EP2925936A1 - Double top suction pile and suction pile foundation - Google Patents

Double top suction pile and suction pile foundation

Info

Publication number
EP2925936A1
EP2925936A1 EP13824532.9A EP13824532A EP2925936A1 EP 2925936 A1 EP2925936 A1 EP 2925936A1 EP 13824532 A EP13824532 A EP 13824532A EP 2925936 A1 EP2925936 A1 EP 2925936A1
Authority
EP
European Patent Office
Prior art keywords
suction
suction pile
load bearing
bearing surface
seafloor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP13824532.9A
Other languages
German (de)
French (fr)
Other versions
EP2925936B1 (en
Inventor
Oene Jeljer DIJKSTRA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SPT Equipment BV
Original Assignee
Suction Pile Tech BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suction Pile Tech BV filed Critical Suction Pile Tech BV
Priority to EP20158104.8A priority Critical patent/EP3690145A1/en
Priority to PL13824532T priority patent/PL2925936T3/en
Publication of EP2925936A1 publication Critical patent/EP2925936A1/en
Application granted granted Critical
Publication of EP2925936B1 publication Critical patent/EP2925936B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0078Suction piles, suction cans

Definitions

  • the invention relates to a suction pile, a foundation made prom one or more suction piles and an offshore structure resting on a foundation of one or more suction piles.
  • a suction pile is a thin walled steel sleeve or pipe or cylinder, which cylinder is closed at its longitudinal top end by a bulkhead or different sealing means and which cylinder is sealingly located on the subsea bottom with the open end opposite the bulkhead since this open end penetrates the subsea bottom due to the weight of the suction pile.
  • the cavity also called suction space
  • suction space delimited by the cylinder and the bulkhead is sealed by the subsea floor such that vacuum or suction can be generated by removing water from within the suction space such that a resulting force tends to force the suction pile deeper into the subsea floor.
  • the creation of the suction can be with the aid of a suction source, such as a pump, being on, or close to or at a distance from the suction pile and connected to the suction space.
  • the applied level of the suction can be e.g. at least substantially constant, smoothly increase or decrease or else pulsate, for which there are convenient means .
  • the suction pile can easily be removed by creating an overpressure within the suction space, e.g. by pumping in (sea) water.
  • a self installing platform applying suction piles is known from e.g. W099/51821 (SIP1) or EP-A-1101872 (SIP2) of the present inventor.
  • WO 02/088.475 (Suction Pile Technology, SIP3) discloses a tower carrying a wind turbine at the top and suction piles as foundation.
  • US8025463 discloses an offshore foundation system having an assembly of spaced suction piles and a reaction base connecting the suction piles.
  • the closed suction pile top projects a distance above the bottom face of the reaction base such that, in use, a gap remains between the top of a soil plug inside the suction space and the closed suction pile top.
  • WO 03/099646 discloses a seabed anchor provided by a suction pile having within its suction space a seabed soil retaining means embodied by a top down oriented cone with sharp angled apex. This anchor is designed for a seabed of fluent mud .
  • suction piles One of the benefits of suction piles is that a marine structure can be designed to be self foundating or self installing by providing it with one or more suction piles. So the hoisting device and the plant for installing the foundation, e.g. hammering device, can be eliminated.
  • the structure is provided with one or more suction piles, removal after use is made easier in that by pressing out the suction pile, the anchoring of the structure to the underwater bottom can be removed.
  • each suction pile has one or more of: a diameter of at least 5 metres; a height of at least 5 metres; a wall thickness of at least 1 centimetre; the longitudinal axis of the suction pile and the relevant supporting leg (of the upper structure to be supported by the suction pile) are substantially in line.
  • the object of the invention is versatile. In an aspect the reliability and/or quality of the foundation is improved. In an aspect the installation of the foundation is facilitated. In an aspect removal of the foundation is facilitated.
  • the object is obtained by providing within the suction pile near the top bulkhead and spaced from this bulkhead a pre-installed, fixed load bearing surface designed to keep the suction pile immovable while the offshore structure resting onto it is in full operation and which load bearing surface preferably is fluid permeable to provide a fluid connection between the suction pile inner spaces above and below it.
  • the load bearing surface replaces the top bulkhead for the load bearing capacity it offers while used as a foundation body.
  • the suction pile provided with the load bearing surface is a prefabricated object, thus containing the load bearing surface prior to penetration of the suction pile into the seabed.
  • the load bearing surface is located within the suction space such that the suction space is present below and above the load bearing surface or, in other words, the suction spaces above and below the load bearing surface are in mutual fluid communication through the load bearing surface.
  • Such load bearing surface can be a flat metal sheet but also a conical shaped metal sheet or a grid or lattice of mutually crossing beams or a sheet of geotextile or geogrid (commonly named geosynthetics ) .
  • a grid/lattice/geosynthetic is fluid permeable by nature.
  • a metal sheet could be perforated or its outer circumference keeps a gap with the axial boundary of the suction pile.
  • the load bearing surface could also be provided by the lower face of a fluid permeable slab which completely fills the space between the top bulkhead and the bearing surface. Such slab could be prefabricated and subsequently mounted into the suction pile, or could be obtained by fabrication in situ by casting a material against the top bulkhead and allowing it to solidify.
  • Such slab could also be provided by a layer of non coherent granules, e.g. stones, retained by a sheet providing the load bearing surface, e.g. a permeable structure of interweaved wires or a perforated metal sheet, such that the granules are retained between the load bearing surface and the top bulkhead.
  • a sheet providing the load bearing surface e.g. a permeable structure of interweaved wires or a perforated metal sheet, such that the granules are retained between the load bearing surface and the top bulkhead.
  • Such slab could completely fill the space captured between the top bulkhead and the load bearing surface or could leave a gap with the top bulkhead.
  • the bearing load from the load bearing surface could be transferred to the suction pile side wall in which case the load bearing surface preferably is inflexible or rigid, e.g. provided with or made from stiffeners, e.g. I-beams.
  • incompressible elements e.g. the slab completely filling the space between the load bearing surface and the top bulkhead, or girders bridging the distance between the load bearing surface and the top bulkhead
  • incompressible elements e.g. the slab completely filling the space between the load bearing surface and the top bulkhead, or girders bridging the distance between the load bearing surface and the top bulkhead
  • the invention is based on the recognition that
  • the invention is directed to suction piles for foundations, in other words designed to carry the weight of an upper structure placed on top, to avoid that such upper structure sinks into the subsea bottom.
  • a foundation suction pile bears loads from the associated upper structure which tend to force the suction pile further into the ground.
  • the fixed bearing surface spaced below the top bulkhead is designed to prevent that the suction pile moves deeper into the subsea bottom due to the pushing loads generated by the weight of the upper structure.
  • a foundation suction pile is 5 by the nature of its loading different from a suction pile for anchoring, which anchoring suction pile must withstand pulling forces from the anchored object which tries to leave its desires location by trying to pull the anchoring suction pile out of the subsea bottom.
  • the load bearing surface is parallel to the top bulkhead; the suction required to penetrate the suction pile into the subsea bottom during installation is generated within the suction pile above the load bearing surface, preferably since the suction side
  • a suction pump means is connected to the suction space above the load bearing surface, e.g. the top bulkhead is provided with a nozzle or different sealable port for fluid connection of the suction space with a suction pump means; the diameter of the suction pile is constant over its height (the height
  • the foundation comprises one, two, three, four or more mutually spaced suction piles;
  • load bearing surface has a permeability of at least 10% or 20%, in other words at least 10% or 20% of the cross sectional surface area of the suction space at the level of the load bearing surface allows free passage of fluid between above and below the load bearing surface; the load bearing surface is at least
  • the cone shaped load bearing surface is shallow and the cone angle is obtuse, preferably is limited to between 180 (flat sheet) and 120 degrees; with the penetration of the suction pile into the sea floor completed, the top bulkhead is spaced from the sea floor and/or the load bearing surface bears onto the sea floor which is possibly at elevated level within the suction pile, compared to the seafloor level external from the suction pile, due to raising of the seabed plug within the suction space caused by penetration of the suction pile into the seabed;
  • the suction pile is also preferably provided with known as such valves and/or hatches adjacent or at its top bulkhead for selectively allowing water and air to enter or exit the suction space through the top side of the suction pile.
  • the suction pile preferably provided by an open bottom and closed top, advantageously cylindrical, elongate shell providing a suction compartment or suction space, said closed top having an externally facing upper face and an opposite, toward the suction space facing lower face and preferably provided with one or more valves selectively allowing fluid communication between the suction space and the environment, the suction space being provided with a preferably fixedly located load bearing surface oriented perpendicular to the longitudinal axis of the shell and there is a gap between said load bearing surface and the lower face of the closed top, which gap preferably is in fluid communication with the suction space and wherein, in use, the load bearing surface bears onto a top of a soil plug inside the suction space, the load bearing surface preferably being provided by the bottom surface of a sheet or slab like element which is preferably integrally formed with the suction pile.
  • Fig. 1 shows a side view
  • Fig. 2-13 show a top views, sectional side views and partly cutaway perspective views of four different embodiments of the suction pile; Fig. 14 and 15 show marine structures in perspective view.
  • Fig. 1 shows three stages during penetration of the suction pile into the sea floor by suction within the suction space.
  • the left hand stage is the initial stage in which the open bottom of the suction pile has penetrated the seabed by gravity, such that the suction space is sealed.
  • the central stage is obtained by removing water from the suction space by pumping, such that suction is created within the suction space such that the suction pile penetrates deeper into the seabed, thus it top comes closer to the seabed.
  • the right hand stage is the final stage in which the suction pile is penetrated to its final depth, providing its design load bearing capacity for a weight resting on top of it.
  • the load bearing surface 4 spaced below the top bulkhead is shown.
  • the top bulkhead 6 always is spaced from the sea floor 11.
  • Such seabed part captive within the suction space is also called soil plug.
  • Fig. 2-13 show suction piles having a load bearing surface
  • a pipe stud 5 penetrates the top bulkhead to connect the suction space with a suction source.
  • the suction space is bounded by the top bulkhead 6, the cylindrical side wall 7 and the open end 8. In all embodiments the distance between the top bulkhead and the load bearing surface measures 50 centimetre.
  • the load bearing surface 4 is the bottom side of a flat sheet keeping at its circumference an annular air and water gap with the wall 7.
  • Compression loaded girders 10 bridging the load bearing surface 4 and the top bulkhead 6 transfer the bearing load from the load bearing surface to the top bulkhead 6 through.
  • the girders leave openings 13 to allow fluid to pass the girders in the direction perpendicular to the longitudinal axis 14 of the suction pile.
  • the load bearing surface 4 has a cone shape and also keeps an air and water gap with the wall 7 at its outer circumference.
  • the opposite walls of the cone include an obtuse angle of 160 degrees, in other words the wall of the cone, vertically oriented resting on its apex, include an angle (referred to as a in the drawing) of 10 degrees with the horizontal.
  • a in the drawing the angle (referred to as a in the drawing) of 10 degrees with the horizontal.
  • the flat load bearing surface 4 tightly fits within the cylinder 7 thus the circumferential air and water gap is absent.
  • the sheet 4 is perforated to be air and water permeable.
  • the load bearing surface is the lower face 4 of a slab 9.
  • the slab 9 is air and water permeable and the face 4 is also air and water permeable.
  • the slab 9 could be replaced by a layer of incoherent gravel of same thickness, captive between the top bulkhead 6 and the face 4 provided by e.g. a perforated sheet or lattice.
  • Fig. 14 and 15 are examples of the upper structures to be supported by the suction piles 1.
  • the top of the upper structures is provided by a platform 2 above water level 3.
  • the marine structure can have a different number of suction piles.
  • the number of supporting legs by which the platform rests onto the suction piles is preferably equal to the number of suction piles, but this is not absolutely necessary.
  • three suction piles are at the corners of a structure that is triangular in top view. It is not required that the suction piles and supporting legs are at the corners of the structure.
  • the platform can be constructed and/or shaped differently.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

Suction pile for installation in the seafloor to operate as a foundation or part of it to support an offshore structure resting onto the seafloor, the suction pile having internally near the top bulkhead (6) and spaced from this bulkhead (6) a pre-installed, fixed load bearing surface (4) designed to keep the suction pile immovable while the offshore structure resting onto it is in full operation.

Description

Double top suction pile and suction pile foundation
The invention relates to a suction pile, a foundation made prom one or more suction piles and an offshore structure resting on a foundation of one or more suction piles.
Suction piles and their way of installing are a.o. known from GB-B-2300661 and EP-B-0011894, which disclosures are enclosed in here by reference. Briefly, a suction pile is a thin walled steel sleeve or pipe or cylinder, which cylinder is closed at its longitudinal top end by a bulkhead or different sealing means and which cylinder is sealingly located on the subsea bottom with the open end opposite the bulkhead since this open end penetrates the subsea bottom due to the weight of the suction pile. Thus the cavity, also called suction space, delimited by the cylinder and the bulkhead is sealed by the subsea floor such that vacuum or suction can be generated by removing water from within the suction space such that a resulting force tends to force the suction pile deeper into the subsea floor. The creation of the suction can be with the aid of a suction source, such as a pump, being on, or close to or at a distance from the suction pile and connected to the suction space. The applied level of the suction can be e.g. at least substantially constant, smoothly increase or decrease or else pulsate, for which there are convenient means . After use, the suction pile can easily be removed by creating an overpressure within the suction space, e.g. by pumping in (sea) water.
A self installing platform applying suction piles is known from e.g. W099/51821 (SIP1) or EP-A-1101872 (SIP2) of the present inventor. WO 02/088.475 (Suction Pile Technology, SIP3) discloses a tower carrying a wind turbine at the top and suction piles as foundation.
US8025463 discloses an offshore foundation system having an assembly of spaced suction piles and a reaction base connecting the suction piles. The closed suction pile top projects a distance above the bottom face of the reaction base such that, in use, a gap remains between the top of a soil plug inside the suction space and the closed suction pile top.
WO 03/099646 discloses a seabed anchor provided by a suction pile having within its suction space a seabed soil retaining means embodied by a top down oriented cone with sharp angled apex. This anchor is designed for a seabed of fluent mud .
One of the benefits of suction piles is that a marine structure can be designed to be self foundating or self installing by providing it with one or more suction piles. So the hoisting device and the plant for installing the foundation, e.g. hammering device, can be eliminated.
Since the structure is provided with one or more suction piles, removal after use is made easier in that by pressing out the suction pile, the anchoring of the structure to the underwater bottom can be removed.
Preferably each suction pile has one or more of: a diameter of at least 5 metres; a height of at least 5 metres; a wall thickness of at least 1 centimetre; the longitudinal axis of the suction pile and the relevant supporting leg (of the upper structure to be supported by the suction pile) are substantially in line.
OBJECT OF THE INVENTION
The object of the invention is versatile. In an aspect the reliability and/or quality of the foundation is improved. In an aspect the installation of the foundation is facilitated. In an aspect removal of the foundation is facilitated.
The object is obtained by providing within the suction pile near the top bulkhead and spaced from this bulkhead a pre-installed, fixed load bearing surface designed to keep the suction pile immovable while the offshore structure resting onto it is in full operation and which load bearing surface preferably is fluid permeable to provide a fluid connection between the suction pile inner spaces above and below it. Thus the load bearing surface replaces the top bulkhead for the load bearing capacity it offers while used as a foundation body. Obviously, the suction pile provided with the load bearing surface is a prefabricated object, thus containing the load bearing surface prior to penetration of the suction pile into the seabed.
Preferably, the load bearing surface is located within the suction space such that the suction space is present below and above the load bearing surface or, in other words, the suction spaces above and below the load bearing surface are in mutual fluid communication through the load bearing surface.
Such load bearing surface can be a flat metal sheet but also a conical shaped metal sheet or a grid or lattice of mutually crossing beams or a sheet of geotextile or geogrid (commonly named geosynthetics ) . A grid/lattice/geosynthetic is fluid permeable by nature. A metal sheet could be perforated or its outer circumference keeps a gap with the axial boundary of the suction pile. The load bearing surface could also be provided by the lower face of a fluid permeable slab which completely fills the space between the top bulkhead and the bearing surface. Such slab could be prefabricated and subsequently mounted into the suction pile, or could be obtained by fabrication in situ by casting a material against the top bulkhead and allowing it to solidify. Such slab could also be provided by a layer of non coherent granules, e.g. stones, retained by a sheet providing the load bearing surface, e.g. a permeable structure of interweaved wires or a perforated metal sheet, such that the granules are retained between the load bearing surface and the top bulkhead. Such slab could completely fill the space captured between the top bulkhead and the load bearing surface or could leave a gap with the top bulkhead.
The bearing load from the load bearing surface could be transferred to the suction pile side wall in which case the load bearing surface preferably is inflexible or rigid, e.g. provided with or made from stiffeners, e.g. I-beams.
Alternatively such load is transferred to the top bulkhead in which case incompressible elements (e.g. the slab completely filling the space between the load bearing surface and the top bulkhead, or girders bridging the distance between the load bearing surface and the top bulkhead) between the load bearing surface and the top bulkhead are applied which are compression loaded.
The invention is based on the recognition that
transferring the required load bearing capacity from the top bulkhead to a lower level increases the stability of the foundation dramatically. With prior art suction piles the top bulkhead provides the required load bearing capacity for the suction pile to function as a foundation body and it occurred that after completion of sucking the suction pile completely into the sea floor, the suction pile was pushed deeper into the sea floor by the upper structure placed on top of the suction pile which according to the design calculations of the foundation such was impossible to occur. This made the behaviour of the foundation unpredictable. It came out that by providing the load bearing capacity at a lower level at the suction pile, such unpredictable behaviour of the foundation was eliminated. Based on speculation a reason could be that if the load bearing surface is no longer provided by the top bulkhead and provided at a level below the top bulkhead, the load distribution across such load bearing surface becomes more equal, resulting in more and immediate stability. Without to be bound by theory it is believed that remote from the top bulkhead, at the level of the inventive load bearing surface, the upright wall of the suction pile functions as a skirt which ensures complete contact between the load bearing surface and the soil plug within the suction pile.
On the other hand extraction from the seabed of the suction pile according to the invention is easier compared to the prior art suction pile, in case an overpressure within the suction space is applied to force the suction pile from the seabed opposite the way in which the suction pile penetrated the seabed by creation of suction within the suction space. Without to be bound by theory it is believed that the invention ensures equal distribution of the overpressure within the suction space, which makes extraction more reliable.
It is noted that the invention is directed to suction piles for foundations, in other words designed to carry the weight of an upper structure placed on top, to avoid that such upper structure sinks into the subsea bottom. Thus a foundation suction pile bears loads from the associated upper structure which tend to force the suction pile further into the ground. The fixed bearing surface spaced below the top bulkhead is designed to prevent that the suction pile moves deeper into the subsea bottom due to the pushing loads generated by the weight of the upper structure. A foundation suction pile is 5 by the nature of its loading different from a suction pile for anchoring, which anchoring suction pile must withstand pulling forces from the anchored object which tries to leave its desires location by trying to pull the anchoring suction pile out of the subsea bottom.
10 Preferably one or more of the following applies: the load bearing surface is parallel to the top bulkhead; the suction required to penetrate the suction pile into the subsea bottom during installation is generated within the suction pile above the load bearing surface, preferably since the suction side
15 of a suction pump means is connected to the suction space above the load bearing surface, e.g. the top bulkhead is provided with a nozzle or different sealable port for fluid connection of the suction space with a suction pump means; the diameter of the suction pile is constant over its height (the height
20 is the direction from the top bulkhead towards the opposite open end) ; from the top bulkhead the cylinder walls of the suction pile extend parallel; the open end of the suction pile, designed to be located on the sea floor first is completely open, in other words, its aperture is merely bordered by the
25 cylinder walls; the water depth is such that the suction pile is completely below the water surface when its lower end contacts the sea floor, in other words when its lower end has not penetrated the sea floor yet; the foundation comprises one, two, three, four or more mutually spaced suction piles; the
30 load bearing surface has a permeability of at least 10% or 20%, in other words at least 10% or 20% of the cross sectional surface area of the suction space at the level of the load bearing surface allows free passage of fluid between above and below the load bearing surface; the load bearing surface is at least
35 10 or 20 or 50 centimetre and/or 1 or 1.5 or 2 metre to a maximum below the top bulkhead; the cone shaped load bearing surface is shallow and the cone angle is obtuse, preferably is limited to between 180 (flat sheet) and 120 degrees; with the penetration of the suction pile into the sea floor completed, the top bulkhead is spaced from the sea floor and/or the load bearing surface bears onto the sea floor which is possibly at elevated level within the suction pile, compared to the seafloor level external from the suction pile, due to raising of the seabed plug within the suction space caused by penetration of the suction pile into the seabed;
The suction pile is also preferably provided with known as such valves and/or hatches adjacent or at its top bulkhead for selectively allowing water and air to enter or exit the suction space through the top side of the suction pile.
An offshore foundation system or a suction pile of said system, the suction pile preferably provided by an open bottom and closed top, advantageously cylindrical, elongate shell providing a suction compartment or suction space, said closed top having an externally facing upper face and an opposite, toward the suction space facing lower face and preferably provided with one or more valves selectively allowing fluid communication between the suction space and the environment, the suction space being provided with a preferably fixedly located load bearing surface oriented perpendicular to the longitudinal axis of the shell and there is a gap between said load bearing surface and the lower face of the closed top, which gap preferably is in fluid communication with the suction space and wherein, in use, the load bearing surface bears onto a top of a soil plug inside the suction space, the load bearing surface preferably being provided by the bottom surface of a sheet or slab like element which is preferably integrally formed with the suction pile.
The invention is further illustrated by way of non-limiting, presently preferred embodiments providing the best way of carrying out the invention and shown in the drawings.
Fig. 1 shows a side view;
Fig. 2-13 show a top views, sectional side views and partly cutaway perspective views of four different embodiments of the suction pile; Fig. 14 and 15 show marine structures in perspective view.
Fig. 1 shows three stages during penetration of the suction pile into the sea floor by suction within the suction space. The left hand stage is the initial stage in which the open bottom of the suction pile has penetrated the seabed by gravity, such that the suction space is sealed. The central stage is obtained by removing water from the suction space by pumping, such that suction is created within the suction space such that the suction pile penetrates deeper into the seabed, thus it top comes closer to the seabed. The right hand stage is the final stage in which the suction pile is penetrated to its final depth, providing its design load bearing capacity for a weight resting on top of it. The load bearing surface 4 spaced below the top bulkhead is shown. The top bulkhead 6 always is spaced from the sea floor 11. Within the suction space internal from the side wall 7, the surface 12 of the sea floor material rises due to penetration of the suction pile. Such seabed part captive within the suction space is also called soil plug.
Fig. 2-13 show suction piles having a load bearing surface
4 within the suction space 7 and spaced below the top bulkhead 6. A pipe stud 5 penetrates the top bulkhead to connect the suction space with a suction source. The suction space is bounded by the top bulkhead 6, the cylindrical side wall 7 and the open end 8. In all embodiments the distance between the top bulkhead and the load bearing surface measures 50 centimetre.
In fig. 2-4 the load bearing surface 4 is the bottom side of a flat sheet keeping at its circumference an annular air and water gap with the wall 7. Compression loaded girders 10 bridging the load bearing surface 4 and the top bulkhead 6 transfer the bearing load from the load bearing surface to the top bulkhead 6 through. As shown, the girders leave openings 13 to allow fluid to pass the girders in the direction perpendicular to the longitudinal axis 14 of the suction pile. In fig. 5-7 the load bearing surface 4 has a cone shape and also keeps an air and water gap with the wall 7 at its outer circumference. The opposite walls of the cone include an obtuse angle of 160 degrees, in other words the wall of the cone, vertically oriented resting on its apex, include an angle (referred to as a in the drawing) of 10 degrees with the horizontal. In fig. 8-10 the flat load bearing surface 4 tightly fits within the cylinder 7 thus the circumferential air and water gap is absent. In stead, the sheet 4 is perforated to be air and water permeable. In fig. 11-13 the load bearing surface is the lower face 4 of a slab 9. The slab 9 is air and water permeable and the face 4 is also air and water permeable. As an alternative the slab 9 could be replaced by a layer of incoherent gravel of same thickness, captive between the top bulkhead 6 and the face 4 provided by e.g. a perforated sheet or lattice.
Fig. 14 and 15 are examples of the upper structures to be supported by the suction piles 1. The top of the upper structures is provided by a platform 2 above water level 3.
The invention is not limited to the above described and in the drawings illustrated embodiments. E.g. the marine structure can have a different number of suction piles. The number of supporting legs by which the platform rests onto the suction piles is preferably equal to the number of suction piles, but this is not absolutely necessary. E.g. three suction piles are at the corners of a structure that is triangular in top view. It is not required that the suction piles and supporting legs are at the corners of the structure. The platform can be constructed and/or shaped differently.

Claims

1. Suction pile for installation in the seafloor to operate as a foundation or part of it to support an offshore structure resting onto the seafloor, the suction pile having internally near the top bulkhead and spaced from this bulkhead a pre-installed, fixed load bearing surface designed to keep the suction pile immovable while the offshore structure resting onto it is in full operation.
2. Suction pile according to claim 1 and which load bearing surface is fluid permeable to provide a fluid connection between the suction pile inner spaces above and below it.
3. Suction pile according to claim 1 or 2 and which load bearing surface comprises a metal sheet.
4. Suction pule according to claim 1, 2 or 3, the load bearing surface is at least 10 or 20 or 50 centimetre and/or 1 or 1.5 or 2 metre to a maximum below the top bulkhead.
5. Suction pile according to any of claims 1-4, being a prefabricated object comprising the load bearing surface.
6. Offshore structure having a foundation of one or more suction piles supporting the offshore structure resting onto the seafloor, wherein at least one of the suction piles is as according to any of claims 1-5 and its load bearing surface rests onto the seafloor.
7. Method of installing a suction pile according to any of claims 1-5, wherein the suction pile bottom (8) penetrates the seafloor (12) and fluid is removed from the suction space such that penetration proceeds by suction and thus the load bearing surface moves towards the seafloor and finally bears onto the seafloor, preventing continuation of further penetration.
8. Method according to claim 7, wherein the suction pile before penetrating the seafloor comprises the load bearing surface and/or at the end of the method the top bulk head is at a level above the sea floor, preferably at least 10 or 20 or 50 centimetre and/or 1 or 1.5 or 2 metre to a maximum.
EP13824532.9A 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation Active EP2925936B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP20158104.8A EP3690145A1 (en) 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation
PL13824532T PL2925936T3 (en) 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NL2009910 2012-11-29
NL2011860A NL2011860B1 (en) 2012-11-29 2013-11-28 Double top suction pile and suction pile foundation.
PCT/NL2013/050861 WO2014084737A1 (en) 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP20158104.8A Division EP3690145A1 (en) 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation

Publications (2)

Publication Number Publication Date
EP2925936A1 true EP2925936A1 (en) 2015-10-07
EP2925936B1 EP2925936B1 (en) 2020-02-19

Family

ID=50023820

Family Applications (2)

Application Number Title Priority Date Filing Date
EP13824532.9A Active EP2925936B1 (en) 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation
EP20158104.8A Pending EP3690145A1 (en) 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP20158104.8A Pending EP3690145A1 (en) 2012-11-29 2013-11-29 Double top suction pile and suction pile foundation

Country Status (5)

Country Link
EP (2) EP2925936B1 (en)
DK (1) DK2925936T3 (en)
NL (1) NL2011860B1 (en)
PL (1) PL2925936T3 (en)
WO (1) WO2014084737A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2018568B1 (en) * 2016-03-24 2021-10-14 Spt Equipment B V Suction pile re-float provision.
CN110106907B (en) * 2019-05-10 2021-07-02 东南大学 Suction type caisson foundation and cement soil mixing pile reinforcement combination
GB2584902B (en) 2019-06-21 2022-05-04 Subsea 7 Norway As Hollow subsea foundations
NO346296B1 (en) * 2019-06-21 2022-05-30 Subsea 7 Norway As Hollow subsea foundations
CN111472382B (en) * 2020-04-28 2021-04-20 中山大学 Suction bucket foundation with uplift-resistant steel pipe pile and installation method thereof
CN115059107A (en) * 2022-06-30 2022-09-16 福建永福电力设计股份有限公司 Grouting-free top plate structure of offshore wind power suction pile foundation and mounting method thereof
CN116084371B (en) * 2023-02-02 2024-05-24 中国电建集团贵阳勘测设计研究院有限公司 Offshore wind power installation platform

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0011894B1 (en) 1978-12-04 1984-07-04 Shell Internationale Researchmaatschappij B.V. A method for installing a tubular element in the bottom of a body of water and apparatus for carrying out this method
NL9400101A (en) 1994-01-21 1995-09-01 Hogervorst Johannes R Method and device for installing a hollow suction pole in the bottom of a water.
ID26811A (en) 1998-04-02 2001-02-08 Suction Pile Technology B V SEA BUILDING.
US6481932B1 (en) 1999-11-18 2002-11-19 Suction Pile Technology B.V. Marine structure
WO2002088475A1 (en) 2001-04-26 2002-11-07 Suction Pile Technology B.V. Marine structure
GB0212003D0 (en) * 2002-05-24 2002-07-03 Stolt Offshore Sa Seabed anchor
SG157260A1 (en) 2008-06-02 2009-12-29 Keppel Offshore & Marine Techn Offshore foundation system with integral elements for preloading and extracting
NO20085187L (en) * 2008-12-12 2010-06-14 Sclantic Subsea As Suction foundation device

Also Published As

Publication number Publication date
EP2925936B1 (en) 2020-02-19
NL2011860A (en) 2014-06-04
PL2925936T3 (en) 2020-10-19
WO2014084737A1 (en) 2014-06-05
NL2011860B1 (en) 2016-05-18
DK2925936T3 (en) 2020-04-27
EP3690145A1 (en) 2020-08-05

Similar Documents

Publication Publication Date Title
EP2925936B1 (en) Double top suction pile and suction pile foundation
US8668408B2 (en) Skirted foundation for penetrating soft material
Tjelta The suction foundation technology
US4733993A (en) Subsea foundation element and applications thereof
JP6264776B2 (en) Suction structure
NL2018568B1 (en) Suction pile re-float provision.
KR20190031868A (en) Suction foundation using inner wall and offshare structure using thereof
JPS6149029A (en) Underwater foundation fixer
GB2524460A (en) Offshore foundation
EP1268947B1 (en) Method for establishing a foundation in a seabed for an offshore facility and the foundation according to the method
GB2501123A (en) Submerged foundation with ballast
KR101251414B1 (en) Detachable apparatus for driving suction pile using assembly type block body
KR20090120997A (en) The method for constructing underwater structure
WO1994006970A1 (en) Foundation arrangement for an offshore framework construction or subsea installation
KR101630522B1 (en) Suction foundation for pre-loading and construction method thereof
JP5713442B2 (en) Ground improvement method and decompression vessel
KR101384168B1 (en) installation method of slab foundation for offshore wind power generator using position senser
US20230212834A1 (en) Hybrid anchor
KR20190031867A (en) Suction foundation using rubber plate and offshare structure using thereof
Kim et al. Field Trials of Suction-Assisted Installation of Circular Steel Pipe Cofferdam in Silty Sand
KR20230133964A (en) Methods for installing foundations and foundations for offshore structures
JP3054731B2 (en) Apparatus and method for enhancing support of structural foundation
van Wijk et al. DREDGING AS AN INTEGRATED PART OF MONOPILE DECOMMISSIONING BY HYDRAULIC EXTRACTION
RU2574666C2 (en) Foundation equipped with skirt for introduction into soft material
RU167967U1 (en) DESIGN OF THE SUPPORT OF THE MARINE STATIONARY PLATFORM ON THE SEA SHELF

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20150608

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20160811

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

RIC1 Information provided on ipc code assigned before grant

Ipc: E02B 17/00 20060101ALI20190723BHEP

Ipc: E02D 27/52 20060101AFI20190723BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190830

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SPT EQUIPMENT BV

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1235105

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200315

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013065999

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20200421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200519

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200520

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200619

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200519

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200712

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1235105

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200219

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013065999

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20201120

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201129

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201130

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230526

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20231126

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231127

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20231127

Year of fee payment: 11

Ref country code: FR

Payment date: 20231127

Year of fee payment: 11

Ref country code: DK

Payment date: 20231127

Year of fee payment: 11

Ref country code: DE

Payment date: 20231129

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20231103

Year of fee payment: 11

Ref country code: BE

Payment date: 20231127

Year of fee payment: 11