EP2904410A1 - Compteur d'energie electrique - Google Patents
Compteur d'energie electriqueInfo
- Publication number
- EP2904410A1 EP2904410A1 EP13762156.1A EP13762156A EP2904410A1 EP 2904410 A1 EP2904410 A1 EP 2904410A1 EP 13762156 A EP13762156 A EP 13762156A EP 2904410 A1 EP2904410 A1 EP 2904410A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- downstream
- measuring
- resistor
- voltage
- measurement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
- G01R22/066—Arrangements for avoiding or indicating fraudulent use
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/10—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods using digital techniques
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H11/00—Emergency protective circuit arrangements for preventing the switching-on in case an undesired electric working condition might result
- H02H11/005—Emergency protective circuit arrangements for preventing the switching-on in case an undesired electric working condition might result in case of too low isolation resistance, too high load, short-circuit; earth fault
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/16—Measuring impedance of element or network through which a current is passing from another source, e.g. cable, power line
Definitions
- the invention relates to an electric energy meter.
- This cut-off device allows the distributor to cut or restore a power supply from a power line of a distribution network to which a meter connects an electrical installation of a user (in case of termination of a subscription or in case of moving the user into a new home for example), without the need to send staff on site.
- the distributors also wish that the meter cut-off device can be reset following deliberate manipulation by the user of a circuit-breaker of the installation, generally an opening followed by closing of the circuit-breaker.
- the electric meter before controlling the resetting of the cut-off device, the electric meter must be able to detect the operation of the circuit-breaker. This detection can be performed by a variation detection of an impedance across the installation, which impedance is relatively low when the circuit breaker is closed, and relatively strong when it is open.
- the object of the invention is to enable an electrical energy meter referenced to the neutral to detect a manipulation of a circuit breaker of an electrical installation so as to be able to control a resetting of a cut-off member of the meter.
- an electric energy meter comprising means for connecting it to a distribution network and to terminals of an electrical installation, means for measuring upstream of a phase voltage of the network, means for measuring a phase current flowing under the phase voltage, a switching device for selectively connecting and disconnecting the network and the terminals, means for downstream measurement of a downstream voltage at the terminals of the installation , and processing means for controlling the cut-off member between an open state and a closed state and acquiring measurements made by the measuring means.
- the meter comprises means for supplying a measurement voltage across the installation when the cut-off device is open, impedance measuring means connected to the supply means for measuring a voltage.
- At least one measurement switch connected to a first measurement resistor of the downstream measuring means and controlled by the processing means for selectively connecting and disconnecting the first measurement resistor and the supply means according to a downstream voltage measurement or an impedance measurement is controlled.
- the meter can therefore detect the state (open or closed) of the cut-off device by means of measuring means downstream of the downstream voltage, then, in the case where the cut-off device is open, measure the impedance of the installation through the supply means and the impedance measuring means. It is thus possible to detect a manipulation of a circuit breaker of the installation, and thus to control the resetting of the breaking device. Sufficient accuracy of the downstream voltage measurement and the impedance measurement is ensured by the switch which is adapted to connect and disconnect the first measurement resistor. None of the aforementioned means of the counter of the invention requires connection of an electrical ground of the meter to a neutral conductor of a line of the distribution network.
- FIG. 1 represents a circuit diagram of a counter of the invention according to a first implementation mode
- FIG. 2 represents an electric meter of the invention according to a variant of the first mode of implementation.
- an electrical energy meter 1 of the invention according to a first embodiment is here connected to a three-phase electrical line 2 of an electrical distribution network via first means. 3, and two terminals B1, B2 of an electrical installation 4 via second connecting means 5.
- the power line 2 can transport electrical energy, provided by a distributor of energy, to supply the electrical installation 4.
- the electricity meter 1 is here a three-phase counter and referenced in neutral, that is to say that an electric mass 6 of the counter 1 is connected to a neutral conductor 7 of the line 2.
- the line comprises three phase conductors 8 of which only one is shown in Figure 1 for the sake of clarity of the figure.
- the meter comprises a transformer 9 connected in series on the phase conductor 8 to transform the current of the line into a current suitable for installation, and to isolate the phase conductor 8 from the rest of the counter 1 (referenced neutral).
- the meter 1 is arranged to measure an amount of electrical energy consumed by the electrical installation 4, so that the distributor can bill this electrical energy to a user of the installation 4.
- the electric meter 1 comprises, for each three phase conductors 8 of the line, means for measuring a phase current Iph flowing on the phase conductor 8 under a phase voltage Vph, and upstream measurement means of the phase voltage Vph (only the measuring means of a phase 8 are shown in FIG. 1).
- the phase current measuring means comprise an Amp current sensor connected to a secondary of the transformer 9 which makes it possible to reduce the amplitude of the phase current Iph to adapt it to the current sensor Amp.
- the current sensor Amp therefore measures a current of reduced amplitude flowing in this secondary and whose amplitude is proportional to that of the phase current Iph.
- the upstream measurement means of the phase voltage Vph are located upstream of the transformer 9 and amperage measurement means (that is to say on the network side), and are adapted to measure a voltage between the phase conductor 8 and the neutral conductor 7 of line 2. They comprise a first upstream resistor R1, a second upstream resistor R2, and a first Voltl voltage sensor.
- the first upstream resistor R1 comprises a first terminal B1R1 connected to the phase conductor 8 and a second terminal B2R1 connected to a first terminal B1R2 of the second upstream resistor R2.
- a second terminal B2R2 of the second upstream resistor R2 is connected to the neutral conductor 7.
- the first voltage sensor Volt1 is arranged to measure the potential of the terminal B2R1 (or of the terminal B1R2), which makes it possible to obtain by division voltage voltage V1 proportional to the phase voltage Vph and from which the phase voltage Vph is easily deduced.
- current sensor and “voltage sensor” is meant a set of measurement components comprising in particular an analog-digital converter and making it possible to perform an analog current or voltage measurement and to transform this measurement into digital data.
- the acquisitions of measurements of the phase current Iph and of the phase voltage Vph are carried out by processing means 13 of the electric meter 1, which are advantageously adapted to memorize these measurements and to transmit them to the distributor by means of communication means ( communication line, carrier currents, etc.) not shown here.
- the measurements are acquired either regularly, at a frequency defined by the processing means, or following an external command transmitted to the processing means 13 via the communication means.
- the distributor can know the electrical power consumed by the installation, and therefore deduce an electric power consumed.
- the meter 1 is further arranged to allow the distributor to remotely cut or restore the power supply of the installation 4.
- the counter 1 has a cut-off member 14 located in the counter 1 downstream of the transformer 9. and current measuring means Amp (that is to say electrical installation side).
- the distributor sends a command to the processing means 13 which control the cut-off member 14 to open or close it according to the order.
- the counter 1 is furthermore arranged to measure a downstream voltage Va at the terminals B1, B2 of the installation, and to measure an impedance Z of the installation 4.
- a measurement of the downstream voltage Va makes it possible, in particular, to know a real state of the cut-off member 14 (open or closed), and to detect any possible fraud committed by the user, which would have short-circuited the cut-off member 14 to connect the installation to the network.
- a measurement of the impedance Z of the installation allows the distributor to know the status of a circuit breaker 15 at the input of the installation 4, and thus to detect a maneuver opening and closing circuit breaker 15 for remotely controlling a reset of the cut-off member 14.
- the resetting of the cut-off member 14 is of course controlled only when the cut-off member 14 is open, and therefore the measurement of the impedance Z is necessary only when the cutoff member 14 is open.
- the acquisitions of the downstream voltage Va and the Z impedance measurements of the installation 4 are carried out by the processing means 13, as are the acquisitions of phase current measurements and phase voltage measurements.
- the counter 1 comprises downstream measuring means comprising a first downstream resistor R3, a first measurement resistor R4, and a second voltage sensor Volt2.
- the resistors R3 and R4 are connected in series between the phase conductor 8 and the neutral conductor 7.
- the second voltage sensor Volt2 is arranged to measure the potential of a first terminal B1R3 of the first downstream resistor R3, on the side of the resistor R4, which makes it possible to obtain, by voltage division, a voltage V2 proportional to the downstream voltage. Va and from which the downstream voltage Va is easily deduced.
- the first downstream resistor R3 and the first measurement resistor R4 here respectively have a resistance value of 600 kilo-ohms and 4 kilo-ohms.
- the counter 1 further comprises a measuring switch 16, whose role will be specified below, controlled by the processing means 13 and connected in series with the first measuring resistor R4, so that the switch is located between the resistor R4 and the first terminal B1R3.
- the counter 1 comprises impedance measuring means comprising a second downstream resistor R5.
- the second downstream resistor R5 is connected in parallel with the switch 16 and the first measurement resistor R4, so that a first terminal B1R5 of the second downstream resistor R5 is connected to the terminal B1R3, and a second terminal B2R5 of the second downstream resistor R5 is connected to the neutral conductor 7.
- the second downstream resistor R5 here has a resistance value of 200 kilo-ohms.
- the impedance Z is also deduced from the voltage V2 measured by the second voltage sensor Volt2.
- the electric meter 1 further comprises means for supplying a measurement voltage Vmes to the terminals of the installation when the cut-off member 14 is open.
- Vmes a measurement voltage
- These supply means are here formed by a supply resistor R6 connected in parallel with the cut-off member 14.
- the supply resistor R6 here has a resistance value of 6 mega-ohms.
- the voltage Vmes is therefore directly obtained from the voltage Vph by voltage division, and is relatively low because of the high value of the supply resistor R6.
- the operation of the electric meter 1 of the invention is now described when the distributor wishes to detect a manipulation of the circuit-breaker 15 of the installation 4 consisting of opening and then closing the circuit-breaker 15, the manipulation having the effect of causing the circuit-breaker 15 to pass through.
- an open state in which the impedance Z of the installation is relatively large
- a closed state in which the impedance Z of the installation is relatively low
- the processing means 13 first control a measurement of the downstream voltage Va, and acquire this measurement, to know the actual state of the cut-off device 14.
- the processing means control the measuring switch 16 in a closed state, so as to connect the first measuring resistor R4 to the supply resistor R6 via the first downstream resistor R3.
- the first measurement resistor R4 and the second downstream resistor R5 are therefore connected in parallel.
- the voltage value V2 supplied by the second voltage sensor Volt2 is therefore equal to:
- V2 Va Ml .
- R3 + R4 // R5 denotes the equivalent resistance of R4 in parallel with R5.
- the resistance value of the measuring resistor R4 is much smaller than that of the second downstream resistor R5, these resistors in parallel have an equivalent resistance having a value close to that of the measuring resistor R4.
- the voltage V2 is therefore approximately equal to:
- first measurement resistor R4 having a low resistance value. Indeed, when the switching device is closed, the voltage across the installation is high, and therefore the downstream voltage Va (equal to the phase voltage Vph) must be sufficiently divided, firstly to be adapted to the second voltage sensor Volt2, which is adapted to measure relatively low input voltages, and on the other hand, so that the voltage sensor Volt 2 can detect relatively precise variations of the impedance over a wide range of values possible impedance of the installation.
- the processing means can detect whether the cutoff member is open or closed. It should be noted that if the cut-off device is detected closed while a command from the distributor had previously opened it, the cut-off device has probably been short-circuited by the user. A case of fraud is then detected.
- the supply resistor R6 is large enough to make Vmes sufficiently small on the one hand to not allow power to the installation and on the other hand to distinguish a case of fraud (in which the organ of cutoff is supposed to be open, but in which the downstream voltage Va is relatively large), and a case of opening of the cutoff device without fraud (in which the measured downstream voltage Va is equal to Vmes).
- V2 Vmes-
- Vmes Vph- ⁇ + - ⁇
- V2 Vph-
- the measured voltage V2 depends directly on the impedance Z of the installation. It is therefore possible to detect a significant variation of Z, corresponding to the maneuver of the circuit breaker mentioned above.
- the processing means 13 are here adapted, by appropriate software means, to detect that the circuit breaker 15 is open when the impedance Z of the measured installation 4 is greater than a first threshold value equal to 100 kilo-ohms, or closed when the measured impedance is less than a second threshold value equal to 10 kilo-ohms.
- the resistors R1, R2, R3, R4, R5, R6, as well as the voltage sensors Voltl, Volt2, have electrical characteristics (accuracy, tolerance, etc.) which make it possible to reliably distinguish an impedance Z of less than 10 kilo- meters. ohms and an impedance Z greater than 100 kilo-ohms.
- the first threshold value may appear to be relatively low, but it corresponds to installations with long electrical wire lengths connecting the meter 1 to the circuit breaker 15, or the circuit breaker 15 to the rest of the installation 4.
- the second threshold value meanwhile, corresponds to a very low load of the installation 4, and therefore a low power consumption.
- FIG. 2 A variant 20 of the electric meter of the invention is shown in Figure 2. All the elements of Figure 2 already present in Figure 1 have retained their reference.
- the downstream measuring means comprise, in addition to the elements mentioned above, a DC voltage source Vcc connected to the second voltage sensor Volt2 via a second measuring resistor R8.
- This DC voltage source Vcc makes it possible to add to the voltage V2 measured by the second voltage sensor Volt2 a DC voltage component, in the case where the voltage sensor Volt2 requires an input having such a DC component (for example, in the case where a Volt2 digital analog converter is powered by a single positive supply voltage, and not by a positive supply voltage and a negative supply voltage).
- the impedance measuring means comprise a third downstream resistor R7.
- the electric meter 20 is provided with an additional measurement switch 21.
- the second measuring resistor R8 and the additional measuring switch 21 are connected in series between the DC voltage source Vcc and the first measurement switch 16.
- the third downstream resistor R7 is connected in parallel with the switch 21 and the second measuring resistor R8.
- the additional switch 21 is closed by the processing means 13 to measure the downstream voltage Va, and open to measure the impedance Z of the installation 4.
- the resistance value of the third downstream resistor R7 is equal to that of the second downstream resistor R5
- the resistance value of the second measurement resistor R8 is equal to that of the first measurement resistor R4.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Measurement Of Current Or Voltage (AREA)
- Measurement Of Resistance Or Impedance (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR1259296A FR2996310B1 (fr) | 2012-10-01 | 2012-10-01 | Compteur d'energie electrique |
| PCT/EP2013/069175 WO2014053302A1 (fr) | 2012-10-01 | 2013-09-16 | Compteur d'energie electrique |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP2904410A1 true EP2904410A1 (fr) | 2015-08-12 |
| EP2904410B1 EP2904410B1 (fr) | 2019-05-22 |
Family
ID=47257991
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13762156.1A Active EP2904410B1 (fr) | 2012-10-01 | 2013-09-16 | Compteur d'energie electrique |
Country Status (4)
| Country | Link |
|---|---|
| EP (1) | EP2904410B1 (fr) |
| CN (1) | CN104685364B (fr) |
| FR (1) | FR2996310B1 (fr) |
| WO (1) | WO2014053302A1 (fr) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9793716B2 (en) | 2014-04-24 | 2017-10-17 | Elster Solutions, Llc | Power meter disconnect switch operation |
| FR3027111B1 (fr) * | 2014-10-13 | 2016-11-04 | Sagemcom Energy & Telecom Sas | Compteur permettant de detecter une fraude par by-pass |
| FR3028048B1 (fr) * | 2014-10-31 | 2016-11-04 | Sagemcom Energy & Telecom Sas | Procede de detection d'une tentative de by-pass frauduleux d'un compteur |
| FR3029294B1 (fr) * | 2014-12-02 | 2019-06-21 | Sagemcom Energy & Telecom Sas | Procede de detection d'une incoherence entre un etat commande et un etat reel d'un organe de coupure |
| FR3063185B1 (fr) * | 2017-02-20 | 2019-03-22 | Sagemcom Energy & Telecom Sas | Procede de verification du cablage d’un compteur |
| FR3067118B1 (fr) * | 2017-05-31 | 2021-07-02 | Sagemcom Energy & Telecom Sas | Compteur electrique monophase |
| FR3090094B1 (fr) * | 2018-12-12 | 2020-11-20 | Sagemcom Energy & Telecom Sas | Compteur électrique ayant un accès à la connectique situé sur la face arrière |
| FR3094498B1 (fr) * | 2019-03-25 | 2021-04-02 | Sagemcom Energy & Telecom Sas | Compteur électrique comprenant un circuit de détection d’un état ouvert ou fermé d’un disjoncteur |
| FR3124268B1 (fr) * | 2021-06-16 | 2023-06-30 | Sagemcom Energy & Telecom Sas | Détection de l’ouverture d’un transformateur externe |
| FR3126157A1 (fr) * | 2021-08-10 | 2023-02-17 | Sagemcom Energy & Telecom Sas | Vérification de la précision métrologique d’un compteur électrique |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2281401B (en) * | 1993-08-28 | 1997-07-30 | Ampy Automation Digilog | Electricity comsumption meter |
| GB2313201A (en) * | 1996-05-15 | 1997-11-19 | Gen Electric Co Plc | Isolation bypass detector for a commodity supply line |
| US5940009A (en) * | 1997-09-08 | 1999-08-17 | Abb Power T&D Company Inc. | Apparatus and method to detect tampering with an electronic utility meter |
| US7746054B2 (en) * | 2007-02-26 | 2010-06-29 | Elster Electricity, Llc | System and method for detecting the presence of an unsafe line condition in a disconnected power meter |
| KR100868892B1 (ko) * | 2007-08-08 | 2008-11-17 | (주)제일전기기술단 | 배전계통의 원격감시제어 및 자료취득 시스템 |
| US7772829B2 (en) * | 2008-04-21 | 2010-08-10 | Elster Electricity, Llc | Power meter and method for measuring power consumption |
| FR2947055B1 (fr) * | 2009-06-22 | 2011-07-29 | Itron France | Compteur d'energie electrique a capteur de courant non isole et contacteur de coupure |
-
2012
- 2012-10-01 FR FR1259296A patent/FR2996310B1/fr not_active Expired - Fee Related
-
2013
- 2013-09-16 CN CN201380051525.1A patent/CN104685364B/zh not_active Expired - Fee Related
- 2013-09-16 WO PCT/EP2013/069175 patent/WO2014053302A1/fr not_active Ceased
- 2013-09-16 EP EP13762156.1A patent/EP2904410B1/fr active Active
Non-Patent Citations (1)
| Title |
|---|
| See references of WO2014053302A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| FR2996310A1 (fr) | 2014-04-04 |
| EP2904410B1 (fr) | 2019-05-22 |
| WO2014053302A1 (fr) | 2014-04-10 |
| CN104685364B (zh) | 2018-10-26 |
| FR2996310B1 (fr) | 2015-08-21 |
| CN104685364A (zh) | 2015-06-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2904410B1 (fr) | Compteur d'energie electrique | |
| FR3019303B1 (fr) | Dispositif de mesure d'au moins une grandeur physique d'une installation electrique | |
| EP2446281B1 (fr) | Compteur d'energie electrique a capteur de courant non isole et contacteur de coupure | |
| EP3715874B1 (fr) | Compteur electrique comprenant un circuit de detection d'un etat ouvert ou ferme d'un disjoncteur | |
| EP2820433B1 (fr) | Compteur d'énergie électrique et procédé de détection de l'état d'un disjoncteur d'une installation reliée a un tel compteur | |
| EP3583432B1 (fr) | Procede de verification du cablage d'un compteur | |
| EP3707521B1 (fr) | Procede de detection de l'etat d'un appareil de protection electrique dans une installation electrique et dispositif de detection mettant en oeuvre ledit procede | |
| EP4134695B1 (fr) | Verification de la precision metrologique d'un compteur electrique | |
| FR2978556A1 (fr) | Dispositif de surveillance d'un conducteur de terre avec mesure de l'impedance | |
| EP2909909A1 (fr) | Système de protection d'une pluralité de sources de tension continues | |
| EP3009851B1 (fr) | Compteur permettant de détecter une fraude par by-pass | |
| FR3007844A1 (fr) | Dispositif d'estimation de l'impedance d'une liaison electrique de terre, procede d'estimation et systeme d'alimentation electrique associes | |
| EP4350925B1 (fr) | Surveillance et optimisation de la consommation electrique | |
| EP3588105A1 (fr) | Compteur electrique comportant un organe de coupure auxiliaire agence pour raccorder selectivement un equipement d'une installation au reseau electrique | |
| EP4311053A1 (fr) | Module de détection d'un défaut électrique pour un appareil de protection électrique et procédé correspondant | |
| FR2983303A1 (fr) | Mesure de la resistance au sol d'une structure metallique ou de la resistivite du sol, en utilisant une structure metallique enterree de grande taille, eventuellement sous protection cathodique | |
| EP4105670B1 (fr) | Detection de l'ouverture d'un transformateur externe | |
| EP4184183B1 (fr) | Detection de l'etat ouvert ou ferme d'un disjoncteur | |
| EP4089422B1 (fr) | Dispositif et procédé d'estimation de l'impédance d'isolation d'un réseau tt ou tn | |
| EP3015873B1 (fr) | Procédé de détection d'une tentative de by-pass frauduleux d'un compteur | |
| FR2471609A1 (fr) | Dispositif portatif d'alimentation en courant |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20150312 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20180626 |
|
| GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| INTC | Intention to grant announced (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20181219 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: FRENCH |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1136758 Country of ref document: AT Kind code of ref document: T Effective date: 20190615 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013055776 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20190522 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190822 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190922 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190823 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190822 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1136758 Country of ref document: AT Kind code of ref document: T Effective date: 20190522 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013055776 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 |
|
| 26N | No opposition filed |
Effective date: 20200225 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190916 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190916 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190930 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190922 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130916 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190522 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20250820 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20250820 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250820 Year of fee payment: 13 |