EP2847718A1 - Method for placement of ducts/cables and device for planning placement thereof - Google Patents
Method for placement of ducts/cables and device for planning placement thereofInfo
- Publication number
- EP2847718A1 EP2847718A1 EP13787960.7A EP13787960A EP2847718A1 EP 2847718 A1 EP2847718 A1 EP 2847718A1 EP 13787960 A EP13787960 A EP 13787960A EP 2847718 A1 EP2847718 A1 EP 2847718A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- ducts
- cables
- node
- links
- nodes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/08—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging wheels turning round an axis
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/10—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables
- E02F5/101—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with arrangements for reinforcing trenches or ditches; with arrangements for making or assembling conduits or for laying conduits or cables forming during digging, e.g. underground canalisations or conduits, by bending or twisting a strip of pliable material; by extrusion
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/14—Component parts for trench excavators, e.g. indicating devices travelling gear chassis, supports, skids
- E02F5/145—Component parts for trench excavators, e.g. indicating devices travelling gear chassis, supports, skids control and indicating devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/2045—Guiding machines along a predetermined path
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/205—Remotely operated machines, e.g. unmanned vehicles
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/032—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being continuous
-
- G—PHYSICS
- G02—OPTICS
- G02B—OPTICAL ELEMENTS, SYSTEMS OR APPARATUS
- G02B6/00—Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
- G02B6/46—Processes or apparatus adapted for installing or repairing optical fibres or optical cables
- G02B6/50—Underground or underwater installation; Installation through tubing, conduits or ducts
- G02B6/504—Installation in solid material, e.g. underground
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/16—Cables, cable trees or wire harnesses
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/02—Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
Definitions
- the present invention relates to a method for placement of ducts/cables in a geographical area. More specifically, the invention relates to a method according to claim 1. Furthermore, the invention also relates to a computer program, a computer program product, a device and a system thereof.
- fibre optic networks for communication in residential areas is often hampered by the high cost of excavation and restoration of the road layer, such as asphalt or concrete.
- a typical residential connection may cost approximately EUR 3 000 plus VAT, and hence many homeowners are reluctant to make such an investment.
- This in turn means that the connection rate for houses is low when a residential area is built, which further increases the cost of connecting.
- the reason for this is that the cost for the backbone is more or less independent of the connection rate, and a low connection rate means that fewer houses will have to bear the total cost for the backbone.
- Micro Trenching is expected to become the dominating method for building Fiber-To-The-Home (FTTH) in areas with detached or semidetached houses.
- FTTH Fiber-To-The-Home
- In Sweden around 400 000 houses are expected to be connected to a fiber network during the next 5 - 10 years.
- the world market is enormous and may be estimated to around 100 - 500 times the Swedish market. This means that somewhere between 40 million to 200 million houses may be connected during the next 20 years.
- the planning, sawing of trenches for ducts/cables as well as the actual placement of ducts/cables is a complicated task and involves high investment costs. Therefore, it is critical how trenches and placement of ducts/cables is planned and deployed in different geographical areas.
- An object of the present invention is to provide a control method which fully or in part solves the problems of prior art solutions. Another object is to provide an effective method for planning and placing ducts/cables in a geographical area.
- the above mentioned objects are achieved by a method for placement of ducts/cables in a geographical area, said method using a topology comprising one or more links and one or more nodes;
- each node being a starting point and/or an end point for a link, and each node being associated with information about which links said node is connected to,
- each link representing a trench and having a starting point and an end point connected to a node, respectively, and each link being associated with information about which nodes said link is connected to;
- Embodiments of the method above are defined in the appended dependent method claims.
- the invention also relates to a computer program and a computer program product.
- a device for planning placement of ducts/cables in a geographical area comprising a server unit having input means, computer/processing means, communication means and a first data base, said first data base including positioning data; said device being arranged to use a topology comprising one or more links and one or more nodes;
- each node being a starting point and/or an end point for a link, and each node being associated with information about which links said node is connected to, - each link representing a trench and having a starting point and an end point connected to a node, respectively, and each link being associated with information about which nodes said link is connected to; said device further being arranged to:
- the device can further be comprised in a system which also includes a sawing machine.
- the solution according to the present invention makes the planning of trenches for ducts/cables fast and cost effective. Also, the actual placement of ducts/cables in the trenches can be made with high precision and at a low cost since the use of a topology of the present invention makes it possible to plan the work in an efficient manner regarding production capacity used, such as amount of ducts/cables, number of sawing machines needed for a project, etc.
- Figure 1 shows a sawing machine with its sawing blade/disc cutter and a stabilizing device for placing ducts/cables immediately behind the sawing disc;
- Figure 2 shows the sawing machine where the stabilizing device is adapted for placing a plurality of ducts/cables at the same time while maintaining the order of the ducts/cables in the micro trench;
- Figure 3 shows in detail where to cut the top duct so that it will be long enough to reach its final destination
- FIG. 4-6 shows further embodiments of the stabilizing device (the channels are only illustrated in figures 4-6 and should therefore not be seen as true representations);
- Figures 7-9 illustrates different data flows in a system;
- - Figure 10 illustrates a work order; and
- FIG. 1 1-13 illustrates the generation of a topology according to the invention.
- the present method relates to a method for placement of ducts/cables in a geographical area.
- the present method uses a topology comprising one or more links and one or more nodes.
- Each node is a starting point and/or an end point for a link, and each node is associated with information about which links the specific node is connected to.
- Each link represents a trench and has a starting point and an end point connected to a node, respectively, and each link is associated with information about which nodes the specific link is connected to.
- the method comprises the steps of: placing links in a representation of a geographical area and interconnecting the links by means of nodes so as to generate a topology comprising of nodes and links; and using the topology for placement of ducts/cables in the geographical area.
- each node may further be associated with information about the main trenches and the branch trenches the node is connected to.
- the representation of a geographical area can e.g. be a computer representation displayed on a screen as a map and/or being a logical representation in a data base.
- the topology generated by the present method is used for projecting/planning placement of ducts/cables and hence the step of using involves: using the associated information of the nodes and links for projecting placement of ducts/cables in the geographical area.
- the step of using involves: indicating a first node and a second node of the topology; and generating a shortest route between the first and second nodes via one or more nodes and one or more links of the topology.
- the shortest route can be obtained by using an optimisation algorithm.
- a designer may use a software module to design/project new trenching and placement of ducts/cables.
- the work of the designer is interactive and the first step is to create a trenching network comprising trench-links (links) and trench-nodes (nodes).
- a link is a trench in the ground.
- the link has a start and a stop point/location. Each start and stop location also consist of a node.
- a node is associated with information about "events" at that specific node.
- Example of events may be: a trench (line) starts in node S51 in the example in figure 11; or a trench is split up into two trenches in the example below (three trench links "meet" in trench-node S52).
- a duct-network consists of wells, cabinets (duct-nodes), ducts/tubes (duct-links), etc. Firstly, the duct-nodes (wells, cabinets) is created and placed in spatial locations in the geographic area.
- Next step in the workflow of duct-network creation is to design ducts/tubes that are running from one trench-node to any other desired trench-node in the topology.
- the duct can pass a number of trench nodes on the way from a start node to a stop node.
- the designer point out the start and stop node and the system automatically traces the shortest way within the trench- network from the start-node to the stop-node.
- the designer reuses/inherits the trench network during automatic trace of a path where to place a duct. If there are alternative ways in the topology, the shortest way is selected. A mathematical algorithm (e.g. a suitable optimization algorithm) calculates this and possibly more alternatives - although the shortest is selected.
- the process of creating the trench and duct network is done efficient due to the semi automatic approach. The system automatically searches for any existing duct nodes in the start/stop point of the duct link and automatically connects any duct nodes to the duct link.
- a mathematical topology is created in the duct- network.
- the designer generates one or more first work orders comprising an assembled logic regarding what is needed in the saw machine client on board the computer of the sawing machine.
- the method comprises the steps of: generating at least one first work order for a sawing machine based on the shortest route; and transmitting a first data flow A comprising the first work order to the sawing machine.
- the information is preferably transmitted by using any suitable wireless communication technique.
- the sawing machine is of the kind having computer/processing means and communication means for receiving and processing the first work order.
- the machine is also arranged for sawing trenches in an area.
- the first work order is provided by a device comprising: a server unit having computer/processing means, communication means and a first data base, said first data base including positioning data.
- the controlling may according to an embodiment of the invention involve: sawing, by the sawing machine, at least one trench in the area according to the first work order.
- the first data flow A preferably comprises position data related to the first work order.
- the position data contains information e.g. in X-, Y-, Z-coordinates where the sawing of the trench should be performed, i.e. the shortest route.
- the Z- coordinates to represent the depth of the trench to be sawn X- coordinates represents longitude and Y- coordinates represents latitude.
- the sawing machine receives the first work order it process it and starts to saw trenches according to the first type of work order.
- the sawing machine may be controlled by an operator which is instructed e.g. by means of display means (screen) mounted on the sawing machine.
- the first work order comprises position data so that the machine is instructed to saw trenches in the right positions of the geographical area.
- the first work order may also comprises information about number of ducts/cables to be placed, an internal order of said ducts/cables, and where (in what position) said ducts/cables should be cut.
- the sawing machine further comprises a positioning receiver such as a precision GPS
- the method further comprises the steps of: transmitting, by the sawing machine, a second data flow (B) comprising positioning data for the sawing machine to the server unit, and updating the first data base with the second data flow (B).
- FIG 7 This embodiment is illustrated in figure 7. As seen in the figure a first data flow A is transmitted from the server unit to the sawing machine while a second data flow B is transferred in the opposite direction.
- the system can in this embodiment keep track of the exact position of the sawing machine.
- the positioning can also be used to lead staff to the right place and to control the entities in the system such as sawing machines.
- the position determination is also a safety feature in that it can accurately tell where a person like operator, installer or inspector is if an accident should occur.
- All positioning data is sent to the server unit via suitable communication systems.
- the positioning data and other relevant information can be stored in the computer means (or associated memory means) that is connected to the GPS receiver and transmitted when communicating is possible.
- Precise positioning in the X-, Y- and Z-coordinates is central to the automatic real-time documentation of the present invention.
- Geographic Information System (GIS/GIT) which is the software that computes the spatial data allows a traceability and precision with millimetre accuracy.
- the second data flow B may also comprise receipt data corresponding to the first work order so that the system can keep track of how, and where the different work orders are performed.
- the receipt data relates to the positioning data of the sawing machine which means that for each receipt a position is recorded and stored.
- the following is an example embodiment of the work flow for the sawing machine in the present method.
- the first step for the operator of the sawing machine is to check out the first work orders.
- the work orders on board the saw-computer are executed using the client of the sawing machine with the following actions:
- the saw-operator is requested to position the sawing machine at the start point the next work order to process.
- the machine is displayed in real time via the GPS on the screen of the machine.
- the GPS-system connected to the on board computer calculates the "direction" of the saw/trenching and displays it on the screen.
- the system tells the operator when the sawing machine is on correct start-trench-position and the trenching can start.
- the sawing machine is moving on the screen and the current minimum distance between calculated/designed trenches compared to actual trench is displayed.
- the operator When the sawing machine enters a trench node, the operator is informed, e.g. there may be a trench branch in the trench-node that has to be marked up on ground.
- the system according to the invention in which the method is implemented, therefore comprises a server unit having computer means, communication means and a first data base which includes positioning data and a plurality of work orders.
- the system further comprises a sawing machine having computer means and communication means, and other necessary means so as to be arranged for sawing trenches in an area.
- the first type of work orders may further comprise information and control data for controlling the sawing machine so that the sawing machine performs its task in an effective and precise way.
- the work order may e.g. instruct the sawing machine where (i.e. the position) to start and stop an activity: where to raise and lower the saw blade, where to stop for a side cut, when to change saw blade, etc.
- the activities can be executed manually, automatically or semi-automatically depending on the system entities and activities.
- Figure 10 illustrates an example of a work order in X-, Y-coordinates.
- the lines in the figure illustrates the positions in X-, Y-coordinates where trenches shall be sawn and the black spots indicate where the saw blade should be changed e.g. due to change of road layer from asphalt to concrete.
- the dotted lines illustrate where the saw blade and the stabilizing device should be raised over ground since no trench shall be sawn in this area (which in this case relates to instructions in Z- coordinates). However, the dotted line marks which way the sawing machine shall move between positions PI and P2. From position P2 the sawing machine continues producing micro trench.
- the communication means are any suitable communication means so that wireless communication systems, such as GSM, UMTS, LTE, etc, can be used, e.g. over the Internet with well known protocols and techniques.
- wireless communication systems such as GSM, UMTS, LTE, etc.
- the work orders are related to the positioning data, e.g. the exact position to start and stop an activity, and the work order contains information to an entity/unit in the system which will perform a task.
- the work order contains information about what should be done, who should do it, when to do it and where it should be done. Each step to be performed may have extended information attached to it depending on the task to be performed.
- the first database of the server unit is central to the present system. It contains all work orders regardless of type (first, second, third, fourth, etc), and all information is linked to a work order.
- the idea is that regardless of the type of work to be undertaken, (scanning, sawing, placing, installing, inspecting, etc.), there is a work order underlying an activity for the entities.
- the work order is supplemented by various types of information depending on the type of work. For example, for a GEO scanner it may contain the scanned images. For a sawing machine it is supplemented with information about where and how fibre is installed into the sawed trench. For inspections it store values that aggregate rotting in poles, pole tilt, etc.
- the first database For installations above ground it stores information about what is installed on poles and what route it has from pole to pole, etc.
- the first database also includes a variety of tables with standard data that the user of the system can choose from to avoid entering data by hand which saves time.
- the first data base can further comprise spatial/map data for the mentioned area according to an embodiment of the invention. Spatial/map data can be seen as the information used to build the map image, e.g. lines and symbols and their positions on the map image.
- data/information collected by various government agencies may be imported to the first database, including: property data from Land Survey, population/demographic data, and road/rail data.
- data from the municipality, energy companies and other enterprise and organizations can be imported to the first data base to further facilitate planning and prospecting.
- the sawing machine in the system may comprises any suitable means, such as one or more engine means for powering the saw blade and the stabilizing device and/or for driving means (e.g. drive train and wheels), communication means for wireless communication with e.g. a remote server unit, processing/computer means, memory means, sensors, GPS means, vehicle means, display means for displaying information such as graphics, data base means. Information from these means (especially from the different sensors) is recorded and stored, and transmitted as operational data (for the sawing machine) to the server unit and/or to an office client in the second data flow.
- suitable means such as one or more engine means for powering the saw blade and the stabilizing device and/or for driving means (e.g. drive train and wheels), communication means for wireless communication with e.g. a remote server unit, processing/computer means, memory means, sensors, GPS means, vehicle means, display means for displaying information such as graphics, data base means. Information from these means (especially from the different sensors) is recorded and stored, and transmitted as operational data (for the sawing machine) to the
- a new first work order may be generated or modified.
- the sawing machine may also comprise a second data base which includes information from the first data base.
- the second data base can be continuously updated (by means of the communication means) with relevant information from the first data base, or be replicated to the first database of the server unit at start-up and when data needs to be renewed, the latter solution saving communication resources. This is to allow work to proceed even if communication is not possible between the client in the sawing machine and the server unit.
- the system further comprises a GEO scanner having communication means.
- the method according to this embodiment therefore further comprises the steps of: transmitting, by the server unit, a third data flow C comprising a second work order to the GEO scanner, scanning, by the GEO scanner, at least a part of the area according to the second work order, transmitting, by the GEO scanner, a fourth data flow D comprising scanning information about the area to the server unit, and updating the first data base with the fourth data flow D.
- the GEO scanner is controlled by means of the second work order.
- the GEO scanner may preferably comprise a positioning receiver so that the fourth data flow D further comprises receipt data corresponding to the second work order and positioning data for the GEO scanner.
- the positioning data is related to the scanning information and receipt data.
- the first data base is kept updated in real time with relevant geological data. Therefore, a first work order may be generated and/or modified based on the fourth data flow D. It should be noted that the first work order may be generated and/or modified based on the second and/or the fourth data flow so as to allow the system to use the latest correct information.
- the described embodiment is illustrated in figure 8 in which the GEO scanner is a part of the process for investigating, detecting and documenting existing underground installations.
- a vehicle mounted ground penetrating radar detects signals that are sent into the ground at an angle in front, behind and just below the GEO scanner.
- the ground surface is e.g. covered with a width of about one meter. The depth depends on the purpose of the survey. For sawing for fibre installation 1 meter will often be enough, but other depths is possible.
- the signals from the GEO scanner are complemented by signals from the GPS positioning so that an exact location is stored for scanned images (the ratio of position/scanned image may be adjusted).
- the signals are filtered, interpreted and processed to give a comprehensible picture of what lies below the ground surface in which the trenches shall be sawn.
- the information also shows the state of the ground so that the right saw blade can be used by the sawing machine, e.g. concrete and asphalt needs different types of saw blades.
- the GEO scanner may also have a data base of its own, i.e. a third data base, including relevant information from the first data base.
- the third data base can be continuously updated (by means of communication means) with relevant information from the first data base or updated at start-up and when data have to be renewed.
- the system according to the invention may also according to a preferred embodiment comprise an office client.
- the office client can be implemented in a personal computer (PC) having communication means, such as wired or wireless communication, so that it can interact and communicate with the server unit e.g. by means of a suitable web interface.
- the method according to this embodiment comprises the steps of: generating and/or modifying, by the office client, a first and/or a second work order. Transmitting, by the office client, a fifth data flow E comprising the generated and/or modified first and/or the second work order to the sawing machine and/or the GEO scanner via the server unit.
- the office client may also generate third and fourth (or any further) work orders to the installer and inspector, respectively.
- the office client is connected to a master system, on the server unit that receives and processes data from the different clients, according to the invention for administrating trenching, placing, and other steps in the system.
- the master system may be used for machine control, fibre documentation in real time, logistics and optimization.
- the master system controls, monitors and records all activities and events related to the installation with the MTT method.
- Based on an optimized design different types of work orders are created. These work orders each contain information for different stages of the installation. They contain information about what to be done. For example, where each element will start, which saw blade to be used, how long and to what depth (Z-coordinate) it must be sawed, what is to be installed in the sawed trench, where side tracks are to be cut, etc.
- FIG 9 In which also a sixth data flow F is illustrated.
- the present method may therefore also comprise the step of: transmitting, by the server unit, a sixth data flow F comprising the receipt data from the sawing machine and/or GEO scanner to the office client.
- the sixth data flow F can also comprise other information from the second B and fourth D data flows so as to update the office client with information.
- the office client is used to create and modify: work orders, system parameters and spatial/map data.
- Work orders may be based on system parameters and the work orders may also contain system parameters, examples of system parameters are: different types of installation components, valid status values (e.g. "activity started", “activity finished"), available entities/equipment, personnel, etc.
- the office client may also be used to monitor the work of sawing machines, GEO scanners and other entities in the system, both visually on the map (displayed on a screen) and by the progress of work orders.
- the office client has no database of its own, so it stores all data in the first database on the server unit. Since there might be several office clients working with the same data it is important that the data is stored centrally at the server unit and not on different office clients.
- the data flow from the server unit to the office client contains receipt data and info related to the work orders, and position info from the other entities of the system.
- the data flow from the office system to the server contains work orders and spatial/map data.
- the office client creates second work orders for the GEO scanner that are sent to and stored in the first database.
- the second work orders say in principle: scan this section in this area;
- the GEO scanner downloads today's second work orders from the first database at start-up;
- the GEO scanner accepts the second work orders and performs them in sequence. Current position from the GPS is sent periodically to the server unit as well as receipt data; d. When a second work order is completed data from the scanning is transmitted/ replicated to the first database;
- the scanning data from GEO scanner is filtered, interpreted and processed in by the server unit;
- Processed scanning data from GEO scanner is stored in usable format in the first database which therefore is updated in this respect.
- the office client creates first work orders for the sawing machine with the help of data from the GEO scanner and the first work orders are sent to and stored in the first data base;
- the sawing machine downloads the current first work orders from the first database at start-up;
- the sawing machine accepts first work orders and performs them in sequence; e. Current positions for the sawing machine from the GPS are sent periodically to the server unit;
- an alarm If an alarm is triggered, information will be sent to the server unit; an alarm can for example notify that the saw blade is due to be replaced soon.
- a sawing machine is arranged for sawing micro trenches in an area with the present method.
- the machine comprises a saw blade, preferable circular in shape, for sawing/cutting the micro trenches.
- the produced micro trenches are adapted for receiving ducts/cables which means that the micro trenches have the proper dimensions.
- the machine also comprises a stabilizing device arranged for stabilizing the walls of the micro trench when placing ducts/cables, and for this purpose the stabilizing device is positioned immediately behind the saw blade in the micro trench, so that the walls are stabilized until the ducts/cables have bee placed/installed by means of guiding means which are also arranged on the stabilizing device.
- the stabilizing device comprises suitable elements such as proper side elements which are arranged to "hold up" the walls until the ducts/cables have been installed in the trenches.
- the stabilizing device is positioned immediately behind the saw blade so that the trenches sawn by the saw blade are stabilized directly after they are produced so that they do not collapse, or that debris or other dirt fall into the trenches before the ducts/cables have been placed. Therefore, a closest distance between the saw blade and the stabilizing device is larger than 0 mm but less than 10 mm according to an embodiment.
- the dimension of the stabilizing device is dependent on the size of the ducts/cables, the number of ducts to be placed at the same time, and the depth for placement in the trench. However, the width of the stabilizing device should be slightly less then the width of the sawing blade.
- the device has also guiding means which guides the ducts/cables into the trench in a controlled and ordered manner.
- the combination of stabilization and guiding has proved to reduce cost and time in an effective manner since the process of sawing and installing can be performed at the same time.
- the guides are arranged on the stabilizing device and hence makes it possible to place the ducts/cables into the trench while the trench is stabilized by the device.
- the ducts/cables can therefore be placed with high precision into the trench (e.g. on the correct height in the trench) since the trench is "clean" as long as the trench is stabilized by the device.
- the stabilizing device may be made of any suitable strong material so that the trenches are stabilized.
- the material should preferably be rigid, tough, hard and yet flexible so as to withstand stress during operation.
- the mounting of the stabilizing device to the sawing machine should have an amount of flexibility to prevent damage if the stabilizing device is stuck in the trench.
- Steel or steel alloys are suitable since they can be given the right properties by alloying with different metals such as platinum and manganese. There is limited space in the trench so the walls of the stabilizing device have to be thin as possible so as to be able to accommodate the passing the ducts/cables but still have the properties mentioned above. Steel alloys in the hardness of about 400-700 Brinell have proved suitable for these applications. It has also been realised that the stabilizing device can be made of moulded carbon fibre. Different parts of the stabilizing device can be cast separately and assembled into a stabilizing device assembly.
- the device has an inlet and an outlet for ducts/cables, the inlet and outlet being connected to the guiding means.
- the guiding means are channels through which the ducts/cables are guided through the stabilizing device.
- the inlet is preferably above ground and vertically or close to vertically arranged while the outlet is below ground in the trench and horizontally or close to horizontally arranged in order to minimize wear and tear on the ducts/cables. Therefore, a minimum distance between the outlet and the saw blade (at ground lever) is slightly longer than the recommended minimum bending radius for the ducts/cables to be installed. This normally translates to somewhere between 100 to 500 mm measured at ground level, but other distances are possible.
- the inlet, outlet and guiding means may together be removably attached on the stabilizing device e.g. in the form of a removable cassette.
- the installation time shortens in some cases as the time consuming task of inserting many ducts/cables into their respective channels may be avoided
- an operating depth for the stabilizing device in the micro trench should be up to 50 mm less than an operating depth for the saw blade according to an embodiment.
- This difference in depth between the saw blade and the stabilizing device decides how quickly the ground level may change (i.e. goes down).
- the saw blade must have sawed the trench deep enough so that the stabilizing device never touches the bottom of the trench in order to avoid the possibility of the stabilizing device sticking to the ground. This avoids unnecessary forces on the stabilizing device and possible breakage. This may happen when the ground level suddenly becomes lower.
- the stabilizing device and the saw blade are arranged to be elevated and lowered independently of each other. This is advantages when for example the saw blade has to be changed due to wear or when another type of saw blade is needed (e.g. one type for asphalt and another type for concrete). Further, the stabilizing device may have to be replaced which may easily be performed if the two parts can be lowered and elevated independently of each other. Also, during shorter interruptions in the sawing operation the sawing blade is elevated, but the stabilizing device must remain in the ground, since the need for stabilization of the trench still exists. However, the stabilizing device and the saw blade may further be arranged to together be elevated and lowered, e.g. when underground infrastructure is encountered both parts can be elevated so as to avoid damage.
- the stabilizing device is preferably mounted separately on the sawing machine by means of a number of movable axes for elevation and lowering.
- the movable axes may be powered by a dedicated engine for this specific purpose.
- the sawing machine may have on its left and right sides (in the sawing direction) attachments means and driving means for both the stabilizing device and the saw blade. Thereby, any of the left or right sides of the sawing machine can be used for sawing and placing ducts/cables which may be necessary due to hindering infrastructure, traffic situation in the area, etc.
- FIG 9 shows an embodiment of a machine.
- the stabilizing device has a front part and a back part, wherein the front part is located immediately behind the saw blade. It can also be seen that the stabilizing device has a section at the front part that has a shape that is complementary to the shape of the saw blade, which in this particular case is circular. Thus, in case the section at the front part has a concave circular shape with the same radius, or close to the same radius, as the saw blade and is placed as close as possible and less than 10 mm away from the saw blade. The reason for this is that the underground part of the stabilizing device must be arranged so close to the saw blade such that it is virtually impossible for dirt, stones and other debris to fall to the bottom of the trench, or wedge between the sides of the trench.
- the guiding means in this embodiment are guiding channels inside the stabilizing device.
- the channels are illustrated with dotted lines in the figures.
- the back part of the stabilizing device where the outlet is arranged may have different preferred shapes.
- One shape is substantially parallel to the complementary shape of the front section described above.
- Another shape is substantially opposite to the complementary shape, and a third embodiment defines a shape for the back part which is substantially diagonal from the base to the top of the back part in the backwards direction. These embodiments are shown in figures 11-13.
- the inlet, outlet and channels are arranged on the back part of the stabilizing device in this embodiment.
- the stabilizing device may also be axe shaped in cross section at the front part in the forward direction.
- the stabilizing device has a maximum width in cross section that is equal to or slightly less than a width for the saw blade.
- the stabilizing device must be wide enough to have room for the ducts/cables to be installed, but small enough so that it can be drawn along the sawed trench.
- Another important aspect is that with the use of guiding means an order of a plurality of ducts/cables is preserved when placed in the micro trench. This is very important when more than one duct is placed at the same time.
- the duct/cable for a certain house is cut at a certain distance after the house. It is important that this duct/cable is one of the ducts/cables on top of the pile of ducts/cables in the trench, so that it can be easily found.
- the duct/cable must be cut before the stabilizing device. Therefore it is important to know which one of all ducts/cables that enters the stabilizing device will come out on top in the trench.
- the order of the ducts/cables must be arranged so that the duct/cable with correct colour comes out on top, cut to the correct length, in the trench when that particular house is passed.
- the stabilizing device has a plurality of guiding means each guiding one or a few ducts/cables into the trench.
- the device may comprise a plurality of channels so arranged that a know order is preserved, which means that an order of the ducts/cables out of the stabilizing device is known form the order of ducts/cables into the stabilizing device, hence the order into and out of the stabilizing device is related and known. This can e.g.
- the order of the ducts/cables should be arranged in such a way that one of the ducts/cables on top of the pile of ducts/cables in the trench is always the one to be routed to the next location. Therefore, a downmost duct/cable entering the inlet will be an uppermost duct/cable out from the outlet, and the uppermost duct/cable entering the inlet will be a downmost duct/cable out from the outlet.
- the branching micro trenches may be sawn before the main trench as shown in figure 6 and 7 or the branching micro trenches may be sawn after the main trench is sawn.
- each branching micro trench goes to a final location for one of the ducts/cables from the main micro trench.
- the uppermost duct/cable is cut (before it enters the stabilizing device) at a certain distance beyond the location of the respective branching trench, so that that duct/cable can be lifted and routed to the final location for that duct/cable, see figure 10. If the cut is made correctly the length of the duct/cable will be sufficient so that the duct/cable is long enough to reach the final location without splicing.
- the ducts/cables are one by one routed to each passed location through the branches.
- the duct/cable should be cut at a certain minimum distance after passing the corresponding branching trench, so that, when lifted from the main trench and routed towards its final location, the length is sufficient to reach the final location without splicing.
- the stabilizing device (formerly also known as "plough") is designed with individual channels for the ducts/cables or with individual channels, each with room for a few ducts/cables, it is easy to know which duct/cable will be on top in the trench and thereby which duct/cable should be cut before the stabilizing device.
- Example of such stabilizing device is shown in Figure 9.
- the stabilizing device in this embodiment has a duct/cable inlet and a duct/cable outlet which is connected to each other by means of a plurality of channels as guiding means (illustrated with dotted lines) for the ducts/cables.
- the underground outlet of the stabilizing device may in an embodiment comprise a "matrix" (or vector) part so arranged that the channels are arranged in a matrix with n row and m columns, thereby in a controlled way horizontally and/or vertically separating the ducts/cables when placing them in the micro trench.
- the machine may further comprise at least one drum arranged for holding the ducts/communication cables before placing them into the micro trench via the stabilizing device. In this way easy access to the ducts/cables is achieved.
- the machine may also comprises other suitable means, such as: one or more engine means for powering the saw blade and the stabilizing device and/or for driving means (e.g. drive train and wheels), communication means for wireless communication with e.g. a remote server unit, processing/computer means, memory means, sensors, GPS means, vehicle means, display means for displaying information such as graphics, data base means, reading means for reading mechanical coding means on the saw blade, immobilizer, etc.
- this can e.g. be performed by means of direct mechanical driving, hydraulic driving and electric driving.
- the mechanical driving gives the highest power transmission ration while the electrical driving gives the lowest, so the former is preferred if high power is needed which often is the case.
- the saw blade is coated/covered with diamonds (not shown in figure 1), and is available in several different configurations dependent on ground and surface material and desired cut depth and width.
- diamonds not shown in figure 1
- the ratio width is maximized to 40 mm and the depth of 600 mm.
- 25 mm wide and 400 mm deep is used in the normal case.
- the saw blade for sawing micro trenches is arranged for depths between 10 to 600 mm and widths between 5 to 25 mm according to a preferred embodiment.
- the rotation of the saw blade is counter clockwise so that material is transported up in front of the saw and can be collected in a container that is mounted in front of the saw blade.
- the counter clockwise rotation of the saw blade also means that less debris is left in the micro trench.
- the saw blade may further be cooled with water, and may be monitored by sensors that give indications of heat (sensor), wobbling (gyro), speed (tachometer), saw pressure (sensor) and wear (sensor).
- the wear of the saw blade can be determined by analysing wave signals from the sound of the saw blade in operation.
- the saw blade need be applied against the ground absolutely vertically during the process to prevent wobbling and uneven wear. A gyro monitor so that this happens, the software in the on board computer verify that the application is kept within given parameters, and terminates automatically upon failure.
- Saw pressure is related to the solid nature of the ground material and the speed at which the machine is driven forward. Sensors and control systems monitor the relationship between the saw blade pressure and speed of the driving wheels and the software automatically control relations between these two. With unique identity ID labelling, all the above information and any deviation singled out geographically in X-, Y-, and Z-coordinates can be linked to each separate saw blade.
- any method according to the present invention may also be implemented in a computer program, having code means, which when run by processing means causes the processing means to execute the steps of the method.
- the computer program is included in a computer readable medium of a computer program product.
- the computer readable medium may comprises of essentially any memory, such as a ROM (Read-Only Memory), a PROM (Programmable Read-Only Memory), an EPROM (Erasable PROM), a Flash memory, an EEPROM (Electrically Erasable PROM), or a hard disk drive.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Mechanical Engineering (AREA)
- Business, Economics & Management (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Architecture (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Optics & Photonics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP17176614.0A EP3252236B1 (en) | 2012-05-10 | 2013-05-08 | Method for placement of ducts/cables and device for planning placement thereof |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE1250479 | 2012-05-10 | ||
PCT/SE2013/050523 WO2013169200A1 (en) | 2012-05-10 | 2013-05-08 | Method for placement of ducts/cables and device for planning placement thereof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17176614.0A Division EP3252236B1 (en) | 2012-05-10 | 2013-05-08 | Method for placement of ducts/cables and device for planning placement thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2847718A1 true EP2847718A1 (en) | 2015-03-18 |
EP2847718A4 EP2847718A4 (en) | 2016-09-14 |
Family
ID=49551065
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13787960.7A Withdrawn EP2847718A4 (en) | 2012-05-10 | 2013-05-08 | Method for placement of ducts/cables and device for planning placement thereof |
EP17176614.0A Active EP3252236B1 (en) | 2012-05-10 | 2013-05-08 | Method for placement of ducts/cables and device for planning placement thereof |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17176614.0A Active EP3252236B1 (en) | 2012-05-10 | 2013-05-08 | Method for placement of ducts/cables and device for planning placement thereof |
Country Status (2)
Country | Link |
---|---|
EP (2) | EP2847718A4 (en) |
WO (1) | WO2013169200A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016176467A1 (en) | 2015-04-29 | 2016-11-03 | Condux International, Inc. | System and method of mapping a duct |
WO2018056889A1 (en) * | 2016-09-23 | 2018-03-29 | Dellcron Ab | A machine for installing ducts/cables in micro trenches |
EP3538938A4 (en) * | 2016-11-14 | 2020-07-08 | Condux International, Inc. | Transmission line installation system |
US10432311B1 (en) | 2018-08-01 | 2019-10-01 | Khalifa University of Science and Technology | Methods and systems for optimizing network catchment areas |
CN110646905B (en) * | 2019-09-19 | 2021-01-05 | 烽火通信科技股份有限公司 | Method and system for calculating fiber running distance between ODF frames |
CN112436439B (en) * | 2020-11-11 | 2022-11-18 | 阳光新能源开发股份有限公司 | Method and device for laying cable bridge of photovoltaic power station |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2555624B1 (en) * | 1983-11-28 | 1986-12-26 | Syndicat Nal Entr Drainage | METHOD AND APPARATUS FOR THE AUTOMATIC GUIDANCE OF EARTHMOVING MACHINES, ESPECIALLY OF A MACHINE FOR LAYING DRAINAGE ELEMENTS |
US5329464A (en) * | 1992-03-23 | 1994-07-12 | Puget Sound Power & Light Company | Utility layout design system |
US5553407A (en) | 1995-06-19 | 1996-09-10 | Vermeer Manufacturing Company | Excavator data acquisition and control system and method of use |
US5960570A (en) * | 1997-04-01 | 1999-10-05 | Caterpillar Inc. | Apparatus and method for removing silt from under a body of water |
DE19715213B4 (en) | 1997-04-11 | 2006-06-01 | Norddeutsche Seekabelwerke Gmbh & Co. Kg | Method for laying optical or electrical cables in a fixed laying ground |
US6850161B1 (en) * | 2000-10-23 | 2005-02-01 | Verizon Corporate Services Group Inc. | Systems and methods for identifying and mapping conduit location |
AU2006200987B2 (en) | 2001-02-15 | 2008-09-11 | Teraspan Networks Inc. | Subsurface fibre optic cable network installation |
US6907336B2 (en) | 2003-03-31 | 2005-06-14 | Deere & Company | Method and system for efficiently traversing an area with a work vehicle |
US7197214B2 (en) * | 2004-05-24 | 2007-03-27 | Corning Cable Systems Llc | Methods and apparatus for facilitating cable locating |
JP2005352764A (en) * | 2004-06-10 | 2005-12-22 | Mitsubishi Electric Engineering Co Ltd | Cable laying route design support system |
US20060234617A1 (en) * | 2005-03-25 | 2006-10-19 | Black & Decker Inc. | Power tool accessory identification system |
FR2898689B1 (en) * | 2006-03-20 | 2008-09-05 | Groupe Marais Sa | METHOD AND MACHINE FOR DEPLOYING OPTICAL FIBER NETWORKS IN THE URBAN ENVIRONMENT |
US7760094B1 (en) * | 2006-12-14 | 2010-07-20 | Corning Cable Systems Llc | RFID systems and methods for optical fiber network deployment and maintenance |
US8417083B2 (en) | 2007-05-04 | 2013-04-09 | Teraspan Networks Inc. | Fibre optic network installation |
DE102007043647A1 (en) * | 2007-09-13 | 2009-03-26 | Ifk Gesellschaft M.B.H. | Method and system for supervised laying of cables |
US7696879B2 (en) * | 2007-12-18 | 2010-04-13 | Alcatel Lucent | Ascertaining physical routing of cabling interconnects |
US8090508B2 (en) | 2008-12-22 | 2012-01-03 | Deere & Company | Method and system for determining a planned path for a machine |
WO2012051673A1 (en) | 2010-10-22 | 2012-04-26 | John Holland Pty Ltd | Deployment of a reticulated system |
CN102314536B (en) * | 2011-08-30 | 2013-06-05 | 湖州电力局 | Analyzing method for shortest available path of underground pipe network cable based on power grid model |
-
2013
- 2013-05-08 EP EP13787960.7A patent/EP2847718A4/en not_active Withdrawn
- 2013-05-08 EP EP17176614.0A patent/EP3252236B1/en active Active
- 2013-05-08 WO PCT/SE2013/050523 patent/WO2013169200A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
EP3252236B1 (en) | 2019-03-13 |
EP2847718A4 (en) | 2016-09-14 |
WO2013169200A1 (en) | 2013-11-14 |
EP3252236A1 (en) | 2017-12-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9850629B2 (en) | Control method and system for a sawing machine | |
EP3252236B1 (en) | Method for placement of ducts/cables and device for planning placement thereof | |
EP2847836B1 (en) | Machine for sawing trenches and placing ducts/cables | |
US9876337B2 (en) | Machine arranged for sawing micro trenches and placing ducts/cables in micro trenches | |
CN110365402B (en) | Optical cable fault positioning and retrieving system | |
EP3221938A1 (en) | A laying machine for ducts/cables in micro trenches with additional functions | |
WO2017041859A1 (en) | Installation of ducts/cables in micro trenches | |
SE1800037A1 (en) | Method to Build Fiber-to-Home (FTTH) Networks | |
SE1750835A1 (en) | Control of movements of a stabilizer | |
SE1451394A1 (en) | Control of movements of a stabilizer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20141209 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F16L 1/032 20060101ALI20160414BHEP Ipc: G02B 6/50 20060101ALI20160414BHEP Ipc: H02G 1/06 20060101ALI20160414BHEP Ipc: E02F 5/14 20060101ALI20160414BHEP Ipc: G06Q 10/04 20120101ALI20160414BHEP Ipc: G06F 17/50 20060101ALI20160414BHEP Ipc: E02F 3/18 20060101AFI20160414BHEP Ipc: E02F 5/08 20060101ALI20160414BHEP Ipc: H02G 9/02 20060101ALI20160414BHEP Ipc: E02F 5/10 20060101ALI20160414BHEP |
|
RA4 | Supplementary search report drawn up and despatched (corrected) |
Effective date: 20160811 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E02F 5/14 20060101ALI20160805BHEP Ipc: E02F 5/10 20060101ALI20160805BHEP Ipc: H02G 1/06 20060101ALI20160805BHEP Ipc: H02G 9/02 20060101ALI20160805BHEP Ipc: G06F 17/50 20060101ALI20160805BHEP Ipc: F16L 1/032 20060101ALI20160805BHEP Ipc: G02B 6/50 20060101ALI20160805BHEP Ipc: G06Q 10/04 20120101ALI20160805BHEP Ipc: E02F 3/18 20060101AFI20160805BHEP Ipc: E02F 5/08 20060101ALI20160805BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20170912 |