EP2777117A2 - Verfahren zur bereitstellung von regelleistung für ein elektrische energieversorgungsnetz - Google Patents
Verfahren zur bereitstellung von regelleistung für ein elektrische energieversorgungsnetzInfo
- Publication number
- EP2777117A2 EP2777117A2 EP12781066.1A EP12781066A EP2777117A2 EP 2777117 A2 EP2777117 A2 EP 2777117A2 EP 12781066 A EP12781066 A EP 12781066A EP 2777117 A2 EP2777117 A2 EP 2777117A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- power
- energy
- consumer
- generator
- energy store
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
Definitions
- the invention relates to a method for providing control power for a power grid in which a power generator connected to the power grid supplies power to the power grid as needed or a power consumer connected to the power grid receives power from the power grid as needed.
- the invention also relates to a device for carrying out such a method.
- Electricity grids are used to distribute electricity from many energy generators in large areas to many users and to supply households and industry with energy. Energy producers mostly in the form of power plants provide the required energy. As a rule, power generation is planned and provided based on the forecasted consumption.
- Both the generation and the consumption of energy can lead to unplanned fluctuations. These can arise on the energy producer side, for example, in that a power plant or part of the power grid fails or, for example, in the case of renewable energies such as wind, that the energy production is higher than predicted. Consumers may also experience unexpectedly high or low consumption. For example, the failure of a portion of the grid, which cuts off some consumers from the power supply, can lead to a sudden reduction in power consumption.
- the desired AC frequency is, for example, in Europe 50,000 Hz. This frequency is often referred to as the desired frequency.
- a reduction in consumption compared to the plan results in an increase in the frequency of planned power generation by the energy producers, as well as an increase in electricity production compared to the planned consumption plan.
- a reduction in power compared with the energy producers' plan results in a reduction of the network frequency at scheduled consumption, as well as an increase in consumption compared to the planned production plan. For reasons of network stability, it is necessary to keep these deviations within a defined range.
- secondary control power SRL
- minute reserve power MRL
- SRL minute reserve power
- hydro pumped storage plants to provide control power is state of the art. In Europe, the various types of control are provided by pumped storage. However, hydropumps are also often referred to as the most economical renewable energy storage and retrieval technology today to better match energy supply and demand over time. The potential for expanding storage capacity - especially in Norway - is a matter of controversy, as significant capacity in power lines needs to be approved and installed for use. Consequently, the use for the energy management of load management is in competition with the provision of control power.
- an energy management system which comprises a power generator and an energy store, wherein the energy store can be charged by the power generator.
- This is intended to enable an energy producer, who in normal operation does not guarantee uniform energy production, such as the increasingly favored renewable energies, such as wind power or photovoltaic power plants, to distribute their energy more evenly into the power grid.
- uniform energy production such as the increasingly favored renewable energies, such as wind power or photovoltaic power plants.
- the disadvantage of this is that in this way a single power plant can be stabilized, but all other disturbances and fluctuations in the power network can not be intercepted or only to a very limited extent.
- DE 10 2008 046 747 A1 also proposes operating an energy store in an island power grid in such a way that the energy store is used to compensate for consumption peaks and consumption minima.
- the disadvantage hereof is that the energy stores do not have the necessary capacity to compensate for a longer disturbance or a plurality of disturbances rectified with respect to the frequency deviation one after the other.
- the price for the provision of control power depends largely on how quickly the control power can be provided after a request, that is, after a frequency deviation outside the tolerance.
- PRL Primary control power
- SRL secondary control power
- the stabilization of electricity grids is achieved by technologies that are assigned to different classes in terms of overall capacity and service delivery dynamics.
- the UCTE is divided into primary control power (PRL), secondary control power (SRL) and minute reserve (MR).
- PRL primary control power
- SRL secondary control power
- MR minute reserve
- the prequalifiable secondary control power results from the power change activated and measured within 5 minutes (each control direction)
- a short-term overshoot of a maximum of 10% above the secondary control power setpoint is permitted. In any case, a short-term overshoot up to 5 MW is permissible.
- the compensation for the secondary control power provision consists of a performance fee for the provision of the secondary control power and a remuneration for the actual energy provided in the context of the secondary control power provision.
- power generators or energy consumers are often not operated at full load and operated only when needed at a higher power, which is at the expense of the efficiency of the power plant or the consumer.
- only a small proportion of the maximum producible power of the power plant or the consumer can be prequalified as rated power.
- the object of the invention is therefore to overcome the disadvantages of the prior art.
- a possibility should be found to provide control power with efficient energy yield of the control power suppliers.
- the maximum possible output of the control power supplier should be usable.
- energy should not be given away to the grid operator unnecessarily or be sourced from the grid.
- the fastest possible provision of control power should be possible.
- a further object of the invention is to be seen in that, in particular when using galvanic elements, such as accumulators, the capacity of the energy store should be as low as possible in order to provide the required control power.
- a power generator and / or an energy consumer is operated together with an energy storage connected to the power supply to provide the control power and the energy storage at least partially absorbs and / or releases an overshoot energy, wherein the overshoot energy is generated in the overshoot of the power of the power generator beyond the rated power and / or is consumed in the overshoot of the power of the energy consumer over the rated power addition.
- nominal power is to be understood as the power with which the control power source, which is operated by a method according to the invention, is prequalified.
- control power is delivered to the power grid (positive control power) or taken from the mains (negative control power).
- the advantage of methods according to the invention is to be seen in particular in the fact that it is possible with the energy store to provide a higher prequalifiable nominal power as a control power source.
- the appropriate state of charge is given when the energy storage is combined only with a power generator, that this has sufficient free charge capacity to absorb the overshoot of the power generator at the previous maximum power increase, or when the energy storage is combined with an energy consumer that this is sufficiently charged, to give the energy for the overshoot of the energy consumer at previous maximum power increase.
- the appropriate state of charge is approximately half charged when the energy storage is combined with a power generator and an energy consumer.
- the state of charge corresponds, in particular in the case of accumulators as an energy store, to the state of charge (English: “State-of-charge”, SoC) or the energy content ("State-of-energy”, SoE).
- SoC state of charge
- SoE energy content
- state of charge and state of charge are to be regarded as equivalent according to the invention.
- the inventive method ensures that the wishes of the customer, that is, the grid operator can be met for a predictable and defined control power and no regulatory oscillations are generated in the power grid.
- the energy storage receives at least 25%, preferably at least 50%, more preferably at least 75% of the overshoot energy and / or releases.
- control power source can be prequalified for a higher rated power
- stored energy can be used.
- the energy storage emits from a first time at least the difference of the power provided by the power generator to a rated power to the power grid or absorbs the power consumed by the consumer power to a rated power from the mains and Energy storage provides at least this difference between the rated power and the power supplied by the power generator or the power consumed by the power consumer, until the power of the power generator or the energy consumer reaches the rated power at a second time.
- the time until which the rated power is provided can be further shortened.
- a secondary control power source or a minute reserve can be converted to a primary control power source or a minute reserve to a secondary control power source. As a result, higher revenues can be achieved.
- the capacity of the energy storage is chosen at least so large that the energy can be stored in the energy storage, for bridging the rated power to be provided from the first time to reach the rated power by the power generator and / or the energy consumer to the second Time is needed.
- Tuning the capacity of the energy storage device on the performance (the maximum power increase) of the energy producer or the energy consumer has the advantage that the energy storage device can be as small as possible and thus dimensioned and constructed inexpensively.
- the energy store absorbs energy from the energy generator at a third time, while the power of the energy generator is reduced and / or the energy store provides energy for the energy consumer from the third time, while the power of the energy consumer is reduced becomes.
- a flywheel, a heat accumulator, a hydrogen generator and storage with fuel cell, a natural gas generator with gas power plant, a pumped storage power plant, a compressed air storage power plant, a superconducting magnetic energy storage, a redox flow element and / or a galvanic element is used, preferably an accumulator and / or a battery storage power plant, more preferably a lithium-ion battery.
- the heat storage must be operated together with a device for producing electricity from the stored thermal energy.
- accumulators are particularly suitable for methods according to the invention because of their rapid reaction time, that is, the rate at which the power can be increased or reduced.
- the accumulators include in particular lead-acid batteries, sodium-nickel-chloride accumulators, sodium-sulfur accumulators, nickel-iron accumulators, nickel-cadmium accumulators, nickel-metal hydride accumulators, nickel-hydrogen accumulators, nickel-zinc accumulators, tin Sulfur Lithium Ion Accumulators, Sodium Ion Accumulators and Potassium Ion Accumulators.
- accumulators are preferred, which have a high efficiency and a high operational and calendar life.
- the energy store has a capacity of at least 4 kWh, preferably of at least 10 kWh, particularly preferably at least 50 kWh, very particularly preferably at least 250 kWh.
- the capacity of electrochemical energy storage can be at least 40 Ah, preferably about 100 Ah.
- this memory can advantageously be operated with a voltage of at least 1 V, preferably at least 10 V and particularly preferably at least 100 V.
- the energy storage consists of a pool of several energy storage.
- the various energy storage can also be arranged at different locations of the power grid.
- the energy storage may comprise a plurality of rechargeable batteries, for example in electric cars, which are switched as a pool when they are connected to a charging station and thus to the power grid.
- the power of the energy store over a period of at least 0.5 s before the first time to the first time is increased, preferably over a period of at least 2 s, more preferably over a period of at least 30 s.
- a power plant is used as the energy generator, preferably a coal-fired power station, gas-fired power plant or a hydroelectric power plant and / or a plant for producing a substance is used as energy consumer, in particular an electrolysis plant or a metal plant, preferably one Aluminum plant or a steel plant.
- the nominal power of the energy generator together with the energy storage and / or the nominal power of the energy consumer together with the energy storage by the method within 15 minutes, preferably within 5 minutes, more preferably within 30 seconds, to at least 95 % is reached.
- control power sources operated in such a manner can be used efficiently and with better efficiency as secondary control power sources or even as primary control power sources.
- a higher nominal power can be prequalified.
- the ratio of rated power of the energy store to maximum power of the power generator and / or energy consumer may preferably be in the range of 1: 10,000 to 10: 1, more preferably in the range of 1: 1000 to 1: 1.
- the mains frequency of the power supply network is measured and, given a deviation from a nominal value or a deviation from a tolerance by a nominal value, control power is delivered to the power grid or taken from the power grid and / or at a return of the mains frequency to the setpoint or in the tolerance the control power is reduced.
- the energy store is charged to at least 50% when reducing the power of the power generator, in particular substantially fully charged and / or the energy storage is discharged at less than 50% in reducing the power of the energy consumer , is essentially completely discharged.
- the energy storage is operated together with a power generator and an energy consumer and the energy storage in reducing the power of the power generator in about half, preferably between 25% and 75%, more preferably between 40% and 60%, completely is particularly preferably charged between 45% and 55% or the energy storage in reducing the power of the energy consumer about half, preferably between 25% and 75%, more preferably between 40% and 60%, most preferably between 45% and 55% discharged becomes.
- the appropriate state of charge of the energy storage is at the beginning of a method according to the invention in about 50% when both a power generator, as well as an energy consumer is operated with the energy storage. This is achieved by these measures for the following cycles.
- the output of the power supply of the power generator or the power absorbed by the power supply of the energy consumer, in particular after the second time, at several times, preferably continuously measured and calculates the difference to the rated power at several times, preferably continuously is adjusted, wherein output or recorded power of the energy storage in response to this difference, preferably any power, the 1 10% of the nominal power, in particular after a time exceeds, received by the energy storage and / or provided and / or at least this difference is set as the power of the energy storage, in particular between the first and second time.
- the energy generator and / or the energy consumer has or have a maximum power of at least 1 MW, preferably at least 10 MW, particularly preferably at least 100 MW.
- a portion of the overshoot energy dependent on the state of charge of the energy store is absorbed by the energy store and / or emitted, so that the state of charge of the energy store after a control cycle is as close as possible to a setpoint of the state of charge, preferably the entire overshoot Energy is absorbed by the energy storage when the state of charge of the energy storage is below a first limit and only absorbs the portion of the overshoot energy that is above a tolerance above the rated power when the state of charge is above a second limit.
- the state of charge can be kept in the desired state of charge due to the tolerances of the network operator. Then less energy needs to be bought from the power grid or less energy needs to be put into the power grid unnecessarily. At the same time, it ensures that the process remains stable over a long period of time, in particular with automatic control of the process.
- the object of the invention is achieved with respect to a device in that the device comprises a controller, an energy storage and an energy generator and / or an energy consumer, wherein the device is connected to a power grid, the controller with the energy storage and the energy consumer and / or Power generator is connected and controls the generated and / or absorbed control power.
- each control comprises a control, as in a control, a control in dependence on a difference of an actual value to a desired value takes place.
- the controller is thus designed as a control, in particular with regard to the state of charge.
- the controller is a control system.
- the device comprises a frequency meter for measuring the mains frequency of the power network and a memory, wherein in the memory at least one limit value of the network frequency is stored, wherein the controller is adapted to compare the network frequency with the at least one threshold and depending on the comparison to control the performance of the energy storage and the energy consumer and / or the energy generator.
- the rated power of the device for providing control power is the power achievable within a certain time. It is also spoken of the prequalifiable performance, since this meets the criteria of the customer, that is the network operator.
- the invention is based on the surprising finding that the combination of an energy store with at least one conventional control power source makes it possible to improve it in terms of its properties as a control power source.
- a minute reserve may be converted to a secondary control power source or a secondary control power source into a primary control power source.
- the energy store is used to pick up unwanted overshoots beyond the agreed nominal output.
- Battery storage systems are distinguished from conventional technologies for providing primary and / or secondary control functions, inter alia, in that they can change the services provided more quickly, among other things. In most cases, however, is a disadvantage of battery storage that they have a relatively small storage capacity, so can provide the required services only over a limited period.
- One to solve the Therefore, the key finding is that the above-mentioned restrictions on the example of the European interconnected network of the UCTE are met by suitable pooling of battery storages with conventional SR sources.
- the energy store is an accumulator or battery store that is used at the same time to provide primary control power.
- the energy store still has reserves in terms of both the power and the energy in normal operation.
- the energy taken into the memory in the event of negative SR power can be sold on the spot market if the conditions there are advantageous.
- a plurality of energy stores are pooled and operated in accordance with the method of the invention.
- the size of the energy storage within the pool can vary.
- the various energy stores of a pool in the use of tolerances, in particular the choice of bandwidth in the deadband, the change from one parameter setting to another not synchronously, but deliberately offset in time to minimize any disturbances in the network or at least tolerable.
- the tolerance with regard to the amount of the control power provided and the tolerance in determining the frequency deviation, etc., is to be understood by the network operator to be certain deviations between an ideal nominal power due to technical conditions, such as the measurement accuracy in determining the control power supplied or the grid frequency and the actual control power actually delivered.
- the tolerance may be granted by the network operator, but could also comply with a legal requirement.
- the tolerances used in the various methods vary depending on the time of day, the day of the week or the season. For example, within a period of 5 minutes to 5 minutes after the hour change, tolerances may be more narrowly defined. This is due to the fact that Here often very rapid frequency changes take place. It may be in the interest of transmission system operators that there are lower tolerances and thus the control energy supply is more secure in the sense of sharper.
- control power that, in particular, more energy is absorbed from the network than is fed in by the energy store. This can be done by providing very much negative control power in accordance with the regulations including the procedure outlined above, whereas according to the regulations including the procedure set out above, preferably only the at least guaranteed power is provided at positive control power.
- an average of at least 0.1% more energy is withdrawn from the network than is supplied, in particular at least 0.2%, preferably at least 0.5%, more preferably at least 1.0%, especially preferably 5%, these values being based on a Average measured over a period of at least 15 minutes, preferably at least 4 hours, more preferably at least 24 hours and especially preferably at least 7 days, and refer to the energy fed.
- control power provision set out above can be used to extract a maximum of energy from the network, whereby the maximum possible negative control power is provided, whereas only a minimum of positive control power is provided.
- the energy thus extracted from the network can be sold via the energy trade described above, preferably at times when the highest possible price is to be achieved.
- forecasts of the price development based on historical data can be used.
- Figure 1 is a schematic P-t diagram of a conventional secondary control power source and a conventional pool as a secondary control power source;
- FIG. 2 shows a schematic P-t diagram of a control power source operated using a method according to the invention and conventional control power sources;
- FIG. 3 shows a second schematic P-t diagram of a control power source operated with a method according to the invention
- FIG. 4 shows a flow chart for a method according to the invention.
- Figure 5 a schematic representation of a device according to the invention for the provision of control power.
- Figure 1 shows a graph of power (P) versus time (t) of a conventional single secondary control power source (solid line) and a secondary control power source pool (dashed line) comprising a hydroelectric plant and a thermal power plant (e.g., a nuclear power plant).
- the hydraulic hydropower plant provides a contribution to the balancing power right from the start.
- the energy added by the hydropower station can be sold and ensures that the pool's response as a secondary control power source to the customer, ie the grid operator, is readily apparent.
- the performance over the permissible level over the rated power (Psoii) overshoots, moreover, the energy that is provided by such a power is not remunerated.
- the energy corresponds to the area which lies above the straight line of the nominal power (Psoii) and between this straight line and the curves.
- a single or multiple energy stores connected in a pool can be used to limit the overshoot by targeted, ie opposite performance.
- This is schematically outlined in the diagram of Figure 2.
- the energy store may be used to pick up any excess energy or, in the event, overshoot while providing a negative power Control power enters, deliver.
- Figure 2 shows how a conventional power generator or energy consumer must be operated to provide control power (lower graph) if it would overshoot at maximum power increase (over 10%) above the prequalified rated power P 2 (upper graph). Although a higher prequalifiable power P 2 could generally be achieved with maximum power increase, such an increase in power can not be offered due to excessively high overshoot.
- the lower curve shows how much power the conventional power generator or energy consumer can still operate to limit the overshoot to 10% over a lower prequalified rated power Pi. As a result, within the prescribed control period of 5 minutes, only a lower prequalifiable rated power Pi is possible.
- any excess balancing energy is absorbed or discharged by the energy store, since the energy contributions are not compensated for up to 10% above the prequalified power, or must be paid for.
- the excess output power of the energy producer in the range of 0% to 10% of the prequalified power is only absorbed by the energy store or the surplus absorbed power of the energy consumer in the range of 0% to 10% of the prequalified power is only given by the energy storage, if the state of charge of the energy storage makes sense sense. If, for example, the energy store is already charged to more than 50% or to two-thirds, it may be useful to absorb the surplus energy of an energy producer only if it provides a power of more than 10% above the prequalified power P 2 . This is done to maintain the state of charge of the energy store in a desired state suitable for the following control cycles.
- the energy store can absorb any excess energy of the energy producer that is above the prequalified power P 2 .
- the energy store can provide the energy consumed beyond the rated power. Whether this already happens from reaching the nominal power P 2 or only when reaching 10% above the rated power P 2 , in turn, can be made dependent on the state of charge of the energy storage. If the charge of the energy store is to be reduced more, because the charge of the energy store is, for example, in the range of the maximum charge of the energy store, the energy store will already provide its power as soon as the nominal power P 2 has been reached . If the charge of the energy storage is to be reduced less, because the charge of the energy storage is small, for example, less than half or less than one third of the maximum possible charge of the energy storage is the energy storage only provide its power from reaching 10% above the nominal power P 2 .
- the energy store which is preferably a rechargeable battery, in this way allows the conventional SR technology to be prequalified with a higher power than if it were operated alone.
- the overshoot energy E provided or consumed may not be sold to the grid operator since this power can not be sustainably provided. Instead, it is taken up in the energy storage or provided by the energy storage, so that the overshoot energy E can remain with the operator of the control power system, or does not have to be purchased from the power grid.
- the energy storage can be used to close the difference between power demand (target value) and current service provision and thus to achieve additional operating revenue.
- target value power demand
- the decision as to whether this energy is additionally provided could be made dependent on the current working prices or the current state of charge of the battery storage.
- the solid line A shows the maximum increase in output of a conventional power plant, such as a coal power plant or a gas power plant. After 7 minutes, the power plant reaches its maximum output of 18 MW. However, this is too slow to provide SRL. For example, the provision of SRLs requires that the pre-qualifiable power of an SR power source should be achieved within 5 minutes. As a result, the conventional power plant can only provide a prequalifiable power of 13 MW, or can only be prequalified for a SR power of 13 MW.
- the conventional power plant is now combined with an accumulator.
- the accumulator is switched on.
- the accumulator provides 5 MW of power, which is precisely the difference in power that the conventional power plant provides due to its maximum time gradient after 5 minutes, to the maximum power of the conventional power plant.
- the device according to the invention namely the combination of a conventional power plant and an accumulator and a controller for implementing such a method according to the invention, is thus able to apply a power of 18 MW after only 5 minutes, ie the maximum power of the conventional power plant.
- the device for providing SR power can be prequalified to 18 MW.
- the capacity of the accumulator can be steadily reduced from time ti to the extent that increases the power of the conventional power plant.
- a controller may be provided which measures the lack of power of the conventional power plant to its maximum power and provides this power from the accumulator. The power of the accumulator is thus reduced to zero until time t 2 , since from this time t 2 the entire control power can be applied by the conventional power plant.
- an energy E 2 must therefore be applied by the accumulator, which corresponds to the left diagonally hatched area E 2 in FIG.
- the energy E 2 is equal to the integral of the accumulator's power over time, from which the integral of the conventional power plant's output is subtracted over time.
- the capacity of the accumulator should therefore be chosen at least approximately so large that the energy E 2 can be absorbed or released. If only a prequalifiable power of the control power source according to the invention is offered, which is smaller than the maximum power of the power generator / power plant and / or the energy consumer, the capacity of the accumulator can be selected correspondingly smaller.
- the power of the power generator / power plant is sufficient to provide the complete control power.
- the power continues to increase over the rated power of 18 MW in the short term. Since this overshoot is not desirable and is not allowed to a certain extent, since it can lead to control oscillations of various control power sources and thus the grid frequency in the power grid, the excess overshoot energy E is absorbed by the energy storage. Since the charge of the energy storage has previously been reduced, the energy storage has enough capacity to absorb the overshoot energy E.
- the right diagonal hatched area between the straight line at 18 MW and the curve above 18 MW corresponds exactly to the energy E and can be calculated by integration.
- the conventional power plant usually can not be easily turned off, but the power is reduced over a certain period of time to zero.
- the energy E 3 provided by the conventional power station in this period from the time t 3 characterized in Figure 3 by the horizontally dashed surface, no longer needs to be fed into the network, but instead according to the invention can be used for further charging or recharging of the battery. If necessary, the charging process can be terminated when the output state of charge of the energy storage is reached again before the request for control power.
- the principle discussed in this exemplary embodiment with reference to FIG. 3 is readily applicable to an energy consumer and a rechargeable battery or to an energy consumer and another energy store.
- a maximum output of 18 MW is consumed by a plant (energy consumer).
- the plant can produce, for example, methane or ethane or even hydrogen.
- the energy store for example a flywheel to which electrical energy is supplied, can absorb the missing power, that is, in the energy store between the first times t 1 and the second time t 2, the energy E 2 is stored.
- the device according to the invention comprising the energy consumer and the energy store can be prequalified not only to 13 MW but to 18 MW.
- the energy storage can deliver energy very quickly and is particularly responsive. Therefore, accumulators and to some extent flywheels are particularly well suited as energy storage, while pumped storage power plants or gas generators in particular with memory and Gas power plant as an energy storage are not so well suited for implementing inventive method.
- a device according to the invention can also comprise an energy consumer, an energy store and an energy generator and thereby implement a method according to the invention in which both positive and negative control power can be provided and all three components are used.
- FIG. 4 shows a flow chart for a method according to the invention.
- an energy storage, a power generator and an energy consumer are used.
- the grid frequency of the power grid is measured.
- Decision step 2 checks whether the grid frequency is within a tolerance, or above or below it. Alternatively, it is also possible to respond to a request from the network operator. This would then indicate whether he needs positive or negative control power.
- step 4 the pre-qualified rated power of the energy consumer is reached at time t 2 and is consumed by the consumer.
- the power of the energy consumer oscillates beyond the prequalified power due to its inertia.
- the energy storage provides the consumed excess energy E available.
- step 6 it is finally checked whether the mains frequency is still above the tolerance. If so, the energy consumer continues to run and absorb energy, and the energy storage supplies the energy E that exceeds the prequalified power rating. If not, the power of the energy consumer is reduced in step 7 from time t 3 . At the same time, optionally in step 7, the power for the energy consumer can be supplied by the optional energy storage device loaded in step 3 and the charge of the energy storage device can be further reduced.
- the mains frequency is measured again in step 1.
- the measurement of the mains frequency can also be carried out according to the invention in parallel to steps 3, 4, 5 and 7, the power of the energy consumer being increased whenever the mains frequency is above the tolerance.
- Steps 1 to 7 together already provide a method according to the invention for an energy store and an energy consumer, wherein in step 2 it is only decided whether the grid frequency is below the tolerance or not.
- step 13 is continued.
- the power of a power generator such as a coal power plant is increased.
- the energy storage device can provide the missing power of the energy generator.
- the power of the power generator will increase and the power of the energy storage accordingly reduced, until finally in step 14 at time t 2 of the power generator reaches the rated power and the energy storage no longer needs to provide energy.
- the power of the power generator will increase beyond the prequalified power rating.
- the additionally generated Energy, or the excess power is absorbed by the energy storage in step 15.
- step 16 it is then determined whether the mains frequency is still below the tolerance. In decision step 16 this is checked. If the grid frequency is still below the tolerance, the power generator simply keeps running. If not, the process continues to step 17, in which the power of the power generator is reduced, that is, the power generator is shut down, the energy storage from this time t 3 receives and stores the energy generated by the power generator.
- Steps 1, 2 and 13 to 17 thus provide, analogously to steps 1 to 7, a method according to the invention for an energy store and a power generator, wherein in step 2 it is only decided whether the grid frequency is above the tolerance or not.
- the method can also be considered in decision step 2 deciding whether the energy store forms a pool for the following control with the energy producer or the energy consumer.
- steps 1, 2 and 13 to 17 can be continuously checked whether the grid frequency is below the tolerance or not and then reacted accordingly.
- the tolerance is currently ⁇ 10 mHz.
- FIG. 5 shows, in a schematic view, a device 20 according to the invention comprising a power generator 21 or energy consumer 21, which is connected to an energy store 22.
- a controller 23 is connected to the power generator 21 or consumer 21 and to the energy store 22 so that the controller 23 can adjust the power of the power generator 21 or consumer 21 and the power consumption and output of the energy store 22.
- the power generator 21 or consumer 21 and the energy storage 22 are connected to a power grid 24 and can absorb and / or deliver power from the power grid 24. If there is a need for control power - positive or negative control power - the controller 23 receives a signal. Subsequently the power of the power generator 21 or consumer 21 is increased. From the time ti, for example after 30 seconds, or shortly before the power of the energy storage device 22 is switched on, that is, energy is absorbed into the energy storage 22 or discharged from the energy storage 22.
- the controller 23 determines the currently provided by the power generator 21 or consumer 21 control power and ensures that the difference is provided by the energy storage 22. If the power of the energy generator 21 or consumer 21 from the time t 2 is sufficient to provide the entire rated power of the device 20, the energy storage 22 can be disconnected by the controller 23 from the power supply 24, or switched off.
- the controller 23 receives the signal that the control power is no longer needed.
- the power of the power generator 21 or consumer 21 is reduced. So that no unnecessary energy is fed into or taken out of the power network 24, the controller 23 again switches on the energy store 22, which can receive the energy of the energy generator 21 or can provide it to the energy consumer 21.
- This measure also leads to a medium state of charge of the energy store 22, so that it has a suitable state of charge for the next control cycle.
- the controller 23 can charge or discharge the energy storage 22 in an intelligent manner, so that a certain desired state of charge is desired. For example, tolerances in the overshoot or the times ti, t 2 and / or t 3 can be used to develop the state of charge in the desired direction. For example, the power of the energy storage 22 may be provided earlier than ti to charge or discharge the energy storage 22 when deemed necessary. Similarly, an overshoot of up be tolerated to 10% or be intercepted by the energy storage 22 to regulate the state of charge of the energy storage 22.
- Li-ion batteries are quickly and frequently charged and discharged without damaging influences on the battery, so that they are particularly suitable and preferred for all embodiments according to the invention.
- a device 20 according to the invention is therefore particularly well suited as a primary or secondary control power source.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201110055230 DE102011055230A1 (de) | 2011-11-10 | 2011-11-10 | Verfahren zur Bereitstellung von Regelleistung |
PCT/EP2012/071223 WO2013068244A2 (de) | 2011-11-10 | 2012-10-26 | Verfahren zur bereitstellung von regelleistung |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2777117A2 true EP2777117A2 (de) | 2014-09-17 |
Family
ID=47137687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12781066.1A Withdrawn EP2777117A2 (de) | 2011-11-10 | 2012-10-26 | Verfahren zur bereitstellung von regelleistung für ein elektrische energieversorgungsnetz |
Country Status (4)
Country | Link |
---|---|
US (1) | US20140327304A1 (de) |
EP (1) | EP2777117A2 (de) |
DE (1) | DE102011055230A1 (de) |
WO (1) | WO2013068244A2 (de) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102013221750A1 (de) * | 2012-11-15 | 2014-05-15 | Siemens Aktiengesellschaft | Verfahren zur rechnergestützten Steuerung der Leistung in einem elektrischen Stromnetz |
DE102012113051A1 (de) | 2012-12-21 | 2014-06-26 | Evonik Industries Ag | Verfahren zur Erbringung von Regelleistung zur Stabilisierung eines Wechselstromnetzes, umfassend einen Energiespeicher |
SE538504C2 (en) * | 2014-11-24 | 2016-08-16 | Perific Tech Ab | System and Method for Controlling the End-Usage of a Network Distributed Utility |
CN114142620B (zh) * | 2021-12-03 | 2023-03-10 | 华中科技大学 | 一种液氢超导共融储能的优化控制方法及系统 |
EP4220884A1 (de) * | 2022-01-31 | 2023-08-02 | Bloom Energy Corporation | Netz-unterstützender elektrolyseur |
FR3146552A1 (fr) * | 2023-03-07 | 2024-09-13 | Electricite De France | Fonction avancée d’une couche de contrôle-commande intermédiaire d’une centrale virtuelle |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0965588A (ja) * | 1995-08-24 | 1997-03-07 | Hitachi Ltd | 電力貯蔵システム |
EP0822332B1 (de) * | 1996-08-02 | 2001-10-17 | VA TECH HYDRO GmbH & Co. | Wasserkraftanlage |
US20030102675A1 (en) * | 2000-04-17 | 2003-06-05 | Umweltkontor Renewable Energy Ag | Power generators and method and device for generating power |
JP2001327083A (ja) * | 2000-05-18 | 2001-11-22 | Ngk Insulators Ltd | 高温二次電池による電力貯蔵及び補償システム |
DE50305698D1 (de) * | 2002-07-04 | 2006-12-28 | Alstom Technology Ltd | Verfahren zum betrieb eines kraftspeichers - krafterzeugungsanlage |
JP4945077B2 (ja) | 2004-12-03 | 2012-06-06 | シャープ株式会社 | 蓄電設備管理システム |
US8829799B2 (en) * | 2006-03-28 | 2014-09-09 | Wireless Environment, Llc | Autonomous grid shifting lighting device |
DE102006047792A1 (de) * | 2006-10-06 | 2008-04-10 | Technische Universität Clausthal | Konditionierungseinrichtung für Energieversorgungsnetze |
JP5100132B2 (ja) | 2007-01-18 | 2012-12-19 | 株式会社東芝 | 周波数調整システムおよび周波数調整方法 |
EP2139090A1 (de) * | 2008-06-24 | 2009-12-30 | ABB Research Ltd. | Verfahren zum Berteiben eines Batteriestromspeichersystems |
DE102008046747A1 (de) | 2008-09-11 | 2010-03-18 | Hoppecke Advanced Battery Technology Gmbh | Verfahren zum Betrieb eines Produktionssystems und/oder einer lokalen Anlage im Inselbetrieb |
US7839027B2 (en) | 2008-10-09 | 2010-11-23 | The Aes Corporation | Frequency responsive charge sustaining control of electricity storage systems for ancillary services on an electrical power grid |
DE102009037239B4 (de) * | 2009-08-12 | 2011-04-14 | Repower Systems Ag | Windenergieanlage mit einstellbarer Leistungsreserve |
DE102009054078A1 (de) * | 2009-11-20 | 2011-05-26 | Li-Tec Battery Gmbh | Batterieproduktionseinrichtung |
US8478452B2 (en) * | 2010-04-06 | 2013-07-02 | Battelle Memorial Institute | Grid regulation services for energy storage devices based on grid frequency |
JP2013526824A (ja) * | 2010-05-07 | 2013-06-24 | アドバンスド エナージィ インダストリーズ,インコーポレイテッド | 太陽光発電予測システム並びに方法 |
-
2011
- 2011-11-10 DE DE201110055230 patent/DE102011055230A1/de not_active Withdrawn
-
2012
- 2012-10-26 EP EP12781066.1A patent/EP2777117A2/de not_active Withdrawn
- 2012-10-26 US US14/357,280 patent/US20140327304A1/en not_active Abandoned
- 2012-10-26 WO PCT/EP2012/071223 patent/WO2013068244A2/de active Application Filing
Non-Patent Citations (2)
Title |
---|
None * |
See also references of WO2013068244A2 * |
Also Published As
Publication number | Publication date |
---|---|
WO2013068244A2 (de) | 2013-05-16 |
US20140327304A1 (en) | 2014-11-06 |
WO2013068244A3 (de) | 2013-10-17 |
DE102011055230A1 (de) | 2013-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2777130A2 (de) | Verfahren zur bereitstellung von regelleistung in einem energieversorgungsnetz | |
EP2777124A1 (de) | Verfahren zur bereitstellung von regelleistung mit einem energiespeicher unter ausnutzung von toleranzen bei der leistungserbringung | |
EP2777125B1 (de) | Verfahren zur bereitstellung von regelleistung mit einem energiespeicher mit variabler totbandbreite bei der regelleistungserbringung | |
EP2777121B1 (de) | Verfahren zur bereitstellung von regelleistung mit einem energiespeicher unter ausnutzung von toleranzen beim zeitpunkt der regelleistungserbringung | |
EP2777120B1 (de) | Verfahren zur erbringung von regelleistung unter verwendung von energiespeichern | |
WO2013068256A1 (de) | Verfahren zur bereitstellung von regelleistung mit einem energiespeicher unter ausnutzung von toleranzen bei der bestimmung der frequenzabweichung | |
WO2014095457A2 (de) | Verfahren zur erbringung von regelleistung zur stabilisierung eines wechselstromnetzes, umfassend einen energiespeicher | |
EP2777117A2 (de) | Verfahren zur bereitstellung von regelleistung für ein elektrische energieversorgungsnetz | |
EP2777123A1 (de) | Verfahren zur bereitstellung von regelleistung für ein stromnetz | |
EP2777126A1 (de) | Verfahren zur erbringung von regelleistung unter berücksichtigung einer variablen sollfrequenz | |
EP3382841B1 (de) | Hybride nutzung von energiespeichern | |
WO2014095343A2 (de) | Verfahren zum betreiben von energiespeichern | |
WO2014095346A2 (de) | Verfahren zur erbringung von regelleistung zur stabilisierung eines wechselstromnetzes | |
WO2013068247A2 (de) | Verfahren zur bereitstellung von regelleistung mit einem energieerzeuger und einem energieverbraucher | |
WO2014180839A1 (de) | Verfahren zur bereitstellung von regelleistung für ein stromnetz mit einem akkumulator | |
WO2014180830A1 (de) | Verfahren zur bereitstellung von regelleistung für ein stromnetz mit einem akkumulator | |
WO2013068233A2 (de) | Verfahren zur erbringung von regelleistung zur stabilisierung eines wechselstromnetzes | |
WO2014139878A1 (de) | Verfahren zur bestimmung des ladezustands eines akkumulators | |
EP3340416B1 (de) | Steuereinheit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20140428 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: DEIS, WOLFGANG Inventor name: IGEL, MICHAEL Inventor name: GAMRAD, DENNIS Inventor name: FLEMMING, ANNA Inventor name: SCHWEISSTHAL, WOLFGANG Inventor name: KOLLIGS, CARSTEN Inventor name: BREZSKI, HOLGER Inventor name: MARKOWZ, GEORG Inventor name: COCHET, SEBASTIEN |
|
DAX | Request for extension of the european patent (deleted) | ||
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: STEAG POWER SAAR GMBH Owner name: EVONIK DEGUSSA GMBH |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20171222 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20190501 |