EP3205772B1 - Asphalt finisher - Google Patents
Asphalt finisher Download PDFInfo
- Publication number
- EP3205772B1 EP3205772B1 EP15849548.1A EP15849548A EP3205772B1 EP 3205772 B1 EP3205772 B1 EP 3205772B1 EP 15849548 A EP15849548 A EP 15849548A EP 3205772 B1 EP3205772 B1 EP 3205772B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- hydraulic
- screed
- hydraulic oil
- source
- cylinders
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000010426 asphalt Substances 0.000 title claims description 63
- 239000010720 hydraulic oil Substances 0.000 claims description 126
- 230000007246 mechanism Effects 0.000 claims description 39
- 230000008878 coupling Effects 0.000 claims description 24
- 238000010168 coupling process Methods 0.000 claims description 24
- 238000005859 coupling reaction Methods 0.000 claims description 24
- 230000004044 response Effects 0.000 description 20
- 238000010276 construction Methods 0.000 description 16
- 238000006073 displacement reaction Methods 0.000 description 11
- 239000002131 composite material Substances 0.000 description 8
- 239000003921 oil Substances 0.000 description 7
- 238000011144 upstream manufacturing Methods 0.000 description 7
- 238000007599 discharging Methods 0.000 description 6
- 230000007423 decrease Effects 0.000 description 4
- 230000003247 decreasing effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000008602 contraction Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000006870 function Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/48—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
Definitions
- the present invention relates to an asphalt finisher including a hydraulic actuator.
- Document DE 42 11 286 A1 discloses an asphalt finisher in which a hydraulic cylinder is supplied with fluid from a main supply and an auxiliary supply.
- Document JP2012031890 discloses an emergency escape unit which moves a hydraulic construction machine when a failure occurs in a running system hydraulic unit during operation.
- Document JPH08120710 discloses an emergency rescuing vehicle for supplying fuel or electric power to a construction vehicle disabled from operating.
- the hydraulic source unit mounts an external engine that is different from the engine mounted on the hydraulic shovel, and an external hydraulic pump that is different from the hydraulic pump of the hydraulic shovel and is actuated by the external engine.
- An operator connects the external hydraulic pump with a traveling motor of the hydraulic shovel via a hose, actuates the traveling motor by using the hydraulic oil discharged by the external pump, and causes the shovel to run.
- the above-described hydraulic source unit requires a large scale structure including an external engine capable of providing an output sufficient for causing the hydraulic shovel, which has become incapable of running due to a failure related to the hydraulic source, to run. Therefore, the hydraulic source unit has an excessive performance as an apparatus for driving hydraulic actuators other than the traveling motor in the asphalt finisher that has become incapable of running due to a failure related to the hydraulic source, and thus, it is difficult to introduce the hydraulic source unit because of the high cost, etc.
- Fig. 1A and Fig. 1B are schematic drawings of an asphalt finisher 100 as an example of a road machine according to an embodiment. It should be noted that Fig. 1A is a left side view of the asphalt finisher 100 and Fig. 1B is a top view of the asphalt finisher 100.
- the asphalt finisher 100 includes mainly a tractor 1, a hopper 2, a screed 3, and a controller 50. It should be noted that, in the present embodiment, it is assumed that a front direction refers to a direction of the hopper 2 viewed from the tractor 1 and a rear direction refers to a direction of the screed 3 viewed from the tractor 1.
- the controller 50 is a control device for controlling the asphalt finisher 100.
- the controller 50 has an arithmetic processing including with a CPU and an internal memory. Further, various types of functions of the controller 50 are realized by causing the CPU to execute programs stored in the internal memory.
- the tractor 1 is a mechanism for causing the asphalt finisher 100 to travel.
- the tractor 1 causes the asphalt finisher 100 to move by rotating rear wheels 5L, 5R by using rear wheel traveling motors 20L, 20R, and by rotating front wheels 6L, 6R by using front wheel traveling motors 22L, 22R.
- Fig. 1A and Fig. 1B approximate positions of various types of hydraulic actuators are illustrated transparently, and the rear wheel 5R and the front wheel 6R are hidden and unseen.
- the rear wheel traveling motors 20L, 20R and the front wheel traveling motors 22L, 22R rotate by receiving hydraulic oil supply from a hydraulic oil source 14.
- a cabin including a driving seat and a control panel.
- a canopy 10 is attached on top of the cabin. It should be noted that, for the sake of drawing clarity, illustration of the canopy 10 is omitted in Fig. 1B .
- the hopper 2 is a mechanism for accepting a pavement material.
- the hopper 2 is capable of being opened and closed in a vehicle width direction via hopper cylinders 24L, 24R.
- the asphalt finisher 100 accepts the pavement material (e.g., asphalt composite material) from a carrier of a dump track (not shown) by causing the hopper 2 to be in a full open state.
- Fig. 1A and Fig. 1B illustrate that the hopper 2 is in a full open state.
- the hopper 2 is closed and the asphalt composite material near the inner wall of the hopper 2 is collected in the center of the hopper 2, and thus, the asphalt composite material is ready to be conveyed and supplied to the screed 3 via a conveyor CV and a screw (not shown).
- the screed 3 is a mechanism for pouring and leveling the asphalt composite material.
- the screed 3 includes mainly a left leveling arm (screed arm) 3AL, a right leveling arm 3AR, a left front screed 3LF, a right front screed 3RF, a left rear screed 3LR, and a right rear screed 3RR.
- the screed 3 is a floating screed that is towed by the tractor 1, and is connected to the tractor 1 via the left leveling arm 3AL and the right leveling arm 3AR.
- the screed 3 is moved up and down by using screed lift cylinders 25L, 25R, and is expanded/contracted in the vehicle width direction by using screed expand/contract cylinders 27L, 27R.
- the screed lift cylinders 25L, 25R are hydraulic actuators for lifting the screed 3 from the ground (pavement surface)
- cylinders of the screed lift cylinders 25L, 25R are connected to the tractor 1 and rods of the screed lift cylinders 25L, 25R are connected to the screed 3.
- the controller 50 causes the screen lift cylinders 25L, 26R to be contracted by causing the hydraulic oil discharged by the hydraulic source 14 to be capable of flowing into each of rod side oil chambers of the screed lift cylinders 25L, 25R.
- the controller 50 causes the hydraulic oil in each of the rod side oil chambers of the screed lift cylinders 25L, 25R to be capable of flowing out. Further, the controller 50 causes the screed lift cylinders 25L, 25R to be expanded by causing the hydraulic oil in the rod side oil chambers to flow out due to the weight of the screed 3.
- the screed expand/contract cylinders 27L, 27R are hydraulic actuators for expanding/contracting the screed 3 in the vehicle width direction.
- the screed expand/contract cylinder 27L causes the left rear screed 3LR to be expanded in a left direction with respect to the left front screed 3LF in the figure.
- the screed expand/contract cylinder 27R causes the right rear screed 3RR to be expanded in a right direction with respect to the right front screed 3RF in the figure.
- the leveling arms 3AL, 3AR are devices for connecting the screed 3 to the tractor 1. Specifically, one end of each of the leveling arms 3AL, 3AR is connected to the screed 3 and the other end is connected to the tractor 1 in a pivoting manner.
- Leveling cylinders 23L, 23R are hydraulic actuators for moving up and down the leveling arms 3AL, 3AR in order to adjust construction thickness of an asphalt.
- cylinders of the leveling cylinders 23L, 23R are connected to the tractor 1, and rods of the leveling cylinders 23L, 23R are connected to the pivoting parts.
- the controller 50 causes the leveling cylinders 23L, 23R to be contracted in order to raise the leveling arms 3AL, 3AR by causing the hydraulic oil discharged by the hydraulic source 14 to flow into each of the rod side oil chambers of the leveling cylinders 23L, 23R.
- the controller 50 causes the leveling cylinders 23L, 23R to be expanded in order to lower the leveling arms 3AL, 3AR by causing the hydraulic oil in each of the rod side oil chambers of the leveling cylinders 23L, 23R to flow out.
- Fig. 2 is a hydraulic circuit diagram illustrating an example of a structure of a hydraulic system mounted on the asphalt finisher 100.
- the hydraulic system includes mainly a hydraulic source 14, a rear wheel drive unit F1, a conveyor/screw drive unit F2, a front wheel drive unit F3, a steering/compacting device drive unit F4, a leveling unit F5, a hopper drive unit F6, a screed lift unit F7, a crown device drive unit F8, a screed expand/contract unit F9, a step device drive unit F10, and a canopy drive unit F11.
- the hydraulic source 14 is a functional element for supplying hydraulic oil for causing the drive units F1 to F10 to operate.
- the hydraulic source 14 includes mainly an engine 14E, a rear wheel traveling pump 14R, a charge pump 14C, a cylinder pump 14M, a conveyor/screw pump 14S, and a front wheel traveling pump 14F.
- the engine 14E is a drive source for driving the hydraulic pumps 14R, 14C, 14M, 14S, 14F.
- the rear wheel traveling pump 14R is a variable displacement hydraulic pump that supplies the hydraulic oil for driving the rear wheel drive unit F1.
- the rear wheel traveling pump 14R is a swash plate type variable displacement bidirectional hydraulic pump used in a closed circuit.
- the charge pump 14C is a fixed displacement hydraulic pump that supplies the hydraulic oil for controlling the rear wheel drive unit F1.
- the cylinder pump 14M is a variable displacement hydraulic pump that supplies the hydraulic oil to the drive units F4 to F10.
- the cylinder pump 14M is a swash plate type variable displacement hydraulic pump, whose discharge amount is controlled in such a way that a discharge pressure becomes constant at a predetermined pressure.
- the conveyor/screw pump 14S is a variable displacement hydraulic pump for supplying the hydraulic oil to the conveyor/screw drive unit F2.
- the conveyor/screw pump 14S is a swash plate type variable displacement hydraulic pump.
- the front wheel traveling pump 14F is a variable displacement hydraulic pump that supplies the hydraulic oil for driving the front wheel drive unit F3.
- the front wheel traveling pump 14F is a swash plate type variable displacement hydraulic pump.
- the rear wheel drive unit F1 is a functional element for driving the rear wheels 5L, 5R.
- the rear wheel drive unit F1 includes a left rear wheel traveling motor 20L, a right rear wheel traveling motor 20R, check valves 20La, 20Ra, relief valves 20Lb, 20Rb, and a decelerator switch valve 40.
- the left rear wheel traveling motor 20L is a hydraulic motor for driving the left rear wheel 5L.
- the right rear wheel traveling motor 20R is a hydraulic motor for driving the right rear wheel 5R.
- the left rear traveling motor 20L and the right rear wheel traveling motor 20R are non-stage transmission hydraulic motors, and form a closed circuit (HST circuit) together with the rear wheel traveling pump 14R.
- the check valve 20La maintains a pressure of the hydraulic oil in a duct C1 that connects a first port of the rear wheel traveling pump 14R and each of second ports of the left rear wheel traveling motor 20L and the right rear wheel traveling motor 20R at or greater than a predetermined pressure. Specifically, the check valve 20La causes the hydraulic oil discharged by the charge pump 14C to flow into the duct C1 in the case where a pressure of the hydraulic oil in the duct C1 becomes less than the discharge pressure of the charge pump 14C. It should be noted that, in the figure, the numbers in parentheses indicate port numbers.
- the check valve 20Ra maintains a pressure of the hydraulic oil in a duct C2 that connects a second port of the rear wheel traveling pump 14R and each of first ports of the left rear wheel traveling motor 20L and the right rear wheel traveling motor 20R at or greater than a predetermined pressure.
- the check valve 20Ra causes the hydraulic oil discharged by the charge pump 14C to flow into the duct C2 in the case where a pressure of the hydraulic oil in the duct C2 becomes less than the discharge pressure of the charge pump 14C.
- the relief valve 20Lb maintains a pressure of the hydraulic oil in the duct C1 less than a predetermined relief pressure. Specifically, the relief valve 20Lb causes the hydraulic oil in the duct C1 to flow out of the closed circuit in the case where a pressure of the hydraulic oil in the duct C1 becomes greater than the relief pressure. Similarly, the relief valve 20Rb maintains a pressure of the hydraulic oil in the duct C2 less than a predetermined relief pressure. Specifically, the relief valve 20Rb causes the hydraulic oil in the duct C2 to flow out of the closed circuit in the case where a pressure of the hydraulic oil in the duct C2 becomes greater than the relief pressure.
- the decelerator switch valve 40 is a mechanism for switching respective reduction ratios of the left rear wheel traveling motor 20L and the right rear wheel traveling motor 20R.
- the deceleration switch valve 40 in response to control instructions from the controller 50, switches respective reduction ratios of the left rear wheel traveling motor 20L and the right rear wheel traveling motor 20R by using the hydraulic oil discharged by the charge pump 14C.
- the conveyor/screw drive unit F2 is a functional element for driving a conveyor and a screw.
- the conveyor/screw drive unit F2 includes mainly a conveyor/screw motor 21 and a conveyor/screw valve 41.
- the conveyor/screw motor 21 is a variable displacement hydraulic motor that forms an open circuit, and includes a conveyor motor and a screw motor. Further, the conveyor/screw valve 41 includes a conveyor control valve and a screw control valve.
- the conveyor control valve is switched in response to control instructions from the controller 50, and causes the hydraulic oil discharged by the conveyor/screw pump 14S to flow into a suction port of the conveyor motor, and causes the hydraulic oil flowing out of a discharge port of the conveyor motor to be discharged into a hydraulic oil tank T.
- the screw control valve is switched in response to control instructions from the controller 50, causes the hydraulic oil discharged by the conveyor/screw pump 14S to flow into a suction port of the screw motor, and causes the hydraulic oil flowing out of a discharge port of the screw motor to be discharged into a hydraulic oil tank T. It should be noted that the hydraulic oil flowing out of a discharge port of the screw motor is discharged into the hydraulic oil tank T through an oil cooler 43.
- the front wheel drive unit F3 is a functional element for driving the front wheels 6L, 6R.
- the front wheel drive unit F3 includes mainly front wheel traveling motors 22L, 22R and a front wheel traveling valve 42.
- the front wheel traveling motors 22L, 22R are fixed displacement hydraulic motors that form an open circuit. Further, the front wheel traveling valve 42 is switched in response to control instructions from the controller 50, and causes the hydraulic oil discharged by the front wheel traveling pump 14F to flow into suction ports of the front wheel traveling motors 22L, 22R. The hydraulic oil flowing out of a discharge port of the front wheel traveling pump 14F is discharged into the hydraulic oil tank T without going through the front wheel traveling valve 42.
- the steering/compacting device drive unit F4 is a functional element for driving a steering device (not shown) and a compacting device (not shown).
- the steering device is a hydraulic device for steering the front wheels 6L, 6R.
- the steering device in response to an operation of a steering ST (refer to Fig. 1A ) by an operator, changes a steering angle of the front wheels 6L, 6R by using the hydraulic oil discharged by the cylinder pump 14M.
- the compacting device is a hydraulic device for compacting the asphalt composite material.
- the compacting device includes a tamper and a vibrator, and causes the tamper and the vibrator to operate by using the hydraulic oil discharged by the cylinder pump 14M.
- the leveling unit F5 is a functional element for adjusting the construction thickness of the asphalt.
- the leveling unit F5 includes mainly a leveling control valves 33L, 33R, leveling cylinders 23L, 23R, and pilot check valves 33La, 33Lb, 33Ra, 33Rb.
- the leveling cylinders 23L, 23R are hydraulic cylinders for moving up and down the leveling arms 3AL, 3AR in order to adjust the construction thickness of the asphalt.
- the leveling cylinders 23L, 23R are contracted when increasing the construction thickness, and are expanded when decreasing the construction thickness.
- the leveling control valves 33L, 33R switch their valve positions in response to a control signal from the controller 50.
- the leveling control valves 33L, 33R causes the hydraulic oil discharged by the cylinder pump 14M to flow into rod side hydraulic chambers of the leveling cylinders 23L, 23R, and causes the hydraulic oil flowing out of head side hydraulic chambers of the leveling cylinders 23L, 23R to be discharged into the hydraulic oil tank T.
- the leveling cylinders 23L, 23R are contracted, and the leveling arms 3AL, 3AR are moved up.
- the leveling control valves 33L, 33R causes the hydraulic oil discharged by the cylinder pump 14M to flow into the head side hydraulic chambers of the leveling cylinders 23L, 23R, and causes the hydraulic oil flowing out of the rod side hydraulic chambers of the leveling cylinders 23L, 23R to be discharged into the hydraulic oil tank T.
- the leveling cylinders 23L, 23R are expanded, and the leveling arms 3AL, 3AR are moved down.
- the pilot check valves 33La, 33Lb, 33Ra, 33Rb prevent the leveling cylinders 23L, 23R from being moved by an external force.
- the pilot check valve 33La allows the hydraulic oil in the rod side hydraulic chamber of the leveling cylinder 23L to flow toward the hydraulic oil tank T only in the case where the hydraulic oil discharged by the cylinder pump 14M flows into the head side hydraulic chamber of the leveling cylinder 23L.
- the pilot check valve 33La prohibits the hydraulic oil in the rod side hydraulic chamber of the leveling cylinder 23L from flowing toward the hydraulic oil tank T. The same goes for the pilot check valves 33Lb, 33Ra, 33Rb.
- the hopper drive unit F6 is a functional element for opening and closing the hopper 2.
- the hopper drive unit F6 includes mainly a hopper control valves 34L, 34R, hopper cylinders 24L, 24R, and pilot check valves 34La, 34Ra.
- the hopper cylinders 24L, 24R are hydraulic actuators for opening and closing the hopper 2.
- the hopper cylinders 24L, 24R are contracted when opening the hopper 2, and are expanded when closing the hopper 2.
- the hopper control valves 34L, 34R switch their valve positions in response to a control signal from the controller 50.
- the hopper control valves 34L, 34R causes the hydraulic oil discharged by the cylinder pump 14M to flow into rod side hydraulic chambers of the hopper cylinders 24L, 24R, and causes the hydraulic oil flowing out of head side hydraulic chambers of the hopper cylinders 24L, 24R to be discharged into the hydraulic oil tank T.
- the hopper cylinders 24L, 24R are contracted.
- the hopper control valves 34L, 34R causes the hydraulic oil discharged by the cylinder pump 14M to flow into the head side hydraulic chambers of the hopper cylinders 24L, 24R, and causes the hydraulic oil flowing out of the rod side hydraulic chambers of the hopper cylinders 24L, 24R to be discharged into the hydraulic oil tank T.
- the hopper cylinders 24L, 24R are expanded.
- the pilot check valves 34La, 34Ra prevent the hopper 2 from being opened by the contraction of the hopper cylinders 24L, 24R due to the weight of the hopper 2, or due to the weight of hopper 2 and the asphalt composite material in the hopper 2.
- the pilot check valve 34La allows the hydraulic oil in the head side hydraulic chamber of the hopper cylinder 24L to flow toward the hydraulic oil tank T only in the case where the hydraulic oil discharged by the cylinder pump 14M flows into the rod side hydraulic chamber of the hopper cylinder 24L.
- the pilot check valve 34La prohibits the hydraulic oil in the head side hydraulic chamber of the hopper cylinder 24L from flowing toward the hydraulic oil tank T. The same goes for the pilot check valves 34Ra.
- pilot check valves are not included between the rod side hydraulic chambers of the hopper cylinders 24L, 24R and the hopper control valves 34L, 34R. This is because there is little possibility that the hopper cylinders 24L, 24R are expanded unintentionally by an external force since the weight of the hopper 2 is large. It should be noted, however, that pilot check valves may be included between the rod side hydraulic chambers of the hopper cylinders 24L, 24R and the hopper control valves 34L, 34R.
- the screed lift unit F7 is a functional element for lifting the screed 3.
- the screed lift unit F7 includes mainly a screed lift control valve 35, screed lift cylinders 25L, 25R, a switch valve 35a, a relief valve 35b, and a switch valve 35c.
- the screed lift cylinders 25L, 25R are hydraulic actuators for lifting the screed 3.
- the screed lift cylinders 25L, 25R are contracted simultaneously when lifting the screed 3, and are expanded simultaneously when moving down the screed 3.
- the screed lift control valve 35 switches its valve position in response to a control signal from the controller 50.
- the screed lift control valve 35 causes the hydraulic oil discharged by the cylinder pump 14M to flow into rod side hydraulic chambers of the screed lift cylinders 25L, 25R.
- the switch valve 35a is switched to the first position including a check valve in response to the control signal from the controller 50. This is to prevent the hydraulic oil from flowing backward from the rod side hydraulic chambers of the screed lift cylinders 25L, 25R to the hydraulic oil tank T.
- the hydraulic oil flowing out of the head side hydraulic chambers of the screed lift cylinders 25L, 25R is discharged into the hydraulic oil tank T without going through the screed lift control valve 35.
- the screed lift cylinders 25L, 25R are contracted.
- the screed lift control valve 35 is not used (maintained in a state illustrated in Fig. 2 ).
- the switch valve 35a is switched to the second position not including a check valve in response to the control signal from the controller 50. This is to cause the hydraulic oil in the rod side hydraulic chambers of the screed lift cylinders 25L, 25R to flow toward the hydraulic oil tank T.
- the screed lift cylinders 25L, 25R are expanded due to the weight of the screed 3, and the hydraulic oil in the rod side hydraulic chambers of the screed lift cylinders 25L, 25R is discharged into the hydraulic oil tank T by going through the switch valve 35a and the relief valve 35b.
- the switch valve 35a and the relief valve 35b realize upward and downward movement of the screed 3 in accordance with changes of lift force (force of the asphalt composite material for lifting the screed 3) that is generated when the asphalt finisher 100 paves the road while moving. Specifically, when the screed 3 moves up due to an increase of the lift force, the screed lift cylinders 25L, 25R are contracted. In this case, the hydraulic oil discharged by the cylinder pump 14M flows into the rod side hydraulic chambers of the screed lift cylinders 25L, 25R by going through a duct C3, the screed lift control valve 35, and the switch valve 35a. On the other hand, when the screed 3 moves down due to a decrease of the lift force, the screed lift cylinders 25L, 25R are expanded.
- lift force force of the asphalt composite material for lifting the screed 3
- the hydraulic oil flowing out of the rod side hydraulic chambers of the screed lift cylinders 25L, 25R is discharged into the hydraulic oil tank T by going through the switch valve 35a, the screed lift control valve 35, and the relief valve 35b.
- the switch valve 35c is switched to the first position that includes a check valve. This is for not providing bad influence to the drive units F8 to F10 located downstream. Specifically, this is for preventing a crown device, a step device, etc., from moving unintentionally.
- the crown device drive unit F8 is a functional element for driving the crown device.
- the crown device drive unit F8 includes mainly a crown device control valve 36 and a crown device motor 26.
- the crown device is a mechanism for causing the length of a turnbuckle 26a (refer to Fig. 1B ) attached between the left front screed 3LF and the right front screed 3RF to increase or decrease, and thus, causing the top contour shape of the screed 3 viewed from the back to be convex or concave.
- the crown device in response to control instructions from the controller 50, causes the length of the turnbuckle 26a to increase or decrease by rotating the crown device motor 26 as a hydraulic actuator.
- the convex degree of the top contour shape of the screed 3 increase as the length of the turnbuckle 26a increases compared with a reference length; the concave degree of the top contour shape of the screed 3 increases as the length of the turnbuckle 26a decreases compared with the reference length; and the top contour shape is linear in the case where the length of the turnbuckle 26a is equal to the reference length.
- the crown device control valve 36 switches its valve position in response to a control signal from the controller 50.
- the crown device control valve 36 causes the hydraulic oil discharged by the cylinder pump 14M to flow into one port of the crown device motor 26.
- the crown device control valve 36 causes the hydraulic oil discharged by the cylinder pump 14M to flow into the other port of the crown device motor 26.
- the screed expand/contract unit F9 is a functional element for expanding and contracting the rear screeds in the vehicle width direction.
- the screed expand/contract unit F9 includes mainly a screed expand/contract control valves 37L, 37R, screed expand/contract cylinders 27L, 27R, pilot check valves 37La, 37Lb, 37Ra, 37Rb, and relief valves 37Lc, 37Rc.
- the screed expand/contract cylinder 27L is a hydraulic actuator for expanding/contracting the left rear screed 3LR in the vehicle width direction.
- the screed expand/contract cylinder 27L is contracted when narrowing the width, and is expanded when widening the width.
- the screed expand/contract cylinder 27R is a hydraulic actuator for expanding/contracting the right rear screed 3RR in the vehicle width direction.
- the screed expand/contract cylinder 27R is contracted when narrowing the width, and is expanded when widening the width.
- the screed expand/contract control valves 37L, 37R switch their valve positions in response to a control signal from the controller 50.
- the screed expand/contract control valves 37L, 37R causes the hydraulic oil discharged by the cylinder pump 14M to flow into rod side hydraulic chambers of the screed expand/contract cylinders 27L, 27R, and causes the hydraulic oil flowing out of head side hydraulic chambers of the screed expand/contract cylinders 27L, 27R to be discharged into the hydraulic oil tank T.
- the screed expand/contract cylinders 27L, 27R are contracted, and the left rear screed 3LR and the right rear screed 3RR are retracted in the center.
- the screed expand/contract control valves 37L, 37R causes the hydraulic oil discharged by the cylinder pump 14M to flow into the head side hydraulic chambers of the screed expand/contract cylinders 27L, 27R, and causes the hydraulic oil flowing out of the rod side hydraulic chambers of the screed expand/contract cylinders 27L, 27R to be discharged into the hydraulic oil tank T.
- the screed expand/contract cylinders 27L, 27R are expanded, and the left rear screed 3LR and the right rear screed 3RR are extruded left and right
- the pilot check valves 37La, 37Lb, 37Ra, 37Rb prevent the screed expand/contract cylinders 27L, 27R from being moved unintentionally by an external force.
- the pilot check valve 37La allows the hydraulic oil in the rod side hydraulic chamber of the screed expand/contract cylinder 27L to flow toward the hydraulic oil tank T only in the case where the hydraulic oil discharged by the cylinder pump 14M flows into the head side hydraulic chamber of the screed expand/contract cylinder 27L.
- the pilot check valve 37La prohibits the hydraulic oil in the rod side hydraulic chamber of the screed expand/contract cylinder 27L from flowing toward the hydraulic oil tank T. The same goes for the pilot check valves 37Lb, 37Ra, 37Rb.
- the relief valves 37Lc, 37Rc prevent members related to the rear screeds from being destroyed by an excessive external force acting in a direction for causing the rear screeds to be contracted.
- the relief valve 37Lc allows the hydraulic oil in the head side chamber to flow into the hydraulic oil tank T.
- the screed expand/contract cylinder 27L is contracted, and partially absorbs the external force, and thus, prevents the left rear screed 3LR from being damaged. The same goes for the relief valve 37Rc.
- the step device drive unit F10 is a functional element for driving the step device.
- the step device drive unit F10 includes mainly a step device control valves 38L, 38R, and step device motors 28L, 28R.
- the step device is a mechanism for moving the rear screeds up and down in order to eliminate a step formed between a surface paved by the front screeds and a surface paved by the rear screeds. Specifically, in response to control instructions from the controller 50, the step device rotates the step device motors 28L, 28R as hydraulic actuators, drives a rotational-movement/linear-movement conversion mechanism attached to the rear screeds, and moves the rear screeds up and down.
- the step device control valve 38L switches its valve position in response to a control signal from the controller 50.
- the step device control valve 38L causes the hydraulic oil discharged by the cylinder pump 14M to flow into one port of the step device motor 28L.
- the step device control valve 38L causes the hydraulic oil discharged by the cylinder pump 14M to flow into the other port of the step device motor 28L. The same goes for a case in which the step device control valve 38R moves the right rear screed 3RR up and down.
- the canopy drive unit F11 is a functional element for unfolding the folded canopy 10.
- the canopy drive unit F11 includes mainly an auxiliary hydraulic source 60, a self-seal coupling mechanism 46, and a canopy cylinder 29.
- the auxiliary hydraulic source 60 is a hydraulic source prepared separately from the hydraulic source 14.
- the auxiliary hydraulic source 60 includes mainly a manual hydraulic pump system 15 and an auxiliary hydraulic source control valve 39.
- the manual hydraulic pump system 15 pumps and discharges the hydraulic oil in the hydraulic oil tank T in response to up and down movement of an attached lever moved by an operator.
- the auxiliary hydraulic source control valve 39 switches its valve position in response to a manual operation of the operator.
- the auxiliary hydraulic source control valves 39 causes the hydraulic oil discharged by the manual hydraulic pump system 15 to flow into a head side hydraulic chamber of the canopy cylinder 29, and causes the hydraulic oil flowing out of a rod side hydraulic chamber of the canopy cylinder 29 to be discharged into the hydraulic oil tank T.
- the canopy cylinder 29 is expanded, and the canopy 10 in a folded state is unfolded.
- the auxiliary hydraulic source control valve 39 causes the hydraulic oil in the head side chamber of the canopy cylinder 29 to be capable of flowing out; the hydraulic oil in the head side hydraulic chamber flows out due to the weight of the canopy 10; and the canopy cylinder 20 is contracted.
- the self-seal coupling mechanism 46 is a mechanism for connecting the head side hydraulic chamber of the canopy cylinder 29 with the auxiliary hydraulic source 60, and includes a pair of couplers 46L, 46R.
- the coupler 46L is attached to a duct extending from the head side hydraulic chamber of the canopy cylinder 29.
- the coupler 46R is attached to a duct extending from the discharging side of the auxiliary hydraulic source 60.
- the self-seal coupling mechanism 46 causes the hydraulic oil to flow through the pair of the couplers 47L, 46R in the case where the pair of the couplers 46L, 46R are connected. Further, in the case where the pair of the couplers 46L, 46R are separated, each of the couplers 46L, 46R seals the duct automatically.
- the self-seal coupling mechanism 47 is a mechanism for connecting the cylinder pump 14M with the drive units F5 to F10, and includes a pair of couplers 47L, 47R.
- the coupler 47L is attached to a duct extending from the discharging side of the cylinder pump 14M.
- the coupler 47R is attached to an upstream side duct of the leveling unit F5.
- the self-seal coupling mechanism 47 causes the hydraulic oil to flow through the pair of the couplers 47L, 46R in the case where the pair of the couplers 46L, 46R are connected. Further, in the case where the pair of the couplers 47L, 47R are separated, each of the couplers 47L, 47R seals the duct automatically.
- the auxiliary hydraulic source 60 is not used for driving the rear wheel traveling motors 20L, 20R. This is because driving the rear wheel traveling motors 20L, 20R requires a higher discharging pressure and a larger discharging amount compared with a case of driving other hydraulic actuators, and requires a larger scale structure. The same goes for the front wheel traveling motors 22L, 22R. Therefore, a duct extending from the discharging side of the auxiliary hydraulic source 60 is separated from a duct connected to the rear wheel traveling motors 20L, 20R, and the front wheel traveling motors 22L, 22R. The two ducts are in a state of no connection with each other.
- the two ducts will not be connected with each other even via the self-seal coupling mechanisms.
- the self-seal coupling mechanisms 46, 47 are in a state of no connection with ducts connected to the rear wheel traveling motors 20L, 20R and the front wheel traveling motors 22L, 22R.
- FIG. 3 illustrates a state of the hydraulic system in a case where an operator causes the screed lift unit F7 to operate by using the auxiliary hydraulic source 60, and corresponds to Fig. 2 .
- Fig. 3 illustrates a state in which the coupler 46R has already been connected with the coupler 47R by an operator.
- solid line arrows in Fig. 3 depict a flow of the hydraulic oil flowing out of the hydraulic oil tank T into each of the rod side hydraulic chambers of the screed lift cylinders 25L, 25R.
- Dotted line arrows in Fig. 3 depict a flow of the hydraulic oil flowing out of each of the head side hydraulic chambers of the screed lift cylinders 25L, 25R.
- an operator manually operates the auxiliary hydraulic source 60 and the auxiliary hydraulic source control valve 39 to cause the hydraulic oil discharged by the manual hydraulic pump system 15 to be directed to the screed lift unit F7.
- the hydraulic oil discharged by the manual hydraulic pump system 15 goes through the auxiliary hydraulic source control valve 39, the coupler 46R, the coupler 47R, the screed lift control valve 35, and the switch valve 35a, and flows into each of the rod side hydraulic chambers of the screed lift cylinders 25L, 25R.
- the screed lift control valve 35 is switched to a state illustrated in Fig. 3 in response to control instructions from the controller 50 according to an operational input by the operator via the control panel.
- the screed lift control valve 35 is switched to a state illustrated in Fig. 3 according to a manual operation of the operator. It should be noted that an operator who operates the screed lift control valve 35 is typically different from an operator who manually operates the manual hydraulic pump system 15, but may be the same operator who operates the manual hydraulic pump system 15.
- each of the screed lift cylinders 25L, 25R When the hydraulic oil flows into each of the rod side hydraulic chambers of the screed lift cylinders 25L, 25R, the hydraulic oil flows out of each of the head side hydraulic chambers of the screed lift cylinders 25L, 25R toward the hydraulic oil tank T. As a result, each of the screed lift cylinders 25L, 25R is contracted, and the screed 3 is lifted.
- the operator When the screed 3 is lifted to a desired height, the operator operates the screed lift control valve 35 to block the hydraulic oil flow from the manual hydraulic pump system 15 to each of the rod side hydraulic chambers of the screed lift cylinders 25L, 25R. As a result, the screed lift cylinders 25L, 25R are maintained in a contracted state, and the screed 3 is maintained in a lifted state.
- FIG. 4 illustrates a state of the hydraulic system in a case where an operator causes the screed expand/contract unit F9 to operate by using the auxiliary hydraulic source 60, and corresponds to Fig. 2 and Fig. 3 . Further, Fig. 4 illustrates a state in which the coupler 46R has already been connected with the coupler 47R by the operator. It should be noted that solid line arrows in Fig. 4 depict a flow of the hydraulic oil flowing out of the hydraulic oil tank T into each of the rod side hydraulic chambers of the screed expand/contract cylinders 27L, 27R.
- Dotted line arrows in Fig. 4 depict a flow of the hydraulic oil flowing out of each of the head side hydraulic chambers of the screed expand/contract cylinders 27L, 27R. Further, Fig. 4 illustrates the screed lift cylinders 25L, 25R that are contracted by manual operations.
- the operator manually operates the auxiliary hydraulic source 60 and the auxiliary hydraulic source control valve 39 to cause the hydraulic oil discharged by the manual hydraulic pump system 15 to be directed to the screed expand/contract unit F9.
- the hydraulic oil discharged by the manual hydraulic pump system 15 goes through the auxiliary hydraulic source control valve 39, the coupler 46R, the coupler 47R, the screed expand/contract control valves 37L, 37R, and the pilot check valves 37La, 37Ra, and flows into each of the rod side hydraulic chambers of the screed expand/contract cylinders 27L, 27R.
- the switch valve 35c and the screed expand/contract control valves 37L, 37R are switched to a state illustrated in Fig.
- switch valve 35c and the screed expand/contract control valves 37L, 37R are switched to a state illustrated in Fig. 4 according to a manual operation of the operator. It should be noted that an operator who operates the switch valve 35c and the screed expand/contract control valves 37L, 37R is typically different from an operator who manually operates the manual hydraulic pump system 15, but may be the same operator who operates the manual hydraulic pump system 15.
- the screed expand/contract unit F9, of the asphalt finisher 100 that has become unable to move in a state in which at least one of the left rear screed 3LR and the right rear screed 3RR is expanded in the vehicle width direction due to a failure related to the hydraulic source 14, to operate by using the auxiliary hydraulic source 60 to retract the rear screeds.
- the hopper drive unit F6, of the asphalt finisher 100 that has become unable to move in a state in which the hopper 2 is opened due to a failure related to the hydraulic source 14, to operate by using the auxiliary hydraulic source 60 to close the hopper 2.
- the cumbersome work includes works of, for example, lifting the screed 3 with a crane after removing the piping or a hose of the hydraulic cylinder that the operator wants to operate, pushing the rear screeds toward the center by using another machine, or closing the hopper 2 by using another machine.
- the pavement construction of a road such as an express highway and a national highway is carried out by closing the road, and the pavement construction of an airport runway is carried out at night when the runway is not used. Further, there is a limit to the time the road can be closed and there is a limit to the time the runway is not used, and thus, the pavement construction must be finished within the time limits. Under these limits, in the case where the asphalt finisher 100 has become unable to move due to a failure related to the hydraulic source 14, it is required that at least the asphalt finisher 100 is moved out of the construction site within the time limits in order to recover the construction site.
- the operator after causing the screed lift cylinders 25L, 25R to be contracted by using the auxiliary hydraulic source 60, the operator causes the screed expand/contract cylinders 27L, 27R to be contracted, or causes the hopper cylinders 24L, 24R to be expanded. This is to cause the asphalt finisher 100 to be in a state capable of being towed as soon as possible.
- the operator may carry out the contraction of the screed lift cylinders 25L, 25R, the contraction of the screed expand/contract cylinders 27L, 27R, and the expanding of the hopper cylinders 24L, 24R in different order, or may carry out simultaneously.
- the operator causes the screed expand/contract cylinders 27L, 27R to be contracted simultaneously.
- the operator may cause the screed expand/contract cylinders 27L, 27R to be contracted one by one in order. The same goes for the hopper cylinders 24L, 24R.
- the operator connects the coupler 46R attached to a duct extending from the discharging side of the auxiliary hydraulic source 60 with the coupler 47R attached to a duct of the upstream side of the leveling unit F5 in order to cause each of the drive units F5 to F10 to operate.
- the auxiliary hydraulic source 60 may be connected to right before the upstream side of the rode side hydraulic chambers of the screed lift cylinders 25L, 25R in order to only cause the screed lift cylinders 25L, 25R to be contracted.
- a connection mechanism that is similar to the self-seal coupling mechanism 47 may be located right before the upstream side of the rod side hydraulic chambers of the screed lift cylinders 25L, 25R.
- a connection mechanism as described above may be additionally arranged right before the upstream side of the rod side hydraulic chambers of the screed expand/contract cylinders 27L, 27R.
- a connection mechanism as described above may be additionally arranged right before the upstream side of the head side hydraulic chambers of the hopper cylinders 24L, 24R.
- a connection mechanism as described above may be additionally arranged right before the upstream side of other hydraulic cylinders.
- the auxiliary hydraulic source 60 is connected to the hydraulic system to be able to cause each of the drive units F5 to F10 to operate.
- the auxiliary hydraulic source 60 may be connected to the hydraulic system to be able to cause only the screed lift unit F7 to operate. This is because it is possible to cause the asphalt finisher 100 to be at least in a state capable of being towed if the screed lift unit F7 can be caused to operate.
- the auxiliary hydraulic source 60 may be connected to the hydraulic system to be able to cause only the hopper drive unit F6, the screed lift unit F7, and the screed expand/contract unit F9.
- the asphalt finisher 100 is at least in a state capable of being towed and capable of being transported by a trailer if the hopper drive unit F6, the screed lift unit F7, and the screed expand/contract unit F9 can be caused to operate.
- the auxiliary hydraulic source 60 is attached to the asphalt finisher 100 in a fixed manner.
- the auxiliary hydraulic source 60 may be attached to the asphalt finisher 100 in a detachable and re-attachable manner.
- another self-seal coupling mechanism may be arranged between the suction side of the auxiliary hydraulic source 60 and the hydraulic oil tank T.
- the auxiliary hydraulic source 60 includes the manual hydraulic pump system 15.
- the auxiliary hydraulic source 60 may include an electric hydraulic pump system or an accumulator.
- auxiliary hydraulic source 60 may be a portable type. In this case, preferably, the auxiliary hydraulic source 60 has such a size and weight that can be carried by one operator alone.
- the suction side of the auxiliary hydraulic source 60 is connected to the hydraulic oil tank T in an undetachable manner.
- the discharge side of the auxiliary hydraulic source 60 is either connected to the discharge side of the cylinder pump 14M via the self-seal coupling mechanism 47 or connected to the expansion side hydraulic chamber (head side hydraulic chamber) of the canopy cylinder 29 via the self-seal coupling mechanism 46 in a detachable and re-attachable manner.
- the auxiliary hydraulic source 60 is attached mainly in order to cause the canopy cylinder 29 to be expanded.
- the auxiliary hydraulic source 60 is attached in order to, in an emergency, cause the hopper cylinders 24L, 24R to be expanded, to cause the screed lift cylinders 25L, 25R to be contracted, or to cause the screed expand/contract cylinders 27L, 27R to be contracted.
- the main use of the auxiliary hydraulic source 60 may be other than causing the canopy cylinder 29 to be expanded.
- the auxiliary hydraulic source 60 may be attached in order to be used only in an emergency.
- the hydraulic system may include two or more auxiliary hydraulic sources.
- the discharge side of the first auxiliary hydraulic source may be connected to the discharge side of the cylinder pump 14M via the self-seal coupling mechanism 47 in a detachable manner and the discharge side of the second auxiliary hydraulic source may be connected to the expansion side hydraulic chamber (head side hydraulic chamber) of the canopy cylinder 29 via the self-seal coupling mechanism 46 in a detachable manner.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Machines (AREA)
Description
- The present invention relates to an asphalt finisher including a hydraulic actuator.
-
Document DE 42 11 286 A1 discloses an asphalt finisher in which a hydraulic cylinder is supplied with fluid from a main supply and an auxiliary supply. - Document
JP2012031890 - Document
JPH08120710 - In the case where a hydraulic shovel, which mounts an engine, a hydraulic pump actuated by the engine, and a traveling motor actuated by the hydraulic pump, becomes incapable of running due to a hydraulic oil source related failure such as an engine failure or a hydraulic pump failure, a hydraulic source unit as an external unit which enables the hydraulic shovel to run temporarily is known (refer to Patent Document 1).
- The hydraulic source unit mounts an external engine that is different from the engine mounted on the hydraulic shovel, and an external hydraulic pump that is different from the hydraulic pump of the hydraulic shovel and is actuated by the external engine. An operator connects the external hydraulic pump with a traveling motor of the hydraulic shovel via a hose, actuates the traveling motor by using the hydraulic oil discharged by the external pump, and causes the shovel to run.
- However, the above-described hydraulic source unit requires a large scale structure including an external engine capable of providing an output sufficient for causing the hydraulic shovel, which has become incapable of running due to a failure related to the hydraulic source, to run. Therefore, the hydraulic source unit has an excessive performance as an apparatus for driving hydraulic actuators other than the traveling motor in the asphalt finisher that has become incapable of running due to a failure related to the hydraulic source, and thus, it is difficult to introduce the hydraulic source unit because of the high cost, etc. As a result, there is a risk of creating, for example, a situation in which an asphalt finisher, which has become incapable of running and incapable of being towed in a state in which a screed is touched on a pavement surface due to a hydraulic source related failure, cannot be moved to a state capable of being towed. Further, there is a risk of creating a situation in which an asphalt finisher, which has become incapable of running and incapable of being transported by a trailer due to a hydraulic source related failure, cannot be moved to a state capable of being transported by a trailer. It should be noted that the state incapable of being transported by a trailer refers to, for example, a state in which the asphalt finisher has become incapable of running while the screed or a hopper has been expanded wider than a width of a tractor as a main body.
- In view of the above, it is desired to provide an asphalt finisher with a simple mechanism that moves the asphalt finisher, which has become incapable of running due to a hydraulic source related failure, to a state capable of being towed or a state capable of being transported by a trailer.
- According to the invention, this is done by providing an asphalt finisher as defined in
claim 1. -
-
Fig. 1A is a schematic side view of an asphalt finisher according to an embodiment of the present invention. -
Fig. 1B is a schematic top view of the asphalt finisher. -
Fig. 2 is a hydraulic circuit diagram illustrating an example of a structure of a hydraulic system mounted on the asphalt finisher. -
Fig. 3 is a hydraulic circuit diagram illustrating a state of the hydraulic system in a case where an operator causes a screed lift unit to operate by using an auxiliary hydraulic source. -
Fig. 4 is a hydraulic circuit diagram illustrating a state of the hydraulic system in a case where the operator operates a screed expand/contract unit by using an auxiliary hydraulic source. -
Fig. 1A andFig. 1B are schematic drawings of anasphalt finisher 100 as an example of a road machine according to an embodiment. It should be noted thatFig. 1A is a left side view of theasphalt finisher 100 andFig. 1B is a top view of theasphalt finisher 100. - The
asphalt finisher 100 includes mainly atractor 1, ahopper 2, a screed 3, and acontroller 50. It should be noted that, in the present embodiment, it is assumed that a front direction refers to a direction of thehopper 2 viewed from thetractor 1 and a rear direction refers to a direction of the screed 3 viewed from thetractor 1. - The
controller 50 is a control device for controlling theasphalt finisher 100. In the present embodiment, thecontroller 50 has an arithmetic processing including with a CPU and an internal memory. Further, various types of functions of thecontroller 50 are realized by causing the CPU to execute programs stored in the internal memory. - The
tractor 1 is a mechanism for causing theasphalt finisher 100 to travel. In the present embodiment, thetractor 1 causes theasphalt finisher 100 to move by rotatingrear wheels 5L, 5R by using rearwheel traveling motors front wheels 6L, 6R by using frontwheel traveling motors Fig. 1A andFig. 1B , approximate positions of various types of hydraulic actuators are illustrated transparently, and the rear wheel 5R and the front wheel 6R are hidden and unseen. The rearwheel traveling motors wheel traveling motors hydraulic oil source 14. Further, on top of thetractor 1, there is a cabin including a driving seat and a control panel. Acanopy 10 is attached on top of the cabin. It should be noted that, for the sake of drawing clarity, illustration of thecanopy 10 is omitted inFig. 1B . - The
hopper 2 is a mechanism for accepting a pavement material. In the present embodiment, thehopper 2 is capable of being opened and closed in a vehicle width direction viahopper cylinders asphalt finisher 100 accepts the pavement material (e.g., asphalt composite material) from a carrier of a dump track (not shown) by causing thehopper 2 to be in a full open state. It should be noted thatFig. 1A andFig. 1B illustrate that thehopper 2 is in a full open state. Further, when the asphalt composite material in thehopper 2 is decreased, thehopper 2 is closed and the asphalt composite material near the inner wall of thehopper 2 is collected in the center of thehopper 2, and thus, the asphalt composite material is ready to be conveyed and supplied to the screed 3 via a conveyor CV and a screw (not shown). - The
screed 3 is a mechanism for pouring and leveling the asphalt composite material. In the present embodiment, thescreed 3 includes mainly a left leveling arm (screed arm) 3AL, a right leveling arm 3AR, a left front screed 3LF, a right front screed 3RF, a left rear screed 3LR, and a right rear screed 3RR. Further, thescreed 3 is a floating screed that is towed by thetractor 1, and is connected to thetractor 1 via the left leveling arm 3AL and the right leveling arm 3AR. - The
screed 3 is moved up and down by using screedlift cylinders contract cylinders - The screed
lift cylinders screed 3 from the ground (pavement surface) In the present embodiment, cylinders of the screedlift cylinders tractor 1 and rods of the screedlift cylinders screed 3. Further, in the case of lifting thescreed 3 from the ground, thecontroller 50 causes thescreen lift cylinders 25L, 26R to be contracted by causing the hydraulic oil discharged by thehydraulic source 14 to be capable of flowing into each of rod side oil chambers of the screedlift cylinders controller 50 causes the hydraulic oil in each of the rod side oil chambers of the screedlift cylinders controller 50 causes the screedlift cylinders screed 3. - The screed expand/
contract cylinders screed 3 in the vehicle width direction. In the present embodiment, the screed expand/contract cylinder 27L causes the left rear screed 3LR to be expanded in a left direction with respect to the left front screed 3LF in the figure. Further, the screed expand/contract cylinder 27R causes the right rear screed 3RR to be expanded in a right direction with respect to the right front screed 3RF in the figure. - The leveling arms 3AL, 3AR are devices for connecting the
screed 3 to thetractor 1. Specifically, one end of each of the leveling arms 3AL, 3AR is connected to thescreed 3 and the other end is connected to thetractor 1 in a pivoting manner. - Leveling
cylinders cylinders tractor 1, and rods of the levelingcylinders controller 50 causes the levelingcylinders hydraulic source 14 to flow into each of the rod side oil chambers of the levelingcylinders controller 50 causes the levelingcylinders cylinders - Next, referring to
Fig. 2 , a hydraulic system mounted on theasphalt finisher 100 will be described. It should be noted thatFig. 2 is a hydraulic circuit diagram illustrating an example of a structure of a hydraulic system mounted on theasphalt finisher 100. - The hydraulic system includes mainly a
hydraulic source 14, a rear wheel drive unit F1, a conveyor/screw drive unit F2, a front wheel drive unit F3, a steering/compacting device drive unit F4, a leveling unit F5, a hopper drive unit F6, a screed lift unit F7, a crown device drive unit F8, a screed expand/contract unit F9, a step device drive unit F10, and a canopy drive unit F11. - The
hydraulic source 14 is a functional element for supplying hydraulic oil for causing the drive units F1 to F10 to operate. In the present embodiment, thehydraulic source 14 includes mainly anengine 14E, a rearwheel traveling pump 14R, acharge pump 14C, acylinder pump 14M, a conveyor/screw pump 14S, and a frontwheel traveling pump 14F. - The
engine 14E is a drive source for driving thehydraulic pumps wheel traveling pump 14R is a variable displacement hydraulic pump that supplies the hydraulic oil for driving the rear wheel drive unit F1. In the present embodiment, the rearwheel traveling pump 14R is a swash plate type variable displacement bidirectional hydraulic pump used in a closed circuit. - The
charge pump 14C is a fixed displacement hydraulic pump that supplies the hydraulic oil for controlling the rear wheel drive unit F1. - The
cylinder pump 14M is a variable displacement hydraulic pump that supplies the hydraulic oil to the drive units F4 to F10. In the present embodiment, thecylinder pump 14M is a swash plate type variable displacement hydraulic pump, whose discharge amount is controlled in such a way that a discharge pressure becomes constant at a predetermined pressure. - The conveyor/
screw pump 14S is a variable displacement hydraulic pump for supplying the hydraulic oil to the conveyor/screw drive unit F2. In the present embodiment, the conveyor/screw pump 14S is a swash plate type variable displacement hydraulic pump. - The front
wheel traveling pump 14F is a variable displacement hydraulic pump that supplies the hydraulic oil for driving the front wheel drive unit F3. In the present embodiment, the frontwheel traveling pump 14F is a swash plate type variable displacement hydraulic pump. - The rear wheel drive unit F1 is a functional element for driving the
rear wheels 5L, 5R. In the present embodiment, the rear wheel drive unit F1 includes a left rearwheel traveling motor 20L, a right rearwheel traveling motor 20R, check valves 20La, 20Ra, relief valves 20Lb, 20Rb, and adecelerator switch valve 40. - The left rear
wheel traveling motor 20L is a hydraulic motor for driving the leftrear wheel 5L. Further, the right rearwheel traveling motor 20R is a hydraulic motor for driving the right rear wheel 5R. In the present embodiment, the leftrear traveling motor 20L and the right rearwheel traveling motor 20R are non-stage transmission hydraulic motors, and form a closed circuit (HST circuit) together with the rearwheel traveling pump 14R. - The check valve 20La maintains a pressure of the hydraulic oil in a duct C1 that connects a first port of the rear
wheel traveling pump 14R and each of second ports of the left rearwheel traveling motor 20L and the right rearwheel traveling motor 20R at or greater than a predetermined pressure. Specifically, the check valve 20La causes the hydraulic oil discharged by the charge pump 14C to flow into the duct C1 in the case where a pressure of the hydraulic oil in the duct C1 becomes less than the discharge pressure of thecharge pump 14C. It should be noted that, in the figure, the numbers in parentheses indicate port numbers. Similarly, the check valve 20Ra maintains a pressure of the hydraulic oil in a duct C2 that connects a second port of the rearwheel traveling pump 14R and each of first ports of the left rearwheel traveling motor 20L and the right rearwheel traveling motor 20R at or greater than a predetermined pressure. Specifically, the check valve 20Ra causes the hydraulic oil discharged by the charge pump 14C to flow into the duct C2 in the case where a pressure of the hydraulic oil in the duct C2 becomes less than the discharge pressure of thecharge pump 14C. - The relief valve 20Lb maintains a pressure of the hydraulic oil in the duct C1 less than a predetermined relief pressure. Specifically, the relief valve 20Lb causes the hydraulic oil in the duct C1 to flow out of the closed circuit in the case where a pressure of the hydraulic oil in the duct C1 becomes greater than the relief pressure. Similarly, the relief valve 20Rb maintains a pressure of the hydraulic oil in the duct C2 less than a predetermined relief pressure. Specifically, the relief valve 20Rb causes the hydraulic oil in the duct C2 to flow out of the closed circuit in the case where a pressure of the hydraulic oil in the duct C2 becomes greater than the relief pressure.
- The
decelerator switch valve 40 is a mechanism for switching respective reduction ratios of the left rearwheel traveling motor 20L and the right rearwheel traveling motor 20R. In the present embodiment, in response to control instructions from thecontroller 50, thedeceleration switch valve 40 switches respective reduction ratios of the left rearwheel traveling motor 20L and the right rearwheel traveling motor 20R by using the hydraulic oil discharged by thecharge pump 14C. - The conveyor/screw drive unit F2 is a functional element for driving a conveyor and a screw. In the present embodiment, the conveyor/screw drive unit F2 includes mainly a conveyor/
screw motor 21 and a conveyor/screw valve 41. - The conveyor/
screw motor 21 is a variable displacement hydraulic motor that forms an open circuit, and includes a conveyor motor and a screw motor. Further, the conveyor/screw valve 41 includes a conveyor control valve and a screw control valve. - The conveyor control valve is switched in response to control instructions from the
controller 50, and causes the hydraulic oil discharged by the conveyor/screw pump 14S to flow into a suction port of the conveyor motor, and causes the hydraulic oil flowing out of a discharge port of the conveyor motor to be discharged into a hydraulic oil tank T. The screw control valve is switched in response to control instructions from thecontroller 50, causes the hydraulic oil discharged by the conveyor/screw pump 14S to flow into a suction port of the screw motor, and causes the hydraulic oil flowing out of a discharge port of the screw motor to be discharged into a hydraulic oil tank T. It should be noted that the hydraulic oil flowing out of a discharge port of the screw motor is discharged into the hydraulic oil tank T through anoil cooler 43. - The front wheel drive unit F3 is a functional element for driving the
front wheels 6L, 6R. In the present embodiment, the front wheel drive unit F3 includes mainly frontwheel traveling motors wheel traveling valve 42. - The front
wheel traveling motors wheel traveling valve 42 is switched in response to control instructions from thecontroller 50, and causes the hydraulic oil discharged by the frontwheel traveling pump 14F to flow into suction ports of the frontwheel traveling motors wheel traveling pump 14F is discharged into the hydraulic oil tank T without going through the frontwheel traveling valve 42. - The steering/compacting device drive unit F4 is a functional element for driving a steering device (not shown) and a compacting device (not shown). The steering device is a hydraulic device for steering the
front wheels 6L, 6R. In the present embodiment, in response to an operation of a steering ST (refer toFig. 1A ) by an operator, the steering device changes a steering angle of thefront wheels 6L, 6R by using the hydraulic oil discharged by thecylinder pump 14M. Further, the compacting device is a hydraulic device for compacting the asphalt composite material. In the present embodiment, the compacting device includes a tamper and a vibrator, and causes the tamper and the vibrator to operate by using the hydraulic oil discharged by thecylinder pump 14M. - The leveling unit F5 is a functional element for adjusting the construction thickness of the asphalt. In the present embodiment, the leveling unit F5 includes mainly a leveling
control valves cylinders - The leveling
cylinders cylinders - The leveling
control valves controller 50. In the case of increasing the construction thickness, the levelingcontrol valves cylinder pump 14M to flow into rod side hydraulic chambers of the levelingcylinders cylinders cylinders control valves cylinder pump 14M to flow into the head side hydraulic chambers of the levelingcylinders cylinders cylinders - The pilot check valves 33La, 33Lb, 33Ra, 33Rb prevent the
leveling cylinders leveling cylinder 23L to flow toward the hydraulic oil tank T only in the case where the hydraulic oil discharged by thecylinder pump 14M flows into the head side hydraulic chamber of theleveling cylinder 23L. Further, in the case other than the above, the pilot check valve 33La prohibits the hydraulic oil in the rod side hydraulic chamber of theleveling cylinder 23L from flowing toward the hydraulic oil tank T. The same goes for the pilot check valves 33Lb, 33Ra, 33Rb. - The hopper drive unit F6 is a functional element for opening and closing the
hopper 2. In the present embodiment, the hopper drive unit F6 includes mainly ahopper control valves hopper cylinders - The
hopper cylinders hopper 2. Thehopper cylinders hopper 2, and are expanded when closing thehopper 2. - The
hopper control valves controller 50. In the case of opening thehopper 2, thehopper control valves cylinder pump 14M to flow into rod side hydraulic chambers of thehopper cylinders hopper cylinders hopper cylinders hopper 2, thehopper control valves cylinder pump 14M to flow into the head side hydraulic chambers of thehopper cylinders hopper cylinders hopper cylinders - The pilot check valves 34La, 34Ra prevent the
hopper 2 from being opened by the contraction of thehopper cylinders hopper 2, or due to the weight ofhopper 2 and the asphalt composite material in thehopper 2. For example, the pilot check valve 34La allows the hydraulic oil in the head side hydraulic chamber of thehopper cylinder 24L to flow toward the hydraulic oil tank T only in the case where the hydraulic oil discharged by thecylinder pump 14M flows into the rod side hydraulic chamber of thehopper cylinder 24L. Further, in the case other than the above, the pilot check valve 34La prohibits the hydraulic oil in the head side hydraulic chamber of thehopper cylinder 24L from flowing toward the hydraulic oil tank T. The same goes for the pilot check valves 34Ra. - It should be noted that, in the hopper drive unit F6, pilot check valves are not included between the rod side hydraulic chambers of the
hopper cylinders hopper control valves hopper cylinders hopper 2 is large. It should be noted, however, that pilot check valves may be included between the rod side hydraulic chambers of thehopper cylinders hopper control valves - The screed lift unit F7 is a functional element for lifting the
screed 3. In the present embodiment, the screed lift unit F7 includes mainly a screedlift control valve 35,screed lift cylinders switch valve 35a, arelief valve 35b, and aswitch valve 35c. - The
screed lift cylinders screed 3. Thescreed lift cylinders screed 3, and are expanded simultaneously when moving down thescreed 3. - The screed
lift control valve 35 switches its valve position in response to a control signal from thecontroller 50. In the case of lifting thescreed 3, the screedlift control valve 35 causes the hydraulic oil discharged by thecylinder pump 14M to flow into rod side hydraulic chambers of thescreed lift cylinders switch valve 35a is switched to the first position including a check valve in response to the control signal from thecontroller 50. This is to prevent the hydraulic oil from flowing backward from the rod side hydraulic chambers of thescreed lift cylinders screed lift cylinders lift control valve 35. In this case, thescreed lift cylinders screed 3 on the ground surface, the screedlift control valve 35 is not used (maintained in a state illustrated inFig. 2 ). In this case, theswitch valve 35a is switched to the second position not including a check valve in response to the control signal from thecontroller 50. This is to cause the hydraulic oil in the rod side hydraulic chambers of thescreed lift cylinders screed lift cylinders screed 3, and the hydraulic oil in the rod side hydraulic chambers of thescreed lift cylinders switch valve 35a and therelief valve 35b. - The
switch valve 35a and therelief valve 35b realize upward and downward movement of thescreed 3 in accordance with changes of lift force (force of the asphalt composite material for lifting the screed 3) that is generated when theasphalt finisher 100 paves the road while moving. Specifically, when thescreed 3 moves up due to an increase of the lift force, thescreed lift cylinders cylinder pump 14M flows into the rod side hydraulic chambers of thescreed lift cylinders lift control valve 35, and theswitch valve 35a. On the other hand, when thescreed 3 moves down due to a decrease of the lift force, thescreed lift cylinders screed lift cylinders switch valve 35a, the screedlift control valve 35, and therelief valve 35b. It should be noted that, when theasphalt finisher 100 paves the road while moving, in response to a control signal from thecontroller 50, during when the drive units F8 to F10 are not used, theswitch valve 35c is switched to the first position that includes a check valve. This is for not providing bad influence to the drive units F8 to F10 located downstream. Specifically, this is for preventing a crown device, a step device, etc., from moving unintentionally. - The crown device drive unit F8 is a functional element for driving the crown device. In the present embodiment, the crown device drive unit F8 includes mainly a crown
device control valve 36 and acrown device motor 26. - The crown device is a mechanism for causing the length of a
turnbuckle 26a (refer toFig. 1B ) attached between the left front screed 3LF and the right front screed 3RF to increase or decrease, and thus, causing the top contour shape of thescreed 3 viewed from the back to be convex or concave. Specifically, in response to control instructions from thecontroller 50, the crown device causes the length of theturnbuckle 26a to increase or decrease by rotating thecrown device motor 26 as a hydraulic actuator. - The convex degree of the top contour shape of the
screed 3 increase as the length of theturnbuckle 26a increases compared with a reference length; the concave degree of the top contour shape of thescreed 3 increases as the length of theturnbuckle 26a decreases compared with the reference length; and the top contour shape is linear in the case where the length of theturnbuckle 26a is equal to the reference length. - The crown
device control valve 36 switches its valve position in response to a control signal from thecontroller 50. In the case of increasing the convex degree of the top contour shape of thescreed 3, the crowndevice control valve 36 causes the hydraulic oil discharged by thecylinder pump 14M to flow into one port of thecrown device motor 26. Further, in the case of increasing the concave degree of the top contour shape of thescreed 3, the crowndevice control valve 36 causes the hydraulic oil discharged by thecylinder pump 14M to flow into the other port of thecrown device motor 26. - The screed expand/contract unit F9 is a functional element for expanding and contracting the rear screeds in the vehicle width direction. In the present embodiment, the screed expand/contract unit F9 includes mainly a screed expand/
contract control valves contract cylinders - The screed expand/
contract cylinder 27L is a hydraulic actuator for expanding/contracting the left rear screed 3LR in the vehicle width direction. The screed expand/contract cylinder 27L is contracted when narrowing the width, and is expanded when widening the width. Further, the screed expand/contract cylinder 27R is a hydraulic actuator for expanding/contracting the right rear screed 3RR in the vehicle width direction. The screed expand/contract cylinder 27R is contracted when narrowing the width, and is expanded when widening the width. - The screed expand/
contract control valves controller 50. In the case of narrowing the width, the screed expand/contract control valves cylinder pump 14M to flow into rod side hydraulic chambers of the screed expand/contract cylinders contract cylinders contract cylinders - On the other hand, in the case of widening the width, the screed expand/
contract control valves cylinder pump 14M to flow into the head side hydraulic chambers of the screed expand/contract cylinders contract cylinders contract cylinders - The pilot check valves 37La, 37Lb, 37Ra, 37Rb prevent the screed expand/
contract cylinders contract cylinder 27L to flow toward the hydraulic oil tank T only in the case where the hydraulic oil discharged by thecylinder pump 14M flows into the head side hydraulic chamber of the screed expand/contract cylinder 27L. Further, in the case other than the above, the pilot check valve 37La prohibits the hydraulic oil in the rod side hydraulic chamber of the screed expand/contract cylinder 27L from flowing toward the hydraulic oil tank T. The same goes for the pilot check valves 37Lb, 37Ra, 37Rb. - The relief valves 37Lc, 37Rc prevent members related to the rear screeds from being destroyed by an excessive external force acting in a direction for causing the rear screeds to be contracted. For example, in the case where a pressure of the hydraulic oil in the head side chamber of the screed expand/
contract cylinder 27L increases excessively by receiving an excessive external force acting in a direction for causing the screed expand/contract cylinder 27L to be contracted, the relief valve 37Lc allows the hydraulic oil in the head side chamber to flow into the hydraulic oil tank T. As a result, the screed expand/contract cylinder 27L is contracted, and partially absorbs the external force, and thus, prevents the left rear screed 3LR from being damaged. The same goes for the relief valve 37Rc. - The step device drive unit F10 is a functional element for driving the step device. In the present embodiment, the step device drive unit F10 includes mainly a step
device control valves step device motors - The step device is a mechanism for moving the rear screeds up and down in order to eliminate a step formed between a surface paved by the front screeds and a surface paved by the rear screeds. Specifically, in response to control instructions from the
controller 50, the step device rotates thestep device motors - The step
device control valve 38L switches its valve position in response to a control signal from thecontroller 50. In the case of moving up the left rear screed 3LR, the stepdevice control valve 38L causes the hydraulic oil discharged by thecylinder pump 14M to flow into one port of thestep device motor 28L. Further, in the case of moving down the left rear screed 3LR, the stepdevice control valve 38L causes the hydraulic oil discharged by thecylinder pump 14M to flow into the other port of thestep device motor 28L. The same goes for a case in which the stepdevice control valve 38R moves the right rear screed 3RR up and down. - The canopy drive unit F11 is a functional element for unfolding the folded
canopy 10. In the present embodiment, the canopy drive unit F11 includes mainly an auxiliaryhydraulic source 60, a self-seal coupling mechanism 46, and acanopy cylinder 29. - The auxiliary
hydraulic source 60 is a hydraulic source prepared separately from thehydraulic source 14. In the present embodiment, the auxiliaryhydraulic source 60 includes mainly a manualhydraulic pump system 15 and an auxiliary hydraulicsource control valve 39. - The manual
hydraulic pump system 15 pumps and discharges the hydraulic oil in the hydraulic oil tank T in response to up and down movement of an attached lever moved by an operator. - The auxiliary hydraulic
source control valve 39 switches its valve position in response to a manual operation of the operator. In the case of unfolding thecanopy 10, the auxiliary hydraulicsource control valves 39 causes the hydraulic oil discharged by the manualhydraulic pump system 15 to flow into a head side hydraulic chamber of thecanopy cylinder 29, and causes the hydraulic oil flowing out of a rod side hydraulic chamber of thecanopy cylinder 29 to be discharged into the hydraulic oil tank T. In this case, thecanopy cylinder 29 is expanded, and thecanopy 10 in a folded state is unfolded. On the other hand, in the case of folding the unfoldedcanopy 10, the auxiliary hydraulicsource control valve 39 causes the hydraulic oil in the head side chamber of thecanopy cylinder 29 to be capable of flowing out; the hydraulic oil in the head side hydraulic chamber flows out due to the weight of thecanopy 10; and the canopy cylinder 20 is contracted. In this case, it is not necessary for an operator to manually operate the manualhydraulic pump system 15. This is because thecanopy cylinder 29 is contracted naturally while drawing the hydraulic oil in the hydraulic oil tank T into the rod side hydraulic chamber of thecanopy cylinder 29 due to the weight of thecanopy 10. - The self-
seal coupling mechanism 46 is a mechanism for connecting the head side hydraulic chamber of thecanopy cylinder 29 with the auxiliaryhydraulic source 60, and includes a pair ofcouplers coupler 46L is attached to a duct extending from the head side hydraulic chamber of thecanopy cylinder 29. Thecoupler 46R is attached to a duct extending from the discharging side of the auxiliaryhydraulic source 60. Further, the self-seal coupling mechanism 46 causes the hydraulic oil to flow through the pair of thecouplers couplers couplers couplers - The self-
seal coupling mechanism 47 is a mechanism for connecting thecylinder pump 14M with the drive units F5 to F10, and includes a pair ofcouplers coupler 47L is attached to a duct extending from the discharging side of thecylinder pump 14M. Thecoupler 47R is attached to an upstream side duct of the leveling unit F5. Further, the self-seal coupling mechanism 47 causes the hydraulic oil to flow through the pair of thecouplers couplers couplers couplers - By using the above self-
seal coupling mechanisms engine 14E and thecylinder pump 14M), the auxiliaryhydraulic source 60. As a result, in the case where a failure related to thehydraulic source 14 occurs, it is possible for an operator to cause the drive units F5 to F10 to operate by using the auxiliaryhydraulic source 60. Specifically, it is possible for an operator to separate each of the connections of the self-seal coupling mechanisms hydraulic source 60 with the drive units F5 to F10 by connecting thecoupler 46R with thecoupler 47R. - It should be noted that the auxiliary
hydraulic source 60 is not used for driving the rearwheel traveling motors wheel traveling motors wheel traveling motors hydraulic source 60 is separated from a duct connected to the rearwheel traveling motors wheel traveling motors seal coupling mechanisms wheel traveling motors wheel traveling motors - Here, referring to
Fig. 3 , a process will be described in which an operator causes the screed lift unit F7 to operate by using the auxiliaryhydraulic source 60. It should be noted thatFig. 3 illustrates a state of the hydraulic system in a case where an operator causes the screed lift unit F7 to operate by using the auxiliaryhydraulic source 60, and corresponds toFig. 2 . Further,Fig. 3 illustrates a state in which thecoupler 46R has already been connected with thecoupler 47R by an operator. It should be noted that solid line arrows inFig. 3 depict a flow of the hydraulic oil flowing out of the hydraulic oil tank T into each of the rod side hydraulic chambers of thescreed lift cylinders Fig. 3 depict a flow of the hydraulic oil flowing out of each of the head side hydraulic chambers of thescreed lift cylinders - First, an operator manually operates the auxiliary
hydraulic source 60 and the auxiliary hydraulicsource control valve 39 to cause the hydraulic oil discharged by the manualhydraulic pump system 15 to be directed to the screed lift unit F7. The hydraulic oil discharged by the manualhydraulic pump system 15 goes through the auxiliary hydraulicsource control valve 39, thecoupler 46R, thecoupler 47R, the screedlift control valve 35, and theswitch valve 35a, and flows into each of the rod side hydraulic chambers of thescreed lift cylinders lift control valve 35 is switched to a state illustrated inFig. 3 in response to control instructions from thecontroller 50 according to an operational input by the operator via the control panel. In the case where the electrical system cannot be used, the screedlift control valve 35 is switched to a state illustrated inFig. 3 according to a manual operation of the operator. It should be noted that an operator who operates the screedlift control valve 35 is typically different from an operator who manually operates the manualhydraulic pump system 15, but may be the same operator who operates the manualhydraulic pump system 15. - When the hydraulic oil flows into each of the rod side hydraulic chambers of the
screed lift cylinders screed lift cylinders screed lift cylinders screed 3 is lifted. - When the
screed 3 is lifted to a desired height, the operator operates the screedlift control valve 35 to block the hydraulic oil flow from the manualhydraulic pump system 15 to each of the rod side hydraulic chambers of thescreed lift cylinders screed lift cylinders screed 3 is maintained in a lifted state. - Next, referring to
Fig. 4 , a process will be described in which an operator causes the screed expand/contract unit F9 to operate by using the auxiliaryhydraulic source 60. It should be noted thatFig. 4 illustrates a state of the hydraulic system in a case where an operator causes the screed expand/contract unit F9 to operate by using the auxiliaryhydraulic source 60, and corresponds toFig. 2 andFig. 3 . Further,Fig. 4 illustrates a state in which thecoupler 46R has already been connected with thecoupler 47R by the operator. It should be noted that solid line arrows inFig. 4 depict a flow of the hydraulic oil flowing out of the hydraulic oil tank T into each of the rod side hydraulic chambers of the screed expand/contract cylinders Fig. 4 depict a flow of the hydraulic oil flowing out of each of the head side hydraulic chambers of the screed expand/contract cylinders Fig. 4 illustrates thescreed lift cylinders - First, the operator manually operates the auxiliary
hydraulic source 60 and the auxiliary hydraulicsource control valve 39 to cause the hydraulic oil discharged by the manualhydraulic pump system 15 to be directed to the screed expand/contract unit F9. The hydraulic oil discharged by the manualhydraulic pump system 15 goes through the auxiliary hydraulicsource control valve 39, thecoupler 46R, thecoupler 47R, the screed expand/contract control valves contract cylinders switch valve 35c and the screed expand/contract control valves Fig. 4 in response to control instructions from thecontroller 50 according to an operational input by the operator via the control panel. In the case where the electrical system cannot be used, theswitch valve 35c and the screed expand/contract control valves Fig. 4 according to a manual operation of the operator. It should be noted that an operator who operates theswitch valve 35c and the screed expand/contract control valves hydraulic pump system 15, but may be the same operator who operates the manualhydraulic pump system 15. - With the above processes, it is possible for an operator to cause the screed lift unit F7, of the
asphalt finisher 100 that has become unable to move in a state in which thescreed 3 is touched on the pavement surface due to a failure related to thehydraulic source 14, to operate by using the auxiliaryhydraulic source 60 to lift thescreed 3 from the pavement surface. As described above, even in the case where theasphalt finisher 100 cannot be moved due to a failure related to thehydraulic source 14, it is possible for an operator to cause theasphalt finisher 100 in a state incapable of being towed to be in a state capable of being towed. - Further, it is possible for an operator to cause the screed expand/contract unit F9, of the
asphalt finisher 100 that has become unable to move in a state in which at least one of the left rear screed 3LR and the right rear screed 3RR is expanded in the vehicle width direction due to a failure related to thehydraulic source 14, to operate by using the auxiliaryhydraulic source 60 to retract the rear screeds. Further, it is possible for an operator to cause the hopper drive unit F6, of theasphalt finisher 100 that has become unable to move in a state in which thehopper 2 is opened due to a failure related to thehydraulic source 14, to operate by using the auxiliaryhydraulic source 60 to close thehopper 2. As described above, even in the case where theasphalt finisher 100 cannot be moved due to a failure related to thehydraulic source 14, it is possible for an operator to cause theasphalt finisher 100 in a state incapable of being transported by a trailer to be in a state capable of being transported by a trailer. - As a result, it is possible for an operator to quickly cause the
asphalt finisher 100 to be in a state capable of being towed or a state capable of being transported by a trailer, while avoiding the cumbersome work. The cumbersome work includes works of, for example, lifting thescreed 3 with a crane after removing the piping or a hose of the hydraulic cylinder that the operator wants to operate, pushing the rear screeds toward the center by using another machine, or closing thehopper 2 by using another machine. - Normally, the pavement construction of a road such as an express highway and a national highway is carried out by closing the road, and the pavement construction of an airport runway is carried out at night when the runway is not used. Further, there is a limit to the time the road can be closed and there is a limit to the time the runway is not used, and thus, the pavement construction must be finished within the time limits. Under these limits, in the case where the
asphalt finisher 100 has become unable to move due to a failure related to thehydraulic source 14, it is required that at least theasphalt finisher 100 is moved out of the construction site within the time limits in order to recover the construction site. Even in the case where theasphalt finisher 100 has become unable to move due to a failure related to thehydraulic source 14, it is possible for the above-described hydraulic system to quickly and easily cause theasphalt finisher 100 to be in a state capable of being towed, and thus, the above requirements can be satisfied. - It should be noted that, in the above embodiment, after causing the
screed lift cylinders hydraulic source 60, the operator causes the screed expand/contract cylinders hopper cylinders asphalt finisher 100 to be in a state capable of being towed as soon as possible. However, the operator may carry out the contraction of thescreed lift cylinders contract cylinders hopper cylinders - Further, in the above embodiment, the operator causes the screed expand/
contract cylinders contract cylinders hopper cylinders - Further, in the above embodiment, the operator connects the
coupler 46R attached to a duct extending from the discharging side of the auxiliaryhydraulic source 60 with thecoupler 47R attached to a duct of the upstream side of the leveling unit F5 in order to cause each of the drive units F5 to F10 to operate. However, the auxiliaryhydraulic source 60 may be connected to right before the upstream side of the rode side hydraulic chambers of thescreed lift cylinders screed lift cylinders seal coupling mechanism 47 may be located right before the upstream side of the rod side hydraulic chambers of thescreed lift cylinders hydraulic source 60 capable of causing the screed expand/contract cylinders contract cylinders hydraulic source 60 capable of causing thehopper cylinders hopper cylinders - Further, in the above embodiment, the auxiliary
hydraulic source 60 is connected to the hydraulic system to be able to cause each of the drive units F5 to F10 to operate. However, the auxiliaryhydraulic source 60 may be connected to the hydraulic system to be able to cause only the screed lift unit F7 to operate. This is because it is possible to cause theasphalt finisher 100 to be at least in a state capable of being towed if the screed lift unit F7 can be caused to operate. Further, the auxiliaryhydraulic source 60 may be connected to the hydraulic system to be able to cause only the hopper drive unit F6, the screed lift unit F7, and the screed expand/contract unit F9. This is because it is possible to cause theasphalt finisher 100 to be at least in a state capable of being towed and capable of being transported by a trailer if the hopper drive unit F6, the screed lift unit F7, and the screed expand/contract unit F9 can be caused to operate. - Further, in the above embodiment, the auxiliary
hydraulic source 60 is attached to theasphalt finisher 100 in a fixed manner. However, the auxiliaryhydraulic source 60 may be attached to theasphalt finisher 100 in a detachable and re-attachable manner. In this case, another self-seal coupling mechanism may be arranged between the suction side of the auxiliaryhydraulic source 60 and the hydraulic oil tank T. With the above arrangement, even in the case where the auxiliaryhydraulic source 60 is not included in theasphalt finisher 100 as standard equipment, it is possible for an operator to attach an auxiliaryhydraulic source 60 located at another location to theasphalt finisher 100 as necessary. - Further, in the above embodiment, the auxiliary
hydraulic source 60 includes the manualhydraulic pump system 15. However, the auxiliaryhydraulic source 60 may include an electric hydraulic pump system or an accumulator. - Further, the auxiliary
hydraulic source 60 may be a portable type. In this case, preferably, the auxiliaryhydraulic source 60 has such a size and weight that can be carried by one operator alone. - Further, in the above embodiment, the suction side of the auxiliary
hydraulic source 60 is connected to the hydraulic oil tank T in an undetachable manner. Further, the discharge side of the auxiliaryhydraulic source 60 is either connected to the discharge side of thecylinder pump 14M via the self-seal coupling mechanism 47 or connected to the expansion side hydraulic chamber (head side hydraulic chamber) of thecanopy cylinder 29 via the self-seal coupling mechanism 46 in a detachable and re-attachable manner. In other words, the auxiliaryhydraulic source 60 is attached mainly in order to cause thecanopy cylinder 29 to be expanded. In addition to the above, the auxiliaryhydraulic source 60 is attached in order to, in an emergency, cause thehopper cylinders screed lift cylinders contract cylinders hydraulic source 60 may be other than causing thecanopy cylinder 29 to be expanded. Further, the auxiliaryhydraulic source 60 may be attached in order to be used only in an emergency. - Further, the hydraulic system may include two or more auxiliary hydraulic sources. In this case, the discharge side of the first auxiliary hydraulic source may be connected to the discharge side of the
cylinder pump 14M via the self-seal coupling mechanism 47 in a detachable manner and the discharge side of the second auxiliary hydraulic source may be connected to the expansion side hydraulic chamber (head side hydraulic chamber) of thecanopy cylinder 29 via the self-seal coupling mechanism 46 in a detachable manner. - Further, the present application is based on and claims the benefit of priority of Japanese Priority Application No.
2014-208605 filed on October 10, 2014 -
- 1:
- tractor,
- 2:
- hopper,
- 3:
- screed,
- 3AL:
- left leveling arm,
- 3AR:
- right leveling arm,
- 3LF:
- left front screed,
- 3RF:
- right front screed,
- 3LR:
- left rear screed,
- 3RR:
- right rear screed,
- 5L, 5R:
- rear wheels,
- 6L, 6R:
- front wheels,
- 10:
- canopy,
- 14:
- hydraulic source,
- 14C:
- charge pump,
- 14E:
- engine,
- 14F:
- front wheel traveling pump,
- 14M:
- cylinder pump,
- 14R:
- rear wheel traveling pump,
- 14S:
- conveyor/screw pump,
- 15:
- manual hydraulic pump system,
- 20L, 20R:
- rear wheel traveling motor,
- 20La, 20Ra:
- check valves,
- 20Lb, 20Rb:
- relief valves,
- 21:
- conveyor/screw motor,
- 22L, 22R:
- front wheel traveling motor,
- 23L, 23R:
- leveling cylinders,
- 24L, 24R:
- hopper cylinders,
- 25L, 25R:
- screed lift cylinders,
- 26:
- crown device motor,
- 26a:
- turnbuckle,
- 27L, 27R:
- screed expand/contract cylinders,
- 28L, 28R:
- step device motor,
- 29:
- canopy cylinder,
- 33L, 33R:
- leveling control valves,
- 33La, 33Ra, 33Lb, 33Rb:
- pilot check valves,
- 34L, 34R:
- hopper control valves,
- 34La, 34Ra:
- pilot check valves,
- 35:
- screed lift control valve,
- 35a:
- switch valve,
- 35b:
- relief valve,
- 35c:
- switch valve,
- 36:
- crown device control valve,
- 37L, 37R:
- screed expand/contract control valves,
- 37La, 37Ra, 37Lb, 37Rb:
- pilot check valves,
- 37Lc, 37Rc:
- relief valves,
- 38L, 38R:
- step device control valves,
- 39:
- auxiliary hydraulic source control valve,
- 40:
- deceleration switch valve,
- 41:
- conveyor/screw valve,
- 42:
- front wheel traveling valve,
- 43:
- oil cooler,
- 46:
- self-seal coupling mechanism,
- 46L, 46R:
- couplers,
- 47:
- self-seal coupling mechanism,
- 47L, 47R:
- couplers,
- 50:
- controller,
- 60:
- auxiliary hydraulic source,
- F1:
- rear wheel drive unit,
- F2:
- conveyor/screw drive unit,
- F3:
- front wheel drive unit,
- F4:
- steering/compacting device drive unit,
- F5:
- leveling unit,
- F6:
- hopper drive unit,
- F7:
- screed lift unit,
- F8:
- crown device drive unit,
- F9:
- screed expand/contract unit,
- F10:
- step device drive unit,
- F11:
- canopy drive unit,
- ST:
- steering,
- T:
- hydraulic oil tank
Claims (7)
- An asphalt finisher comprising:a first hydraulic pump (14R) configured to supply hydraulic oil to a traveling motor (20L, 20R);a second hydraulic pump (14M) configured to supply hydraulic oil to a first hydraulic actuator (23L, 23R, 24L, 24R, 25L, 25R, 26, 27L, 27R, 28L, 28R) via a first self-seal coupling mechanism (47);an auxiliary hydraulic source (60) comprising an auxiliary hydraulic source control valve (39) and comprising a third manual or electric hydraulic pump (15) or an accumulator configured to supply hydraulic oil to a second hydraulic actuator (29) via a second self-seal coupling mechanism (46), wherein the auxiliary hydraulic source is a portable type; anda drive source (14E) configured to drive the first hydraulic pump and the second hydraulic pump, wherein the first and the second self-seal coupling mechanisms (46, 47) can be used to connect the first hydraulic actuator (23L, 23R, 24L, 24R, 25L, 25R, 26, 27L, 27R, 28L, 28R) with the auxiliary hydraulic source (60), andthe auxiliary hydraulic source control valve (39) is configured to be arranged between the first as well as second hydraulic actuators (23L, 23R, 24L, 24R, 25L, 25R, 26, 27L, 27R, 28L, 28R, 29) and the third manual or electric hydraulic pump (15) or the accumulator via the first and the second self-seal coupling mechanisms (46, 47) in order to switch the flow destination of the hydraulic oil, which is supplied from the third manual or electric hydraulic pump (15) or the accumulator, from the second hydraulic actuator (29) to the first hydraulic actuator (23L, 23R, 24L, 24R, 25L, 25R, 26, 27L, 27R, 28L, 28R).
- The asphalt finisher according to claim 1, wherein a duct of a discharge side of the auxiliary hydraulic source (60) is separated from a duct connected to the traveling motor (20L, 20R).
- The asphalt finisher according to claim 1, further comprising:
a connection mechanism connectable to the auxiliary hydraulic source (60). - The asphalt finisher according to claim 1, wherein
the first hydraulic actuator includes a screed liftcylinder (25L, 25R), and
the auxiliary hydraulic source (60) is capable of supplying the hydraulic oil to at least the screed lift cylinder. - The asphalt finisher according to claim 1, wherein the auxiliary hydraulic source (60) is attachable to and detachable from the asphalt finisher.
- The asphalt finisher according to claim 1, wherein a discharge side of the auxiliary hydraulic source (60) is connectable to a discharge side of the second hydraulic pump (14M) via the first self-seal coupling mechanism (47), and is connectable to an expansion side hydraulic chamber of a canopy cylinder (29) via the second self-seal coupling mechanism (46).
- The asphalt finisher according to claim 2, wherein the second self-seal coupling mechanism (46) and the duct connected to the traveling motor (20L, 20R) are in a state of no connection.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014208605 | 2014-10-10 | ||
PCT/JP2015/078529 WO2016056603A1 (en) | 2014-10-10 | 2015-10-07 | Asphalt finisher |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3205772A1 EP3205772A1 (en) | 2017-08-16 |
EP3205772A4 EP3205772A4 (en) | 2017-10-18 |
EP3205772B1 true EP3205772B1 (en) | 2020-09-23 |
Family
ID=55653209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15849548.1A Active EP3205772B1 (en) | 2014-10-10 | 2015-10-07 | Asphalt finisher |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3205772B1 (en) |
JP (1) | JP6513692B2 (en) |
CN (1) | CN106795700B (en) |
WO (1) | WO2016056603A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113403919B (en) * | 2021-05-22 | 2022-07-15 | 山东高速工程建设集团有限公司 | High liquid limit soil filling compaction method |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4211286C2 (en) * | 1992-04-03 | 2003-08-21 | Metso Dynapac Gmbh | Method for locking a paving stone of a paver and paver for carrying out the method |
JP2937773B2 (en) * | 1994-10-19 | 1999-08-23 | 新キャタピラー三菱株式会社 | Emergency equipment for emergency rescue vehicles and construction vehicles |
DE20013638U1 (en) * | 2000-08-08 | 2000-10-12 | Joseph Voegele Ag, 68163 Mannheim | Paver |
CN201023420Y (en) * | 2007-02-13 | 2008-02-20 | 西安达刚路面车辆有限公司 | Roadway maintenance vehicle with special power source |
DE502009000490D1 (en) * | 2009-06-29 | 2011-05-05 | Joseph Voegele Ag | Self-propelled machine |
JP5134051B2 (en) * | 2010-07-29 | 2013-01-30 | 住友建機株式会社 | Operation unit provided between the hydraulic construction machine and the emergency escape hydraulic unit |
JP5523261B2 (en) * | 2010-09-21 | 2014-06-18 | 日本車輌製造株式会社 | Hydraulic work machine |
CN103569098B (en) * | 2013-11-19 | 2016-10-26 | 中国第一汽车股份有限公司 | Hydraulic pressure process auxiliary drive and brakes and control method thereof |
-
2015
- 2015-10-07 WO PCT/JP2015/078529 patent/WO2016056603A1/en active Application Filing
- 2015-10-07 CN CN201580054488.9A patent/CN106795700B/en active Active
- 2015-10-07 EP EP15849548.1A patent/EP3205772B1/en active Active
- 2015-10-07 JP JP2016553142A patent/JP6513692B2/en active Active
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
CN106795700B (en) | 2019-11-12 |
JP6513692B2 (en) | 2019-05-15 |
CN106795700A (en) | 2017-05-31 |
WO2016056603A1 (en) | 2016-04-14 |
EP3205772A1 (en) | 2017-08-16 |
EP3205772A4 (en) | 2017-10-18 |
JPWO2016056603A1 (en) | 2017-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10316496B2 (en) | Hydraulic system for work machine, and work machine | |
US10711438B2 (en) | Hydraulic system for working machine | |
US8448741B2 (en) | Electro-hydraulic steering feedback and adjustment | |
EP2652212B1 (en) | Closed loop drive circuit with open circuit pump assist for high speed travel | |
CN103930626B (en) | Engineering machinery | |
JP6006252B2 (en) | Dump truck hoist equipment | |
US11767660B2 (en) | Control valve of hydraulic system for working machine | |
JP6537962B2 (en) | Hydraulic system of work machine and work machine | |
US20180066681A1 (en) | Hydraulic stabilizing system | |
JP6419521B2 (en) | Road machinery | |
EP3205772B1 (en) | Asphalt finisher | |
US10604177B2 (en) | Steering device, construction machine with a steering device and method for steering a steerable machine | |
WO2016163058A1 (en) | Work machine hydraulic system and work machine provided with said hydraulic system | |
US11255353B2 (en) | Hydraulic system of working machine | |
JP4502890B2 (en) | Backhoe hydraulic circuit structure | |
US11053664B2 (en) | Hydraulic system for working machine | |
US10731323B2 (en) | Hydraulic system for working machine | |
JP6869829B2 (en) | Work machine hydraulic system | |
JP2022154675A (en) | asphalt finisher | |
JP6949783B2 (en) | Work machine hydraulic system | |
WO2022210608A1 (en) | Asphalt finisher | |
CN115198613A (en) | Self-propelled ground milling machine and method for operating a ground milling machine in emergency operation | |
JP2019124359A (en) | Hydraulic system of work machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20170503 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20170915 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E01C 19/48 20060101AFI20170911BHEP |
|
17Q | First examination report despatched |
Effective date: 20171002 |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20200515 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602015059631 Country of ref document: DE Ref country code: AT Ref legal event code: REF Ref document number: 1316490 Country of ref document: AT Kind code of ref document: T Effective date: 20201015 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201224 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201223 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1316490 Country of ref document: AT Kind code of ref document: T Effective date: 20200923 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20200923 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210125 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210123 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602015059631 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201007 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20201031 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 |
|
26N | No opposition filed |
Effective date: 20210624 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201123 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201007 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201223 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210123 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200923 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200923 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20230913 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20230830 Year of fee payment: 9 |