EP2971492A2 - Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well - Google Patents
Method for determining a position of a water/cement boundary between pipes in a hydrocarbon wellInfo
- Publication number
- EP2971492A2 EP2971492A2 EP14710316.2A EP14710316A EP2971492A2 EP 2971492 A2 EP2971492 A2 EP 2971492A2 EP 14710316 A EP14710316 A EP 14710316A EP 2971492 A2 EP2971492 A2 EP 2971492A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- well
- tool
- signals
- hyperbola
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000004568 cement Substances 0.000 title claims abstract description 64
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 30
- 238000000034 method Methods 0.000 title claims abstract description 27
- 239000004215 Carbon black (E152) Substances 0.000 title claims abstract description 15
- 229930195733 hydrocarbon Natural products 0.000 title claims abstract description 15
- 150000002430 hydrocarbons Chemical class 0.000 title claims abstract description 15
- 238000001914 filtration Methods 0.000 claims abstract description 9
- 239000011159 matrix material Substances 0.000 claims description 9
- 238000012545 processing Methods 0.000 claims description 7
- 239000006096 absorbing agent Substances 0.000 claims description 4
- 230000004913 activation Effects 0.000 claims description 4
- FGUUSXIOTUKUDN-IBGZPJMESA-N C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 Chemical compound C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 FGUUSXIOTUKUDN-IBGZPJMESA-N 0.000 claims 1
- 230000005291 magnetic effect Effects 0.000 description 24
- 239000004020 conductor Substances 0.000 description 22
- 239000003990 capacitor Substances 0.000 description 12
- 238000004519 manufacturing process Methods 0.000 description 10
- 230000015572 biosynthetic process Effects 0.000 description 7
- 239000000463 material Substances 0.000 description 6
- 238000004088 simulation Methods 0.000 description 6
- 241000191291 Abies alba Species 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 230000008859 change Effects 0.000 description 4
- 238000005553 drilling Methods 0.000 description 4
- 230000006698 induction Effects 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 125000004122 cyclic group Chemical group 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000010304 firing Methods 0.000 description 3
- 239000012530 fluid Substances 0.000 description 3
- 239000004033 plastic Substances 0.000 description 3
- 229920003023 plastic Polymers 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 230000003213 activating effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 2
- 238000003491 array Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000013500 data storage Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000005294 ferromagnetic effect Effects 0.000 description 2
- 230000004907 flux Effects 0.000 description 2
- 238000011835 investigation Methods 0.000 description 2
- 230000010355 oscillation Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 229920005372 Plexiglas® Polymers 0.000 description 1
- 230000005534 acoustic noise Effects 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000012267 brine Substances 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 230000003467 diminishing effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005674 electromagnetic induction Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000003302 ferromagnetic material Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000696 magnetic material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000010358 mechanical oscillation Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000012811 non-conductive material Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000004926 polymethyl methacrylate Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/005—Monitoring or checking of cementation quality or level
Definitions
- the present invention relates to a method and system for determining a position of a water/cement boundary in an annular area between two concentric pipes in a hydrocarbon well.
- Cavities are often filled with a material for insulation or other purposes. In one instance this can for example be a tank with double walls where the cavity between the walls is filled with cement or other hardening material. In another instance it can be a special purpose building, for example a power station having walls where the cavity is filled with cement. Sometimes it may be necessary to ascertain the quality of the filling but where there are difficulties due to inaccessibility or safety reasons.
- a cavity is the annular space between the casing strings of a hydrocarbon well.
- a typical hydrocarbon well construction consists of a number of coaxial pipes called casing strings that are successively installed in the well as the drilling progresses.
- the first pipe (conductor pipe) is set in the well by being bonded to the surrounding formation with cement that is pumped down the pipe and allowed to flow up in the space between the conductor pipe and the surrounding ground.
- a second casing normally called surface casing is installed in the well and again the casing is set by filling the annular space between the pipe and the borehole resp. conductor pipe with cement.
- successive casing strings with diminishing diameters are introduced into the borehole and hung off from the wellhead.
- production tubing is installed into the well down to the producing formation and the casings are perforated to allow fluids to enter the well to flow up through the tubing and through the Christmas tree into a flowline.
- cementing each pipe the normal practice is to calculate the amount of cement needed, based on the annular space and the length of the space designed to be filled. However, it is often difficult to calculate the exact amount of cement needed and the cement level may be lower than intended.
- surface casing it is desirable to fill the annular space all the way up to the mudline (seabed), but this may not always be achieved, leading to so-called cement shortfall.
- the top of the surface casing may therefore be filled with a fluid (water or brine) instead of cement resulting in that the surface casing string is not bonded to the conductor pipe all the way up to the mudline.
- a fluid water or brine
- the part of the surface casing that is not cemented can be regarded as a free-standing column that, if subjected to loads, can be damaged.
- the surface casing carries a wellhead and is the principal load-carrying structure for the equipment mounted on top of the wellhead. It serves both the purpose of being a foundation for external loads, such as production equipment (Christmas tree) and for borehole support against the formation.
- a well will be subjected to various loads during its lifetime.
- a BOP and riser is attached to the Christmas tree, the riser extending to the surface.
- the movements of the riser and the use of drilling equipment can set up cyclic loads in the wellhead and the surface casing string (See Fig. 1). This may induce fatigue in the casing string.
- heating and cooling of the casing may induce loads that can lead to fatigue problems and deformation of the casing.
- the main purpose of the invention is therefore to find he level of the cement from which the length of the column can be determined.
- the wellhead is subjected to external loads, as explained above. How this affects the wellhead depends on the length of the free standing column. A longer column will be more vulnerable to fatigue. If the length of the free standing column can be determined it can be calculated how much load the wellhead can be subjected to and this will in turn determine how much work that can be done. This enables an operator to predict the operational lifetime of the well and to ensure the integrity of the well structure.
- One method for non-destructive logging of layers of different materials comprises the creation of a magnetic pulse within a pipe to cause the pipe to act as an acoustic transmitter.
- a magnetic pulse within a pipe to cause the pipe to act as an acoustic transmitter.
- US Patent No. 6595285 where there is described a method and device for emitting radial seismic waves using
- the transmitter is located such that the acoustic waves only have to traverse one pipe wall, e.g. the conductor pipe. If the device is to be located in a fully completed well there is the challenge to create a signal that is both strong enough to penetrate through several different casing pipes and to be able to distinguish between the reflected signals from the various casings.
- US-4805156 is directed to an apparatus and method for obtaining azimuthally dependent measurements for evaluating the casing cement bond quality.
- the apparatus and method employ a plurality of sonic transducers disposed in near contact with the casing in defined segmented locations about or around the exterior surface of a downhole tool.
- the transducers are arranged in a plurality of arrays, each array comprising four transducers, two transmitting and two receiving transducers, disposed along a single arc about or around the exterior of the tool.
- the transducers are arranged so that two adjacent transducers in each array perform the same function in the array so that the bond quality between the similarly
- transducers provide determinations in a continuous and complete loop around the casing.
- the casing cement bond quality is determined by measuring the attenuation of the compression wave from a pulsed acoustic wave traveling along the arcs of the helices.
- the invention relates to a method for determining a position of a water/cement boundary in an annular area between two concentric pipes in a hydrocarbon well, as set forth in the appended independent claim 1.
- the invention also relates to a system for determining a position of a water/cement boundary in an annular area between two concentric pipes in a hydrocarbon well, as set forth in the appended independent claim 1 1.
- Fig. 1 is a simplified sketch of a completed well supported by the seabed
- Fig. 2 is a partial illustration of the well of fig. 1 , showing the instrument located in the production tubing;
- Fig. 3 is an illustration of a well tool according to the invention.
- Fig. 4 is a schematic diagram of an induction coil with its associated circuitry
- Fig. 5 is a schematic view of an induction coil and accompanying field lines
- Fig. 6 is a schematic view of an induction coil according to the present invention
- Fig. 7 illustrates a reflected signal from one pulse
- Fig. 8 illustrates a simulation of reflected signals from several pulses fired at different heights in a well
- Fig. 9 illustrates theoretical waveforms at the boundary between water/cement
- Fig. 10 illustrates reflected signals from several pulses after processing, where the theoretical waveforms from fig. 9 are overlaid.
- Fig. 1 1 illustrates how the cement level may be deduced from fig. 10.
- FIG. 1 there is shown an illustrative embodiment of a completed hydrocarbon well 1.
- the well is completed with a wellhead 2, production tubing 3, a first intermediate casing 4, a second intermediate casing 5, surface casing 6 and conductor casing 7.
- the annulus between the surface casing 6 and the conductor 7 is shown filled with cement 8.
- Cement is normally provided between the drilled hole and the conductor casing, and between the conductor casing and the surface casing.
- the annular space between the conductor and the surface casing should ideally be filled with cement all the way to the wellhead.
- the annular spaces between the other casings are normally only filled partway up from the bottom with cement, the amount determined by the formation characteristics.
- the top end of the production tubing is connected to a tubing hanger that in turn is anchored in the well head or Christmas tree (depending on type of completion) while its lower end is fastened in the first casing with a production packer, as is well known in the art.
- fig. 2 there is shown a part of the well in vertical section showing the casing strings and with the position of the pulse generator 14 and receiver 16 indicated inside the production tubing 3. There are also lines indicating the signals going from the pulse generator and being reflected back to the receiver.
- Fig. 3 there is shown a sketch of the well tool 10 intended to be used in a well pipe.
- the tool 10 comprises a tool housing 1 1 , and a first pulse generator 14 for generating an electromagnetic pulse, which due to the magnetic properties of the pipe will cause the pipe to vibrate.
- the tool 10 further comprises signal recorder(s)
- a second pulse generator 34 is also located within the housing 1 1. It is preferably located within a short distance from and above the first pulse generator 14. The distance between the pulse generator centers may for example be around 120 mm. With an inductor length (height) of about 70 mm this means they are located about 50 mm apart. Other distances may be suitable.
- the housing 1 1 is preferably a steel tube that will fit in the well. However, in the region of the pulse generator(s) the tube should be made of a material that is transparent of the magnetic pulses such as glass or plastic. The pulse generators would preferably be held in place in the housing using plates (not shown) that also preferably are made of plastic or Plexiglas.
- Each pulse generator 14, 34 that is housed within the tool 10 further comprises a power supply and charging device 22 and a data storage system 24. Further the tool may comprise a cable head 26 for attaching the tool to a cable 30. The cable 30 communicates between the tool and the surface control equipment that may comprise a first control unit 32 for the control of the tool, and a second control unit 33 for receiving and processing data from the tool.
- An ultrasonic absorber (not shown) may be located between the pulse generators and also between the pulse generator(s) and the signal recorder(s) to avoid unwanted noise in the system.
- the tool may be coupled to a tractor or similar device for moving the tool in the well.
- Each pulse generator 14, 34 comprises an inductor Ls and a power supply device HV, c, which, in use, supplies electrical power to the inductor Ls. Thereby an electromagnetic pulse is generated.
- the tool and the well pipe are arranged in such a way that the electromagnetic pulse is providing physical vibrations in the well pipe.
- the well pipe may be made, at least partly, of a magnetic material.
- Each inductor may comprise a metallic core, the metallic core may e.g. be a cylinder.
- the power supply device HV may be separate for each pulse generator 14, 34.
- one common power supply device HV may be used for each pulse generator.
- the cross sectional gap area Agap of an annular gap between an outside of the inductor Ls and an inner surface of the well pipe is substantially equal to an inner cross sectional area Ainner of the inductor Ls.
- substantially equal may, e.g. mean that the ratio between the cross sectional gap area Agap and the inner cross sectional area Ainner is in the range 0.7 to 1.3. More advantageosly, the area ratio may be in the range 0.9 to 1.1 , and even more advantageously, the area atio may be in the range 0.95 to 1.05. Particularly advantageously, the cross sectional gap area Agap is equal to the inner cross sectional area Ainner.
- the well tool 10 may advantageously comprise a centralizing device which is configured to positioning the well tool 10 in a central position within the well pipe.
- the inductor may advantageously have an inductance in the range of 10 * 10 "6 H to 40* 10 ⁇ 6 H.
- the power supply device may advantageously comprise a capacitor, c, connected to the inductor, Ls, wherein the capacitor, c, is configured to discharge its energy over the inductor.
- the power supply device may comprise a switch, s, connected between the inductor Ls and the capacitor c.
- the well tool 10 is provided for determining or measuring the presence or absence of cement in an annular area between two concentric pipes in a hydrocarbon well.
- the well tool comprises a tool housing 1 1 , a firstpulse generator 14 and a second pulse generator 34 provided within the tool housing 1 for generating a magnetic field, where each pulse generator 14, 34 comprises an inductor, Ls, and a power supply device, HV, c, for supplying electrical power to the inductor Ls and thereby providing that an electromagnetic pulse is generated, in such a way that the electromagnetic pulse provides physical vibrations in the pipe being closest to the first pulse generator 14.
- the well tool further comprises at least one signal recorder 16 provided within the tool housing 1 1 for recording reflected acoustic signals from the well.
- a first distance, HI between the signal recorder 16 and the first pulse generator 14 is substantially equal to a second distance, H2, between the first pulse generator 14 and the annular area.
- substantially equal may, e.g. mean that the ratio between the first distance HI and the second distance H2 is in the range 0.7 to 1.3. More advantageously, the distance ratio may be in the range 0.9 to 1.1 , and even more advantageously, the distance ratio may be in the range 0.95 to 1.05.
- the first distance HI and the second distance H2 are equal.
- the well tool 10 may comprise a centralizing device which is configured to positioning the tool 10 in a central position within the well pipe.
- the second distance H2 may advantageously be measured in a radial direction in relation to the well from the center axis of the inductor Ls and the center of the annular area.
- the well tool 10 may advantageously be provided in the innermost pipe of the well.
- the first pulse generator 14 may e.g. be located at a distance between 10 and 20 cm from the signal recorder 16.
- the well tool 10 may comprise an ultrasonic absorber 15 located between the pulse generator 14 and the signal recorder 16.
- the signal recorder may be located above the pulse generators 14, 34.
- a second signal recorder may also be arranged, and in particular, it may be located in close proximity to the first signal recorder.
- a third signal recorder may also be arranged, and in particular, it may be located below the first pulse generator 14, at the distance substantially equal to or equal to HI below the pulse generator.
- the tool 10 may thus comprise signal recorder(s)
- a preferred signal recorder may be a hydrophone.
- the tool 10 may be held in a central position by centralizers (not shown).
- the pulse generators 14, 34 are housed within the tool 10 that may further comprise a power supply and charging device 22 and a data storage system 24. Further, the tool may comprise a cable head 26 for attaching the tool to a cable 30.
- the cable 30 may provide communication between the tool and control equipment, for example surface control equipment that may e.g. comprise a first control unit 32 for the control of the tool, and a second control unit 33 for receiving and processing data from the tool.
- An sound absorber may be located between the pulse generator 14 and the signal recorder(s) and may be used to prevent acoustic pulses from the inductor to reach the signal recorder and create noise in the system.
- the tool may be coupled to a tractor 20 or similar device for moving the tool in the well.
- Fig. 3 there are shown three signal recorders. However, there may be only one located above or below the pulse generators or there may be one located above and one located below. In a preferred embodiment there is only one signal recorder which preferably is located above the pulse generators.
- the distance between the pulse generators and the signal receiver in relation to the distance to the target may have significant effect.
- the outward waves travels outwards to the D annulus and get reflected back as acoustic waves to the signal recorder.
- the standard nominal diameter of a surface casing is 20 inches (50 cm) and a normal size for the conductor casing is 30 inches (75 cm). If we regard the center of the well as the datum, the signals will only have traveled 25 - 35 cm before they reach the surface casing resp. the conductor pipe.
- the distance HI between the pulse generator 14 and the closest signal receiver 16 is indicated.
- the distance H2 between the pulse generator 14 and the D annulus is indicated.
- the distance H2 is indicating the horizontal distance between the center axis of the pulse generator 14 and the center of the D annulus.
- the separation becomes very important. This technology would not give satisfying results in the confined environment of a well.
- the applicant has found that a particularly advantageous result is obtained when the distance HI between the first pulse generator 14 and the signal recorder is substantially equal to, or equal to, the distance H2 between the first pulse generator 14 and the annulus being analyzed.
- the signal recorder should be located about 30 cm from the first pulse generator 14 when the D annulus is analyzed. But a small deviation from this is possible so between 20 and 40 cm will still enable a good separation of reflected signals.
- the signal recorders both above and below the first pulse generator 14 they should both be the same distance (HI) from the first pulse generator 14.
- they are preferably placed as close to each other as possible.
- the first pulse generator 14 comprises a charging device, for example a high voltage power supply HV for charging an energy storage device, for example a capacitor C.
- the capacitor C is connected to a series connection of a switching device S, at least one inductor L and a resistor device R.
- the at least one inductor L is represented by a first inductor Ls and a second inductor Li.
- the second inductor Li is shown only to illustrate self inductance, i.e. internal inductance in the pulse generator 14.
- the switch is turned off.
- the voltage Uo is applied by the high voltage power supply HV to the capacitor C for charging the capacitor.
- the switch is turned on, and the capacitor C will discharge by supplying a current I through the inductor MS and the resistor R.
- the current through the magnetic inductor MS generates the electromagnetic signal pulse which will result in mechanical action on the pipes in the well.
- the inductor MS comprises a coil 42 with a number of turns, where the number of turns is
- a supporting sleeve 43 (shown in fig. 6) may be arranged to support the coil 42 during use and also during production of the coil. When current passes through the inductor Ls it will produce a magnetic field as shown in the figure 5.
- Inductance results from the magnetic field forming around a current- carrying conductor. Electric current through the conductor creates a magnetic flux proportional to the current. A change in this current creates a corresponding change in magnetic flux which, in turn, by Faraday's law generates an electromotive force (EMF) in the conductor that opposes this change in current. Thus inductors oppose changes in current through them. Inductance is a measure of the amount of EMF generated per unit change in current.
- an inductor with an inductance of 1 Henry produces an EMF of 1 volt when the current through the inductor changes at the rate of 1 ampere per second. It is this electromotive force that is exploited in the invention.
- the inductor When the inductor is placed within a pipe having magnetic properties, the magnetic pressure from the inductor is converted into a mechanical pressure that sets the pipe in motion, as shown in Fig. 5.
- An inductor is usually constructed as a coil of conducting material, typically copper wire, wrapped around a core either of air or of ferromagnetic or nonferromagnetic material. When current is delivered through the inductor, magnetic field lines will form around the coil as shown in Fig. 4.
- the inductance (in Henry) is presented by the general formula for a type of induction coil called an "air core coil". _ ⁇ 0 ⁇ 2 ⁇
- A area of cross-section of the coil in square meters (m 2 )
- the present invention may, in an exemplary aspect, use an "air core coil” that does not use a magnetic core made of a ferromagnetic material.
- the term also refers to coils wound on plastic, ceramic, or other nonmagnetic forms. Air core coils have lower inductance than ferromagnetic core coils. If the coil is not placed into a conductive pipe the field lines inside the inductor will be closer together and therefore the field will be stronger on the inside than outside. This kind of coil directs the magnetic pressure outwards, i.e. the magnetic pressure acts to the inductor extending it in a radial direction.
- the inductor When the inductor is placed within a conductive screen, e.g. a metal pipe such as tubing the field in the gap between the inductor and pipe will be much stronger than inside the inductor. This effect will depend on the size of the gap and will be strongest when the gap is small.
- the magnetic pressure then acts to the inductor compressing it in the radial direction.
- the inventors have found that particularly advantageous result for limiting noise in the recorded signals depends on the position of the first inductor Ls and also the size of the inductor Ls in relation to the conductive pipe. This is realized when the cross sectional area of the annular gap area around the coil is equal to the cross sectional area of the inductor inner cross section.
- cross sectional gap area Agap can be expressed as:
- the cross sectional area Ainner of the inductor inner cross section can be expressed as: di _ ⁇
- the coil may be wound around a supporting sleeve 26 of a non-conductive material.
- the length of the inductor is 1.
- a conductive (metallic) cylinder is arranged inside the coil. This will function as a balancing element, allowing equalized magnetic pressures inside and outside coil. Due to its mechanical strength it will actually not generate acoustic noise itself. In this case the gap between coil and pipe can be reduced and this may result in lower energy consumption needed for generating of strong enough magnetic field.
- the pulse generator In use, the pulse generator is charged up, and when the switch is closed, the inductor will discharge an electromagnetic pulse. The pulse will transmit to the pipe and set the pipe in oscillation. This oscillation excites from the pipe and propagates as pressure pulses through the layers of pipes. As it reaches each layer the pipes will be set in motion and this motion creates acoustic waves that will be reflected back and be recorded by the signal recorder.
- Several exemplary tests have been performed, using different values and
- the switch is turned off.
- the voltage Uo is applied over the capacitor C for charging the capacitor until a voltage of 3 - 15 kV is achieved, as mentioned above.
- the voltage Uo is applied via the wire 12.
- the switch is turned on, and the capacitor will discharge by supplying a current I through the magnetic device L and the resistor R.
- the switch was turned on for periods between 20 - 200 ⁇ . Even shorter periods of 4 - 20 have also been tested. This short duration is achieved by the geometry of the coil.
- the current I will, with the values given above, have an amplitude value in the range of 5 - 20 kA.
- the current through the magnetic device MS will generate an electromagnetic signal pulse which will result in mechanical oscillations of the pipes in the well.
- the best results were achieved with an energy of the electromagnetic signal of 0, 1 - 3 kJ.
- a reflected signal is shown in Fig. 7.
- the reflected signals coming from the nearest pipe(s) are very strong but get progressively weaker the further away from the signal recorder they are, in the graph this is shown as response time. Therefore, reflections from the area of the "D" annulus are very weak and difficult to interpret.
- the tool may be positioned at various locations in the tubing. According to such an approach, the tool is positioned at a point in the well a distance below the inferred cement level location. The tool is then moved upwards at small intervals, preferably around 4 cm. At each position the first pulse generator is activated. Each time the first pulse generator is activated a signal of the type shown in Fig. 7 is recorded by the signal recorder. Data representing the acoustic reflections is recorded by means of the signal recorder. The recorded data is transferred to the analyzing device 18 for performing the analysis.
- the output from the analyzing device is a time-delayed signal that is depicted as lines and curves on a monitor. But for further analysis a two dimensional matrix is used where the columns represent depth of the well and each row represents the time of returned signals. Each element will then show strength of signal. This matrix will be used for the subsequent 2D filtering, as discussed below.
- a production tubing string is made up of lengths of pipe connected together using couplings. At the couplings the tubing has a larger wall thickness than the ordinary pipe. This thicker pipe may result in weaker signals and result in more unwanted noise.
- the invention envisages keeping the tool stationary and using sequential firing of two pulse generators to control the strength and direction of the acoustic pulses. The inventors have found that by varying the timing of the sequential activation of the pulse generators we can maximize the signal strength and in this way direct the signal at specific angles. In this way we can effectively make a "sweeping" of the acoustic beam.
- a good result can be obtained by increasing the time interval between firing in increments of 10 between each sequential activation of the pulse generators.
- the increments may be in the range 5 to 20 ⁇ .
- Activating the two pulse generators 14, 34 at the same point of time (0 interval) will propagate the strongest signal in a horizontal plane.
- the interval can be increased by the increment (e.g., 10 ⁇ ), up to a maximum interval.
- a practical duration of the maximum interval has been found to be about 200 ⁇ which will result in a maximization of the signal at ⁇ 45°.
- the interval may be in the range 0 ⁇ to 400 ⁇ .
- Advantageous results have been achieved when the interval is varied, in particular incrementally increased, e.g. within the range of 140 ⁇ to 340
- first pulse generator 14 If the upper, first pulse generator 14 is activated first the signal will be directed at a downwards angle. Conversely, by activating the lower, second pulse generator 34 first, the signal will be directed upwards.
- the activation of the pulse generators in this manner enables us to build up the hyperbola picture and thus determine the cement/water boundary.
- An advantageous effect of generating a first and second electromagnetic pulses by means of the first and second pulse generators, wherein the pulses are separated by a time interval, thereby providing physical vibrations in the central pipe of the well; recording reflected acoustic signals from the well by means of the signal recorder; and repeating steps the generating and recording steps with different time intervals of the pulse generators in the well, is that an appropriate scan may be achieved without moving the well tool's vertical position.
- the method includes a step of running a well tool 10 into a central pipe of the well.
- the well tool may e.g. be of a type which has been presented earlier in the present disclosure.
- the well tool 10 comprises a tool housing 1 1 , at least a first and a second pulse generators 14, 34, and a signal recorder 16 provided within the housing 1 1.
- a first and a second electromagnetic pulses are generated by means of the pulse generators 14, 34 included int the well tool housing 1 1. Thereby physical vibrations are provided in the central pipe of the well.
- the first and second pulses are separated by a time interval.
- reflected acoustic signals are recorded from the well by means of the signal recorder 16 included in the well tool housing 1 1.
- the two former steps of generating pulses and recording reflected acoustic signals are then repeated for different time intervals of the pulse generators in the well.
- the repeating may be controlled by the control equipment 32, 33, which includes the first control unit 32 for controlling the well tool 10 and a second control unit 33 for receiving and processing data from the well tool 10.
- the recorded signals are organized in a two-dimensional representation.
- the organizing may be performed by the control equipment 32, 33.
- the organized recorded signals are filtered in order to identify, in the two- dimensional representation, a hyperbola B.
- the filtering may be performed by the control equipment 32, 33.
- an apex of the hyperbola B is found or identified as the determined position of the water/cement boundary in the annular area between the two concentric pipes in the hydrocarbon well.
- the determinatio of the apex may be performed by the control equipment 32, 33.
- the method also includes computing a tip point of the hyperbola B by means of one hyperbola leg and parameters of the well pipe structure, in particular known positions of the two concentric pipes, where the tip point of the hyperbola B represents the water/cement boundary. This may also be performed by the control equipment 32, 33.
- the two-dimensional representation in which the recorded signals are organized may in an advantageous aspect include a two-dimensional matrix with the relationship between the height, or vertical position, in the well and the time delay of the reflected acoustic signal.
- Each element of the matrix may advantageously include a numerical value which represents a signal strength value of the recorded signals. More particularly, the matrix may include column positions that correspond to vertical positions in the well and row positions that correspond to acoustic time delay values.
- a filter may be used in the filtering steps to filter out signals with a direction of propagation that is perpendicular to an axis of the well tool.
- Fig. 8 there is shown a diagram of reflected signals after having positioned the tool at several locations and thereby representing the recorded signals from the total number of pulses.
- the vertical lines show the waves coming from the edges, i.e. the pipes. Since we know the strength of the signals, the speed of the acoustic waves and the dimensions of the system we can reliably predict which lines represent which pipe. This will give us a horizontal position of the pipe of interest (the conductor or surface casing). It should be noted that in fig.
- the signals are from an experimental setup with known cement/water boundary and it was known where the cement was (indicated by dashed line) and where the water was located (indicated by dashed circle). However, as seen in fig. 8, it is not possible to see the difference between the signals representing water from signals representing cement. In fig. 8, the darker lines representing the pipes 4, 5, 6 and 7 from fig. 1 are indicated.
- the theoretical simulation may give us the hyperbolas B with a shape as indicated in fig. 9.
- the apex of one of the hyperbolas B is also indicated in fig. 9.
- the picture shown in Fig. 10 represents exemplary signals received by the signal receiver when firing the pulse generators as disclosed, wherein the cement/water boundary is present in the model of the well. Hence, the cement/water boundary is expected to be found.
- the received signals are placed into a two dimensional matrix where each element is a numerical value representing the strength of the signal.
- the columns are the vertical position in the well and the rows are the time delay value.
- a filter may therefore be used on the signals illustrated in fig. 10 in order to reduce noise.
- the result of the filtering process is shown in fig. 1 1.
- a signal area BA indicated by a dashed circle. This area is found to represent the apex of a part of the upper half section of the hyperbola B from fig. 9.
- the hyperbola B can be drawn as shown in fig. 1 1.
- the tip of the hyperbola (i.e. the horizontal line through the tip) represents the cement/water boundary.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- Quality & Reliability (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Length Measuring Devices Characterised By Use Of Acoustic Means (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP14710316.2A EP2971492A2 (en) | 2013-03-15 | 2014-03-17 | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2013/055407 WO2014139585A1 (en) | 2013-03-15 | 2013-03-15 | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well |
NO20130571 | 2013-04-25 | ||
PCT/EP2014/055285 WO2014140363A2 (en) | 2013-03-15 | 2014-03-17 | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well |
EP14710316.2A EP2971492A2 (en) | 2013-03-15 | 2014-03-17 | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2971492A2 true EP2971492A2 (en) | 2016-01-20 |
Family
ID=54842956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14710316.2A Withdrawn EP2971492A2 (en) | 2013-03-15 | 2014-03-17 | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP2971492A2 (en) |
-
2014
- 2014-03-17 EP EP14710316.2A patent/EP2971492A2/en not_active Withdrawn
Non-Patent Citations (1)
Title |
---|
See references of WO2014140363A3 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109831922B (en) | Improved underground electromagnetic acoustic transducer sensor | |
US10465509B2 (en) | Collocated multitone acoustic beam and electromagnetic flux leakage evaluation downhole | |
US9690000B2 (en) | System for measuring shear stress in downhole tubulars | |
US20200033494A1 (en) | Through tubing cement evaluation using seismic methods | |
US9341733B2 (en) | Method and apparatus for determining the nature of a material in a cavity between one inner metal wall and one outer metal wall | |
CA2758942A1 (en) | Casing thickness evaluation method | |
JP2013545980A (en) | System and method for communicating data between an excavator and a surface device | |
JPH07280947A (en) | Method and device for evaluating and/or measuring permeability of rock bed structure | |
US9581012B2 (en) | Well tool for use in a well pipe | |
CA2899667C (en) | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well | |
GB2627151A (en) | Estimation of formation and/or downhole component properties using electromagnetic acoustic sensing | |
EP2971460B1 (en) | Well tool for use in a well pipe | |
WO2014140363A2 (en) | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well | |
WO2019232016A1 (en) | Downhole flowmeter | |
EP2971492A2 (en) | Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well | |
WO2014139584A1 (en) | Well tool | |
US20220413176A1 (en) | Annulus Velocity Independent Time Domain Structure Imaging In Cased Holes Using Multi-Offset Secondary Flexural Wave Data | |
JPH07286490A (en) | Discharge type elastic wave layer detecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20151009 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170201 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20170613 |