
  • Prior art also teaches a drilling and production platform consisting of a semi-submersible platform body having the shape of a cylinder having a flat bottom and a circular cross-section.
  • Previous vessels have a peripheral circular cut-out or recess in a lower part of the cylinder, and the design provides a reduction in pitching and rolling movement.
  • US2009012661 describes an offshore floating production, storage, and off-loading vessel with a monolithic non ship-shaped hull of polygonal configuration surrounding a central double tapered conical moon pool and contains water ballast and oil storage components.
  • US20110107951 describes an offshore structure having a vertically symmetric hull, an upper vertical wall, an upper inwardly-tapered wall disposed below the upper sloped wall, a lower outwardly-tapered wall disposed below the upper sloped wall, and a lower vertical wall disposed below the lower sloped wall.
  • a moveable hawser connection assembly is mounted to the hull which is attached to a hawser for attachment of a tanker to the offshore structure.
  • Chinese Utility Model Application CN2900352Y entitled “Float rocking reducing device on sea” discloses an offshore floating body anti-rolling device which includes a ring of anti-rolling plates arranged around the bottom of the offshore floating body, and the outer edge of the anti-rolling plate is L-shaped upwards, a set of supporting plates connecting the anti-rolling plate and the floating body are arranged on the anti-rolling plate at intervals, and a set of spoiler openings are arranged on the anti-rolling plate on the side close to the floating body at intervals, away from all
  • the anti-rolling plate on one side of the floating body is provided with 1 to 3 stiffening angles.
  • a catenary anchor leg mooring (CALM) buoy is typically anchored near a floating production, storage and offloading vessel.
  • the buoy is anchored to the seabed so as to provide a minimum distance from a nearby floating production, storage and offloading vessel.
  • a pair of cables attaches the buoy to the floating production, storage and offloading vessel and an offloading hose extends from the floating production, storage and offloading vessel to the buoy.
  • a tanker is moored temporarily to the buoy and a hose is extended from the tanker to the buoy for receiving product from the floating production, storage and offloading vessel through hoses connected through the buoy.
  • the disclosed technology relates to a floating platform, storage and offloading (FPSO) vessel with several alternative hull designs, and a moveable hawser system for offloading, which allows a tanker to weathervane over a wide arc with respect to the floating production, storage and offloading vessel.
  • FPSO floating platform, storage and offloading
  • the disclosed technology further relates to a floating vessel configured to support at least one of: drilling of wells, workover of wells, production of hydrocarbons, storage of hydrocarbons, and personnel accommodation.
  • the floating production, storage and offloading vessel can have a hull planform that can be circular, oval, elliptical, or polygonal.
  • the hull of the floating production, storage and offloading vessel can have a bottom surface (known as a keel); deck surface (also known as a main deck); at least two connected sections engaging between the bottom surface (keel) and the deck surface (main deck).
  • a bottom surface known as a keel
  • deck surface also known as a main deck
  • the at least two connected sections can be joined in series and each can be configured to be symmetrical about a vertical axis.
  • the connected sections can extend downwardly from the deck surface toward the bottom surface.
  • the connected sections can have at least two of an upper cylindrical portion, a cylindrical neck section, and a lower conical section.
  • At least one radial fin can be secured to the hull to reduce movement.
  • the lower conical section provides added mass improved hydrodynamic performance through linear and quadratic damping to the hull.
  • the floating production, storage and offloading vessel specifically does not require a retractable center column to control pitch roll and heave.
  • Figure 1 depicts a floating production, storage and offloading vessel 10 is shown in a plan view.
  • the tanker T is shown in two different positions A, and B, as the tanker weathervane on the floating production, storage and offloading vessel 10.
  • the floating production, storage and offloading vessel 10 can be a hull 9a.
  • the floating production, storage and offloading vessel 10 floats in water W and can be used in the production, storage and/or offloading of resources extracted from the Earth, such as hydrocarbons including crude oil and natural gas and minerals such as can be extracted by solution mining.
  • the floating production, storage and offloading vessel 10 can be assembled onshore using known methods, which can be similar to shipbuilding, and towed to an offshore location, typically above an oil and/or gas field in the earth below the offshore location.
  • At least one anchor line 16a, 16b, 16c, and 16d which would be fastened to anchors in the seabed that are not shown, moor floating production, storage and offloading vessel 10 in a desired location.
  • At least one moveable hawser assemblies 18 can be used. Each moveable hawser assembly can be disposed in a different location on the hull, namely as a moveable hawser connection assembly 40 and a moveable hawser assembly 60.
  • a hose 20 can be extended between hull 9a and tanker T for transferring crude oil and/or another fluid from floating production, storage and offloading vessel 10 to tanker T.
  • Figure 2 depicts a side elevation of the floating production, storage and offloading vessel 10 according to the disclosed technology.
  • crude oil can be produced from the Earth below the seabed under the floating production, storage and offloading vessel 10, transferred into and stored temporarily in the hull 9a, and offloaded to a tanker T for transport to onshore facilities.
  • Tanker T can be moored temporarily to the floating production, storage and offloading vessel 10 during the offloading operation by the moveable hawser connection assembly 40.
  • the hose 20 can be extended between the hull 9a and tanker T for transferring crude oil and/or another fluid from the floating production, storage and offloading vessel 10 to tanker T.
  • the at least one moveable hawser assemblies 18 can be used.
  • Each moveable hawser assembly can be disposed in a different location on the hull 9a, namely as the moveable hawser connection assembly 40 and the moveable hawser assembly 60.
  • Figure 3 is side elevation of floating production, storage and offloading vessel 10.
  • a hull 9b of the floating production, storage and offloading vessel 10 is shown having a top deck surface 12a, an upper cylindrical portion 12b extending downwardly from the deck surface 12a, an upper conical section 12c extending downwardly from upper cylindrical portion 12b, and tapering inwardly, a cylindrical neck section 12d extending downwardly from upper conical section 12c, a lower conical section 12e extending downwardly from cylindrical neck section 12d which can flare outwardly, and a lower cylindrical section 12f extending downwardly from the lower conical section 12e.
  • the lower conical section 12e can be described herein as having the shape of an inverted cone or as having an inverted conical shape as opposed to the upper conical section 12c, which can be described herein as having a regular conical shape.
  • the floating production, storage and offloading vessel 10 floats such that the surface of the water intersects regular with the upper conical section 12c, which can be referred to herein as the waterline being on the regular cone shape.
  • the floating production, storage and offloading vessel 10 can be loaded and/or ballasted to maintain the waterline on a bottom portion of regular, upper conical section 12c.
  • a cross-section of the hull 9b through any horizontal plane can have a circular shape.
  • the hull 9b can be designed and sized to meet the requirements of a particular application, and services can be requested from Maritime Research Institute of the Netherlands to provide optimized design parameters to satisfy the design requirements for a particular application.
  • the upper cylindrical portion 12b can have approximately the same height as the cylindrical neck section 12d, while the height of the lower cylindrical section 12f can be about 3 to 4 times greater than the height of the upper cylindrical portion 12b.
  • the lower cylindrical section 12f can have a greater diameter than the upper cylindrical portion 12b.
  • the upper conical section 12c can have a greater height than the lower conical section 12e.
  • the bottom surface 12g is also depicted.
  • a plurality of catenary production risers 90a and 90c are depicted.
  • the plurality of catenary production risers can be at least one of: a catenary riser or a vertical riser production riser, or combinations thereof.
  • the hawser 18 of the moveable hawser connection assembly 40 and the moveable hawser assembly 60 are also depicted.
  • a tubular channel 42 is also depicted.
  • the hose 20 can be depicted on a hose reel.
  • the hose can extend from the hull 9b and the tanker for transfer of crude oil and/or another fluid from floating production, storage and offloading vessel 10 to tanker.
  • the at least one anchor lines 16 is depicted.
  • Figure 4 depicts the moveable hawser connection assembly 40 that has in one embodiment nearly fully enclosing the tubular channel 42.
  • the tubular channel 42 can have a rectangular cross-section and a longitudinal slot.
  • the hull 9b of floating production, storage and offloading vessel 10 is shown with the top deck surface 12a and the lower conical section 12e.
  • the lower conical section 12e can be described herein as having the shape of an inverted cone or as having an inverted conical shape.
  • the hawser 18 of the moveable hawser connection assembly 40 is also depicted.
  • the hose 20 can be depicted on a hose reel; this can be the hose 20 that extends between the hull 9b and tanker for the transfer of crude oil and/or another fluid from the floating production, storage and offloading vessel 10 to tanker.
  • the at least one anchor lines 16a, 16b, 16c, and 16d are depicted.
  • Figure 5 depicts side elevations showing an alternative design for the hull 9c.
  • a hull 9c can have the top deck surface 12a, wherein the upper conical section 12c extends from the top deck surface 12a and tapers inwardly as it extends downwardly.
  • the cylindrical neck section 12d which can be attached to a lower end of the upper conical section 12c and extend downwardly from the upper conical section.
  • the lower conical section 12e can be attached to a lower end of the cylinder neck section 12d and extends downwardly from cylindrical neck section 12d while flaring outwardly.
  • the lower cylindrical section 12f extends downwardly from the lower conical section 12e.
  • a significant difference between the hull 9c and other hull designs can be that hull 9c does not have the upper cylindrical portion 12b.
  • Figure 6 depicts side elevations showing an alternative design for the hull 9d.
  • a side elevation of a hull 9d which shows the hull 9d that can have the top deck surface 12a, the upper cylindrical portion 12b, the upper conical section 12c extending from the upper cylindrical portion 12b and taper inwardly as it extends downwardly.
  • the lower conical section 12e can be attached to the upper conical section 12c.
  • the lower conical section 12e can extend downwardly while flaring outwardly.
  • the lower cylindrical section 12f extends downwardly from the lower conical section 12e.
  • a significant difference between the hull 9d and other hull designs can be that the hull 9d does not have the cylindrical neck section 12d.
  • Figure 7 is a top plan view of the moveable hawser connection assembly 40, according to the disclosed technology.
  • the moveable hawser connection assembly 40 is depicted on the floating production, storage and offloading vessel, which can help to accommodate movement of the transport tanker with respect to the floating production, storage and offloading vessel.
  • the moveable hawser connection assembly 40 comprises in one embodiment nearly fully enclosing the tubular channel 42 that has a rectangular cross-section and a longitudinal slot.
  • tubular channel 42 is shown with a set of standoffs 44a and 44b that can connect the tubular channel 42 horizontally to the top deck surface 12a.
  • a trolley 46 can be captured and moveable within the tubular channel 42.
  • a trolley shackle 48 can be attached to the trolley 46 providing a connection point and a plate 50 pivotably attaching to the trolley shackle 48 through a plate shackle 52.
  • the plate 50 can have a generally triangular shape with the apex of the triangle attached to the plate shackle 52 through a pin 54 passing through a hole in the plate shackle 52.
  • the plate 50 can have a first hole 55a adjacent another point of the triangle and a second hole 55b adjacent the final point of the triangle.
  • the hawser 18 terminates with a dual connection point 19a and 19b which can be connected to the plate 50 by passing through the holes 55a and 55b respectively.
  • the dual connection point 19a and 19b of the plate 50 and or the plate shackle 52 can be eliminated and the hawser 18 can be connected directly to the trolley shackle 48.
  • Other variations can be usable in connecting the hawser 18 to the trolley 46.
  • Figure 8 depicts a side elevation of the floating, production, storage and offloading vessel 10 according to the disclosed technology.
  • the floating production, storage and offloading vessel 10 can have the hull 9d and the top deck surface 12a and a cross-section of the hull 9d, through any horizontal plane, while the hull 9d can be floating, can be a circular shape.
  • the upper cylindrical portion 12b extends downwardly from the top deck surface 12a and the upper conical section 12c extends downwardly from the upper cylindrical portion 12b and tapers the floating production, storage and offloading vessel 10.
  • the lower conical section 12e extends downwardly from the upper conical section 12c and can flare outwardly.
  • the lower cylindrical section 12f can extend downwardly from the lower conical section 12e.
  • the hull 9d can have the bottom surface 12g, also known as a keel.
  • the lower conical section 12e can be described herein as having the shape of an inverted cone or as having an inverted conical shape as opposed to the upper conical section 12c, which can be described herein as having a regular conical shape.
  • the floating production, storage and offloading vessel 10 is shown as floating, such that the surface of the water can intersect the upper cylindrical portion 12b when loaded and/or ballasted.
  • the upper conical section 12c can have a substantially greater vertical height than the lower conical section 12e, and the upper cylindrical portion 12b can have a slightly greater vertical height than the lower cylindrical section 12f.
  • At least one fin 84 can be attached to a lower and outer portion of the hull.
  • the at least one anchor lines 16a and 16f are shown for mooring the floating production, storage and offloading vessel 10.
  • a moon pool 92 is shown formed in the center of the hull 9d and extending through the bottom surface 12g.
  • Catenary production risers 90a and 90d are also shown.
  • Figure 9 depicts a cross-section of the floating production, storage and offloading vessel with the hull 9d.
  • the hull 9d can have at least one fin.
  • a plurality of fins 84a, 84b, 84c and 84d are shown.
  • the plurality of fins can be separated from each other by a plurality of gaps 86a, 86b, 86c and 86d.
  • the plurality of gaps 86a, 86b, 86c and 86d can be spaced between the plurality of fins 84a, 84b, 84c and 84d, which can provide a place that accommodates the at least one catenary production risers 90a, 90c (see Figure 8 ), such as production risers and anchor lines 16a, 16b, 16c, 16d on the exterior of the hull 9d, without contact with the at least one fin 84a, 84b, 84c, and 84d.
  • the fins can be radial fins.
  • At least one anchor line 16a, 16b, 16c and 16d can be received in the plurality of the gaps 86a, 86b, 86c and 86d respectively.
  • the at least one anchor line secures the floating drilling, production, storage and offloading vessel and/or the floating production, storage and offloading vessel 10 to the seabed.
  • Catenary production risers can be received in the plurality of gaps 86a, 86b, 86c, and 86d and can deliver a resource, such as crude oil, natural gas and/or a leached mineral, from the Earth below the seabed to tankage within the floating production, storage and offloading vessel 10.
  • the moon pool 92 is also depicted with an opening 91 to the bottom surface.
  • Figure 10 depicts the at least one fin 84a and 84b for reducing heave.
  • Each section of the at least one fin 84a and 84b can have the shape of a right triangle in a vertical cross-section, where the 90 degree angle can be located adjacent a lowermost outer side wall of the lower cylindrical section 12f of any of the hulls, shown here as hull 9d, such that a bottom edge 85 of the triangle shape of the at least one fin 84a and 84b is co-planar with the bottom surface 12g of the hull 9d.
  • a hypotenuse 82 of the triangle shape extends from a distal end 88 of the bottom edge 85 of the triangle shape upwards and inwards to attach to the outer side wall of the lower cylindrical section 12f at a point only slightly higher than the lowermost edge of the outer side wall of lower cylindrical section 12f.
  • Some experimentation can be required to size the at least one fin 84a and 84b for optimum effectiveness.
  • a starting point can be the bottom edge 85 extending radially outwardly a distance that can be about half the vertical height of lower cylindrical section 12f, and the hypotenuse 82 attaches to the lower cylindrical section 12f such as, about one quarter up the vertical height of the lower cylindrical section 12f from the bottom surface 12g of the hull or combinations thereof.
  • each triangle shape fin can be rotated by 45 degrees and attached to the hull and be usable herein.
  • the floating production, storage and offloading vessel can be anchored and its installation can be otherwise complete, it can be used for drilling exploratory or production wells, provided a derrick is installed, and it can be used for production and storage of resource or products.
  • At least one ballast tank 96 is depicted for ballasting and deballasting the floating production, storage and offloading vessel 10 as well as the moon pool 92.
  • Figure 11 provides a perspective detailed view of the floating production, storage and offloading vessel 10 with a detail of the at least one fin 84 attached to and transitioned from one of the aforementioned hull configurations.
  • the plurality of gaps 86a and 86b are shown separating the at least one fin 84.
  • this hull design with the submerged section of the hull having the at least one fin and a heavier or larger lower cylindrical section can create the hull that provides for improved hydrodynamic performance through linear and quadratic damping, namely suppression of radiated waves and friction of viscous origin while that portion of the hull is submerged.
  • the vessel can have an ellipsoidal planform, the dynamic response of the hull can be independent of wave direction (when neglecting any asymmetries in the mooring system, risers, and underwater appendages), thereby minimizing wave-induced yaw forces.
  • the vessel has a conical form of the hull, the hull can be structurally efficient, offering a high payload and storage volume per ton of steel when compared to traditional ship-shaped offshore structures.
  • the hull can have ellipsoidal walls which can be ellipsoidal in radial cross-section, but such shape may be approximated using a large number of flat metal plates rather than bending plates into a desired curvature.
  • a polygonal hull planform can be used according to alternative embodiments.
  • an elliptical hull can minimize or eliminate wave interference.
  • the floating production, storage and offloading vessel can be configured to support at least one of: drilling of wells, work over of wells, production, storage of hydrocarbons, and personnel accommodation.
  • the floating production, storage and offloading vessel can have the hull with a hull planform that can be circular, oval, elliptical, or polygonal.
  • the hull can have the bottom surface and the deck surface.
  • the hull can be formed using at least two connected sections engaging between the bottom surface and the deck surface.
  • the at least two connected sections can be joined in series and symmetrically configured about a vertical axis with the connected sections extending downwardly from the deck surface toward the bottom surface.
  • the connected sections can be at least two of: the upper cylindrical portion; the neck section; and the lower conical section.
  • the at least one fin can be secured to the hull and extend from an outer side of the hull.
  • the hull can be configured so that the lower conical section provides added mass improved hydrodynamic performance through linear and quadratic damping to the hull and wherein the floating production, storage and offloading vessel does not require a retractable center column to control pitch roll and heave.
  • the floating production, storage and offloading vessel can have a centrally disposed moon pool.
  • the moon pool can open through the bottom surface.
  • the floating production, storage and offloading vessel can have the at least one anchor line extending from the deck surface or the hull to moor the floating production, storage and offloading vessel to the sea floor.
  • the floating production, storage and offloading vessel can have the at least one fin discontinuously secured around the hull on the outer surface of the hull.
  • the floating production, storage and offloading vessel can have the at least one catenary production riser or at the least one vertical riser secured to the bottom surface below a transit depth of the floating production, storage and offloading vessel.
  • the floating production, storage and offloading vessel can have the at least one ballast tank for ballasting and deballasting the floating production, storage and offloading vessel.
  • the floating production, storage and offloading vessel can have the movable hawser connection assembly mounted to the hull.
  • the floating production, storage and offloading vessel can have the low center of gravity providing an inherent stability to the structure.

Description

  • The present application claims priority to and the benefit of co-pending US Patent Application Serial No.: 14/630,563 filed on February 24, 2015 , entitled "FLOATING VESSEL," which is a Continuation in Part of co-pending US Patent Application Serial No. 14/524,992 filed on October 27, 2014 , entitled "BUOYANT STRUCTURE," which is a Continuation in Part of co-pending US Patent Application Serial No. 14/105,321 filed on December 13, 2013 , entitled "FLOATING VESSEL," now issued as US Patent No. 8,869,727 on October 28, 2014 , which is a Continuation in Part of co-pending US Patent Application Serial No. 13/369,600 filed on February 09, 2012 , entitled "STABLE OFFSHORE FLOATING DEPOT," now issued as US Patent No. 8,662,000 on March 04, 2014 , which is a Continuation in Part of US Patent Application Serial No. 12/914,709 filed on October 28, 2010 , now issued as US Patent No. 8,251,003 on August 28, 2012 , which claims the benefit of US Provisional Patent Application Serial No. 61/521,701 filed on August 09, 2011 , US Provisional Patent Application Serial No. 61/259,201 filed on November 08, 2009 and US Provisional Patent Application Serial No. 61/262,533 filed on November 18, 2009 .
  • FIELD
  • The disclosed technology relates to floating production, storage and offloading (FPSO) vessels and to hull designs and offloading systems for a floating drilling, production, storage and offloading (FDPSO) vessel.
  • BACKGROUND
  • Prior art relevant to the present invention, which is defined by the accompanying claims, provides the following background information concerning the development of offshore energy systems such as deepwater oil and/or gas production. Long flowlines, power cables, and control umbilicals are frequently required between subsea wells and a host platform. The extended lengths pose energy loss, pressure drop, and production difficulties. The costs of structures for deepwater applications are high and costs frequently increase due to the foreign locations at which they are fabricated.
  • Other difficulties, associated with deepwater offshore operations, result from floating vessel motions which affect personnel and efficiencies especially when related to liquid dynamics in tanks. The primary motion-related problem, associated with offshore petrochemical operations, occurs with large horizontal vessels in which the liquid level oscillates and provides erroneous signals to the liquid level instruments causing shutdown of processing and overall inefficiency for the operation.
  • The principal elements which can be modified for improving the motion characteristics of a moored floating vessel are the draft, the water plane area, and its draft rate of change, location of the center of gravity (CG), the metacentric height about which small amplitude roll and pitching motions occur, the frontal area and shape on which winds, current and waves act, the system response of pipe and cables contacting the seabed acting as mooring elements, and the hydrodynamic parameters of added mass and damping. The latter values can be determined by complex solutions of the potential flow equations integrated over the floating vessels detailed features and appendages and then simultaneously solved for the potential source strengths. It is only significant to note herein that the addition of features which allow the added mass and/or damping to be "tuned" for a certain condition requires that several features can be modified in combination, or more preferably independently, to provide the desired properties. The optimization can be greatly simplified if the vessel possesses vertical axial symmetry as in the present invention which reduces the 6 degrees of motion freedom to 4, (i.e. roll=pitch=pendular motion, sway=surge=lateral motion, yaw=rotational motion, and heave=vertical motion). It can be further simplified if hydrodynamic design features can be decoupled to linearize the process and ease the ideal solution search.
  • The prior art provides for an offshore floating facility with improved hydrodynamic characteristics and the ability to moor in extended depths thereby providing a satellite platform in deep water resulting in shorter flowline, cables, and umbilicals from the subsea trees to the platform facilities. Previous designs incorporate a retractable center assembly which contains features to enhance the hydrodynamics and allows for the integral use of vertical separators in a quantity and size providing opportunity for individual full time well flow monitoring and extending retention times.
  • A principal feature of vessels of the industry is a retractable center assembly within the hull, which can be raised or lowered in the field to allow transit in shallow areas. The retractable center assembly provides a means of pitch motion damping, a large volumetric space for the incorporation of optional ballast, storage, vertical pressure or storage vessels, or a centrally located moon pool for deploying diving or remote operated vehicle (ROV) video operations without the need for added support vessels.
  • Hydrodynamic motion improvements of vessels are provided by: the basic hull configuration; extended skirt and fins at the hull base; a (lowered at site) center assembly extending the retractable center section with the base and mid-mounted hydrodynamic skirts and fins, the mass of the separators below the hull deck that lowers the center of gravity; and attachment of the steel catenary risers, cables, umbilicals, and mooring lines near the center of gravity at the hull base. The noted features improve vessel stability and provide increased added mass and damping, which improves the overall response of the system under environmental loading.
  • Prior art vessels can have hulls which are hexagonal in shape. Floating production, storage and offloading vessel can have an octagonal hull. Prior art floating production, storage, and offloading vessels have a polygonal exterior side wall configuration with sharp corners to cut ice sheets, resist and break ice, and move ice pressure ridges away from the vessel. Prior art also teaches a drilling and production platform consisting of a semi-submersible platform body having the shape of a cylinder having a flat bottom and a circular cross-section. Previous vessels have a peripheral circular cut-out or recess in a lower part of the cylinder, and the design provides a reduction in pitching and rolling movement. Because floating production, storage and offloading vessels may be connected to production risers, and in general the need to be stable, even during storm conditions, remains a need for improvements in vessel hull design. US2009012661 describes an offshore floating production, storage, and off-loading vessel with a monolithic non ship-shaped hull of polygonal configuration surrounding a central double tapered conical moon pool and contains water ballast and oil storage components. US20110107951 describes an offshore structure having a vertically symmetric hull, an upper vertical wall, an upper inwardly-tapered wall disposed below the upper sloped wall, a lower outwardly-tapered wall disposed below the upper sloped wall, and a lower vertical wall disposed below the lower sloped wall. A moveable hawser connection assembly is mounted to the hull which is attached to a hawser for attachment of a tanker to the offshore structure. Chinese Utility Model Application CN2900352Y entitled "Float rocking reducing device on sea" discloses an offshore floating body anti-rolling device which includes a ring of anti-rolling plates arranged around the bottom of the offshore floating body, and the outer edge of the anti-rolling plate is L-shaped upwards, a set of supporting plates connecting the anti-rolling plate and the floating body are arranged on the anti-rolling plate at intervals, and a set of spoiler openings are arranged on the anti-rolling plate on the side close to the floating body at intervals, away from all The anti-rolling plate on one side of the floating body is provided with 1 to 3 stiffening angles.
  • Further there is a need for improvement in offloading product from a floating production, storage and offloading vessel to a ship or tanker then transporting the product from the floating production, storage and offloading vessel to an onshore facility.
  • As part of an offloading system, a catenary anchor leg mooring (CALM) buoy, is typically anchored near a floating production, storage and offloading vessel. An example of a buoy usable with the offloading system, the buoy is anchored to the seabed so as to provide a minimum distance from a nearby floating production, storage and offloading vessel. In this example, a pair of cables attaches the buoy to the floating production, storage and offloading vessel and an offloading hose extends from the floating production, storage and offloading vessel to the buoy. A tanker is moored temporarily to the buoy and a hose is extended from the tanker to the buoy for receiving product from the floating production, storage and offloading vessel through hoses connected through the buoy. If adverse weather conditions, such as a storm with significant wind speeds occur during offloading, problems can occur due to movement of the tanker caused by wind and current forces acting on the tanker. Thus, there is also a need for an improvement in the offloading system typically used in transferring product stored on the floating production, storage and offloading vessel to a tanker.
  • A need exists for a floating vessel that provides kinetic energy absorption capabilities from a watercraft by providing a plurality of dynamic movable tendering mechanisms in a tunnel formed in the floating vessel.
  • A further need exists for a floating vessel that provides wave damping and wave breakup within a tunnel formed in the floating vessel.
  • A need exists for a floating vessel that provides friction forces to a hull of a watercraft in the tunnel.
  • The disclosed technology meet these needs.
  • The invention is defined by the accompanying claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The detailed description will be better understood in conjunction with the accompanying drawings as follows:
    • Figure 1 depicts a top plan view of a floating production, storage and offloading vessel, according to the present invention and a tanker moored to the floating production, storage and offloading vessel.
    • Figure 2 depicts a side elevation of the floating production, storage and offloading vessel.
    • Figure 3 depicts an enlarged and more detailed version of the side elevation of the floating production, storage and offloading vessel.
    • Figure 4 depicts an enlarged and more detailed version of the top plan view of the floating production, storage and offloading vessel.
    • Figure 5 depicts a side elevation of an alternative embodiment of the hull for floating production, storage and offloading vessel according to the disclosed technology.
    • Figure 6 depicts a side elevation of an alternative embodiment of the hull for a floating production, storage and offloading vessel, according to the disclosed technology.
    • Figure 7 depicts a top plan view of a moveable hawser connection, according to the disclosed technology.
    • Figure 8 depicts a side elevation of a floating production, storage and offloading vessel, according to the disclosed technology.
    • Figure 9 depicts a cross section of the floating production, storage and offloading vessel as seen along the line 16-16.
    • Figure 10 depicts the side elevation of the floating production, storage and offloading vessel shown in cross section.
    • Figure 11 depicts a detail view of a fin secured to a hull according to the floating production, storage and offloading for the purpose of providing hydrodynamic performance through linear and quadratic damping.
  • The disclosed technology is detailed below with reference to the listed Figures.
  • DETAILED DESCRIPTION OF THE EMBODIMENTS
  • Before explaining the present apparatus in detail, it is to be understood that the apparatus is not limited to the particular disclosures and that it can be practiced or carried out in various ways, however, the scope of the invention is determined by the accompanying claims.
  • The disclosed technology relates to a floating platform, storage and offloading (FPSO) vessel with several alternative hull designs, and a moveable hawser system for offloading, which allows a tanker to weathervane over a wide arc with respect to the floating production, storage and offloading vessel.
  • The disclosed technology further relates to a floating vessel configured to support at least one of: drilling of wells, workover of wells, production of hydrocarbons, storage of hydrocarbons, and personnel accommodation.
  • As disclosed, the floating production, storage and offloading vessel can have a hull planform that can be circular, oval, elliptical, or polygonal.
  • As disclosed, the hull of the floating production, storage and offloading vessel can have a bottom surface (known as a keel); deck surface (also known as a main deck); at least two connected sections engaging between the bottom surface (keel) and the deck surface (main deck).
  • As disclosed, the at least two connected sections can be joined in series and each can be configured to be symmetrical about a vertical axis. The connected sections can extend downwardly from the deck surface toward the bottom surface.
  • As disclosed, the connected sections can have at least two of an upper cylindrical portion, a cylindrical neck section, and a lower conical section.
  • As an additional disclosure, at least one radial fin can be secured to the hull to reduce movement.
  • The lower conical section provides added mass improved hydrodynamic performance through linear and quadratic damping to the hull. The floating production, storage and offloading vessel specifically does not require a retractable center column to control pitch roll and heave.
  • Turning now to the Figures, Figure 1 depicts a floating production, storage and offloading vessel 10 is shown in a plan view.
  • The tanker T is shown in two different positions A, and B, as the tanker weathervane on the floating production, storage and offloading vessel 10.
  • The floating production, storage and offloading vessel 10 can be a hull 9a. The floating production, storage and offloading vessel 10 floats in water W and can be used in the production, storage and/or offloading of resources extracted from the Earth, such as hydrocarbons including crude oil and natural gas and minerals such as can be extracted by solution mining. The floating production, storage and offloading vessel 10 can be assembled onshore using known methods, which can be similar to shipbuilding, and towed to an offshore location, typically above an oil and/or gas field in the earth below the offshore location. At least one anchor line 16a, 16b, 16c, and 16d, which would be fastened to anchors in the seabed that are not shown, moor floating production, storage and offloading vessel 10 in a desired location.
  • At least one moveable hawser assemblies 18 can be used. Each moveable hawser assembly can be disposed in a different location on the hull, namely as a moveable hawser connection assembly 40 and a moveable hawser assembly 60.
  • A hose 20 can be extended between hull 9a and tanker T for transferring crude oil and/or another fluid from floating production, storage and offloading vessel 10 to tanker T.
  • Figure 2 depicts a side elevation of the floating production, storage and offloading vessel 10 according to the disclosed technology.
  • In a typical application for floating production, storage and offloading vessel 10, crude oil can be produced from the Earth below the seabed under the floating production, storage and offloading vessel 10, transferred into and stored temporarily in the hull 9a, and offloaded to a tanker T for transport to onshore facilities. Tanker T can be moored temporarily to the floating production, storage and offloading vessel 10 during the offloading operation by the moveable hawser connection assembly 40. The hose 20 can be extended between the hull 9a and tanker T for transferring crude oil and/or another fluid from the floating production, storage and offloading vessel 10 to tanker T.
  • As disclosed, the at least one moveable hawser assemblies 18 can be used. Each moveable hawser assembly can be disposed in a different location on the hull 9a, namely as the moveable hawser connection assembly 40 and the moveable hawser assembly 60.
  • Figure 3 is side elevation of floating production, storage and offloading vessel 10.
  • A hull 9b of the floating production, storage and offloading vessel 10 is shown having a top deck surface 12a, an upper cylindrical portion 12b extending downwardly from the deck surface 12a, an upper conical section 12c extending downwardly from upper cylindrical portion 12b, and tapering inwardly, a cylindrical neck section 12d extending downwardly from upper conical section 12c, a lower conical section 12e extending downwardly from cylindrical neck section 12d which can flare outwardly, and a lower cylindrical section 12f extending downwardly from the lower conical section 12e.
  • As disclosed, the lower conical section 12e can be described herein as having the shape of an inverted cone or as having an inverted conical shape as opposed to the upper conical section 12c, which can be described herein as having a regular conical shape. The floating production, storage and offloading vessel 10 floats such that the surface of the water intersects regular with the upper conical section 12c, which can be referred to herein as the waterline being on the regular cone shape.
  • As disclosed, the floating production, storage and offloading vessel 10 can be loaded and/or ballasted to maintain the waterline on a bottom portion of regular, upper conical section 12c. When the floating production, storage and offloading vessel 10 can be installed and float properly, a cross-section of the hull 9b through any horizontal plane can have a circular shape.
  • As disclosed, the hull 9b can be designed and sized to meet the requirements of a particular application, and services can be requested from Maritime Research Institute of the Netherlands to provide optimized design parameters to satisfy the design requirements for a particular application.
  • In this disclosure, the upper cylindrical portion 12b can have approximately the same height as the cylindrical neck section 12d, while the height of the lower cylindrical section 12f can be about 3 to 4 times greater than the height of the upper cylindrical portion 12b. The lower cylindrical section 12f can have a greater diameter than the upper cylindrical portion 12b. The upper conical section 12c can have a greater height than the lower conical section 12e. The bottom surface 12g is also depicted.
  • In this disclosure, a plurality of catenary production risers 90a and 90c are depicted. As disclosed, the plurality of catenary production risers can be at least one of: a catenary riser or a vertical riser production riser, or combinations thereof.
  • The hawser 18 of the moveable hawser connection assembly 40 and the moveable hawser assembly 60 are also depicted. A tubular channel 42 is also depicted.
  • In this disclosure, the hose 20 can be depicted on a hose reel. The hose can extend from the hull 9b and the tanker for transfer of crude oil and/or another fluid from floating production, storage and offloading vessel 10 to tanker.
  • In this disclosure the at least one anchor lines 16 is depicted.
  • Figure 4 depicts the moveable hawser connection assembly 40 that has in one embodiment nearly fully enclosing the tubular channel 42. The tubular channel 42 can have a rectangular cross-section and a longitudinal slot.
  • In this Figure, the hull 9b of floating production, storage and offloading vessel 10 is shown with the top deck surface 12a and the lower conical section 12e.
  • The lower conical section 12e can be described herein as having the shape of an inverted cone or as having an inverted conical shape.
  • In this disclosure, the hawser 18 of the moveable hawser connection assembly 40. The moveable hawser assembly 60 is also depicted.
  • As disclosed, the hose 20 can be depicted on a hose reel; this can be the hose 20 that extends between the hull 9b and tanker for the transfer of crude oil and/or another fluid from the floating production, storage and offloading vessel 10 to tanker.
  • In this disclosure, the at least one anchor lines 16a, 16b, 16c, and 16d are depicted.
  • Figure 5 depicts side elevations showing an alternative design for the hull 9c.
  • As disclosed, a hull 9c can have the top deck surface 12a, wherein the upper conical section 12c extends from the top deck surface 12a and tapers inwardly as it extends downwardly. The cylindrical neck section 12d which can be attached to a lower end of the upper conical section 12c and extend downwardly from the upper conical section. The lower conical section 12e can be attached to a
    lower end of the cylinder neck section 12d and extends downwardly from cylindrical neck section 12d while flaring outwardly. The lower cylindrical section 12f extends downwardly from the lower conical section 12e.
  • As further disclosures, a significant difference between the hull 9c and other hull designs can be that hull 9c does not have the upper cylindrical portion 12b.
  • Figure 6 depicts side elevations showing an alternative design for the hull 9d.
  • A side elevation of a hull 9d which shows the hull 9d that can have the top deck surface 12a, the upper cylindrical portion 12b, the upper conical section 12c extending from the upper cylindrical portion 12b and taper inwardly as it extends downwardly.
  • In this disclosure, the lower conical section 12e can be attached to the upper conical section 12c. The lower conical section 12e can extend downwardly while flaring outwardly. The lower cylindrical section 12f extends downwardly from the lower conical section 12e.
  • As disclosed, a significant difference between the hull 9d and other hull designs can be that the hull 9d does not have the cylindrical neck section 12d.
  • Figure 7 is a top plan view of the moveable hawser connection assembly 40, according to the disclosed technology.
  • In this disclosure, the moveable hawser connection assembly 40 is depicted on the floating production, storage and offloading vessel, which can help to accommodate movement of the transport tanker with respect to the floating production, storage and offloading vessel.
  • As disclosed, the moveable hawser connection assembly 40 comprises in one embodiment nearly fully enclosing the tubular channel 42 that has a rectangular cross-section and a longitudinal slot.
  • In this disclosure, the tubular channel 42 is shown with a set of standoffs 44a and 44b that can connect the tubular channel 42 horizontally to the top deck surface 12a. A trolley 46 can be captured and moveable within the tubular channel 42. A trolley shackle 48 can be attached to the trolley 46 providing a connection point and a plate 50 pivotably attaching to the trolley shackle 48 through a plate shackle 52.
  • As disclosed, the plate 50 can have a generally triangular shape with the apex of the triangle attached to the plate shackle 52 through a pin 54 passing through a hole in the plate shackle 52. The plate 50 can have a first hole 55a adjacent another point of the triangle and a second hole 55b adjacent the final point of the triangle. The hawser 18 terminates with a dual connection point 19a and 19b which can be connected to the plate 50 by passing through the holes 55a and 55b respectively.
  • In alternative disclosures, the dual connection point 19a and 19b of the plate 50 and or the plate shackle 52 can be eliminated and the hawser 18 can be connected directly to the trolley shackle 48. Other variations can be usable in connecting the hawser 18 to the trolley 46.
  • Figure 8 depicts a side elevation of the floating, production, storage and offloading vessel 10 according to the disclosed technology.
  • The floating production, storage and offloading vessel 10 can have the hull 9d and the top deck surface 12a and a cross-section of the hull 9d, through any horizontal plane, while the hull 9d can be floating, can be a circular shape.
  • The upper cylindrical portion 12b extends downwardly from the top deck surface 12a and the upper conical section 12c extends downwardly from the upper cylindrical portion 12b and tapers the floating production, storage and offloading vessel 10. The lower conical section 12e extends downwardly from the upper conical section 12c and can flare outwardly. The lower cylindrical section 12f can extend downwardly from the lower conical section 12e. The hull 9d can have the bottom surface 12g, also known as a keel. The lower conical section 12e can be described herein as having the shape of an inverted cone or as having an inverted conical shape as opposed to the upper conical section 12c, which can be described herein as having a regular conical shape.
  • In this disclosure, the floating production, storage and offloading vessel 10 is shown as floating, such that the surface of the water can intersect the upper cylindrical portion 12b when loaded and/or ballasted. In this disclosure, the upper conical section 12c can have a substantially greater vertical height than the lower conical section 12e, and the upper cylindrical portion 12b can have a slightly greater vertical height than the lower cylindrical section 12f.
  • In this disclosure, for reducing heave and otherwise steadying the floating production, storage and offloading vessel 10, at least one fin 84 can be attached to a lower and outer portion of the hull.
  • In this disclosure, a low center of gravity 87 that provides an inherent stability to the floating production, storage and offloading vessel 10 is depicted.
  • The at least one anchor lines 16a and 16f are shown for mooring the floating production, storage and offloading vessel 10.
  • A moon pool 92 is shown formed in the center of the hull 9d and extending through the bottom surface 12g.
  • Catenary production risers 90a and 90d are also shown.
  • Figure 9 depicts a cross-section of the floating production, storage and offloading vessel with the hull 9d.
  • The hull 9d can have at least one fin. In this disclosure, a plurality of fins 84a, 84b, 84c and 84d are shown. When using a plurality of fins 84a, 84b, 84c, and 84d, the plurality of fins can be separated from each other by a plurality of gaps 86a, 86b, 86c and 86d. The plurality of gaps 86a, 86b, 86c and 86d can be spaced between the plurality of fins 84a, 84b, 84c and 84d, which can provide a place that accommodates the at least one catenary production risers 90a, 90c (see Figure 8), such as production risers and anchor lines 16a, 16b, 16c, 16d on the exterior of the hull 9d, without contact with the at least one fin 84a, 84b, 84c, and 84d. As disclosed, the fins can be radial fins.
  • At least one anchor line 16a, 16b, 16c and 16d can be received in the plurality of the gaps 86a, 86b, 86c and 86d respectively. The at least one anchor line secures the floating drilling, production, storage and offloading vessel and/or the floating production, storage and offloading vessel 10 to the seabed. Catenary production risers can be received in the plurality of gaps 86a, 86b, 86c, and 86d and can deliver a resource, such as crude oil, natural gas and/or a leached mineral, from the Earth below the seabed to tankage within the floating production, storage and offloading vessel 10.
  • The moon pool 92 is also depicted with an opening 91 to the bottom surface.
  • Figure 10 depicts the at least one fin 84a and 84b for reducing heave.
  • Each section of the at least one fin 84a and 84b can have the shape of a right triangle in a vertical cross-section, where the 90 degree angle can be located adjacent a lowermost outer side wall of the lower cylindrical section 12f of any of the hulls, shown here as hull 9d, such that a bottom edge 85 of the triangle shape of the at least one fin 84a and 84b is co-planar with the bottom surface 12g of the hull 9d.
  • A hypotenuse 82 of the triangle shape extends from a distal end 88 of the bottom edge 85 of the triangle shape upwards and inwards to attach to the outer side wall of the lower cylindrical section 12f at a point only slightly higher than the lowermost edge of the outer side wall of lower cylindrical section 12f. Some experimentation can be required to size the at least one fin 84a and 84b for optimum effectiveness. As one example, a starting point can be the bottom edge 85 extending radially outwardly a distance that can be about half the vertical height of lower cylindrical section 12f, and the hypotenuse 82 attaches to the lower cylindrical section 12f such as, about one quarter up the vertical height of the lower cylindrical section 12f from the bottom surface 12g of the hull or combinations thereof.
  • The orientation of each triangle shape fin can be rotated by 45 degrees and attached to the hull and be usable herein.
  • After the floating production, storage and offloading vessel can be anchored and its installation can be otherwise complete, it can be used for drilling exploratory or production wells, provided a derrick is installed, and it can be used for production and storage of resource or products.
  • At least one ballast tank 96 is depicted for ballasting and deballasting the floating production, storage and offloading vessel 10 as well as the moon pool 92.
  • Figure 11 provides a perspective detailed view of the floating production, storage and offloading vessel 10 with a detail of the at least one fin 84 attached to and transitioned from one of the aforementioned hull configurations.
  • The plurality of gaps 86a and 86b are shown separating the at least one fin 84.
  • It should be noted that this hull design with the submerged section of the hull having the at least one fin and a heavier or larger lower cylindrical section can create the hull that provides for improved hydrodynamic performance through linear and quadratic damping, namely suppression of radiated waves and friction of viscous origin while that portion of the hull is submerged.
  • In a disclosed embodiment, the vessel can have an ellipsoidal planform, the dynamic response of the hull can be independent of wave direction (when neglecting any asymmetries in the mooring system, risers, and underwater appendages), thereby minimizing wave-induced yaw forces. When the vessel has a conical form of the hull, the hull can be structurally efficient, offering a high payload and storage volume per ton of steel when compared to traditional ship-shaped offshore structures.
  • As disclosed, the hull can have ellipsoidal walls which can be ellipsoidal in radial cross-section, but such shape may be approximated using a large number of flat metal plates rather than bending plates into a desired curvature. A polygonal hull planform can be used according to alternative embodiments.
  • As disclosed, an elliptical hull can minimize or eliminate wave interference.
  • In further disclosed embodiments, the floating production, storage and offloading vessel can be configured to support at least one of: drilling of wells, work over of wells, production, storage of hydrocarbons, and personnel accommodation.
  • As disclosed, the floating production, storage and offloading vessel can have the hull with a hull planform that can be circular, oval, elliptical, or polygonal.
  • As disclosed, the hull can have the bottom surface and the deck surface.
  • As disclosed, the hull can be formed using at least two connected sections engaging between the bottom surface and the deck surface.
  • As disclosed, the at least two connected sections can be joined in series and symmetrically configured about a vertical axis with the connected sections extending downwardly from the deck surface toward the bottom surface.
  • In further disclosures, the connected sections can be at least two of: the upper cylindrical portion; the neck section; and the lower conical section.
  • As disclosed, the at least one fin can be secured to the hull and extend from an outer side of the hull.
  • As disclosed, the hull can be configured so that the lower conical section provides added mass improved hydrodynamic performance through linear and quadratic damping to the hull and wherein the floating production, storage and offloading vessel does not require a retractable center column to control pitch roll and heave.
  • As disclosed, the floating production, storage and offloading vessel can have a centrally disposed moon pool. The moon pool can open through the bottom surface.
  • As disclosed, the floating production, storage and offloading vessel can have the at least one anchor line extending from the deck surface or the hull to moor the floating production, storage and offloading vessel to the sea floor.
  • As disclosed, the floating production, storage and offloading vessel can have the at least one fin discontinuously secured around the hull on the outer surface of the hull.
  • As disclosed, the floating production, storage and offloading vessel can have the at least one catenary production riser or at the least one vertical riser secured to the bottom surface below a transit depth of the floating production, storage and offloading vessel.
  • As disclosed, the floating production, storage and offloading vessel can have the at least one ballast tank for ballasting and deballasting the floating production, storage and offloading vessel.
  • As disclosed, the floating production, storage and offloading vessel can have the movable hawser connection assembly mounted to the hull.
  • As disclosed, the floating production, storage and offloading vessel can have the low center of gravity providing an inherent stability to the structure.
  • While some of these disclosures have been described with emphasis on the claimed embodiments, it should be understood that within the scope of the appended claims, the embodiments might be practiced other than as specifically described herein. The scope of the invention is defined accordingly by the embodiments which form the accompanying independent and dependent claims.

Claims (11)

  1. A floating production, storage and offloading vessel (10), the floating production, storage and offloading vessel comprising:
    a. a hull (9a, 9b, 9c, 9d) with a hull planform that is circular, oval, elliptical, or polygonal, wherein the hull comprises:
    (i) a bottom surface (12g);
    (ii) a top deck surface (12a); and
    (iii) at least two connected sections engaging between the bottom surface (12g) and the top deck surface (12a), the at least two connected sections joined in series and symmetric configured about a vertical axis with the at least two connected sections extending downwardly from the top deck surface (12a) toward the bottom surface (12g), the at least two connected sections comprising a lower conical section (12e) and at least one of:
    1. an upper cylindrical portion (12b); and
    2. a cylindrical neck section (12d);
    wherein the floating production, storage and offloading vessel (10) is shaped and arranged in a manner to control pitch, roll and heave in absence of a retractable center column;
    b. a plurality of catenary production risers (90a, 90c) and/or at least one anchor line (16);
    c. at least one radial fin (84) having a shape of a right triangle in a vertical cross section such that a bottom edge (85) of the right triangle is coplanar with the bottom surface (12g) of the hull (9a, 9b, 9c, 9d), wherein the at least one radial fin (84) comprises a distal end (88) towards a vertex formed by the bottom edge (85) and a hypotenuse (82) of the right triangle; and an end opposed to the distal end (88), the end being towards a vertex formed by the hypotenuse (82) and an opposite side of the right triangle, and the at least one radial fin (84) is discontinuously secured around the hull (9a, 9b, 9c, 9d);
    d. a gap (86a) arranged separating the at least one fin (84) such that a portion of the distal end (88) of the at least one fin (84) is discontinued, characterized by another gap (86b) formed between a portion of the end opposed to the distal end (88) and at least part of the hull (9a, 9b, 9c, 9d), wherein the at least part of the hull (9a, 9b, 9c, 9d) and the opposite side of the right triangle are arranged facing each other;
    wherein the another gap (86b) accommodates at least one of the plurality of catenary
    production risers (90a, 90c) and/or the at least one anchor line (16),
    e. wherein the lower conical section (12e) provides added mass improved hydrodynamic performance through linear and quadratic damping to the hull.
  2. The floating production, storage and offloading vessel (10) of claim 1, further comprising a moon pool (92), wherein the moon pool (92) opens through the bottom surface (12g).
  3. The floating production, storage and offloading vessel (10) of claim 1, wherein the hull (9a, 9b, 9c, 9d) further comprises a low center of gravity (87) providing an inherent stability to the floating production, storage and offloading vessel (10).
  4. The floating production, storage and offloading vessel (10) of claim 1, comprising at least one anchor line (16a, 16b, 16c, 16d) to moor the floating production, storage and offloading vessel (10) to a sea floor.
  5. The floating production, storage and offloading vessel (10) of claim 1, comprising at least one catenary production riser (90a, 90d) secured to the bottom surface (12g) below a transit depth of the floating production, storage and offloading vessel (10).
  6. The floating production, storage and offloading vessel (10) of claim 1, comprising at least one ballast tank (96) for ballasting and deballasting the floating production, storage and offloading vessel (10).
  7. The floating production, storage and offloading vessel (10) of claim 1, comprising a moveable hawser connection assembly (40) mounted to the hull (9a, 9b, 9c, 9d).
  8. The floating production, storage and offloading vessel (10) of claim 7, comprising a plate (50) pivotally attached to the moveable hawser connection assembly (40) through a plate shackle (52), wherein the plate is for attachment of a hawser (18).
  9. The floating production, storage and offloading vessel (10) of claim 8 wherein the plate (50) has a generally triangular shape with an apex of the triangular shape attached to the plate shackle (52), a first hole (55a) adjacent another point of the triangular shape of the plate and a second hole (55b) adjacent a final point of the triangular shape of the plate (50), the first hole (55a) and the second hole (55b) is for attachment to the hawser (18) with a dual connection point (19a, 19b).
  10. The floating production, storage and offloading vessel (10) of any one of claims 8 to 9, wherein the moveable hawser connection assembly comprises a tubular channel (42), a trolley (46) captured and moveable within the tubular channel (42), and a trolley shackle (48) attached to the trolley (46), wherein the plate (50) is pivotally attached to the trolley shackle (48) through the plate shackle (52).
  11. The floating production, storage and offloading vessel (10) of claim 1, wherein the at least one radial fin is configured to provide hydrodynamic performance through linear and quadratic damping.
EP16756028.3A 2015-02-24 2016-01-27 Floating vessel Active EP3261917B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US14/630,563 US9266587B1 (en) 2009-11-08 2015-02-24 Floating vessel
PCT/US2016/015159 WO2016137643A1 (en) 2015-02-24 2016-01-27 Floating vessel

Publications (3)

Publication Number Publication Date
EP3261917A1 EP3261917A1 (en) 2018-01-03
EP3261917A4 EP3261917A4 (en) 2018-09-26
EP3261917B1 true EP3261917B1 (en) 2021-12-08

Family

ID=56789717

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16756028.3A Active EP3261917B1 (en) 2015-02-24 2016-01-27 Floating vessel

Country Status (13)

Country Link
EP (1) EP3261917B1 (en)
KR (1) KR102365576B1 (en)
CN (1) CN107249977B (en)
AU (1) AU2016223268B2 (en)
BR (1) BR112017018128B1 (en)
CA (1) CA2966003C (en)
IL (1) IL251968B (en)
MX (1) MX2017006314A (en)
MY (1) MY192549A (en)
PH (1) PH12017500846A1 (en)
RU (1) RU2684939C2 (en)
SG (1) SG11201706732TA (en)
WO (1) WO2016137643A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10093394B2 (en) 2009-11-08 2018-10-09 Jurong Shipyard Pte Ltd. Method for offshore floating petroleum production, storage and offloading with a buoyant structure
US10494064B2 (en) * 2017-10-30 2019-12-03 Jurong Shipyard Pte Ltd Floating driller
US8662000B2 (en) * 2009-11-08 2014-03-04 Ssp Technologies, Inc. Stable offshore floating depot
US10494060B2 (en) 2017-09-14 2019-12-03 Jurong Shipyard Pte Ltd Buoyant structure
US10450038B2 (en) * 2017-06-27 2019-10-22 Jurong Shipyard Pte Ltd Continuous vertical tubular handling and hoisting buoyant structure
BR112020010038A8 (en) * 2017-11-22 2022-10-04 Jurong Shipyard Pte Ltd METHOD FOR PRODUCTION, STORAGE AND FLOW OF OFFSHORE FLOATING OIL
CN107914834B (en) * 2017-12-12 2023-08-29 中海油能源发展股份有限公司 Polygonal floating type oil storage device for production

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1283548B1 (en) * 1996-03-21 1998-04-22 Tecnomare Spa MONOREGGIO METHOD AND SYSTEM FOR MOORING OF SHIPS IN THE OPEN SEA
US6761508B1 (en) * 1999-04-21 2004-07-13 Ope, Inc. Satellite separator platform(SSP)
US6663320B1 (en) * 2002-09-25 2003-12-16 Single Buoy Moorings Inc. Anchor line connector
CN2900352Y (en) * 2006-05-10 2007-05-16 中国海洋石油总公司 Float rocking reducing device on sea
US7958835B2 (en) * 2007-01-01 2011-06-14 Nagan Srinivasan Offshore floating production, storage, and off-loading vessel for use in ice-covered and clear water applications
NO336984B1 (en) * 2008-05-09 2015-12-07 Sevan Marine As Liquid platform and method of operation thereof
KR101164085B1 (en) * 2009-09-15 2012-07-12 대우조선해양 주식회사 Roll Suppression Device for offshore structure
US8662000B2 (en) * 2009-11-08 2014-03-04 Ssp Technologies, Inc. Stable offshore floating depot
SG175061A1 (en) * 2009-11-08 2011-11-28 Ssp Technologies Inc Offshore buoyant drilling, production, storage and offloading structure
RU2591780C2 (en) * 2010-07-08 2016-07-20 Итрек Б.В. Semisubmersible floating base and operation method thereof
CN103085946B (en) * 2012-10-15 2016-04-13 大连理工大学 Docking circular table Floating Production oil storage system
RU2530921C1 (en) * 2013-06-11 2014-10-20 Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации Sea gravity platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
IL251968B (en) 2021-09-30
CN107249977B (en) 2022-08-09
KR102365576B1 (en) 2022-02-18
EP3261917A4 (en) 2018-09-26
CA2966003A1 (en) 2016-09-01
WO2016137643A1 (en) 2016-09-01
SG11201706732TA (en) 2017-09-28
AU2016223268A1 (en) 2017-05-18
BR112017018128A2 (en) 2018-04-10
KR20170121177A (en) 2017-11-01
EP3261917A1 (en) 2018-01-03
RU2017133098A (en) 2019-03-25
MY192549A (en) 2022-08-28
AU2016223268B2 (en) 2020-01-23
RU2017133098A3 (en) 2019-03-25
MX2017006314A (en) 2018-02-16
BR112017018128B1 (en) 2023-03-21
CN107249977A (en) 2017-10-13
CA2966003C (en) 2023-02-28
IL251968A0 (en) 2017-06-29
PH12017500846A1 (en) 2017-10-30
RU2684939C2 (en) 2019-04-16

Similar Documents

Publication Publication Date Title
EP3261917B1 (en) Floating vessel
KR102528209B1 (en) floating drilling rig
US8733265B2 (en) Offshore buoyant drilling, production, storage and offloading structure
US9266587B1 (en) Floating vessel
US10112685B2 (en) Buoyant structure
US10494060B2 (en) Buoyant structure
US10494064B2 (en) Floating driller
US20040161303A1 (en) Catenary anchor leg mooring system
Sablok et al. SS: Spar Technology-The Internationalization of the Spar Platform
CN116816265A (en) Drilling machine device for floating drilling platform
KR20200101148A (en) Hybrid offshore structure

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170921

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20180829

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 35/44 20060101AFI20180823BHEP

Ipc: B63B 21/04 20060101ALI20180823BHEP

Ipc: B63B 1/04 20060101ALI20180823BHEP

Ipc: E21B 17/01 20060101ALI20180823BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20190611

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: JURONG SHIPYARD PTE. LTD.

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20210713

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1453578

Country of ref document: AT

Kind code of ref document: T

Effective date: 20211215

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016067136

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20211208

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20211208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220308

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1453578

Country of ref document: AT

Kind code of ref document: T

Effective date: 20211208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220309

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220408

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602016067136

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220408

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220131

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220127

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220802

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

26N No opposition filed

Effective date: 20220909

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220127

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20230105

Year of fee payment: 8

Ref country code: FR

Payment date: 20230109

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211208

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230110

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20160127