EP3104119B1 - System and method for determining an alternative flight route based on sector geometry - Google Patents

System and method for determining an alternative flight route based on sector geometry Download PDF

Info

Publication number
EP3104119B1
EP3104119B1 EP16168080.6A EP16168080A EP3104119B1 EP 3104119 B1 EP3104119 B1 EP 3104119B1 EP 16168080 A EP16168080 A EP 16168080A EP 3104119 B1 EP3104119 B1 EP 3104119B1
Authority
EP
European Patent Office
Prior art keywords
sectors
airspace
arcs
points
sector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16168080.6A
Other languages
German (de)
French (fr)
Other versions
EP3104119A1 (en
Inventor
Laura S. Kang
Darryn R. Frafford
Michael L. Carter
Matthew E. Berge
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Boeing Co
Original Assignee
Boeing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Boeing Co filed Critical Boeing Co
Publication of EP3104119A1 publication Critical patent/EP3104119A1/en
Application granted granted Critical
Publication of EP3104119B1 publication Critical patent/EP3104119B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G5/00Traffic control systems for aircraft, e.g. air-traffic control [ATC]
    • G08G5/003Flight plan management
    • G08G5/0039Modification of a flight plan
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G5/00Traffic control systems for aircraft, e.g. air-traffic control [ATC]
    • G08G5/003Flight plan management
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C21/00Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C23/00Combined instruments indicating more than one navigational value, e.g. for aircraft; Combined measuring devices for measuring two or more variables of movement, e.g. distance, speed or acceleration
    • G01C23/005Flight directors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G5/00Traffic control systems for aircraft, e.g. air-traffic control [ATC]
    • G08G5/0017Arrangements for implementing traffic-related aircraft activities, e.g. arrangements for generating, displaying, acquiring or managing traffic information
    • G08G5/0026Arrangements for implementing traffic-related aircraft activities, e.g. arrangements for generating, displaying, acquiring or managing traffic information located on the ground
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G5/00Traffic control systems for aircraft, e.g. air-traffic control [ATC]
    • G08G5/003Flight plan management
    • G08G5/0034Assembly of a flight plan
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G5/00Traffic control systems for aircraft, e.g. air-traffic control [ATC]
    • G08G5/0043Traffic management of multiple aircrafts from the ground

Definitions

  • the disclosed system relates to a flight routing system for an aircraft and, more particularly, to a flight routing system for determining an alternative route for an aircraft based on an airspace partitioned into a plurality of sectors.
  • portions of an aircraft's flight route may become unavailable due to disruptions such as, for example, convective weather conditions or air traffic congestion.
  • an alternative route that avoids the blocked airspace needs to be determined. Specifically, the aircraft should be re-routed along the alternative route, and directed to the final destination as quickly and as effectively as possible.
  • the waypoint based network approach may be a relatively simple way to determine the alternative route.
  • the waypoint network includes a limited set of waypoints, which in turn translates into a limited set of re-routing options for the aircraft. This in turn often results in a longer detour than necessary around the blocked airspace.
  • Re-routing on a uniform grid network typically includes a network of connected points uniformly spaced throughout the airspace and is often based on the center or edge points of a grid of polygons, such as, for example, hexagons, rectangles, or triangles. Determining the alternative route based on the uniform grid network is often inefficient as well, depending on the granularity of the grid as well as the approach used to form connections between the points.
  • a route determined based on the uniform grid network may also be inoperable, depending on how the path of the route aligns with the airspace sectors' geometries. Specifically, the aircraft may fly too closely to an edge of a sector, or may even cut a corner of a sector. This should be avoided because of the extra workload created for air traffic controllers when the aircraft flies too closely to an edge of a sector, or cuts a corner of a sector. Accordingly, there exists a need in the art for an improved approach for determining an alternative route for an aircraft.
  • JP 2014 016264 A discloses an avoidance route derivation device, a avoidance route derivation program, and an avoidance route derivation method for deriving an avoidance route when an avoidance areas occurs in a flight path of an aircraft.
  • EP 2031 350 A1 discloses methods, systems, and apparatus for routing a vehicle to avoid an adverse condition.
  • WO 2003/025507 A discloses a four-dimensional route planner.
  • FIG. 1 is a block diagram illustrating an exemplary flight routing system 10 for establishing routing for one or more aircraft 20.
  • the flight planning system 10 may include a route planning control module 22, a command and control system 24, and a transceiver 26.
  • the flight planning system 10 may reroute one or more aircraft 20 in the event a portion of a specific aircraft's original flight route 30 (shown in FIG. 2 ) becomes unavailable due to disruptions.
  • Some example of disruptions that may cause a portion of the original flight route 30 to become unavailable include, but are not limited to, convective weather conditions or air traffic congestion.
  • the command and control system 24 may send and receive information to and from each of the aircraft 20 through the transceiver 26. For example, the command and control system 24 may transmit updated routing information determined by the route planning control module 22 to one or more of the aircraft 20.
  • the command and control system 24 may include one or more computers (not illustrated) that may be staffed by airline personnel.
  • the command and control system 24 may be used to collect information relating to the various aircraft 20 such as, but not limited to, an initial point of takeoff or the current aircraft position, a destination point, aircraft type, the current position of the aircraft 20, weather conditions, air traffic control data, headings, altitudes, speed, originally planned flight route and fuel information.
  • the information collected by the command and control system 24 may be shared with the route planning control module 22.
  • the route planning control module 22 may refer to, or be part of, an application specific integrated circuit (ASIC), an electronic circuit, a combinational logic circuit, a field programmable gate array (FPGA), a processor (shared, dedicated, or group) comprising hardware or software that executes code, or a combination of some or all of the above, such as in a system-on-chip.
  • ASIC application specific integrated circuit
  • FPGA field programmable gate array
  • the route planning control module 22 includes control logic for determining an alternative route 32 (shown in FIG. 2 ) for a specific aircraft 20 in the event a portion of the specific aircraft's flight route becomes unavailable based on a plurality of inputs from the command and control system 24.
  • the route planning control module 22 includes control logic for determining the alternative route 32 based on a network formed from a plurality of sector geometries. More specifically, the route planning control module 22 may determine the alternative route 32 based on an airspace 42 that is partitioned into a plurality of sectors 40 (illustrated in FIG. 2 ).
  • airspace 42 that may be partitioned into the sectors 40 is the National Airspace System (NAS), however it should be understood that the present disclosure should not be limited to a specific airspace and may work regardless of how the airspace 42 is partitioned into individual sectors or geometries.
  • NAS National Airspace System
  • FIG. 2 an exemplary illustration of the airspace 42 is shown, where the sectors 40 each include a hexagonal shape.
  • the sectors 40 may be part of a uniform grid network 46, where each sector 40 includes substantially identical hexagonal profiles.
  • FIG. 2 illustrates hexagonally-shaped sectors, this illustration is merely exemplary in nature, and disclosure should not be limited to the illustrated example.
  • the sectors 40 may be any type of polygon having a closed shape including, but not limited to, a triangle or a rectangle.
  • the sectors 40 may even be irregularly shaped polygons.
  • the sectors 40 are usually based upon standard real world sector geometries, which reflect the primary flows of aircraft and traffic levels throughout the airspace 42.
  • each sector 40 may include its own unique shape and may be, for example, standard real sector geometries defined in the NAS or in other airspace regions.
  • the sectors 40 may include geometry that is a reflection of the flow and density of the air traffic within the airspace 42, as in the NAS.
  • the sectors 40 may be shaped to align with the prevalent flow of air traffic, where smaller sectors 40 may be provided in areas with higher air traffic.
  • the original flight route 30 of the aircraft 20 is depicted between an initial point of takeoff 52 and a destination point 54.
  • the aircraft 20 may be diverted from the original flight route 30 and is rerouted to follow the alternative route 32.
  • the alternative route 32 may eventually guide the aircraft 20 to its destination point 54.
  • the route planning control module 22 (shown in FIG. 1 ) includes control logic for determining the alternative route 32 based on the geometry of the sectors 40. Specifically, the route planning control module 22 calculates or determines the alternative route 32 based on nodes or points 60 that are located along edges 62 of each individual sector 40 ( FIG. 3 ).
  • FIG. 4 is a block diagram of the route planning control module 22.
  • the route planning control module 22 may include plurality of sub-modules and control logic for determining the alternative route 32 (shown in FIG. 2 ).
  • the route planning control module 22 includes an edge point sub-module 72, an arc determination sub-module 74, a sector crossing sub-module 76, a connector sub-module 78, an integration sub-module 80, a capacity sub-module 82, and a route calculation sub-module 84.
  • the edge point sub-module 72 of the route planning control module 22 receives as input airspace sector geometries 92 and control parameters 94, and determines a specific location of each point 60 located along the edges 62 of each individual sector 40.
  • the airspace sector geometries 92 contain a description specifying the specific shape of all of the sectors 40 within the airspace 42. For example, in the embodiment as shown in FIG. 5 , the airspace sector geometries 92 would describe the geometry of the sectors 40 as uniformly hexagonal.
  • control parameters 94 include, but are not limited to, a maximum connecting angle ⁇ max , a minimum number of points 60 located on each edge 62 of the sectors 40, and maximum distance measured between points 60 on the same edge 62 of the sectors 40 (if the edges 62 include more than one point 60).
  • the edge point sub-module 72 of the route planning control module 22 determines how many points 60 should be placed along each edge 62 of each sector 40 based on the control parameters 94, as well as the specific location of each point 60 for each sector 40. For example, in the embodiment as shown in FIG. 5 , a single point 60 is located along each edge 62 of each sector 40, along a midpoint M of each edge 62. Although FIG. 5 illustrates a single point 60 located at each edge 62, it is to be understood that multiple points 60 may be located along a single edge 60 as well. For example, in the embodiment as shown in FIG. 3 , a longer edge 104 of the sector 40 includes two points 60.
  • the maximum connecting angle ⁇ max for each sector 40 used by the arc determination submodule 74 shall now be explained.
  • the maximum connecting angle ⁇ max is indicative of a maximum angle that may be measured between two of the points 60 of a single sector 40, and is explained in greater detail below and illustrated in FIG. 6 .
  • FIG. 6 an illustration of an exemplary sector 40 is shown,
  • the sector 40 includes a single point 60 located along each edge 62.
  • a connecting arc 100 may be used to connect one of the points 60 with another point 60 located along another edge 62 of the sector 40.
  • a connecting angle ⁇ may be measured between a perpendicular line 102, which is perpendicular to the edge 62 of an initiating point 60A, and a potential connecting arc 100A.
  • the connecting angle ⁇ is the angle measured between the perpendicular line 102 and the potential arc 100A.
  • the connecting angle ⁇ for the potential arc 100A is about thirty degrees. If the connecting angle ⁇ is less than the maximum connecting angle ⁇ max , then the potential arc 100A may be included. However, it should be appreciated that any connecting arcs 100 that form a connecting angle ⁇ greater than ⁇ max are not included as connecting arcs in forming the network.
  • the maximum connecting angle ⁇ max is set to forty degrees, then the points 60 that are located on edges 62 directly adjacent to another may not be connected to one another by one of the connecting arcs 100, since this would require the connecting arcs 100 to be positioned at an angle that is greater than forty degrees.
  • an absolute value of a negative connecting angle may be used when comparing to the maximum connecting angle ⁇ max .
  • the maximum connecting angle ⁇ max may be based on factors such as, but not limited to, limitations of the specific aircraft performance, air traffic control, and the desired connectedness of the network in traversing one of the sectors 40. It should also be appreciated that if the maximum connecting angle ⁇ max is too large, then this may result in a route that cuts through the corner or a sector 40.
  • the arc determination sub-module 74 of the route planning control module 22 receives as input the specific location of each of the points 60 located along the edges 62 of each individual sector 40 of the airspace 42 as determined by the edge point sub-module 72, and determines a set of connecting arcs 100 for each individual sector 40 based on the input.
  • FIG. 7 illustrates a single sector 40, where each connecting arc 100has been determined by the arc determination sub-module 74.
  • the points 60 located on edges 62 directly adjacent to another may not be connected to one another by one of the connecting arcs 100, since this would require the connecting arcs 100 to be positioned at an angle that is greater than the maximum connecting angle ⁇ max (which is forty degrees in the present example).
  • ⁇ max which is forty degrees in the present example.
  • one of the points 60 of each sector 40 may be connected to at least one other point 60 along another edge 62 of the sector 40, and connecting arcs 100 formed from individual sectors 40 may connect to connecting arcs 100 located within adjacent sectors 40 to form a network of arcs through the entire airspace 42.
  • the sector crossing sub-module 76 of the route planning control module 22 receives as input a set of waypoints 110 used to determine the original flight route 30, a designator 112 which indicates that rerouting of the original flight route 30 is required, and the airspace sector geometries 92.
  • the original flight route 30 is a planned flight route, and includes two waypoints 110 (e.g., the initial point of takeoff 52 and the destination point 54).
  • the initial point of takeoff 52 may similarly be the current location of the aircraft 20 at the time the alternative route 32 is determined.
  • the original flight route 30 is assumed to be direct, and is shown as a straight line for purposes of simplicity and clarity, and therefore only requires two waypoints 110.
  • the designator 112 provides an indication that rerouting of the original flight route 30 is required because the original flight route 30 (shown in FIG. 2 ) is unavailable due to disruptions such as convective weather conditions or air traffic congestion.
  • the sector crossing sub-module 76 of the route planning control module 22 determines all of the locations within the airspace 42 where the original flight route 30 intersects with the edges 62 of the sectors 40.
  • the exemplary original flight route 30 intersects with the edges 62 of the sectors 40 at three unique intersections 120, however it is to be appreciated that this illustration is merely exemplary in nature, and that any number of intersections may be determined based on the specific geometry of the original flight route 30. It is to be understood that while the original flight route 30 still appears the same, the original flight route 30 has actually been divided or partitioned into a series of four individual arcs 122.
  • the arcs 122 are defined as segments between two of the intersections 120, or between one of the intersections and either the initial point of takeoff 52 of the destination point 54.
  • the connector sub-module 78 of the route planning control module 22 receives as input the intersections 120 determined by the sector crossing sub-module 76, and the connecting arcs 100 for each sector 40 within the airspace 42 ( FIG. 8 ) determined by the arc determination sub-module 74.
  • the connector sub-module 78 determines a set of jump on arcs 130 as well as a set of jump off arcs 132 based on the input, As seen in FIG. 10 , the jumping on arcs 130 connect one of the points 60 of one of the sectors 40 of the uniform grid network 46 to one of the intersections 120, or the destination point 54 (i.e., the arc jumps onto the original flight route 30).
  • the jumping off arcs 132 represent where one of the intersections 120 or the initial point of takeoff 52 connects to one of the points 60 of one of the sectors 40 of the uniform grid network 46 (i.e., the arc jumps off the original flight route 30).
  • the integration sub-module 80 of the route planning control module 22 receives as input the specific location of each of the points 60 located along the edges 62 of each individual sector 40 of the airspace 42, the set of connecting arcs 100 for each individual sector 40, the intersections 120, four individual arcs 122, the set of jump on arcs 130, and set of jump off arcs 132.
  • the integration sub-module 80 may then combine all of the inputs together to create a fully integrated airspace network 140, which is seen in FIG. 11 , and provides multiple pathways over which the aircraft 20 may traverse the airspace 42.
  • the capacity sub-module 82 of the route planning control module 22 receives as input a sector forecast capacity 142, as well as the fully integrated airspace network 140 as seen in FIG. 11 .
  • the sector forecast capacity 142 indicates a forecast of the available capacity for each sector 40 (i.e., a measure of how many aircraft may simultaneously be within in a sector 40), and also indicates which sector 40 or sectors 40 may be unavailable or have limited availability due to conditions such as, for example, convective weather conditions or air traffic congestion.
  • the air traffic congestion may be referred to as restricted airspace.
  • the sector forecast capacity 142 is time-based, which means that the available capacity as well as the availability of a specific sector 40 may change as time progresses. Specifically, if there is a convective weather condition contained in one of the sectors 40 that make the sector unavailable, eventually the weather conditions will improve. Thus, the sector 40 will eventually become available again.
  • a specific sector 40' is shaded as an unavailable sector.
  • the unavailable sector 40' is representative of unavailable airspace.
  • the aircraft 20 is unable to fly through the specific sector 40', at least during the time the aircraft 20 would traverse the specific sector 40' to reach the destination point 54.
  • the capacity sub-module 82 of the route planning control module 22 may then turn off or make all of the connecting arcs 100 located within the specific sector 40' from the integrated airspace 140 unavailable, thereby creating a complete time-based airspace network 150, which is shown in FIG. 12 .
  • the complete time-based airspace network 150 which includes any arcs located within the specific sector 40' turned off.
  • the complete time-based airspace network 150 includes all of the arcs (e.g., the connecting arcs 100, the arcs 122, the jump on arcs 130, and the jump off arcs 132).
  • the route planning control module 22 may now determine a valid, complete rerouting option for the aircraft 20 based on the complete time-based airspace network 150.
  • the illustration of the complete time-based airspace network 150 may change as time progresses. Specifically, the arcs included within the complete time-based airspace network 150 may change over time, where specific sectors 40 and their associated arcs may become available or unavailable for periods of time. Thus, it is important to determine the availability of each sector 40 within the complete time-based airspace network 150 based on a specific path through the complete time-based airspace network 150 and the estimated time when the aircraft would traverse a given sector 40.
  • the route calculation sub-module 84 of the route planning control module 22 receives as input the complete time-based airspace network 150 as determined by the forecast capacity sub-module 82.
  • the route calculation sub-module may then determine the shortest potential route between the initial point of takeoff 52 and the destination point 54. Referring to both FIGS. 4 and 12 , the shortest potential route may be calculated based on all of the arcs within the complete time-based airspace network 150, which include the connecting arcs 100, the arcs 122, the jump on arcs 130, and the jump off arcs 132.
  • the route calculation sub-module 84 may then output the shortest route in terms of distance, which is the alternative route 32 as illustrated in FIG. 2 .
  • the disclosed flight routing system 10 provides numerous benefits and advantages when compared to the existing flight routing systems that are currently available. Specifically, the disclosed flight routing system 10 includes a higher resolution network compared to a waypoint based network, therefore reducing the length of detours around blocked sectors, which in turn reduces the fuel consumption of an aircraft. Moreover, the disclosed flight routing system 10 is also flexible, since the number of points located along each edge of each sector and the maximum connecting angle ⁇ max (seen in FIG. 6 ) are both variable. Thus, the resolution of the sector network, even by individual sectors, may be controlled.
  • FIG. 13 is an illustration of a block diagram of a computing environment 300 including a general purpose computing device 310 for supporting embodiments of computer-implemented methods and computer-executable program instructions (or code) according to the present disclosure.
  • the computing device 310 may execute instructions to adaptively encode/decode data in a particular number of bits.
  • the computing device 310, or portions thereof, may further execute instructions according to any of the methods described herein.
  • the computing device 310 may include a processor 320.
  • the processor 320 may communicate with a system memory 330, one or more storage devices 340, one or more input/output interfaces 350, one or more communications interfaces 360, or a combination thereof.
  • the system memory 330 may include volatile memory devices (e.g., random access memory (RAM) devices), nonvolatile memory devices (e.g., read-only memory (ROM) devices, programmable read-only memory, and flash memory), or both.
  • the system memory 330 may include an operating system 332, which may include a basic/input output system for booting the computing device 310 as well as a full operating system to enable the computing device 310 to interact with users, other programs, and other devices.
  • the system memory 330 may include one or more computer programs or applications 334 which may be executable by the processor 320.
  • the applications 334 may include instructions executable by the processor 320 to determine the alternative route 32 ( FIG. 2 ).
  • the system memory 330 may include program data 336 usable for controlling the analysis of data.
  • the applications 334 may also be embodied in a computer readable medium having the applications 334 stored therein.
  • the processor 320 may also communicate with one or more storage devices 340.
  • the one or more storage devices 340 may include nonvolatile storage devices, such as magnetic disks, optical disks, or flash memory devices.
  • the storage devices 340 may include both removable and non-removable memory devices.
  • the storage devices 340 may be configured to store an operating system, images of operating systems, applications, and program data.
  • the memory 330, the storage devices 340, or both include tangible computer-readable media.
  • the processor 320 may also communicate with one or more input/output interfaces 350 that enable the computing device 310 to communicate with one or more input/output devices 370 to facilitate user interaction.
  • the input/output interfaces 350 may include serial interfaces (e.g., universal serial bus (USB) interfaces or Institute of Electrical and Electronics Engineers (IEEE) 1394 interfaces), parallel interfaces, display adapters, audio adapters, and other interfaces.
  • the input/output devices 370 may include keyboards, pointing devices, displays, speakers, microphones, touch screens, and other devices.
  • the processor 320 may detect interaction events based on user input received via the input/output interfaces 350. Additionally, the processor 320 may send a display to a display device via the input/output interfaces 350.
  • the processor 320 may communicate with devices or controllers 380 via the one or more communications interfaces 360.
  • the one or more communications interfaces 360 may include wired Ethernet interfaces, IEEE 802 wireless interfaces, other wireless communication interfaces, or other network interfaces.
  • the devices or controllers 380 may include host computers, servers, workstations, and other computing devices.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Automation & Control Theory (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Traffic Control Systems (AREA)
  • Navigation (AREA)

Description

    FIELD
  • The disclosed system relates to a flight routing system for an aircraft and, more particularly, to a flight routing system for determining an alternative route for an aircraft based on an airspace partitioned into a plurality of sectors.
  • BACKGROUND
  • Sometimes portions of an aircraft's flight route may become unavailable due to disruptions such as, for example, convective weather conditions or air traffic congestion. In the event a portion of the flight route becomes unavailable, an alternative route that avoids the blocked airspace needs to be determined. Specifically, the aircraft should be re-routed along the alternative route, and directed to the final destination as quickly and as effectively as possible.
  • Two known and commonly used approaches for determining the alternative route are re-routing on a waypoint based network and re-routing on a uniform grid based network. The waypoint based network approach may be a relatively simple way to determine the alternative route. However, the waypoint network, as historically defined, includes a limited set of waypoints, which in turn translates into a limited set of re-routing options for the aircraft. This in turn often results in a longer detour than necessary around the blocked airspace. Re-routing on a uniform grid network typically includes a network of connected points uniformly spaced throughout the airspace and is often based on the center or edge points of a grid of polygons, such as, for example, hexagons, rectangles, or triangles. Determining the alternative route based on the uniform grid network is often inefficient as well, depending on the granularity of the grid as well as the approach used to form connections between the points.
  • In addition to the above mentioned difficulties, a route determined based on the uniform grid network may also be inoperable, depending on how the path of the route aligns with the airspace sectors' geometries. Specifically, the aircraft may fly too closely to an edge of a sector, or may even cut a corner of a sector. This should be avoided because of the extra workload created for air traffic controllers when the aircraft flies too closely to an edge of a sector, or cuts a corner of a sector. Accordingly, there exists a need in the art for an improved approach for determining an alternative route for an aircraft.
  • JP 2014 016264 A discloses an avoidance route derivation device, a avoidance route derivation program, and an avoidance route derivation method for deriving an avoidance route when an avoidance areas occurs in a flight path of an aircraft.
  • EP 2031 350 A1 discloses methods, systems, and apparatus for routing a vehicle to avoid an adverse condition.
  • WO 2003/025507 A discloses a four-dimensional route planner.
  • SUMMARY
  • The invention is defined in the independent claims 1 and 9.
  • Other objects and advantages of the disclosed method and system will be apparent from the following description, the accompanying drawings and the appended claims.
  • BRIEF DESCRIPTION OF THE DRAWINGS
    • FIG. 1 is a block diagram of an exemplary flight routing system for establishing routing for one or more aircraft, where the flight routing system includes a route planning control module;
    • FIG. 2 is an exemplary illustration of an airspace including a plurality of uniformly shaped sectors;
    • FIG. 3 is an exemplary illustration of a sector having an irregular shape;
    • FIG. 4 is a block diagram of the route planning control module shown in FIG. 1;
    • FIG. 5 is an exemplary illustration of the airspace in FIG. 2 where each edge of each sector includes a single point;
    • FIG. 6 is an illustration of a single sector seen in FIG. 5, where an arc is drawn between one of the points on an edge to another point on another edge of the sector;
    • FIG. 7 is an illustration of the sector in FIG. 6, where all of the possible arcs are determined;
    • FIG. 8 is an illustration of the airspace in FIG. 5 where each arc crossing the sectors are determined;
    • FIG. 9 is an illustration of the airspace shown in FIG. 5 where an original flight route intersects with edges of the sectors;
    • FIG. 10 is an illustration of the airspace shown in FIG. 9 including a set of jump off arcs as well as a set of jump on arcs;
    • FIG. 11 is illustration of a fully integrated airspace, including the original flight route, the set of jump off arcs, and the set of jump on arcs;
    • FIG. 12 is an illustration of a complete airspace, where a sector that is unavailable has been omitted; and
    • FIG. 13 is an illustration of a block diagram of an exemplary computing environment including a general purpose computing device for supporting embodiments of the present disclosure.
    DETAILED DESCRIPTION
  • FIG. 1 is a block diagram illustrating an exemplary flight routing system 10 for establishing routing for one or more aircraft 20. The flight planning system 10 may include a route planning control module 22, a command and control system 24, and a transceiver 26. As explained in greater detail below, the flight planning system 10 may reroute one or more aircraft 20 in the event a portion of a specific aircraft's original flight route 30 (shown in FIG. 2) becomes unavailable due to disruptions. Some example of disruptions that may cause a portion of the original flight route 30 to become unavailable include, but are not limited to, convective weather conditions or air traffic congestion.
  • The command and control system 24 may send and receive information to and from each of the aircraft 20 through the transceiver 26. For example, the command and control system 24 may transmit updated routing information determined by the route planning control module 22 to one or more of the aircraft 20. The command and control system 24 may include one or more computers (not illustrated) that may be staffed by airline personnel. The command and control system 24 may be used to collect information relating to the various aircraft 20 such as, but not limited to, an initial point of takeoff or the current aircraft position, a destination point, aircraft type, the current position of the aircraft 20, weather conditions, air traffic control data, headings, altitudes, speed, originally planned flight route and fuel information. The information collected by the command and control system 24 may be shared with the route planning control module 22.
  • The route planning control module 22 may refer to, or be part of, an application specific integrated circuit (ASIC), an electronic circuit, a combinational logic circuit, a field programmable gate array (FPGA), a processor (shared, dedicated, or group) comprising hardware or software that executes code, or a combination of some or all of the above, such as in a system-on-chip. As explained in greater detail below, the route planning control module 22 includes control logic for determining an alternative route 32 (shown in FIG. 2) for a specific aircraft 20 in the event a portion of the specific aircraft's flight route becomes unavailable based on a plurality of inputs from the command and control system 24.
  • The route planning control module 22 includes control logic for determining the alternative route 32 based on a network formed from a plurality of sector geometries. More specifically, the route planning control module 22 may determine the alternative route 32 based on an airspace 42 that is partitioned into a plurality of sectors 40 (illustrated in FIG. 2). One example of airspace 42 that may be partitioned into the sectors 40 is the National Airspace System (NAS), however it should be understood that the present disclosure should not be limited to a specific airspace and may work regardless of how the airspace 42 is partitioned into individual sectors or geometries.
  • Turning now to FIG. 2, an exemplary illustration of the airspace 42 is shown, where the sectors 40 each include a hexagonal shape. Specifically, in the embodiment as illustrated the sectors 40 may be part of a uniform grid network 46, where each sector 40 includes substantially identical hexagonal profiles. It is to be understood that while FIG. 2 illustrates hexagonally-shaped sectors, this illustration is merely exemplary in nature, and disclosure should not be limited to the illustrated example. Indeed, the sectors 40 may be any type of polygon having a closed shape including, but not limited to, a triangle or a rectangle. Moreover, as seen in the embodiment as shown in FIG. 3, the sectors 40 may even be irregularly shaped polygons. It should also be appreciated that in practice, the sectors 40 are usually based upon standard real world sector geometries, which reflect the primary flows of aircraft and traffic levels throughout the airspace 42.
  • Referring back to FIG. 2, it should also be understood that the sectors 40 do not need to be shaped identically, and the sectors 40 are merely illustrated in this manner for purposes of simplicity and clarity. Indeed, those of ordinary skill in the art will appreciate that each sector 40 may include its own unique shape and may be, for example, standard real sector geometries defined in the NAS or in other airspace regions. Moreover, it is also understood the sectors 40 may include geometry that is a reflection of the flow and density of the air traffic within the airspace 42, as in the NAS. For example, the sectors 40 may be shaped to align with the prevalent flow of air traffic, where smaller sectors 40 may be provided in areas with higher air traffic.
  • As seen in FIG. 2, the original flight route 30 of the aircraft 20 is depicted between an initial point of takeoff 52 and a destination point 54. The aircraft 20 may be diverted from the original flight route 30 and is rerouted to follow the alternative route 32. The alternative route 32 may eventually guide the aircraft 20 to its destination point 54. The route planning control module 22 (shown in FIG. 1) includes control logic for determining the alternative route 32 based on the geometry of the sectors 40. Specifically, the route planning control module 22 calculates or determines the alternative route 32 based on nodes or points 60 that are located along edges 62 of each individual sector 40 (FIG. 3).
  • FIG. 4 is a block diagram of the route planning control module 22. The route planning control module 22 may include plurality of sub-modules and control logic for determining the alternative route 32 (shown in FIG. 2). In the embodiment as shown in FIG. 4, the route planning control module 22 includes an edge point sub-module 72, an arc determination sub-module 74, a sector crossing sub-module 76, a connector sub-module 78, an integration sub-module 80, a capacity sub-module 82, and a route calculation sub-module 84.
  • Referring to FIGS. 4 and 5, the edge point sub-module 72 of the route planning control module 22 receives as input airspace sector geometries 92 and control parameters 94, and determines a specific location of each point 60 located along the edges 62 of each individual sector 40. The airspace sector geometries 92 contain a description specifying the specific shape of all of the sectors 40 within the airspace 42. For example, in the embodiment as shown in FIG. 5, the airspace sector geometries 92 would describe the geometry of the sectors 40 as uniformly hexagonal. In one embodiment, the control parameters 94 include, but are not limited to, a maximum connecting angle θmax, a minimum number of points 60 located on each edge 62 of the sectors 40, and maximum distance measured between points 60 on the same edge 62 of the sectors 40 (if the edges 62 include more than one point 60).
  • The edge point sub-module 72 of the route planning control module 22 determines how many points 60 should be placed along each edge 62 of each sector 40 based on the control parameters 94, as well as the specific location of each point 60 for each sector 40. For example, in the embodiment as shown in FIG. 5, a single point 60 is located along each edge 62 of each sector 40, along a midpoint M of each edge 62. Although FIG. 5 illustrates a single point 60 located at each edge 62, it is to be understood that multiple points 60 may be located along a single edge 60 as well. For example, in the embodiment as shown in FIG. 3, a longer edge 104 of the sector 40 includes two points 60.
  • The maximum connecting angle θmax for each sector 40 used by the arc determination submodule 74 shall now be explained. The maximum connecting angle θmax is indicative of a maximum angle that may be measured between two of the points 60 of a single sector 40, and is explained in greater detail below and illustrated in FIG. 6. Turning now to FIG. 6, an illustration of an exemplary sector 40 is shown, The sector 40 includes a single point 60 located along each edge 62. As seen in FIG. 6, a connecting arc 100 may be used to connect one of the points 60 with another point 60 located along another edge 62 of the sector 40. A connecting angle θ may be measured between a perpendicular line 102, which is perpendicular to the edge 62 of an initiating point 60A, and a potential connecting arc 100A. The connecting angle θ is the angle measured between the perpendicular line 102 and the potential arc 100A. For example, in the embodiment as shown in FIG. 6, the connecting angle θ for the potential arc 100A is about thirty degrees. If the connecting angle θ is less than the maximum connecting angle θmax, then the potential arc 100A may be included. However, it should be appreciated that any connecting arcs 100 that form a connecting angle θ greater than θmax are not included as connecting arcs in forming the network. Thus, if the maximum connecting angle θmax is set to forty degrees, then the points 60 that are located on edges 62 directly adjacent to another may not be connected to one another by one of the connecting arcs 100, since this would require the connecting arcs 100 to be positioned at an angle that is greater than forty degrees.
  • It is to be understood that an absolute value of a negative connecting angle may be used when comparing to the maximum connecting angle θmax. The maximum connecting angle θmax may be based on factors such as, but not limited to, limitations of the specific aircraft performance, air traffic control, and the desired connectedness of the network in traversing one of the sectors 40. It should also be appreciated that if the maximum connecting angle θmax is too large, then this may result in a route that cuts through the corner or a sector 40.
  • Referring to FIGS. 4 and 7, the arc determination sub-module 74 of the route planning control module 22 receives as input the specific location of each of the points 60 located along the edges 62 of each individual sector 40 of the airspace 42 as determined by the edge point sub-module 72, and determines a set of connecting arcs 100 for each individual sector 40 based on the input. FIG. 7 illustrates a single sector 40, where each connecting arc 100has been determined by the arc determination sub-module 74. As explained above, the points 60 located on edges 62 directly adjacent to another may not be connected to one another by one of the connecting arcs 100, since this would require the connecting arcs 100 to be positioned at an angle that is greater than the maximum connecting angle θmax (which is forty degrees in the present example). As seen in FIG. 8, one of the points 60 of each sector 40 may be connected to at least one other point 60 along another edge 62 of the sector 40, and connecting arcs 100 formed from individual sectors 40 may connect to connecting arcs 100 located within adjacent sectors 40 to form a network of arcs through the entire airspace 42.
  • It is to be appreciated that if a specific connecting arc 100 is formed that falls outside the edges 62 of one of the sectors 40, then the specific connecting arc 100 may be eliminated. It should also be understood that since all of the sectors 40 shown in FIG. 8 are generally hexagonal, none of the connecting arcs 100 may fall outside of the edges 62. However, as seen in FIG. 3, the connecting arc 100' falls outside of the edges 62, and therefore would be eliminated.
  • Referring to FIGS. 2 and 4, the sector crossing sub-module 76 of the route planning control module 22 receives as input a set of waypoints 110 used to determine the original flight route 30, a designator 112 which indicates that rerouting of the original flight route 30 is required, and the airspace sector geometries 92. As seen in FIG. 2, the original flight route 30 is a planned flight route, and includes two waypoints 110 (e.g., the initial point of takeoff 52 and the destination point 54). The initial point of takeoff 52 may similarly be the current location of the aircraft 20 at the time the alternative route 32 is determined. In the embodiment as shown in FIG. 2, the original flight route 30 is assumed to be direct, and is shown as a straight line for purposes of simplicity and clarity, and therefore only requires two waypoints 110. However, those of ordinary skill in the art will readily appreciate that an aircraft's original flight route may not be straight, and may include more than two waypoints that are connected to one another. The designator 112 provides an indication that rerouting of the original flight route 30 is required because the original flight route 30 (shown in FIG. 2) is unavailable due to disruptions such as convective weather conditions or air traffic congestion.
  • Referring to FIGS. 4 and 9, the sector crossing sub-module 76 of the route planning control module 22 determines all of the locations within the airspace 42 where the original flight route 30 intersects with the edges 62 of the sectors 40. As seen in FIG. 9, the exemplary original flight route 30 intersects with the edges 62 of the sectors 40 at three unique intersections 120, however it is to be appreciated that this illustration is merely exemplary in nature, and that any number of intersections may be determined based on the specific geometry of the original flight route 30. It is to be understood that while the original flight route 30 still appears the same, the original flight route 30 has actually been divided or partitioned into a series of four individual arcs 122. The arcs 122 are defined as segments between two of the intersections 120, or between one of the intersections and either the initial point of takeoff 52 of the destination point 54.
  • Referring to FIGS. 4 and 10, the connector sub-module 78 of the route planning control module 22 receives as input the intersections 120 determined by the sector crossing sub-module 76, and the connecting arcs 100 for each sector 40 within the airspace 42 (FIG. 8) determined by the arc determination sub-module 74. The connector sub-module 78 then determines a set of jump on arcs 130 as well as a set of jump off arcs 132 based on the input, As seen in FIG. 10, the jumping on arcs 130 connect one of the points 60 of one of the sectors 40 of the uniform grid network 46 to one of the intersections 120, or the destination point 54 (i.e., the arc jumps onto the original flight route 30). The jumping off arcs 132 represent where one of the intersections 120 or the initial point of takeoff 52 connects to one of the points 60 of one of the sectors 40 of the uniform grid network 46 (i.e., the arc jumps off the original flight route 30).
  • Referring to FIGS. 4 and 11, the integration sub-module 80 of the route planning control module 22 receives as input the specific location of each of the points 60 located along the edges 62 of each individual sector 40 of the airspace 42, the set of connecting arcs 100 for each individual sector 40, the intersections 120, four individual arcs 122, the set of jump on arcs 130, and set of jump off arcs 132. The integration sub-module 80 may then combine all of the inputs together to create a fully integrated airspace network 140, which is seen in FIG. 11, and provides multiple pathways over which the aircraft 20 may traverse the airspace 42.
  • The capacity sub-module 82 of the route planning control module 22 receives as input a sector forecast capacity 142, as well as the fully integrated airspace network 140 as seen in FIG. 11. The sector forecast capacity 142 indicates a forecast of the available capacity for each sector 40 (i.e., a measure of how many aircraft may simultaneously be within in a sector 40), and also indicates which sector 40 or sectors 40 may be unavailable or have limited availability due to conditions such as, for example, convective weather conditions or air traffic congestion. The air traffic congestion may be referred to as restricted airspace, It is to be appreciated that the sector forecast capacity 142 is time-based, which means that the available capacity as well as the availability of a specific sector 40 may change as time progresses. Specifically, if there is a convective weather condition contained in one of the sectors 40 that make the sector unavailable, eventually the weather conditions will improve. Thus, the sector 40 will eventually become available again.
  • For example, in the embodiment as shown in FIG. 2 a specific sector 40' is shaded as an unavailable sector. The unavailable sector 40' is representative of unavailable airspace. Thus, the aircraft 20 is unable to fly through the specific sector 40', at least during the time the aircraft 20 would traverse the specific sector 40' to reach the destination point 54. Accordingly, the capacity sub-module 82 of the route planning control module 22 may then turn off or make all of the connecting arcs 100 located within the specific sector 40' from the integrated airspace 140 unavailable, thereby creating a complete time-based airspace network 150, which is shown in FIG. 12. As seen in FIG. 12, the complete time-based airspace network 150, which includes any arcs located within the specific sector 40' turned off. Thus, as can be seen in FIG. 12, the complete time-based airspace network 150 includes all of the arcs (e.g., the connecting arcs 100, the arcs 122, the jump on arcs 130, and the jump off arcs 132). The route planning control module 22 may now determine a valid, complete rerouting option for the aircraft 20 based on the complete time-based airspace network 150.
  • It is to be understood that because the complete time-based airspace network 150 is time-based, the illustration of the complete time-based airspace network 150 may change as time progresses. Specifically, the arcs included within the complete time-based airspace network 150 may change over time, where specific sectors 40 and their associated arcs may become available or unavailable for periods of time. Thus, it is important to determine the availability of each sector 40 within the complete time-based airspace network 150 based on a specific path through the complete time-based airspace network 150 and the estimated time when the aircraft would traverse a given sector 40.
  • Turning back to FIG. 4, the route calculation sub-module 84 of the route planning control module 22 receives as input the complete time-based airspace network 150 as determined by the forecast capacity sub-module 82. The route calculation sub-module may then determine the shortest potential route between the initial point of takeoff 52 and the destination point 54. Referring to both FIGS. 4 and 12, the shortest potential route may be calculated based on all of the arcs within the complete time-based airspace network 150, which include the connecting arcs 100, the arcs 122, the jump on arcs 130, and the jump off arcs 132. The route calculation sub-module 84 may then output the shortest route in terms of distance, which is the alternative route 32 as illustrated in FIG. 2.
  • Referring generally to the figures, the disclosed flight routing system 10 provides numerous benefits and advantages when compared to the existing flight routing systems that are currently available. Specifically, the disclosed flight routing system 10 includes a higher resolution network compared to a waypoint based network, therefore reducing the length of detours around blocked sectors, which in turn reduces the fuel consumption of an aircraft. Moreover, the disclosed flight routing system 10 is also flexible, since the number of points located along each edge of each sector and the maximum connecting angle θmax (seen in FIG. 6) are both variable. Thus, the resolution of the sector network, even by individual sectors, may be controlled. Moreover, it is to be understood that even though the figures illustrated hexagonal sectors for simplicity and clarity, real airspace sector geometries may be used in practice, which reflect the primary traffic flow and density of the air traffic. Thus, the sectors may be shaped to align with the prevalent flow of air traffic and reflect the air traffic density. Therefore, smaller sectors may be provided in areas with higher air traffic, which results in sectors that are aligned with the flow of air traffic. Using sector geometries based on air traffic and density may result in reroute options that are more likely to be operationally favorable.
  • FIG. 13 is an illustration of a block diagram of a computing environment 300 including a general purpose computing device 310 for supporting embodiments of computer-implemented methods and computer-executable program instructions (or code) according to the present disclosure. For example, the computing device 310, or portions thereof, may execute instructions to adaptively encode/decode data in a particular number of bits. The computing device 310, or portions thereof, may further execute instructions according to any of the methods described herein.
  • The computing device 310 may include a processor 320. The processor 320 may communicate with a system memory 330, one or more storage devices 340, one or more input/output interfaces 350, one or more communications interfaces 360, or a combination thereof. The system memory 330 may include volatile memory devices (e.g., random access memory (RAM) devices), nonvolatile memory devices (e.g., read-only memory (ROM) devices, programmable read-only memory, and flash memory), or both. The system memory 330 may include an operating system 332, which may include a basic/input output system for booting the computing device 310 as well as a full operating system to enable the computing device 310 to interact with users, other programs, and other devices.
  • The system memory 330 may include one or more computer programs or applications 334 which may be executable by the processor 320. For example, the applications 334 may include instructions executable by the processor 320 to determine the alternative route 32 (FIG. 2). The system memory 330 may include program data 336 usable for controlling the analysis of data. The applications 334 may also be embodied in a computer readable medium having the applications 334 stored therein.
  • The processor 320 may also communicate with one or more storage devices 340. For example, the one or more storage devices 340 may include nonvolatile storage devices, such as magnetic disks, optical disks, or flash memory devices. The storage devices 340 may include both removable and non-removable memory devices. The storage devices 340 may be configured to store an operating system, images of operating systems, applications, and program data. In a particular embodiment, the memory 330, the storage devices 340, or both, include tangible computer-readable media.
  • The processor 320 may also communicate with one or more input/output interfaces 350 that enable the computing device 310 to communicate with one or more input/output devices 370 to facilitate user interaction. The input/output interfaces 350 may include serial interfaces (e.g., universal serial bus (USB) interfaces or Institute of Electrical and Electronics Engineers (IEEE) 1394 interfaces), parallel interfaces, display adapters, audio adapters, and other interfaces. The input/output devices 370 may include keyboards, pointing devices, displays, speakers, microphones, touch screens, and other devices. The processor 320 may detect interaction events based on user input received via the input/output interfaces 350. Additionally, the processor 320 may send a display to a display device via the input/output interfaces 350.
  • The processor 320 may communicate with devices or controllers 380 via the one or more communications interfaces 360. The one or more communications interfaces 360 may include wired Ethernet interfaces, IEEE 802 wireless interfaces, other wireless communication interfaces, or other network interfaces. The devices or controllers 380 may include host computers, servers, workstations, and other computing devices.
  • While the forms of apparatus and methods herein described constitute preferred aspects of this disclosure, it is to be understood that the disclosure is not limited to these precise forms of apparatus and methods, and the changes may be made therein without departing from the scope of the disclosure, as defined by the appended claims.

Claims (12)

  1. A flight routing system (10) for determining an alternative route (32) for an aircraft (20) based on an airspace (42) that is partitioned into a plurality of sectors (40) and a original flight route (30), wherein the original flight route (30) has an initial point of takeoff (52) and a destination point (54) and wherein the sectors (40) have a closed shape and are based upon standard real world geometries which reflect flow and density of aircraft traffic throughout the airspace (42), the flight routing system (10) comprising:
    a processor (320) which receives as input airspace sector geometries (92) and control parameters (94), the airspace sector geometries (92) containing a description specifying the specific shape of all of the sectors (40) within the airspace (42) and the control parameters (94) including a maximum connecting angle, a minimum number of points located on each edge of the sectors (40), and a maximum distance measured between points (60) on each edge (62) of the sectors (40); and
    a memory (330) storing instructions executable by the processor (320) to perform operations comprising:
    determining, based on the received airspace sector geometries (92) and the control parameters (94), a plurality of points (60) for each of the plurality of sectors (40), wherein the plurality of points (60) are each located along the edges of each of the sectors (40), wherein a single one of the points is located along each edge (62) of each sector (40) for which edge the minimum number of points is one, which single one of the points is a midpoint (M) of the respective edge;
    determining a set of connecting arcs (100) for each of the plurality of sectors (40), wherein each connecting arc (100) connects one of the points (60A) with another one of the points (60) located along another edge (62) of the respective sector (40), wherein a connecting angle of each of the connecting arcs is smaller than or equal to the maximum connecting angle, which respective connecting angle is measured between a line perpendicular to the edge of the one of the points (60A) and the respective connecting arc, and wherein none of the connecting arcs (100) must fall outside of the edges (62) of the respective sector (40);
    creating a fully integrated airspace network (140) by combining specific location of each of the points (60) of each of the sectors (40), the sets of connecting arcs (100) for each of the sectors (40), intersections (120) representing where edges of the plurality of sectors and the original flight route intersect, individual arcs (122) partitioning the original flight route based on the intersections (120), a set of jump on arcs (130), and a set of jump off arcs (132);
    determining a complete time-based airspace network (150) based on at least a forecast capacity (142) and the fully integrated airspace network (140) by making all arcs (100, 122, 130, 132) located within an unavailable sector (40') from the fully integrated airspace network (140) unavailable, wherein the forecast capacity (142) indicates an available capacity for each of the plurality of sectors (40) and which of the plurality of sectors are unavailable; and
    selecting the alternative route (132) as output based on at least the complete time-based airspace network (150) by determining a shortest potential route between the initial point of takeoff (52) and the destination (54) based on all of the arcs (100, 122, 130, 132) within the complete time-based airspace network (150);
    wherein the processor determines the alternative route without any of the connecting arcs located within an unavailable sector, and wherein the unavailable sector is representative of unavailable airspace.
  2. The flight routing system of claim 1, wherein the processor performs an operation to determine a plurality of the intersections.
  3. The flight routing system of claim 1 or 2, wherein the processor performs an operation to partition the original flight route into a series of the individual arcs based on the plurality of the intersections.
  4. The flight routing system of any of claims 1 to 3, wherein the processor performs an operation to determine the jump on arcs based on either the destination point or one of the plurality of the intersections, wherein the each of the jumping on arcs connects one of the plurality of points to either one of the plurality of the intersections or the destination point.
  5. The flight routing system of any of claims 1 to 4, wherein the processor performs an operation to determine the jump off arcs based on either the one of the plurality of intersections or the initial point of takeoff, wherein each of the one jump off arcs connects one of the plurality of points to either one of the plurality of the intersections or the initial point of takeoff.
  6. The flight routing system of any of claims 1 to 5, wherein the available capacity is based on a number of aircraft that are simultaneously located within in a single sector.
  7. The flight routing system of any of claims 1 to 6, wherein the forecast capacity (142) is based on at least one of convective weather conditions, air traffic congestion, and restricted airspace.
  8. The flight routing system of any of claims 1 to 7, wherein the plurality of sectors each include a unique shape that is a reflection of the flow and density of air traffic within the airspace.
  9. A computer-implemented method of determining an alternative route (32) for an aircraft (20) based on an airspace (42) that is partitioned into a plurality of sectors (40) and a waypoint-based original flight route (30) having an initial point of takeoff (52) and a destination point (54), wherein the sectors (40) have a closed shape and are based upon standard real world geometries which reflect flow and density of aircraft traffic throughout the airspace (42), the method comprising:
    determining, based on airspace sector geometries (92) and control parameters (94), a plurality of points (60) for each of the plurality of sectors (40) by a processor (320) which receives as input the airspace sector geometries (92) and the control parameters (94), the airspace sector geometries (92) containing a description specifying the specific shape of all of the sectors (40) within the airspace (42) and the control parameters (94) including a maximum connecting angle, a minimum number of points located on each edge of the sectors (40), and a maximum distance measured between points (60) on each edge (62) of the sectors (40), wherein the plurality of points (60) are each located along the edges (62) of each of the sectors (40), wherein a single one of the points is located along each edge (62) of each sector (40) for which edge the minimum number of points is one, which single one of the points is a midpoint (M) of the respective edge;
    determining a set of connecting arcs for each of the plurality of sectors by the processor, wherein each connecting arc connects one of the points (60) with another one of the points located along another edge of the respective sector, wherein a connecting angle of each of the connecting arcs is smaller than or equal to the maximum connecting angle, which respective connecting angle is measured between a line perpendicular to the edge of the one of the points (60A) and the respective connecting arc, and wherein none of the connecting arcs (100) must fall outside of the edges (62) of the respective sector (40);
    creating a fully integrated airspace network (140) by combining specific location of each of the points (60) of each of the sectors (40), the sets of connecting arcs (100) for each of the sectors (40), intersections (120) representing where edges of the plurality of sectors and the original flight route intersect, individual arcs (122) partitioning the original flight route based on the intersections (120), a set of jump on arcs (130), and a set of jump off arcs (132);
    determining a complete time-based airspace network (150) based on at least a forecast capacity (142) and the fully integrated airspace network (140) by making all arcs (100, 122, 130, 132) located within an unavailable sector (40') from the fully integrated airspace network (140) unavailable, wherein the forecast capacity (142) indicates an available capacity for each of the plurality of sectors, and which of the plurality of sectors are unavailable; and
    selecting the alternative route by the processor based on at least the complete time-based airspace network by determining a shortest potential route between the initial point of takeoff (52) and the destination (54) based on all of the arcs (100, 122, 130, 132) within the complete time-based airspace network (150);
    wherein the processor determines the alternative route without any of the connecting arcs located within an unavailable sector, and wherein the unavailable sector is representative of unavailable airspace.
  10. The method of claim 9, wherein the processor determines the intersections.
  11. The method of claim 9 or 10, wherein the processor partitions the original flight route into a series of 15 the individual arcs based on the intersections.
  12. The method of any of claims 9 to 11 , wherein the processor determines at the jump on arc based on either the destination point or one of the plurality of intersections, wherein the at least one jumping on arc connects one of the plurality of points to either one of the plurality of intersections or the destination point.
EP16168080.6A 2015-06-08 2016-05-03 System and method for determining an alternative flight route based on sector geometry Active EP3104119B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US14/733,550 US9870711B2 (en) 2015-06-08 2015-06-08 System and method for determining an alternative flight route based on sector geometry

Publications (2)

Publication Number Publication Date
EP3104119A1 EP3104119A1 (en) 2016-12-14
EP3104119B1 true EP3104119B1 (en) 2022-09-14

Family

ID=55910835

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16168080.6A Active EP3104119B1 (en) 2015-06-08 2016-05-03 System and method for determining an alternative flight route based on sector geometry

Country Status (4)

Country Link
US (1) US9870711B2 (en)
EP (1) EP3104119B1 (en)
JP (1) JP6758902B2 (en)
CN (1) CN106251706B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG10201505848SA (en) * 2014-10-03 2016-05-30 Infinium Robotics Pte Ltd Method and apparatus for controlling agent movement in an operating space
JP6335354B1 (en) * 2017-03-25 2018-05-30 株式会社Aerial Lab Industries Route management control server, method and system, and first and second flying bodies used therefor
JP6951013B2 (en) * 2017-08-28 2021-10-20 Necソリューションイノベータ株式会社 Unmanned aerial vehicle management equipment, unmanned aerial vehicle management methods, and programs
US11017678B2 (en) * 2017-09-22 2021-05-25 Vianair Inc. Terminal and en-route airspace operations based on dynamic routes
GB2569156B (en) * 2017-12-07 2020-08-26 Maritech Development Ltd A method of determining an optimal route
US20190266902A1 (en) * 2018-02-26 2019-08-29 Honeywell International Inc. Method and system for generating a grid map that shows air traffic intensity
FR3078583B1 (en) * 2018-03-02 2020-03-13 Airbus Defence And Space Sas SYSTEMS AND METHODS FOR AVOIDING COLLISIONS BETWEEN AIRCRAFT OR VESSELS
US10909858B2 (en) * 2018-09-28 2021-02-02 The Boeing Company Aircraft flight management systems and methods
NL2022800B1 (en) * 2019-03-25 2020-10-02 Vanderlande Ind Bv System and method for the intralogistics transport of products.
US11935419B2 (en) 2019-07-22 2024-03-19 The Boeing Company Holding pattern detection and management
EP4014215A1 (en) * 2019-09-02 2022-06-22 Skygrid, LLC Flight path deconfliction among unmanned aerial vehicles
EP3839919A1 (en) * 2019-12-16 2021-06-23 The Boeing Company Aircraft flight strategy selection systems and methods
EP3893224A1 (en) * 2020-04-07 2021-10-13 The Boeing Company Systems, methods, and apparatus to improve aircraft traffic control
JP7496436B2 (en) * 2020-04-26 2024-06-06 北京三快在線科技有限公司 Flight route determination
CN111899571B (en) * 2020-07-29 2021-11-02 成都民航空管科技发展有限公司 Method and system for automatically adjusting flight approach procedure based on AMAN system
CN113627742A (en) * 2021-07-21 2021-11-09 齐鲁空天信息研究院 Aircraft airspace capacity evaluation method
US11854407B2 (en) * 2021-10-12 2023-12-26 James W. Herriot System and method for airspace planning
WO2023085109A1 (en) * 2021-11-15 2023-05-19 ソニーグループ株式会社 Information processing method, information processing program, and information processing device

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6085147A (en) 1997-09-26 2000-07-04 University Corporation For Atmospheric Research System for determination of optimal travel path in a multidimensional space
US6266610B1 (en) 1998-12-31 2001-07-24 Honeywell International Inc. Multi-dimensional route optimizer
US20030093219A1 (en) 2001-09-20 2003-05-15 Honeywell Inc. Four-dimensional route planner
FR2898972B1 (en) * 2006-03-21 2008-06-27 Thales Sa METHOD AND DEVICE FOR MONITORING THE MINIMUM FLIGHT ALTITUDE OF AN AIRCRAFT
FR2905480B1 (en) * 2006-08-30 2011-03-25 Thales Sa METHOD OF CHANGING THE ROAD FOLLOWED BY AN AIRCRAFT, THE AIRCRAFT ORIGINALLY FOLLOWING A PREDEFINED TRACK, THE METHOD FOR AN ANCILLARY RETURN OF THE AIRCRAFT ON THE PREDEFINED TRACK.
US20090063032A1 (en) * 2007-08-30 2009-03-05 Honeywell International, Inc. Methods, systems, and apparatus for routing a vehicle to avoid an adverse condition
US8060295B2 (en) * 2007-11-12 2011-11-15 The Boeing Company Automated separation manager
FR2942043B1 (en) * 2009-02-06 2011-02-11 Thales Sa SYSTEM AND METHOD FOR DETECTING AND DETERMINING REMOTE ATMOSPHERIC ANOMALIES.
US8700298B2 (en) * 2010-09-30 2014-04-15 The Boeing Company Tailored arrivals allocation system clearance generator
US8818576B2 (en) * 2010-09-30 2014-08-26 The Boeing Company Tailored arrivals allocation system trajectory predictor
US8712744B1 (en) * 2010-10-01 2014-04-29 The Boeing Company Simulation tool for air traffic communications security
US9020757B2 (en) * 2012-05-11 2015-04-28 Trimble Navigation Limited Path planning autopilot
JP5926637B2 (en) 2012-07-10 2016-05-25 富士重工業株式会社 Avoidance route derivation device, avoidance route derivation program, and avoidance route derivation method
CN103226899B (en) * 2013-03-19 2015-12-23 北京工业大学 Based on the space domain sector method for dynamically partitioning of air traffic feature
CN103473955B (en) * 2013-09-17 2015-04-29 中国民航大学 Terminal sector dividing method based on graph theory and spectral clustering algorithm

Also Published As

Publication number Publication date
CN106251706B (en) 2020-12-08
JP2017001661A (en) 2017-01-05
JP6758902B2 (en) 2020-09-23
CN106251706A (en) 2016-12-21
EP3104119A1 (en) 2016-12-14
BR102016012822A2 (en) 2016-12-27
US20160358480A1 (en) 2016-12-08
US9870711B2 (en) 2018-01-16

Similar Documents

Publication Publication Date Title
EP3104119B1 (en) System and method for determining an alternative flight route based on sector geometry
US6606553B2 (en) Traffic flow management method and system for weather problem resolution
US9734724B2 (en) Method and system for recovering the energy state of an aircraft during descent
JP6025742B2 (en) Aircraft path compatibility monitoring
US10657829B2 (en) Method of calculation by a flight management system of a trajectory exhibiting improved transitions
US8565944B1 (en) Alternate diversion airport planner
EP2717018B1 (en) Flight deck display of multi-path arrival procedures
KR101772556B1 (en) Aircraft trajectory predicting method and system by real-time track data monitoring
EP3032518B1 (en) Aircraft turns for interval managent
US11164468B2 (en) Standardizing platform approaches for aircraft
Vivona et al. Pattern-based genetic algorithm for airborne conflict resolution
CN111680362A (en) Method, device and equipment for acquiring automatic driving simulation scene and storage medium
CN113682318A (en) Vehicle running control method and device
Sabhnani et al. Flow conforming operational airspace sector design
Nilim et al. Algorithms for air traffic flow management under stochastic environments
US20240133706A1 (en) Path Planning Method, Server, and Vehicle
Mitchell et al. Dynamic airspace configuration management based on computational geometry techniques
CN113807790A (en) Path planning method and device for robot, electronic equipment and storage medium
Nilim et al. Multi-aircraft routing and traffic flow management under uncertainty
KR102185690B1 (en) Method of deciding one-way roads based on 2-SAT in smart cities
CN113674552A (en) Efficient flight planning for areas with high-altitude terrain
US20220068148A1 (en) Device and method for managing aircraft systems
US9454800B2 (en) System for representing cartographic indications at multiple scales
Chen et al. Integrated arrival and departure weather avoidance routing within extended terminal airspace
CN114550502A (en) Airspace management system and method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20160503

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20190927

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220408

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016074959

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1518960

Country of ref document: AT

Kind code of ref document: T

Effective date: 20221015

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220914

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221214

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1518960

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220914

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221215

RAP4 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: THE BOEING COMPANY

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230116

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230114

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016074959

Country of ref document: DE

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230526

Year of fee payment: 8

Ref country code: DE

Payment date: 20230530

Year of fee payment: 8

26N No opposition filed

Effective date: 20230615

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230529

Year of fee payment: 8

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230503

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230531

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220914

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230531