EP3248917B1 - Method and device for cutting out of objects from a sheet-like material or for the subdivision of a sheet-like material - Google Patents

Method and device for cutting out of objects from a sheet-like material or for the subdivision of a sheet-like material Download PDF

Info

Publication number
EP3248917B1
EP3248917B1 EP17000867.6A EP17000867A EP3248917B1 EP 3248917 B1 EP3248917 B1 EP 3248917B1 EP 17000867 A EP17000867 A EP 17000867A EP 3248917 B1 EP3248917 B1 EP 3248917B1
Authority
EP
European Patent Office
Prior art keywords
stack
support
station
conveyor
processing station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP17000867.6A
Other languages
German (de)
French (fr)
Other versions
EP3248917A1 (en
Inventor
Held Gunnar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP3248917A1 publication Critical patent/EP3248917A1/en
Application granted granted Critical
Publication of EP3248917B1 publication Critical patent/EP3248917B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H5/00Feeding articles separated from piles; Feeding articles to machines
    • B65H5/006Feeding stacks of articles to machines
    • AHUMAN NECESSITIES
    • A41WEARING APPAREL
    • A41HAPPLIANCES OR METHODS FOR MAKING CLOTHES, e.g. FOR DRESS-MAKING OR FOR TAILORING, NOT OTHERWISE PROVIDED FOR
    • A41H43/00Other methods, machines or appliances
    • A41H43/02Handling garment parts or blanks, e.g. feeding, piling, separating or reversing
    • A41H43/0285Tables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B26HAND CUTTING TOOLS; CUTTING; SEVERING
    • B26DCUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
    • B26D7/00Details of apparatus for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
    • B26D7/06Arrangements for feeding or delivering work of other than sheet, web, or filamentary form
    • B26D7/0675Arrangements for feeding or delivering work of other than sheet, web, or filamentary form specially adapted for piles of sheets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H29/00Delivering or advancing articles from machines; Advancing articles to or into piles
    • B65H29/26Delivering or advancing articles from machines; Advancing articles to or into piles by dropping the articles
    • B65H29/36Delivering or advancing articles from machines; Advancing articles to or into piles by dropping the articles from tapes, bands, or rollers rolled from under the articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H31/00Pile receivers
    • B65H31/30Arrangements for removing completed piles
    • B65H31/3009Arrangements for removing completed piles by dropping, e.g. removing the pile support from under the pile
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H31/00Pile receivers
    • B65H31/30Arrangements for removing completed piles
    • B65H31/3054Arrangements for removing completed piles by moving the surface supporting the lowermost article of the pile, e.g. by using belts or rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H31/00Pile receivers
    • B65H31/30Arrangements for removing completed piles
    • B65H31/3054Arrangements for removing completed piles by moving the surface supporting the lowermost article of the pile, e.g. by using belts or rollers
    • B65H31/3063Arrangements for removing completed piles by moving the surface supporting the lowermost article of the pile, e.g. by using belts or rollers by special supports like carriages, containers, trays, compartments, plates or bars, e.g. moved in a closed loop
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/42Piling, depiling, handling piles
    • B65H2301/422Handling piles, sets or stacks of articles
    • B65H2301/4226Delivering, advancing piles
    • B65H2301/42264Delivering, advancing piles by moving the surface supporting the lowermost article of the pile, e.g. conveyor, carriage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2404/00Parts for transporting or guiding the handled material
    • B65H2404/20Belts
    • B65H2404/25Driving or guiding arrangements
    • B65H2404/257Arrangement of non endless belt
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2405/00Parts for holding the handled material
    • B65H2405/30Other features of supports for sheets
    • B65H2405/32Supports for sheets partially insertable - extractable, e.g. upon sliding movement, drawer
    • B65H2405/324Supports for sheets partially insertable - extractable, e.g. upon sliding movement, drawer between operative position and non operative position
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/10Handled articles or webs
    • B65H2701/18Form of handled article or web
    • B65H2701/182Piled package

Definitions

  • the invention relates to a method and a device for cutting out objects from sheet material.
  • the invention relates to such a method in which, in a first station, a plurality of material webs or a plurality of sections of a material web are stacked one above the other and substantially congruently to form a stack.
  • a laying device is usually used for this purpose.
  • the individual sections of the web of material can be pulled off a supply roll or a supply bale and cut to length, or they are already pre-cut to length and laid one on top of the other.
  • the assembled stack is then transferred from this first station to a subsequent processing station, where objects are cut out of the stack according to a cutting pattern of a fixed geometry, or the stack is divided into small sections.
  • the stacked webs of material with the objects that have been cut out but not yet detached or isolated are now transferred to a further station, where they are removed. Remnants of the material webs are then disposed of.
  • the stacked material web sections have a length of up to 10 meters, so that the individual stations lined up next to each other, i.e. the first station, the processing station and the removal station, require a total length of 30 meters and more, in addition to the space required by the Supply roll required on the inlet side of the first station.
  • the width of the material web sections which can be 2 meters or more, tools are required needed to remove the cut or isolated objects at the removal station from the middle of the web stack, which are one meter or more away from the edge of the web stack and are therefore not directly accessible by a person.
  • Devices that are currently used to cut objects out of a stack of web-shaped material use support tables or grates that transfer the respective stack of material webs from one station to the next station.
  • the empty support tables or grids are then returned to the first station, in order to then build up a new stack of the web-shaped material thereon.
  • the objects that have been cut out can only be removed when the respective supporting table or grating has been completely transferred from the processing station to the removal station. Also, additional space is required to return the empty support tables to the first station unless the support tables are returned to the first station above or below the processing station.
  • the document GB 1 036 732 A describes a device for cutting out pieces of fabric from a stack of layers of fabric stacked on top of one another.
  • these layers of fabric are stacked one on top of the other on a support surface of an upper conveyor belt in the support area.
  • a form knife with dies Below this support surface is a form knife with dies. After the stack of fabric layers has been assembled on the support surface of the upper conveyor belt, they are transferred over a suitable surface to the belt below, by the belt with the stack and the conveyor belt being driven at the same speed.
  • the tape leads up to a press.
  • the form knives are attached to the conveyor belt and thus form the support for the stack of fabric when the belt is advanced in the direction of the press.
  • the stack has been transferred from the belt or the support to the belt or the forming knives, a new stack can be formed on the support area. Consequently, the total length of the plant consists of the length of the upper conveyor belt, the inclined surface, the length of the press and the length of the conveyor belt between the conveyor belt or inclined surface and the entry area of the press.
  • the method according to the invention provides that, in a first processing step, a plurality of material webs are stacked one on top of the other, essentially congruently, to form a stack. If the material webs are pulled off a material coil or material bale, they are preferably cut to the required length directly in the area of the first station.
  • the material webs are usually stacked on top of one another on a support grid to form a stack, on which the stack remains in the processing station. Only after the objects that have been cut out have been removed from the support grate, after the latter has been conveyed out of the processing station, is the support grate returned to the first station in order to pick up webs of material again.
  • the method according to the invention provides that the material webs are stacked in the first station on a support device which is located above a conveyor device with which the stack of material webs is transported into the processing station, which, however, is decoupled from the conveyor device . Only when a material web stack has been assembled on the support device is this material web stack transferred to the conveyor device, so that the material web stack is deposited directly on the conveyor device, which then transports the material web stack to the processing station.
  • the support device After the material web stack has been completely deposited on the conveyor device in the first station, the support device is returned to its basic position above the conveyor device, so that in this basic position it is again ready for a new material web stack made up of individual material web sections is compiled.
  • the conveyor is decoupled from the support device, for the transport of the material web or for the transport of the material web stack from the first station via the processing station to the Removal area a single conveyor can be used.
  • the cutting device can be moved relative to the stack of material webs. This also means that the conveyor with the web stack in the processing station can be stopped or moved continuously or intermittently according to the requirements for the relative cutting speeds, without taking into account the stacking process in the first station or the progress of the stacking process in the first station got to.
  • the conveyor device is also assigned to the first station, in which the individual material web sections are stacked into a stack, this stacking process is independent of a movement of the conveyor device, which is necessary due to the processing of a material web stack in the processing station, since the conveyor device is in the first station below the support device, decoupled from this, is located.
  • the respective area of the material web stack in which the objects have already been cut out can be conveyed out of the processing station by the conveyor device in order to immediately remove the objects that have already been cut out, although they are still within the material web stack.
  • the objects that have been cut out are easily accessible, even if they are very wide webs of material, viewed transversely to the conveyor device.
  • the length of the entire device can be approximately the length of such a support grid or a corresponding conveyor belt, consequently by about a third, shortened.
  • the material webs are stacked on a support belt, which has a length that corresponds approximately to the length of the material web sections that are to be stacked.
  • This support belt is located above the conveyor belt associated with the processing station and the delivery station and is therefore decoupled from this conveyor belt.
  • the conveyor belt is stopped and the conveyor belt or support belt is pulled off below the material web stack, so that the end of the material web stack extends over the support belt pushed out and placed on the conveyor belt below and then transported to the processing station.
  • the material web stack has left the support belt, its movement is stopped in order to build up a new material web stack on it, decoupled from the conveyor belt.
  • the stack is transferred to the conveyor device located below the support device, in that the support device is pulled off from under the stack.
  • the support device can be designed in such a way that it is pulled off from underneath the stack without generating any significant relative movement between the support device and the lower web of material resting on the support device.
  • the support device is then returned to a basic position in order to build up a new stack of material webs, decoupled from the conveyor device. As soon as the material web stack has been deposited from the support device onto the conveyor device located underneath, a new material web stack can be created on the support device without the material web stack lying on the conveyor device underneath moving from the first station to the second station was promoted.
  • the method according to the invention is also characterized in that, at least during the time at which objects are being cut out of the previously formed stack in the processing station, a new stack can be formed on the support device, although the conveyor device that transfers the previous material web stack into the processing station, can be moved further in order to move the material web stack in the processing station relative to a cutting device, for example a laser beam, and to remove the processed part of the material web stack from the processing station for removal of the cut or lead out isolated parts.
  • a cutting device for example a laser beam
  • a support belt is used as the support device in order to build up a stack of material webs thereon.
  • a support belt can be composed of several narrow belts running side by side, which are preferably deflected around common rollers.
  • At least two conveyor devices are used, one conveyor device being assigned to the area below the support device while the other conveyor device is assigned to the area of the processing station.
  • These at least two conveying devices should be positioned relative to one another in such a way that they form a common support and transport plane for the stack of material webs.
  • the third conveyor is assigned to the output zone, which can nevertheless be kept very short, while the other two conveyors are assigned to the area of the support device and the area of the processing device.
  • a conveyor belt is expediently used as the conveying device, with a cutting grid being provided in the cutting area.
  • the conveyor belt of the conveyor device could also be constructed from a number of narrow belts running alongside one another, just as a wire mesh can be used for the conveyor belt or such narrow belts.
  • the device according to the invention for cutting out objects from web-like material comprises a first station in which several webs of material are stacked one on top of the other, essentially congruently, to form a stack on a support belt or another support device.
  • a laying device can be used for this purpose.
  • a conveyor device is present in order to transfer the stack to a processing station following the first station, as has already been explained above.
  • On the side of the processing station opposite the first station there is an output zone for outputting the cut out and/or separated objects or parts of the material web stack.
  • the at least one conveyor device extends from the first station at least to the end of the processing station.
  • the first station has the support device, preferably a support belt, on which, in a basic position of the support device, the material web is placed or the material webs are stacked to form a stack. It is essential that the support device located above the conveyor so that it is decoupled from the conveyor belt and its drive or conveyor movement.
  • the support device is formed by a support belt that is guided around at least two rollers or cylinders. As this support belt is driven, the material web stack is transferred to the conveyor belt at the level below.
  • a support device or a support belt provided for this purpose, which is mounted and guided in such a way that it can be pulled off below the stack of web material, so that the stack of web material is placed on the conveyor belt.
  • the stack of material webs does not change its position, as seen in a projection onto the conveyor belt located below the support belt.
  • a support band is used as the support device, which can expediently be pulled off underneath the stack by being guided back at one end under itself to its other end into a stack-deposit position.
  • the part of the support belt that forms the support referred to as the upper run
  • the lower run is pulled off at its free end by being guided parallel to the upper run to the stationary shifted towards the end.
  • the at least one roller is advantageously mounted at both ends in such a way that it can be displaced parallel to the belt plane.
  • the upper side of the upper run forms the support surface for the material web(s) or the material web stack.
  • the part of the support belt that is deflected over the roller is pulled off so that the roller moves underneath the material web and thus the upper part of the support belt, the upper run, on the the material web stack rests, consequently the contact surface, gradually pulls off by the upper run being transferred to the lower run.
  • the material web or the material web stack falls onto the conveyor device located underneath, which then transports the material web stack into the processing device. It is particularly advantageous here that there is no friction between the stack of material webs and the support belt, which is drawn off underneath the stack of material webs.
  • the roller which can also be referred to as a deflection roller, is then returned to the basic position so that the support surface is ready again for building up another stack of material webs, or just for placing a single material web section.
  • a material web a material web section or a material web stack
  • these terms are interchangeable where possible.
  • the method according to the invention and the device according to the invention can preferably be used for processing a material web stack consisting of material web sections stacked on top of one another, although an individual material web section can also be processed in each case.
  • conveyor device can be a support belt, a transport chain or another link belt with which the stack of material webs can be transported from one station to the next station.
  • the direction of transport can also be temporarily reversed, at least by that conveyor device which is assigned to the processing station, in order to expand the working area of the processing device, for example a laser, in the processing station and to shorten the processing time.
  • the device as in the Figures 1A to 1C is shown is divided into three stations, a first station 1, a second station 2 and a third station 3.
  • the first station 1 is used to stack a plurality of material webs 4 on a support device 5 one above the other and essentially congruently to form a stack 6 .
  • These material webs 4 are either supplied as such or they are drawn off from a material bale or material coil 7 via a laying device 25 shown schematically and cut to length by a cutting device 8 .
  • the support device 5 is part of a support belt 9 with an upper run 10 and a lower run 11, the upper side of the upper run 10 forming the support device 5.
  • One end 12 of the support belt 9, which is assigned to the upper strand 10, is held in place.
  • the other end 13 of the upper run 10 is deflected around a deflection device, for example a deflection roller 14, leading to the lower run 11.
  • the end 15 of the lower run 11 opposite the deflection roller 14 is connected to a wind
  • a conveyor belt 17 which extends from the first station 1, the stacking station, through the second station 2, the processing station, to the third station 3, the output station.
  • This conveyor belt 17 is guided endlessly at both ends so as to revolve around rollers 18 .
  • FIGS Figures 1A to 1C While in the embodiment as shown in FIGS Figures 1A to 1C 1, only a single conveyor belt 17 is used, passing through the three stations 1, 2 and 3, in the embodiment shown in FIGS Figures 2A to 2D shown, the conveyor belt 17 is divided into two sub-conveyor belts 19 and 20; One conveyor belt section 19 is located in the area of the first station 1, while the second conveyor belt section 20 is directly adjacent to the first conveyor belt section 19 and extends through the second station 2, the processing station, to the third station 3, the output station.
  • the support belt 9 is pulled off underneath the stack 6 assembled on the upper run 10.
  • the lower strand 11 of the support belt 9 is wound up on the winding device 16 in the direction of the arrow 21, so that the deflection roller 14 in the direction of the arrow 22, guided in a guide device 23, is displaced.
  • the upper run 10 is deflected around the deflection roller 14, transferred to the lower run 11, whereby the web stack 6 is continuously deposited on the upper run of the conveyor belt 17 or 19, as in the Figures 1B and 2 B is shown until it rests completely on the conveyor belt 17 or 19, as the Figures 1C and 2C demonstrate.
  • the support belt 9 is again unwound from the winding device 16 against the arrow 21, whereby the deflection roller 14 against the arrow 22 in the guide device 23 in the starting position in the Figures 1A and 2A is shown shifts, so that the support device 5 is provided for receiving a new stack 6, as shown in the sequence of figures.
  • the material coil 7 and the cutting device 8 are omitted for clarity.
  • the displacement movement of the deflection roller 14 in the guide device 23 can be coupled with the rotary movement of the winding device 16 .
  • Springs can also be coupled to the deflection roller 14, which tension, for example, in one direction of displacement of the deflection roller 14 in the guide device 23 and which, when the support belt 9 is unwound from the winding device 16, moves the deflection roller 14 into the starting position of the Figures 1A , 2A and 2D withdraw.
  • the figures show that the material stack 6 located on the conveyor belt 17 or the partial conveyor belt 20 is processed in the processing station 2 is by a processing device 24, such as a laser, is moved back and forth, as indicated by a double arrow.
  • a processing device 24 such as a laser
  • the conveyor belt 17 or the partial conveyor belt 20 can also be moved in both directions.
  • both the conveyor belt 17 and the partial conveyor belt 20 are conveyed in a preferred direction, the transport direction, to the third station, the output station 3 .
  • the output station 3 can be kept very short (seen in the direction of the conveyor belt).
  • the processing device 24 As soon as the processing device 24 has processed a material web stack 6 in the processing station 2, the next material web stack 6 lying on the conveyor belt is transferred to the processing station 2 so that the processing of this next material web stack 6 can take place.
  • the previous processing time can be shortened with the device according to the invention, since a material web stack 6 can be formed in the first station, while a previously formed material web stack 6 is still below the support belt 9 and thus below the through the support belt 9 is provided support device 5, as is the Figures 1C and 2C, 2D demonstrate. In this state, a new material web stack 6 is assembled on the support device 5 in its basic position.
  • the output station 3 can be kept short, since the processed parts of the material web stack 6 can be removed piece by piece from the conveyor belt 17, 19 while another part of the material web stack 6 is still being processed.
  • the third station, the output station 3 is required to have a length which corresponds to the length of such a transport grid or transport table.
  • the processing time is also significantly reduced with the method according to the invention, since a new material web stack 6 can be assembled on the support device 5, although the previously created one Material web stack 6 is still on the conveyor belt 17 or 19 and has not yet been transferred to the processing station 2.
  • material web stack 6 which is stacked on the support belt 9
  • a single material web section can also be placed on the support belt in order to then transport it to the conveyor belt below and then to the processing station .
  • material web stacks 6 are preferably assembled on the support device 5 or the support belt 9 in order to then guide this material web stack 6 through the processing station.

Description

Die Erfindung betrifft ein Verfahren und eine Vorrichtung zum Ausschneiden von Gegenständen aus bahnenförmigem Material.The invention relates to a method and a device for cutting out objects from sheet material.

Insbesondere betrifft die Erfindung ein solches Verfahren, bei dem in einer ersten Station mehrere Materialbahnen oder mehrere Abschnitte einer Materialbahn zu einem Stapel übereinander und im Wesentlichen deckungsgleich gestapelt werden. Hierzu wird üblicherweise eine Legevorrichtung eingesetzt. Die einzelnen Abschnitte der Materialbahn können von einer Vorratsrolle oder einem Vorratsballen abgezogen und abgelängt werden, oder sie werden, bereits in der Länge vorkonfektioniert, übereinander gelegt. Von dieser ersten Station wird dann der zusammengestellte Stapel in eine daran anschließende Bearbeitungsstation überführt, wo Gegenstände entsprechend einem Schneidmuster einer festgelegten Geometrie aus dem Stapel ausgeschnitten werden oder der Stapel in kleine Abschnitte unterteilt wird. Die gestapelten Materialbahnen mit den ausgeschnittenen aber noch nicht herausgelösten oder vereinzelten Gegenständen werden nun in eine weitere Station überführt, wo sie entnommen werden. Reste der Materialbahnen werden dann entsorgt.In particular, the invention relates to such a method in which, in a first station, a plurality of material webs or a plurality of sections of a material web are stacked one above the other and substantially congruently to form a stack. A laying device is usually used for this purpose. The individual sections of the web of material can be pulled off a supply roll or a supply bale and cut to length, or they are already pre-cut to length and laid one on top of the other. The assembled stack is then transferred from this first station to a subsequent processing station, where objects are cut out of the stack according to a cutting pattern of a fixed geometry, or the stack is divided into small sections. The stacked webs of material with the objects that have been cut out but not yet detached or isolated are now transferred to a further station, where they are removed. Remnants of the material webs are then disposed of.

Üblicherweise weisen die gestapelten Materialbahnabschnitte eine Länge von bis zu 10 Metern auf, so dass die einzelnen, aneinander gereihten Stationen, d.h. die erste Station, die Bearbeitungsstation und die Entnahmestation, eine Gesamtlänge von 30 Metern und mehr benötigen, zusätzlich zu dem Platzbedarf, den die Vorratsrolle einlaufseitig der ersten Station benötigt. Je nach Breite der Materialbahnabschnitte, die 2 Meter und mehr betragen kann, werden Hilfsmittel benötigt, um die ausgeschnittenen oder vereinzelten Gegenstände an der Entnahmestation aus der Mitte des Materialbahn-Stapels zu entnehmen, die vom Rand des Materialbahn-Stapels einen Meter und mehr entfernt liegen und so durch eine Person nicht direkt erreichbar sind.Usually, the stacked material web sections have a length of up to 10 meters, so that the individual stations lined up next to each other, i.e. the first station, the processing station and the removal station, require a total length of 30 meters and more, in addition to the space required by the Supply roll required on the inlet side of the first station. Depending on the width of the material web sections, which can be 2 meters or more, tools are required needed to remove the cut or isolated objects at the removal station from the middle of the web stack, which are one meter or more away from the edge of the web stack and are therefore not directly accessible by a person.

Vorrichtungen, die derzeit eingesetzt werden, um Gegenstände aus einem Stapel des bahnenförmigen Materials auszuschneiden, setzen Auflagetische oder -roste ein, die die jeweiligen Materialbahn-Stapel von der einen Station zu der jeweils nächsten Station überführen. An der Entnahmestation werden dann die leeren Auflagetische oder -roste wieder zu der ersten Station zurückgeführt, um dann darauf einen neuen Stapel aus dem bahnenförmigen Material aufzubauen. Aufgrund der eingesetzten Auflagetische oder -roste können die ausgeschnittenen Gegenstände erst dann entnommen werden, wenn der jeweilige Auflagetisch oder -rost vollständig von der Bearbeitungsstation zu der Entnahmestation überführt ist. Auch wird zusätzlicher Platz benötigt, um die leeren Auflagetische wieder zu der ersten Station zurückzuführen, es sei denn, die Auflagetische werden oberhalb oder unterhalb der Bearbeitungsstation zu der ersten Station zurückgeführt.Devices that are currently used to cut objects out of a stack of web-shaped material use support tables or grates that transfer the respective stack of material webs from one station to the next station. At the unloading station, the empty support tables or grids are then returned to the first station, in order to then build up a new stack of the web-shaped material thereon. Because of the supporting tables or gratings used, the objects that have been cut out can only be removed when the respective supporting table or grating has been completely transferred from the processing station to the removal station. Also, additional space is required to return the empty support tables to the first station unless the support tables are returned to the first station above or below the processing station.

Es ist auch bekannt, für den Transport der Materialbahn-Stapel Förderbänder einzusetzen.It is also known to use conveyor belts for the transport of the material web stack.

Das Dokument GB 1 036 732 A beschreibt eine Vorrichtung zum Ausschneiden von Stoffteilen aus einem Stapel von übereinander gestapelten Stofflagen. Wie die hierzu vorgesehene Vorrichtung zeigt, werden diese Stofflagen auf einer Auflagefläche eines oberen Transportbands im Auflagebereich übereinander gestapelt. Unterhalb dieser Auflagefläche befindet sich ein Formmesser mit Stanzformen. Nachdem der Stapel der Stofflagen auf der Auflagefläche des oberen Transportbands zusammengestellt ist, werden diese über eine geeignete Fläche auf das darunter befindliche Band überführt, indem das Band mit dem Stapel und das Transportband mit gleicher Geschwindigkeit angetrieben werden. Das Band führt bis zu einer Presse. Die Formmesser sind auf dem Transportband befestigt und bilden so mit dem Vorschub des Bands in Richtung der Presse die Auflage für den Stoffbahnstapel. Anschließend werden die Formmesser mit dem Stapel stückweise in die Presse geführt und die Presse drückt den Stapel auf die Formmesser, so dass die Stoffteile ausgeschnitten werden. Nachdem der Stapel von dem Band bzw. der Auflage auf das Band bzw. die Formmesser überführt ist, kann ein neuer Stapel auf dem Auflagebereich gebildet werden. Folglich setzt sich die gesamte Länge der Anlage aus der Länge des oberen Transportbands, der geneigten Fläche, der Länge der Presse und der Länge des Förderbands zwischen dem Transportband bzw. der geneigten Fläche und dem Eintrittsbereich der Presse zusammen.The document GB 1 036 732 A describes a device for cutting out pieces of fabric from a stack of layers of fabric stacked on top of one another. As the device provided for this purpose shows, these layers of fabric are stacked one on top of the other on a support surface of an upper conveyor belt in the support area. Below this support surface is a form knife with dies. After the stack of fabric layers has been assembled on the support surface of the upper conveyor belt, they are transferred over a suitable surface to the belt below, by the belt with the stack and the conveyor belt being driven at the same speed. The tape leads up to a press. The form knives are attached to the conveyor belt and thus form the support for the stack of fabric when the belt is advanced in the direction of the press. Then the form knife with the stack piece by piece fed into the press and the press presses the stack onto the forming knives so that the fabric pieces are cut out. After the stack has been transferred from the belt or the support to the belt or the forming knives, a new stack can be formed on the support area. Consequently, the total length of the plant consists of the length of the upper conveyor belt, the inclined surface, the length of the press and the length of the conveyor belt between the conveyor belt or inclined surface and the entry area of the press.

Aufgrund der derzeitigen Arbeitsweisen und der eingesetzten Vorrichtungen zum Ausschneiden von Gegenständen aus bahnenförmigem Material, insbesondere aus einem Materialbahn-Stapel, besteht die Forderung nach einer Verringerung des benötigten Platzbedarfs, um eine entsprechende Anlage aufzustellen und zu betreiben. Auch sollte die Bearbeitungszeit zum Bearbeiten eines Materialbahn-Stapels verkürzt werden.Due to the current working methods and the devices used for cutting out objects from sheet material, in particular from a stack of material sheets, there is a demand for a reduction in the space required to set up and operate a corresponding system. The processing time for processing a material web stack should also be shortened.

Gemäß der Erfindung werden ein Verfahren zum Ausschneiden von Gegenständen aus einem bahnenförmigen Material mit den Merkmalen des Anspruchs 1 sowie eine Vorrichtung mit den Merkmalen des Anspruchs 7 angegeben. Vorteilhafte Ausgestaltungen sowohl des Verfahrens als auch der Vorrichtung ergeben sich aus den abhängigen Ansprüchen.According to the invention, a method for cutting out objects from a web-like material with the features of claim 1 and a device with the features of claim 7 are specified. Advantageous configurations of both the method and the device result from the dependent claims.

In vielen Bereichen ist es erforderlich, Gegenstände aus bahnenförmigem Material auszuschneiden. Um mit einem Schneidvorgang gleichzeitig eine große Anzahl an Gegenständen zu erhalten, werden mehrere Materialbahnen oder Materialbahnabschnitte zu einem Stapel übereinander gelegt, so dass mit einem Schneidvorgang die übereinander gelegten Materialbahnabschnitte gleichzeitig bearbeitet werden können. Entsprechend der Anzahl der übereinander gelegten Materialbahnen wird gleichzeitig eine entsprechende Anzahl an Gegenständen durch den jeweiligen Schneidvorgang in der Bearbeitungsstation erzeugt. Solche Verfahren werden insbesondere für das Bearbeiten von dünnen Blechen, beispielsweise unter Verwendung einer Laserschneidvorrichtung, oder auch von Stoff oder anderen Gewebebahnen, eingesetzt. Diese Bleche oder Stoff-/Gewebebahnen werden beispielsweise von einem Material-Coil oder Material-Ballen abgezogen.In many areas it is necessary to cut objects out of sheet material. In order to obtain a large number of objects simultaneously with one cutting process, several material webs or material web sections are placed one on top of the other to form a stack, so that the material web sections placed one on top of the other can be processed simultaneously with one cutting process. Corresponding to the number of material webs laid one on top of the other, a corresponding number of objects is simultaneously produced by the respective cutting process in the processing station. Such methods are used in particular for the processing of thin metal sheets, for example using a laser cutting device, or of fabric or other webs of fabric. These sheets of metal or cloth/fabric panels are deducted from a material coil or material bale, for example.

Das erfindungsgemäße Verfahren sieht vor, dass in einem ersten Bearbeitungsschritt mehrere Materialbahnen, im Wesentlichen deckungsgleich, zu einem Stapel übereinander gestapelt werden. Falls die Materialbahnen von einem Material-Coil oder Material-Ballen abgezogen werden, werden sie vorzugsweise direkt im Bereich der ersten Station auf die erforderliche Länge abgelängt. Üblicherweise werden die Materialbahnen auf einem Auflagerost übereinander zu einem Stapel gestapelt, auf dem der Stapel in der Bearbeitungsstation verbleibt. Erst nachdem die ausgeschnittenen Gegenstände von dem Auflagerost, nachdem dieser aus der Bearbeitungsstation herausbefördert ist, entnommen sind, wird der Auflagerost in die erste Station zurückgeführt, um darauf erneut Materialbahnen aufzunehmen.The method according to the invention provides that, in a first processing step, a plurality of material webs are stacked one on top of the other, essentially congruently, to form a stack. If the material webs are pulled off a material coil or material bale, they are preferably cut to the required length directly in the area of the first station. The material webs are usually stacked on top of one another on a support grid to form a stack, on which the stack remains in the processing station. Only after the objects that have been cut out have been removed from the support grate, after the latter has been conveyed out of the processing station, is the support grate returned to the first station in order to pick up webs of material again.

Im Gegensatz zu dieser Verfahrensweise sieht das erfindungsgemäße Verfahren vor, dass die Materialbahnen in der ersten Station auf einer Auflageeinrichtung gestapelt werden, die sich oberhalb einer Fördereinrichtung befindet, mit der der Materialbahn-Stapel in die Bearbeitungsstation transportiert wird, die allerdings von der Fördereinrichtung entkoppelt ist. Erst wenn ein Materialbahn-Stapel auf der Auflageeinrichtung zusammengestellt ist, wird dieser Materialbahn-Stapel auf die Fördereinrichtung überführt, so dass sich der Materialbahn-Stapel unmittelbar auf die Fördereinrichtung ablegt, die dann den Materialbahn-Stapel in die Bearbeitungsstation transportiert.In contrast to this procedure, the method according to the invention provides that the material webs are stacked in the first station on a support device which is located above a conveyor device with which the stack of material webs is transported into the processing station, which, however, is decoupled from the conveyor device . Only when a material web stack has been assembled on the support device is this material web stack transferred to the conveyor device, so that the material web stack is deposited directly on the conveyor device, which then transports the material web stack to the processing station.

Nachdem der Materialbahn-Stapel vollständig auf der Fördereinrichtung in der ersten Station abgelegt ist, wird die Auflageeinrichtung wieder in ihre Grundstellung oberhalb der Fördereinrichtung zurückgeführt, so dass sie in dieser Grundstellung wieder dazu bereit gestellt ist, dass darauf ein neuer Materialbahn-Stapel aus einzelnen Materialbahnabschnitten zusammengestellt wird. Dadurch, dass die Fördereinrichtung von der Auflageeinrichtung entkoppelt ist, kann für den Transport der Materialbahn oder für den Transport des Materialbahn-Stapels von der ersten Station über die Bearbeitungsstation bis zu dem Entnahmebereich eine einzige Fördereinrichtung verwendet werden. In der Bearbeitungsstation kann die Schneidvorrichtung relativ zu dem Materialbahn-Stapel bewegt werden. Dies bedeutet auch, dass die Fördereinrichtung mit dem Materialbahn-Stapel in der Bearbeitungsstation entsprechend den Anforderungen an die relativen Schneidgeschwindigkeiten angehalten oder kontinuierlich oder diskontinuierlich bewegt werden kann, ohne dass der Stapelvorgang in der ersten Station oder das Fortschreiten des Stapelvorgangs in der ersten Station berücksichtigt werden muss.After the material web stack has been completely deposited on the conveyor device in the first station, the support device is returned to its basic position above the conveyor device, so that in this basic position it is again ready for a new material web stack made up of individual material web sections is compiled. The fact that the conveyor is decoupled from the support device, for the transport of the material web or for the transport of the material web stack from the first station via the processing station to the Removal area a single conveyor can be used. In the processing station, the cutting device can be moved relative to the stack of material webs. This also means that the conveyor with the web stack in the processing station can be stopped or moved continuously or intermittently according to the requirements for the relative cutting speeds, without taking into account the stacking process in the first station or the progress of the stacking process in the first station got to.

Obwohl die Fördereinrichtung auch der ersten Station zugeordnet ist, in der die einzelnen Materialbahnabschnitte zu einem Stapel gestapelt werden, ist dieser Stapelvorgang unabhängig von einer Bewegung der Fördereinrichtung, die aufgrund der Bearbeitung eines Materialbahn-Stapels in der Bearbeitungsstation erforderlich ist, da sich die Fördereinrichtung in der ersten Station unterhalb der Auflageeinrichtung, von dieser entkoppelt, befindet.Although the conveyor device is also assigned to the first station, in which the individual material web sections are stacked into a stack, this stacking process is independent of a movement of the conveyor device, which is necessary due to the processing of a material web stack in the processing station, since the conveyor device is in the first station below the support device, decoupled from this, is located.

Durch die Fördereinrichtung kann der jeweilige Bereich des Materialbahn-Stapels, in dem die Gegenstände bereits ausgeschnitten sind, aus der Bearbeitungsstation herausbefördert werden, um dort die bereits ausgeschnittene Gegenstände, die sich allerdings noch innerhalb des Materialbahn-Stapels befinden, unmittelbar zu entnehmen. In diesem Bereich ausgangsseitig der Bearbeitungsstation sind die ausgeschnittenen Gegenstände gut zugänglich, auch dann, wenn es sich um sehr breite Materialbahnen, quer zur Fördereinrichtung gesehen, handelt.The respective area of the material web stack in which the objects have already been cut out can be conveyed out of the processing station by the conveyor device in order to immediately remove the objects that have already been cut out, although they are still within the material web stack. In this area on the output side of the processing station, the objects that have been cut out are easily accessible, even if they are very wide webs of material, viewed transversely to the conveyor device.

Da das erfindungsgemäße Verfahren keine Auflageroste oder sonstigen Auflagen einsetzt, auf denen die Materialbahnen gestapelt werden und mit denen dann auch der jeweilige Materialbahn-Stapel von der ersten Station zu der zweiten Station, der Bearbeitungsstation, überführt wird und der, nach der Bearbeitung des Materialbahn-Stapels, für die Entnahme und Vereinzelung der ausgeschnittenen Gegenstände vollständig aus der Bearbeitungsstation herausgefahren werden müssen, kann die Länge der gesamten Vorrichtung um annähernd der Länge eines solchen Auflagerosts oder eines entsprechenden Förderbands, folglich um etwa ein Drittel, verkürzt werden. Da das Bilden eines Materialbahn-Stapels in der ersten Station von der Fördereinrichtung, die den Stapel in die Bearbeitungszone der Bearbeitungsstation befördert, entkoppelt ist, können Bearbeitungszeiten verkürzt werden, da ein in der ersten Station gebildeter Materialbahn-Stapel unmittelbar von der Auflageeinrichtung auf die Fördereinrichtung abgelegt wird und mit der Fördereinrichtung in die Bearbeitungsstation überführt wird, wenn ein Bearbeitungsvorgang in der Bearbeitungsstation entsprechend fortgeschritten ist.Since the method according to the invention does not use any support grates or other supports on which the material webs are stacked and with which the respective material web stack is then also transferred from the first station to the second station, the processing station, and which, after processing the material web Stack, for the removal and isolation of the cut objects must be completely moved out of the processing station, the length of the entire device can be approximately the length of such a support grid or a corresponding conveyor belt, consequently by about a third, shortened. Since the formation of a material web stack in the first station is decoupled from the conveyor device that transports the stack into the processing zone of the processing station, processing times can be shortened, since a material web stack formed in the first station is deposited directly from the support device onto the conveyor device and connected to the conveyor device in the processing station is transferred when a processing operation in the processing station has progressed accordingly.

Gemäß dem Verfahren werden die Materialbahnen auf einem Auflageband gestapelt, das etwa die Länge entsprechend der Länge der Materialbahnabschnitte, die gestapelt werden sollen, besitzt. Dieses Auflageband befindet sich oberhalb des Förderbands, das der Bearbeitungsstation und der Ausgabestation zugeordnet ist, und ist folglich von diesem Förderband entkoppelt. Um den Materialbahn-Stapel auf die Fördereinrichtung zu überführen, wird, nachdem der Materialbahn-Stapel erstellt ist, das Förderband angehalten und das Transportband bzw. Auflageband unterhalb des Materialbahn-Stapels abgezogen, so dass sich der Materialbahn-Stapel mit seinem Ende über das Auflageband hinausschiebt und sich auf das im Niveau darunter befindliche Förderband ablegt und anschließend in die Bearbeitungsstation transportiert wird. Wenn der Materialbahn-Stapel das Auflageband verlassen hat, wird dieses in seiner Bewegung angehalten, um darauf, entkoppelt von dem Förderband, einen neuen Materialbahn-Stapel aufzubauen.According to the method, the material webs are stacked on a support belt, which has a length that corresponds approximately to the length of the material web sections that are to be stacked. This support belt is located above the conveyor belt associated with the processing station and the delivery station and is therefore decoupled from this conveyor belt. In order to transfer the material web stack onto the conveyor device, after the material web stack has been created, the conveyor belt is stopped and the conveyor belt or support belt is pulled off below the material web stack, so that the end of the material web stack extends over the support belt pushed out and placed on the conveyor belt below and then transported to the processing station. When the material web stack has left the support belt, its movement is stopped in order to build up a new material web stack on it, decoupled from the conveyor belt.

Der Stapel wird auf die sich unterhalb der Auflageeinrichtung befindliche Fördereinrichtung überführt, indem die Auflageeinrichtung unter dem Stapel abgezogen wird. Die Auflageeinrichtung kann dazu derart ausgelegt sein, dass sie unterhalb des Stapels ohne Erzeugung einer wesentlichen Relativbewegung zwischen der Auflageeinrichtung und der unteren auf der Auflageeinrichtung aufliegenden Materialbahn abgezogen wird. Anschließend wird die Auflageeinrichtung wieder in eine Grundstellung zurückgeführt, um einen neuen Materialbahn-Stapel, entkoppelt von der Fördereinrichtung, aufzubauen. Sobald der Materialbahn-Stapel von der Auflageeinrichtung auf die sich darunter befindlichen Fördereinrichtung abgelegt ist, kann auf der Auflageeinrichtung ein neuer Materialbahn-Stapel erstellt werden, ohne dass der Materialbahn-Stapel, der darunter auf der Fördereinrichtung aufliegt, von der ersten Station in die zweite Station befördert wurde.The stack is transferred to the conveyor device located below the support device, in that the support device is pulled off from under the stack. For this purpose, the support device can be designed in such a way that it is pulled off from underneath the stack without generating any significant relative movement between the support device and the lower web of material resting on the support device. The support device is then returned to a basic position in order to build up a new stack of material webs, decoupled from the conveyor device. As soon as the material web stack has been deposited from the support device onto the conveyor device located underneath, a new material web stack can be created on the support device without the material web stack lying on the conveyor device underneath moving from the first station to the second station was promoted.

Wie bereits vorstehend erwähnt, zeichnet sich das erfindungsgemäße Verfahren auch dadurch aus, dass zumindest während der Zeit, zu der aus dem zuvor gebildeten Stapel in der Bearbeitungsstation Gegenstände ausgeschnitten werden, teilweise ein neuer Stapel auf der Auflageeinrichtung gebildet werden kann, obwohl die Fördereinrichtung, die den vorherigen Materialbahn-Stapel in die Bearbeitungsstation überführt, weiterhin bewegt werden kann, um den Materialbahn-Stapel in der Bearbeitungsstation relativ zu einer Schneideinrichtung, beispielsweise einem Laserstrahl, zu bewegen und den bearbeiteten Teil des Materialbahn-Stapels aus der Bearbeitungsstation zur Entnahme der ausgeschnittenen oder vereinzelten Teile herauszuführen.As already mentioned above, the method according to the invention is also characterized in that, at least during the time at which objects are being cut out of the previously formed stack in the processing station, a new stack can be formed on the support device, although the conveyor device that transfers the previous material web stack into the processing station, can be moved further in order to move the material web stack in the processing station relative to a cutting device, for example a laser beam, and to remove the processed part of the material web stack from the processing station for removal of the cut or lead out isolated parts.

Ein wesentlicher Aspekt der Erfindung ist darin zu sehen, dass als Auflageeinrichtung, um darauf einen Materialbahn-Stapel aufzubauen, ein Auflageband eingesetzt wird. Ein solches Auflageband kann aus mehreren, schmalen, nebeneinander verlaufenden Bändern zusammengesetzt werden, die vorzugsweise um gemeinsame Rollen umgelenkt werden.An essential aspect of the invention can be seen in the fact that a support belt is used as the support device in order to build up a stack of material webs thereon. Such a support belt can be composed of several narrow belts running side by side, which are preferably deflected around common rollers.

Auch ist vorgesehen, dass mindestens zwei Fördereinrichtungen eingesetzt werden, wobei die eine Fördereinrichtung dem Bereich unterhalb der Auflageeinrichtung zugeordnet wird während die andere Fördereinrichtung dem Bereich der Bearbeitungsstation zugeordnet wird. Diese mindestens zwei Fördereinrichtungen sollten so zueinander positioniert werden, dass sie eine gemeinsame Auflage- und Transportebene für den Materialbahn-Stapel bilden.It is also provided that at least two conveyor devices are used, one conveyor device being assigned to the area below the support device while the other conveyor device is assigned to the area of the processing station. These at least two conveying devices should be positioned relative to one another in such a way that they form a common support and transport plane for the stack of material webs.

Falls drei Fördereinrichtungen eingesetzt werden, wird die dritte Fördereinrichtung der Ausgabezone zugeordnet, die aber dennoch sehr kurz gehalten werden kann, während die anderen beiden Fördereinrichtungen dem Bereich der Auflageeinrichtung und dem Bereich der Bearbeitungseinrichtung zugeordnet sind. Als Fördereinrichtung wird zweckmäßigerweise ein Förderband eingesetzt, wobei im Schneidbereich ein Schneidrost vorgesehen wird. Auch könnte das Förderband der Fördereinrichtung aus mehreren schmalen, nebeneinander verlaufenden Bändern aufgebaut werden, ebenso wie für das Förderband oder solche schmalen Bänder ein Drahtgeflecht verwendet werden kann.If three conveyors are used, the third conveyor is assigned to the output zone, which can nevertheless be kept very short, while the other two conveyors are assigned to the area of the support device and the area of the processing device. A conveyor belt is expediently used as the conveying device, with a cutting grid being provided in the cutting area. The conveyor belt of the conveyor device could also be constructed from a number of narrow belts running alongside one another, just as a wire mesh can be used for the conveyor belt or such narrow belts.

Die erfindungsgemäße Vorrichtung zum Ausschneiden von Gegenständen aus bahnenförmigem Material umfasst eine erste Station, in der auf einem Auflageband oder einer anderen Auflageeinrichtung mehrere Materialbahnen übereinander, im Wesentlichen deckungsgleich, zu einem Stapel gestapelt werden. Hierzu kann eine Legevorrichtung verwendet werden. Weiterhin ist eine Fördereinrichtung vorhanden, um den Stapel in eine sich an die erste Station anschließende Bearbeitungsstation zu überführen, wie dies bereits vorstehend erläutert ist. Auf der der ersten Station gegenüberliegenden Seite der Bearbeitungsstation befindet sich eine Ausgabezone zur Ausgabe der ausgeschnittenen und/oder vereinzelten Gegenstände bzw. Teile des Materialbahn-Stapels. Die mindestens eine Fördereinrichtung erstreckt sich von der ersten Station zumindest bis zum Ende der Bearbeitungsstation. Die erste Station weist die Auflageeinrichtung, vorzugsweise ein Auflageband, auf, auf dem, in einer Grundstellung der Auflageeinrichtung, die Materialbahn aufgelegt oder die Materialbahnen zu einem Stapel gestapelt werden. Wesentlich ist, dass sich die Auflageeinrichtung oberhalb der Fördereinrichtung befindet, so dass sie von dem Förderband und dessen Antriebs- oder Förderbewegung entkoppelt ist.The device according to the invention for cutting out objects from web-like material comprises a first station in which several webs of material are stacked one on top of the other, essentially congruently, to form a stack on a support belt or another support device. A laying device can be used for this purpose. Furthermore, a conveyor device is present in order to transfer the stack to a processing station following the first station, as has already been explained above. On the side of the processing station opposite the first station there is an output zone for outputting the cut out and/or separated objects or parts of the material web stack. The at least one conveyor device extends from the first station at least to the end of the processing station. The first station has the support device, preferably a support belt, on which, in a basic position of the support device, the material web is placed or the material webs are stacked to form a stack. It is essential that the support device located above the conveyor so that it is decoupled from the conveyor belt and its drive or conveyor movement.

In einer Ausführungsform wird die Auflageeinrichtung durch ein Auflageband gebildet, das über mindestens zwei Rollen oder Walzen umlaufend geführt ist. Indem dieses Auflageband angetrieben wird, wird der Materialbahn-Stapel auf das sich im Niveau darunter liegende Förderband überführt.In one embodiment, the support device is formed by a support belt that is guided around at least two rollers or cylinders. As this support belt is driven, the material web stack is transferred to the conveyor belt at the level below.

Bevorzugt ist allerdings eine Auflageeinrichtung oder ein hierfür vorgesehenes Auflageband, das so gelagert und geführt ist, dass es unterhalb des Materialbahn-Stapels abziehbar ist, so dass der Materialbahn-Stapel auf das Förderband abgelegt wird. Hierbei verändert der Materialbahn-Stapel, in Projektion auf das sich unterhalb des Auflagebands befindlichen Förderbands gesehen, nicht seine Position.However, preference is given to a support device or a support belt provided for this purpose, which is mounted and guided in such a way that it can be pulled off below the stack of web material, so that the stack of web material is placed on the conveyor belt. In this case, the stack of material webs does not change its position, as seen in a projection onto the conveyor belt located below the support belt.

Bevorzugt wird als Auflageeinrichtung ein Auflageband eingesetzt, das zweckmäßigerweise unterhalb des Stapels abziehbar ist, indem es an seinem einen Ende unter sich selbst zu seinem anderen Ende hin in eine Stapel-Ablage-position zurückgeführt wird. Der die Auflage bildende Teil des Auflagebands, als Obertrum bezeichnet, ist an seinem freien Ende ortsfest gehalten, während der zurückgeführte Teil des Auflagebands, als Untertrum bezeichnet, an seinem freien Ende abgezogen wird, indem sich, parallel zu dem Obertrum geführt, zu dem ortsfesten Ende hin verschiebt. Hierzu wird in vorteilhafter Weise die mindestens eine Rolle an ihren beiden Enden gelagert derart, dass sie parallel zu der Bandebene verschiebbar ist. Die obere Seite des Obertrums bildet die Auflagefläche für die Materialbahn(en) bzw. den Materialbahn-Stapel. Um die Materialbahn(en) bzw. den Materialbahn-Stapel auf die Fördereinrichtung abzulegen, wird der über die Rolle umgelenkte Teil des Auflagebands abgezogen, so dass sich die Rolle unterhalb der Materialbahn verschiebt und dadurch den oberen Teil des Auflagebands, das Obertrum, auf dem der Materialbahn-Stapel aufliegt, folglich die Auflagefläche, schrittweise abzieht, indem das Obertrum in das Untertrum überführt wird. Dadurch fällt die Materialbahn bzw. der Materialbahn-Stapel auf die sich darunter befindliche Fördereinrichtung, die dann den Materialbahn-Stapel in die Bearbeitungseinrichtung transportiert. Besonders vorteilhaft ist hierbei, dass keine Reibung zwischen Materialbahn-Stapel und Auflageband, das unterhalb des Materialbahn-Stapels abgezogen wird, auftritt. Anschließend wird die Rolle, die auch als Umlenkrolle bezeichnet werden kann, wieder in die Grundstellung überführt, so dass erneut die Auflagefläche zum Aufbau eines weiteren Materialbahn-Stapels, oder auch nur zum Auflegen eines einzelnen Materialbahnabschnitts, bereit steht.Preferably, a support band is used as the support device, which can expediently be pulled off underneath the stack by being guided back at one end under itself to its other end into a stack-deposit position. The part of the support belt that forms the support, referred to as the upper run, is held stationary at its free end, while the returned part of the support belt, referred to as the lower run, is pulled off at its free end by being guided parallel to the upper run to the stationary shifted towards the end. For this purpose, the at least one roller is advantageously mounted at both ends in such a way that it can be displaced parallel to the belt plane. The upper side of the upper run forms the support surface for the material web(s) or the material web stack. In order to place the material web(s) or the material web stack on the conveyor, the part of the support belt that is deflected over the roller is pulled off so that the roller moves underneath the material web and thus the upper part of the support belt, the upper run, on the the material web stack rests, consequently the contact surface, gradually pulls off by the upper run being transferred to the lower run. As a result, the material web or the material web stack falls onto the conveyor device located underneath, which then transports the material web stack into the processing device. It is particularly advantageous here that there is no friction between the stack of material webs and the support belt, which is drawn off underneath the stack of material webs. The roller, which can also be referred to as a deflection roller, is then returned to the basic position so that the support surface is ready again for building up another stack of material webs, or just for placing a single material web section.

Soweit die Begriffe einer Materialbahn, eines Materialbahnabschnitts oder eines Materialbahn-Stapels verwendet werden, so sind diese Begriffe gegeneinander, dort, wo es möglich ist, austauschbar. Allerdings sind das erfindungsgemäße Verfahren und die erfindungsgemäße Vorrichtung bevorzugt für die Bearbeitung eines Materialbahn-Stapels, der aus übereinander gestapelt Materialbahnabschnitten besteht, einsetzbar, obwohl auch jeweils ein einzelner Materialbahnabschnitt bearbeitet werden kann.As far as the terms of a material web, a material web section or a material web stack are used, these terms are interchangeable where possible. However, the method according to the invention and the device according to the invention can preferably be used for processing a material web stack consisting of material web sections stacked on top of one another, although an individual material web section can also be processed in each case.

Soweit der Begriff der Fördereinrichtung verwendet ist, so kann es sich hierbei um ein Auflageband, eine Transportkette oder ein anderes Gliederband handeln, mit dem der Materialbahn-Stapel von einer Station zu der nächsten Station transportiert werden kann. Auch kann die Transportrichtung zumindest von derjenigen Fördereinrichtung zeitweise umgekehrt werden, die der Bearbeitungsstation zugeordnet ist, um den Arbeitsbereich der Bearbeitungseinrichtung, beispielsweise eines Lasers, in der Bearbeitungsstation zu erweitern und die Bearbeitungszeit zu verkürzen.As far as the term conveyor device is used, it can be a support belt, a transport chain or another link belt with which the stack of material webs can be transported from one station to the next station. The direction of transport can also be temporarily reversed, at least by that conveyor device which is assigned to the processing station, in order to expand the working area of the processing device, for example a laser, in the processing station and to shorten the processing time.

Weitere Einzelheiten und Merkmale der Erfindung ergeben sich aus der nachfolgenden Beschreibung von Ausführungsbeispielen anhand der Zeichnung. In der Zeichnung zeigt:

Figur 1A
eine Vorrichtung gemäß einer ersten Ausführungsform der Erfindung, wobei die zusätzlichen Figuren 1B und 1C deren Arbeitsablauf darstellen, und
Figur 2A
eine Vorrichtung gemäß einer zweiten Ausführungsform der Erfindung, wobei die zusätzlichen Figuren 2B bis 2D deren Arbeitsablauf darstellen.
Further details and features of the invention result from the following description of exemplary embodiments with reference to the drawing. In the drawing shows:
Figure 1A
a device according to a first embodiment of the invention, wherein the additional Figures 1B and 1C show their workflow, and
Figure 2A
a device according to a second embodiment of the invention, wherein the additional Figures 2B to 2D show their workflow.

In den Figuren 1A bis 1C und 2A bis 2D ist jeweils eine Vorrichtung zum Ausschneiden von Gegenständen aus bahnenförmigem Material oder zum Unterteilen von bahnenförmigem Material dargestellt.In the Figures 1A to 1C and 2A to 2D a device for cutting out objects from web-shaped material or for subdividing web-shaped material is shown in each case.

Es ist ausdrücklich darauf hinzuweisen, dass in der nachfolgenden Beschreibung der verschiedenen Ausführungsbeispiele, wie sie in den Figuren 1 und 2 dargestellt sind, nicht alle Bauteile erneut zu einer Ausführungsform oder einer Figur einer Ausführungsform beschrieben werden, wenn sie anhand einer anderen Ausführungsform oder einer anderen Figur bereits beschrieben oder erläutert wurden. Entsprechend kann die Beschreibung der verschiedenen Bauteile zu einer Ausführungsform oder einer Figur einer solchen Ausführungsform auf die jeweiligen Bauteile einer anderen Ausführungsform oder einer anderen Figur der entsprechenden Ausführungsform übertragen werden, ohne dass dies ausdrücklich erwähnt ist.It is expressly pointed out that in the following description of the various exemplary embodiments, as in figures 1 and 2 are shown, not all components again to an embodiment or a figure be described in one embodiment if they have already been described or explained using another embodiment or another figure. Correspondingly, the description of the various components for one embodiment or a figure of such an embodiment can be transferred to the respective components of another embodiment or another figure of the corresponding embodiment without this being expressly mentioned.

Die Vorrichtung, wie sie in den Figuren 1A bis 1C dargestellt ist, ist in drei Stationen, eine erste Station 1, eine zweite Station 2 und eine dritte Station 3, unterteilt. Die erste Station 1 dient dazu, mehrere Materialbahnen 4 auf einer Auflageeinrichtung 5 übereinander und im Wesentlichen deckungsgleich zu einem Stapel 6 zu stapeln. Diese Materialbahnen 4 werden entweder als solche zugeführt oder sie werden von einem Materialballen oder Material-Coil 7 über eine schematisch dargestellte Legevorrichtung 25 abgezogen und durch eine Schneidvorrichtung 8 abgelängt. Die Auflageeinrichtung 5 ist Teil eines Auflagebands 9 mit einem Obertrum 10 und einem Untertrum 11, wobei die Oberseite des Obertrums 10 die Auflageeinrichtung 5 bildet. Das eine Ende 12 des Auflagebands 9, das dem Obertrum 10 zugeordnet ist, ist ortsfest gehalten. Das andere Ende 13 des Obertrums 10 ist um eine Umlenkeinrichtung, beispielsweise eine Umlenkrolle 14, zu dem Untertrum 11 führend umgelenkt. Das der Umlenkrolle 14 gegenüberliegende Ende 15 des Untertrums 11 ist mit einer Aufrolleinrichtung 16 verbunden.The device as in the Figures 1A to 1C is shown is divided into three stations, a first station 1, a second station 2 and a third station 3. The first station 1 is used to stack a plurality of material webs 4 on a support device 5 one above the other and essentially congruently to form a stack 6 . These material webs 4 are either supplied as such or they are drawn off from a material bale or material coil 7 via a laying device 25 shown schematically and cut to length by a cutting device 8 . The support device 5 is part of a support belt 9 with an upper run 10 and a lower run 11, the upper side of the upper run 10 forming the support device 5. One end 12 of the support belt 9, which is assigned to the upper strand 10, is held in place. The other end 13 of the upper run 10 is deflected around a deflection device, for example a deflection roller 14, leading to the lower run 11. The end 15 of the lower run 11 opposite the deflection roller 14 is connected to a winding device 16 .

Unterhalb der Auflageeinrichtung 5 und damit unterhalb des Auflagebands 9 befindet sich ein Förderband 17, das sich von der ersten Station 1, der Stapelstation, über die zweite Station 2, die Bearbeitungsstation, bis zu der dritten Station 3, der Ausgabestation, erstreckt. Dieses Förderband 17 ist an seinen beiden Enden umlaufend um Rollen 18 endlos geführt.Below the support device 5 and thus below the support belt 9 is a conveyor belt 17 which extends from the first station 1, the stacking station, through the second station 2, the processing station, to the third station 3, the output station. This conveyor belt 17 is guided endlessly at both ends so as to revolve around rollers 18 .

Während in der Ausführungsform, wie sie in den Figuren 1A bis 1C dargestellt ist, nur ein einzelnes Förderband 17 verwendet ist, das durch die drei Stationen 1, 2 und 3 führt, ist in der Ausführungsform, wie sie in den Figuren 2A bis 2D dargestellt ist, das Förderband 17 in zwei Teilförderbänder 19 und 20 unterteilt; das eine Teilförderband 19 befindet sich in dem Bereich der ersten Station 1, während sich das zweite Teilförderband 20 unmittelbar an das erste Teilförderband 19 anschließt und durch die zweite Station 2, die Bearbeitungsstation, bis zu der dritten Station 3, der Ausgabestation, erstreckt.While in the embodiment as shown in FIGS Figures 1A to 1C 1, only a single conveyor belt 17 is used, passing through the three stations 1, 2 and 3, in the embodiment shown in FIGS Figures 2A to 2D shown, the conveyor belt 17 is divided into two sub-conveyor belts 19 and 20; One conveyor belt section 19 is located in the area of the first station 1, while the second conveyor belt section 20 is directly adjacent to the first conveyor belt section 19 and extends through the second station 2, the processing station, to the third station 3, the output station.

Anhand der Figuren wird deutlich, dass die Auflageeinrichtung 5, die in den dargestellten Ausführungsformen durch den oberen Teil, das Obertrum 10, des Auflagebands 9 bereit gestellt wird, in ihrer Bewegung unabhängig von einer Bewegung des Förderbands 17 oder der Teilförderbänder 19 und 20 ist. Folglich kann der Stapel 6 aus den Materialbahnen 4 unabhängig von der weiteren Arbeitsweise der Vorrichtung erzeugt werden.The figures make it clear that the movement of the support device 5, which in the illustrated embodiments is provided by the upper part, the upper run 10, of the support belt 9, is independent of a movement of the conveyor belt 17 or the partial conveyor belts 19 and 20. Consequently, the stack 6 can be produced from the material webs 4 independently of the further operation of the device.

Wenn ein Materialbahn-Stapel 6 für eine Bearbeitung über das Förderband 17 oder über die Teilförderbänder 19, 20 der Bearbeitungsstation 2 zugeführt werden soll, wird das Auflageband 9 unterhalb des auf dem Obertrum 10 zusammengestellten Stapels 6 abgezogen. Hierbei wird das Untertrum 11 des Auflagebands 9 auf der Aufrolleinrichtung 16 in Richtung des Pfeils 21 aufgewickelt, so dass sich die Umlenkrolle 14 in Richtung des Pfeils 22, in einer Führungseinrichtung 23 geführt, verschiebt. Hierbei wird das Obertrum 10, um die Umlenkrolle 14 umgelenkt, in das Untertrum 11 überführt, wodurch sich der Materialbahn-Stapel 6 auf das Obertrum des Förderbands 17 bzw. 19 kontinuierlich ablegt, wie dies in den Figuren 1B und 2B dargestellt ist, bis es vollständig auf dem Förderband 17 oder 19 aufliegt, wie dies die Figuren 1C und 2C zeigen.If a material web stack 6 is to be fed to the processing station 2 for processing via the conveyor belt 17 or via the partial conveyor belts 19, 20, the support belt 9 is pulled off underneath the stack 6 assembled on the upper run 10. Here, the lower strand 11 of the support belt 9 is wound up on the winding device 16 in the direction of the arrow 21, so that the deflection roller 14 in the direction of the arrow 22, guided in a guide device 23, is displaced. Here, the upper run 10 is deflected around the deflection roller 14, transferred to the lower run 11, whereby the web stack 6 is continuously deposited on the upper run of the conveyor belt 17 or 19, as in the Figures 1B and 2 B is shown until it rests completely on the conveyor belt 17 or 19, as the Figures 1C and 2C demonstrate.

Anschließend wird das Auflageband 9 wieder von der Aufrolleinrichtung 16 entgegen des Pfeils 21 abgewickelt, wodurch sich die Umlenkrolle 14 entgegen des Pfeils 22 in der Führungseinrichtung 23 in die Ausgangsstellung, die in den Figuren 1A und 2A dargestellt ist, verschiebt, so dass die Auflageeinrichtung 5 zur Aufnahme eines neuen Stapels 6 bereit gestellt ist, wie dies in der Folge der Figuren dargestellt ist. In den Figuren 1C, 2A und 2D sind der Material-Coil 7 und die Schneidvorrichtung 8 für eine übersichtlichere Darstellung weggelassen.Subsequently, the support belt 9 is again unwound from the winding device 16 against the arrow 21, whereby the deflection roller 14 against the arrow 22 in the guide device 23 in the starting position in the Figures 1A and 2A is shown shifts, so that the support device 5 is provided for receiving a new stack 6, as shown in the sequence of figures. In the Figures 1C , 2A and 2D the material coil 7 and the cutting device 8 are omitted for clarity.

Die Verschiebebewegung der Umlenkrolle 14 in der Führungseinrichtung 23 kann mit der Drehbewegung der Aufrolleinrichtung 16 gekoppelt sein. Auch können nicht näher dargestellte Federn mit der Umlenkrolle 14 gekoppelt sein, die sich beispielsweise in der einen Verschieberichtung der Umlenkrolle 14 in der Führungseinrichtung 23 spannen und die die Umlenkrolle 14 mit dem Abwickeln des Auflagebands 9 von der Aufrolleinrichtung 16 in die Ausgangsstellung der Figuren 1A, 2A und 2D zurückziehen.The displacement movement of the deflection roller 14 in the guide device 23 can be coupled with the rotary movement of the winding device 16 . Springs, not shown in detail, can also be coupled to the deflection roller 14, which tension, for example, in one direction of displacement of the deflection roller 14 in the guide device 23 and which, when the support belt 9 is unwound from the winding device 16, moves the deflection roller 14 into the starting position of the Figures 1A , 2A and 2D withdraw.

Anhand der Figuren ist zu erkennen, dass in der Bearbeitungsstation 2 der sich auf dem Förderband 17 bzw. dem Teilförderband 20 befindliche Material-Stapel 6 bearbeitet wird, indem eine Bearbeitungseinrichtung 24, beispielsweise ein Laser, hin- und herbewegt wird, wie dies durch einen Doppelpfeil angedeutet ist. Gleichzeitig kann aber auch das Förderband 17 oder das Teilförderband 20 in beiden Richtungen bewegt werden. Jedoch werden sowohl das Förderband 17 als auch das Teilförderband 20 in einer Vorzugsrichtung, der Transportrichtung, zu der dritten Station, der Ausgabestation 3, hin befördert.The figures show that the material stack 6 located on the conveyor belt 17 or the partial conveyor belt 20 is processed in the processing station 2 is by a processing device 24, such as a laser, is moved back and forth, as indicated by a double arrow. At the same time, however, the conveyor belt 17 or the partial conveyor belt 20 can also be moved in both directions. However, both the conveyor belt 17 and the partial conveyor belt 20 are conveyed in a preferred direction, the transport direction, to the third station, the output station 3 .

Sobald ein bearbeiteter Materialbahn-Stapel 6 von der Bearbeitungsstation 2 in die Ausgabestation 3 gelangt, können dort Teile aus dem Materialbahn-Stapel herausgenommen oder vereinzelte Teile entfernt werden. Dadurch kann die Ausgabestation 3 sehr kurz (in Richtung des Förderbands gesehen) gehalten werden.As soon as a processed material web stack 6 reaches the output station 3 from the processing station 2, parts can be removed from the material web stack or individual parts can be removed there. As a result, the output station 3 can be kept very short (seen in the direction of the conveyor belt).

Sobald die Bearbeitungseinrichtung 24 in der Bearbeitungsstation 2 einen Materialbahn-Stapel 6 bearbeitet hat, wird der nächste, auf dem Förderband aufliegende Materialbahn-Stapel 6 in die Bearbeitungsstation 2 überführt, so dass die Bearbeitung dieses nächsten Materialbahn-Stapels 6 erfolgen kann.As soon as the processing device 24 has processed a material web stack 6 in the processing station 2, the next material web stack 6 lying on the conveyor belt is transferred to the processing station 2 so that the processing of this next material web stack 6 can take place.

Es ist erkennbar, dass insbesondere die bisherige Bearbeitungszeit mit der erfindungsgemäßen Vorrichtung verkürzt werden kann, da in der ersten Station ein Materialbahn-Stapel 6 gebildet werden kann, während sich noch ein zuvor gebildeter Materialbahn-Stapel 6 unterhalb des Auflagebands 9 und damit unterhalb der durch das Auflageband 9 bereit gestellten Auflageeinrichtung 5 befindet, wie dies die Figuren 1C und 2C, 2D zeigen. In diesem Zustand wird auf der Auflageeinrichtung 5 in deren Grundstellung ein neuer Materialbahn-Stapel 6 zusammengestellt. Außerdem kann die Ausgabestation 3 kurz gehalten werden, da die bearbeiteten Teile des Materialbahn-Stapels 6 Stück für Stück von dem Förderband 17, 19 entnommen werden können, während ein anderer Teil des Materialbahn-Stapels 6 noch bearbeitet wird. Bei bekannten Vorrichtungen, die einen Materialbahn-Stapel 6 auf einen Transportrost oder Transporttisch auflegen und diesen in die Bearbeitungsstation umsetzen und nach vollständiger Bearbeitung des Materialbahn-Stapels 6 in die Ausgabestation 3 verschieben, ist eine Länge der dritten Station, der Ausgabestation 3, erforderlich, die der Länge eines solchen Transportrosts oder Transporttischs entspricht. Auch wird mit dem erfindungsgemäßen Verfahren die Bearbeitungszeit wesentlich verkürzt, da auf der Auflageeinrichtung 5 ein neuer Materialbahn-Stapel 6 zusammengestellt werden kann, obwohl sich der zuvor erstellte Materialbahn-Stapel 6 noch auf dem Förderband 17 oder 19 befindet und noch nicht in die Bearbeitungsstation 2 überführt ist.It can be seen that in particular the previous processing time can be shortened with the device according to the invention, since a material web stack 6 can be formed in the first station, while a previously formed material web stack 6 is still below the support belt 9 and thus below the through the support belt 9 is provided support device 5, as is the Figures 1C and 2C, 2D demonstrate. In this state, a new material web stack 6 is assembled on the support device 5 in its basic position. In addition, the output station 3 can be kept short, since the processed parts of the material web stack 6 can be removed piece by piece from the conveyor belt 17, 19 while another part of the material web stack 6 is still being processed. In known devices that place a stack of web material 6 on a transport grid or transport table and transfer it to the processing station and move it to the output station 3 after the stack of web material 6 has been processed completely, the third station, the output station 3, is required to have a length which corresponds to the length of such a transport grid or transport table. The processing time is also significantly reduced with the method according to the invention, since a new material web stack 6 can be assembled on the support device 5, although the previously created one Material web stack 6 is still on the conveyor belt 17 or 19 and has not yet been transferred to the processing station 2.

Es wird ausdrücklich darauf hingewiesen, dass anstelle eines Materialbahn-Stapels 6, der auf dem Auflageband 9 gestapelt wird, auch ein einzelner Materialbahn-Abschnitt auf das Auflageband aufgelegt werden kann, um es dann auf das darunter liegende Förderband und anschließend in die Bearbeitungsstation zu transportieren. Bevorzugt werden jedoch Materialbahn-Stapel 6 auf der Auflageeinrichtung 5 bzw. dem Auflageband 9 zusammengestellt, um diesen Materialbahn-Stapel 6 dann durch die Bearbeitungsstation zu führen.It is expressly pointed out that instead of a material web stack 6, which is stacked on the support belt 9, a single material web section can also be placed on the support belt in order to then transport it to the conveyor belt below and then to the processing station . However, material web stacks 6 are preferably assembled on the support device 5 or the support belt 9 in order to then guide this material web stack 6 through the processing station.

Claims (8)

  1. Method for cutting out articles from web-shaped material or for subdividing web-shaped material, in which in a first step a plurality of material webs (4) are stacked one on top of the other, substantially congruently, to form a stack (6), then in a second step the stack (6) is transferred to a processing station (2), where the articles are cut out of the stack (6) in accordance with a cutting pattern, and in a third step the cut-out articles are removed, wherein in the first step the material webs (4) are stacked on a support device (5) in their basic position, then the stack (6) is transferred to a conveyor device (17; 19) located below the support device (5), in that the stack (6) is deposited on the conveyor device (17; 19) located below it, then the stack (6) is transferred by means of the conveyor device (17; 19, 20) into the processing station (2), the articles are cut out and conveyed out of the processing station (2) by means of the conveying device (17, 20), characterized in that, after the stack (6) has been deposited on the conveying device (17, 19) lying below, the supporting device (5) is returned to its basic position, ready to receive a new stack (6) of the material webs (4).
  2. Method according to claim 1, characterised in that the stack (6) is transferred to the conveyor (17, 19) located below the support device (5) by withdrawing the support device (5) from under the stack (6).
  3. Method according to claim 2, characterised in that the support device (5) is withdrawn below the stack (6) without producing any significant relative movement between the support device (5) and the lower web of material (4) resting on the support device (5).
  4. Method according to one of the claims 1 to 3, characterized in that a new stack (6) is formed on the support device (5) immediately after the previously formed stack (6) has been discharged by the conveyor device (17, 19).
  5. Method according to one of the claims 1 to 4, characterized in that a support belt (9) is used as support device (5).
  6. Method according to one of the claims 1 to 5, characterised in that at least two conveying devices (19, 20) are used, whereby the one conveying device (19) is assigned to the area of the support device (5) while the other conveying device (20) is assigned to the area of the processing station (2).
  7. Apparatus for cutting out articles from web-shaped material (4) or for dividing web-shaped material (4), having a first station (1) which has a support (5) and a laying device (25) stacking a plurality of material webs (4) on the support (5) one above the other and substantially congruently to form a stack (6), having a processing station (2) and a processing device (24) which is associated with the processing station (2) and is cutting out articles out of the stack (6), having a discharge station (3) located on the side of the processing station (2) opposite the first station (1) for discharging the cut-out articles, and having at least one conveyor device (17; 19, 20) for transporting the stack (6) through the stations (1, 2, 3), wherein the at least one conveyor (17; 19, 20) is located below the support (5) and the at least one conveyor (17; 19, 20) extends from the first station (1) at least as far as that end of the processing station (2) which is assigned to the output station (3), wherein the support being formed by a support belt (9) on which the material webs (4) are stacked in a basic position, and wherein the support device (5) having means which deposit the stack (6) onto the conveying device (17; 19), characterised in that the support belt (9) is guided around a deflection pulley and deflection roller (14) and back under itself, whereby the part of the support belt (9) forming the support (5), referred to as the upper run (10), is held stationary at its free end (10) while the returned part of the support belt (9), referred to as the lower run (11), is detracted at its free end, whereby the deflection pulley or the deflection roller (14) is guided parallel to the upper run (10) and is guided towards the stationary end (10).
  8. Device according to claim 7, characterised in that the deflection pulley and the deflection roller (14) can be returned to the basic position by means of devices.
EP17000867.6A 2016-05-23 2017-05-22 Method and device for cutting out of objects from a sheet-like material or for the subdivision of a sheet-like material Active EP3248917B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102016006165.0A DE102016006165A1 (en) 2016-05-23 2016-05-23 Method and device for cutting objects from sheet material or for dividing sheet material

Publications (2)

Publication Number Publication Date
EP3248917A1 EP3248917A1 (en) 2017-11-29
EP3248917B1 true EP3248917B1 (en) 2022-04-13

Family

ID=58692261

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17000867.6A Active EP3248917B1 (en) 2016-05-23 2017-05-22 Method and device for cutting out of objects from a sheet-like material or for the subdivision of a sheet-like material

Country Status (2)

Country Link
EP (1) EP3248917B1 (en)
DE (1) DE102016006165A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202021002529U1 (en) 2021-07-29 2021-09-28 Vulkan Technic Gmbh Device for cutting cut figures, in particular adhesive pads made of tape-shaped material, by means of a cutting device and a variable gripper system for receiving the cut-out adhesive pads

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1036732A (en) * 1963-04-24 1966-07-20 Samco Strong Ltd Improvements in or relating to cutting cloth or other material in sheet form
US4034636A (en) * 1975-07-16 1977-07-12 Gerber Garment Technology, Inc. Method and apparatus for placing a multi-ply layup of sheet material on a work table
CH660352A5 (en) * 1983-04-26 1987-04-15 Fischer Ag Brugg Georg STORAGE DEVICE FOR PLATE-SHAPED WORKPIECES.
ATE527194T1 (en) * 2004-05-05 2011-10-15 Hunkeler Ag STACKING DEVICE

Also Published As

Publication number Publication date
EP3248917A1 (en) 2017-11-29
DE102016006165A1 (en) 2017-11-23

Similar Documents

Publication Publication Date Title
DE3500766C2 (en) Device for the production of individual stacks consisting of a material web folded in a zigzag shape
DE3042519A1 (en) DEVICE FOR STACKING PRODUCTS
DE602004005430T2 (en) A UNWINDING DEVICE FOR ROLLERS OF RAILING MATERIAL WITH TEMPORARY STORAGE FOR THE UNWINNED MATERIAL IN THE STAGE OF THE ROLLING CHANGE AND METHOD THEREOF
DE3006229C2 (en) System for sorting and filing stacks of sheets
CH654554A5 (en) METHOD AND DEVICE FOR REMOVING FLAT PRODUCTS, preferably PRINTED PRODUCTS, WINDED ON A WINDING CORE.
DE3238536A1 (en) Corrugated cardboard machine
DE3020009A1 (en) DEVICE FOR PRODUCING BAGS FROM A PLASTIC TUBE TUBE
DE2017325C3 (en) Apparatus for making a non-woven open-meshed net
DE2731023B2 (en) Method and device for cutting sheets to size and stacking them in an orderly manner
EP3248917B1 (en) Method and device for cutting out of objects from a sheet-like material or for the subdivision of a sheet-like material
DE102007032099A1 (en) Method and device for the continuous packaging of web rolls
EP0041685A1 (en) Process and apparatus for joining metal or synthetic spiral elements into a belt
EP3757046B1 (en) Device and method for joining two sheets of material each running from a reel
DE602004004205T3 (en) Automatic system for sorting and palletizing articles
DE2506682C2 (en) Device for cutting transformer core sheets
AT405821B (en) SORTING AND STACKING DEVICE
EP2694415B1 (en) Method and device for switching winding shafts
EP1652639B1 (en) Method for changing the format in a corrugated board manufacturing plant
EP3369663B1 (en) Collar forming device for elongated workpieces and method for bundling elongated workpieces
EP1124656A1 (en) Method and plant for continuously producing construction elements
DE2815829C3 (en) Device for creating a gap in a stream of workpieces lying on top of each other
DE508474C (en) Automatic press for successively producing parallel rows of cuts or holes in uncut material panels
DE4208547A1 (en) Stacking system for corrugated card panels - has two stacking positions operated in sequence for uninterrupted work-flow
DD149351A5 (en) METHOD AND DEVICE FOR MANIPULATING PRINTED PRODUCTS
EP2660176B1 (en) Device for feeding cuboid stacks of single sheets to a processing unit

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180420

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200330

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

RIC1 Information provided on ipc code assigned before grant

Ipc: B65H 29/36 20060101ALI20210809BHEP

Ipc: B65H 31/30 20060101ALI20210809BHEP

Ipc: B26D 7/06 20060101ALI20210809BHEP

Ipc: A41H 43/02 20060101ALI20210809BHEP

Ipc: B65H 5/00 20060101AFI20210809BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20211111

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502017012940

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1483272

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220515

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220816

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220713

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220714

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220713

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220813

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502017012940

Country of ref document: DE

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220522

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20230116

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220713

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220713

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 1483272

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220522

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20230519

Year of fee payment: 7

Ref country code: FR

Payment date: 20230526

Year of fee payment: 7

Ref country code: DE

Payment date: 20230519

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20170522

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 502017012940

Country of ref document: DE

Representative=s name: TER MEER STEINMEISTER & PARTNER PATENTANWAELTE, DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413