EP3189572A1 - System and method for switching an electrical system to backup power during a utility power outage - Google Patents

System and method for switching an electrical system to backup power during a utility power outage

Info

Publication number
EP3189572A1
EP3189572A1 EP15716961.6A EP15716961A EP3189572A1 EP 3189572 A1 EP3189572 A1 EP 3189572A1 EP 15716961 A EP15716961 A EP 15716961A EP 3189572 A1 EP3189572 A1 EP 3189572A1
Authority
EP
European Patent Office
Prior art keywords
branch breakers
generation source
local generation
breaker
structured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP15716961.6A
Other languages
German (de)
English (en)
French (fr)
Inventor
David A. ELDRIDGE
Brandon J. Rogers
Maximilian A. Mueller
Ronald L. Thompson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Eaton Intelligent Power Ltd
Original Assignee
Eaton Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eaton Corp filed Critical Eaton Corp
Publication of EP3189572A1 publication Critical patent/EP3189572A1/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00036Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
    • H02J13/0004Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers involved in a protection system
    • H02J13/0006
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/08Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems requiring starting of a prime-mover
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/248UPS systems or standby or emergency generators

Definitions

  • the disclosed concept pertains generally to electrical distribution systems, and, more particularly, to a system and method for switching an electrical system, such as a residential electrical system, to a local generation source during a main utility source power outage that does not employ an automatic transfer switch or similar apparatus.
  • a distributed power source also sometimes referred to as a local generation source or a local energy resource, is a small-scale power generation mechanism used to provide an alternative to or an enhancement of the traditional electric power system.
  • Distributed power sources include, for example and without limitation, photovoltaic (PV) modules (coupled to a DC/ AC inverter), wind turbine modules (coupled to a DC/ AC inverter), natural gas turbines, backup generators, energy storage, and uninterruptible power supplies.
  • PV photovoltaic
  • PV modules, generators and/or other local generation sources as just described are installed at a location, such as a residence, they are not allowed to produce power during a utility power outage unless they are isolated from the utility grid. This restriction is in place in order to prevent power from being back fed by the local generation source onto the grid during the power outage, a condition which could pose a danger to workers working on the grid.
  • system 100 that utilizes and automatic transfer switch (ATS) to ensure a safe transition to a local generation source during the power outage.
  • ATS is an electrical switch that switches a load between two sources.
  • system 100 includes a utility source 105, a main meter 110, and a load center 115 coupled to main meter 1 10 for receiving power from the utility source 105.
  • Load center 115 includes a number of conventional circuit breakers, including a
  • conventional main circuit breaker 120 a number of conventional branch circuit breakers 125, and a conventional local energy resource (LER) circuit breaker 130 (which is merely a conventional breaker coupled to a local generation source as described below).
  • LER local energy resource
  • conventional branch circuit breakers 125A and 125B are coupled to and provide protection for a number of "noncritical" loads 130 (i.e., loads that have been determined in advance to not be configured to receive backup power in the case of a utility power outage).
  • the remaining conventional branch circuit breaker, labeled 125C is coupled to an ATS 135 (or, alternatively, another switching device such as a manual transfer switch).
  • ATS 135 The output of ATS 135 is provided to a sub panel 140 which in turn feeds a number of predetermined "critical" loads 145 (i.e., loads that have been determined in advance to be configured to receive backup power in the case of a utility power outage).
  • system 100 includes a local generation source 150, which may be, for example and without limitation, a PV module coupled to an inverter, or any other suitable distributed power source.
  • the output of local generation source 150 is provided to ATS 135 and to a grid tie disconnect 155.
  • ATS 135 has two inputs, namely an output received from conventional branch breaker 125C and an output received from local generation source 150, and a single output which is selectable between the 2 inputs.
  • automatic transfer switch 135 In operation, under normal operating conditions wherein utility source 105 is not experiencing a power outage, automatic transfer switch 135 is configured in a manner wherein the input received from conventional branch circuit breaker 125 is coupled to the output provided to subpanel 140. In addition, under such normal conditions, grid tie disconnect 155 is closed to enable local generation source 150 to back feed power to utility source 105. When utility source 105 experiences a power outage, grid tie disconnect 155 is opened in order to isolate local generation source 150 from load center 115 and utility source 105, and therefore protect any workers that may be working on the utility grid. Once grid tie disconnect 155 is opened, automatic transfer switch 135 may be switched to a configuration wherein the input received from local generation source 150 is coupled to the output provided to subpanel 140. As a result, during such an outage condition, predetermined critical loads 145 are able to receive power from local generation source 150.
  • system 100 While system 100 described above is effective, it introduces an extra layer of cost and complexity to the residential electrical system. Furthermore, system 100 is restricted in that it must be sized and configured in advance based on predetermined load profiles, namely the load profiles of certain predetermined loads that are to be powered by local generation source 150 during an outage. As will be appreciated, this eliminates any flexibility in determining which loads will be powered by local generation source 150.
  • an apparatus for managing an electrical system includes a main breaker structured to be coupled to a utility source, an LER breaker structured to be coupled to a local generation source, a number of branch breakers, each branch breaker being structured to be coupled to one or more loads, and a control component.
  • the control component is structured to, in response to a determination that the utility source is experiencing a power outage: cause the main breaker to be opened, determine which one or more of the number of branch breakers are to receive backup power from the local generation source, cause the branch breakers to be configured such that only the determined one or more of the number of branch breakers are in a closed condition, and cause the local generation source to be activated.
  • a method for controlling an electrical system that includes a main breaker provided in a load center and coupled to a utility source, an LER breaker provided in the load center and coupled to a local generation source, and a number of branch breakers provided in the load center and each being coupled to one or more loads.
  • the method comprising includes determining in the load center that the utility source is experiencing a power outage, responsive to determining that the utility source is experiencing the power outage, causing the main breaker to be opened by providing first communication information to the main breaker, determining which one or more of the number of branch breakers are to receive backup power from the local generation source, causing the branch breakers to be configured such that only the determined one or more of the number of branch breakers are in a closed condition by providing second communication information to branch breakers other than the one or more of the number of branch breakers, and causing the local generation source to be activated by providing third communication information to the local generation source.
  • FIG. 1 is a schematic diagram of a prior art system that utilizes and automatic transfer switch to ensure a safe transition to a local generation source during a power outage;
  • FIG. 2 is a schematic diagram of a system for ensuring a safe transition to a local generation source during a power outage according to an exemplary embodiment of the present invention
  • FIG. 3 is a flowchart showing a control methodology for the system of FIG. 2 according to an exemplary embodiment of the present invention
  • FIGS. 4-7 are diagrams of an exemplary circuit breaker that may be employed to implement the system of FIG. 2 and the methodology of FIG. 3.
  • number shall mean one or an integer greater than one (i.e., a plurality).
  • Coupled together shall mean that the parts are joined together either directly or joined through one or more intermediate parts.
  • a component is intended to refer to a computer related entity, either hardware, a combination of hardware and software, software, or software in execution.
  • a component can be, but is not limited to being, a process running on a processor, a processor, an object, an executable, a thread of execution, a program, and/or a computer.
  • an application running on a processor or a server and the processor or server can be a component.
  • One or more components can reside within a process and/or thread of execution, and a component can be localized on one
  • FIG. 2 is an electrical distribution system 200 according to one non- limiting, exemplary embodiment of the disclosed concept.
  • system 200 includes a system of controllable (and in the exemplary embodiment, metering capable) circuit breakers including a main circuit breaker and a subset of branch circuit breakers downstream from the main circuit breaker.
  • System 200 implements a control methodology (illustrated in FIG. 3 and described in detail in connection therewith) which enables a local generation source, such as, without limitation, a PV module coupled to an inverter, to be safely put into use during a power outage condition without the need to use an ATS, such as ATS 135 shown in FIG. 1, or similar switching device.
  • a local generation source such as, without limitation, a PV module coupled to an inverter
  • the control methodology determines when there is a utility power outage, isolates the load panel that is coupled to the utility grid, brings a local generation source safely online for as long as needed, coordinates load demand with local generation supply capacity , and restores grid power safely when the outage condition subsides.
  • the methodology employs a control element wherein load demand is managed (i.e., loads are coupled to the local generation supply by closing associated breakers) so as to ensure that the load demand does not exceed the actual local generation supply capacity.
  • the methodology may optionally employ synchronization among multiple local generation sources if provided and/or phase synchronization with grid power to allow for a seamless or "blinkless" transfer of power.
  • this control methodology is accomplished by directly controlling the circuit breakers in system 200 rather than using a traditional switching mechanism such as an ATS.
  • a traditional switching mechanism such as an ATS.
  • the load panel that is coupled to the utility grid can be isolated from the grid, and by switching a number of the branch circuit breakers on and off, the load demand can be balanced to match local generation supply capacity.
  • the load's power demand can be controlled in order to prevent it from exceeding the power capacity of the local generation source.
  • system 200 can dynamically determine the amount of local generation supply that is available from the local generation source (local generation source 245 described herein) and then coordinate with the other breakers (branch breakers 230 described herein) in system 200 to close only those breakers that can be supported by the local generation source without overloading.
  • each of the controllable circuit breakers employed in system 200 as described herein is in the form of a power vending machine (PVM) circuit breaker 400 that is described in detail in the United States Patent Application Publication Nos.
  • PVM power vending machine
  • PVM circuit breaker 400 in the system 200 is for illustrative purposes only and is not limiting, as alternative types of controllable circuit breakers may also be employed.
  • one or more of the controllable circuit breakers employed in system 200 may be a smart breaker as described in U.S. Patent Application Serial No.
  • the exemplary PVM circuit breaker 400 is shown schematically in FIG. 4 and includes the following four types of functionality: (1) circuit protection functionality, including traditional thermal-magnetic circuit protection, short circuit protection, overload protection, ground fault protection, arc fault protection, and/or other types of protection as needed, (2) branch circuit metering functionality, including utility grade net metering ( ⁇ 0.2%) and time stamped values, (3) remote control functionality for operating controllable contacts, including on/off control relay functionality that is independent from the circuit breaker trip mechanism, (4) wired and/or wireless communications functionality, including functionality for transmitting and receiving meter control and status information, backup functionality for communications during an outage condition, and, optionally, load specific control features/signals which are configured to control particular types of connected loads (such as an electric vehicle supply equipment (EVSE) version of the breaker that can directly charge an electric vehicle (EV), a HVAC breaker that can directly and independently control the fan, compressor, and heating unit either directly through the opening and closing of the circuits or through low voltage signaling, essentially removing the need for a control thermostat, and
  • functions (2)- ⁇ 4) under the control of a microcontroller 401, which may be, for example and without limitation, a microprocessor or any other suitable processing device.
  • function (1) is not controlled by microcontroller 401, it will be understood that in alternative embodiments function (1) may also be under the control of microcontroller 401.
  • PVM circuit breaker 400 also includes indicator functionality (labeled (5)) controlled by microprocessor 401 to indicate information such as fault states and/or current flowing through PVM circuit breaker 400.
  • PVM circuit breaker 400 can support billing a user for energy consumed through the PVM circuit breaker 400.
  • a metering function 402 (FIG. 5) uses a logic circuit 404 (FIGS. 5 and 6) to store timestamped energy values 406 in a persistent database 408 in memory 410. Both of the metering function 402 and the logic circuit 404 are within the housing of the PVM circuit breaker 400.
  • the energy values 406, during certain timestamps, can be "flagged" as belonging to a number of specific users, which provides energy allocation to each of such number of specific users.
  • the energy can be suitably allocated to the specific power circuit (e.g., to electric load 412 (shown in phantom line drawing in FIG. 5) at terminals 414,416).
  • an electricity source such as an electric utility 418 (shown in phantom line drawing in FIGS. 5 and 6), which supplies power to breaker stab 420 (e.g., from a hot line or bus bar (not shown)) and neutral pigtail 422 (e.g., to a neutral bar (not shown)) at a panelboard or load center (not shown), is ready to bill the user, it can do so in a variety of ways through communication done via an expansion port 424 (FIG. 6), or optionally through a built-in wireless interface (e.g., without limitation, Wi-Fi; BlueTooth).
  • an electric utility 418 shown in phantom line drawing in FIGS. 5 and 6
  • neutral pigtail 422 e.g., to a neutral bar (not shown)
  • a panelboard or load center not shown
  • One example method is a "meter read" of the total energy at the time of the reading from a main circuit breaker (not shown, but which can be substantially the same as or similar to the circuit breaker 400, except having a relatively larger value of rated current) of a corresponding panelboard or load center (not shown).
  • the value of the "meter read” is compared with the value of the "meter read” from, for example, the previous month's reading and the difference value is billed.
  • the electric utility 418 can download the database 408 of each circuit breaker, such as 400, in its entirety, query the energy values 406 as appropriate, and then apply a suitable rate structure using the timestamps, specific circuits, and any allocation flags.
  • FIGS. 5-7 show the example controllable, PVM circuit breaker 400, which can include optional support for communications and/or a number of different add-on modules 426, as will be discussed.
  • the example PVM circuit breaker 400 can include a number of optional add-on modules 426.
  • An alternating current (AC) electrical path through the PVM circuit breaker 400 between the electricity source 418 and the load 412 includes a thermal-magnetic protection function 428, the metering function 402 and controllable separable contacts 430.
  • An AC-DC power supply 432 supplies DC power to, for example, the logic circuit 404 and a communications circuit 434.
  • the DC power supply 432 can be located outside of the PVM circuit breaker 400 and supply DC power thereto.
  • the number of optional add-on modules 426 can provide specific logic and/or I/O functions and a communications circuit 436.
  • Optional remote software functions 438,440 can optionally communicate with the communications circuits 434,436.
  • FIG. 6 shows more details of the example PVM circuit breaker 400, which includes an external circuit breaker handle 442 that cooperates with the thermal magnetic trip function 428 to open, close and/or reset corresponding separable contacts 429 (FIG. 7), an OK indicator 444 that is controlled by the logic circuit 404, and a test/reset button 446 that inputs to the logic circuit 404.
  • a power metering circuit 452 of the metering function 402 inputs from the current sensors 448,449 and the voltage sensors 450,451 , and outputs corresponding power values to the logic circuit 404, which uses a timer/clock function 454 to provide the corresponding timestamped energy values 406 in the database 408 of the memory 410.
  • the current sensors 448,449 can be electrically connected in series with the respective separable contacts 430A,430B, can be current transformers coupled to the power lines, or can be any suitable current sensing device.
  • the voltage sensors 450,451 can be electrically connected to the respective power lines in series with the respective separable contacts 430A,430B, can be potential transformers, or can be any suitable voltage sensing device.
  • FIG. 7 is an example one-line diagram of the example PVM circuit breaker 400. Although one phase (e.g., hot line and neutral) is shown, the disclosed concept is applicable to PVM circuit breakers having any number of phases or poles.
  • a hot line is received through the termination 420 to a bus bar (not shown).
  • Electrical current flows through the first circuit breaking element 429 of the thermal-magnetic overload protection function 428 and flows through a set of controllable separable contacts 430 (only one set is shown in this example for the hot line) to the load terminal 414.
  • a first current transformer (CT) 448 provides current sensing and ground fault detection with customizable trip settings. The return current path from the load 412 (FIG.
  • a second CT 449 provides current sensing and ground fault detection with customizable trip settings.
  • the outputs of the CTs 448,449 are input by the logic circuit 404, which controls the controllable separable contacts 430.
  • the power supply 432 receives power from the hot and neutral lines.
  • the logic circuit communications circuit 434 also outputs to a communication termination point 456 of the expansion port 424 (FIG. 6).
  • System 200 includes a utility source 205 coupled to a main meter 210.
  • a load center 215 is coupled to the output of main meter 210 for receiving utility power from the utility grid of utility source 205 therefrom.
  • Load center 215 includes a main breaker 220 coupled to main meter 210.
  • main meter 210 may be omitted, with load center 215 being connected directly to utility source 205.
  • the metering functionality may instead be provided by main breaker 220, which, as described below, is provided with such metering functionality.
  • Load center 215 further includes a main busbar 225 and a number of branch breakers 230 coupled to main busbar 225. As seen in FIG. 2, each branch breaker 230 is coupled to an associated load or loads 235. In the illustrated, exemplary embodiment, load center 215 feeds dedicated circuits, meaning that each branch breaker 230 feeds and is coupled to a single load 235 (each load 235 is not, however, necessarily a dedicated circuit). It will be understood, however, that this is meant to be exemplary only and that other configurations wherein non-dedicated circuits and/or a combination of dedicated circuits and non-dedicated circuits may also be employed within the scope of the disclosed concept.
  • Load center 215 further includes an LER breaker 240 having a local generation source 245 coupled thereto.
  • Local generation source 245 may be any type of distributed power source such as, without limitation, a distributed power source that employs a PV module, a generator, a wind turbine, a natural gas turbine, or battery storage.
  • main breaker 220, branch breakers 230, and LER breaker 240 are each a PVM circuit breaker 400 described in detail elsewhere herein.
  • each of those breakers will have circuit protection functionality, branch circuit metering functionality, remote control functionality and communications functionality as described herein (FIG. 4).
  • load center 215 includes a control component 250.
  • Control component 250 is structured to control operation of system 200 as described herein, and, in particular, is structured and programmed to implement the control methodology shown in FIG. 3 and described in detail below.
  • Control component 250 may reside anywhere within load center 215, such as within main breaker 220, branch breakers 230, LER breaker 240, or may be spread among and distributed across one or more of those elements.
  • control component may be a computing device having a processor and a programmed memory that plugs into load center 215.
  • control component may be remotely located from load center 250 yet still in communication with and in control of aspects of load center 250 as described herein.
  • control component 250 forms part of main breaker 220 to enable main breaker 220 to act as a system coordinator for load center 215.
  • control methodology of the disclosed concept begins at step 300, wherein an outage at utility source 205 is detected.
  • this outage is detected by main breaker 220 by sensing that the voltage from utility source 205 has dropped below a certain predetermined level.
  • control component 250 opens main breaker 220 to isolate load center 215 and local generation source 245 from the main grid of utility source 205.
  • control component causes LER breaker 240 to be opened by communicating a control signal to LER breaker 240 (by a suitable wired or wireless connection).
  • control component 250 identifies which ones of the branch breakers 230, if any, are to not receive backup power from local generation source 245.
  • This step may be performed in a number of ways and includes determining which breakers are and which breakers are not to receive backup power based upon one or more stored and/or measured parameters and/or functions.
  • control component 250 may be programmed to identify certain predetermined ones of the loads 235 that are to receive backup power in the event of a power outage (i.e., "critical loads”), and thus at step 315, the loads 235 that are not "critical loads" will be identified.
  • critical loads i.e., "critical loads”
  • identification of the "critical loads” in this particular implementation may be done by the utility and or the local user of load center 215, and thus this aspect of the disclosed concept provides great flexibility for the provision of backup power by allowing for dynamic load management during power outage conditions.
  • the programming and identification of the "critical loads” may also be prioritized such that when an outage is detected, loads 235 will be selected to receive back up power based on the power that is available according to the predetermined priority.
  • control component 250 may be programmed to dynamically select the ones of the loads 235 that are to receive backup power based upon predetermined parameters such as time of day and/or date, with certain loads 235 being identified for receiving backup power based upon the current state of such parameters.
  • predetermined parameters such as time of day and/or date
  • each load 235 is identified in advance as “critical” or “non-critical”, and control element 250 coordinates with metering data measured by the associated branch breaker as 230 to ensure that as many "critical" loads are operational without overloading/straining local generation source 245 (i.e., without exceeding the local generation source supply capacity).
  • each load 235 is assigned a priority level, with, for example, "1" being the highest priority and so on.
  • Control component 250 then coordinates with metering data measured by the associated branch breakers 230 to ensure that as many of the highest prioritized loads 235 are operational without overloading/straining local generation source 245.
  • the first example schema provided above is essentially a two-priority example of this second control schema.
  • each load 235 is assigned a priority and a preferred "run time".
  • Control component 250 then coordinates with metering data and time data to ensure that as many of the highest prioritized loads 235 are operational for their specified run times, and at the end of the run time of a load 235 other lower-prioritized loads 235 may have their associated branch breakers 230 closed.
  • control component 250 may implement any of the above schemas, with a "user override" component wherein the user may select particular branch breakers 230 to be opened and/or closed.
  • control component 250 causes the branch breakers 230B identified in step 315 to be opened.
  • control component 250 causes a signal to be sent to local generation source 245 (using a suitable wired and/or wireless connection between those components) which causes local generation source 245 to be activated.
  • control component 250 causes LER breaker 240 to be closed by causing a signal to be sent to LER breaker 240 (using a suitable wired and/or wireless connection between those components).
  • step 335 wherein system 200 is able to run on power from local generation source 245 with power being provided to any of the loads 235 that were not identified in step 315.
  • step 340 a determination is made as to whether utility power at utility source 205 has been restored. If the answer is no, then the method returns to step 335.
  • the user of load center 215 may reconfigure the system to change the branch circuit breakers 230 that are open (or closed) and thus the loads 235 that receive power using control components 250. For example, if during a power outage event, a user determines that they now need a load 235 that was originally determined "non-critical" or low priority, they can now close that circuit, and, if necessary, open another circuit of lower priority in order to prevent
  • overstraining the local generation source 240 (as described below). For instance, if a user determines that they need to recharge their EV that was originally determined "non-critical", they may choose to temporarily turn off their air conditioning unit in order to allow charging of their EV. Then, once the EV has sufficiently charged, the user may choose to turn the EVSE off and the air conditioning unit back on. This provides a substantial amount of extra flexibility and resiliency for the user that traditional systems cannot offer. Care should be taken, however, to manage/match the connected loads 235 so as to not overstrain the capacity of local generation source 245 and either tripping its back feed breaker or over straining it to the point of failure.
  • control component 250 includes control features to assist with the management and matching of loads 235 so as to prevent overstraining of local generation source 245. For example, before any changes are made, control component 250 can examine metering data and determine what effect the changes will have on load demand and prevent any changes that would result in an over straining condition. If, however, the answer at step 340 is yes, then the method proceeds to step 345 wherein control component 250 causes the LER breaker 240 to be opened. Next, at step 350, control component 250 causes local generation source 245 to be deactivated. Thereafter, at step 355, control component 250 causes main breaker 220 to be closed.
  • control component 250 causes all of the branch breakers 230 to be closed by sending one or more signals to those branch breakers 230 (using a suitable wired and/or wireless connection between those components). Alternatively, the order of steps 355 and 360 may be switched such that step 360 is performed first followed by step 355. Finally, at step 365, control component 250 causes local generation source 245 to be activated so that it can return to back feeding utility source 205 now that the outage has been rectified.
  • the methodology shown in FIG. 3 and described above provides a safe mechanism for switching to backup power via a local generation source in the case of a power outage and back to utility power following the outage that does not require a cosdy, complex and inflexible switching mechanism such as an ATS (FIG. 1) ⁇
  • system 200 shown in FIG. 2 and the methodology described in connection with FIG. 3 include only a single local generation source 245, it will be understood that the disclosed concept may also be employed in systems that include multiple local generation sources 245 and multiple LER breakers 240.
  • the methodology as implemented in control component 250 would need to ensure that the multiple local generation sources 245 are able to synchronize to each other.
  • one local generation source 245 would be promoted to become the "utility" and would be connected to a main bus bar 225. That local generation source 245 then provides the wetting voltage for other local generation sources 245 to synchronize to.
  • control component 250 is provided with metadata about local generation source 245 for example, weather data for solar embodiments or fuel capacity in fuel consumption for generator embodiments, and metering data received from the branch breakers 230 may be used to predict "uptime remaining" for how long local generation source 245 can continue to provide power to the connected loads 235. Load management decisions can be made more intelligently with the addition of metadata from which important statistics may be derived, such as, but not limited to, "uptime remaining.”
  • local generation source 245 shown in FIG. 2 may, rather than being provided at a customer location such as a residence, be a local generation source that is intended for a group of utility customers within an electrical distribution system (e.g., a "neighborhood" local generation source).
  • local generation source 245 may be a local energy storage device (e.g., battery) that is configured to serve a number of customers in a particular area in the event of a power outage.
  • one or more customers may have a load center 215 as described herein having an LER breaker 240 that is coupled to that "neighborhood" local generation source 245.
  • each customer having such a load center 215 can determine which loads 235 will receive backup power from the "neighborhood" local generation source 245 in the event of an outage.
  • main breaker 220, LER breaker 240, and branch breakers 230 are, in the exemplary embodiment, each PVM circuit breakers 400 as described herein having a metering functionality, the utility providing the "neighborhood" local generation source 245 will be able to bill the customers for their usage thereof. In one example, customer usage may be unlimited and customers will pay for any power that is consumed.
  • customers may subscribe for (and pay for) a certain amount of backup power in the case of an outage, and their access to the "neighborhood" local generation source will be limited to the amount of power covered by their subscription (i.e., the LER breaker 240 will be opened once the subscription amount of power has been consumed).
  • the customer may want to actively manage the loads 235 of load center 215 as described herein in order to ration the power to which they have access.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
EP15716961.6A 2014-09-04 2015-04-06 System and method for switching an electrical system to backup power during a utility power outage Pending EP3189572A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201462045864P 2014-09-04 2014-09-04
PCT/US2015/024423 WO2016036419A1 (en) 2014-09-04 2015-04-06 System and method for switching an electrical system to backup power during a utility power outage

Publications (1)

Publication Number Publication Date
EP3189572A1 true EP3189572A1 (en) 2017-07-12

Family

ID=52875817

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15716961.6A Pending EP3189572A1 (en) 2014-09-04 2015-04-06 System and method for switching an electrical system to backup power during a utility power outage

Country Status (7)

Country Link
EP (1) EP3189572A1 (zh)
CN (1) CN106688155B (zh)
BR (1) BR112017003386B1 (zh)
CA (1) CA2959590C (zh)
MX (1) MX2017002146A (zh)
RU (1) RU2690008C1 (zh)
WO (1) WO2016036419A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11817701B2 (en) 2021-01-29 2023-11-14 Eaton Intelligent Power Limited Multi-port split-phase power system

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3232529A1 (en) 2016-04-14 2017-10-18 DET International Holding Limited Power supply arrangement
US11114855B2 (en) 2016-05-24 2021-09-07 Solaredge Technologies Ltd. Load management in hybrid electrical systems
FR3053808B1 (fr) * 2016-07-07 2020-03-06 Schneider Electric Industries Sas Procede de commande d'une installation electrique depuis un lieu distant
KR20230170129A (ko) * 2016-09-15 2023-12-18 사반트 시스템즈, 인크. 동적 나노 그리드들을 생성하고 에너지 시장에 참여하도록 전기 전력 소비자들을 집성하기 위한 시스템 및 방법들
US11316471B2 (en) 2016-11-08 2022-04-26 Tesla, Inc. Manual transfer switch for onsite energy generation and storage systems
US10852799B2 (en) * 2017-07-14 2020-12-01 Analog Devices Global Unlimited Company Adaptive use of multiple power supplies in communication systems
CN109560606A (zh) * 2017-09-26 2019-04-02 中兴通讯股份有限公司 一种市电发电自动切换方法及装置
CN109696629A (zh) * 2018-12-21 2019-04-30 中广核研究院有限公司 核电厂柴油发电机组试验方法
CN112682973B (zh) * 2020-12-21 2023-02-03 北京能高自动化技术股份有限公司 一种应用于光伏储热系统的负载加热时间控制方法
US11424641B1 (en) 2021-06-09 2022-08-23 Savant Systems, Inc. Flexible load management system
US11621580B2 (en) 2021-08-31 2023-04-04 Savant Systems, Inc. Microgrid switchover using zero-cross detection

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140211345A1 (en) * 2013-01-30 2014-07-31 Eaton Corporation Annunciating or power vending circuit breaker for an electric load
US20140214218A1 (en) * 2013-01-30 2014-07-31 Eaton Corporation Electric power distribution system including metering function and method of evaluating energy metering

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7015599B2 (en) * 2003-06-27 2006-03-21 Briggs & Stratton Power Products Group, Llc Backup power management system and method of operating the same
RU2318281C1 (ru) * 2006-11-13 2008-02-27 Общество с ограниченной ответственностью "Технологическая лаборатория" Автоматизированная система гарантированного электроснабжения стационарного объекта
US7615888B2 (en) * 2007-04-23 2009-11-10 Eaton Corporation Multiple generator loadcenter and method of distributing power from multiple generators
RU2353035C1 (ru) * 2008-05-12 2009-04-20 Юрий Петрович Баталин Электроэнергетический комплекс
US9246432B2 (en) * 2011-02-14 2016-01-26 Beckman Coulter, Inc. Regenerative braking safety system and method of use
US20140088780A1 (en) * 2012-09-26 2014-03-27 Hongxia Chen Automatic local electric management system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140211345A1 (en) * 2013-01-30 2014-07-31 Eaton Corporation Annunciating or power vending circuit breaker for an electric load
US20140214218A1 (en) * 2013-01-30 2014-07-31 Eaton Corporation Electric power distribution system including metering function and method of evaluating energy metering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11817701B2 (en) 2021-01-29 2023-11-14 Eaton Intelligent Power Limited Multi-port split-phase power system

Also Published As

Publication number Publication date
MX2017002146A (es) 2017-05-03
WO2016036419A1 (en) 2016-03-10
BR112017003386B1 (pt) 2022-08-09
CA2959590A1 (en) 2016-03-10
CA2959590C (en) 2023-10-10
CN106688155B (zh) 2020-11-17
CN106688155A (zh) 2017-05-17
RU2690008C1 (ru) 2019-05-30
BR112017003386A2 (pt) 2017-11-28

Similar Documents

Publication Publication Date Title
CA2959590C (en) System and method for switching an electrical system to backup power during a utility power outage
US20230331089A1 (en) Annunciating or power vending circuit breaker for an electric load
US10545194B2 (en) Electric power distribution system including metering function and method of evaluating energy metering
KR102610662B1 (ko) 동적 나노 그리드들을 생성하고 에너지 시장에 참여하도록 전기 전력 소비자들을 집성하기 위한 시스템 및 방법들
US9667056B2 (en) Microgrid system structured to detect overload conditions and take corrective actions relating thereto
TWI550987B (zh) 多用途功率管理系統及方法
EP2924840B1 (en) Power supply system, power conversion apparatus, and measurement point switching apparatus
US9787080B2 (en) Microgrid distribution manager with dynamically adjustable trip curves for multi-source microgrids
US9903893B2 (en) Method and device for registering electrical consumption and generation
Mak et al. Synchronizing SCADA and smart meters operation for advanced smart distribution grid applications
US20230208187A1 (en) Photovoltaic disconnect device for storage integration
US11916381B2 (en) Smart power splitters for high voltage outlet
Rongali et al. iPlug: Decentralised dispatch of distributed generation
US11764603B2 (en) Smart circuit breaker, system including the same, and method of managing power
WO2023075624A1 (en) Process, system and kit for automatically controlling the electrical current or power available to a target device connected to an electrical installation
CN118100246A (zh) 供电控制方法、装置、存储介质及电子设备
Srikrishna et al. Equalized power regulation among households using real time clock based intelligent metering system

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170327

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIN1 Information on inventor provided before grant (corrected)

Inventor name: MUELLER, MAXIMILIAN A.

Inventor name: THOMPSON, RONALD L.

Inventor name: ELDRIDGE, DAVID A.

Inventor name: ROGERS, BRANDON J.

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: EATON INTELLIGENT POWER LIMITED

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20210311

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230521