EP3186868A1 - Power grid system and method of determining power consumption at one or more building connections in a power grid system - Google Patents

Power grid system and method of determining power consumption at one or more building connections in a power grid system

Info

Publication number
EP3186868A1
EP3186868A1 EP15835110.6A EP15835110A EP3186868A1 EP 3186868 A1 EP3186868 A1 EP 3186868A1 EP 15835110 A EP15835110 A EP 15835110A EP 3186868 A1 EP3186868 A1 EP 3186868A1
Authority
EP
European Patent Office
Prior art keywords
power
building
power grid
mains
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP15835110.6A
Other languages
German (de)
French (fr)
Other versions
EP3186868A4 (en
Inventor
Matthew PELOSO
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sun Electric Digital Stream Ltd
Original Assignee
Sun Electric Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sun Electric Pte Ltd filed Critical Sun Electric Pte Ltd
Publication of EP3186868A1 publication Critical patent/EP3186868A1/en
Publication of EP3186868A4 publication Critical patent/EP3186868A4/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/133Arrangements for measuring electric power or power factor by using digital technique
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/133Arrangements for measuring electric power or power factor by using digital technique
    • G01R21/1333Arrangements for measuring electric power or power factor by using digital technique adapted for special tariff measuring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/25Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
    • G01R19/2513Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Definitions

  • the present invention relates broadly to a power grid system and to a method of determining power consumption thereof at one or more building connections in a power grid system.
  • PV photo-voltaic
  • Embodiments of the present invention provide a power grid system and a method of determining power consumption at one or more building connections in a power grid system that seek to address at least one of the above problems.
  • a power grid system comprising a power grid comprising a mains grid portion; a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion; for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.
  • a method of determining power consumption at one or more building connections in a power grid system comprising metering power imported from a mains grid portion of the power grid system to a building associated with respective ones of the one or more building connections and power exported from the associated building into the mains grid portion using a first meter; metering, for one or more of the building connections, power exported to the associated building from an auxiliary generator using a second meter disposed downstream from the first meter relative to the mains grid portion; and determining power consumption at said one or more of the building connections based on readings from the first and from the second meters.
  • Figure 1 shows a schematic drawing illustrating a power grid system 100 according to an example embodiment.
  • Figure 2 shows a flowchart illustrating a method of determining power consumption at one or more building connections in a power grid system and supply to a load at one or more building connections in a power grid system, according to an example embodiment.
  • Figure 3 shows a series of voltages on a network associated with electrical conduction through various voltage transformers, each voltage level associated to a particular market settlement pool (.eg. Low Voltage, High Voltage, Extra High Voltage, etc.).
  • FIG. 1 shows a schematic drawing illustrating a power grid system 100 according to an example embodiment.
  • the system 100 comprises a power grid 102 comprising a mains grid portion 104.
  • the power grid 102 is associated through flow of electrons and holes through the network and is associated with various voltages defined through the placement of voltage transformers matching a corresponding specification.
  • the mains supply for the power grid 102 is from a transformer 119, as a step down from a higher voltage level.
  • the application of transformers for establishing the various voltages on the power grid 102 network is understood in the art and will not be described herein in any detail.
  • Figure 3 shows example voltage levels, e.g. Low Voltage 303, High Voltage 304, and Extra High Voltage 305 in a power grid network 300.
  • Each of the transformers 301, 302 or the Extra High Voltage generator 306 can take the role of the transformer 119 illustrated in Figure 1.
  • the power grid 102 network is used to transfer power among loads from various sources of electricity.
  • this power grid 102 network is used to establish a central energy pool from which suppliers and consumers may trade, while the various voltages of the power grid 102 network may establish various markets and different settlements in pools associated to the specific voltage range.
  • the power grid system 100 further comprises a plurality of building connections e.g. 106, 107, each building connection e.g. 106, 107 comprising bi-directional meters e.g. Ml, M3, configured for metering power imported from the mains grid portion 104 to the associated building e.g. 108, 110 and power exported from the associated building e.g. 108, 110 into the mains grid portion 104.
  • a further meter M2 is disposed downstream from the first meter Ml relative to the mains grid portion 104 and is configured for metering power exported to one or more loads 112 in the associated building e.g. 108 from an auxiliary generator e.g. 114.
  • the meter M2 is bidirectional, but it is noted that the meter M2 can be uni-directional in other embodiments, as will be appreciated by a person skilled in the art.
  • each second meter may be provided downstream from one building connection.
  • each second meter may be associated with a different auxiliary generator at or near the same building.
  • a consolidation unit 116 of the system 100 is configured for determining power consumption at the one or more building connections e.g. 106 having the meter M2 based on readings from the meters Ml and M2.
  • the consolidation unit 116 may be specially constructed for the required purposes, or may comprise a general purpose computer or other device selectively activated or reconfigured by a computer program stored in the computer.
  • the algorithms and outputs presented herein are not inherently related to any particular computer or other apparatus.
  • Various general purpose machines may be used with programs in accordance with the teachings herein.
  • the construction of more specialized apparatus to perform the required method steps may be appropriate.
  • the present specification also implicitly discloses a computer program, in that it would be apparent to the person skilled in the art that the individual steps of the method described herein may be put into effect by computer code.
  • the computer program is not intended to be limited to any particular programming language and implementation thereof.
  • the computer program is not intended to be limited to any particular control flow. There are many other variants of the computer program, which can use different control flows without departing from the spirit or scope of the invention. Furthermore, one or more of the steps of the computer program may be performed in parallel rather than sequentially.
  • Such a computer program may be stored on any computer readable medium.
  • the computer readable medium may include storage devices such as magnetic or optical disks, memory chips, or other storage devices suitable for interfacing with device selectively activated or reconfigured by the computer program.
  • the computer readable medium may also include a hard- wired medium such as exemplified in the Internet system, or Wireless medium such as exemplified in the GSM mobile telephone system.
  • the computer program when loaded and executed on the device effectively results in an apparatus that implements the steps of the preferred method.
  • the consolidation unit 116 may also be implemented as hardware modules. More particularily, in the hardware sense, a module is a functional hardware unit designed for use with other components or modules. For example, a module may be implemented using discrete electronic components, or it can form a portion of an entire electronic circuit such as an Application Specific Integrated Circuit (ASIC). Numerous other possibilities exist. Those skilled in the art will appreciate that the system can also be implemented as a combination of hardware and software modules.
  • ASIC Application Specific Integrated Circuit
  • the consolidation unit 116 in the example embodiment is configured for determining the power consumption at the building connections 106 by calculating:
  • Mn m port is the power imported from the mains grid portion 104 to the associated building 108
  • Miexport is the power exported from the associated building 108 into the mains grid portion 104
  • M2export is the power exported to the associated building 108 from the auxiliary generator 114.
  • a transmission loss through this hardware may be incorporated within equation ( 1 ) to more accurately compute the flow of energy through the consolidation unit 116 by subtraction of the absolute transmission loss or through other means. In this embodiment it is assumed that this transmission loss is negligible and it is not investigated further.
  • equation (1) can be readily extended to account for two or more second meters downstream of the associated building connection.
  • the consolidation unit 116 is further configured for determining power supplied by the auxiliary generator 114 to the power grid 102 on the basis of the reading from the meter M2.
  • the consolidation unit 116 is further configured for settling an aggregate supply of power from a plurality of auxiliary generators to one or more loads connected on the power grid system 100.
  • the auxiliary generator 114 produces 50 kW over a specified consolidation period and exports all of the power via the meter M2.
  • Case 1 The loads 112 in the associated building 108 consume 100 kW over the specified consolidation period.
  • Ml meters that no power was exported from the building 108 to the mains grid portion 104 and that 50 kW were imported from the mains grid portion 104 into the building 108, being the difference between the power provided by the auxiliary generator 114 and the power consumed by the loads 1 12.
  • the calculated power consumption C at building connection 106 is:
  • the power consumption determined by the consolidation unit 116 in the example embodiment can preferably be used for settlement in an energy pool associated with the power grid system 100.
  • the power client associated with the building 108 will have to settle a consumption bill for 100 kW in the pool, i.e. consistent with the actual consumption at the loads 112.
  • the owner or stakeholder of the auxiliary generator 114 is settled on the basis of having sold 50 kW into the pool.
  • Case 2 The loads 112 in the associated building 108 consume 25 kW over the specified consolidation period.
  • M2 again meters 50 kW being exported from the auxiliary generator 114 to the building 108 during the specified consolidation period.
  • the calculated power consumption C at building connection 106 is:
  • the power consumption determined by the consolidation unit 116 in the example embodiment can preferably be used for settlement in the energy pool associated with the power grid system 100.
  • the power client associated with the building 108 will have to settle a consumption bill for 25 kW in the pool, i.e. consistent with the actual consumption at the loads 112
  • the owner or stakeholder of the auxiliary generator 114 is again settled on the basis of having sold 50 kW into the pool.
  • the excess power provided by the auxiliary generator 114 into the pool can thus in effect be sold to other consumers, such as the power client associated with the building 110.
  • the power consumption determined by the consolidation unit 116 in the example embodiment can preferably be used for settlement in the energy pool associated with the power grid system 100.
  • the power client associated with the building 108 will incur no power charge, i.e. consistent with the (zero) consumption at the loads 112.
  • the owner or stakeholder of the auxiliary generator 114 is again settled on the basis of having sold 50 kW into the pool.
  • the excess power provided by the generator 114 into the pool can thus in effect be sold to other consumers, such as the power client associated with the building 110.
  • Customer B and/or Customer C can be supplied based on a flexible settlement implementation in an example embodiment, as follows.
  • Case 4 Assuming a total aggregate generation of 50 kW or more at the sources as measured through one or more consolidation units, and a demand of 25 kW at Customer B, and 25 kW at Customer C.
  • Case 5 Assuming a total aggregate generation of 50 kW or more at the sources as measured through one or more consolidation units, and a demand of 50 kW at Customer B, and 0 kW at Customer C.
  • the total aggregate generation is settled with Customer B, and no energy is settled with Customer C.
  • example embodiments of the present invention can have one or more of the following advantages and technical effects:
  • the auxiliary generator 1 14 may comprise a photo-voltaic (PV) generator.
  • the PV generator may be disposed on a roof top area of the building 108.
  • the consolidation unit 1 16 may further be configured to determine power consumption at one or more other building connections e.g. 107 on the basis of the reading from the meter M3.
  • the consolidation unit 1 16 may be configured for remotely reading any one or more of the meters M1-M3.
  • FIG. 2 shows a flowchart 200 illustrating a method of determining power consumption of one or more building connections in a power grid system, according to an example embodiment, and preferably allowing for the consolidated power units in aggregate, or as a fraction of the total generation at a given time, to be established through a settlement to one or more loads.
  • step 202 power imported from a mains grid portion of the power grid system to a building associated with respective ones of the one or more building connections and power exported from the associated building into the mains grid portion using a first meter are metered.
  • power exported to the associated building from an auxiliary generator using a second meter disposed downstream from the first meter relative to the mains grid portion is metered for one or more of the building connections.
  • power consumption at said one or more of the building connections is determined based on readings from the first and from the second meters.
  • the method further comprises at step 208 settling an aggregate supply of power from one or more auxiliary generators to one or more loads connected on the power grid system.
  • the method may further comprise determining power supplied by the auxiliary generator to the power grid on the basis of the reading from the second meter.
  • the auxiliary generator may comprise a photo-voltaic (PV) generator.
  • the PV generator may be disposed on a roof top area of the building.
  • the method may further comprise determining power consumption at one or more other building connections on the basis of the reading from the first meter.
  • the method may comprise remotely reading the any one or more of the first and second meters.
  • the mains supply for the power grid would be from a transformer, typically as a step down as described in the example embodiments, it will be appreciated that the present invention would also apply if the power grid is supplied directly from a mains power generator.

Abstract

Power grid system and method of determining power consumption at one or more building connections in a power grid system. The power grid system comprises a power grid comprising a mains grid portion; a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion; for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.

Description

POWER GRID SYSTEM AND METHOD OF DETERMINING POWER CONSUMPTION AT ONE OR MORE BUILDING CONNECTIONS IN A POWER GRID SYSTEM
FIELD OF INVENTION
The present invention relates broadly to a power grid system and to a method of determining power consumption thereof at one or more building connections in a power grid system.
BACKGROUND
To date, the majority of buildings, in particular commercial buildings such as shopping malls or industrial buildings, obtain all their power from a mains power grid system. Any generation associated to the building is performed independently of the power network as an embedded generator to the building solely reducing the total energy drawn from the power network. This has left energy supply and associated issues such as technical development and integration of alternative or "green" energy sources etc., as well as systems and methods for financial settlement etc. under the responsibility of only a few entities, which may have hindered faster improvements in those areas.
On the other hand, owners or stakeholders in buildings which already have power being supplied from an auxiliary source such as photo-voltaic (PV) generators are facing technical issues associated with the independent connections to both a mains power grid and to a typically proprietary connection to the PV generators, including associated meters etc. This can result in increased complexity, including in terms of technical maintenance and calibration issues etc., the provision of necessary resources, both technical and administratively, for separate settlements, and liability issues.
Embodiments of the present invention provide a power grid system and a method of determining power consumption at one or more building connections in a power grid system that seek to address at least one of the above problems.
SUMMARY
In accordance with a first aspect of the present invention, there is provided a power grid system comprising a power grid comprising a mains grid portion; a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion; for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.
In accordance with a second aspect of the present invention, there is provided a method of determining power consumption at one or more building connections in a power grid system, the method comprising metering power imported from a mains grid portion of the power grid system to a building associated with respective ones of the one or more building connections and power exported from the associated building into the mains grid portion using a first meter; metering, for one or more of the building connections, power exported to the associated building from an auxiliary generator using a second meter disposed downstream from the first meter relative to the mains grid portion; and determining power consumption at said one or more of the building connections based on readings from the first and from the second meters.
BRIEF DESCRIPTION OF THE DRAWINGS
Embodiments of the present invention will be better understood and readily apparent to one of ordinary skill in the art from the following written description, by way of example only, and in conjunction with the drawings, in which:
Figure 1 shows a schematic drawing illustrating a power grid system 100 according to an example embodiment.
Figure 2 shows a flowchart illustrating a method of determining power consumption at one or more building connections in a power grid system and supply to a load at one or more building connections in a power grid system, according to an example embodiment.
Figure 3 shows a series of voltages on a network associated with electrical conduction through various voltage transformers, each voltage level associated to a particular market settlement pool (.eg. Low Voltage, High Voltage, Extra High Voltage, etc.).
DETAILED DESCRIPTION
Figure 1 shows a schematic drawing illustrating a power grid system 100 according to an example embodiment. The system 100 comprises a power grid 102 comprising a mains grid portion 104. The power grid 102 is associated through flow of electrons and holes through the network and is associated with various voltages defined through the placement of voltage transformers matching a corresponding specification. Typically, the mains supply for the power grid 102 is from a transformer 119, as a step down from a higher voltage level. The application of transformers for establishing the various voltages on the power grid 102 network is understood in the art and will not be described herein in any detail. Figure 3 shows example voltage levels, e.g. Low Voltage 303, High Voltage 304, and Extra High Voltage 305 in a power grid network 300. Each of the transformers 301, 302 or the Extra High Voltage generator 306 can take the role of the transformer 119 illustrated in Figure 1.
Returning to Figure 1, the power grid 102 network is used to transfer power among loads from various sources of electricity. Conventionally this power grid 102 network is used to establish a central energy pool from which suppliers and consumers may trade, while the various voltages of the power grid 102 network may establish various markets and different settlements in pools associated to the specific voltage range.
The power grid system 100 further comprises a plurality of building connections e.g. 106, 107, each building connection e.g. 106, 107 comprising bi-directional meters e.g. Ml, M3, configured for metering power imported from the mains grid portion 104 to the associated building e.g. 108, 110 and power exported from the associated building e.g. 108, 110 into the mains grid portion 104. For one or more of the building connections e.g. 106 a further meter M2 is disposed downstream from the first meter Ml relative to the mains grid portion 104 and is configured for metering power exported to one or more loads 112 in the associated building e.g. 108 from an auxiliary generator e.g. 114. In this example embodiment, the meter M2 is bidirectional, but it is noted that the meter M2 can be uni-directional in other embodiments, as will be appreciated by a person skilled in the art.
It is noted that more than one second meter may be provided downstream from one building connection. For example, each second meter may be associated with a different auxiliary generator at or near the same building.
A consolidation unit 116 of the system 100 is configured for determining power consumption at the one or more building connections e.g. 106 having the meter M2 based on readings from the meters Ml and M2.
The consolidation unit 116 may be specially constructed for the required purposes, or may comprise a general purpose computer or other device selectively activated or reconfigured by a computer program stored in the computer. The algorithms and outputs presented herein are not inherently related to any particular computer or other apparatus. Various general purpose machines may be used with programs in accordance with the teachings herein. Alternatively, the construction of more specialized apparatus to perform the required method steps may be appropriate. In addition, the present specification also implicitly discloses a computer program, in that it would be apparent to the person skilled in the art that the individual steps of the method described herein may be put into effect by computer code. The computer program is not intended to be limited to any particular programming language and implementation thereof. It will be appreciated that a variety of programming languages and coding thereof may be used to implement the teachings of the disclosure contained herein. Moreover, the computer program is not intended to be limited to any particular control flow. There are many other variants of the computer program, which can use different control flows without departing from the spirit or scope of the invention. Furthermore, one or more of the steps of the computer program may be performed in parallel rather than sequentially. Such a computer program may be stored on any computer readable medium. The computer readable medium may include storage devices such as magnetic or optical disks, memory chips, or other storage devices suitable for interfacing with device selectively activated or reconfigured by the computer program. The computer readable medium may also include a hard- wired medium such as exemplified in the Internet system, or Wireless medium such as exemplified in the GSM mobile telephone system. The computer program when loaded and executed on the device effectively results in an apparatus that implements the steps of the preferred method.
The consolidation unit 116 may also be implemented as hardware modules. More particularily, in the hardware sense, a module is a functional hardware unit designed for use with other components or modules. For example, a module may be implemented using discrete electronic components, or it can form a portion of an entire electronic circuit such as an Application Specific Integrated Circuit (ASIC). Numerous other possibilities exist. Those skilled in the art will appreciate that the system can also be implemented as a combination of hardware and software modules.
The consolidation unit 116 in the example embodiment is configured for determining the power consumption at the building connections 106 by calculating:
C=M limport-M lexport+M2export ( 1 ) ,
where C is the consumed power, Mnmport is the power imported from the mains grid portion 104 to the associated building 108, Miexport is the power exported from the associated building 108 into the mains grid portion 104 and M2export is the power exported to the associated building 108 from the auxiliary generator 114.
As will be appreciated by a person skilled in the art, a transmission loss through this hardware may be incorporated within equation ( 1 ) to more accurately compute the flow of energy through the consolidation unit 116 by subtraction of the absolute transmission loss or through other means. In this embodiment it is assumed that this transmission loss is negligible and it is not investigated further.
Also, it will be appreciated by a person skilled in the art that equation (1) can be readily extended to account for two or more second meters downstream of the associated building connection.
The consolidation unit 116 is further configured for determining power supplied by the auxiliary generator 114 to the power grid 102 on the basis of the reading from the meter M2. The consolidation unit 116 is further configured for settling an aggregate supply of power from a plurality of auxiliary generators to one or more loads connected on the power grid system 100.
In the following, example cases illustrating the determining of the power consumption in the consolidation unit 116 will be described, by way of example, not limitation. The above system can be summarised by the following process flow, each step of which may be completed in a variety of combinations to obtain the same outcome.
Assign Λ = 0, A £ {0,1}.
Assign C° as customer load {normal procedure}, G° = 0 as generator supply.
Condition { " -L Λ 2 " } : Install ΐ 5 a bi-directional meter, at the incoming line; and install M2, e.g. a unidirectional meter, at the generator.
IF { M1 A M2 } ; A = 1; else{};
Assign C1 as customer load {modified procedure}, G1 as generator supply.
Compute
C1 = M1 + M2;
G^ = M2 ;
End;
It will be appreciated by the person skilled in the art that in the above algorithm, the default system is established to reflect a conventional working power network wherein there is no associated generator at the building and thus the consolidation unit can be set to the null set. Additionally, it will be appreciated by the person skilled in the art that more than one sources can be identified by the inclusion of more consolidations units A=2, A=3, et cetera.
Assumptions:
The auxiliary generator 114 produces 50 kW over a specified consolidation period and exports all of the power via the meter M2.
Case 1: The loads 112 in the associated building 108 consume 100 kW over the specified consolidation period.
For the specified consolidation period, Ml meters that no power was exported from the building 108 to the mains grid portion 104 and that 50 kW were imported from the mains grid portion 104 into the building 108, being the difference between the power provided by the auxiliary generator 114 and the power consumed by the loads 1 12.
M2 meters 50 kW being exported from the auxiliary generator 114 to the building 108 during the specified consolidation period.
Accordingly, based on equation (1) above, the calculated power consumption C at building connection 106 is:
C=50 kW-0 kW +50 kW=100 kW. The power consumption determined by the consolidation unit 116 in the example embodiment can preferably be used for settlement in an energy pool associated with the power grid system 100. In the Case 1 scenario, the power client associated with the building 108 will have to settle a consumption bill for 100 kW in the pool, i.e. consistent with the actual consumption at the loads 112.
On the other hand, the owner or stakeholder of the auxiliary generator 114 is settled on the basis of having sold 50 kW into the pool.
Case 2: The loads 112 in the associated building 108 consume 25 kW over the specified consolidation period.
For the specified consolidation period, Ml meters that 25 kW were exported from the building 108 to the mains grid portion 104 and that no power was imported from the mains grid portion 104 into the building 108, because the power needs of the loads 112 were fully met, and exceeded, by the auxiliary generator 114.
M2 again meters 50 kW being exported from the auxiliary generator 114 to the building 108 during the specified consolidation period.
Accordingly, based on equation (1) above, the calculated power consumption C at building connection 106 is:
C=0 kW-25 kW +50 kW=25 kW.
The power consumption determined by the consolidation unit 116 in the example embodiment can preferably be used for settlement in the energy pool associated with the power grid system 100. In the Case 2 scenario, the power client associated with the building 108 will have to settle a consumption bill for 25 kW in the pool, i.e. consistent with the actual consumption at the loads 112
On the other hand, the owner or stakeholder of the auxiliary generator 114 is again settled on the basis of having sold 50 kW into the pool. As will be appreciated by a person skilled in the art, the excess power provided by the auxiliary generator 114 into the pool can thus in effect be sold to other consumers, such as the power client associated with the building 110.
Case 3: The loads 112 in the associated building 108 consume no power over the specified consolidation period.
For the specified consolidation period, Ml meters that 50 kW were exported from the building 108 to the mains grid portion 104 and that no power was imported from the mains grid portion 104 into the building 108, because with no consumption at the loads 112, all of the power from the auxiliary generator was exported into the mains grid portion 104.
M2 again meters 50 kW being exported from the auxiliary generator 114 to the building 108 during the specified consolidation period. Accordingly, based on equation (1) above, the calculated power consumption C at building connection 106 is:
C=0 kW-50 kW +50 kW=0 kW.
The power consumption determined by the consolidation unit 116 in the example embodiment can preferably be used for settlement in the energy pool associated with the power grid system 100. In the Case 3 scenario, the power client associated with the building 108 will incur no power charge, i.e. consistent with the (zero) consumption at the loads 112.
On the other hand, the owner or stakeholder of the auxiliary generator 114 is again settled on the basis of having sold 50 kW into the pool. As will be appreciated by a person skilled in the art, the excess power provided by the generator 114 into the pool can thus in effect be sold to other consumers, such as the power client associated with the building 110.
For example, Customer B and/or Customer C can be supplied based on a flexible settlement implementation in an example embodiment, as follows.
Case 4: Assuming a total aggregate generation of 50 kW or more at the sources as measured through one or more consolidation units, and a demand of 25 kW at Customer B, and 25 kW at Customer C.
25 kW of units are settled with Customer B, while 25 kW are settled with Customer C.
Case 5: Assuming a total aggregate generation of 50 kW or more at the sources as measured through one or more consolidation units, and a demand of 50 kW at Customer B, and 0 kW at Customer C.
The total aggregate generation is settled with Customer B, and no energy is settled with Customer C.
As can be seen from the examples described above, example embodiments of the present invention can have one or more of the following advantages and technical effects:
- Backward compatibility for power connections and pool settlements for power clients associated with buildings which previously had no power being supplied from an auxiliary generator;
- Backward compatibility for power connections for power clients associated with buildings which already had power being supplied from an auxiliary generator, with the advantage of avoiding or at least reducing technical issues associated with independent connections to both a mains power grid and to a typically proprietary connection to the PV generators, including associated meters etc., which can result in a reduced complexity, including in terms of technical maintenance and calibration issues etc., the provision of necessary resources, both technical and administratively, for separate settlements, and liability issues; - Enabling power supply and settlement directly between the auxiliary generator and the energy pool associated with the power grid system, optimisation of the use of resources; and
- To flexibly define a source and load; and
- To reduce the costs of installing the associated hardware for integration of a generator directly to a power grid network; and
- Creating new commercial links between the power client associated with the building an and the owner or stakeholder of the auxiliary generator, e.g. roof top rental, share in profits made from selling power into the pool associated with the power grid system, etc.
The auxiliary generator 1 14 may comprise a photo-voltaic (PV) generator. The PV generator may be disposed on a roof top area of the building 108.
The consolidation unit 1 16 may further be configured to determine power consumption at one or more other building connections e.g. 107 on the basis of the reading from the meter M3. The consolidation unit 1 16 may be configured for remotely reading any one or more of the meters M1-M3.
Figure 2 shows a flowchart 200 illustrating a method of determining power consumption of one or more building connections in a power grid system, according to an example embodiment, and preferably allowing for the consolidated power units in aggregate, or as a fraction of the total generation at a given time, to be established through a settlement to one or more loads. At step 202, power imported from a mains grid portion of the power grid system to a building associated with respective ones of the one or more building connections and power exported from the associated building into the mains grid portion using a first meter are metered. At step 204, power exported to the associated building from an auxiliary generator using a second meter disposed downstream from the first meter relative to the mains grid portion is metered for one or more of the building connections. At step 206, power consumption at said one or more of the building connections is determined based on readings from the first and from the second meters.
Optionally, the method further comprises at step 208 settling an aggregate supply of power from one or more auxiliary generators to one or more loads connected on the power grid system.
The determining the power consumption may be by calculating C=Miimport-Miexport+M2export, where C is the consumed power, Mnmport is the power imported from the mains power grid to the associated building, Miexport is the power exported from the associated building into the mains power grid and M2export is the power exported to the associated building from the auxiliary generator.
The method may further comprise determining power supplied by the auxiliary generator to the power grid on the basis of the reading from the second meter.
The auxiliary generator may comprise a photo-voltaic (PV) generator. The PV generator may be disposed on a roof top area of the building. The method may further comprise determining power consumption at one or more other building connections on the basis of the reading from the first meter.
The method may comprise remotely reading the any one or more of the first and second meters.
It will be appreciated by a person skilled in the art that numerous variations and/or modifications may be made to the present invention as shown in the specific embodiments without departing from the spirit or scope of the invention as broadly described. The present embodiments are, therefore, to be considered in all respects to be illustrative and not restrictive. Also, the invention includes any combination of features, in particular any combination of features in the patent claims, even if the feature or combination of features is not explicitly specified in the patent claims or the present embodiments.
For example, while for most practical applications the mains supply for the power grid would be from a transformer, typically as a step down as described in the example embodiments, it will be appreciated that the present invention would also apply if the power grid is supplied directly from a mains power generator.

Claims

1. A power grid system comprising:
a power grid comprising a mains grid portion;
a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion;
for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and
a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.
2. The power grid system as claimed in claim 1, wherein the consolidation unit is configured for determining the power consumption by calculating C=Miimport-Miexport+M2export, where C is the consumed power, Mnmport is the power imported from the mains power grid to the associated building, Miexport is the power exported from the associated building into the mains power grid and M2export is the power exported to the associated building from the auxiliary generator.
3. The power grid system as claimed in claims 1 or 2, wherein the consolidation unit is further configured for determining power supplied by the auxiliary generator to the power grid on the basis of the reading from the second meter.
4. The power grid system as claimed in claim 3, wherein the consolidation unit is further configured for settling an aggregate supply of power from one or more auxiliary generators to one or more loads connected on the power grid system.
5. The power grid system as claimed in any one of the preceding claims, wherein the auxiliary generator comprises a photo-voltaic (PV) generator.
6. The power grid system as claimed in claim 5, wherein the PV generator is disposed on a roof top area of the building.
7. The power grid system as claimed in any one of the preceding claims, wherein the consolidation unit is further configured to determine power consumption at one or more other building connections on the basis of the reading from the first meter.
8. The power grid system as claimed in any one of the preceding claims, wherein the consolidation unit is configured for remotely reading any one or more of the first and second meters.
9. A method of determining power consumption at one or more building connections in a power grid system, the method comprising: metering power imported from a mains grid portion of the power grid system to a building associated with respective ones of the one or more building connections and power exported from the associated building into the mains grid portion using a first meter;
metering, for one or more of the building connections, power exported to the associated building from an auxiliary generator using a second meter disposed downstream from the first meter relative to the mains grid portion; and
determining power consumption at said one or more of the building connections based on readings from the first and from the second meters.
10. The method as claimed in claim 9, wherein the determining the power consumption is by calculating where C is the consumed power, Mnmport is the power imported from the mains power grid to the associated building, Miexport is the power exported from the associated building into the mains power grid and Miexport is the power exported to the associated building from the auxiliary generator.
11. The method as claimed in claims 9 or 10, further comprising determining power supplied by the auxiliary generator to the power grid on the basis of the reading from the second meter.
12. The method as claimed in claim 10, further comprising settling an aggregate supply of power from one or more auxiliary generators to one or more loads connected on the power grid system.
13. The method as claimed in any one of claims 8 to 12, wherein the auxiliary generator comprises a photo-voltaic (PV) generator.
14. The method as claimed in claim 13, wherein the PV generator is disposed on a roof top area of the building.
15. The method as claimed in any one of claims 8 to 14, further comprising determining power consumption at one or more other building connections on the basis of the reading from the first meter.
16. The method as claimed in any one of the preceding claims, comprising remotely reading the any one or more of the first and second meters.
EP15835110.6A 2014-08-29 2015-06-19 Power grid system and method of determining power consumption at one or more building connections in a power grid system Withdrawn EP3186868A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SG10201405341YA SG10201405341YA (en) 2014-08-29 2014-08-29 Power Grid System And Method Of Determining Power Consumption At One Or More Building Connections In A Power Grid System
PCT/SG2015/050170 WO2016032396A1 (en) 2014-08-29 2015-06-19 Power grid system and method of determining power consumption at one or more building connections in a power grid system

Publications (2)

Publication Number Publication Date
EP3186868A1 true EP3186868A1 (en) 2017-07-05
EP3186868A4 EP3186868A4 (en) 2018-04-25

Family

ID=55400137

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15835110.6A Withdrawn EP3186868A4 (en) 2014-08-29 2015-06-19 Power grid system and method of determining power consumption at one or more building connections in a power grid system

Country Status (11)

Country Link
US (2) US20170285080A1 (en)
EP (1) EP3186868A4 (en)
JP (1) JP2017530686A (en)
CN (1) CN107112751A (en)
AU (2) AU2015307294A1 (en)
CA (1) CA2959626A1 (en)
HK (1) HK1243554A1 (en)
PH (1) PH12017500379A1 (en)
SG (3) SG10201405341YA (en)
TW (1) TW201617620A (en)
WO (1) WO2016032396A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10234885B2 (en) 2016-06-13 2019-03-19 Sun Electric Digital Stream Ltd. Method and system for facilitating auditing of power generation and allocation thereof to consumption loads
WO2019132774A1 (en) * 2017-12-29 2019-07-04 Sun Electric Digital Stream Ltd Communication module and method for electric power supply applications

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3875149B2 (en) * 2002-06-10 2007-01-31 三菱電機株式会社 Solar power system
JP3889679B2 (en) * 2002-06-28 2007-03-07 三菱電機株式会社 Power-related display device and private power generation system using the same
US8295960B2 (en) * 2007-04-17 2012-10-23 Timothy Patrick Cooper Load management controller for a household electrical installation
JP5512212B2 (en) * 2009-09-29 2014-06-04 パナソニック株式会社 Power management system
US8401709B2 (en) * 2009-11-03 2013-03-19 Spirae, Inc. Dynamic distributed power grid control system
JP2011135651A (en) * 2009-12-22 2011-07-07 Panasonic Electric Works Co Ltd Power supply system
GB201005801D0 (en) * 2010-04-07 2010-05-26 Cooper Timothy P A localy based electricity supply management system and method
WO2012015508A1 (en) * 2010-07-29 2012-02-02 Spirae, Inc. Dynamic distributed power grid control system
US9893526B2 (en) * 2011-03-25 2018-02-13 Green Charge Networks Llc Networked power management and demand response
US8849715B2 (en) * 2012-10-24 2014-09-30 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
JP6013076B2 (en) * 2012-08-10 2016-10-25 京セラ株式会社 Energy management device, energy management system, and energy management method
GB2507039A (en) * 2012-10-16 2014-04-23 Ivy Ltd Surplus power detection and diversion in co-generation system
US9246334B2 (en) * 2012-10-25 2016-01-26 New Jersey Institute Of Technology Alleviating solar energy congestion in the distribution grid via smart metering communications
CN105556831B8 (en) * 2013-04-13 2018-08-31 蜜獾国际有限公司 System, method and apparatus for energy production load compensation

Also Published As

Publication number Publication date
TW201617620A (en) 2016-05-16
EP3186868A4 (en) 2018-04-25
AU2015307294A1 (en) 2017-02-23
SG11201700648QA (en) 2017-02-27
HK1243554A1 (en) 2018-07-13
AU2019271982A1 (en) 2019-12-19
PH12017500379A1 (en) 2017-07-17
SG10201405341YA (en) 2016-03-30
CN107112751A (en) 2017-08-29
US20190285670A1 (en) 2019-09-19
WO2016032396A1 (en) 2016-03-03
SG10201802478XA (en) 2018-04-27
US20170285080A1 (en) 2017-10-05
CA2959626A1 (en) 2016-03-03
JP2017530686A (en) 2017-10-12

Similar Documents

Publication Publication Date Title
AU2017364328B2 (en) Method and apparatus for facilitating the operation of an on-site energy storage system to co-optimize battery dispatch
JP6429200B2 (en) Method and system for operating a power system
JP6563491B2 (en) Power grid system and method for integrating power input and consumption in a power grid system
US10128658B2 (en) Autonomous methods, systems, and software for self-adjusting generation, demand, and/or line flows/reactances to ensure feasible AC power flow
CN102792543A (en) Electric power supply system
US20160131688A1 (en) Determining an orientation of a metering device in an energy generation system
US20190285670A1 (en) Power grid system and method of determining power consumption at one or more building connections in a power grid system
KR102173207B1 (en) Building energy management system with distributed energy resources of scheduling and real time control
Li et al. CTS2M: concurrent task scheduling and storage management for residential energy consumers under dynamic energy pricing
US20160268811A1 (en) Systems and methods for secondary voltage loss estimator
Swami Social welfare maximization in deregulated power system
JP2013156866A (en) Power generation facility management system and power generation facility management method
Iino et al. Model predictive control for demand response aggregation management system with response delay time and uncertainty model
US11599074B2 (en) Power information management device and power information management system
US9983024B2 (en) Determining a load meter installation location in an energy generation system
Nam et al. Application of SVC for voltage regulation in real-time power market
US20160065128A1 (en) Iterative method of solar electrical system optimization
CN105787238B (en) The analysis method of unit spinning reserve cost in a kind of electric system containing wind-powered electricity generation
Concepcion et al. QuESt: An Energy Storage Application Suite.
WO2023215255A1 (en) Methods and apparatus for providing charging-related benefits to an electric vehicle user
CN103904687A (en) Hybrid energy system configuration and output smoothing method oriented towards power grid load data

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20170301

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIN1 Information on inventor provided before grant (corrected)

Inventor name: PELOSO, MATTHEW

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SUN ELECTRIC DIGITAL STREAM LTD.

A4 Supplementary search report drawn up and despatched

Effective date: 20180322

RIC1 Information provided on ipc code assigned before grant

Ipc: G01R 21/133 20060101ALI20180316BHEP

Ipc: H02J 3/00 20060101AFI20180316BHEP

Ipc: H02J 3/38 20060101ALI20180316BHEP

Ipc: G01R 22/00 20060101ALI20180316BHEP

Ipc: G01R 19/25 20060101ALI20180316BHEP

REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1241145

Country of ref document: HK

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20200103

REG Reference to a national code

Ref country code: HK

Ref legal event code: WD

Ref document number: 1241145

Country of ref document: HK