EP2915737A1 - Apparatus for lifting and lowering an object - Google Patents
Apparatus for lifting and lowering an object Download PDFInfo
- Publication number
- EP2915737A1 EP2915737A1 EP14305327.0A EP14305327A EP2915737A1 EP 2915737 A1 EP2915737 A1 EP 2915737A1 EP 14305327 A EP14305327 A EP 14305327A EP 2915737 A1 EP2915737 A1 EP 2915737A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pulley
- cable
- pulley mechanism
- support structure
- housing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPINGÂ
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/56—Towing or pushing equipment
- B63B21/66—Equipment specially adapted for towing underwater objects or vessels, e.g. fairings for tow-cables
Definitions
- the present disclosure relates to an apparatus for launching and recovering modules.
- the disclosure relates to an apparatus for launching and recovering submergible modules.
- ROV underwater remotely operated vehicle
- ROVs are typically adapted to carry out such undersea operations through control operations exercised remotely by a control center from the surface of the water, a platform or a land station. In such cases, operation commands are transmitted between the control center and the vehicle through transmission cables.
- ROVs therefore typically need to be conveniently launched in the water from the board of a vessel, controlled as they operate in the water and recover them once the operation is fulfilled.
- the first cable is a wire configured for descending and lifting the housing.
- the second cable is configured for allowing transmission of command signals between a control station and the remotely operated vehicle.
- the third pulley mechanism is attached to the second pulley mechanism through a transversal beam comprised in the housing, the transversal beam being configured to allow for passage of the first cable from the second pulley mechanism to the third pulley mechanism.
- the first cable is wound over a partial circumference of the first pulley, a partial circumference of the third pulley and a partial circumference of the fifth pulley and is attached at one end to the support structure.
- the second cable is wound over a partial circumference of the second pulley, a partial circumference of the fourth pulley and is attached at one end to the remotely operated vehicle.
- the apparatus comprises a plurality of clips wherein each clip is configured to be hooked on the first cable and the second cable such that it encloses the respective width of the first cable and the second cable.
- the clips have snap-hook configuration.
- a segment of rope is fastened at one end to a first clip and is fastened at an opposite end to a second clip.
- a segment of rope is fastened at one end to a casing of the second pulley mechanism and is fastened at an opposite to a clip closest to the second pulley mechanism.
- the apparatus further comprises a container wherein the support structure is a telescopic.
- the apparatus is configured for launching and recovering a remotely operated vehicle.
- the apparatus is configured for submersion in water.
- ROVs e.g. used in submarine operations, typically need a communication link to allow the exchange of control and command signals between a control center, typically on the surface of the water and the ROV.
- Such communication link is often a cable, typically called umbilical, which comprises communication medium such as electric wires or optical fibers through which signals are transmitted.
- a wire is typically used.
- This wire typically made of metal, e.g. steel, is sufficiently strong in order to support the weight of the ROV during the lifting or the lowering (descending) of the ROV from or into the water.
- this wire will be referred to as the lifting wire.
- Both the umbilical and the lifting wire are typically long enough to support the submersion of the ROV in deep waters, typically in the range of about 500 meters depth.
- ROVs In addition to the lifting and lowering operations, the use of ROVs implies further operations such as housing the ROV on board a ship, deploying it e.g. over the side of the vessel and controlling it while in the water. Similar operations would be required if the ROV was launched from a platform on the surface of the water. These functions are typically provided through a so-called launch and recovery system (LARS).
- LATS launch and recovery system
- lifting wire and umbilical are also generally referred to as cables.
- FIGS 1 a and 1b illustrate an exemplary schematic representation, in perspective and front views respectively, of some aspects of a launch and recovery system (LARS) 100 according to some embodiments of the disclosure.
- the LARS comprises a housing, or cage, 110 and a support structure 120.
- the housing is adapted to contain in its interior space a ROV (not shown in the figure) and may have any convenient shape and size for the intended purpose.
- the support structure 120 provides support for the housing and the rest of the elements used in the LARS which will be described in further detail below.
- the support structure 120 may have any convenient shape and size.
- the support structure is shown in the form of an elongated beam 121, however this is only exemplary and other configurations such as properly designed arched-shape structures may also be used.
- the support structure 120 may be installed in any convenient manner.
- the support structure 120 may be attached to a crane capable of holding the support structure 120 in place or moving it from one place to another.
- the support structure 120 may be attached to another structure such as a container which may serve as a housing for the entire LARS structure.
- the LARS 100 further comprises three mechanisms of pulleys.
- a first pulley mechanism 130 is attached to the support structure 120, a second pulley mechanism 140 is attached to the housing 110 and a third pulley mechanism 150 is also attached to the housing 110 and may be further attached to the second pulley mechanism 140 through an intermediate transversal beam 111.
- the transversal beam 111 which may be an integral part of the body of the housing 110, may provide additional rigidity and strength to the structure of the housing and also allow for the passage of a wire from the second pulley mechanism 140 to the third pulley mechanism 150 as will be described in further detail below.
- Figure 2 illustrates an exemplary schematic representation of the first pulley mechanism 130. It is to be noted that for simplicity of illustration, only the elements that are relevant for understanding the disclosure are shown. Those of skill in the related art will realize that the pulley mechanism may comprise other elements that are not shown but nevertheless may be present in real-life pulley mechanisms, such as for example a casing in which the pulleys are installed (see for example figure 1 element 139) and a rotation axle or shaft around which the pulleys can rotate.
- the first pulley mechanism 130 comprises a first pulley 131 and a second pulley 132.
- the first pulley 131 comprises a pair of lateral flanges 133a and 133b and a recess 135 is provided between the lateral flanges 133a and 133b.
- the recess 135 is adapted to receive a wire or cable which may run around a part of the circumference of the recess 135 and exit the recess and the first pulley 131.
- the lifting wire 160 (as identified in reference to figures 1a and 1b ) enters the first pulley 131 in a direction shown by arrow A and after winding around a part of the circumference of the recess 135, exits the first pulley 131 as shown by arrow B.
- the second pulley 132 comprises a pair of lateral flanges 134a and 134b and a recess 136 is provided between the lateral flanges 134a and 134b.
- the recess 136 is adapted to receive a wire or cable which may run around a part of the circumference of the recess 136 and exit the recess to the outside of the second pulley 132.
- the umbilical cable 170 enters the first pulley 132 in a direction shown by arrow C and after winding around a part of the circumference of the recess 136, exits the first pulley 132 as shown by arrow D.
- the direction of the arrows A, B, C and D are all indicative of an overall movement of the lifting wire 160 and the umbilical 170 as they exit the respective first and second pulleys 131, 132 in the direction of gravity illustrated by arrow G.
- This overall direction facilitates the descending movement of the housing 110 (containing the ROV) which will eventually be submerged into the water.
- the direction of the arrows A, B, C and D will be reversed as in such conditions the housing 110 (containing the ROV) is lifted out of the water (i.e. opposite to the direction of arrow G).
- Each one of the first pulley 131 and second pulley 132 may rotate independently from each other.
- FIG 3 illustrates an exemplary schematic representation of the second pulley mechanism 140.
- the second pulley mechanism 140 comprises a third pulley 141 and a fourth pulley 142.
- the second pulley mechanism is configured to receive the lifting wire 160 and the umbilical 170 in the direction of arrows B and D (in conformity with the same arrows shown in figure 2 ) and after winding around a part of the circumference of the recesses 145 and 146 respectively, exit the second pulley mechanism 140 in the direction of arrows E and F respectively.
- These directions are indicative of an overall movement of the lifting wire and the umbilical, and as a consequence an overall movement of the second pulley mechanism 140 and the housing 110 attached thereto, in the direction of gravity as shown by arrow G.
- the second pulley mechanism 140 may be configured to cooperate with the first pulley mechanism 130 in a back-to-back arrangement.
- Figure 4 illustrates an exemplary schematic representation of the third pulley mechanism 140.
- Figure 4 illustrates an exemplary schematic representation of the third pulley mechanism 140.
- elements that are relevant for understanding the disclosure are shown.
- the third pulley mechanism 150 comprises a fifth pulley 151 with a structure and operational characteristics similar to those of first, second, third and fourth pulleys of figures 2 and 3 . Therefore a detailed description of the similar features is considered not necessary.
- the third pulley mechanism 150 is configured to receive the lifting wire 160 in the direction of arrow E (in conformity with the same arrow E as shown in figure 3 ). After running around a part of the circumference of the recess 155, the lifting wire exits the third pulley mechanism 140 in the direction of arrows H. These directions are indicative of an overall movement of the third pulley mechanism 150 and the housing 110 attached thereto in the direction of gravity as shown by arrow G.
- the first pulley cooperates with the third pulley and the third pulley cooperates with the fifth pulley to collectively form a path for supporting the lifting wire.
- second pulley cooperates with the fourth pulley to collectively form a second path for supporting the umbilical.
- the first path and the second path are separate from each other. This separation ensures that the possibility of entanglement between the two cables is eliminated or reduced.
- the first pulley mechanism 130 is attached to the support structure 120 such that it does not move relative to the latter and is configured to support the movement of the lifting wire 160 and the umbilical 170.
- the lifting wire 160 may enter into the first pulley mechanism 130 and after winding over a partial circumference of the first pulley 131 of the first pulley mechanism 130 enter into the second pulley mechanism 140 and after winding over a partial circumference of the third pulley 141 of the second pulley mechanism 140 exit the latter.
- This path is shown in figure 1b by means of a broken line L1 in the first and the second pulley mechanisms 130 and 140.
- the umbilical 170 may enter into the first pulley mechanism 130 and after winding over a partial circumference of the second pulley 132 of the first pulley mechanism 130 enter into the second pulley mechanism 140 and after winding over a partial circumference of the fourth pulley 142 of the second pulley mechanism 140 exit the latter.
- the broken line L1 in the first and the second pulley mechanisms 130 and 140 may also be considered as illustratively showing the path of the umbilical.
- the lifting wire 160 travels along the length of the housing toward the third pulley mechanism 150.
- the lifting wire 160 passes through the interior of the transversal beam 111.
- the lifting wire winds over a partial circumference of the fifth pulley 151 of the third pulley mechanism 140 and next exits the latter. This path is shown in figure 1b by means of a broken line L2 in the third pulley mechanism 150.
- the lifting wire 160 is then fastened at a fixed point 122 to the support structure 120.
- the umbilical 170 is extended toward a predetermined location where it is made available for providing connection between control center and the ROV. This location may be determined according to the particular design requirements. In the example of figure 1b , this location is shown by reference numeral 112.
- the second pulley mechanism 140 and the third pulley mechanism 150 are attached to the housing 110. However, they are moveable relative to the support structure 120. For example during a descent operation, the second and third pulley mechanisms 140 and 150 move away from the support structure 120 towards the water. As the housing moves toward the water, the lifting wire and the umbilical are fed into the first pulley mechanism 130, thereby facilitating such descending movement. Likewise, during a lifting operation, the second and third pulley mechanisms 140 and 150 move toward the support structure 120 and away from the water. As the housing moves toward the support structure 120, the lifting wire and the umbilical are pulled out of the first pulley mechanism 130, thereby facilitating such lifting movement.
- the LARS as proposed herein provides an additional safety measure to ensure that the possibility of entanglements or other conflicts between the lifting wire and the umbilical is reduced still further. Such additional safety measure is described with reference to figure 5 .
- Figure 5 is an exemplary schematic representation of the second pulley mechanism 140 with an additional safety measure generally represented by reference numeral 190.
- the second pulley mechanism 140 of figure 5 is identical to the second pulley mechanism of figure 3 where like elements have been provided with like reference numerals.
- a plurality of clips 191 (191 a, 191b, 191c) may be hooked on the two cables (the lifting wire and the umbilical) before they enter inside the corresponding third and the fourth pulleys 141 and 142, such that after hooking, each clip encloses both the width of the lifting wire 160 and the width of the umbilical 170 in its interior as represented in the figure.
- the clips 191 may engage to the lifting wire 160 and the umbilical 170 in any known manner.
- the clips 191 may have snap-hook configuration using a spring that allows a portion of the body of the clip to open and thereby allow the entry of the lifting wire and the umbilical in the clip and thereafter close to prevent the exit of the lifting wire and the umbilical from the interior of the clip.
- the term clip as used herein is to be understood broadly and may comprise any device capable of performing an enclosure around the lifting wire and the umbilical as described above, including but not limited to hooks or harnesses.
- the clips may be hooked to the lifting wire 160 and the umbilical 170 in a successive manner.
- Figure 5 illustrates three clips 191 a, 191b, 191c being successively hooked to the lifting wire and the umbilical.
- the number of the clips to be hooked may vary case by case.
- the successive attachment of the clips may be performed in regular length intervals. For example after every certain length of the lifting wire and the umbilical which are fed to the first pulley mechanism to descend the housing (and the ROV), a clip may be hooked to the two cables and this is repeated successively as descending continues. Alternatively the succession of attachments of the clips may be performed irregularly and under other criteria according to each specific use.
- the lifting wire 160 and the umbilical 170 respectively move in the directions opposite to the arrow G.
- the clips 191 may be removed, also successively to thereby allow the storage of the lifting wire and the umbilical e.g. in corresponding storage reels.
- the clips may be interconnected by rope segments 192 (192a, 192b, 192c). This is done by fastening one end of a segment of a rope 192 to one clip, e.g. 192a, and fastening an opposite end of the rope segment to the next (successive) clip, e.g. 192b, as shown in the figure.
- the plurality of rope segments 192 in combination provide an overall length of rope which may be as long as the depth in which the housing is intended to be submerged, for example about 500 meters.
- the rope segments 192a, 192b, 192c may have equal lengths, or they may differ in length depending on design requirements.
- a further segment of rope 193 is fastened at one end to the first clip 191 a, i.e. the clip which is closest to the second pulley mechanism 130, and at an opposite end is fastened to a fixed point P located on the casing of the second pulley mechanism 140 which is illustratively shown by reference numeral 149.
- the second pulley mechanism 140 moves away from the first pulley mechanism 130 (which is stationary and attached to the support structure 120) in the direction of arrow G.
- a first clip 191a may be engaged.
- the rope 193 which is fixedly fastened at one end to the casing 149 of the second pulley mechanism tenses and thereby requires the first clip 191a to move along with the lifting wire 160 and umbilical 170 as they descend.
- a second clip 191b is engaged.
- the first rope segment 192a tenses and requires the second clip 191 b to move along with the lifting wire 160 and umbilical 170 as they descend.
- This operation is repeated by engaging the third 191c, and successive clips, during the descending operation.
- rope segments 192 allows for keeping the clips at desired distances from each other and thereby prevents jamming of the clips at one or more points along their lengths, both in descend and lifting operations.
- the LARS as proposed herein may be embodied in a variety of manners within the scope of the present disclosure.
- the LARS may comprise container with an integrated telescopic arm which can be placed on the side of a vessel.
- the telescopic arm may then operate as the support structure 120 described with reference to figures 1a and 1b .
- the containerized LARS may contain all of the instrumentation required to operate the ROV together with space for the ROV pilot, the housing, the ROV itself and a telescopic or horizontal crane arm.
- Figure 6 is an example of a containerized LARS 200 comprising a container 210 attached to a telescopic arm 220.
- the container provides an interior space 211 sufficient to house the instrumentation required, for example as represented by reference numeral 212, for a complete operation cycle of the LARS as well as the LARS and the ROV. This design enables the LARS to be moved between different installation vessels and is autonomous in launch, recovery and operations.
- the LARS may be attached to an A-frame or a crane in a vessel.
- the A-frame is a known piece of equipment on board cable laying vessels, normally used for deploying a seabed cable plough.
- the embodiments provided herein are related to a submerging the housing and the ROV in water, the disclosure is not so limited and the LARS as proposed herein may likewise be used in terrestrial applications.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
- The present disclosure relates to an apparatus for launching and recovering modules. In a particular embodiment, the disclosure relates to an apparatus for launching and recovering submergible modules.
- As known in the related art, an underwater remotely operated vehicle (ROV) is a vehicle adapted for use underwater, for example in submarine communications or oil and gas industry when undersea installations are involved or underwater extraction, security, survey and scientific research are carried out. ROVs are typically adapted to carry out such undersea operations through control operations exercised remotely by a control center from the surface of the water, a platform or a land station. In such cases, operation commands are transmitted between the control center and the vehicle through transmission cables.
- Such ROVs therefore typically need to be conveniently launched in the water from the board of a vessel, controlled as they operate in the water and recover them once the operation is fulfilled.
- Embodiments of the disclosure feature an apparatus comprising:
- a housing adapted to contain a remotely operated vehicle;
- a support structure;
- a first pulley mechanism attached to the support structure and comprising first and second pulleys;
- a second pulley mechanism attached to the housing and moveable relative to the support structure and comprising third and fourth pulleys; and
- a third pulley mechanism directly attached to the housing and moveable relative to the support structure and comprising a fifth pulley;
- According to some specific embodiments, the first cable is a wire configured for descending and lifting the housing.
- According to some specific embodiments, the second cable is configured for allowing transmission of command signals between a control station and the remotely operated vehicle.
- According to some specific embodiments, the third pulley mechanism is attached to the second pulley mechanism through a transversal beam comprised in the housing, the transversal beam being configured to allow for passage of the first cable from the second pulley mechanism to the third pulley mechanism. According to some specific embodiments, the first cable is wound over a partial circumference of the first pulley, a partial circumference of the third pulley and a partial circumference of the fifth pulley and is attached at one end to the support structure.
- According to some specific embodiments, the second cable is wound over a partial circumference of the second pulley, a partial circumference of the fourth pulley and is attached at one end to the remotely operated vehicle.
- According to some specific embodiments, the apparatus comprises a plurality of clips wherein each clip is configured to be hooked on the first cable and the second cable such that it encloses the respective width of the first cable and the second cable.
- According to some specific embodiments, the clips have snap-hook configuration.
- According to some specific embodiments, a segment of rope is fastened at one end to a first clip and is fastened at an opposite end to a second clip.
- According to some specific embodiments, a segment of rope is fastened at one end to a casing of the second pulley mechanism and is fastened at an opposite to a clip closest to the second pulley mechanism.
- According to some specific embodiments, the apparatus further comprises a container wherein the support structure is a telescopic.
- According to some specific embodiments, the apparatus is configured for launching and recovering a remotely operated vehicle.
- According to some specific embodiments, the apparatus is configured for submersion in water.
- These and further features and advantages of the present disclosure are described in more detail, for the purpose of illustration and not limitation, in the following description as well as in the claims with the aid of the accompanying drawings.
-
-
Figures 1 a and 1b are exemplary schematic representations, in perspective and front views respectively, of some aspects of a launch and recovery system according to some embodiments. -
Figure 2 illustrates an exemplary schematic representation of a first pulley mechanism according to some embodiments. -
Figure 3 illustrates an exemplary schematic representation of a second pulley mechanism according to some embodiments. -
Figure 4 illustrates an exemplary schematic representation of a third pulley mechanism according to some embodiments. -
Figure 5 illustrates an exemplary schematic representation of the first pulley mechanism and additional safety measure according to some embodiments. -
Figure 6 is an example of a containerized launch and recovery system according to some embodiments. - It is to be noted that the figures are provided merely for illustrative purposes and are not necessarily to scale.
- ROVs, e.g. used in submarine operations, typically need a communication link to allow the exchange of control and command signals between a control center, typically on the surface of the water and the ROV. Such communication link is often a cable, typically called umbilical, which comprises communication medium such as electric wires or optical fibers through which signals are transmitted.
- On the other hand in order to submerge the ROVs and remove them from the water depth, a wire is typically used. This wire, typically made of metal, e.g. steel, is sufficiently strong in order to support the weight of the ROV during the lifting or the lowering (descending) of the ROV from or into the water. Herein, this wire will be referred to as the lifting wire.
- Both the umbilical and the lifting wire are typically long enough to support the submersion of the ROV in deep waters, typically in the range of about 500 meters depth.
- In addition to the lifting and lowering operations, the use of ROVs implies further operations such as housing the ROV on board a ship, deploying it e.g. over the side of the vessel and controlling it while in the water. Similar operations would be required if the ROV was launched from a platform on the surface of the water. These functions are typically provided through a so-called launch and recovery system (LARS).
- However, there are certain problems in managing and operating ROVs using known LARSs. One such problem is that during launching or recovering, the two cables, namely the umbilical and the lifting wire may entangle with each other. This problem becomes even more difficult to address when the vehicle is in deep water.
- Herein the terms lifting wire and umbilical are also generally referred to as cables.
-
Figures 1 a and 1b illustrate an exemplary schematic representation, in perspective and front views respectively, of some aspects of a launch and recovery system (LARS) 100 according to some embodiments of the disclosure. The LARS comprises a housing, or cage, 110 and asupport structure 120. The housing is adapted to contain in its interior space a ROV (not shown in the figure) and may have any convenient shape and size for the intended purpose. - The
support structure 120, as its name indicates, provides support for the housing and the rest of the elements used in the LARS which will be described in further detail below. Thesupport structure 120 may have any convenient shape and size. For example infigures 1a and1b , the support structure is shown in the form of anelongated beam 121, however this is only exemplary and other configurations such as properly designed arched-shape structures may also be used. Thesupport structure 120 may be installed in any convenient manner. For example thesupport structure 120 may be attached to a crane capable of holding thesupport structure 120 in place or moving it from one place to another. Alternatively, thesupport structure 120 may be attached to another structure such as a container which may serve as a housing for the entire LARS structure. The LARS 100 further comprises three mechanisms of pulleys. Afirst pulley mechanism 130 is attached to thesupport structure 120, asecond pulley mechanism 140 is attached to thehousing 110 and athird pulley mechanism 150 is also attached to thehousing 110 and may be further attached to thesecond pulley mechanism 140 through an intermediatetransversal beam 111. Thetransversal beam 111, which may be an integral part of the body of thehousing 110, may provide additional rigidity and strength to the structure of the housing and also allow for the passage of a wire from thesecond pulley mechanism 140 to thethird pulley mechanism 150 as will be described in further detail below. -
Figure 2 illustrates an exemplary schematic representation of thefirst pulley mechanism 130. It is to be noted that for simplicity of illustration, only the elements that are relevant for understanding the disclosure are shown. Those of skill in the related art will realize that the pulley mechanism may comprise other elements that are not shown but nevertheless may be present in real-life pulley mechanisms, such as for example a casing in which the pulleys are installed (see for examplefigure 1 element 139) and a rotation axle or shaft around which the pulleys can rotate. Thefirst pulley mechanism 130 comprises afirst pulley 131 and asecond pulley 132. - The
first pulley 131 comprises a pair of lateral flanges 133a and 133b and arecess 135 is provided between the lateral flanges 133a and 133b. Therecess 135 is adapted to receive a wire or cable which may run around a part of the circumference of therecess 135 and exit the recess and thefirst pulley 131. In the example offigure 2 , it is shown that the lifting wire 160 (as identified in reference tofigures 1a and1b ) enters thefirst pulley 131 in a direction shown by arrow A and after winding around a part of the circumference of therecess 135, exits thefirst pulley 131 as shown by arrow B. - Similarly, the
second pulley 132 comprises a pair of lateral flanges 134a and 134b and arecess 136 is provided between the lateral flanges 134a and 134b. Therecess 136 is adapted to receive a wire or cable which may run around a part of the circumference of therecess 136 and exit the recess to the outside of thesecond pulley 132. In the example offigure 2 , it is shown that theumbilical cable 170 enters thefirst pulley 132 in a direction shown by arrow C and after winding around a part of the circumference of therecess 136, exits thefirst pulley 132 as shown by arrow D. - It may be appreciated that the direction of the arrows A, B, C and D are all indicative of an overall movement of the
lifting wire 160 and the umbilical 170 as they exit the respective first and 131, 132 in the direction of gravity illustrated by arrow G. This overall direction facilitates the descending movement of the housing 110 (containing the ROV) which will eventually be submerged into the water. In case the ROV is being removed from the water, the direction of the arrows A, B, C and D will be reversed as in such conditions the housing 110 (containing the ROV) is lifted out of the water (i.e. opposite to the direction of arrow G).second pulleys - Each one of the
first pulley 131 andsecond pulley 132 may rotate independently from each other. - Therefore, with the first pulley mechanism of
figure 2 , it becomes possible to run each of the lifting wire and the umbilical through a separate path provided by a separate pulley and as a consequence reduce the possibilities of entanglement between the two cables during operation. -
Figure 3 illustrates an exemplary schematic representation of thesecond pulley mechanism 140. Here also, similar to the illustration infigure 2 , only the elements that are relevant for understanding the disclosure are shown. Thesecond pulley mechanism 140 comprises athird pulley 141 and afourth pulley 142. - The structure and operational characteristics of the second pulley mechanism is similar to that of the
first pulley mechanism 130 offigure 2 and therefore a detailed description of the similar features is considered not necessary. As shown infigure 3 , the second pulley mechanism is configured to receive thelifting wire 160 and the umbilical 170 in the direction of arrows B and D (in conformity with the same arrows shown infigure 2 ) and after winding around a part of the circumference of the 145 and 146 respectively, exit therecesses second pulley mechanism 140 in the direction of arrows E and F respectively. These directions are indicative of an overall movement of the lifting wire and the umbilical, and as a consequence an overall movement of thesecond pulley mechanism 140 and thehousing 110 attached thereto, in the direction of gravity as shown by arrow G. - The
second pulley mechanism 140 may be configured to cooperate with thefirst pulley mechanism 130 in a back-to-back arrangement. -
Figure 4 illustrates an exemplary schematic representation of thethird pulley mechanism 140. Here also, similar to the illustration infigures 2 and 3 , only the elements that are relevant for understanding the disclosure are shown. - As shown in
figure 4 , thethird pulley mechanism 150 comprises afifth pulley 151 with a structure and operational characteristics similar to those of first, second, third and fourth pulleys offigures 2 and 3 . Therefore a detailed description of the similar features is considered not necessary. - The
third pulley mechanism 150 is configured to receive thelifting wire 160 in the direction of arrow E (in conformity with the same arrow E as shown infigure 3 ). After running around a part of the circumference of therecess 155, the lifting wire exits thethird pulley mechanism 140 in the direction of arrows H. These directions are indicative of an overall movement of thethird pulley mechanism 150 and thehousing 110 attached thereto in the direction of gravity as shown by arrow G. - As it can be appreciated, with the above described arrangements of the first, second and third pulley mechanisms, the first pulley cooperates with the third pulley and the third pulley cooperates with the fifth pulley to collectively form a path for supporting the lifting wire.
- Likewise, second pulley cooperates with the fourth pulley to collectively form a second path for supporting the umbilical.
- As it can be appreciated from the
figures 2, 3 and 4 the first path and the second path are separate from each other. This separation ensures that the possibility of entanglement between the two cables is eliminated or reduced. - Referring now back to
figures 1 a and 1b, thefirst pulley mechanism 130 is attached to thesupport structure 120 such that it does not move relative to the latter and is configured to support the movement of thelifting wire 160 and the umbilical 170. - The
lifting wire 160 may enter into thefirst pulley mechanism 130 and after winding over a partial circumference of thefirst pulley 131 of thefirst pulley mechanism 130 enter into thesecond pulley mechanism 140 and after winding over a partial circumference of thethird pulley 141 of thesecond pulley mechanism 140 exit the latter. This path is shown infigure 1b by means of a broken line L1 in the first and the 130 and 140. Likewise, the umbilical 170 may enter into thesecond pulley mechanisms first pulley mechanism 130 and after winding over a partial circumference of thesecond pulley 132 of thefirst pulley mechanism 130 enter into thesecond pulley mechanism 140 and after winding over a partial circumference of thefourth pulley 142 of thesecond pulley mechanism 140 exit the latter. The broken line L1 in the first and the 130 and 140 may also be considered as illustratively showing the path of the umbilical.second pulley mechanisms - After exiting the
second pulley mechanism 140, thelifting wire 160 travels along the length of the housing toward thethird pulley mechanism 150. Preferably in the path between thesecond pulley mechanism 140 and thethird pulley mechanism 150, thelifting wire 160 passes through the interior of thetransversal beam 111. Upon reaching thethird pulley mechanism 150, the lifting wire winds over a partial circumference of thefifth pulley 151 of thethird pulley mechanism 140 and next exits the latter. This path is shown infigure 1b by means of a broken line L2 in thethird pulley mechanism 150. Thelifting wire 160 is then fastened at afixed point 122 to thesupport structure 120. - After exiting the
second pulley mechanism 140, the umbilical 170 is extended toward a predetermined location where it is made available for providing connection between control center and the ROV. This location may be determined according to the particular design requirements. In the example offigure 1b , this location is shown byreference numeral 112. - As previously mentioned, the
second pulley mechanism 140 and thethird pulley mechanism 150 are attached to thehousing 110. However, they are moveable relative to thesupport structure 120. For example during a descent operation, the second and 140 and 150 move away from thethird pulley mechanisms support structure 120 towards the water. As the housing moves toward the water, the lifting wire and the umbilical are fed into thefirst pulley mechanism 130, thereby facilitating such descending movement. Likewise, during a lifting operation, the second and 140 and 150 move toward thethird pulley mechanisms support structure 120 and away from the water. As the housing moves toward thesupport structure 120, the lifting wire and the umbilical are pulled out of thefirst pulley mechanism 130, thereby facilitating such lifting movement. - Although the use of two separate, first and second, pulley mechanisms reduces, as described above, the possibility of entanglement between the two cables during operation, the LARS as proposed herein provides an additional safety measure to ensure that the possibility of entanglements or other conflicts between the lifting wire and the umbilical is reduced still further. Such additional safety measure is described with reference to
figure 5 . -
Figure 5 is an exemplary schematic representation of thesecond pulley mechanism 140 with an additional safety measure generally represented by reference numeral 190. Thesecond pulley mechanism 140 offigure 5 is identical to the second pulley mechanism offigure 3 where like elements have been provided with like reference numerals. - However in the scenario of
figure 5 , during a descent operation as shown by arrow G, a plurality of clips 191 (191 a, 191b, 191c) may be hooked on the two cables (the lifting wire and the umbilical) before they enter inside the corresponding third and the 141 and 142, such that after hooking, each clip encloses both the width of thefourth pulleys lifting wire 160 and the width of the umbilical 170 in its interior as represented in the figure. The clips 191 may engage to thelifting wire 160 and the umbilical 170 in any known manner. For example the clips 191 may have snap-hook configuration using a spring that allows a portion of the body of the clip to open and thereby allow the entry of the lifting wire and the umbilical in the clip and thereafter close to prevent the exit of the lifting wire and the umbilical from the interior of the clip. - The term clip as used herein is to be understood broadly and may comprise any device capable of performing an enclosure around the lifting wire and the umbilical as described above, including but not limited to hooks or harnesses. The clips may be hooked to the
lifting wire 160 and the umbilical 170 in a successive manner.Figure 5 illustrates threeclips 191 a, 191b, 191c being successively hooked to the lifting wire and the umbilical. The number of the clips to be hooked may vary case by case. The successive attachment of the clips may be performed in regular length intervals. For example after every certain length of the lifting wire and the umbilical which are fed to the first pulley mechanism to descend the housing (and the ROV), a clip may be hooked to the two cables and this is repeated successively as descending continues. Alternatively the succession of attachments of the clips may be performed irregularly and under other criteria according to each specific use. - During the lifting operation of the housing (and the ROV), the
lifting wire 160 and the umbilical 170 respectively move in the directions opposite to the arrow G. As the lifting wire and the umbilical are recovered, the clips 191 may be removed, also successively to thereby allow the storage of the lifting wire and the umbilical e.g. in corresponding storage reels. - The clips may be interconnected by rope segments 192 (192a, 192b, 192c). This is done by fastening one end of a segment of a rope 192 to one clip, e.g. 192a, and fastening an opposite end of the rope segment to the next (successive) clip, e.g. 192b, as shown in the figure. The plurality of rope segments 192 in combination provide an overall length of rope which may be as long as the depth in which the housing is intended to be submerged, for example about 500 meters.
- The rope segments 192a, 192b, 192c may have equal lengths, or they may differ in length depending on design requirements.
- A further segment of
rope 193 is fastened at one end to thefirst clip 191 a, i.e. the clip which is closest to thesecond pulley mechanism 130, and at an opposite end is fastened to a fixed point P located on the casing of thesecond pulley mechanism 140 which is illustratively shown byreference numeral 149. - With this arrangement, as the descending operation starts, the
second pulley mechanism 140 moves away from the first pulley mechanism 130 (which is stationary and attached to the support structure 120) in the direction of arrow G. At this stage afirst clip 191a may be engaged. With the descent of thesecond pulley mechanism 140, therope 193 which is fixedly fastened at one end to thecasing 149 of the second pulley mechanism tenses and thereby requires thefirst clip 191a to move along with thelifting wire 160 and umbilical 170 as they descend. At this stage a second clip 191b is engaged. Similarly, as the descent continues the first rope segment 192a tenses and requires the second clip 191 b to move along with thelifting wire 160 and umbilical 170 as they descend. This operation is repeated by engaging the third 191c, and successive clips, during the descending operation. - The use of rope segments 192 allows for keeping the clips at desired distances from each other and thereby prevents jamming of the clips at one or more points along their lengths, both in descend and lifting operations.
- In the lifting operation, as the lifting wire and the umbilical are pulled out of the water, the rope segments are also pulled up and the clips 191 are successively removed.
- The LARS as proposed herein may be embodied in a variety of manners within the scope of the present disclosure.
- For example the LARS may comprise container with an integrated telescopic arm which can be placed on the side of a vessel. The telescopic arm may then operate as the
support structure 120 described with reference tofigures 1a and1b . The containerized LARS may contain all of the instrumentation required to operate the ROV together with space for the ROV pilot, the housing, the ROV itself and a telescopic or horizontal crane arm.Figure 6 is an example of acontainerized LARS 200 comprising acontainer 210 attached to atelescopic arm 220. As can be appreciated, the container provides an interior space 211 sufficient to house the instrumentation required, for example as represented byreference numeral 212, for a complete operation cycle of the LARS as well as the LARS and the ROV. This design enables the LARS to be moved between different installation vessels and is autonomous in launch, recovery and operations. - Alternatively the LARS may be attached to an A-frame or a crane in a vessel. The A-frame is a known piece of equipment on board cable laying vessels, normally used for deploying a seabed cable plough.
- Although the embodiments provided herein are related to a submerging the housing and the ROV in water, the disclosure is not so limited and the LARS as proposed herein may likewise be used in terrestrial applications.
- It should be appreciated by those skilled in the art that any block diagrams herein represent conceptual views of illustrative circuitry embodying the principles of the disclosure.
wherein the first path and the second path are separate from each other.
Claims (13)
- An apparatus comprising:• a housing adapted to contain a remotely operated vehicle;• a support structure;• a first pulley mechanism attached to the support structure and comprising first and second pulleys;• a second pulley mechanism attached to the housing and moveable relative to the support structure and comprising third and fourth pulleys; and• a third pulley mechanism directly attached to the housing and moveable relative to the support structure and comprising a fifth pulley;wherein, the first pulley is configured to cooperate with the third pulley and the third pulley is configured to cooperate with the fifth pulley to collectively form a first path for supporting a first cable; and the second pulley is configured to cooperate with the fourth pulley to collectively form a second path for supporting a second cable; and
wherein the first path and the second path are separate from each other. - The apparatus of claim 1, wherein the first cable is a wire configured for descending and lifting the housing.
- The apparatus of any one of the previous claims, wherein the second cable is configured for allowing transmission of command signals between a control station and the remotely operated vehicle.
- The apparatus of any one of the previous claims, wherein the third pulley mechanism is attached to the second pulley mechanism through a transversal beam comprised in the housing, the transversal beam being configured to allow for passage of the first cable from the second pulley mechanism to the third pulley mechanism.
- The apparatus of any one of the previous claims, wherein the first cable is wound over a partial circumference of the first pulley, a partial circumference of the third pulley and a partial circumference of the fifth pulley and is attached at one end to the support structure.
- The apparatus of any one of the previous claims, wherein the second cable is wound over a partial circumference of the second pulley, a partial circumference of the fourth pulley and is attached at one end to the remotely operated vehicle.
- The apparatus of any one of the previous claims, further comprising a plurality of clips wherein each clip is configured to be hooked on the first cable and the second cable such that it encloses the respective width of the first cable and the second cable.
- The apparatus of claim 7, wherein the clip has snap-hook configuration.
- The apparatus of any one of the previous claims 7 or 8, wherein a segment of rope is fastened at one end to a first clip and is fastened at an opposite end to a second clip.
- The apparatus of claim 9, wherein a segment of rope is fastened at one end to a casing of the second pulley mechanism and is fastened at an opposite to a clip closest to the second pulley mechanism.
- The apparatus of any one of the previous claims, wherein the apparatus further comprises a container and wherein the support structure is a telescopic.
- The apparatus of any one of the previous claims, wherein the apparatus is configured for launching and recovering a remotely operated vehicle.
- The apparatus of any one of the previous claims, wherein the apparatus is configured for submersion in water.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP14305327.0A EP2915737B1 (en) | 2014-03-06 | 2014-03-06 | Apparatus for lifting and lowering an object |
| DK14305327.0T DK2915737T3 (en) | 2014-03-06 | 2014-03-06 | Device for lifting and lowering an object |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP14305327.0A EP2915737B1 (en) | 2014-03-06 | 2014-03-06 | Apparatus for lifting and lowering an object |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP2915737A1 true EP2915737A1 (en) | 2015-09-09 |
| EP2915737B1 EP2915737B1 (en) | 2018-05-02 |
Family
ID=50336241
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP14305327.0A Active EP2915737B1 (en) | 2014-03-06 | 2014-03-06 | Apparatus for lifting and lowering an object |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP2915737B1 (en) |
| DK (1) | DK2915737T3 (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5253605A (en) * | 1992-12-21 | 1993-10-19 | Applied Remote Technology, Inc. | Method and apparatus for deploying and recovering water borne vehicles |
| FR2783494A1 (en) * | 1998-09-22 | 2000-03-24 | Thomson Marconi Sonar Sas | Method of immersing, towing and recovering wire guided underwater vehicle involves using chute with cable and pulley to control deployment |
| EP2019034A1 (en) * | 2007-07-25 | 2009-01-28 | Saab Ab | Sluice device for an ROV |
| DE102009019556A1 (en) * | 2009-04-30 | 2010-11-04 | Atlas Elektronik Gmbh | Apparatus and method for starting an underwater hull |
| WO2013178792A1 (en) * | 2012-06-01 | 2013-12-05 | Thales | System for launching and retrieving submarine vehicles, in particular towed submarine vehicles |
-
2014
- 2014-03-06 EP EP14305327.0A patent/EP2915737B1/en active Active
- 2014-03-06 DK DK14305327.0T patent/DK2915737T3/en active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5253605A (en) * | 1992-12-21 | 1993-10-19 | Applied Remote Technology, Inc. | Method and apparatus for deploying and recovering water borne vehicles |
| FR2783494A1 (en) * | 1998-09-22 | 2000-03-24 | Thomson Marconi Sonar Sas | Method of immersing, towing and recovering wire guided underwater vehicle involves using chute with cable and pulley to control deployment |
| EP2019034A1 (en) * | 2007-07-25 | 2009-01-28 | Saab Ab | Sluice device for an ROV |
| DE102009019556A1 (en) * | 2009-04-30 | 2010-11-04 | Atlas Elektronik Gmbh | Apparatus and method for starting an underwater hull |
| WO2013178792A1 (en) * | 2012-06-01 | 2013-12-05 | Thales | System for launching and retrieving submarine vehicles, in particular towed submarine vehicles |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2915737B1 (en) | 2018-05-02 |
| DK2915737T3 (en) | 2018-08-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6350085B1 (en) | Cable deployment system and method of using same | |
| US7543799B2 (en) | Method and apparatus for deploying articles in deep waters | |
| JP5884978B2 (en) | Underwater vehicle lifting device and method | |
| US20190054982A1 (en) | A system and method of operating a subsea module | |
| JP2019529227A (en) | Reusable levitation module for buoyancy control of underwater vehicles | |
| EP2892800B1 (en) | Unmanned underwater vehicle launcher | |
| CN104081603A (en) | Cable assembly holding apparatus | |
| US10328999B2 (en) | System for launch and recovery of remotely operated vehicles | |
| GB2466983A (en) | Lowering loads into the sea | |
| EP3917826B1 (en) | System and method for releasing and retrieving an auv using a uav | |
| JP6684286B2 (en) | Offshore machine or underwater machine and method of connection therefor | |
| EP2915737B1 (en) | Apparatus for lifting and lowering an object | |
| US10583897B2 (en) | High angle deployment system for a seismic marine surface vessel | |
| KR102533392B1 (en) | Apparatus for installing underground well pipe | |
| WO2014011620A1 (en) | Methods for installing or removing and replacing a segment of a mooring line | |
| EP2921445B1 (en) | Connecting an underwater vehicle to a tether | |
| FI3601036T3 (en) | Submerged system for storing an underwater vehicle such as a drone and keeping it in operational condition | |
| KR101650082B1 (en) | For rov lars portable disinfection device easy to clean for rov lars | |
| Shepherd et al. | Observatory cable laying system | |
| RU2736248C2 (en) | Marine plant | |
| RU2267438C1 (en) | Device for bringing hoisting cable to surface | |
| CA3035815C (en) | Marine installation | |
| Aoki et al. | Development of expendable optical fiber cable ROV system | |
| RU2689095C2 (en) | System for sunk submarine salvaging | |
| JPS60131015A (en) | Method of laying submarine cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| 17P | Request for examination filed |
Effective date: 20160309 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| 17Q | First examination report despatched |
Effective date: 20160921 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20171102 |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: TOSSEL, DAVID IVOR Inventor name: KJELDERSGAARD, TEIT |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: ALCATEL LUCENT |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 994922 Country of ref document: AT Kind code of ref document: T Effective date: 20180515 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014024794 Country of ref document: DE Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20180806 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180502 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180802 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180802 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180803 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 994922 Country of ref document: AT Kind code of ref document: T Effective date: 20180502 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014024794 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20190205 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190306 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190306 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180903 Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190306 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180902 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140306 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180502 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20260323 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20260313 Year of fee payment: 13 Ref country code: DK Payment date: 20260226 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20260330 Year of fee payment: 13 |