EP2831353A1 - Système de construction anti-torsion permettant d'obtenir une intégrité structurelle et une résistance sismique - Google Patents

Système de construction anti-torsion permettant d'obtenir une intégrité structurelle et une résistance sismique

Info

Publication number
EP2831353A1
EP2831353A1 EP13769034.3A EP13769034A EP2831353A1 EP 2831353 A1 EP2831353 A1 EP 2831353A1 EP 13769034 A EP13769034 A EP 13769034A EP 2831353 A1 EP2831353 A1 EP 2831353A1
Authority
EP
European Patent Office
Prior art keywords
wall
fastened
construction
roof
brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP13769034.3A
Other languages
German (de)
English (en)
Other versions
EP2831353B1 (fr
EP2831353A4 (fr
Inventor
Steven Zimmerman
Van T. Walworth
Scott DRUMMOND
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SR Systems LLC
Original Assignee
SR Systems LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US13/613,441 external-priority patent/US8726581B2/en
Priority claimed from PCT/US2012/055809 external-priority patent/WO2013040590A2/fr
Application filed by SR Systems LLC filed Critical SR Systems LLC
Priority claimed from PCT/US2013/033936 external-priority patent/WO2013148725A1/fr
Publication of EP2831353A1 publication Critical patent/EP2831353A1/fr
Publication of EP2831353A4 publication Critical patent/EP2831353A4/fr
Application granted granted Critical
Publication of EP2831353B1 publication Critical patent/EP2831353B1/fr
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/027Preventive constructional measures against earthquake damage in existing buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/14Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • E04B1/2608Connectors made from folded sheet metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • E04B2001/268Connection to foundations
    • E04B2001/2684Connection to foundations with metal connectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B2001/2696Shear bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • E04H9/0237Structural braces with damping devices

Definitions

  • the present disclosure relates to storm resistant components and residential or commercial structures enhanced to resist the damaging forces imposed by storm winds, storm rains, torsion forces, and seismic events.
  • Wind storm forces are known to remove and/or compromise the primary sealing systems of shingles, roofing, siding, and veneers. Furthermore, wind storm forces are well known to lift off entire roof systems and blow down and/or suck out walls.
  • tornado and hurricane storms are known to include destructive straight line winds and other destructive forces that impose torsion forces upon a structure to effectively twist it apart.
  • tornado and hurricane storms buffet structures with seismic type forces that effectively weaken the holding power of traditional fasteners like nails and screws.
  • tornado storms include a vortex, and sometimes several smaller vortices inside of a large vortex, which impose a spiraling shell of wind capable of imposing an effective dynamic wall of wind known to apply impact forces to a structure, capable of effectively bumping and/or knocking it down, not just blowing it down.
  • wind storm forces are well known to impose substantial blowing rain events which become influent to structures even before the construction components fail and/or are compromised. Beyond the obvious influent opportunities resulting from broken windows and/or other compromised construction components, wind storm events are known to blow rain into and through functioning vents of an intact roof system, thus creating water damage even though little or no actual structural damage occurs.
  • One preferred embodiment of the subject invention relates to a typical residential stick-built or prefabricated home construction which is enhanced and substantially strengthened in specific areas of the structure to better withstand the destructive wind forces of hurricanes and tornados, as imposed in the form of straight line winds, torsion forces, and/or seismic forces.
  • One preferred embodiment also provides a secondary watertight seal which is utilized to maintain a reasonable barrier from influent storm water and blowing rain in the event that the primary water barrier via the shingles and/or siding is compromised during the storm.
  • the structural enhancement system is comprised of several subsystems which all work together to collectively enhance the structural integrity of the structure. These subsystems include but are not limited to the following:
  • Figure 1 is a front left perspective view of a building structure anchoring system
  • Figure 2 is a front left perspective view of the building structure of Figure 1 , further including a wall reinforcement system;
  • Figure 3 is a front left perspective view of area 3 of Figure 2;
  • Figure 4 is a front left perspective view of a portion of the building structure of Figure 1 , modified to show upper and lower structure joined by floor joists;
  • Figure 5 is a front right perspective view of area 5 of Figure 3;
  • Figure 6 is a bottom front perspective view of a truss assembly
  • Figure 7 is a front left perspective view of the building structure similar to Figure 2, further including a wall sheeting system;
  • Figure 8 is a front left perspective view of a roof decking system
  • Figure 9 is a front elevational view of the roof decking system of
  • Figure 10 is a cross sectional end elevational view taken at section 10 of Figure 9;
  • Figure 1 1 is a cross sectional end elevational view modified from Figure 10 to show a venting system
  • Figure 12 is a front elevational schematic view of a building window/door protective seal system
  • Figure 13 is a front left perspective view of the building of Figure 12 modified to include an interior storm safe room;
  • Figure 14 is a front left perspective view of a blocking brace subassembly used to establish a line of compression blocking in a roof system or wall system;
  • Figure 15 is a front left perspective view of a line of compression blocking having multiple blocking brace subassemblies of Figure 14;
  • Figure 16 is a front elevational perspective view of a line of compression blocking applied to a wall system comprised of blocking brace subassemblies similar to Figure 14;
  • Figure 17 is a top perspective view of a gable-end of a roof system braced against a ceiling joist and roof system construction elements;
  • Figure 18 is a an end elevational perspective view of an improved diaphragm system
  • Figure 19 is a side elevational perspective view of an inside corner of a wall system featuring a lateral corner brace enhancement assembly
  • Figure 20 is a side elevational perspective view looking from the outside in through a corner of a wall construction having a lateral corner brace enhancement assembly and a diaphragm system applied to the roof system;
  • Figure 21 is a front elevational view of lateral corner brace enhancement subassembly.
  • an anchoring system 10 connected to a typical slab 12 defining a foundation construction includes anchor bolt sets 14 at least partially embedded in the slab 12 connected to a wall reinforcement system having multiple anchor brackets 16, and multiple specialized structural members or structural columns 18 connected to the anchor brackets 16.
  • the anchoring system 10 as defined by the subject invention is a subsystem that anchors a building structure 20 to the slab 12 or other foundational elements.
  • One preferred embodiment enhancement system provides specialized first and second anchor bolts 22, 24 to provide proper placement and anchoring means to cooperate with other structural enhancement components.
  • An alternative preferred embodiment employs standard anchor bolt components.
  • anchor means include anchor bolt nuts 26, 28 connecting to freely extending portions 22a, 24a of the specialized anchor bolts 22, 24 to the anchor brackets 16, which are positioned between sequentially spaced apart members such as studs 30, 32, are employed with new construction slabs 12 being poured, preexisting slabs, and for construction or retrofit of structures on top of crawl space walls or basement walls.
  • the freely extending portions 22a, 24a of the anchor bolts 22, 24 for each anchor bracket 16 are oppositely positioned with respect to a longitudinal axis 27 of the structural column 18 connected to each anchor bracket 16 to resist axial rotation/twisting of the structural columns 18 and thereby to resist axial rotation/twisting of the studs 30, 32.
  • the present disclosure unitizes the anchoring system 10 to cooperate and integrate the respective features of a wall reinforcement system 34 (shown and described in reference to Figures 2-3) and/or a safe room system 72 (shown and described in reference to Figure 13).
  • the wall reinforcement system 34 as defined by the present disclosure is a subsystem which integrates into a typical stud type wall construction 36 of building structure 20 to provide significant enhanced compression and tension strength to the wall construction 36.
  • a typical wood or metal stud built wall 38 having sequentially spaced studs 30, 32 may have appropriate compressive strength but it has very little tension strength and therefore is susceptible to lift forces during storm winds.
  • the wall reinforcement system 34 of the subject invention provides resistance to forces that result in torsion and/or rhombus conditions.
  • the specialized structural member or structural column 18 is a metal tube installed in the stud wall 38 at intervals between adjacent ones of the studs along the wall 38 and/or at wall corners 40 such that the structural member 18 is substantially stronger than the typical stud wall components, such as wood or metal studs, and is capable of being firmly and strongly attached to the anchoring system 10 described in reference to Figure 1 .
  • sheeting 42 is bolted to the specialized wall member 18 which is anchored to the foundation slab 12 and bolted through a double top plate 44 to the rafter/joist tie-down system 46.
  • the wall reinforcement system 34 provides a strong and solid connection from a bottom plate 48 of the stud wall 38 all the way to the top plate 44 of the stud wall 38, where it is again firmly and solidly attached and terminated.
  • the structural column 18 is bolted through the top plate 44 of the wall 38 to roof elements 50, 52, such as the upper and lower chords of a roof truss or the rafters and ceiling joists of a common roof system.
  • the wall reinforcement system 34 ties together the roof components, the wall components, and the foundation using the structural columns 18 fastened/bolted at opposite ends to building structure.
  • the present disclosure also applies to multi-story structures by employing bolted connections across a floor joist construction 54 of a multi-story wall construction 56 wherein wall reinforcement columns 18, 18' on lower and upper floors 58, 60 are bridged and connected via bolted connectors 62, 64 across the floor joist construction 54.
  • the present disclosure effectively unitizes the entire wall construction 56 by employing the wall reinforcement system 34 to cooperate and integrate the respective features of the anchoring system 10 and a rafter/joist tie-down system 66 (which is shown and described in reference to Figure 5) and with a wall sheeting system 68 (which is shown and described in reference to Figure 7) and with a diaphragm reinforcement system 70 (which is shown and described in reference to Figure 10) and/or a safe room system 72 (which is shown and described in reference to Figure 13).
  • the rafter/joist tie-down system 66 as defined by the subject invention is a firmly and strongly attached means to effectively connect the upper chords or rafters 50 and the lower chords or ceiling joists 52 to the top plate 44 of the stud wall 38 and more importantly directly to the wall reinforcement system 34.
  • the rafter/joist tie-down system 66 also provides a strong connection means at each crossing point on outside walls and inside walls for every rafter 50 and/or joist 52 whether it is connected directly to or indirectly connected to a member 18 of the wall reinforcement system 34.
  • each wall reinforcement member or structural column 18 is bolted to a rafter tie-down connector 74.
  • a typical truss example is provided wherein a rafter tie-down extension 76 spans between the lower chord 52 and upper chord 50 of a truss 78.
  • the rafter/joist tie-down system 66 also resists rafters 50 and/or joists 52 from being compromised due to lift forces generated by storm wind forces.
  • the rafter/joist tie-down system 66 also resists rafters 50 and/or joists 52 from being easily twisted due to torsion forces and/or rhombus forces, which enhances the relative strength of the structure to resist shear forces acting upon the structure as a result of strong straight line winds or tornadic vortexes.
  • Testing and research has demonstrated and taught that the best roof pitch for storm wind resistance is about a 15-degree angle off a horizontal plane; that a hip roof construction is more storm-worthy than a gable end construction; and further that less roof overhang is better than long extended roof overhang construction.
  • the present disclosure and rafter/joist tie-down system 66 is able to enhance standard roof construction that exploits the known research and yet still provides some enhancements for other roof constructions that do not conform to the prior art research for best storm construction.
  • the subject invention effectively unitizes the entire roof system by employing the features of the rafter/joist tie-down system 66 to cooperate and integrate with the respective features of the wall reinforcement system 34 and a wind-beam system 80 (shown and described in reference to Figure 6), a roof decking system 82 (shown and described in reference to Figure 8), a venting system 84 (shown and described in reference to Figure 1 1 ), the diaphragm reinforcement system 70, and/or the safe room system 72.
  • the wind-beam system 80 as defined by the subject invention is a series of reinforcement components employed at the connections of rafters 50, 50' and trusses 52 to enhance the structural integrity of the rafters and trusses.
  • a typical truss 52 is enhanced at connection points 86, 88, 90 with wind-beam components including in several preferred embodiments a wind-beam chord connector 92, a wind-beam extension 94, and a wind-beam ridge connector 96.
  • the wind-beam chord connector 92 is a metal member connecting the joist 52 to an angularly oriented joining member, which according to several aspects is a transversely oriented center gable end stud or kingpost 100.
  • the wind-beam ridge connector 96 is a metal plate connecting the kingpost 100 to both the upper chords or rafters 50, 50'.
  • the wind-beam extension 94 is a metal U-channel that can be used to connect the wind-beam chord connector 92 to the wind-beam ridge connector 96.
  • Typical construction techniques for rafters 50 and trusses 52 include nail plates and individual nails at connection points.
  • the wind-beam system 80 effectively reinforces roof rafters 52 and/or trusses 98 together with strong and securely fastened members such as the wind-beam chord connector 92, wind-beam extension 94, and wind-beam ridge connector 96, which effectively unitizes the entire roof system together to act more as a unit than as individual roof components.
  • the wind-beam system 80 works on traditional rafter systems and/or traditional truss systems. Those skilled in the art will appreciate that the steeper the roof pitch, the greater the lift forces on the leeward side, and thus the stronger the wind-beam system 80 effectively needs to be, all things being equal.
  • the subject invention effectively unitizes the entire roof system by employing the features of the wind-beam system 80 to cooperate and integrate with the respective features of the rafter/joist tie-down system 66 and the roof decking system 82, the venting system 84, the diaphragm reinforcement system 70, and/or the safe room system 72.
  • the wall sheeting system 68 as defined by the subject invention provides an improved method of covering and sealing the exterior walls 38 of the structure prior to applying additional fagade or other cosmetic coverings such as vinyl siding, brick, et cetera.
  • Wall sheeting 42 such as plywood, is bolted to the wall reinforcement structural columns 18 using bolts 102.
  • the wall sheeting system 68 provides an improved fastening method by bolting the sheeting 42 to the wall reinforcement system 34, which ensures that the sheeting 42 will remain securely in place when the structure is exposed to storm wind forces. Because the wall sheeting system 68 stays securely in place during storm wind forces, it is enabled to provide a secondary water seal for the wall 38 to resist rain and blowing rain in the event that the primary covering and weather seal fagade is compromised and/or lost during storm winds subjected upon the structure.
  • One preferred embodiment of the subject invention includes a specialized bolted fastener 102 featuring an enlarged flat head 104 with barbs 106 which seat into the sheeting 42 and includes a sealing ring rib 108 on the underside 1 10 of the enlarged head 104 to securely and firmly hold and maintain a watertight seal.
  • the wall sheeting system 68 is incorporated into the safe room system 72 such that requirements for resisting penetrations from airborne debris are accomplished.
  • the subject invention effectively unitizes the entire wall construction by employing the features of the wall sheeting system 68 to cooperate and integrate with the respective features of the wall reinforcement system 34 and a window/door protective seal system 1 12 (shown and described with respect to Figure 12), and the safe room system 72.
  • the roof decking system 82 as defined by the subject invention provides an improved method of covering and sealing roof decking 1 14 such as sheets of plywood of the structure prior to applying additional fagade or other cosmetic coverings such as shingles, metal, et cetera.
  • a watertight tape seal 1 16 applied over seams 1 18 at mating edges of roof decking 1 14 helps to provide a watertight seal.
  • the roof decking system 82 provides an improved fastening means via nails and/or screws and/or a specific patterned array application of the fasteners so as to securely retain the decking 1 14 attached to the rafters and/or joist structure.
  • a specialized fastener 120 has a relatively large head and specialized retention features so as to provide improved retention of the decking to the rafters and/or joist.
  • Another preferred embodiment of the subject invention features the decking 1 14 to be tongue & grooved so as to provide a watertight seal via interlaced edges of the decking.
  • a further preferred embodiment of the decking 1 14 features a shiplap edge 122 which presents a watertight sealed edge on a bias cut.
  • Yet another preferred embodiment of the decking includes lineup blocking 124 between adjacent rafters 50, 50' and located under the edges 126 of adjacent decking 1 14 so as to provide a secure fastening surface for the entire edge 126 of the decking 1 14.
  • the lineup blocking 124 also provides an effective sealing surface under the edge of adjacent sheets of decking 1 14 and prevents relative deflection at the mating edges of adjacent sheets of decking.
  • the lineup blocking 124 also provides proper alignment and spacing between rafters 50, 50' while at the same time providing resistance to torsion and rhombus forces acting on the rafters and joist.
  • the lineup blocking 124 also defines a continuous line of compression blocks installed between juxtaposed rafters and/or joist to prevent lateral collapse of the structure.
  • One preferred embodiment of the lineup blocking 124 features a bracket 128 which can be either preassembled to the ends of the lineup block 124 or installed after the lineup block 124 is installed.
  • the bracket 128 provides additional ease of assembly and additional structural integrity to the rafters 50 and decking 1 14.
  • Another preferred application of the subject invention employs the respective features of a watertight membrane 130 placed over the decking 1 14 and/or the watertight seal tape 1 16 covering over the mating edges of adjacent sheets of decking 1 14, including ridges and valleys.
  • a cross section through one preferred embodiment of the roof decking system 82 shows shiplap edges, lineup blocks 124, lineup block brackets 128, decking fasteners 120, tape-seals 1 16 at joints, and the watertight membrane 130.
  • the roof decking system 82 provides a secondary water seal for the roof to resist rain and blowing rain in the event that the primary covering and weather seal fagade is compromised and/or lost during storm winds subjected upon the structure.
  • the subject invention effectively unitizes the entire roof construction by employing the roof decking system 82 to cooperate and integrate with the respective features of the wall reinforcement system 34, the wind beam system 80, the rafter/joist tie- down system 66, the roof decking system 82, the venting system 84, the diaphragm reinforcement system 70, and/or the safe room system 72.
  • the diaphragm reinforcement system 70 as defined by the subject invention addresses several diaphragm problems commonly associated with residential and commercial construction.
  • One common diaphragm problem is gable ends of construction wherein, for instance, a triangle shaped wall gable end 132 is formed enclosing one end of a roof system 134.
  • the gable end 132 forms a gable end plane 136 inside the triangle frame of the gable end 132 which is susceptible to being either blown in or sucked out in response to storm winds.
  • a joist plane 138 formed by any one of several rafter/joist/truss components, such as joists 52 shown, juxtaposed in array adjacent to the gable end 132 of the roof construction.
  • the joist plane 138 is susceptible to being warped and/or wrenched and/or twisted and/or laterally shifted in response to storm wind forces.
  • a ceiling plane 140 formed by a ceiling 142 on the underside of the juxtaposed array of joists 52.
  • the ceiling plane 140 is susceptible to warping and flexing due to the joist plane 138 responding to storm winds acting on the structure.
  • the subject invention overcomes the problems associated with these diaphragms by employing the diaphragm reinforcement system 70.
  • One preferred embodiment of the diaphragm reinforcement system 70 features a pearling brace 144 spanning transverse across the gable end 132.
  • the pearling brace 144 in one preferred embodiment provides a series of specialized brackets 146 which cooperate with standard wood components to enhance the structural integrity of the gable end plane 136.
  • a structural metal beam 148 and associated brackets span transversely across the gable end 132 to enhance the structural integrity of the gable end plane 136.
  • diaphragm reinforcement system 70 features a series of joist brace elements 150 spanning transversely across the array of juxtaposed joists 52 so as to enhance the structural integrity of the joist array to prevent them from being negatively affected by storm force winds.
  • the joist brace elements 150 are firmly affixed to the joist 52 such that the joist 52 is not only prevented from suffering detrimental joist plane 138 deformation but also preventing detrimental ceiling plane 140 deformation.
  • the joist brace elements 150 are firmly anchored to specialized gable end brackets 152 at the gable end 132 which in turn are directly anchored to the wall reinforcement system 34 components, which in turn anchor the entire construction to the foundation elements.
  • the joist brace elements 150 also include strut elements 154 attaching at one end to the joist brace elements 150 and then spanning at a bias angle a up to a connection point 156 on the pearling brace 144.
  • the strut 154 forms the hypotenuse of a triangle comprised of the strut 154, the gable end plane 136, and a joist brace 158 element, which subsequently forms an enhanced structural means to impart structural integrity to the diaphragms aforementioned which were previously unattainable prior to the subject invention.
  • One or more joist brace brackets 160 which connect the joist brace 158 to the joists 52 also define members of the joist brace elements 150.
  • the gable end plane 136, the ceiling plane 140, and the joist plane 138 are simultaneously structurally enhanced via the collective features of the gable end bracket 152, the joist brace bracket 160, the joist brace 158, the strut 154, and the pearling brace 144.
  • the entire set of diaphragms are effectively unitized together and integrated into a larger unitized system of structural integrity to maintain a watertight seal system for the construction when subjected to storm wind forces.
  • the subject invention effectively unitizes the diaphragm reinforcement system 70 by employing and integrating the respective features of the anchoring system 10, the wall reinforcement system 34, the rafter/joist tie-down system 66, the wind- beam system 80, the wall sheeting system 68, the venting system 84, and/or the safe room system 72.
  • an internal access vent 162 enables air to pass from the conditioned air space defining a living portion 164 of the structure and slightly conditions the air in a roof space 166, wherein a closed cell spray foam 168 insulates and seals the entire underside of a roof system 170 and gable ends 132 to prevent water leaks.
  • the venting system 84 as defined by the subject invention provides a solution for maintaining appropriate thermal conditions for the air in the roof space 166 of a structure so that appropriate air changes and/or conditioning occur in the roof space 166.
  • Typical venting methods include a series of external access vents, such as under eve soffit vents, gable vents, ridge vents, turbines, and louvers, many of which come in passive or powered variations.
  • a significant problem that basically all known external access venting systems suffer is that they are susceptible to being damaged and/or completely removed during blowing rain in wind storm conditions, which lead to water leaks and subsequent damage.
  • Another significant problem that basically all prior art external access venting systems suffer is that, even if they manage to stay intact during the wind storm conditions, they are further susceptible to allowing blowing rain in wind storm conditions to pass through them and into the roof space, which leads to water leaks and subsequent damage.
  • venting system 84 of the subject invention provides specialized external venting devices for influent and effluent air handling which are able to remain firmly and functionally intact and at the same time control and mitigate blowing rain during wind storm conditions such that water is channeled and/or redirected and/or drained back out of the structure, preventing damaging accumulation inside the structure.
  • Another preferred embodiment of the subject invention eliminates all external access vents so as to eliminate the problems with any such locations and/or associated venting devices, and replaces them with the small, appropriately sized internal access vents 162 directly connecting the conditioned portion of the structure to the roof space to slightly "condition" the air in the roof space. There is, therefore, no external access vents communicating between the internal conditioned portion of the building structure to ambient air outside the building structure.
  • the conditioned air in the roof space 166 is both appropriately cooled and/or heated in conjunction with the seasons of the year to maintain a moderate temperature range in the roof space 166.
  • the conditioned air in the roof space 166 is further enabled by having no influent or effluent outside air to influence the roof space 166; however, an efficient insulation sealing system, such as the closed cell spray foam 168, is applied to the entire underside of the roof construction to fill in between the rafters 50 to provide an air and water seal to prevent air and water from penetrating the roof construction into the roof space 166.
  • the closed cell spray foam 168 insulation also covers and seals any fasteners of the decking 1 14 or shingles 172 or other exterior construction that might have penetrated through the decking 1 14 and into the roof space 166, such that any chance of becoming a future leak path is prevented.
  • the closed cell spray foam 168 insulation also covers walls 174 of the gable ends 132 in the same manner.
  • the subject invention effectively cooperates with a unitized roof construction by employing the venting system 84 to cooperate and integrate with the respective features of the roof decking system 82, the wind beam system 80, the rafter/joist tie-down system 66, and the diaphragm reinforcement system 70.
  • one preferred embodiment of the window/door protective system 1 12 provides for a typical widow 176 for residential structures which is fitted with installed decorative cover mounts 178 such that a removable protective cover 180 securely fastens to the cover mounts 178.
  • the window/door protective system 1 12 as defined by the subject invention provides the protective cover 180 over windows 176 to minimize the likelihood of breakage during wind storms.
  • One preferred embodiment of the window/door protective system 1 12 is comprised of a series of brackets 182 and mounting hardware designed to securely establish a robust attachment to the structure 184 and receives an appropriate protective cover 180 designed to fit into and cooperate with the mounted protective cover brackets 182.
  • the protective covers 180 can be stored until required to prepare for an oncoming wind storm.
  • the mounted brackets 182 will remain mounted to the structure 184 and designed to be reasonably decorative.
  • Another preferred embodiment of the subject invention features a similar protective cover 186 over doors 188 and/or installed inside of exterior doors to prevent them from blowing in or being sucked outward during storm winds.
  • Another preferred embodiment of the subject invention features a protective cover over garage doors (not shown) to prevent them from blowing in or being sucked outward during storm winds.
  • the subject invention employs the window/door protective system 1 12 to cooperate and integrate with the respective features of the wall reinforcement system 34 and/or the safe room system 72.
  • a preferred embodiment of the storm safe room 72 provides an independent unitized room 190 constructed and fitted with a storm door 192 and an air vent 194 positioned inside the building structure.
  • Another preferred embodiment of the subject invention features a storm safe room system 72 which is prefabricated from appropriate enhanced components and delivered to the construction site, and then installed so the building 196 can be constructed around it.
  • the storm safe room system 72 as defined by the subject invention provides enhanced construction components for a self-contained storm safe room which is firmly and strongly anchored to the foundation and/or slab of the structure.
  • the enhanced construction components include those featured in the wall reinforcement system 34, the anchor system 10, the rafter-joist tie-down system 66, the wind beam system 80, door/window protective seal system 1 12, and/or the roof decking system 82, all combined together to establish a unitized structure to function as an appropriate storm safe room system 72.
  • Another preferred embodiment of the storm safe room system 72 includes an independent unitized roof 198, reinforced walls 200, and the storm door 192 which opens inward.
  • the door features enhanced hinges 202 and locking and security components 204 to ensure closure in the event it is subjected to storm force winds, flying debris, and/or influent water.
  • the storm safe room system 72 provides the independent fresh air vent 194 and the reinforced door 192 to prevent it from opening except at the command of the occupant and provides a watertight seal 206 to prevent influent water.
  • the storm safe room system 72 provides a storm room suitable of being used as a dual purpose room, such as a closet, pantry, bathroom, or the like.
  • One preferred embodiment of the subject invention features a storm safe room system 72 constructed on-site using appropriate enhanced components.
  • the subject invention effectively establishes a unitized storm safe room system 72 by cooperating and integrating with the respective features of the anchor system 10, the wall reinforcement system 34, the rafter/joist tie- down system 66, the window/door protective seal system 1 12, the roof decking system 82, the venting system 84, the wind-beam system 80, the diaphragm reinforcement system 70, and the wall sheeting system 68.
  • first blocking brace bracket 207 and according to several aspects first and second blocking brace brackets 207 are connected to a blocking brace 208 to form a blocking brace subassembly "A".
  • Multiple subassemblies "A” are used to establish a line of compression blocking on roof and/or wall systems as best seen in reference to Figure 15.
  • Each subassembly "A” is bolted into place to provide improved structural strength effectively unitizing the frame-type construction elements of the roof and/or wall system.
  • the present disclosure incorporates a line of compression blocking in combination with the other structural enhancements to effectively unitize the entire frame-type construction elements of the building to resist the destructive forces associated with wind and/or seismic events.
  • a partial view of a line of compression blocking includes multiple subassemblies "A" comprised of blocking braces 208 and blocking brace brackets 207 fastened to roof elements 209.
  • Two brackets 207 which are installed juxtaposed on either side of a roof element 209 are bolted together through roof element 209 establishing a strong continuous line of compression blocking.
  • Each bracket 207 features fastening holes straddling each side of blocking brace 208 which provide stable resistance to torsion and/or seismic forces imposed upon the roof system.
  • a partial view of a line of compression blocking includes multiple subassemblies "B" similar to subassemblies "A" which are comprised of blocking braces 210 and blocking brace brackets 207 fastened to wall elements 21 1 .
  • Two brackets 207 which are installed juxtaposed on either side of a wall element 21 1 are bolted together through wall element 21 1 establishing a strong continuous line of compression blocking.
  • Each bracket 207 features fastening holes straddle each side of the blocking brace 210 which provide stable resistance to torsion and/or seismic forces imposed upon the roof system.
  • a partial view of a typical frame-type building includes a diaphragm enhancement system 220 assembled on a large gable-end truss 212 and braced against vertical studs 219 and joist elements 52.
  • the diaphragm enhancement system 220 includes at least one horizontal prefabricated brace 213 attached to studs 219 along its length, and attached at each end 218 to truss 212. Brace 213 and supported by at least one angled prefabricated brace 214, which is attached to at least one lateral prefabricated brace 215 with double-clevis attachment bracket 216.
  • Lateral brace 215 is fitted with single-clevis attachment brackets
  • joist elements 52 positioned to cooperate with joist elements 52 so as to establish and maintain parallel spacing of joist elements 52.
  • the joists 52 are susceptible to flexing and shifting out of position.
  • sheeting such as sheetrock attached to the interior room side of joist 52 can be compromised and damaged.
  • the present disclosure provides improved structural integrity for joists 52 by maintaining parallel position and resisting shifting movement of joists 52 in response to wind and torsion forces, while also preventing a plane of the ceiling from being compromised.
  • Prefabricated horizontal brace 213 is bolted to vertical studs 219 along its length and bolted at ends 218 to truss 212. This bolted system effectively unitizes the entire gable-end truss thereby resisting wind and torsion forces imposed upon it, as well as preventing a plane of the gable from being blown in or sucked out.
  • a first angled prefabricated brace 214 is attached to prefabricated lateral brace 215 using a double-clevis bracket 126.
  • a second or third bracing system may be required to adequately resist damaging forces.
  • a second prefabricated angle brace 214 can be attached to either the prefabricated lateral brace 215 or to a first installed angle brace 214 by using double-clevis attachment bracket 216.
  • Enhanced diaphragm enhancement system 220 includes a fastening point where prefabricated lateral brace 215 is fastened to bottom chord of truss 212 using a specialized anti-hinge bracket 217.
  • connections of enhanced diaphragm system 220 include joist elements 52 which are spaced parallel and maintain position via single-clevis attachment brackets 222 which fasten joists 52 to prefabricated lateral braces 215.
  • Double-clevis attachment brackets 216 fasten prefabricated angled braces 214 to prefabricated lateral braces 215.
  • a second prefabricated angle brace 214 can be fastened to a first angle brace 214 or fastened to lateral brace 215 using double-clevis attachment bracket 216.
  • Double-clevis attachment bracket 216 is able to slide along lateral brace 215 and/or angled brace 214 so that proper support can be field cut and installed by field drilling appropriate bolting holes in braces 214 or 215.
  • Attachment holes pre-drilled in double-clevis bracket 216 act as drill guides to save time measuring and locating the position of mounting holes through lateral brace 215 or angled brace 214.
  • An anti-hinge bracket 217 is fastened to prefabricated lateral brace 215 and bolted in multiple locations to bottom truss chord 221 .
  • Mounting holes in anti-hinge bracket 217 are positioned straddling lateral brace 215 which provide improved enhancement strength and structural integrity for the gable- end truss to prevent the truss from collapsing and/or being sucked out from wind and/or torsion forces.
  • Additional mounting holes in anti-hinge bracket 217 cooperate and align with anti-torsion tension-compression columns by bolting down through the double top plate 222 and bolting directly to the support columns, which tie directly to foundational elements.
  • an inside corner of a typical frame-type construction includes a corner 224 positioned between two intersecting walls comprised of multiple studs 227, a bottom plate 225, and a double top plate 226.
  • a lateral corner brace subassembly 223 is installed on each side of corner 224 and fastened to studs 227, fastened down through bottom plate 225 to foundation anchors, fastened up through the double top plate 226 to roof elements, and fastened to corner 224.
  • This configuration effectively unitizes the entire corner portion of the building to resist damaging wind and torsion forces imposed by storms and seismic events.
  • the present disclosure provides enhanced structural integrity throughout the entire structure by combining the features and benefits of many structural improvements such as lateral corner brace subassemblies 223.
  • Lateral corner brace subassemblies 223 are appropriately installed straddling building corners as shown in Figure 19 wherein two subassemblies 223 are used. Installations where an interior wall intersects an exterior wall may require three subassemblies 223, wherein two of the subassemblies 223 will be oriented along the exterior wall straddling the intersecting corner, and one subassembly will be oriented transverse along the interior wall. All three of the subassemblies 223 will be fastened to the intersecting corner, which will provide substantially enhanced structural integrity to the building to resist damaging winds and/or torsion forces imposed by storm and/or seismic events.
  • a typical frame-type construction has a corner 224 installed with two lateral corner brace subassemblies 223 oriented along each of the intersecting walls joined at corner 224.
  • Gable-end truss 212 is installed with a bottom chord 221 connected to the double top plate 226 of the wall construction.
  • Wall sheeting 225 is fastened to studs 227 in the wall construction.
  • Prefabricated trusses 234 are installed in a line juxtaposed next to gable-end truss 212.
  • the present disclosure improves the structural integrity of wall sheeting by providing fastening points between the wall sheeting and subassemblies 223.
  • the present disclosure further enhances the gable-end truss 212 by providing a bolted connection from subassembly 223 up through the double top plate 226 of the wall to connect to anti-hinge bracket 217 (not shown) which is bolted to bottom truss chord 221 , and bolted to the diaphragm enhancement system 220.
  • a line of compression blocking (as shown in Figure 15) is installed in trusses 234.
  • Subassemblies 223 are bolted to the corner 224, bolted to the roof elements which are bolted to the trusses 234, bolted to the diaphragm enhancement system 220, fastened to the wall sheeting, bolted through the double top plate 226, bolted through the bottom plate 225, and directly anchored to foundational elements, effectively unitizing all of the frame-type construction elements with structural integrity.
  • each subassembly 223 can comprise at least two specialized anti-torsion tension compression columns 229, at least one lateral connecting brace 232, and at least one corner connecting bracket 235.
  • Lateral connecting brace 232 is comprised of a lateral spanner beam 233 assembled between two lateral connecting brackets 227.
  • Lateral spanner beam 233 is predrilled with holes to provide fastening points for wall sheeting.
  • Columns 229 are predrilled with fastening holes 228 spaced along the length of the column for fastening wall sheeting.
  • Columns 228 are also predrilled with holes to assemble lateral connecting brackets 227 and to receive corner connecting brackets 235.
  • the lower end of columns 229 are fitted with connecting brackets 230 allowing bolted connections down through the bottom plate 225 to fasten directly to foundational elements.
  • the upper end of columns 229 are fitted with connecting brackets 231 to bolt through the double top plate 226 and connect to roof elements.
  • the present disclosure significantly enhances the structural integrity of a framed construction with the installation of subassemblies 223 at each corner and the diaphragm enhancement assembly 220.
  • the present disclosure includes the integration and benefits of the anchoring system (not shown) and the line of compression blocking (described in reference to Figures 15 and 16) and anti-torsion roof system elements and anti-torsion tension compression columns, all combined together to provide a unitized structural frame-type building capable of resisting substantial wind forces, torsion forces, and/or seismic forces, well above what is possible before the introduction of the subject invention.
  • the present disclosure further incorporates the benefits of a secondary sealing system to maintain an integral seal in the event that exterior cosmetic and primary sealing systems are compromised during storm events.
  • the present disclosure further incorporates the features of an entire unitized structural enhancement system to combine with a unitized safe- room to provide maximum protection from the storm events.
  • the present disclosure provides an improved system for a typical residential or commercial structure wherein a series of specialized components are integrated together so as to enhance the structural integrity of the structure against wind forces, such as those associated with hurricanes and/or tornados, so as to provide a secondary relatively watertight seal for the structure, even in the event that the primary sealing system of shingles and/or siding is compromised, damaged, or removed by the storm winds.
  • known shingles and siding provide a cosmetic covering and a primary water seal for the structure; however, the present disclosure provides a secondary water seal in the event that the primary seal system is compromised during storm wind exposure.
  • the present disclosure further provides structural enhancements that can be applied to new construction as well as retrofitting existing structures so as to improve structural integrity and secondary sealing against wind and seismic forces such as those associated with hurricanes and/or tornados.
  • the present disclosure further provides structural enhancements that cooperate with standard construction components so as to improve the structural integrity of the construction components beyond their original capabilities against wind and seismic forces, such as those associated with hurricanes and/or tornados, and further to provide a secondary sealing system to resist influent water in the event that the primary sealing system is compromised.
  • the typical preferred embodiment construction material for the structural enhanced components of the subject invention is metal.
  • Said components may be manufactured from metal using any one of several typical methods such as stamping, forging, bending, welding, or combinations of fabrication methods.
  • said components may be manufactured from non-metal materials such as plastic, reinforced plastic, fiberglass, composites, and/or any other appropriate technology materials suitable to provide the strength requirements for a given application.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Business, Economics & Management (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)

Abstract

L'invention concerne un système pour construire une structure résidentielle ou commerciale et/ou pour réhabiliter une structure existante, lequel système comprend une série d'éléments de construction coopérant avec des matériaux de construction classiques pour améliorer l'intégrité structurelle du bâtiment en cas de forces éoliennes destructrices, de forces de torsion et de forces sismiques, telles que celles qui sont communément associées aux ouragans et aux tornades. La résistance obtenue de la structure est augmentée au-delà de ce que peuvent supporter par eux-mêmes les matériaux de construction classiques. Les éléments coopèrent également avec des matériaux de construction classiques pour fournir une intégrité structurelle à un système autoporteur. Les éléments coopèrent également avec un élément d'étanchéité à l'eau secondaire pour minimiser et/ou empêcher des dégâts provoqués par l'eau de pénétration sur la structure dans le cas où le système d'étanchéité primaire est fragilisé.
EP13769034.3A 2012-03-26 2013-03-26 Système de construction anti-torsion permettant d'obtenir une intégrité structurelle et une résistance sismique Not-in-force EP2831353B1 (fr)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201261685793P 2012-03-26 2012-03-26
US13/613,441 US8726581B2 (en) 2011-09-15 2012-09-13 Construction system providing structural integrity with integral seal
PCT/US2012/055809 WO2013040590A2 (fr) 2011-09-15 2012-09-17 Système de construction produisant une intégrité structurelle à étanchéité intégrée
PCT/US2013/033936 WO2013148725A1 (fr) 2012-03-26 2013-03-26 Système de construction anti-torsion permettant d'obtenir une intégrité structurelle et une résistance sismique

Publications (3)

Publication Number Publication Date
EP2831353A1 true EP2831353A1 (fr) 2015-02-04
EP2831353A4 EP2831353A4 (fr) 2015-11-25
EP2831353B1 EP2831353B1 (fr) 2017-05-03

Family

ID=52114015

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13769034.3A Not-in-force EP2831353B1 (fr) 2012-03-26 2013-03-26 Système de construction anti-torsion permettant d'obtenir une intégrité structurelle et une résistance sismique

Country Status (1)

Country Link
EP (1) EP2831353B1 (fr)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3668828A (en) * 1970-03-10 1972-06-13 George E Nicholas Building construction framework with receivers for bracing means
US6301854B1 (en) * 1998-11-25 2001-10-16 Dietrich Industries, Inc. Floor joist and support system therefor
US6993882B2 (en) * 2000-12-03 2006-02-07 Simpson Strong-Tie Company, Inc. Truss spacer and brace
US6988346B2 (en) * 2001-10-30 2006-01-24 Simpson Strong-Tie Company, Inc. Strap holding device
US7690167B2 (en) * 2005-04-28 2010-04-06 Antonic James P Structural support framing assembly
US8327592B2 (en) * 2005-08-05 2012-12-11 Lafferty Iii George A Structural reinforcing system components

Also Published As

Publication number Publication date
EP2831353B1 (fr) 2017-05-03
EP2831353A4 (fr) 2015-11-25

Similar Documents

Publication Publication Date Title
CA2849014C (fr) Systeme de construction anti-torsion permettant d'obtenir une integrite structurelle et une resistance sismique
US8919050B2 (en) Anti-torsion construction system providing structural integrity and seismic resistance
US8850764B2 (en) Structure anti-torsion system and device, and method of use providing compression and tension support
CA2678586C (fr) Bati de construction modulaire isole
EP2756140B1 (fr) Système de construction produisant une intégrité structurelle à étanchéité intégrée
US20170030072A1 (en) System and method for panelized, superinsulated building envelopes
US5761863A (en) Method of reinforcing a building
US20080034689A1 (en) Structural support for manufactured housing type structures
US8505253B1 (en) Shelter that is capable of withstanding strong winds
US20110072732A1 (en) Roof Panel Tie Down System
US20200208399A1 (en) Envelope Interface to Insulate a Post-Frame Building
EP2831353B1 (fr) Système de construction anti-torsion permettant d'obtenir une intégrité structurelle et une résistance sismique
WO2021210221A1 (fr) Structure de surface de mur et bâtiment
AU2012308171B9 (en) Construction system providing structural integrity with integral seal
AU2012308171A1 (en) Construction system providing structural integrity with integral seal
WO2013040590A2 (fr) Système de construction produisant une intégrité structurelle à étanchéité intégrée
JP7054888B2 (ja) 壁面構造体
JP6963247B2 (ja) 耐力壁及び建物構造体
Wolfe Wind Resistant Design of Light-Frame Buildings
JP2004300801A (ja) 片持ち庇構造

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140414

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20151022

RIC1 Information provided on ipc code assigned before grant

Ipc: E04H 9/14 20060101ALI20151016BHEP

Ipc: E04B 1/26 20060101AFI20151016BHEP

Ipc: E04B 7/02 20060101ALI20151016BHEP

Ipc: E04B 1/35 20060101ALN20151016BHEP

Ipc: E04H 9/02 20060101ALI20151016BHEP

Ipc: E04C 3/12 20060101ALI20151016BHEP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602013020688

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: E04H0009020000

Ipc: E04B0001260000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: E04B 1/26 20060101AFI20161014BHEP

Ipc: E04H 9/02 20060101ALI20161014BHEP

Ipc: E04C 3/12 20060101ALI20161014BHEP

Ipc: E04B 1/35 20060101ALN20161014BHEP

Ipc: E04B 7/02 20060101ALI20161014BHEP

Ipc: E04H 9/14 20060101ALI20161014BHEP

RIC1 Information provided on ipc code assigned before grant

Ipc: E04C 3/12 20060101ALI20161101BHEP

Ipc: E04H 9/02 20060101ALI20161101BHEP

Ipc: E04H 9/14 20060101ALI20161101BHEP

Ipc: E04B 7/02 20060101ALI20161101BHEP

Ipc: E04B 1/26 20060101AFI20161101BHEP

Ipc: E04B 1/35 20060101ALN20161101BHEP

INTG Intention to grant announced

Effective date: 20161117

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 890157

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170515

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013020688

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20170503

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 890157

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170503

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170804

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170803

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170903

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170803

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013020688

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20180206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602013020688

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180326

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180331

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180326

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180326

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180326

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180326

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170503

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130326

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170503