EP3138993A3 - Hydraulic delay toe valve system and method - Google Patents
Hydraulic delay toe valve system and method Download PDFInfo
- Publication number
- EP3138993A3 EP3138993A3 EP16185314.8A EP16185314A EP3138993A3 EP 3138993 A3 EP3138993 A3 EP 3138993A3 EP 16185314 A EP16185314 A EP 16185314A EP 3138993 A3 EP3138993 A3 EP 3138993A3
- Authority
- EP
- European Patent Office
- Prior art keywords
- time delay
- fluid
- casing
- toe valve
- valve system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title abstract 2
- 239000012530 fluid Substances 0.000 abstract 4
- 230000015572 biosynthetic process Effects 0.000 abstract 2
- 238000002347 injection Methods 0.000 abstract 1
- 239000007924 injection Substances 0.000 abstract 1
- 238000011016 integrity testing Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/08—Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
- E21B34/085—Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained with time-delay systems, e.g. hydraulic impedance mechanisms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/063—Valve or closure with destructible element, e.g. frangible disc
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/10—Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole
- E21B34/108—Valve arrangements for boreholes or wells in wells operated by control fluid supplied from outside the borehole with time delay systems, e.g. hydraulic impedance mechanisms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/06—Sleeve valves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/14—Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Fluid-Pressure Circuits (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP17165433.8A EP3219906B1 (en) | 2015-08-31 | 2016-08-23 | Hydraulic delay toe valve method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/840,473 US9650866B2 (en) | 2013-03-07 | 2015-08-31 | Hydraulic delay toe valve system and method |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17165433.8A Division-Into EP3219906B1 (en) | 2015-08-31 | 2016-08-23 | Hydraulic delay toe valve method |
EP17165433.8A Division EP3219906B1 (en) | 2015-08-31 | 2016-08-23 | Hydraulic delay toe valve method |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3138993A2 EP3138993A2 (en) | 2017-03-08 |
EP3138993A3 true EP3138993A3 (en) | 2017-04-19 |
EP3138993B1 EP3138993B1 (en) | 2021-01-20 |
Family
ID=56799308
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16185314.8A Active EP3138993B1 (en) | 2015-08-31 | 2016-08-23 | Hydraulic delay toe valve system and method |
EP17165433.8A Active EP3219906B1 (en) | 2015-08-31 | 2016-08-23 | Hydraulic delay toe valve method |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17165433.8A Active EP3219906B1 (en) | 2015-08-31 | 2016-08-23 | Hydraulic delay toe valve method |
Country Status (3)
Country | Link |
---|---|
EP (2) | EP3138993B1 (en) |
CN (1) | CN106481309B (en) |
CA (1) | CA2939553C (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130945A (en) * | 2017-07-03 | 2017-09-05 | 西安石油大学 | A kind of rupture disk perforated casing box cupling device |
CN109505535A (en) * | 2017-09-15 | 2019-03-22 | 中国石油天然气股份有限公司 | Pipe column |
CA2994290C (en) | 2017-11-06 | 2024-01-23 | Entech Solution As | Method and stimulation sleeve for well completion in a subterranean wellbore |
CN109296348B (en) * | 2018-10-31 | 2023-09-15 | 中国石油集团川庆钻探工程有限公司 | Toe end sliding sleeve capable of being opened in time delay mode |
CN109296349B (en) * | 2018-11-05 | 2023-09-15 | 中国石油集团川庆钻探工程有限公司 | Piston type delay opening toe end sliding sleeve |
US10995585B2 (en) * | 2018-11-26 | 2021-05-04 | Geodynamics, Inc. | Electronic valve with deformable seat and method |
CN111021990B (en) * | 2019-12-18 | 2023-07-25 | 中国石油天然气股份有限公司 | Toe-soluble end sliding sleeve for well cementation and completion and use method thereof |
WO2021127789A1 (en) * | 2019-12-27 | 2021-07-01 | Ncs Multistage Inc. | Systems and methods for producing hydrocarbon material from unconsolidated formations |
CN113153253B (en) * | 2020-01-07 | 2022-08-30 | 中国石油天然气股份有限公司 | Horizontal well composite fracturing method |
CN112780221B (en) * | 2021-03-03 | 2021-11-02 | 东营市友佳石油科技有限公司 | Pollution-free perforation-free well cementation tool device and method for reservoir |
CN113110013B (en) * | 2021-04-02 | 2024-05-28 | 山西汾西重工有限责任公司 | Delay time testing device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140251619A1 (en) * | 2013-03-07 | 2014-09-11 | Kevin R. George | Method and Apparatus for Establishing Injection into a Cased Bore Hole using a Time Delay Toe Injection Apparatus |
CA2892128A1 (en) * | 2015-05-20 | 2015-07-24 | Geodynamics, Inc. | Method and apparatus for establishing injection into a cased bore hole using a time delay toe injection apparatus |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6763892B2 (en) | 2001-09-24 | 2004-07-20 | Frank Kaszuba | Sliding sleeve valve and method for assembly |
NO20051733D0 (en) * | 2005-04-08 | 2005-04-08 | Well Innovation As | Procedure for using a hydraulic load compensated time delay |
CA3019452C (en) * | 2011-05-02 | 2020-06-02 | Peak Completion Technologies, Inc. | Downhole tool |
US8267178B1 (en) * | 2011-09-01 | 2012-09-18 | Team Oil Tools, Lp | Valve for hydraulic fracturing through cement outside casing |
US10107076B2 (en) * | 2012-11-21 | 2018-10-23 | Peak Completion Technologies, Inc | Downhole tools, systems and methods of using |
-
2016
- 2016-08-22 CA CA2939553A patent/CA2939553C/en active Active
- 2016-08-23 EP EP16185314.8A patent/EP3138993B1/en active Active
- 2016-08-23 EP EP17165433.8A patent/EP3219906B1/en active Active
- 2016-08-30 CN CN201610780139.1A patent/CN106481309B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140251619A1 (en) * | 2013-03-07 | 2014-09-11 | Kevin R. George | Method and Apparatus for Establishing Injection into a Cased Bore Hole using a Time Delay Toe Injection Apparatus |
CA2892128A1 (en) * | 2015-05-20 | 2015-07-24 | Geodynamics, Inc. | Method and apparatus for establishing injection into a cased bore hole using a time delay toe injection apparatus |
Also Published As
Publication number | Publication date |
---|---|
EP3138993A2 (en) | 2017-03-08 |
EP3138993B1 (en) | 2021-01-20 |
CN106481309B (en) | 2021-05-07 |
EP3219906B1 (en) | 2019-10-09 |
EP3219906A1 (en) | 2017-09-20 |
CA2939553A1 (en) | 2017-02-28 |
CN106481309A (en) | 2017-03-08 |
CA2939553C (en) | 2023-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3138993A3 (en) | Hydraulic delay toe valve system and method | |
EP4265882A3 (en) | A method of isolating a portion of a well during hydraulic fracturing operations | |
EA201792190A1 (en) | PLASTIC TEST FOR AVAILABILITY OF COMPLETED HYDROCARBON CRACKS BEFORE HYDRO-EXPLOSIVE SHAFT | |
MX2019013507A (en) | Well injection and production methods, apparatus and systems. | |
EP2770159A3 (en) | Apparatus and method for setting a cementitious material plug | |
IT201700096979A1 (en) | DEVICE AND METHOD OF DIAGNOSTICS FOR SOLENOID VALVES | |
EP3183420A4 (en) | System and method for using pressure pulses for fracture stimulation performance enhancement and evaluation | |
GB2572310A (en) | Improvements in particular relating to subsea well construction | |
GB2534049A (en) | Solvent extraction and analysis of formation fluids from formation solids at a well site | |
GB2557026B (en) | Method and system for water injection into an oil and/or gas containing subterranean formation | |
MX2016016113A (en) | Controlled swelling of swellable polymers downhole. | |
MY177129A (en) | Composition and method for blast hole loading | |
AR104688A1 (en) | METHOD FOR TREATING AN UNDERGROUND FORMATION WITH A BINDING SUSPENSION DESIGNED TO FORM A PERMEABLE BINDER | |
GB201600897D0 (en) | Method and apparatus for pressure integrity testing | |
MX2018012882A (en) | Acid diversion in naturally fractured formations. | |
MX2018012610A (en) | Pressure cycle actuated injection valve. | |
AR113592A1 (en) | COMPOSITION OF DIVERGENT FLUID IN WELL STIMULATION | |
BR112017021526A2 (en) | ? piercing gun apparatus, method and system? | |
GB2573522B (en) | Method of identifying faults in the operation of hydraulic fuel injectors having accelerometers | |
DK3877623T3 (en) | Device and method for controlled pressure drilling | |
GB2590026B (en) | Formation Fluid Analysis Apparatus and Related Methods | |
WO2019016469A9 (en) | Method for treating a rock formation against the infiltration of sand using a geopolymer cement grout | |
MX2016015813A (en) | Depth vibrator pipe assembly. | |
EP3412758A4 (en) | Method for producing herbal oil emulsion using ultrasonic treatment | |
EP2357317A3 (en) | Method for renovating a borehole in the soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 34/06 20060101AFI20170316BHEP Ipc: E21B 34/10 20060101ALI20170316BHEP Ipc: E21B 34/14 20060101ALI20170316BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20170815 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180914 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20200813 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: GEORGE, KEVIN R. Inventor name: ROLLINS, JAMES A. Inventor name: HARDESTY, JOHN T. Inventor name: WESSON, DAVID S. |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016051615 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1356555 Country of ref document: AT Kind code of ref document: T Effective date: 20210215 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20210120 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1356555 Country of ref document: AT Kind code of ref document: T Effective date: 20210120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210420 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210421 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210420 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210520 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210520 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602016051615 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
26N | No opposition filed |
Effective date: 20211021 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20210831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210831 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210520 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210823 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210823 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210831 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20160823 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230512 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210120 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240723 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240723 Year of fee payment: 9 |