EP3046831A1 - Tandem and side-by-side mooring offloading systems and associated methods - Google Patents

Tandem and side-by-side mooring offloading systems and associated methods

Info

Publication number
EP3046831A1
EP3046831A1 EP14846525.5A EP14846525A EP3046831A1 EP 3046831 A1 EP3046831 A1 EP 3046831A1 EP 14846525 A EP14846525 A EP 14846525A EP 3046831 A1 EP3046831 A1 EP 3046831A1
Authority
EP
European Patent Office
Prior art keywords
mooring
vessel
line
mooring line
certain embodiments
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP14846525.5A
Other languages
German (de)
French (fr)
Other versions
EP3046831A4 (en
Inventor
Arno Laurentius Michael Van Den Haak
Stergios Liapis
Yile Li
Joao Paulo Juliao Matsuura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Internationale Research Maatschappij BV
Original Assignee
Shell Internationale Research Maatschappij BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Internationale Research Maatschappij BV filed Critical Shell Internationale Research Maatschappij BV
Publication of EP3046831A1 publication Critical patent/EP3046831A1/en
Publication of EP3046831A4 publication Critical patent/EP3046831A4/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/20Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
    • B63B22/025Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids and comprising a restoring force in the mooring connection provided by means of weight, float or spring devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/20Adaptations of chains, ropes, hawsers, or the like, or of parts thereof
    • B63B2021/206Weights attached to mooring lines or chains, or the like; Arrangements thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/448Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]

Definitions

  • the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
  • Floating production storage and offloading vessels FPSOs
  • FSOs floating storage and offloading vessels
  • An FPSO may designed to receive crude oil produced from subsea wells or a nearby platform, process that crude oil, and then store the processed oil until it can be offloaded to a tanker or transported through a pipeline.
  • An FSO is a simplified FPSO without the ability to process crude oil.
  • An FSO typically receives and stores oil that has already been processed at a platform, and then offloads the stored oil to a tanker or through a pipeline.
  • FPSOs and FSOs are particularly suited in offshore regions where there is no pipeline infrastructure in place for transporting produced oil to shore.
  • the FPSO/FSO is employed to store the produced oil until it can be offloaded for transport to another location.
  • FPSOs and FSOs are ship-shaped floating vessels or barges that are moored to the sea floor when receiving crude or processed oil from a platform.
  • a shuttle vessel may be moored and connected to the FPSO or FSO, or alternatively to the platform itself, and then transfer can take place.
  • U.S. Patent Application Publication No. 2010/00212570 the entirety of which is hereby incorporated by reference, describes an example of such a system.
  • the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
  • the present disclosure provides a mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
  • the present disclosure provides a method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
  • the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
  • the present disclosure provides a method for offloading oil and/or gas from an offshore structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
  • Figure 1 illustrates a mooring system
  • Figure 2 illustrates a side-by-side mooring system.
  • Figure 3 illustrates a tandem mooring system.
  • the present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
  • FIG. 1 illustrates mooring system 100.
  • mooring system 100 may comprise offshore structure 110; vessel 120; first mooring line 130; second mooring line 140; and hawser 150.
  • offshore structure 110 may comprise a floating liquid natural gas facility.
  • the floating liquid natural gas facility may comprise one or more liquid natural gas storage tanks and cryogenic offloading equipment.
  • offshore structure 110 may comprise a floating structure floating on sea surface 170. Examples of suitable floating structures include FPSOs, FSOs, spars, TLPs, semi-submersibles, or other floating structures known in the art.
  • offshore structure 110 may be connected to sea floor 160 with one or more catenary or taut mooring lines 165.
  • offshore structure 110 may be a fixed structure such as a pier, compliant tower, gravity based structure, jack-up platform, or jacket platform resting on sea floor 160.
  • offshore structure 110 may comprise one or more winches 111.
  • offshore structure 110 may comprise one or more transfer devices 112.
  • the one or more transfer devices 112 may be capable of offloading oil and/or gas from offshore structure 110.
  • the one or more transfer devices 112 may comprise a hose or a loading arm.
  • vessel 120 may comprise any vessel capable of transporting oil and/or natural gas.
  • vessel 120 may be a liquid natural gas carrier vessel.
  • vessel 120 may be a shuttle tanker.
  • Vessel 120 may comprise storage facilities 121 capable of storing oil and/or gas.
  • one or more hoses 112 of offshore structure 110 may be connected to storage facility 121 of vessel 120 to facilitate transfer of oil and/or gas from offshore structure 110 to vessel 120.
  • vessel 120 may further comprise one or more bollards or mooring bitts 122.
  • first mooring line 130, second mooring line 140, and hawser 150 may be attached individually to at least three different bollard or mooring bitts 122 of vessel 120.
  • first mooring line 130 and second mooring line 140 may each comprise chain, wire, polyester, HMPE segments, or any combination thereof.
  • first end 131 of first mooring line 130 may be anchored to sea floor 160.
  • first end 131 of first mooring line 130 may be attached to chain 132 which is attached to anchor or pile 133 on sea floor 160.
  • first end 141 of second mooring line 140 may be anchored to sea floor 160.
  • first end 141 of second mooring line 140 may be attached to chain 142 which is attached to anchor or pile 143 on sea floor 160.
  • anchor 133 and/or anchor 143 may comprise mooring connectors linked to conventional anchors, vertical load anchors, or suction piles.
  • first mooring line 130 may comprise buoy 134 attached directly or indirectly to first mooring 130 at buoyed point 135.
  • second mooring line 140 may comprise buoy 144 attached directly or indirectly to second mooring 140 at buoyed point 145.
  • buoy 134 and/or buoy 144 may be submersible buoys.
  • buoy 134 and/or buoy 144 may be modular or single mooring buoys of elastomer or foam construction, connected via chain-throughs, pick-ups, or pendants.
  • buoy 134 and buoy 144 may be connected to buoyed points 135 and 145 respectively through buoy lines 136 and 146.
  • first mooring line 130 may further comprise marker buoy 138.
  • marker buoy 138 may be floating on sea surface 170.
  • marker buoy 138 may be a small float or high-visibility buoy to help pick up messenger lines.
  • second mooring line 140 may further comprise marker buoy 148.
  • marker buoy 148 may be floating on sea surface 170.
  • marker buoy 148 may be a small float or high-visibility buoy to help pick up messenger lines.
  • marker buoy 138 and marker buoy 148 may be connected to each other by chord line 180.
  • chord line 180 may comprise a lightweight synthetic line composed of polyester or HMPE segments.
  • second end 139 of first mooring line 130 may be connected to bollard or mooring bitt 122 of vessel 120 and second end 149 of second mooring line 140 may be connected to bollard or mooring bitt 122 of vessel 120.
  • hawser 150 may comprise a nylon or HMPE line with pick-up equipment such as messenger lines, connecting shackles, floats, and weight chains. In certain embodiments, hawser 150 may comprise a single hawser 150 or multiple hawsers 150. In certain embodiments, first end 151 of hawser 150 may be attached to the winch 111 of vessel 110. In certain embodiments, not illustrated in Figure 1, second end 152 hawser 150 may be attached to the one or more bollards or mooring bitts 122 of vessel 120.
  • Figure 2 illustrates a side-by-side mooring system 200.
  • side -by-side mooring system 200 may comprise any of the features of mooring system 100.
  • each of the individual components of side-by-side mooring system 200 may comprise the same features of each of the individual components of mooring system 100.
  • side-by-side mooring system 200 may comprise structure 210, vessel 220, first mooring line 230, second mooring line 240, and two hawsers 250.
  • structure 210 may be floating on sea surface 170 and attached to sea floor 160 by one or more mooring lines 265.
  • two hawsers 250 may connect structure 210 to vessel 220.
  • first ends 251 of hawsers 250 may be attached to one or more winches 211 of structure 210.
  • second ends 252 of hawsers 250 may be attached to one or more bollards or mooring bitts 222 of vessel 220.
  • one or more transfer devices 212 of structure 210 may be connected to storage facility 221 of vessel 220 to facilitate transfer of oil and/or gas from structure 210 to vessel 220.
  • vessel 220 may be moored to the seafloor 260 by mooring lines 230 and 240.
  • mooring line 230 may comprise a first end 231 anchored to sea floor 260 by anchor 233 and chain 232, second end 239 connected to bollard or mooring bitt 222 of vessel 220, buoy 234 connected to buoyed point 235 by buoyed line 236, and marker buoy 238.
  • mooring line 240 may comprise a first end 241 anchored to sea floor 260 by anchor 243 and chain 242, second end 249 connected to bollard or mooring bitt 222 of vessel 220, buoy 244 connected to buoyed point 245 by buoyed line 246, and marker buoy 248.
  • a chord line 280 may connected marker buoy 238 to marker buoy 248.
  • side-by-side mooring system 200 allows for a vessel to be moored to a structure in a side-by-side fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by two points of contact.
  • the vessel is pointed parallel with the structure.
  • the relative motions between the vessel and the structure are smaller compared to a tandem mooring system, allowing for shorter loading arms. Shorter loading arms may minimize heat loss and mechanical stresses during transfers.
  • tandem mooring system 300 may comprise any of the features of mooring system 100 and certain features of side-by-side mooring system 200. Furthermore, each of the individual components of tandem mooring system 300 may comprise the same features of each of the individual components of mooring system 100.
  • tandem mooring system 300 may comprise an offshore structure 310, a vessel 320, a first mooring line 330, a second mooring line 340, and hawser 350.
  • offshore structure 310 may be floating on sea surface 370 and attached to sea floor 360 by one or more mooring lines 370.
  • hawser 350 may connect offshore structure 310 to vessel 320.
  • first end 351 of hawser 350 may be attached to winch 311 of offshore structure 310.
  • second end 352 of hawser 350 may be attached to one or more bollards or mooring bitts 322 of vessel 320.
  • one or more transfer devices 312 of offshore structure 310 may be connected to storage facility 321 of vessel 320 to facilitate transfer of oil and/or gas from offshore structure 310 to vessel 320.
  • vessel 320 may be moored to the seafloor 360 by mooring lines 330 and 340.
  • mooring line 330 may comprise a first end 331 anchored to sea floor 360 by anchor 333 and chain 332, second end 339 connected to bollard or mooring bitt 322 of vessel 320, buoy 334 connected to buoyed point 335 by buoyed line 336, and marker buoy 338.
  • mooring line 340 may comprise a first end 341 anchored to sea floor 360 by anchor 343 and chain 342, second end 349 connected to bollard or mooring bitt 322 of vessel 320, buoy 344 connected to buoyed point 345 by buoyed line 346, and marker buoy 348.
  • a chord line 380 may connected marker buoy 338 to marker buoy 348.
  • tandem mooring system 200 allows for a vessel to be moored to a structure in a tandem fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by one point of contact. In such a system, the vessel is pointed directly toward the structure. Such a system may allow for an easier, more controlled approach maneuvering to the structure. Lines 330 and 340 may provide increasing resistance to the vessel as it advances. Such an orientation also makes use of bow chain stoppers that are commonly found in most tankers, and that easily and safely connected to hawsers.
  • the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising a structure, a vessel, a first mooring line, a second mooring line, and two hawsers; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
  • side-by-side is used to indicate that the vessel and the offshore structure are in a parallel arrangement as illustrated in Figure 2.
  • the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
  • tandem is used to indicate that the vessel and the offshore structure are in a perpendicular arrangement as illustrated in Figure 3.
  • a liquid natural gas carrier vessel may approach a floating liquid natural gas facility.
  • the vessel may then be connected to two mooring lines and then two hawsers from the facility.
  • the facility may then winch in the hawsers by first winching in a single hawser and then winching in the remaining hawser.
  • liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel.
  • the loading arms may be disconnected from the vessel and the facility may winch out the two hawsers allowing the mooring lines to pull the vessel away from the facility.
  • the vessel may then be disconnected from the hawsers and the mooring lines and the facility may take back in the hawsers.
  • a liquid natural gas carrier vessel may approach a floating liquid natural gas facility.
  • the vessel may then be connected to two mooring lines and then a hawser from the facility.
  • the facility may then winch in the hawser.
  • liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel.
  • the loading arms may be disconnected from the vessel and the facility may winch out the hawser allowing the mooring lines to pull the vessel away from the facility.
  • the vessel may then be disconnected from the hawser and the mooring lines and the facility may take back in the hawser.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.

Description

TANDEM AND SIDE-BY-SIDE MOORING OFFLOADING SYSTEMS AND
ASSOCIATED METHODS
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application claims the benefit of U.S. Provisional Application No. 61/879,503, filed September 18, 2013, which is incorporated herein by reference.
BACKGROUND
[0002] The present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
[0003] Floating production storage and offloading vessels (FPSOs) and floating storage and offloading vessels (FSOs) are commonly used in offshore oil and gas operations to temporarily store and then offload produced oil from subsea wells. An FPSO may designed to receive crude oil produced from subsea wells or a nearby platform, process that crude oil, and then store the processed oil until it can be offloaded to a tanker or transported through a pipeline. An FSO is a simplified FPSO without the ability to process crude oil. An FSO typically receives and stores oil that has already been processed at a platform, and then offloads the stored oil to a tanker or through a pipeline. FPSOs and FSOs are particularly suited in offshore regions where there is no pipeline infrastructure in place for transporting produced oil to shore. In particular, the FPSO/FSO is employed to store the produced oil until it can be offloaded for transport to another location.
[0004] Typically, FPSOs and FSOs are ship-shaped floating vessels or barges that are moored to the sea floor when receiving crude or processed oil from a platform. In order to offload crude oil, a shuttle vessel may be moored and connected to the FPSO or FSO, or alternatively to the platform itself, and then transfer can take place. U.S. Patent Application Publication No. 2010/00212570, the entirety of which is hereby incorporated by reference, describes an example of such a system.
[0005] Conventional mooring systems for offloading, such as offloading buoys or tandem offloading using tugs for station keeping, may suffer from several drawbacks. These conventional systems may not be designed for the transfer of natural gas or for emergency offloads, and can be prohibitively costly or risky to operate safely. It is desirable to develop a mooring system that is particularly suited for the transfer of natural gas and also for emergency or temporary offloading. SUMMARY
[0006] The present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
[0007] In one embodiment, the present disclosure provides a mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
[0008] In another embodiment, the present disclosure provides a method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
[0009] In another embodiment, the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
[0010] In another embodiment, the present disclosure provides a method for offloading oil and/or gas from an offshore structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
BRIEF DESCRIPTION OF THE DRAWINGS
[0011] So that the above recited features and advantages of the disclosure may be understood in detail, a more particular description of the disclosure, briefly summarized above, may be had by reference to the embodiments thereof that are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this disclosure and are, therefore, not to be considered limiting of its scope. The figures are not necessarily to scale, and certain features and certain views of the figures may be shown exaggerated in scale or in schematic in the interest of clarity and conciseness.
[0012] Figure 1 illustrates a mooring system.
[0013] Figure 2 illustrates a side-by-side mooring system.
[0014] Figure 3 illustrates a tandem mooring system.
[0015] The features and advantages of the present disclosure will be readily apparent to those skilled in the art. While numerous changes may be made by those skilled in the art, such changes are within the spirit of the invention.
DETAILED DESCRIPTION
[0016] The present disclosure relates generally to mooring systems. More specifically, in certain embodiments the present disclosure relates to systems for mooring a vessel to a structure and associated methods.
[0017] The description that follows includes exemplary apparatuses, methods, techniques, and instruction sequences that embody techniques of the inventive subject matter. However, it is understood that the described embodiments may be practiced without these specific details.
[0018] Referring now to Figure 1, Figure 1 illustrates mooring system 100. In certain embodiments, mooring system 100 may comprise offshore structure 110; vessel 120; first mooring line 130; second mooring line 140; and hawser 150.
[0019] In certain embodiments, offshore structure 110 may comprise a floating liquid natural gas facility. The floating liquid natural gas facility may comprise one or more liquid natural gas storage tanks and cryogenic offloading equipment. In other embodiments, offshore structure 110 may comprise a floating structure floating on sea surface 170. Examples of suitable floating structures include FPSOs, FSOs, spars, TLPs, semi-submersibles, or other floating structures known in the art. In certain embodiments, offshore structure 110 may be connected to sea floor 160 with one or more catenary or taut mooring lines 165. Alternatively offshore structure 110 may be a fixed structure such as a pier, compliant tower, gravity based structure, jack-up platform, or jacket platform resting on sea floor 160.
[0020] In certain embodiments, offshore structure 110 may comprise one or more winches 111. In certain embodiments, offshore structure 110 may comprise one or more transfer devices 112. In certain embodiments, the one or more transfer devices 112 may be capable of offloading oil and/or gas from offshore structure 110. In certain embodiments, the one or more transfer devices 112 may comprise a hose or a loading arm.
[0021] In certain embodiments, vessel 120 may comprise any vessel capable of transporting oil and/or natural gas. In certain embodiments, vessel 120 may be a liquid natural gas carrier vessel. In other embodiments, vessel 120 may be a shuttle tanker. Vessel 120 may comprise storage facilities 121 capable of storing oil and/or gas. In certain embodiments, not illustrated in Figure 1, one or more hoses 112 of offshore structure 110 may be connected to storage facility 121 of vessel 120 to facilitate transfer of oil and/or gas from offshore structure 110 to vessel 120.
[0022] In certain embodiments, vessel 120 may further comprise one or more bollards or mooring bitts 122. In certain embodiments, not illustrated in Figure 1, first mooring line 130, second mooring line 140, and hawser 150 may be attached individually to at least three different bollard or mooring bitts 122 of vessel 120.
[0023] In certain embodiments, first mooring line 130 and second mooring line 140 may each comprise chain, wire, polyester, HMPE segments, or any combination thereof. In certain embodiments, first end 131 of first mooring line 130 may be anchored to sea floor 160. In certain embodiments, first end 131 of first mooring line 130 may be attached to chain 132 which is attached to anchor or pile 133 on sea floor 160. In certain embodiments, first end 141 of second mooring line 140 may be anchored to sea floor 160. In certain embodiments, first end 141 of second mooring line 140 may be attached to chain 142 which is attached to anchor or pile 143 on sea floor 160. In certain embodiments, anchor 133 and/or anchor 143 may comprise mooring connectors linked to conventional anchors, vertical load anchors, or suction piles.
[0024] In certain embodiments, first mooring line 130 may comprise buoy 134 attached directly or indirectly to first mooring 130 at buoyed point 135. In certain embodiments, second mooring line 140 may comprise buoy 144 attached directly or indirectly to second mooring 140 at buoyed point 145. In certain embodiments, buoy 134 and/or buoy 144 may be submersible buoys. In certain embodiments, buoy 134 and/or buoy 144 may be modular or single mooring buoys of elastomer or foam construction, connected via chain-throughs, pick-ups, or pendants. In certain embodiments, buoy 134 and buoy 144 may be connected to buoyed points 135 and 145 respectively through buoy lines 136 and 146.
[0025] In certain embodiments, first mooring line 130 may further comprise marker buoy 138. In certain embodiments, marker buoy 138 may be floating on sea surface 170. In certain embodiments, marker buoy 138 may be a small float or high-visibility buoy to help pick up messenger lines. In certain embodiments, second mooring line 140 may further comprise marker buoy 148. In certain embodiments, marker buoy 148 may be floating on sea surface 170. In certain embodiments, marker buoy 148 may be a small float or high-visibility buoy to help pick up messenger lines. In certain embodiments, marker buoy 138 and marker buoy 148 may be connected to each other by chord line 180. In certain embodiments, chord line 180 may comprise a lightweight synthetic line composed of polyester or HMPE segments.
[0026] In certain embodiments, not illustrated in Figure 1, second end 139 of first mooring line 130 may be connected to bollard or mooring bitt 122 of vessel 120 and second end 149 of second mooring line 140 may be connected to bollard or mooring bitt 122 of vessel 120.
[0027] In certain embodiments, hawser 150 may comprise a nylon or HMPE line with pick-up equipment such as messenger lines, connecting shackles, floats, and weight chains. In certain embodiments, hawser 150 may comprise a single hawser 150 or multiple hawsers 150. In certain embodiments, first end 151 of hawser 150 may be attached to the winch 111 of vessel 110. In certain embodiments, not illustrated in Figure 1, second end 152 hawser 150 may be attached to the one or more bollards or mooring bitts 122 of vessel 120.
[0028] Referring now to Figure 2, Figure 2 illustrates a side-by-side mooring system 200. In certain embodiments, side -by-side mooring system 200 may comprise any of the features of mooring system 100. Furthermore, each of the individual components of side-by-side mooring system 200 may comprise the same features of each of the individual components of mooring system 100.
[0029] As can be seen in Figure 2, side-by-side mooring system 200 may comprise structure 210, vessel 220, first mooring line 230, second mooring line 240, and two hawsers 250.
[0030] In certain embodiments, structure 210 may be floating on sea surface 170 and attached to sea floor 160 by one or more mooring lines 265. In certain embodiments, two hawsers 250 may connect structure 210 to vessel 220. In certain embodiments, first ends 251 of hawsers 250 may be attached to one or more winches 211 of structure 210. In certain embodiments, second ends 252 of hawsers 250 may be attached to one or more bollards or mooring bitts 222 of vessel 220. In certain embodiments, one or more transfer devices 212 of structure 210 may be connected to storage facility 221 of vessel 220 to facilitate transfer of oil and/or gas from structure 210 to vessel 220.
[0031] In certain embodiments, vessel 220 may be moored to the seafloor 260 by mooring lines 230 and 240. In certain embodiments, mooring line 230 may comprise a first end 231 anchored to sea floor 260 by anchor 233 and chain 232, second end 239 connected to bollard or mooring bitt 222 of vessel 220, buoy 234 connected to buoyed point 235 by buoyed line 236, and marker buoy 238. In certain embodiments, mooring line 240 may comprise a first end 241 anchored to sea floor 260 by anchor 243 and chain 242, second end 249 connected to bollard or mooring bitt 222 of vessel 220, buoy 244 connected to buoyed point 245 by buoyed line 246, and marker buoy 248. In certain embodiments, a chord line 280 may connected marker buoy 238 to marker buoy 248.
[0032] As can be seen in Figure 2, side-by-side mooring system 200 allows for a vessel to be moored to a structure in a side-by-side fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by two points of contact. In such a system, the vessel is pointed parallel with the structure. In such a system, the relative motions between the vessel and the structure are smaller compared to a tandem mooring system, allowing for shorter loading arms. Shorter loading arms may minimize heat loss and mechanical stresses during transfers.
[0033] Referring now to Figure 3, Figure 3 illustrates a tandem mooring system 300. In certain embodiments, tandem mooring system 300 may comprise any of the features of mooring system 100 and certain features of side-by-side mooring system 200. Furthermore, each of the individual components of tandem mooring system 300 may comprise the same features of each of the individual components of mooring system 100.
[0034] As can be seen in Figure 3, tandem mooring system 300 may comprise an offshore structure 310, a vessel 320, a first mooring line 330, a second mooring line 340, and hawser 350.
[0035] In certain embodiments, offshore structure 310 may be floating on sea surface 370 and attached to sea floor 360 by one or more mooring lines 370. In certain embodiments, hawser 350 may connect offshore structure 310 to vessel 320. In certain embodiments, first end 351 of hawser 350 may be attached to winch 311 of offshore structure 310. In certain embodiments, second end 352 of hawser 350 may be attached to one or more bollards or mooring bitts 322 of vessel 320. In certain embodiments, one or more transfer devices 312 of offshore structure 310 may be connected to storage facility 321 of vessel 320 to facilitate transfer of oil and/or gas from offshore structure 310 to vessel 320.
[0036] In certain embodiments, vessel 320 may be moored to the seafloor 360 by mooring lines 330 and 340. In certain embodiments, mooring line 330 may comprise a first end 331 anchored to sea floor 360 by anchor 333 and chain 332, second end 339 connected to bollard or mooring bitt 322 of vessel 320, buoy 334 connected to buoyed point 335 by buoyed line 336, and marker buoy 338. In certain embodiments, mooring line 340 may comprise a first end 341 anchored to sea floor 360 by anchor 343 and chain 342, second end 349 connected to bollard or mooring bitt 322 of vessel 320, buoy 344 connected to buoyed point 345 by buoyed line 346, and marker buoy 348. In certain embodiments, a chord line 380 may connected marker buoy 338 to marker buoy 348.
[0037] As can be seen in Figure 3, tandem mooring system 200 allows for a vessel to be moored to a structure in a tandem fashion where the vessel is secured to the seafloor by 2 points of contact and secured to the structure by one point of contact. In such a system, the vessel is pointed directly toward the structure. Such a system may allow for an easier, more controlled approach maneuvering to the structure. Lines 330 and 340 may provide increasing resistance to the vessel as it advances. Such an orientation also makes use of bow chain stoppers that are commonly found in most tankers, and that easily and safely connected to hawsers.
[0038] In one embodiment, the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising a structure, a vessel, a first mooring line, a second mooring line, and two hawsers; connecting the vessel to the first mooring line, the second mooring line, and the two hawsers; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
[0039] As used herein, the term "side-by-side" is used to indicate that the vessel and the offshore structure are in a parallel arrangement as illustrated in Figure 2.
[0040] In another embodiment, the present disclosure provides a method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, and a second mooring line; connecting the vessel to the first mooring line, the second mooring line, and the hawser; transferring oil and/or gas from the offshore structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
[0041] As used herein, the term "tandem" is used to indicate that the vessel and the offshore structure are in a perpendicular arrangement as illustrated in Figure 3.
[0042] To facilitate a better understanding of the present invention, the following examples of specific embodiments are given. In no way should the following examples be read to limit, or to define, the scope of the invention.
Examples
[0043] Example 1 - Side-by-Side Offloading Procedure
[0044] The following example provides details on how side-by-side offloading may be preformed. A liquid natural gas carrier vessel may approach a floating liquid natural gas facility. The vessel may then be connected to two mooring lines and then two hawsers from the facility. The facility may then winch in the hawsers by first winching in a single hawser and then winching in the remaining hawser. Once the vessel is in a side-by-side arrangement with the facility, liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel. After the transfer is complete, the loading arms may be disconnected from the vessel and the facility may winch out the two hawsers allowing the mooring lines to pull the vessel away from the facility. The vessel may then be disconnected from the hawsers and the mooring lines and the facility may take back in the hawsers.
[0045] Example 2 - Tandem Offloading Procedures
[0046] The following example provides details on how side-by-side offloading may be preformed. A liquid natural gas carrier vessel may approach a floating liquid natural gas facility. The vessel may then be connected to two mooring lines and then a hawser from the facility. The facility may then winch in the hawser. Once the vessel is in a side- by-side arrangement with the facility, liquid natural gas loading arms from the facility may be attached to the vessel and liquid natural gas may be transferred from the facility to the vessel. After the transfer is complete, the loading arms may be disconnected from the vessel and the facility may winch out the hawser allowing the mooring lines to pull the vessel away from the facility. The vessel may then be disconnected from the hawser and the mooring lines and the facility may take back in the hawser.
[0047] While the embodiments are described with reference to various implementations and exploitations, it will be understood that these embodiments are illustrative and that the scope of the inventive subject matter is not limited to them. Many variations, modifications, additions and improvements are possible.
[0048] Plural instances may be provided for components, operations or structures described herein as a single instance. In general, structures and functionality presented as separate components in the exemplary configurations may be implemented as a combined structure or component. Similarly, structures and functionality presented as a single component may be implemented as separate components. These and other variations, modifications, additions, and improvements may fall within the scope of the inventive subject matter.

Claims

C L A I M S
1. A mooring system comprising: an offshore structure comprising one or more hawsers; a vessel; a first mooring line; and a second mooring line.
2. The mooring system of claim 1, wherein the offshore structure is a floating liquid natural gas facility.
3. The mooring system of claim 1 or 2, wherein the vessel is a liquid natural gas carrier vessel.
4. The mooring system of any one of claims 1-3, wherein the first and second mooring lines are anchored to a sea floor.
5. The mooring system of any one of claims 1-4, wherein the first and second mooring lines each comprise a buoy and a marker buoy.
6. The mooring system of any one of claims 1-5, wherein the first and second mooring lines are connected to each other via a chord line.
7. The mooring system of any one of claims 1-6, wherein the vessel is connected to the first mooring line, the second mooring line, and the one or more hawsers.
8. The mooring system of claim 7, wherein the vessel and the offshore structure are parallel to each other.
9. The mooring system of claim 7, wherein the vessel and the offshore structure are perpendicular to each other.
10. A method for mooring a vessel comprising: providing a vessel; providing an offshore structure comprising one or more hawsers; providing a first mooring line; providing a second mooring line; attaching the first mooring line to the vessel; attaching the second mooring line to the vessel; and attaching the one or more hawsers to the vessel.
11. The method of claim 10, wherein the offshore structure is a floating liquid natural gas facility.
12. The method of claim 10 or 11, wherein the vessel is a liquid natural gas carrier vessel.
13. The method of any one of claims 10-12, wherein the first and second mooring lines are anchored to a sea floor.
14. The method of any one of claims 10-13, wherein the first and second mooring lines each comprise a buoy and a marker buoy.
15. The method of any one of claims 10-14, wherein the first and second mooring lines are connected to each other via a chord line.
16. The method of any one of claims 10-15, further comprising orienting the vessel parallel with the offshore structure.
17. The method of any one of claims 10-15, further comprising orienting the vessel perindicular to the offshore structure.
18. A method for offloading oil and/or gas from a structure comprising: providing a side-by-side mooring system comprising an offshore structure comprising two hawsers, a vessel, a first mooring line, and a second mooring line, connecting the vessel to the first mooring line, the second mooring line, and the two hawsers in a side-by-side arrangement; transferring oil and/or gas from the structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the two hawsers.
19. A method for offloading oil and/or gas from a structure comprising: providing a tandem mooring system comprising an offshore structure comprising a hawser, a vessel, a first mooring line, a second mooring line, and a hawser; connecting the vessel to the first mooring line, the second mooring line, and the hawser in a tandem arrangement; transferring oil and/or gas from the structure to the vessel; and disconnecting the vessel from the first mooring line, the second mooring line, and the hawser.
EP14846525.5A 2013-09-18 2014-09-11 Tandem and side-by-side mooring offloading systems and associated methods Withdrawn EP3046831A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361879503P 2013-09-18 2013-09-18
PCT/US2014/055111 WO2015041916A1 (en) 2013-09-18 2014-09-11 Tandem and side-by-side mooring offloading systems and associated methods

Publications (2)

Publication Number Publication Date
EP3046831A1 true EP3046831A1 (en) 2016-07-27
EP3046831A4 EP3046831A4 (en) 2017-05-24

Family

ID=52689290

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14846525.5A Withdrawn EP3046831A4 (en) 2013-09-18 2014-09-11 Tandem and side-by-side mooring offloading systems and associated methods

Country Status (5)

Country Link
US (1) US20160236756A1 (en)
EP (1) EP3046831A4 (en)
CN (1) CN105555654A (en)
AU (1) AU2014321620A1 (en)
WO (1) WO2015041916A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106035169B (en) * 2016-06-29 2019-05-31 大连昊昇海事服务有限公司 Offshore breeding facility based on scattered groceries ship's alternation
NO344968B1 (en) 2017-12-08 2020-08-03 Can Systems As A mooring system
SG11202100999SA (en) * 2018-07-31 2021-02-25 Sofec Inc Disconnectable spread mooring and riser tower system and method
WO2021034828A1 (en) 2019-08-19 2021-02-25 Sofec, Inc. Mooring systems and processes for using same
WO2021094460A1 (en) * 2019-11-15 2021-05-20 Single Buoy Moorings Inc. Spread mooring arrangement, use thereof and method therefor
CN112319700B (en) * 2020-11-17 2021-08-24 厦门天吴海洋科技有限公司 Anchoring method of mother ship without anchor machine
US20220306244A1 (en) * 2021-03-02 2022-09-29 Exmar Offshore Company Split mooring system and methods for vessels

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3833032A (en) * 1972-10-31 1974-09-03 Exxon Research Engineering Co Tandem mooring-loading system
US4067282A (en) * 1976-10-04 1978-01-10 Guinn David C Releasable and retrievable mooring system
NO993264D0 (en) * 1999-06-30 1999-06-30 Navion Asa System for securely anchoring a tanker near an offshore production unit
US6692192B2 (en) * 2002-05-03 2004-02-17 Single Buoy Moorings Inc. Spread moored midship hydrocarbon loading and offloading system
GB2394457B (en) * 2002-10-24 2004-09-08 Bluewater Terminal Systems Nv Apparatus for mooring vessels side-by-side
GB0321768D0 (en) * 2003-09-17 2003-10-15 Ocean Power Delivery Ltd Mooring system
US7299760B2 (en) * 2004-03-05 2007-11-27 Sofec, Inc. Floating LNG import terminal and method for docking
WO2006036325A1 (en) * 2004-09-28 2006-04-06 Exxonmobil Upstream Research Company Combined riser, offloading and mooring system
EP1826116B1 (en) * 2006-02-23 2008-05-14 Bluewater Energy Services B.V. Mooring system for a floating structure
NO336244B1 (en) * 2006-10-17 2015-06-29 Sevan Marine Asa Procedure for mooring a conventional tanker
GB2462968B (en) * 2007-06-27 2011-11-16 Shell Int Research Vessel mooring systems and methods
AU2011335362B2 (en) * 2010-11-30 2016-08-18 Single Buoy Moorings Inc. Floating LNG plant

Also Published As

Publication number Publication date
US20160236756A1 (en) 2016-08-18
EP3046831A4 (en) 2017-05-24
CN105555654A (en) 2016-05-04
WO2015041916A1 (en) 2015-03-26
AU2014321620A1 (en) 2016-03-10

Similar Documents

Publication Publication Date Title
US20160236756A1 (en) Tandem and side-by-side mooring offlaoding systems and associated methods
US20210245845A1 (en) Jetty-Less Offshore Terminal Configurations
CN101297144B (en) A system using a catenary flexible conduit for transferring a cryogenic fluid
US9032892B2 (en) Mooring system and connector assembly
US6983712B2 (en) Offloading arrangements and method for spread moored FPSOs
US10059409B2 (en) Taut inverted catenary mooring system
EP2576334B1 (en) Floating production unit with disconnectable transfer system
Rutkowski A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore
CN107107994B (en) Tensioning inverted catenary mooring system
US9409631B2 (en) Loading hose
US8156884B2 (en) Vessel mooring systems and methods
EP2398695B1 (en) Deep water and ultra deep water mooring system
WO2000064732A1 (en) System for transferring fluids and methods for installing, modifying and operating the system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20160316

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20170424

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 21/50 20060101AFI20170418BHEP

Ipc: B63B 27/25 20060101ALI20170418BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Effective date: 20171113