EP3024764A1 - Elevation conveyance system and method - Google Patents
Elevation conveyance system and methodInfo
- Publication number
- EP3024764A1 EP3024764A1 EP14841950.0A EP14841950A EP3024764A1 EP 3024764 A1 EP3024764 A1 EP 3024764A1 EP 14841950 A EP14841950 A EP 14841950A EP 3024764 A1 EP3024764 A1 EP 3024764A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- subassembly
- assembly
- payload
- gate
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G65/00—Loading or unloading
- B65G65/30—Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
- B65G65/34—Emptying devices
- B65G65/40—Devices for emptying otherwise than from the top
- B65G65/42—Devices for emptying otherwise than from the top using belt or chain conveyors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C17/00—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
- B66C17/06—Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J8/00—Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
- B01J8/0015—Feeding of the particles in the reactor; Evacuation of the particles out of the reactor
- B01J8/002—Feeding of the particles in the reactor; Evacuation of the particles out of the reactor with a moving instrument
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J8/00—Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
- B01J8/0015—Feeding of the particles in the reactor; Evacuation of the particles out of the reactor
- B01J8/003—Feeding of the particles in the reactor; Evacuation of the particles out of the reactor in a downward flow
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D88/00—Large containers
- B65D88/26—Hoppers, i.e. containers having funnel-shaped discharge sections
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D88/00—Large containers
- B65D88/26—Hoppers, i.e. containers having funnel-shaped discharge sections
- B65D88/30—Hoppers, i.e. containers having funnel-shaped discharge sections specially adapted to facilitate transportation from one utilisation site to another
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D90/00—Component parts, details or accessories for large containers
- B65D90/12—Supports
- B65D90/16—Skids
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D90/00—Component parts, details or accessories for large containers
- B65D90/54—Gates or closures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D90/00—Component parts, details or accessories for large containers
- B65D90/54—Gates or closures
- B65D90/66—Operating devices therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G47/00—Article or material-handling devices associated with conveyors; Methods employing such devices
- B65G47/02—Devices for feeding articles or materials to conveyors
- B65G47/16—Devices for feeding articles or materials to conveyors for feeding materials in bulk
- B65G47/18—Arrangements or applications of hoppers or chutes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/02—Cages, i.e. cars
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/16—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J2208/00—Processes carried out in the presence of solid particles; Reactors therefor
- B01J2208/00743—Feeding or discharging of solids
- B01J2208/00752—Feeding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/04—Bulk
- B65G2201/042—Granular material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2812/00—Indexing codes relating to the kind or type of conveyors
- B65G2812/06—Skip or hopper conveyors
- B65G2812/0609—Constitutive elements or auxiliary devices
- B65G2812/0618—Skips, hoppers or similar containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2812/00—Indexing codes relating to the kind or type of conveyors
- B65G2812/06—Skip or hopper conveyors
- B65G2812/0672—Loading or unloading skips
- B65G2812/0681—Loading or unloading skips by reciprocating skips along guiding means
- B65G2812/069—Loading or unloading skips by reciprocating skips along guiding means for vertical shaft transport
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2814/00—Indexing codes relating to loading or unloading articles or bulk materials
- B65G2814/03—Loading or unloading means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G65/00—Loading or unloading
- B65G65/30—Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
- B65G65/32—Filling devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
Definitions
- the present invention is an elevation conveyance system and method for transporting a payload substantially vertically and transversely to a preselected release location at a top end of a reactor vessel.
- the catalyst may be aluminum oxide (AI2O3), or zeolites, which are complex aluminosilicates, or the catalyst may be nickel-based or based on other materials.
- the catalyst is provided in the form of particulate matter, e.g., with a bulk density of 0.80 to 0.96 g/cm 3 and an average particle size between about 1270 ⁇ (0.05 inches) to about 3175 ⁇ (0.125 inches).
- the catalyst is typically loaded over a period of five to seven days, approximately once every three years. The reactor operates between the loadings of the catalyst. After about three years of operation, the reactor's catalyst is removed and replaced.
- the catalyst typically is provided by its manufacturer in the form of particulate matter (as noted above) in special containers.
- the usual method of delivering the catalyst to the top of the reactor vessel is to use a crane to lift each container individually to the top of the reactor.
- the catalyst is dumped out of the container or otherwise released therefrom, and directed into a hopper positioned on top of the reactor vessel.
- Other materials e.g., ceramic support material, and grading material
- materials that are particulate matter may also be delivered to the reactor vessel in this way.
- the traditional method has a number of disadvantages.
- the capacity of a crane is typically between about 10 tonnes per hour and about 15 tonnes per hour.
- the loader or bin at the top of the reactor typically has a capacity of about 30 tonnes per hour. This means that, to provide the capacity required while loading, at least two cranes are needed, resulting in substantial costs and increased risk.
- this is rarely done, with the result that the particulate matter is often loaded in practice at a rate below the capacity of the loader or bin at the top of the reactor. It is anticipated that the loader capacity may increase to approximately 60 tonnes per hour, and it is not clear how this capacity could be met by the prior art.
- the traditional method can be dangerous.
- the crane raises the container to a position above a hopper in which the load from the container is receivable.
- the hopper is located above the reactor, and is configured to control the flow of the particulate matter into the reactor.
- the hopper typically includes a lid or covering that is normally in place on the hopper, to prevent rain and snow from entering into the hopper.
- the covering is removed only to permit the particulate matter to be loaded into the hopper. After the covering is removed, the particulate matter may flow from the container into the hopper, under the influence of gravity.
- the crane is often unable to operate. In general, the crane cannot operate safely if winds are greater than 25 km/hour. Where winds are between 20 km/hour and 25 km/hour, whether the crane operates is at the crane operator's discretion. Those skilled in the art would appreciate that, even in a light breeze, a worker positioning the container above the hopper is at risk of potential pinch points. Because of these limitations, loading is often required to be shut down until weather conditions improve. The delays in loading the reactor vessel due to weather conditions are extremely costly.
- the invention provides an elevation conveyance system for transporting a payload substantially vertically and transversely to a preselected release location.
- the system includes a track assembly having a substantially vertical track, one or more bin assemblies in which the payload is receivable, and one or more car assemblies configured for movement along the track.
- the car assembly includes a housing subassembly having a means for engaging the track to permit movement of the car assembly along the track and a conveyor subassembly for transporting the payload substantially transversely relative to the track.
- the bin assembly is receivable in the housing subassembly and configured to release the payload onto the conveyor subassembly for substantially transverse transportation of the payload to the preselected release location.
- the invention provides a car assembly configured for movement along a substantially vertical track to carry a payload up the track.
- the car assembly includes a housing subassembly having a means for engaging the track to permit movement of the car assembly along the track, the payload being receivable in the housing subassembly, and a conveyor subassembly for transporting the payload substantially transversely relative to the track.
- the invention provides a method of transporting particulate matter to a reactor vessel for release therein. The method includes the steps of, first, locating the particulate matter in a car assembly configured for substantially vertical movement along a track.
- the car assembly, with the particulate matter therein, is raised to a preselected location relative to the reactor vessel.
- the particulate matter is moved at least partially transversely relative to the track from the car assembly to the opening at the top of the reactor vessel, for release of the particulate matter into the reactor vessel.
- the invention provides a base pallet for use with a container in which particulate matter is receivable, the container including an opening through which the particulate matter is movable out of the container under the influence of gravity.
- the container additionally includes a gate movable between a closed position, in which the gate obstructs the opening, and an open position, in which the opening is unobstructed by the gate.
- the base pallet includes a base plate comprising an aperture therein, the container being positionable on the base pallet in a predetermined position in which the opening is at least partially vertically aligned with the aperture, and a gate control device.
- the gate control device includes an engagement element engageable with the gate when the container is in the predetermined position, and a gate control subassembly for moving the engagement element relative to the base plate between a first position, in which the engagement element locates the gate in the open position thereof, and a second position, in which the engagement element locates the gate in the closed position thereof.
- the gate control device also includes an activating element for controlling the gate control subassembly, to control movement of the engagement element between the first and second positions.
- the invention provides a bin assembly in which particulate matter is receivable.
- the bin assembly includes a container portion in which the particulate matter is receivable, the container portion having an opening through which the particulate matter is movable out of the container under the influence of gravity.
- the bin assembly has a gate movable between a closed position, in which the gate obstructs the opening, and an open position, in which the opening is unobstructed by the gate, and a base plate for supporting the container portion, the base plate having an aperture at least partially vertically aligned with the opening.
- the bin assembly also includes a gate control device including an engagement element engaging the gate and a gate control subassembly for moving the engagement element relative to the base plate between a first position, in which the engagement element locates the gate in the open position thereof, and a second position, in which the engagement element locates the gate in the closed position thereof.
- the gate control device also includes an activating element for controlling the gate control subassembly, to control movement of the engagement element between the first and second positions.
- FIG. 1A is a side view of an embodiment of an elevation conveyance system of the invention including a car assembly mounted on a track beside a reactor;
- Fig. IB is a partial cross-section of an embodiment of the car assembly of the invention mounted on the track, drawn at a larger scale;
- FIG. 1C is a top view of the system of Fig. 1A including an embodiment of a transfer assembly of the invention including two carriage subassemblies thereof in an unloading position, drawn at a smaller scale;
- Fig. ID is a top view of the system of Fig. 1C showing the carriage subassemblies in a loading position thereof;
- Fig. 2A is a top view of the system of Fig. 1A including the reactor, showing the car assembly mounted on the track at an intermediate position thereon;
- FIG. 2B is a top view of the system of Fig. 1A including a cross-section of the reactor, showing the car assembly mounted on the track in a discharge position;
- FIG. 3 A is an isometric view of an embodiment of the transfer assembly of the invention, with the car assembly at the ground position thereof, drawn at a smaller scale;
- Fig. 3B is an exploded view of the car assembly, drawn at a larger scale
- Fig. 3C is an isometric view of an embodiment of a base pallet of the invention, drawn at a larger scale;
- Fig. 3D is an isometric view of an embodiment of a bin assembly of the invention, drawn at a smaller scale; -
- Fig. 3E is an exploded view of the bin assembly of Fig. 3D;
- Fig. 3F is an isometric view of the bin assembly of Fig. 3D showing a forklift with forks thereof engaged therewith, drawn at a smaller scale;
- Fig. 3G is an isometric view of the bin assembly being positioned on a carriage subassembly of the transfer assembly of Fig. 3 A, drawn at a larger scale;
- Fig. 3H is an isometric view of the bin assembly positioned on the carriage subassembly of Fig. 3G, ready to be loaded into the car assembly drawn at a smaller scale;
- Fig. 4A is an isometric view of the bin assembly of Fig. 3D with a handle for moving a discharge gate thereof, drawn at a larger scale;
- Fig. 4B is an isometric view of the transfer assembly with a loaded bin assembly and an emptied bin assembly positioned thereon, drawn at a smaller scale;
- Fig. 5A is an isometric view of an alternative embodiment of a bin assembly of the invention, drawn at a larger scale;
- Fig. 5B is an isometric view of the bin assembly of Fig. 5A with a payload positioned therein;
- Fig. 5C is an isometric view of the bin assembly of Fig. 5B with a lid positioned thereon;
- Fig. 6 A is a top view of an embodiment of a floor portion of the car assembly mounted on the track, drawn at a smaller scale;
- Fig. 6B is a top view of the car assembly of Fig. 6A with the bin assembly positioned therein in a discharge position and the conveyor subassembly in a retracted position;
- Fig. 6C is a side view of the car assembly and the bin assembly of Fig. 6B including a partial cross-section thereof;
- Fig. 7A is a top view of the car assembly of Fig. 6B, with the bin assembly positioned therein and the conveyor subassembly in an extended position;
- Fig. 7B is a top view of the car assembly of Fig. 7A showing the conveyor subassembly in the extended position and with a shroud thereon;
- Fig. 7C is an isometric view of the car assembly and the bin assembly of Fig.
- Fig. 7D is an isometric view of the car assembly and the bin assembly of Fig.
- Fig. 7E is a side view of the car assembly and the bin assembly of Fig. 7B in which the gate is open, the payload is being discharged from the container under the influence of gravity, and the conveyor subassembly is conveying the payload transversely, drawn at a smaller scale;
- Fig. 8 is an isometric view of the car assembly with the bin assembly therein and the conveyor in the extended position, drawn at a smaller scale;
- Fig. 9 is a cross-section of the car assembly schematically illustrating additional features thereof, drawn at a larger scale;
- Fig. 10A is a top view of the carriage subassemblies of Figs. 1C and ID, drawn at a larger scale;
- Fig. 10B is a side view of the carriage subassemblies of Fig. 10A;
- Fig. IOC is an end view of the carriage subassemblies of Figs. 10A and 10B, drawn at a larger scale;
- Fig. 10D is an isometric view of the transfer assembly of Figs. 1C and ID with the bin assembly positioned thereon, drawn at a smaller scale;
- Fig. 11A is an isometric view of an alternative embodiment of a bin assembly of the invention, drawn at a larger scale;
- Fig. 1 IB is a top view of an alternative embodiment of a base pallet of the invention, drawn at a larger scale;
- Fig. 11C is a side view of the base pallet of Fig. 1 IB;
- Fig. 1 ID is an isometric view of the base pallet of Figs. 1 IB and 11C in which the engagement element is in a second position thereof;
- Fig. 1 IE is an isometric view of the base pallet of Figs. 1 lB-1 ID in which the engagement element is in a first position thereof;
- Fig. 1 IF is an isometric view of an embodiment of an activating element of the invention, drawn at a larger scale;
- Fig. 11G is an isometric view of an embodiment of a control subassembly of the invention configured for connection with the activating element of Fig. 1 IF;
- Fig. 12A is a top view of another alternative embodiment of the base pallet of the invention, drawn at a smaller scale;
- Fig. 12B is a side view of the base pallet of Fig. 12A;
- Fig. 12C is an isometric view of the base pallet of Figs. 12A and 12B in which the engagement element is shown in a second position thereof;
- Fig. 12D is an isometric view of the base pallet of Figs. 12A - 12C in which the engagement element is shown in a first position thereof;
- Fig. 12E is an isometric view of an activating element of the base pallet of
- Fig. 13 is an isometric view of an alternative embodiment of the bin assembly of the invention, drawn at a smaller scale;
- Fig. 14A is a flow chart schematically partially illustrating an embodiment of a method of the invention.
- Fig. 14B is a flow chart schematically partially illustrating an embodiment of a method of the invention.
- the elevation conveyance system 20 is for transporting a payload 22 (Fig. 6C) substantially vertically and transversely to a preselected release location "X" (Figs. 2B, 7E).
- the system 20 preferably includes a track assembly 26 having a substantially vertical track 28, one or more bin assemblies 30 in which the payload 22 is receivable (Figs. 1A, 6C), and one or more car assemblies 32 configured for movement along the track 28 (Fig. IB).
- the car assembly 32 includes a housing subassembly 34 (Fig. 3B) with a means 36 for engaging the track 28 (Fig. IB) to permit movement of the car assembly 32 along the track 28, and a conveyor subassembly 38 (Fig. 3B) for transporting the payload 22 substantially transversely relative to the track 28.
- the bin assembly 30 is receivable in the housing subassembly 34 and configured to release the payload 22 onto the conveyor subassembly 38 for substantially transverse transportation of the payload 22 to the preselected release location.
- the car assembly 32 preferably is movable along the track
- a ground position Figs. ID, 3A
- a discharge position Figs. 1A, 2B
- the bin assembly 30 may be received in the car assembly 32, and also the bin assembly 30 may be removed from the car assembly 32.
- the conveyor subassembly 38 may be moved to an extended condition (Figs. 2B, 7A, 7B, 7E), so that the payload 22 in the bin assembly 30 may be discharged, as will be described.
- track 28 and the track assembly 26 are of conventional construction. Accordingly, further description of the track 28 and the track assembly 26 and the means 36 for engaging the track 28 is not required.
- a reactor vessel "V" into which the payload is ultimately delivered is preferably surrounded and supported by a support structure "S" (Figs. 1A, 3 A), which also may support the track 28.
- the track assembly 26 preferably is secured to the structure "S” in a conventional manner, by girders or beams "G” (Fig. 1A).
- the payload is particulate matter that may be the catalyst or other material, e.g., ceramic support material or grading material.
- the elevation conveyance system 20 preferably also includes a transfer assembly 74 for moving the bin assembly 30 at least partially into the housing subassembly 34.
- a transfer assembly 74 for moving the bin assembly 30 at least partially into the housing subassembly 34.
- the transfer assembly 74 is omitted from Fig. 1A for clarity of illustration.
- the transfer assembly 74 is configured for moving the bin assembly 30 at least partially out of the housing subassembly 34.
- the conveyor subassembly 38 is mounted on a bottom side 40 of the housing subassembly 34 (Fig. IB).
- the housing subassembly 34 preferably includes a floor portion 42 that has a hole 44 therein and a housing roller conveyor 46 positioned proximal to the hole 44.
- the housing subassembly 34 includes walls 48 and a roof portion 50 (only partially shown in Figs. 3B and 3H). (It will be understood that the roof 50 is omitted from Figs.
- the walls 48 preferably include one or more doors 52, to permit egress from and ingress into an interior cavity 54 generally defined by the floor portion 42, the walls 48, and the roof portion 50.
- the housing roller conveyor 46 preferably includes power rollers 55, i.e., the rollers 55 preferably are self-rotating. Alternatively, however, the rollers 55 may be idlers, i.e., not powered or self-rotating.
- the walls 48 and the roof portion 50 preferably include coverings that substantially enclose the interior cavity 54. It will also be understood that portions of the walls 48 and the roof 50 are omitted for clarity of illustration.
- the interior cavity 54 is sufficiently large that the bin assembly 30 is receivable therein, as well as one or more workers 56.
- the housing subassembly 34 preferably includes elements that make the interior cavity 54 comfortable and safe for the workers that ride in the interior cavity 54.
- Fig. 6B the bin assembly 30 is shown in its discharge position inside the housing subassembly 34. As can be seen in Fig. 6B, when the bin assembly 30 is in its discharge position, it is substantially centered over the hole 44, to facilitate the discharge of the payload 22 from the bin assembly 30 through the hole 44.
- the hole 44 preferably is substantially centrally located in the floor portion 42. It is also preferred that the rollers 55 of the housing roller conveyor 46 are arranged in two parallel rows “R- and "R 2 " on either side of the hole 44. The rows “Rj” and “R 2 " of rollers 55 preferably are positioned beside the hole 44, to move the bin assembly into and out of its discharge position.
- the bin assembly 30 may be provided in various configurations.
- the bin assembly 30 preferably includes a container 58 in which the payload (i.e., the particulate matter) 22 is receivable.
- the container 58 includes an opening 73 at a bottom end thereof (Fig. 7D) coverable by a movable gate 82 (Fig. 7C) that is movable between an open position (Fig. 7D), in which the opening 73 is at least partially unobstructed by the gate 82 to permit the payload to exit the container 58 under the influence of gravity through the opening 73, and a closed position (Fig. 7C), in which the opening 73 is substantially obstructed by the gate 82.
- movement of the gate may be controlled in various ways.
- the gate 82 preferably is in the closed position thereof while the loaded bin assembly 30 is moved into the housing subassembly 34, and located in the discharge position therein (i.e., above the hole 44).
- the gate 82 is not opened, even in part, until the car assembly 32 is in its discharge position, and the conveyor subassembly 38 is in the extended condition. In those circumstances, the worker will cause the gate 82 to be moved to the open position, or to a partially open position, when appropriate. Control of the opened (or partially opened) gate is to be closely monitored by the worker.
- the bin assembly 30 includes a base pallet 60.
- the base pallet 60 includes a base plate 64 including an aperture 66 that is at least partially alignable with the opening 73 in the container 58, when the container 58 is positioned on the base pallet 60 (Figs. 3D, 3E, 4A).
- the base pallet 60 preferably includes a gate control device 85 (Fig. 4A) for moving the gate 82 between the closed and open positions thereof.
- the base pallet 60 additionally includes a funnel 68 formed to direct the payload into the aperture 66 (Fig. 3D).
- the base pallet 60 also includes one or more receptacle guide elements 70 with which at least a part of the container 58 is engageable, for locating the container 58 in a predetermined position on the base pallet 60.
- the gate control device 85 includes an engagement element 87 engageable with the gate 82 when the container 58 is positioned on the base pallet 60, to move the gate 82 between the open and the closed positions thereof.
- the gate control device In one embodiment illustrated in Fig. 4A, the gate control device
- the gate control device 85 preferably is an elongate handle, and the engagement element 87 preferably is a hook portion of the handle that is attachable to the gate 82. Once temporarily attached to the gate, the handle 87 may be manually pulled by the worker (not shown in Fig. 4A) to move the gate 82 to the open or partially open position, and also pushed to move the gate toward its closed position.
- the gate control device 85 preferably is energized by hydraulics, or by electrical energy, or compressed air, or other suitable energizing means.
- the discharge gate 82 preferably includes a tab portion "T" with a hole “DH" therein in which the engagement element 87 is receivable.
- the base pallet may alternatively include other means for controlling movement and positioning of the gate 82.
- the base pallet 60 has the advantage that it can engage with rollers (i.e., in a roller conveyor) while moving in any substantially horizontal direction.
- the base pallet 60 includes sleeves
- the base pallet 60 preferably includes four of the guide elements 70 (i.e., one at each corner).
- the guide elements 70 serve to hold the container 58 relatively securely on the base pallet 60 so that the opening 73 of the container hopper 72 is substantially vertically aligned with the base hopper 68 and the aperture 66. Due to such vertical alignment, the payload 22 exits the bin assembly 30 relatively quickly when it is discharged from the container 58, as will be described.
- the guide elements 70 preferably hold the container 58 relatively securely in position on the base pallet 60 so that the container 58 does not move relative to the base pallet 60 when the bin assembly 30 is moved. However, once the container 58 is emptied, it may be separated from the base pallet and returned to the catalyst manufacturer or supplier (or, in the case of other particulate matter, the supplier of such other particulate matter), for refilling.
- the loaded bin assembly 30 preferably is moved initially using any suitable means.
- a forklift or tow motor "F” preferably engages the bin assembly 30 by sliding forks thereof into the sleeves 62A, 62B, in conventional manner.
- the forklift "F” with the bin assembly 30 engaged therewith via the forks moves to a transfer assembly 74 (Fig. 3G).
- the system 20 preferably includes the transfer assembly 74.
- the transfer assembly 74 preferably is located adjacent to the housing subassembly 34 when the car assembly 32 is positioned at the ground position (Figs. 3A, 3H).
- the tow motor "F” sets the loaded bin assembly 30 (i.e., the bin assembly 30 with the payload 22 therein) on the transfer assembly 74, so that the loaded bin assembly 30 can then be moved into the housing subassembly 34.
- the transfer assembly preferably includes one or more carriage subassemblies 75 and a carriage track 77 on which the carriage subassembly 75 is movable (Figs. 10A-10D), for movement of the carriage subassembly 75 between a loading position (Fig. 1C), in which the carriage subassembly 75 is located to at least partially move the bin assembly 30 into the housing subassembly 34, and an unloading position (Fig. ID), in which the carriage subassembly 75 is located to at least partially move the bin assembly 30 out of the housing subassembly 34.
- a loading position Fig. 1C
- Fig. ID unloading position
- the transfer assembly 74 includes a frame 79.
- each of the carriage subassemblies 75 is mounted on the frame 79 and includes one or more transfer devices 81 engageable with the bin assembly 30 and configured to move the bin assembly 30 relative to the frame 79 when the bin assembly 30 is engaged by the transfer device 81, upon activation of the transfer device 81.
- the carriage track 77 includes two parallel rails "Ni", “N 2 "
- the transfer assembly 75 includes two carriage subassemblies, identified in Figs. 1C, ID, and 3H as 75A and 75B for clarity of illustration.
- the frame 79 preferably also includes wheels "W" that are formed for rolling engagement with the rails "Ni", "N 2 ". Movement of the frame 79 on the track 77 may be effected by any suitable means. For instance, in one embodiment, the frame 79 and the carriage subassemblies 75A, 75B mounted thereon preferably are moved between the loading position and the unloading position by motive means mounted on the frame 79. Alternatively, the carriage subassemblies and the frame may be manually moved on the track.
- the transfer device 81 is a roller conveyor (Figs. 1C, ID).
- a number of the rollers in the roller conveyor are self-rotating, so that the roller conveyor 81 can, when activated, move the bin assembly 30 positioned on it.
- the rollers may be idlers (i.e., not powered or self-rotating), and the bin assembly 30 may simply be manually moved by one or more workers (not shown) into or out of the housing subassembly 34.
- the carriage subassembly 75 includes one or more load cells 83 (Fig. IOC), for weighing the bin assembly 30 when the bin assembly 30 is positioned on the carriage subassembly 75.
- load cells 83 Fig. IOC
- the load cells are mounted on the frames 79 of the respective carriage subassemblies 75A, 75B, the weights of the individual payloads that are delivered to the reactor vessel "V" can be quickly and accurately determined.
- the carriage subassembly 75 A preferably is configured to move a loaded bin assembly 30 in the direction indicated by arrow "A" in Fig. ID
- the carriage subassembly 75B preferably is configured to move an unloaded bin assembly 30 in the direction indicated by arrow "B" in Fig. 1C.
- the bin assembly 30 is shown in its discharge position in the housing subassembly 34 for clarity of illustration.
- the bin assembly 30, loaded with the payload 22 is shown after it has been moved from the carriage subassembly 75A into the housing subassembly 34.
- the bin assembly 30, after the payload 22 has been discharged from it is to be moved out of the housing subassembly 34, over the carriage subassembly 75B.
- the emptied or unloaded bin assembly 30 (i.e., one from which the payload 22 has been discharged) should first be removed from the housing subassembly 34, i.e., when the car assembly 32 is returned to the ground position (Fig. 1C) from the raised position (Fig. 1A).
- the carriage subassembly 75B is initially located in the unloading position (Fig. 1C).
- the carriage subassemblies 75A, 75B preferably are moved so that the carriage subassembly 75A is in the loading position (Fig. ID). It will be understood that the emptied bin assembly is removed using the forklift "F" in conventional manner.
- the forklift "F” positions the loaded bin assembly 30 on the carriage subassembly 75A (Fig. 3G). (It will be understood that the car assembly 32 is omitted from Fig. 3G for clarity of illustration.) It is preferred that the carriage subassembly 75 A is in the loading position when the loaded bin assembly 30 is positioned on the carriage subassembly 75 A by the forklift "F". As indicated in Fig.
- the loaded bin assembly 30 is then moved in the direction indicated by arrow "A" over the rollers 81 on the carriage subassembly 75A into the interior cavity 54 of the housing subassembly 34, assisted by the housing roller conveyor 46 mounted in the floor 42 of the housing subassembly 34. It will be understood that, once the loaded bin assembly 30 is inside the interior cavity 54, the loaded bin assembly 30 is positioned on the floor 42 so that the opening 66 in the base plate 64 is substantially aligned with the opening 44 in the floor 42, i.e., the bin assembly 30 is located in its discharge position in the housing subassembly 34 (Figs. 6B, 6C, 7A, 7B).
- the transfer devices 81 alone, move the bin assembly 30 only partly into or out of the housing subassembly 34.
- the loaded bin assembly 30 is moved over the transfer device 81 in the direction indicated by arrow "A" in Fig. 1C initially.
- the rollers 55 of the housing roller conveyor 46 are then used to move the bin assembly 30 further into the cavity 54, to stop ultimately when the bin assembly 30 is in its discharge position inside the housing subassembly 34 (Figs. 6B, 6C).
- the initial movement of the unloaded bin assembly 30 from its discharge position is due to its engagement with the housing roller conveyor 46.
- the unloaded bin assembly 30 engages the transfer device 81 of the second carriage subassembly 75B when the unloaded bin assembly 30 is partially out of the housing subassembly 34.
- the transfer assembly 74 preferably is included in the system 20 in order to protect the car assembly 32 from possible damage due to the operation of the forklift "F".
- the transfer assembly 74 is preferred because it provides for safe loading and unloading of the bin assemblies.
- the transfer assembly 74 requires the forklift "F” to position the loaded bin assembly and to engage the emptied bin assembly at a distance from the car assembly 32. Therefore, the transfer assembly 74 is preferred for safety reasons.
- the forklift may be prevented from engaging the car assembly directly or indirectly, and potentially pushing the car assembly off the track, by other means.
- a stop element (not shown) may be provided, to prevent the forklift from coming closer to the car assembly 32 than a predetermined distance, thereby preventing direct or indirect engagement of the forklift "F” with the car assembly 32.
- the housing subassembly 34 preferably includes the housing roller conveyor 46 for moving the bin assembly to its discharge position (Fig. 6B) in the housing subassembly 34, in which the payload 22 is dischargeable from the bin assembly 30 under the influence of gravity.
- the housing roller conveyor 46 preferably is also used to move the bin assembly 30 at least partially out of the housing subassembly 34 after the payload 22 has been discharged.
- the housing subassembly 34 preferably also includes the floor portion 42, which includes the hole 44 therein through which the payload 22 is dischargeable when the bin assembly 30 is located in the discharge position (Figs. 6C, 6C).
- Figs. 6C the discharge position
- the conveyor subassembly 38 preferably is movable between the retracted condition (Figs. 6A-6C), in which the conveyor subassembly 38 is positioned to permit travel of the car assembly 32 along the substantially vertical track 28, and the extended condition (Figs. 2B, 7A-8), in which the conveyor subassembly 38 is positioned to transfer the payload loaded onto the conveyor subassembly 38 through the hole 44 substantially transversely relative to the track 28.
- the conveyor subassembly 38 preferably includes a conveyor belt 76 and a conveyor body portion 78 supporting the conveyor belt 76 and elements driving the conveyor belt.
- the conveyor subassembly 38 includes a shroud 80 (Fig. 7B) partially covering the conveyor belt 76, as will be described. (It will be understood that the shroud 80 is omitted from Fig. 7A for clarity of illustration.)
- the bin assembly 30 preferably includes the discharge gate 82, for controlling flow of the payload from the container portion 58 into the base hopper 68.
- This control which (as would be appreciated by those skilled in the art) may be effected manually or via electronic, hydraulic, or other controls, is preferred because it enables the worker 56 to control the flow of payload onto the conveyor belt 76 based on visual evidence of the flow of the payload toward the vessel "V".
- control of the rate of discharge of the particulate matter of the payload onto the conveyor subassembly 38 is important, in order to minimize the risk of spilling and wasting the particulate matter.
- the structure "S" preferably includes an intermediate conveyor 84 positioned to convey the payload into an intermediate bin or loader 86 which is positioned to direct material therein into the vessel "V".
- the loader 86 is located at a top end of the vessel “V" (Figs. 1A, 2B).
- the vessel “V” preferably has an opening 87 at its top end.
- material flowing from the intermediate bin 86 is directed through a discharge tube 88 into the vessel "V” via the opening 87.
- the intermediate conveyor 84, the intermediate bin 86, and the opening 87 at the top of the vessel “V” are all enclosed within an enclosure structure 90, to protect such components and the materials therein from atmospheric conditions.
- the conveyor subassembly 38 is moved to its extended condition.
- the preselected release location is at an outer end 92 of the conveyor belt 76 when the conveyor subassembly 38 is in the extended condition (Figs. 7A-7E).
- the preselected release location is identified for clarity by the reference letter "X".
- the conveyor subassembly 38 is moved to its extended condition.
- the outer end 92 preferably is located inside the enclosure structure 90.
- a wall of the enclosure structure 90 may have a small flap covering a small hole (not shown) in its wall that may be pushed open by the conveyor subassembly 38 when it is moved to the extended condition (Fig. 7B).
- Figs. 7C and 7D the gate 82 in the bin assembly 30 is shown in isometric views in which parts of the bin assembly 30 and the payload 22 are omitted, for clarity of illustration.
- the gate 82 is shown in its closed position. It will be understood that, once the car assembly 32 is in its raised position, the gate 82 preferably remains in its closed position until (i) the conveyor subassembly 38 is in its extended condition, and (ii) the conveyor is activated, so that the top surface "TS" of the conveyor belt 76 (Fig. 7E) is moving in the direction indicated by arrow "C" (Figs. 2B, 7B, 7E).
- the gate 82 is moved to its open position, illustrated in Figs. 7D and 7E.
- the gate 82 is moved in the direction indicated by arrow "D" in Fig. 7C from its closed to its open position by the gate control device 85.
- the material 22 that is released from the end "X" of the conveyor 76 falls onto the intermediate conveyor 84, and is moved by the intermediate conveyor 84 to the interim bin 86.
- the upper surface of the intermediate conveyor 84 moves the material that falls onto it in the direction indicated by arrow "E” in Fig. 2B to the intermediate bin 86 (Fig. 2B).
- the payload 22 which is dropped into the interim bin 86 is moved therefrom under the influence of gravity through the discharge tube 88 into the vessel "V", via the opening 87, as indicated by arrow "F” in Fig. 2B.
- a valve may be positioned on the discharge tube 88, if desired, in order to provide a further means for controlling the flow of the payload into the vessel "V".
- the vessel may be constructed and positioned in the structure supporting it so that the preselected release location is directly above a part of the vessel, thereby permitting delivery of the payload directly from the conveyor subassembly 38 into the vessel.
- the worker 56 preferably monitors the delivery of the payload 22, and in particular, the amount of the payload 22 in the interim bin 86 while the payload 22 exits the container 58. If it appears that the rate of discharge of the payload 22 from the bin 86 (or from the intermediate conveyor 84) has slowed or stopped, then the worker 56 preferably then adjusts the rate of discharge from the container 58 by adjusting the position of the gate 82 to obstruct part of the hole 44. As will be described, this may be done by the worker via any suitable means.
- the interior cavity 54 of the housing subassembly 34 preferably is sufficiently large to accommodate one or two workers 56, in addition to the bin assembly 30. This is preferred for at least two reasons. First, it is convenient to have one worker 56 in the housing subassembly with the loaded bin assembly so that the worker 56 can control the discharge of the payload 22 from the bin assembly 30 onto the conveyor belt 76, making adjustments as needed, as described above.
- the second reason to accommodate one or more workers in the housing subassembly 34 is that the car assembly 32 provides a convenient, rapid means of transportation from ground level to the top of the vessel. As is well known in the art, a significant amount of time may be spent by workers manually climbing up or down the structure "S", in the absence of an alternative vertical transportation means.
- Fig. 7A for illustrative purposes, the conveyor subassembly 38 is shown in the extended condition, and the shroud 80 is omitted so that the belt 76 may be shown, for clarity of illustration.
- Fig. 7B the shroud 80 is included.
- the shroud 80 substantially covers the part of the conveyor subassembly 38 that would otherwise be exposed when the conveyor subassembly 38 is in the extended position, except that the shroud 80 includes a hole underneath to permit the material to fall off the end of the conveyor belt clear of the conveyor subassembly 38.
- the shroud 80 is preferably included in the conveyor subassembly 38 in order to protect the payload on the conveyor belt 76 from disturbance thereof by wind or precipitation, when the conveyor subassembly 38 is in the extended position.
- the conveyor subassembly is retracted, to its retracted condition (Fig. 1A).
- the car assembly 32 is then moved down the track 28 past an intermediate position (Fig. 2A) to the ground position thereof (Fig. 1C).
- the empty bin assembly 30 is first removed, and to achieve this, the carriage subassembly 75B is moved to the unloading position, illustrated in Fig. 1C.
- the next loaded bin assembly 30 is then loaded into the housing subassembly 34 from the carriage subassembly 75A when it is in the loading position (Fig. ID).
- each of the carriage subassemblies 34 preferably includes the load cell 83.
- the weight of the loaded bin assembly preferably is first determined when it is positioned on the first carriage subassembly 75A (i.e., immediately before it enters the housing subassembly 34), and recorded in any suitable manner.
- the emptied or discharged bin assembly 30 is weighed as it moves over the carriage subassembly 75B (i.e., immediately after it exits the housing subassembly 34).
- the net amount of the payload 22 that was delivered to the reactor vessel from that particular bin assembly 30 is the difference between the loaded and empty weights, subject only to minor immaterial losses that may occur when the payload is discharged from the bin assembly or moved by the conveyor subassembly to the intermediate conveyor, or other minor losses inside the enclosure structure 90.
- data from the load cells 83 preferably is transmitted therefrom to one or more processors or similar devices for efficient processing thereof.
- parts of the walls of the housing subassembly 34 are omitted, and its roof is also omitted, for clarity of illustration.
- the car assembly with complete walls 48 and the roof 50 can be seen in Fig. 4B.
- the walls and the roof preferably are in place, and the doors 52, so that the cavity 54 is substantially enclosed when the doors 52 are closed.
- the payload 22 in the bin assembly 30 positioned in the housing subassembly 34, and the worker(s) in the housing subassembly 34 are generally protected from the weather.
- the housing subassembly 34 includes various elements to provide for the safety and comfort of the workers located therein. These elements are schematically illustrated in Fig. 9, and include an atmospheric gas detection assembly 3, a dust control assembly 5, an emergency breathing air assembly 7, a fire suppression assembly 9, an air conditioning assembly 11, and a heating assembly 13.
- the housing subassembly 34 also includes dual manway hatches (not shown) in the roof thereof, to permit workers inside to escape if necessary. Because these assemblies are known in the art, further description thereof is unnecessary.
- FIG. 11 A An alternative embodiment of the bin assembly 130 of the invention is illustrated in Fig. 11 A.
- the bin assembly 130 includes the container 58 and an alternative embodiment of the base pallet 160 of the invention that is illustrated in Figs. 11B-11E.
- an embodiment of the gate control device 185 of the invention preferably also includes a gate movement subassembly 189 activatable to move an engagement element 187 between a first position thereof, in which the gate 82 of the container 58 is located in the open position (as shown in Figs. 7D, 7E), and a second position thereof, in which the gate 82 is located in the closed position (as shown in Fig. 7C).
- the engagement element 187 fits into the hole “DH" of the tab "T” of the gate 82 when the container 58 (not shown in Figs. 11B-11E) is positioned on the base pallet 160.
- the engagement element 187 is shown in the second position, and in Fig. HE, the engagement element 187 is shown in the first position thereof.
- the gate movement subassembly 189 is activatable by an activating element 191.
- the gate movement subassembly 189 preferably is powered in any suitable manner (e.g., electrical energy, hydraulic fluid), and the activating element 191 enables the worker to activate or de-activate the gate movement subassembly 189 relatively easily, as the worker considers appropriate. In this way, the worker can control the flow of the particulate matter of the payload out of the container 58 relatively easily.
- an embodiment of the base pallet 160 of the invention is for use with the container 58.
- particulate matter is receivable in the container 58.
- the container 48 includes the opening 73 through which the particulate matter is movable out of the container 58 under the influence of gravity.
- the container additionally includes the gate 82 movable between a closed position, in which the gate 82 obstructs the opening 73, and an open position, in which the opening 73 is unobstructed by the gate 82.
- the base pallet 160 preferably also includes a base plate 164 having an aperture 166 therein.
- the container 58 is positionable on the base pallet 160 in a predetermined position in which the opening 73 is at least partially vertically aligned with the aperture 166.
- the gate control device 185 preferably includes the engagement element 187, which is engageable with the gate 82 when the container 58 is in the predetermined position. It is also preferred that the gate control device 185 includes the gate control subassembly 189 for moving the engagement element 187 between the first position, in which the gate 82 is located by the engagement element 187 in the open position, and the second position, in which the gate 82 is located by the engagement element 187 in the closed position.
- the gate control device 185 preferably also includes the activating element 191 for controlling the gate control subassembly, to control movement of the engagement element 187 between the first and second positions.
- the base pallet 160 preferably includes an embodiment of the gate movement subassembly 189 controllable by the worker via an embodiment of a control subassembly 195 of the invention (Fig. 11G).
- the gate movement subassembly 189 preferably includes a control receptacle 197 operatively connectable with the control subassembly 195 via a port 198 in the activating element (Figs. 1 IF, 11G).
- the receptacle 197 and the control subassembly 195 preferably are connected by a cord element "L" through which signals are transmittable from the control subassembly 195 to the activating element 191.
- the gate movement subassembly 189 preferably is activatable by electrical energy, and includes one or more electric motors (not shown) that can cause telescoping elements 202 to extend or retract, to position the engagement element 187 relative to the base plate 164 as required, i.e., in the first or second positions, or therebetween.
- the worker preferably controls the gate movement subassembly 189 by activating or de-activating one or more electric motors via the activating element 191, to move the engagement element 187 between its first and second positions, and also to position it therebetween, as needed.
- the gate movement subassembly 189 activatable via an energizing means, has been found to be advantageous because manual control of the gate 82 may be awkward or difficult in practice.
- the engagement element 187 is shown in its first position in Fig. 1 IE, and it is shown in its second position in Fig. 11D.
- the movement of the engagement element 187 from its second position to the first position thereof is schematically illustrated by arrow "FT in Fig. 11D.
- Fig. HE when the engagement element 187 is in the first position thereof, the telescoping elements 202 are extended.
- the movement of engagement element 187 from the first position to the second position is schematically illustrated by arrow "I" in Fig. HE.
- the telescoping elements 202 are shown as being retracted.
- the gate movement subassembly 189 is configured to position the engagement element 187 in the first position or the second position or at any point therebetween. In this way, the worker can conveniently control the flow of the particulate matter of the payload to a fairly fine degree using the control subassembly 195.
- control subassembly 195 preferably is configured to enable the worker conveniently to observe the flow of the payload 22 and to adjust the position of the gate 82 accordingly.
- the connecting cord "L" preferably is as long as necessary to enable the worker to control the gate 82 as described above while observing the flow of the particulate matter of the payload into the reactor, or into the interim bin 86, as the case may be.
- the gate 82 may be located in the first or second positions thereof, and any intermediate position(s) thereof.
- the control subassembly 189 provides the worker with greater ability to position himself where he can see the movement of the payload into or toward the reactor vessel, while still controlling discharge of the material from the container 58.
- FIG. 12A-12E Another alternative embodiment of the base pallet 260 is illustrated in Figs. 12A-12E, which includes an alternative embodiment of the gate control device 285.
- the control subassembly 297 includes one or more foot pedals 201A, 201B.
- the activating element 291 includes one or more foot pedals 201 configured for activation of the gate movement subassembly 289 by downward pressure on the foot pedal 201 A.
- Fig. 12C the engagement element 287 is shown in a second position, in which the gate is held closed. It will be understood that, upon the worker depressing the pedal 201A, one or more signals are transmitted to the gate movement subassembly 289, so that the engagement element 287 is moved by the gate movement subassembly 289 toward the first position from the second position (Fig. 12C), i.e., in the direction indicated by arrow "K" in Fig. 12C. In Fig. 12D, the engagement element 287 is shown in a first position, in which the gate is held open.
- one or more signals are transmitted to the gate movement subassembly 289, so that the engagement element 287 is moved by the gate control subassembly 289 toward the second position from the first position (Fig. 12D). This movement is indicated by arrow "U” in Fig. 12D. It will be understood that the gate movement subassembly 289 may locate the engagement element 287 at any point between the first and second positions.
- the base pallet 260 may be preferred where the workers prefer to control the discharge of the payload 22 from the container 58 by using their feet, for convenience. It will also be understood that the control subassembly 295 preferably is configured to locate the gate 82 in its closed or open positions or in any intermediate position therebetween.
- the container 58 as illustrated in Figs. 1A-3A, 3D- 4B, 6B-8, 10G, and 11A is exemplary only.
- the system 20 may be configured to deliver various payloads, which may be delivered to the site in various containers.
- the container 58 may be provided at the site by the payload manufacturer or supplier, with the payload positioned therein.
- the system 20 may be adapted to accommodate other types of containers and bin assemblies.
- FIGs. 5A-5C An alternative embodiment of a bin assembly 330 is illustrated in Figs. 5A-5C.
- the bin assembly 330 includes a body 331 that preferably is at least partially in the form of a hopper, tapering to a discharge outlet 373.
- the bin assembly 330 preferably also includes a gate device 335 mounted at the discharge outlet 373 to control the flow of the payload under the influence of gravity out of the bin assembly 330.
- the bin assembly 330 is adapted to receive the payload 22 in the body 331 (Fig. 5B).
- the bin assembly 330 may be used where, for example, the payload 22 is provided at the site in bags or otherwise in bulk form, instead of being provided in the pre-loaded containers 58, i.e., as described above.
- the bin assembly 330 preferably includes sleeves 362A, 362B in which the forks of a forklift (not shown in Figs. 5A-5C) are receivable. It is also preferred that the bin assembly 330 includes cross-members 339 A, 339B positioned between the sleeves 362A, 362B. Those skilled in the art would appreciate that the arrangement of the sleeves 362A, 362B and the cross-members 339A, 339B enables the bin assembly 330 to be moved substantially horizontally in any direction on rollers.
- a lid 337 preferably is positioned and secured on the body 331 (Fig. 5C).
- the loaded bin assembly 330 is moved into the car assembly 32, in the same manner as described above in connection with the loaded bin assemblies 30.
- the car assembly 32 is then moved upwardly along the track 28, also in the same manner as described above.
- the gate 335 is opened, to permit the payload 22 to exit the bin assembly 330 in the direction indicated by arrow "Q" in Fig. 5C, as schematically illustrated in Fig. 5C.
- Figs. 5C As can be seen in Figs.
- the gate preferably is manually controllable via a lever movable between a closed position (Figs. 5A, 5B) and an open position (Fig. 5C). Because the construction and operation of the gate is conventional, further description thereof is unnecessary. It will be understood that the payload 22 thus discharged is received on the conveyor belt 76, and moved by the conveyor belt 76 to the preselected release location "X", as described above.
- a larger bin assembly 430 may be used (Fig. 13).
- the payload 22 preferably is positioned in the bin assembly 430 at the site.
- the particulate matter of the payload may be delivered to the site by truck or rail or otherwise in bulk, and then positioned into a container portion 458 of the bin assembly 430 at the site.
- the container 458 preferably is a integral part of the bin assembly 430 in which a base plate 464 and the container 458 are welded or otherwise secured together to form a unitary body.
- the bin assembly 430 is that the container portion 458 can receive a relatively large payload.
- the larger container portion 458 would be advantageous because less vertical travel of the car assembly (i.e., fewer trips) would be needed to deliver a particular total amount of the particulate matter of the payload.
- the particulate matter of the payload (e.g., the catalyst, or ceramic support material, or grading material) is receivable in the bin assembly 430.
- the bin assembly 430 includes the container portion 458 in which the particulate matter is receivable.
- the container portion 458 includes an opening 473 through which the particulate matter is movable out of the container portion 458 under the influence of gravity.
- the bin assembly 430 preferably also includes a gate 482 movable between a closed position, in which the gate 482 obstructs the opening, and an open position, in which the opening is unobstructed by the gate, as described above.
- the bin assembly 430 includes a base plate 464 for supporting the container portion 458.
- the base plate 464 preferably also includes an aperture 466 at least partially vertically aligned with the opening 473.
- the bin assembly also includes the gate control device (not shown in Fig. 13) as described above for controlled movement of the gate 482 relative to the base plate 464.
- the system 20 preferably also includes a second car assembly 32', mounted on an opposite side of the track assembly 26.
- a second car assembly 32' doubles the amount of the particulate matter of the payload that is deliverable to the reactor by the system. It has been determined that, using the container 58 (i.e., illustrated in Figs. 3E and 11A), with the single car assembly 32, approximately 29 tonnes of the particulate matter are deliverable per hour. However, if the second car assembly 32' is also used, then the amount delivered is doubled, i.e., to approximately 58 tonnes per hour. From the foregoing, it can be seen that the system and method of the invention can result in much faster delivery of the particulate matter to the reactor vessel. Also, the second car assembly 32' provides a means for payload delivery even if the first car assembly 32 malfunctions.
- the system preferably also includes a crane 4 that is located on top of the track assembly 26.
- the crane 4 may be used for various tasks, e.g., to move equipment normally mounted on the reactor vessel at its top end in order to enable the particulate matter to be loaded into the reactor, as required.
- the payload is located in the car assembly 32, that is configured for substantially vertical movement along the track 28.
- the payload 22 may be provided in the car assembly in any suitable container.
- the car assembly, with the payload therein is raised to the preselected location in the vicinity of the top of the reactor vessel.
- the payload is moved at least partially transversely relative to the track from the car assembly to the opening at the top of the reactor vessel, for release of the payload into the reactor vessel via the opening.
- the invention also provides an embodiment of a method 141 of transporting the payload 22 substantially vertically and transversely to a preselected release location.
- the method includes the steps of, first, providing the track assembly 26 having the substantially vertical track 28 (Fig. 14A, step 143).
- a loaded bin assembly 30 is provided (step 145).
- the car assembly 32, configured for movement along the track 28, is provided (step 147).
- the car assembly 32 is positioned at a ground position (step 149).
- the loaded bin assembly 30 is positioned in the housing subassembly 34 of the car assembly 32 (step 151).
- the car assembly 32 is moved substantially vertically along the track 28 to a discharge position thereof (step 153).
- the conveyor subassembly is extended to an extended condition thereof (step 155).
- the payload is released onto the conveyor subassembly 38 for conveyance of the payload thereby to the preselected release location, to provide an emptied bin assembly (Fig. 14B, step 157).
- the conveyor subassembly 38 is retracted to a retracted condition thereof (step 159).
- the car assembly 32 is moved substantially vertically along the track 28 to the ground position (step 163).
- the emptied bin assembly 30 is removed from the housing subassembly 34 (step 165). As described above, the next step would be to move another loaded bin assembly into the housing subassembly 34, and repeat the process.
- the system has the advantages that it has the capacity to deliver sufficient material per hour to meet requirements, and the operation of the system is not delayed by most inclement weather conditions.
- the system 20 is safer than the prior art method of using a crane.
- the system 20 has the additional advantage that the housing subassembly 34 may be used for transportation of workers and tools or other materials vertically, thereby saving significant time and effort. It is estimated that, through the use of the car assembly 32 in this way, productivity may be increased by approximately ten percent or more.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Civil Engineering (AREA)
- Organic Chemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Transportation (AREA)
- Automation & Control Theory (AREA)
- Architecture (AREA)
- Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
- Intermediate Stations On Conveyors (AREA)
- Loading Or Unloading Of Vehicles (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Types And Forms Of Lifts (AREA)
- Looms (AREA)
- Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
- Warehouses Or Storage Devices (AREA)
- Auxiliary Methods And Devices For Loading And Unloading (AREA)
Abstract
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL14841950T PL3024764T3 (en) | 2013-09-06 | 2014-09-05 | Elevation conveyance system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA 2826315 CA2826315A1 (en) | 2013-09-06 | 2013-09-06 | Elevation conveyance system and method |
PCT/CA2014/000675 WO2015031981A1 (en) | 2013-09-06 | 2014-09-05 | Elevation conveyance system and method |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3024764A1 true EP3024764A1 (en) | 2016-06-01 |
EP3024764A4 EP3024764A4 (en) | 2017-03-29 |
EP3024764B1 EP3024764B1 (en) | 2018-03-28 |
Family
ID=52627641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14841950.0A Active EP3024764B1 (en) | 2013-09-06 | 2014-09-05 | Elevation conveyance system |
Country Status (22)
Country | Link |
---|---|
US (1) | US9878860B2 (en) |
EP (1) | EP3024764B1 (en) |
JP (1) | JP6349400B2 (en) |
KR (1) | KR20160051885A (en) |
CN (1) | CN105579371B (en) |
AR (1) | AR099348A1 (en) |
AU (1) | AU2014317750B2 (en) |
CA (2) | CA2826315A1 (en) |
CL (1) | CL2016000497A1 (en) |
DK (1) | DK3024764T3 (en) |
EA (1) | EA032212B1 (en) |
ES (1) | ES2674379T3 (en) |
IL (1) | IL244414B (en) |
LT (1) | LT3024764T (en) |
MX (1) | MX2016002236A (en) |
MY (1) | MY176227A (en) |
PH (1) | PH12016500426B1 (en) |
PL (1) | PL3024764T3 (en) |
PT (1) | PT3024764T (en) |
SG (1) | SG11201601271PA (en) |
TW (1) | TWI630160B (en) |
WO (1) | WO2015031981A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11536039B2 (en) | 2017-12-08 | 2022-12-27 | Seaway Painting, L.L.C. | Tower apparatus |
CN112110308B (en) * | 2020-09-08 | 2021-12-03 | 广西用有机械设备维修有限公司 | Anti-falling safety support for construction elevator |
CN114275546B (en) * | 2020-09-27 | 2024-06-07 | 中冶宝钢技术服务有限公司 | Automatic collection device for waste bag and waste material and use method thereof |
CN113428616A (en) * | 2021-08-09 | 2021-09-24 | 烟台杰瑞石油装备技术有限公司 | Sand storage and conveying equipment |
RU2764326C1 (en) * | 2021-09-13 | 2022-01-17 | Общество с ограниченной ответственностью «Опытно-конструкторское предприятие «ЭЛЬБРУС» | Method for lifting/lowering and moving on a height of a bearing structure and a device for its implementation |
CN114955803A (en) * | 2022-06-07 | 2022-08-30 | 深圳市宇钧科技有限责任公司 | Sky rail system with vertical lifting mechanism |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3653526A (en) * | 1970-07-02 | 1972-04-04 | Catalyst Services Inc | Dry product loading apparatus |
US5807059A (en) * | 1994-11-22 | 1998-09-15 | Kabuki Construction Co., Ltd. | Ready mixed concrete conveying apparatus |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2297572A (en) * | 1942-01-14 | 1942-09-29 | Charles A Martin | Hoisting apparatus |
US2400939A (en) * | 1944-11-03 | 1946-05-28 | Charles A Martin | Hoisting apparatus |
US3481499A (en) | 1968-03-25 | 1969-12-02 | Miner Denver Inc | Article hoist and lateral transfer mechanism |
JPS5228266Y2 (en) * | 1971-12-10 | 1977-06-28 | ||
US3768626A (en) | 1971-12-22 | 1973-10-30 | Eastern Refractories Co Inc | Apparatus for conveying materials |
JPS4870355A (en) | 1971-12-27 | 1973-09-22 | ||
DE3222509C2 (en) * | 1982-06-16 | 1987-02-05 | Albert Böcker GmbH & Co KG, 4712 Werne | Telescopic guide for a load platform of an inclined lift for the transport of furniture |
US4769127A (en) | 1985-09-30 | 1988-09-06 | Amoco Corporation | Computerized monorail catalyst handling process and system for resid hydrotreating units |
FR2732672B1 (en) * | 1995-04-07 | 1997-06-27 | Elveco Msj Sa | CONTAINER TRANSPORTATION SYSTEM FOR GRAVITY FLOW PRODUCTS |
US5601156A (en) * | 1995-11-29 | 1997-02-11 | Otis Elevator Company | Maintaining communications and power during transfer of horizontally moveable elevator cab |
US5799755A (en) * | 1996-11-14 | 1998-09-01 | Otis Elevator Company | Linear motor transfer of cab horizontally between elevator and bogey platforms |
SG67431A1 (en) | 1996-11-14 | 1999-09-21 | Otis Elevator Co | Horizontal transfer of cab between elevator and bogey platform rails |
JP2000016593A (en) * | 1998-07-01 | 2000-01-18 | Asahi Kankyo System Kk | Inverting and turning-over device |
US6416271B1 (en) * | 2000-04-07 | 2002-07-09 | Nucon Corporation | Drop box container |
JP2002160795A (en) * | 2000-11-24 | 2002-06-04 | Toyota Auto Body Co Ltd | Container for powder and granule and its device combined with transfer pallet therefor |
US6540089B2 (en) | 2001-04-17 | 2003-04-01 | Astec Industries Inc. | Large, stationary, modular aggregate processing plant and method of manufacturing and installing same |
WO2002088004A2 (en) | 2001-04-30 | 2002-11-07 | United States Postal Service | Automated processing of bulk containers |
US7063493B2 (en) * | 2002-03-27 | 2006-06-20 | The Young Industries, Inc. | System and method for handling containers of bulk particulate materials |
US20060280802A1 (en) | 2002-10-04 | 2006-12-14 | Campbell Julie H | Therapeutic uses of beta-casein a2 and dietary supplement containing beta-casein a2 |
AT500551B1 (en) * | 2002-12-18 | 2007-10-15 | Tgw Transportgeraete Gmbh | LOAD RACK FRAME FOR A SHELVING UNIT |
JP2006017466A (en) * | 2004-06-30 | 2006-01-19 | Teraoka Seiko Co Ltd | Platform scale, gauge system, and inventory management method |
ES2246163B1 (en) * | 2004-07-23 | 2007-03-16 | Gamesa Eolica, S.A. Sociedad Unipersonal | AN INDEPENDENT MOBILE CRANE SYSTEM FOR TEMPORARY USE TO MOVE OR REPLACE COMPONENTS AND FOR THE ASSEMBLY OF AEROGENERATORS. |
TWI496732B (en) | 2009-07-31 | 2015-08-21 | Murata Machinery Ltd | Buffered storage and transport device for tool utilization |
-
2013
- 2013-09-06 CA CA 2826315 patent/CA2826315A1/en not_active Abandoned
-
2014
- 2014-09-05 WO PCT/CA2014/000675 patent/WO2015031981A1/en active Application Filing
- 2014-09-05 PL PL14841950T patent/PL3024764T3/en unknown
- 2014-09-05 LT LTEP14841950.0T patent/LT3024764T/en unknown
- 2014-09-05 PT PT148419500T patent/PT3024764T/en unknown
- 2014-09-05 KR KR1020167009002A patent/KR20160051885A/en active IP Right Grant
- 2014-09-05 EP EP14841950.0A patent/EP3024764B1/en active Active
- 2014-09-05 US US14/916,997 patent/US9878860B2/en active Active
- 2014-09-05 SG SG11201601271PA patent/SG11201601271PA/en unknown
- 2014-09-05 JP JP2016539371A patent/JP6349400B2/en not_active Expired - Fee Related
- 2014-09-05 ES ES14841950.0T patent/ES2674379T3/en active Active
- 2014-09-05 AU AU2014317750A patent/AU2014317750B2/en not_active Ceased
- 2014-09-05 TW TW103130885A patent/TWI630160B/en not_active IP Right Cessation
- 2014-09-05 CA CA2922978A patent/CA2922978C/en active Active
- 2014-09-05 EA EA201690419A patent/EA032212B1/en not_active IP Right Cessation
- 2014-09-05 MX MX2016002236A patent/MX2016002236A/en active IP Right Grant
- 2014-09-05 MY MYPI2016700732A patent/MY176227A/en unknown
- 2014-09-05 CN CN201480047687.2A patent/CN105579371B/en not_active Expired - Fee Related
- 2014-09-05 DK DK14841950.0T patent/DK3024764T3/en active
- 2014-09-08 AR ARP140103339A patent/AR099348A1/en active IP Right Grant
-
2016
- 2016-03-03 IL IL24441416A patent/IL244414B/en not_active IP Right Cessation
- 2016-03-04 CL CL2016000497A patent/CL2016000497A1/en unknown
- 2016-03-04 PH PH12016500426A patent/PH12016500426B1/en unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3653526A (en) * | 1970-07-02 | 1972-04-04 | Catalyst Services Inc | Dry product loading apparatus |
US5807059A (en) * | 1994-11-22 | 1998-09-15 | Kabuki Construction Co., Ltd. | Ready mixed concrete conveying apparatus |
Non-Patent Citations (1)
Title |
---|
See also references of WO2015031981A1 * |
Also Published As
Publication number | Publication date |
---|---|
AU2014317750B2 (en) | 2018-02-22 |
US9878860B2 (en) | 2018-01-30 |
SG11201601271PA (en) | 2016-03-30 |
PH12016500426A1 (en) | 2016-05-16 |
KR20160051885A (en) | 2016-05-11 |
JP6349400B2 (en) | 2018-06-27 |
CA2826315A1 (en) | 2015-03-06 |
PH12016500426B1 (en) | 2016-05-16 |
PL3024764T3 (en) | 2018-08-31 |
DK3024764T3 (en) | 2018-06-25 |
US20160214807A1 (en) | 2016-07-28 |
EP3024764A4 (en) | 2017-03-29 |
PT3024764T (en) | 2018-06-18 |
CL2016000497A1 (en) | 2016-10-07 |
TW201524875A (en) | 2015-07-01 |
JP2016535711A (en) | 2016-11-17 |
EP3024764B1 (en) | 2018-03-28 |
EA201690419A1 (en) | 2016-08-31 |
IL244414B (en) | 2019-10-31 |
AR099348A1 (en) | 2016-07-20 |
CN105579371B (en) | 2018-02-02 |
CN105579371A (en) | 2016-05-11 |
CA2922978A1 (en) | 2015-03-12 |
TWI630160B (en) | 2018-07-21 |
IL244414A0 (en) | 2016-04-21 |
ES2674379T3 (en) | 2018-06-29 |
MX2016002236A (en) | 2016-10-07 |
LT3024764T (en) | 2018-07-10 |
CA2922978C (en) | 2021-04-27 |
WO2015031981A1 (en) | 2015-03-12 |
EA032212B1 (en) | 2019-04-30 |
MY176227A (en) | 2020-07-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3024764B1 (en) | Elevation conveyance system | |
AU2014317750A1 (en) | Elevation conveyance system and method | |
JP6357287B1 (en) | Method for discharging powder particles that are stuck inside the hollow structure | |
US7168119B1 (en) | Aircraft passenger boarding bridge having a chute for transport of baggage between boarding bridge and ground level | |
JP2008162311A (en) | Freight falling prevention device for motor-truck | |
CN112298914A (en) | Bulk material bag feeding equipment | |
AU3639197A (en) | Goods handling system | |
KR101345143B1 (en) | Safety Deck for Construction and Method Thereof | |
JP2018047866A (en) | Flight cargo handling transportation device | |
CN104816957A (en) | Mobile environment-friendly fertilizer loading hopper for light portal bulk cargo ship unloader | |
DE102006019220A1 (en) | Freight helicopter, with a cargo hold, has an assembly of cables to move loads in and out of an opening into the hold | |
CN1141872A (en) | Apparatus for loading loose goods on ship | |
US3042238A (en) | Containers for transporting and dumping materials | |
CN112693805B (en) | Useless ton of danger package bag breaking unloader and useless landfill system of danger | |
CN214003015U (en) | Bulk material bag feeding equipment | |
US3438681A (en) | Method and apparatus for handling particulate matter | |
CN205294331U (en) | Safe dustless car unloader of unloading | |
CN218841097U (en) | Automatic change feeding system | |
US20230312251A1 (en) | Systems and methods for handling particulate material | |
CN219545899U (en) | Bulk material track lifting self-discharging device | |
CN220950220U (en) | Loading system for sealing barrel of combined sampling machine | |
CN111017587B (en) | Long-stroke powdery material loading equipment | |
EP3260404A1 (en) | Cargo handling device | |
CN2412880Y (en) | Building cradle lifting safety device | |
CN109592117A (en) | Found box Bulk Grain Stuff (to) method for loading and unloading and bulk grain binning funnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20160225 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RAX | Requested extension states of the european patent have changed |
Extension state: BA Payment date: 20160504 Extension state: ME |
|
RAX | Requested extension states of the european patent have changed |
Extension state: BA Payment date: 20160504 |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20170228 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B66B 9/16 20060101ALI20170222BHEP Ipc: E04G 3/28 20060101ALI20170222BHEP Ipc: B01J 8/00 20060101ALI20170222BHEP Ipc: B66C 17/06 20060101ALI20170222BHEP Ipc: B65G 65/32 20060101AFI20170222BHEP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602014023144 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: B65G0049000000 Ipc: B65G0065320000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04G 3/28 20060101ALI20170830BHEP Ipc: B01J 8/00 20060101ALI20170830BHEP Ipc: B65G 65/32 20060101AFI20170830BHEP Ipc: B66C 17/06 20060101ALI20170830BHEP Ipc: B66B 9/16 20060101ALI20170830BHEP |
|
INTG | Intention to grant announced |
Effective date: 20170915 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAL | Information related to payment of fee for publishing/printing deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR3 |
|
GRAR | Information related to intention to grant a patent recorded |
Free format text: ORIGINAL CODE: EPIDOSNIGR71 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
INTC | Intention to grant announced (deleted) | ||
INTG | Intention to grant announced |
Effective date: 20180208 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 983211 Country of ref document: AT Kind code of ref document: T Effective date: 20180415 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014023144 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Ref document number: 3024764 Country of ref document: PT Date of ref document: 20180618 Kind code of ref document: T Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20180611 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20180618 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2674379 Country of ref document: ES Kind code of ref document: T3 Effective date: 20180629 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20180328 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 5 |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: MAVIRO CATALYST CANADA INC. |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20180622 Year of fee payment: 17 Ref country code: BG Payment date: 20180926 Year of fee payment: 5 Ref country code: SE Payment date: 20180910 Year of fee payment: 5 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PT Payment date: 20180831 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014023144 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: GR Ref legal event code: EP Ref document number: 20180401756 Country of ref document: GR Effective date: 20190109 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20190103 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 983211 Country of ref document: AT Kind code of ref document: T Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180930 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180930 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20190912 Year of fee payment: 6 Ref country code: FR Payment date: 20190913 Year of fee payment: 6 Ref country code: NO Payment date: 20190910 Year of fee payment: 6 Ref country code: DE Payment date: 20190903 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20190917 Year of fee payment: 6 Ref country code: GR Payment date: 20190910 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20190905 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180905 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20191001 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MM4D Effective date: 20190905 |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: MAE |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20190930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200305 Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190906 Ref country code: LT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190905 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190905 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180328 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180728 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 983211 Country of ref document: AT Kind code of ref document: T Effective date: 20190905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190905 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602014023144 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: MMEP |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20201001 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200905 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210401 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 Ref country code: GR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210406 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200905 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20220114 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190905 Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200906 |