EP3235706A1 - Method for initializing the fs mode for the movement of a train on a railway equipped with an ertms/etcs signaling system - Google Patents
Method for initializing the fs mode for the movement of a train on a railway equipped with an ertms/etcs signaling system Download PDFInfo
- Publication number
- EP3235706A1 EP3235706A1 EP16166239.0A EP16166239A EP3235706A1 EP 3235706 A1 EP3235706 A1 EP 3235706A1 EP 16166239 A EP16166239 A EP 16166239A EP 3235706 A1 EP3235706 A1 EP 3235706A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- train
- block
- value
- attribute
- signaling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L21/00—Station blocking between signal boxes in one yard
- B61L21/06—Vehicle-on-line indication; Monitoring locking and release of the route
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L19/00—Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
- B61L19/06—Interlocking devices having electrical operation
Definitions
- the present invention concerns a method for initializing the Full Supervision mode for the movement of a train on a railway equipped with a signaling system complying with the ERTMS/ETCS Level 2 or Level 3 standards, as defined by UNISIG.
- a signaling system 1 of a railway 2 comprises, on-board each train, such as train 4, an EVC (for "European Vital Computer"), and, on the ground, in a control center 10, a RBC (for "Radio Block Centre"), an interlocking system, called IXL, and a supervision system, called ICC (for "Integrated Control Centre”), and, along the tracks of the railway 2, various trackside equipment connected to object controllers 16.
- EVC European Vital Computer
- RBC for "Radio Block Centre”
- IXL interlocking system
- ICC for "Integrated Control Centre
- an example of trackside equipment is given by the axle counters 30 at each end of the blocks subdividing the railway 2.
- a set of axle counters allows the RBC to determine the occupancy status of the corresponding block, which can take the value "OCCUPIED" or "NOT OCCUPIED".
- the ends of a block, Ai or Bi in figure 1 are indicated by associated panels.
- Another example of trackside equipment is given by point machines PM1 to PM4 for locking the corresponding point systems either in a straight position or a diverted position.
- a backbone 20 links the objects controller 16 to the control center 10.
- a radio communication infrastructure for example of the GSM type, referenced by numeral 22 in figure 1 , allows a bidirectional communication between EVCs on board each trains and the RBC.
- the ICC is in charge of defining a route for a train in order this latter to complete its mission.
- the IXL is in charge of opening the route in front of the train, according to the route defined by the ICC.
- the IXL thus commands the pieces of trackside equipment to set them in the appropriate position or status.
- the RBC is in charge of supervising the movement of the train, by sending regularly movement authorities.
- a movement authority informs the train that it can move safely forward from its current point to an end point of the movement authority.
- the movement authority is determined from the occupancy status of the blocks making up the route opened in front of the train.
- the EVC onboard the train calculates speed curves and brake profiles in order to control the train movement.
- the train being completely supervised is said to be in Full Supervision mode, or FS mode.
- the ETCS level 2 defines a Staff responsible mode, SR mode, and an on-sight mode, OS mode, in which a train can enter onto a block whose occupancy status is "OCCUPIED".
- the driver In the SR mode, the driver has to drive the train under his own responsibility, at a low speed.
- the driver In the OS mode, the driver has to drive the train on-sight at a reduced speed and the EVC onboard the train controls a few parameters, for example that the train remains inside the occupied block.
- the driver is responsible for checking the track occupancy when moving the train, because the track may be occupied.
- This SR/OS mode is useful in case of anomalies, such as an axle counter not counting the right number of axles of a passing train so that the RBC considers the corresponding block as occupied, while it is in fact not occupied.
- This OS mode is also useful for train composition, when a locomotive has to enter a block already occupied with coaches to which this locomotive has to be coupled.
- the EVC registers itself to the RBC. But, before the RBC is capable of sending a first movement authority to the train in order for it to operate in the FS mode, the RBC has to ensure that there is no other train or other vehicle between the current position of the train and the end point of the current block.
- the current block being in the occupancy status "OCCUPIED", due to the presence of the train considered, another train could also be present inside this current block.
- the RBC cannot send a movement authority including the end of the current block, while it is capable to send a movement authority once the train has reached the end point of this current block, knowing that the next block is in the occupancy state "NOT OCCUPIED". Consequently, the driver has to move the train to the end of the current block in the SR or OS mode.
- TAF information for Track Ahead Free.
- the practical method is to move the train in SR or OS mode, from the current point to a point close enough to the end of the current block so that a TAF request mechanism or an ATAF mechanism be able to compute TAF information inside the RBC, as recommended in the Start of Mission in Level 2 Guideline (Informative Specification, reference ERA/ERTMS/040054).
- the invention therefore aims at overcoming this problem.
- the object of the invention is to provide a method as defined by the claims. With this method, it is possible to start automatically a train in the FS mode, as defined in ERTMS/ETCS Level 2 or Level 3, even if the train is not close to the end of the current block.
- the principle of the method consists in, as soon as the train of interest (called the first train in the following) disconnects from the RBC at the end of a mission, while being located inside a signaling block (called the current block in the following), monitoring continuously if another train or vehicle (called the second train in the following) enters or has the possibility to enter into said signaling block, until the first train connects again to the RBC for a new mission. Then, if the first train reports a current position compatible with the current block and if no second train has entered or has had the possibility to enter into the current block, the RBC is able to send immediately a movement authority to place the first train into the FS mode, this movement authority extending from the current position of the first train and covering the end portion of the current block.
- step 110 of the method 100 the first train 4, supervised according to the FS mode, enters block A6-A3, corresponding to a platform 40 of a station, and stops along the platform 40.
- step 120 to allow other trains to pass the platform 40, the first switch PM1 is set in the deviated position A1-A4, and the second switch PM2 is set in the direct position A5-A2. Thus, no other train can enter inside the block A6-A3, from A3.
- step 130 the first train 4 ends its mission.
- the EVC on board train 4 disconnects from the RBC, while reporting current position of train 4 inside block A6-A3, which is then considered as the current block for train 4.
- step 140 the RBC launches a monitoring function of the status of the current block associated to train 4.
- This function monitors if a second train has the possibility to enter into bloc A6-A3, from A3.
- This function is based on the periodic verification of at least one logical constraint about events affecting the railway in the vicinity of the current block A6-A3.
- the RCB receives, form the IXL, the positions of the first and second point machines PM1 and PM2 and the occupancy status of the blocks adjacent to the current block A6-A3, i.e. blocks A3-A5-A2 and A1-A6-A4.
- step 143 the RBC checks that logical constraints are still verified.
- block A3-A5-A2 becomes occupied while the position of the second point machine PM2 has been modified to its diverted position, A3-A2, it cannot be guaranteed anymore that the track ahead train 4 is free until A3, as a train may have entered bloc A6-A3 from A3.
- the TAF attribute for current block A6-A3 is set to the value "NOT FREE".
- TAF attribute has the value "NOT FREE"
- FREE the occupancy status of the current signaling block A6-A3 becomes "NOT OCCUPIED”, i.e. when the current train and possibly other trains have left the current block.
- Steps 142 and 143 are repeated at a high frequency, for example every second, until the EVC of the first train 4 connects again to the RBC.
- step 150 when the first train 4 performs its start of mission and connects to the RBC, it sends a position report indicating its current position to the RBC.
- step 160 the RBC verifies that the position report is valid, i.e. that the first train 4 having ended its mission in block A6-A3, is starting a new mission from this same block.
- step 170 the RBC read the current value of the TAF attribute for the current block A6-A3.
- step 180 the RBC sends directly a FS movement authority to the first train 4.
- This FS movement authority comprises at least the portion of block A6-A3 from the current position of the first train to the end point of the block A6-A3, and possibly the preferably next block.
- step 190 on receipt of this FS movement authority, the first train 4 starts its mission immediately in FS mode.
- the RBC If the current value of the TAF attribute is "NOT FREE", it is not possible for the RBC to guarantee that the first train is alone inside the current signaling block on which it is stopped. It is not possible for the RBC to send directly a FS motion authority to the first train 4. A backup procedure 200 using the known TAF request or ATAF mechanisms is then applied.
- More advanced logical constraints may be checked periodically by the RBC to update the value of a TAF attribute of the current block associated to a train having ended its mission.
- Such advanced constraints may be based on information from the trackside equipment and/or other information determined by high level systems, like the ICC: train occupation and localization based on switch position, block occupancy, other train position reports, train routes management, etc.
- the first train is recomposed after the end of its mission
- additional information can be gathered to allow the RBC to know if the first train is still the only train on the block.
- the information outputted by a train composition management function realized by the ICC can be taken into account to build an advanced constraint.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
- Identifying the signaling block (A6-A3) in which the train was located when an Embedded Vital Computer - EVC - on board the train disconnects from a Radio Bloc Center - RBC - of the signaling system;
- monitoring said block by checking periodically that at least one logical constraint that no other train enters in said block is verified, the logical constraint being elaborated from events on the railway in the vicinity of said block; and, when the result of the checking is negative, updating an attribute associated with said block, the attribute switching from the value "FREE" to the value "NOT FREE";
- when the EVC reconnects to the RBC, the RBC reads the attribute and if it has the value "FREE", sends a movement authority to the train to supervise its movement according to the FS mode, at least on said block.
Description
- The present invention concerns a method for initializing the Full Supervision mode for the movement of a train on a railway equipped with a signaling system complying with the ERTMS/ETCS
Level 2 or Level 3 standards, as defined by UNISIG. - According to the ETCS
Level 2 standard, and as illustrated infigure 1 , a signaling system 1 of arailway 2 comprises, on-board each train, such astrain 4, an EVC (for "European Vital Computer"), and, on the ground, in acontrol center 10, a RBC (for "Radio Block Centre"), an interlocking system, called IXL, and a supervision system, called ICC (for "Integrated Control Centre"), and, along the tracks of therailway 2, various trackside equipment connected toobject controllers 16. - In
figure 1 , an example of trackside equipment is given by theaxle counters 30 at each end of the blocks subdividing therailway 2. A set of axle counters allows the RBC to determine the occupancy status of the corresponding block, which can take the value "OCCUPIED" or "NOT OCCUPIED". It is to be noted that the ends of a block, Ai or Bi infigure 1 (with index i between 1 and 6) are indicated by associated panels. Another example of trackside equipment is given by point machines PM1 to PM4 for locking the corresponding point systems either in a straight position or a diverted position. - A
backbone 20 links theobjects controller 16 to thecontrol center 10. - A radio communication infrastructure, for example of the GSM type, referenced by numeral 22 in
figure 1 , allows a bidirectional communication between EVCs on board each trains and the RBC. - The ICC is in charge of defining a route for a train in order this latter to complete its mission.
- The IXL is in charge of opening the route in front of the train, according to the route defined by the ICC. The IXL thus commands the pieces of trackside equipment to set them in the appropriate position or status.
- The RBC is in charge of supervising the movement of the train, by sending regularly movement authorities. A movement authority informs the train that it can move safely forward from its current point to an end point of the movement authority. The movement authority is determined from the occupancy status of the blocks making up the route opened in front of the train.
- On reception of the movement authority, the EVC onboard the train calculates speed curves and brake profiles in order to control the train movement. The train being completely supervised is said to be in Full Supervision mode, or FS mode.
- Beside the FS mode, the
ETCS level 2 defines a Staff Responsible mode, SR mode, and an on-sight mode, OS mode, in which a train can enter onto a block whose occupancy status is "OCCUPIED". - In the SR mode, the driver has to drive the train under his own responsibility, at a low speed.
- In the OS mode, the driver has to drive the train on-sight at a reduced speed and the EVC onboard the train controls a few parameters, for example that the train remains inside the occupied block. The driver is responsible for checking the track occupancy when moving the train, because the track may be occupied.
- This SR/OS mode is useful in case of anomalies, such as an axle counter not counting the right number of axles of a passing train so that the RBC considers the corresponding block as occupied, while it is in fact not occupied. This OS mode is also useful for train composition, when a locomotive has to enter a block already occupied with coaches to which this locomotive has to be coupled.
- At start-up of a train, for a new mission, the EVC registers itself to the RBC. But, before the RBC is capable of sending a first movement authority to the train in order for it to operate in the FS mode, the RBC has to ensure that there is no other train or other vehicle between the current position of the train and the end point of the current block.
- Indeed, the current block being in the occupancy status "OCCUPIED", due to the presence of the train considered, another train could also be present inside this current block. In this condition, the RBC cannot send a movement authority including the end of the current block, while it is capable to send a movement authority once the train has reached the end point of this current block, knowing that the next block is in the occupancy state "NOT OCCUPIED". Consequently, the driver has to move the train to the end of the current block in the SR or OS mode.
- It has also been proposed to send a movement authority for the full supervision of the train before the train reaches the end point of the current block, when the RBC can receive a confirmation that the track ahead the train is free as far as the end of the current block. This information is called TAF information, for Track Ahead Free.
- Several mechanisms are proposed by UNISIG to guarantee that the track ahead is free:
- In a first mechanism, called TAF request mechanism, and disclosed in the subset 26 version 3.4.0, § 5.9.6.2.3 of the ERTMS/ETCS
Level 2 standard, the RBC sends a TAF request to the EVC, which in turn displays this request onto an appropriate screen in the train driver cabin. If the driver confirms that the track is free up to the end of the current block, the EVC will transmit this TAF information back to the RBC. The RBC can then send a movement authority for switching the operative mode of the EVC into the FS mode, this movement authority extending over the end portion of the current block and the next block. - In a second mechanism, the known Automatic TAF solution, proposed by UNISIG in its ETCS Engineering guidelines (Informative Specification, reference ERA/ERTMS/040054), can be used in an ATAF mechanism to provide the TAF information without any input from the driver. This is done through a combination of reported train position and trackside information.
- But, for both of these mechanisms, it is only possible to guarantee that the track ahead is free when the train is close enough to the end of the current block (at sighting distance for the TAF request mechanism, and inside a distance guaranteed as free for the ATAF mechanism).
- Thus, at the start-up of a train, the practical method is to move the train in SR or OS mode, from the current point to a point close enough to the end of the current block so that a TAF request mechanism or an ATAF mechanism be able to compute TAF information inside the RBC, as recommended in the Start of Mission in
Level 2 Guideline (Informative Specification, reference ERA/ERTMS/040054). - This is not an optimized solution due to obvious safety and operational reasons, in particular for blocks of great length where the end point is far away.
- The invention therefore aims at overcoming this problem.
- To this end, the object of the invention is to provide a method as defined by the claims. With this method, it is possible to start automatically a train in the FS mode, as defined in ERTMS/
ETCS Level 2 or Level 3, even if the train is not close to the end of the current block. - The invention and its advantages will be better understood upon reading the description which will follow, provided solely by way of example with reference made to the accompanying drawings in which:
-
Figure 1 is a general schematic representation of a railway equipped with a ERTMS/ETCS signaling system; and, -
Figure 2 is a block diagram of the preferred embodiment of the method according to the invention. - The principle of the method consists in, as soon as the train of interest (called the first train in the following) disconnects from the RBC at the end of a mission, while being located inside a signaling block (called the current block in the following), monitoring continuously if another train or vehicle (called the second train in the following) enters or has the possibility to enter into said signaling block, until the first train connects again to the RBC for a new mission. Then, if the first train reports a current position compatible with the current block and if no second train has entered or has had the possibility to enter into the current block, the RBC is able to send immediately a movement authority to place the first train into the FS mode, this movement authority extending from the current position of the first train and covering the end portion of the current block.
- An embodiment of the method according to the invention will now be given in reference to
figure 1 and2 . - In
step 110 of themethod 100, thefirst train 4, supervised according to the FS mode, enters block A6-A3, corresponding to aplatform 40 of a station, and stops along theplatform 40. - In
step 120, to allow other trains to pass theplatform 40, the first switch PM1 is set in the deviated position A1-A4, and the second switch PM2 is set in the direct position A5-A2. Thus, no other train can enter inside the block A6-A3, from A3. - In
step 130, thefirst train 4 ends its mission. The EVC onboard train 4 disconnects from the RBC, while reporting current position oftrain 4 inside block A6-A3, which is then considered as the current block fortrain 4. - Immediately, in
step 140, the RBC launches a monitoring function of the status of the current block associated to train 4. - This function monitors if a second train has the possibility to enter into bloc A6-A3, from A3.
- This function is based on the periodic verification of at least one logical constraint about events affecting the railway in the vicinity of the current block A6-A3.
- If the or each logical constraint is verified a TAF attribute of the current block, maintained by the RBC, keeps the value "FREE", otherwise it takes the value "NOT FREE".
- For example, in
step 142, the RCB receives, form the IXL, the positions of the first and second point machines PM1 and PM2 and the occupancy status of the blocks adjacent to the current block A6-A3, i.e. blocks A3-A5-A2 and A1-A6-A4. - In
step 143, the RBC checks that logical constraints are still verified. - If for example, block A3-A5-A2 becomes occupied while the position of the second point machine PM2 has been modified to its diverted position, A3-A2, it cannot be guaranteed anymore that the track ahead
train 4 is free until A3, as a train may have entered bloc A6-A3 from A3. In this case, the TAF attribute for current block A6-A3 is set to the value "NOT FREE". - Once the TAF attribute has the value "NOT FREE", it can only be reinitialized at the value "FREE" when the occupancy status of the current signaling block A6-A3 becomes "NOT OCCUPIED", i.e. when the current train and possibly other trains have left the current block.
-
142 and 143 are repeated at a high frequency, for example every second, until the EVC of theSteps first train 4 connects again to the RBC. - In
step 150, when thefirst train 4 performs its start of mission and connects to the RBC, it sends a position report indicating its current position to the RBC. - In
step 160, the RBC verifies that the position report is valid, i.e. that thefirst train 4 having ended its mission in block A6-A3, is starting a new mission from this same block. - With a valid position report, in
step 170, the RBC read the current value of the TAF attribute for the current block A6-A3. - When the current value of the TAF attribute is "FREE", in
step 180, the RBC sends directly a FS movement authority to thefirst train 4. This FS movement authority comprises at least the portion of block A6-A3 from the current position of the first train to the end point of the block A6-A3, and possibly the preferably next block. - In
step 190, on receipt of this FS movement authority, thefirst train 4 starts its mission immediately in FS mode. - If the current value of the TAF attribute is "NOT FREE", it is not possible for the RBC to guarantee that the first train is alone inside the current signaling block on which it is stopped. It is not possible for the RBC to send directly a FS motion authority to the
first train 4. Abackup procedure 200 using the known TAF request or ATAF mechanisms is then applied. - More advanced logical constraints may be checked periodically by the RBC to update the value of a TAF attribute of the current block associated to a train having ended its mission. Such advanced constraints may be based on information from the trackside equipment and/or other information determined by high level systems, like the ICC: train occupation and localization based on switch position, block occupancy, other train position reports, train routes management, etc.
- For example, in case the first train is recomposed after the end of its mission, additional information can be gathered to allow the RBC to know if the first train is still the only train on the block. For example the information outputted by a train composition management function realized by the ICC can be taken into account to build an advanced constraint.
- In another example, in case the first train is split after its mission has ended, additional information can be obtained from the train integrity management function available in ETCS Level 3.
- As an alternative, in place of the RBC, other existing systems of the signaling system 1 or a new dedicated monitoring module of the signaling system could realize the monitoring function described above.
- According to this method, there is no need for the systematic use of TAF request or ATAF mechanisms at starting up of a train. By monitoring the history of the events on the track around the block where the train of interest has stopped, from the time it has stopped to the time it restarts, it is possible to start the next mission immediately in the ETCS FS mode, wherever the train is located inside the current signaling block and whatever the length of this current signaling block is.
Claims (7)
- Method (100) for initializing the Full Supervision mode for the movement of a train (4) on a railway (2) equipped with a signaling system (1) complying with the ERTMS/ETCS Level 2 or Level 3 standards, characterized in that it comprises the steps of:- Identifying the signaling block (A6-A3) in which the train (4) was located when an Embedded Vital Computer (EVC) on board the train disconnects from a Radio Bloc Center (RBC) of the signaling system;- monitoring said signaling block by checking periodically that at least one logical constraint that no other train enters or can enter in said signaling block (A6-A3) is verified, the or each logical constraint being elaborated from events on the railway in the vicinity of said signaling block (A6-A3); and, when the result of the checking is negative, updating a value of an attribute (TAF) associated with said signaling block (A6-A3), the attribute (TAF) switching from the value "FREE" to the value "NOT FREE";- when the Embedded Vital Computer (EVC) of the train (4) reconnects to the Radio Bloc Center (RBC) for a new mission, the Radio Bloc Center reads the current value of the attribute (TAF) and, if said attribute has the value "FREE", sends a movement authority to the train (4) in order to supervise the movement of the train according to the Full Supervision mode, at least on said signaling block.
- Method according to claim 1, wherein the or each logical constraint is elaborated from data selected in the group comprising switch position, signaling block occupancy, other train position reports and train route management.
- Method according to claim 1 or claim 2, wherein the monitoring step is performed by the Radio Block Center (RBC).
- Method according to any one of claims 1 to 3, wherein, once the attribute (TAF) has the value "NOT FREE", the attribute is reinitialized at the value "FREE" when an occupancy status maintained by the Radio Block Center (RBC) of said signaling block is "NOT OCCUPIED".
- Method according to any one of claims 1 to 3, wherein, when the Embedded Vital Computer (EVC) of the train (4) reconnects to the Radio Bloc Center (RBC) for a new mission, the Embedded Vital Computer sends a position report of the train (4) and the Radio Block Center (RBC) checks that the current position of the train (4) mentioned in the position report is located inside the signaling block (A6-A3) associated to the train when said train ended its mission, before reading the value of the attribute (TAF) corresponding to said signaling block (A6-A3).
- Signaling system (1) complying with the ERTMS/ETCS Level 2 or Level 3 standards, for the Full Supervision of the movement of the trains circulating on a railway, characterized in that it comprises a monitoring module capable of monitoring a signaling block associated with a train, which was located on said signaling block when an Embedded Vital Computer on board the train disconnects from a Radio Bloc Center of the signaling system, by checking periodically that at least one logical constraint that no other train enters or can enter in said signaling block is verified, the or each logical constraint being elaborated from events on the railway in the vicinity of said signaling block, and, when the result of the checking is negative, by updating a value of a TAF attribute associated with said signaling block, the TAF attribute switching from the value "FREE" to the value "NOT FREE", and in that the Radio Block Center is capable of reading the current value of the TAF attribute when the Embedded Vital Computer of the train reconnects to the Radio Bloc Center for a new mission, and, if the TAF attribute has the value "FREE", sends a FS movement authority to the train in order to supervise the movement of the train according to the Full Supervision mode at least on said signaling block.
- Signaling system according to claim 6, capable of realizing a method according to any one of claims 1 to 5.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP16166239.0A EP3235706B1 (en) | 2016-04-20 | 2016-04-20 | Method for initializing the fs mode for the movement of a train on a railway equipped with an ertms/etcs signaling system |
| AU2017202545A AU2017202545B2 (en) | 2016-04-20 | 2017-04-19 | Method for initializing the FS mode for the movement of a train on a railway equipped with an ERTMS/ETCS signaling system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP16166239.0A EP3235706B1 (en) | 2016-04-20 | 2016-04-20 | Method for initializing the fs mode for the movement of a train on a railway equipped with an ertms/etcs signaling system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3235706A1 true EP3235706A1 (en) | 2017-10-25 |
| EP3235706B1 EP3235706B1 (en) | 2018-08-01 |
Family
ID=55794914
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP16166239.0A Active EP3235706B1 (en) | 2016-04-20 | 2016-04-20 | Method for initializing the fs mode for the movement of a train on a railway equipped with an ertms/etcs signaling system |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP3235706B1 (en) |
| AU (1) | AU2017202545B2 (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3578436A1 (en) * | 2018-06-06 | 2019-12-11 | Kyosan Electric Mfg. Co., Ltd. | Train operation management system |
| EP3581461A1 (en) * | 2018-06-06 | 2019-12-18 | Kyosan Electric Mfg. Co., Ltd. | On-vehicle apparatus |
| CN111003028A (en) * | 2019-12-26 | 2020-04-14 | 中国铁道科学研究院集团有限公司通信信号研究所 | Train point reporting method and system based on robustness dynamic scene recognition |
| WO2021219308A1 (en) * | 2020-04-29 | 2021-11-04 | Siemens Mobility GmbH | Vehicle control method and vehicle control system |
| CN113771920A (en) * | 2021-11-12 | 2021-12-10 | 卡斯柯信号(北京)有限公司 | A test method and device for backup mode conversion in a national railway train control system |
| CN115123351A (en) * | 2022-09-01 | 2022-09-30 | 卡斯柯信号(北京)有限公司 | A train testing method and device |
| CN117022400A (en) * | 2023-08-03 | 2023-11-10 | 交控科技股份有限公司 | Mobile authorization calculation method, device, equipment and system based on condominium area extension |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110789573B (en) * | 2019-10-16 | 2022-03-08 | 北京全路通信信号研究设计院集团有限公司 | Method and system for obtaining movement authorization of two block partitions |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CH698679B1 (en) * | 2004-08-31 | 2009-09-30 | Alstom Switzerland Ltd | Method for controlled entry of vehicle i.e. rail vehicle, involves determining whether vehicle is first vehicle to deal, authorizing vehicle for entry into armed area, and creating driving license |
| EP2684760A2 (en) * | 2012-07-13 | 2014-01-15 | Siemens Schweiz AG | Train control system on the basis of ETCS "Full Supervision" mode |
| WO2014048719A2 (en) * | 2012-09-28 | 2014-04-03 | Siemens Aktiengesellschaft | Control of a rail vehicle |
| US20150232110A1 (en) * | 2014-02-18 | 2015-08-20 | Nabil N. Ghaly | Method & apparatus for a train control system |
| DE102014210190A1 (en) * | 2014-05-28 | 2015-12-03 | Siemens Aktiengesellschaft | Driving license for a rail vehicle |
-
2016
- 2016-04-20 EP EP16166239.0A patent/EP3235706B1/en active Active
-
2017
- 2017-04-19 AU AU2017202545A patent/AU2017202545B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CH698679B1 (en) * | 2004-08-31 | 2009-09-30 | Alstom Switzerland Ltd | Method for controlled entry of vehicle i.e. rail vehicle, involves determining whether vehicle is first vehicle to deal, authorizing vehicle for entry into armed area, and creating driving license |
| EP2684760A2 (en) * | 2012-07-13 | 2014-01-15 | Siemens Schweiz AG | Train control system on the basis of ETCS "Full Supervision" mode |
| WO2014048719A2 (en) * | 2012-09-28 | 2014-04-03 | Siemens Aktiengesellschaft | Control of a rail vehicle |
| US20150232110A1 (en) * | 2014-02-18 | 2015-08-20 | Nabil N. Ghaly | Method & apparatus for a train control system |
| DE102014210190A1 (en) * | 2014-05-28 | 2015-12-03 | Siemens Aktiengesellschaft | Driving license for a rail vehicle |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3578436A1 (en) * | 2018-06-06 | 2019-12-11 | Kyosan Electric Mfg. Co., Ltd. | Train operation management system |
| CN110562304A (en) * | 2018-06-06 | 2019-12-13 | 株式会社京三制作所 | Train operation management system |
| EP3581461A1 (en) * | 2018-06-06 | 2019-12-18 | Kyosan Electric Mfg. Co., Ltd. | On-vehicle apparatus |
| CN110562304B (en) * | 2018-06-06 | 2022-04-26 | 株式会社京三制作所 | Train operation management system |
| CN111003028A (en) * | 2019-12-26 | 2020-04-14 | 中国铁道科学研究院集团有限公司通信信号研究所 | Train point reporting method and system based on robustness dynamic scene recognition |
| WO2021219308A1 (en) * | 2020-04-29 | 2021-11-04 | Siemens Mobility GmbH | Vehicle control method and vehicle control system |
| CN113771920A (en) * | 2021-11-12 | 2021-12-10 | 卡斯柯信号(北京)有限公司 | A test method and device for backup mode conversion in a national railway train control system |
| CN115123351A (en) * | 2022-09-01 | 2022-09-30 | 卡斯柯信号(北京)有限公司 | A train testing method and device |
| CN115123351B (en) * | 2022-09-01 | 2022-12-09 | 卡斯柯信号(北京)有限公司 | Train testing method and device |
| CN117022400A (en) * | 2023-08-03 | 2023-11-10 | 交控科技股份有限公司 | Mobile authorization calculation method, device, equipment and system based on condominium area extension |
Also Published As
| Publication number | Publication date |
|---|---|
| EP3235706B1 (en) | 2018-08-01 |
| AU2017202545B2 (en) | 2021-09-02 |
| AU2017202545A1 (en) | 2017-11-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3235706B1 (en) | Method for initializing the fs mode for the movement of a train on a railway equipped with an ertms/etcs signaling system | |
| US20240025463A1 (en) | Method & apparatus for an auxiliary train control system | |
| EP3061666B1 (en) | Signalling system for a railway network and method for the full supervision of a train realised by such a signalling system | |
| CN109677466B (en) | A lightweight train automatic control system for China's heavy-haul railways | |
| AU2002242170B2 (en) | Advanced communication-based vehicle control method | |
| CA2936760C (en) | Method & apparatus for a train control system | |
| US20220185350A1 (en) | Quasi-moving block system of train control | |
| US5364047A (en) | Automatic vehicle control and location system | |
| KR101065164B1 (en) | Wireless communication-based line changer control device used in low density driving section and its control method | |
| AU2002242170A1 (en) | Advanced communication-based vehicle control method | |
| CN109715472B (en) | System and method for track occupancy determination | |
| WO2018206610A1 (en) | A decentralised communications based train control system | |
| CN115158410A (en) | Train operation control system, method, electronic device and storage medium | |
| US20250162627A1 (en) | Method & apparatus for a train control system | |
| Hann | Incremental train control system | |
| Platt | Signalling within the context of a rail business | |
| HK40006623A (en) | System and method for track occupancy determination | |
| Bates | Mass transit scheme design | |
| HK1242661A1 (en) | Method and device for automatically influencing track-bound vehicles | |
| ZA200210165B (en) | Advanced communication-based vehicle control method. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| 17P | Request for examination filed |
Effective date: 20171010 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 19/06 20060101ALN20171222BHEP Ipc: B61L 27/00 20060101AFI20171222BHEP Ipc: B61L 21/06 20060101ALI20171222BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20180126 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1023924 Country of ref document: AT Kind code of ref document: T Effective date: 20180815 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016004394 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20180801 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1023924 Country of ref document: AT Kind code of ref document: T Effective date: 20180801 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181101 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181102 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181201 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602016004394 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20190503 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190430 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190420 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190420 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181201 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20160420 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180801 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230823 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20250213 AND 20250219 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20250418 Year of fee payment: 10 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20250422 Year of fee payment: 10 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20250424 Year of fee payment: 10 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20250424 Year of fee payment: 10 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20260306 Year of fee payment: 11 |