EP2898181B1 - Multilateral bore junction isolation - Google Patents

Multilateral bore junction isolation Download PDF

Info

Publication number
EP2898181B1
EP2898181B1 EP12886731.4A EP12886731A EP2898181B1 EP 2898181 B1 EP2898181 B1 EP 2898181B1 EP 12886731 A EP12886731 A EP 12886731A EP 2898181 B1 EP2898181 B1 EP 2898181B1
Authority
EP
European Patent Office
Prior art keywords
liner
bore
junction
liner body
well system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP12886731.4A
Other languages
German (de)
French (fr)
Other versions
EP2898181A4 (en
EP2898181A1 (en
Inventor
Cole A. BENSON
William S. Renshaw
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Publication of EP2898181A1 publication Critical patent/EP2898181A1/en
Publication of EP2898181A4 publication Critical patent/EP2898181A4/en
Application granted granted Critical
Publication of EP2898181B1 publication Critical patent/EP2898181B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0035Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/12Devices for placing or drawing out wear protectors

Definitions

  • the present disclosure relates generally to assemblies and methods to be implemented in a wellbore and, more particularly (although not necessarily exclusively), to assemblies and methods for isolating a junction from fracturing pressure and for being retrievable prior to completion of wellbore construction.
  • a junction can be between one bore and another bore.
  • the junction may be one of the weakest points in a casing string of the wellbore system.
  • Forces used to create or complete the well system can affect the casing or the formation exposed at the junction.
  • One example of these forces is from fracture stimulation, such as from fracturing pressure.
  • Some assemblies can help reduce the amount of force experienced by the junction, but these assemblies are relatively large (for example requiring three or more points of isolation) and are implemented after a well system is completed.
  • Assemblies and methods for junction isolation are desirable that can isolate a junction prior to construction of the well system being completed and/or that are smaller.
  • US 2011/0024121 A1 discloses a method and apparatus for multilateral multistage stimulation of a well.
  • US 2011/0308797 A1 discloses a wireless downhole tool positioning system.
  • US 2003/0221843 A1 discloses a junction isolation apparatus and methods for use in multilateral well treatment operations.
  • Certain embodiments of the present invention are directed to isolating a junction from fracturing pressure using a liner extending from a one bore through a junction into a lateral bore, where at least a portion of the liner is retrievable from the lateral bore prior to completion of wellbore construction.
  • Certain aspects and features relate to isolating a junction from fracturing pressure using a liner extending from a one bore through a junction into a lateral bore, where at least a portion of the liner is retrievable from the lateral bore prior to completion of wellbore construction.
  • the junction may be temporarily isolated from high pressure, such as high pressure from a fracturing stimulation process. Isolating the junction from high pressure can include preventing the junction from experience forces from the high pressure or otherwise protecting the junction from being damaged during the fracturing stimulation process.
  • a casing exit can be milled out of a first bore and the lateral bore created by drilling to a desired depth or location.
  • a liner can be run into the lateral, such as across a whipstock or by using a bent joint, and a retrievable packer can be set in the first bore closer to the surface than the window in the first bore for the lateral bore.
  • the portion of the liner in the lateral bore can include any and one or more of a swell packer, stimulation sleeves, cementing equipment or packers.
  • the liner including certain components, can isolate the junction from pressure from fracturing stimulation performed in the lateral bore subsequent to the liner being run.
  • At least part of the liner can be retrieved (i.e. removed from the wellbore) prior to the wellbore being completed to regain flow from below the junction.
  • the entire liner is retrieved.
  • part of the liner is retrieved and another part remains in the wellbore system.
  • the liner or part of the liner can be retrieved by various methods and using various devices and mechanisms.
  • the liner includes a mechanical and / or hydraulic disconnect mechanism that can be located in part of the liner that can be in the lateral bore.
  • the disconnect mechanism can be activated subsequent to the fracturing stimulation process by rotating, pulling, shearing, shifting a sleeve, or applying hydraulic forces to shift a component.
  • An activated disconnect mechanism can allow part of the liner, such as part of the liner connected to a retrievable packer, to disconnect from the remaining part of the liner (or from another component in the lateral bore) and be retrieved.
  • the liner includes two or more liner sections that are fastened together for sealing and providing pressure isolation.
  • the liner can shear at the fastened sections such that the liner sections separate from each other.
  • the liner sections can separate such that the lower section can remain downhole and the upper section, which may be attached to a retrievable packer, can be retrieved.
  • a cutting tool that includes a mechanical or chemical cutting mechanism is run downhole using wireline, coiled tubing, or another running tool.
  • the cutting tool can enter an internal bore defined at least in part by the liner.
  • the liner can respond to the cutting mechanism be disconnecting and being retrieved.
  • Some aspects of the liner include a profile on an inner wall that can receive part of the running tool to allow the running tool to be run to the proper location.
  • the whipstock (if used) can be retrieved to regain access to the first bore.
  • Certain aspects can save rig time in comparison to previous junction isolation techniques by reducing the number of trips downhole to isolate the junction and by reducing the complexity of completing a fracture stimulated multilateral junction. Certain aspects can avoid the use of seals for pressure integrity and can facilitate a greater pressure isolation rating.
  • Figs. 1-8 depict one aspect of isolating a junction by a liner assembly, at least part of which can be retrieved prior to completion of construction of the wellbore system.
  • Fig. 1 depicts a bore 100 through a subterranean formation 102.
  • a whipstock 104 is set in the bore 100 and is depicted as diverting a milling tool 106 run from the surface (not shown) for creating an exit window 108 in casing that is in the bore 100.
  • Fig. 2 depicts a lateral bore 110 created by a drilling tool 112 diverted through the casing exit window 108 by whipstock 104.
  • a junction 114 between the bore 100 and the lateral bore 110.
  • Fig. 3 depicts a liner assembly 116 that is run downhole and extends from the bore 100 through the junction 114 to the lateral bore 110.
  • the liner assembly 116 includes or is associated with isolation mechanisms, such as a packer 118 in the lateral bore 110 and a retrievable packer 120 in the bore 100.
  • Packer 118 may be a swellable packer that surrounds a portion of the body of the liner assembly 116 that is located in the lateral bore 110. In some aspects, packer 118 surrounds a portion of tubing in the lateral bore 110 to which the liner assembly 116 couples or of which the liner assembly 116 is a section.
  • Retrievable packer 120 may surround a portion of the body of the liner assembly 116 that is in the bore 100. Although retrievable packer 120 is described as a retrievable packer, it may be other types of isolation mechanisms. In some aspects, a retrievable liner hanger can be used in place of the retrievable packer 120.
  • the liner assembly 116 in Fig. 3 includes a disconnect mechanism 122 that is in a portion of the liner assembly 116 that is in the lateral bore 100.
  • Drilling rig equipment at the surface may then be moved off location and a workover rig brought in. Doing so may allow time for swell packers, such as packer 118 to expand or otherwise set.
  • Fig. 4 depicts packer 118 and other packers in the lateral bore 110 in a set position.
  • the liner assembly 116 in cooperation with packer 118 and retrievable packer 120 can isolate the junction 114 from high pressure. Packer 118 in the set position can provide one point of isolation for the junction 114.
  • Retrievable packer 120 can provide a second point of isolation for the junction 114.
  • Fig. 5 depicts the lateral bore 110 undergoing a fracture stimulation process for creating fractures in the subterranean formation 102 adjacent to part of the lateral bore 110.
  • the fracture stimulation process can include various operations applied to the lateral bore 110.
  • the fracture stimulation process can include using a perorating gun to create openings in the lateral bore casing, pumping fracturing fluid into the lateral bore 110, using sliding sleeves or doors for providing and preventing access through the openings in the lateral bore casing.
  • the liner assembly 116 including packer 118 and retrievable packer 120, can isolate the junction 114 from the high pressure.
  • part of the liner assembly 116 can be retrieved from the well system.
  • Fig. 6 depicts the well system with part of the liner assembly 116 from Fig. 5 removed at the disconnect mechanism 122.
  • the disconnect mechanism 122 can be activated using one or more various techniques, some of which are described in following sections.
  • the disconnect mechanism 122 can allow part of the liner assembly 116 to disconnect and be, along with the retrievable packer 120 from Fig. 5 , retrieved using a tool such as a packer retrieval tool.
  • Fig. 7 depicts the well system after the whipstock 104 has been retrieved from the bore 100.
  • Fig. 8 depicts the well system in production by arrows representing fluid flow through the lateral wellbore 110 and the bore 100 toward the surface.
  • the liner assembly 116 can isolate the junction 114 and be retrieved prior to completion of construction of the wellbore system without implementing every step depicted in Figs. 1-8 .
  • the whipstock can remain in the bore 100 instead of being retrieved.
  • a liner assembly can be disconnected for retrieval using various techniques.
  • Figs. 9-10 depict one example of doing so using a disconnect mechanism 200 that is a mechanical or hydraulic disconnect mechanism.
  • a disconnect mechanism 200 that is a mechanical or hydraulic disconnect mechanism.
  • Figs. 9-10 is depicted a bore 202 and lateral bore 204 through a subterranean formation 206.
  • a junction 208 is between the bore 202 and the lateral bore 204.
  • a liner assembly 210 extends from the bore 202 to the lateral bore 204 through the junction 208.
  • the liner assembly 210 includes a liner body 212 and an isolation mechanism that is a retrievable packer 214 exterior to part of the liner body 212 that is in the bore 202.
  • the liner body 212 can cooperate with the retrievable packer 214 and/or other isolation mechanisms, such as packer 216 in the lateral bore 204 to isolate the junction from fracturing pressure.
  • the liner assembly 210 also includes the disconnect mechanism 200 in part of the liner body 212 that is in the lateral bore 204.
  • the disconnect mechanism 200 can be activated by a mechanical or hydraulic force subsequent to the fracturing stimulation process.
  • An activated disconnect mechanism 200 can respond to the mechanical or hydraulic force by allowing at least part of the liner body 212 to detach from another part of the liner body 212.
  • the part of the liner body 212 which can include a section exterior to which is the retrievable packer 214, allowed to detach can be retrieved from the well system, as shown in Fig. 10 .
  • Figs. 11-12 depict another example of disconnecting part of a liner assembly for retrieval using a cutting tool 300 according to one aspect.
  • the liner assembly 210 from Figs. 9-10 is replaced with liner assembly 310 that includes a liner body 312 and an isolation mechanism that is a retrievable packer 314 exterior to part of the liner body 312 that is in the bore 202.
  • the cutting tool 300 can be ran downhole from the surface and through an internal bore defied by the liner body 312 to a location that is farther from the surface than the position of the retrievable packer 314.
  • the cutting tool 300 may be a liner cutting tool, such as one with blades or one that can output a chemical for cutting the liner body 312 at a desired position, such as at a disconnect mechanism 316 that may be a weakened part of the liner body 312 or otherwise a desired position at which the liner body 312 is to be cut.
  • the liner body 312 includes a profile on an inner wall that is adapted for receiving part of the cutting tool 300 such that the cutting tool 300 cuts the liner body 312 at a desired location.
  • the cutting tool 300 can be removed from the well system and part of the liner body 312 can be retrieved, as shown in Fig. 12 .
  • FIG. 13-14 depict another example of disconnecting part of a liner assembly for retrieval using a disconnect mechanism that is a shearable sleeve 400 according to one aspect.
  • the liner assembly 210 from Figs. 9-10 is replaced with liner assembly 410 that includes a liner body 412 and an isolation mechanism that is a retrievable packer 414 exterior to part of the liner body 412 that is in the bore 202.
  • the liner body 412 can be coupled to the shearable sleeve 400 included with the liner assembly 410 using shearable pins or other coupling mechanisms, as shown in Fig. 13A for example.
  • the shearable sleeve 400 can be coupled to a safety sub-assembly 416 in the lateral bore 204.
  • the shearable sleeve 400 and / or shearable pins can respond to a shearable force by disconnecting from liner body 412 and allowing the liner body 412 to be retrieved from the well system, as shown in Fig. 14 .
  • the shearable sleeve 400 is part of the safety sub-assembly 416 instead of the liner assembly 410.

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Measuring Fluid Pressure (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Branch Pipes, Bends, And The Like (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

    Technical Field of the Disclosure
  • The present disclosure relates generally to assemblies and methods to be implemented in a wellbore and, more particularly (although not necessarily exclusively), to assemblies and methods for isolating a junction from fracturing pressure and for being retrievable prior to completion of wellbore construction.
  • Background
  • Various devices can be installed in a well traversing a hydrocarbon-bearing subterranean formation. In a multi-lateral wellbore system, a junction can be between one bore and another bore. The junction may be one of the weakest points in a casing string of the wellbore system. Forces used to create or complete the well system can affect the casing or the formation exposed at the junction. One example of these forces is from fracture stimulation, such as from fracturing pressure.
  • Some assemblies can help reduce the amount of force experienced by the junction, but these assemblies are relatively large (for example requiring three or more points of isolation) and are implemented after a well system is completed.
  • Assemblies and methods for junction isolation are desirable that can isolate a junction prior to construction of the well system being completed and/or that are smaller.
  • US 2011/0024121 A1 discloses a method and apparatus for multilateral multistage stimulation of a well.
  • US 2011/0308797 A1 discloses a wireless downhole tool positioning system.
  • US 2003/0221843 A1 discloses a junction isolation apparatus and methods for use in multilateral well treatment operations.
  • Summary of the Invention
  • In a first aspect of the present invention, there is provided a liner assembly according to Claim 1.
  • In a second aspect of the present invention, there is provided a method according to Claim 6.
  • Certain embodiments of the present invention are directed to isolating a junction from fracturing pressure using a liner extending from a one bore through a junction into a lateral bore, where at least a portion of the liner is retrievable from the lateral bore prior to completion of wellbore construction.
  • Brief Description of the Drawings
  • The invention will be better understood by referring, by way of example, to the accompanying drawings, in which:
    • Fig. 1 depicts by cross-section milling a casing exit window in a bore according to one aspect of the present disclosure;
    • Fig. 2 depicts by cross-section drilling a lateral bore from the bore according to one aspect of the present disclosure;
    • Fig. 3 depicts by cross-section a liner assembly in the bore and lateral bore with packers before being in a set position according to one aspect of the present disclosure;
    • Fig. 4 depicts by cross-section the packers in a set position according to one aspect of the present disclosure;
    • Fig. 5 depicts by cross-section a fracturing stimulation process applied to the lateral bore according to one aspect of the present disclosure;
    • Fig. 6 depicts by cross-section part of the liner assembly disconnected and retrieved from the well system according to one aspect of the present disclosure;
    • Fig. 7 depicts by cross-section a whipstock retrieved from the bore according to one aspect of the present disclosure;
    • Fig. 8 depicts by cross-section a well system in production after construction is completed according to one aspect of the present disclosure;
    • Fig. 9 depicts by cross-section a well system with a liner body having a disconnect mechanism according to one aspect of the present disclosure;
    • Fig. 10 depicts the well system of Fig. 9 after part of the liner body has been disconnected and retrieved according to one aspect of the present disclosure;
    • Fig. 11 depicts by cross-section the well system of Fig. 9 with a liner assembly according to another aspect of the present disclosure that can respond to a cutting tool;
    • Fig. 12 depicts the well system of Fig. 9 after part of the liner body has been cut by the cutting tool and retrieved according to one aspect of the present disclosure;
    • Fig. 13 depicts the well system of Fig. 9 with a disconnect mechanism that includes a shearable sleeve according to one aspect of the present disclosure;
    • Fig. 13A depicts the shearable sleeve of Fig. 13 according to one aspect of the present disclosure; and
    • Fig. 14 depicts the well system of Fig. 9 after part of the liner body has been disconnected from the shearable sleeve and retrieved according to one aspect of the present disclosure.
    Detailed Description
  • Certain aspects and features relate to isolating a junction from fracturing pressure using a liner extending from a one bore through a junction into a lateral bore, where at least a portion of the liner is retrievable from the lateral bore prior to completion of wellbore construction. The junction may be temporarily isolated from high pressure, such as high pressure from a fracturing stimulation process. Isolating the junction from high pressure can include preventing the junction from experience forces from the high pressure or otherwise protecting the junction from being damaged during the fracturing stimulation process.
  • In some aspects, a casing exit can be milled out of a first bore and the lateral bore created by drilling to a desired depth or location. After the lateral bore has been created, a liner can be run into the lateral, such as across a whipstock or by using a bent joint, and a retrievable packer can be set in the first bore closer to the surface than the window in the first bore for the lateral bore. The portion of the liner in the lateral bore can include any and one or more of a swell packer, stimulation sleeves, cementing equipment or packers. The liner, including certain components, can isolate the junction from pressure from fracturing stimulation performed in the lateral bore subsequent to the liner being run.
  • At least part of the liner can be retrieved (i.e. removed from the wellbore) prior to the wellbore being completed to regain flow from below the junction. In some aspects, the entire liner is retrieved. In other aspects, part of the liner is retrieved and another part remains in the wellbore system.
  • The liner or part of the liner can be retrieved by various methods and using various devices and mechanisms. In one aspect, the liner includes a mechanical and / or hydraulic disconnect mechanism that can be located in part of the liner that can be in the lateral bore. The disconnect mechanism can be activated subsequent to the fracturing stimulation process by rotating, pulling, shearing, shifting a sleeve, or applying hydraulic forces to shift a component. An activated disconnect mechanism can allow part of the liner, such as part of the liner connected to a retrievable packer, to disconnect from the remaining part of the liner (or from another component in the lateral bore) and be retrieved.
  • In another aspect, the liner includes two or more liner sections that are fastened together for sealing and providing pressure isolation. When the packer is retrieved, the liner can shear at the fastened sections such that the liner sections separate from each other. The liner sections can separate such that the lower section can remain downhole and the upper section, which may be attached to a retrievable packer, can be retrieved.
  • In another aspect, a cutting tool that includes a mechanical or chemical cutting mechanism is run downhole using wireline, coiled tubing, or another running tool. The cutting tool can enter an internal bore defined at least in part by the liner. The liner can respond to the cutting mechanism be disconnecting and being retrieved. Some aspects of the liner include a profile on an inner wall that can receive part of the running tool to allow the running tool to be run to the proper location.
  • After the retrievable packer and the liner portion are retrieved, the whipstock (if used) can be retrieved to regain access to the first bore.
  • Certain aspects can save rig time in comparison to previous junction isolation techniques by reducing the number of trips downhole to isolate the junction and by reducing the complexity of completing a fracture stimulated multilateral junction. Certain aspects can avoid the use of seals for pressure integrity and can facilitate a greater pressure isolation rating.
  • These illustrative aspects and examples are given to introduce the reader to the general subject matter discussed here and are not intended to limit the scope of the disclosed concepts. The following sections describe various additional features and examples with reference to the drawings in which like numerals indicate like elements, and directional descriptions are used to describe the illustrative aspects but, like the illustrative aspects, should not be used to limit the present invention.
  • Figs. 1-8 depict one aspect of isolating a junction by a liner assembly, at least part of which can be retrieved prior to completion of construction of the wellbore system. Fig. 1 depicts a bore 100 through a subterranean formation 102. A whipstock 104 is set in the bore 100 and is depicted as diverting a milling tool 106 run from the surface (not shown) for creating an exit window 108 in casing that is in the bore 100.
  • Fig. 2 depicts a lateral bore 110 created by a drilling tool 112 diverted through the casing exit window 108 by whipstock 104. At the casing exit window 108 is a junction 114 between the bore 100 and the lateral bore 110.
  • Fig. 3 depicts a liner assembly 116 that is run downhole and extends from the bore 100 through the junction 114 to the lateral bore 110. The liner assembly 116 includes or is associated with isolation mechanisms, such as a packer 118 in the lateral bore 110 and a retrievable packer 120 in the bore 100. Packer 118 may be a swellable packer that surrounds a portion of the body of the liner assembly 116 that is located in the lateral bore 110. In some aspects, packer 118 surrounds a portion of tubing in the lateral bore 110 to which the liner assembly 116 couples or of which the liner assembly 116 is a section. Retrievable packer 120 may surround a portion of the body of the liner assembly 116 that is in the bore 100. Although retrievable packer 120 is described as a retrievable packer, it may be other types of isolation mechanisms. In some aspects, a retrievable liner hanger can be used in place of the retrievable packer 120. The liner assembly 116 in Fig. 3 includes a disconnect mechanism 122 that is in a portion of the liner assembly 116 that is in the lateral bore 100.
  • Drilling rig equipment at the surface may then be moved off location and a workover rig brought in. Doing so may allow time for swell packers, such as packer 118 to expand or otherwise set. Fig. 4 depicts packer 118 and other packers in the lateral bore 110 in a set position. The liner assembly 116 in cooperation with packer 118 and retrievable packer 120 can isolate the junction 114 from high pressure. Packer 118 in the set position can provide one point of isolation for the junction 114. Retrievable packer 120 can provide a second point of isolation for the junction 114.
  • Fig. 5 depicts the lateral bore 110 undergoing a fracture stimulation process for creating fractures in the subterranean formation 102 adjacent to part of the lateral bore 110. The fracture stimulation process can include various operations applied to the lateral bore 110. For example, the fracture stimulation process can include using a perorating gun to create openings in the lateral bore casing, pumping fracturing fluid into the lateral bore 110, using sliding sleeves or doors for providing and preventing access through the openings in the lateral bore casing. During the fracture stimulation process in which high pressure is introduced into the well system, the liner assembly 116, including packer 118 and retrievable packer 120, can isolate the junction 114 from the high pressure.
  • Subsequent to the fracturing stimulation process and prior to construction of the well system is completed and the well system is ready for production, part of the liner assembly 116 can be retrieved from the well system. Fig. 6 depicts the well system with part of the liner assembly 116 from Fig. 5 removed at the disconnect mechanism 122. In some aspects, the disconnect mechanism 122 can be activated using one or more various techniques, some of which are described in following sections. In response, the disconnect mechanism 122 can allow part of the liner assembly 116 to disconnect and be, along with the retrievable packer 120 from Fig. 5, retrieved using a tool such as a packer retrieval tool.
  • Subsequent to part of the liner assembly 116 being retrieved, the whipstock 104 can be retrieved, construction of the well system can be completed, and the well system can be brought into production. Fig. 7 depicts the well system after the whipstock 104 has been retrieved from the bore 100. Fig. 8 depicts the well system in production by arrows representing fluid flow through the lateral wellbore 110 and the bore 100 toward the surface.
  • In other aspects, the liner assembly 116 can isolate the junction 114 and be retrieved prior to completion of construction of the wellbore system without implementing every step depicted in Figs. 1-8. For example, in some aspects, the whipstock can remain in the bore 100 instead of being retrieved.
  • At least part of a liner assembly can be disconnected for retrieval using various techniques. Figs. 9-10 depict one example of doing so using a disconnect mechanism 200 that is a mechanical or hydraulic disconnect mechanism. In Figs. 9-10 is depicted a bore 202 and lateral bore 204 through a subterranean formation 206. A junction 208 is between the bore 202 and the lateral bore 204. A liner assembly 210 extends from the bore 202 to the lateral bore 204 through the junction 208. The liner assembly 210 includes a liner body 212 and an isolation mechanism that is a retrievable packer 214 exterior to part of the liner body 212 that is in the bore 202. The liner body 212 can cooperate with the retrievable packer 214 and/or other isolation mechanisms, such as packer 216 in the lateral bore 204 to isolate the junction from fracturing pressure.
  • The liner assembly 210 also includes the disconnect mechanism 200 in part of the liner body 212 that is in the lateral bore 204. The disconnect mechanism 200 can be activated by a mechanical or hydraulic force subsequent to the fracturing stimulation process. An activated disconnect mechanism 200 can respond to the mechanical or hydraulic force by allowing at least part of the liner body 212 to detach from another part of the liner body 212. The part of the liner body 212, which can include a section exterior to which is the retrievable packer 214, allowed to detach can be retrieved from the well system, as shown in Fig. 10.
  • Figs. 11-12 depict another example of disconnecting part of a liner assembly for retrieval using a cutting tool 300 according to one aspect. The liner assembly 210 from Figs. 9-10 is replaced with liner assembly 310 that includes a liner body 312 and an isolation mechanism that is a retrievable packer 314 exterior to part of the liner body 312 that is in the bore 202. The cutting tool 300 can be ran downhole from the surface and through an internal bore defied by the liner body 312 to a location that is farther from the surface than the position of the retrievable packer 314. The cutting tool 300 may be a liner cutting tool, such as one with blades or one that can output a chemical for cutting the liner body 312 at a desired position, such as at a disconnect mechanism 316 that may be a weakened part of the liner body 312 or otherwise a desired position at which the liner body 312 is to be cut. In some aspects, the liner body 312 includes a profile on an inner wall that is adapted for receiving part of the cutting tool 300 such that the cutting tool 300 cuts the liner body 312 at a desired location. The cutting tool 300 can be removed from the well system and part of the liner body 312 can be retrieved, as shown in Fig. 12.
    Figs. 13-14 depict another example of disconnecting part of a liner assembly for retrieval using a disconnect mechanism that is a shearable sleeve 400 according to one aspect. The liner assembly 210 from Figs. 9-10 is replaced with liner assembly 410 that includes a liner body 412 and an isolation mechanism that is a retrievable packer 414 exterior to part of the liner body 412 that is in the bore 202. The liner body 412 can be coupled to the shearable sleeve 400 included with the liner assembly 410 using shearable pins or other coupling mechanisms, as shown in Fig. 13A for example. The shearable sleeve 400 can be coupled to a safety sub-assembly 416 in the lateral bore 204. The shearable sleeve 400 and / or shearable pins can respond to a shearable force by disconnecting from liner body 412 and allowing the liner body 412 to be retrieved from the well system, as shown in Fig. 14. In other aspects, the shearable sleeve 400 is part of the safety sub-assembly 416 instead of the liner assembly 410.
  • The foregoing description of the aspects, including illustrated aspects, of the disclosure has been presented only for the purpose of illustration and description and is not intended to be exhaustive or to limit the invention to the precise forms disclosed. Numerous modifications, adaptations, and uses thereof will be apparent to those skilled in the art without departing from the scope of this invention, as defined by the appended claims.

Claims (9)

  1. A liner assembly, comprising;
    a liner body (312) partially positionable at a junction (114) between a bore (100) and a lateral bore (110) of a well system through a subterranean formation (102);
    an isolation mechanism exterior to part of the liner body (312), the isolation mechanism being adapted for cooperating with the liner body (312) in isolating the junction (114) from fracturing pressure for the lateral bore (110); and
    a disconnect mechanism (316) in a portion of the liner body (312) configured to be in the lateral bore (110) when the liner body (312) is partially positioned at the junction (114),
    wherein an internal bore of the liner assembly (310) is adapted for running a cutting tool (300) therethrough and the at least part of the liner body (312) is adapted for being cut by the cutting tool (300) farther from a surface of the well system than the isolation mechanism and for responding to being cut by the cutting tool (300) by detaching from another part of the liner body (312),
    wherein at least part of the liner body (312) is retrievable prior to construction of the well system being completed for production.
  2. The liner assembly of claim 1, wherein the isolation mechanism comprises:
    a first isolation mechanism (120) exterior to part of the liner body (312) that is configured to be closer to a surface of the well system than the junction (114) when the liner body is partially positioned at the junction; and
    a second isolation mechanism (118) exterior to part of the liner body (312) that is configured to be in the lateral bore (110) when the liner body is partially positioned at the junction (114).
  3. The liner assembly of claim 1 or 2, wherein the disconnect mechanism (316) is configured for responding to a mechanical force by allowing the at least part of the liner body (312) to be retrieved.
  4. The liner assembly of any preceding claim, wherein the least part of the liner body (312) is retrievable prior to retrieval of a whipstock (104) in the bore (100) from the well system.
  5. A method comprising:
    creating a lateral bore (110) in a well system that includes a bore (100) by milling through a wall of the bore (100) and drilling through a subterranean formation (102);
    installing a liner assembly (310) that extends through a junction (114) between the bore (100) and the lateral bore (110), the liner assembly (310) comprising a liner body (312) and an isolation mechanism exterior to part of the liner body (312) in the bore (100);
    fracturing the subterranean formation that is proximate to at least part of the lateral bore (110) using fracturing pressure, wherein the liner assembly (310) isolates the junction (114) from the fracturing pressure; and
    retrieving at least part of the liner assembly (310) prior to completing construction of the well system for production, wherein retrieving the at least part of the liner assembly (310) prior to completing construction of the well system for production comprises retrieving the at least part of the liner assembly (310) using a disconnect mechanism (316) in a portion of the liner body (312) in the lateral bore (110), and wherein retrieving the at least part of the liner assembly (310) using the disconnect mechanism (316) in the portion of the liner body (312) in the lateral bore (110) comprises:
    running a cutting tool (300) through an internal bore of the liner assembly (310); and
    cutting part of the liner body (312) farther from a surface of the well system than the isolation mechanism to allow the at least part of the liner assembly (310) to disconnect and be retrieved from the well system.
  6. The method of claim 5, further comprising:
    producing fluid from the subterranean formation (102) subsequent to retrieving the at least part of the liner assembly (310).
  7. The method of claim 5 or 6, wherein retrieving the at least part of the liner assembly (310) using the disconnect mechanism (316) in the portion of the liner body (312) in the lateral bore (110) comprises:
    applying a mechanical force that causes the disconnect mechanism (316) to allow the at least part of the liner assembly (310) to disconnect and be retrieved from the well system.
  8. The method of any one of claims 5 to 7, further comprising:
    running a whipstock (104) to a position in the bore (100) that is proximate to the junction (114); and
    retrieving the whipstock (104) from the well system subsequent to retrieving the at least part of the liner body (312).
  9. The method of any one of claims 5 to 8, wherein the isolation mechanism comprises:
    a first isolation mechanism (120) exterior to part of the liner body that is closer to a surface of the well system than the junction when the liner assembly is installed; and
    a second isolation mechanism (118) exterior to part of the liner body that is in the lateral bore when the liner assembly is installed.
EP12886731.4A 2012-10-16 2012-10-16 Multilateral bore junction isolation Not-in-force EP2898181B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2012/060462 WO2014062166A1 (en) 2012-10-16 2012-10-16 Multilateral bore junction isolation

Publications (3)

Publication Number Publication Date
EP2898181A1 EP2898181A1 (en) 2015-07-29
EP2898181A4 EP2898181A4 (en) 2016-02-24
EP2898181B1 true EP2898181B1 (en) 2017-05-10

Family

ID=50488591

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12886731.4A Not-in-force EP2898181B1 (en) 2012-10-16 2012-10-16 Multilateral bore junction isolation

Country Status (7)

Country Link
EP (1) EP2898181B1 (en)
AU (2) AU2012392527B2 (en)
BR (1) BR112015007807B8 (en)
CA (1) CA2888032C (en)
EA (1) EA033092B1 (en)
MX (1) MX355537B (en)
WO (1) WO2014062166A1 (en)

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5474131A (en) * 1992-08-07 1995-12-12 Baker Hughes Incorporated Method for completing multi-lateral wells and maintaining selective re-entry into laterals
US6712148B2 (en) * 2002-06-04 2004-03-30 Halliburton Energy Services, Inc. Junction isolation apparatus and methods for use in multilateral well treatment operations
US7267172B2 (en) * 2005-03-15 2007-09-11 Peak Completion Technologies, Inc. Cemented open hole selective fracing system
US7441604B2 (en) * 2005-10-26 2008-10-28 Baker Hughes Incorporated Fracking multiple casing exit laterals
US7575062B2 (en) * 2006-06-09 2009-08-18 Halliburton Energy Services, Inc. Methods and devices for treating multiple-interval well bores
GB2466715B (en) * 2008-12-31 2011-05-11 Smith International Accessing multiple boreholes with a production tubing assembly
CA2688926A1 (en) * 2008-12-31 2010-06-30 Smith International, Inc. Downhole multiple bore tubing apparatus
US8485259B2 (en) * 2009-07-31 2013-07-16 Schlumberger Technology Corporation Structurally stand-alone FRAC liner system and method of use thereof
US8220547B2 (en) * 2009-07-31 2012-07-17 Schlumberger Technology Corporation Method and apparatus for multilateral multistage stimulation of a well
US8272441B2 (en) 2009-09-14 2012-09-25 Don Umphries Wireless downhole tool positioning system

Also Published As

Publication number Publication date
CA2888032C (en) 2017-01-31
BR112015007807B1 (en) 2021-02-23
EP2898181A4 (en) 2016-02-24
AU2012392527A1 (en) 2015-04-30
BR112015007807A2 (en) 2017-07-04
AU2015249040A1 (en) 2015-11-12
CA2888032A1 (en) 2014-04-24
MX2015004385A (en) 2015-06-10
MX355537B (en) 2018-04-20
BR112015007807B8 (en) 2021-03-30
WO2014062166A1 (en) 2014-04-24
EA201590570A1 (en) 2015-08-31
EP2898181A1 (en) 2015-07-29
AU2015249040B2 (en) 2017-06-01
EA033092B1 (en) 2019-08-30
AU2012392527B2 (en) 2015-08-20

Similar Documents

Publication Publication Date Title
US8794328B2 (en) Multilateral bore junction isolation
US10731417B2 (en) Reduced trip well system for multilateral wells
EP2459845B1 (en) Methods and apparatus for multilateral multistage stimulation of a well
US9951573B2 (en) Whipstock and deflector assembly for multilateral wellbores
CA2674350C (en) Method and apparatus for retrieving an assembly from a wellbore
US9945203B2 (en) Single trip completion system and method
US10538994B2 (en) Modified junction isolation tool for multilateral well stimulation
CA2915624A1 (en) Tool assembly and process for drilling branched or multilateral wells with whipstock
EP2815056B1 (en) Swelling debris barrier and methods
NO20180792A1 (en) Retaining sealing element of wellbore isolation device with slip elements
GB2531399A (en) Apparatus and method of connecting tubular members in multi-lateral wellbores
CA3054380A1 (en) Perforation tool and methods of use
EP2898181B1 (en) Multilateral bore junction isolation
US11851992B2 (en) Isolation sleeve with I-shaped seal
US11867030B2 (en) Slidable isolation sleeve with I-shaped seal
US11814918B2 (en) Force dissipation assembly for use with disconnect tools
EA039924B1 (en) Multilateral bore junction isolation

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20150409

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20160125

RIC1 Information provided on ipc code assigned before grant

Ipc: E21B 43/12 20060101AFI20160119BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20161201

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 892541

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170515

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012032448

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20170510

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 892541

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170510

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170810

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170811

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170910

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170810

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012032448

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20180213

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602012032448

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20171016

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20180629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171016

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180501

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171016

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171031

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171031

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20171031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171031

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171016

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171016

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20121016

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170510