EP2769025A1 - Method of installation of an offshore structure - Google Patents

Method of installation of an offshore structure

Info

Publication number
EP2769025A1
EP2769025A1 EP12779005.3A EP12779005A EP2769025A1 EP 2769025 A1 EP2769025 A1 EP 2769025A1 EP 12779005 A EP12779005 A EP 12779005A EP 2769025 A1 EP2769025 A1 EP 2769025A1
Authority
EP
European Patent Office
Prior art keywords
transition piece
gangway
jacket
foundation
offshore structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12779005.3A
Other languages
German (de)
French (fr)
Inventor
Marc Lefranc
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Windsea AS
Original Assignee
Windsea AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Windsea AS filed Critical Windsea AS
Publication of EP2769025A1 publication Critical patent/EP2769025A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0004Nodal points
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/25Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091Offshore structures for wind turbines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0095Connections of subsea risers, piping or wiring with the offshore structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H2012/006Structures with truss-like sections combined with tubular-like sections
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/912Mounting on supporting structures or systems on a stationary structure on a tower
    • F05B2240/9121Mounting on supporting structures or systems on a stationary structure on a tower on a lattice tower
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/91Mounting on supporting structures or systems on a stationary structure
    • F05B2240/913Mounting on supporting structures or systems on a stationary structure on a mast
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/95Mounting on supporting structures or systems offshore
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Definitions

  • the present invention relates to a method of installation of an offshore structure comprising a jacket foundation and a transition piece and to a transition piece for use in the method.
  • the offshore structure may for example be a foundation for a wind turbine.
  • An offshore wind farm avoids many of the restrictions placed on land-based wind farms by planning regulations and suchlike. It also makes transport and installation of large parts to the wind farm site considerably easier, since it is not necessary to design components to be transportable by road, which can restrict the size and weight of individual components. Many designs of offshore wind turbine have been installed and more are in development.
  • Offshore structures such as offshore wind turbines generally have a structure with three main parts.
  • the lower part of the structure will be a foundation, typically secured to the sea-bed (although floating systems are known) and extending upward above sea- level to support the remainder of the structure.
  • Fixed jacket type foundation structures can be secured to the sea-bed by piles or the like.
  • Gravity foundations are also known, which comprise concrete or metal structures designed to be held in place on the sea-bed by their weight and/or by the weight of ballast placed within the structure.
  • Atop the foundation structure there will be a transition piece (sometimes called a transition deck). The transition piece provides the transition between the foundation structure and the functional parts of the offshore structure and transfers the load from the functional parts to the foundation structure.
  • the functional parts might include a tower for a wind turbine or a derrick for oil and gas offshore operations.
  • the transition piece generally provides a platform for access to the offshore structure and to support ancillary components. Usually this will include some form of deck or gangway structure providing access for personnel, either for manned operation or for carrying out servicing or maintenance work on an unmanned offshore structure.
  • the present invention provides a method of installation of an offshore structure comprising a jacket foundation and a transition piece, the method comprising: prefabricating a transition piece onshore, the transition piece comprising a plurality of connecting parts arranged with rotational symmetry about a central axis of the transition piece and a gangway coupled to the transition piece at a side of the transition piece; installing the jacket foundation at a desired location in the most convenient orientation for the weather conditions and the installing apparatus at the time of installation; conveying the transition piece to the installation location of the jacket foundation; rotating the transition piece in order to place the gangway at a leeward side of the offshore structure; and coupling the connecting parts of the transition piece to rotationally symmetrical connecting points of the jacket foundation.
  • the transition piece is oriented with the foundation structure upon installation in order to ensure that the gangway is located leeward of the structure.
  • the method allows for the jacket foundation to be installed on the sea-bed with any convenient orientation, for example an orientation dictated by the positioning of the installation vessel in relation to wind or wave direction, with the transition piece then being easily installed with the gangway in a desirable leeward location by rotation of the transition piece and matching of the symmetrically arranged parts. This means that significant constraints on the installation vessel are removed. A smaller vessel can be used since it is not required to be able to position itself against the prevailing winds. Installation delays resulting from changes in weather conditions can be avoided since there is a lesser need to await favourable wind or wave direction prior to installation of the foundation.
  • the method may include providing features of the transition piece, gangway and/or jacket foundation as discussed below.
  • the transition piece is pre-fabricated onshore and may have a central structure for supporting functional parts of the offshore structure with the connecting parts arranged symmetrically about the central structure.
  • the method may include subsequent installation of a functional part of the offshore structure onto the transition piece.
  • the functional part(s) of the offshore structure may for example comprise a tower of a wind turbine or a derrick for offshore oil and gas operations.
  • the connecting parts may be coupled with the connecting points of the foundation structure using an interlocking plug and socket type arrangement.
  • the connecting part may comprise a male or a female coupling for joining with a corresponding female or male coupling at the connecting point on the foundation part.
  • the coupling step may include grouting to fix the connecting parts in place.
  • the transition piece is prefabricated onshore with ancillary parts including one or more of a deck area, crane and access way for accessing functional parts of the offshore structure.
  • the transition piece may hence be transported to the offshore installation location with the ancillary parts already in place.
  • the method may include connecting the lower end of the gangway to a vertical element of the jacket foundation using a coupling at the lower end of the gangway.
  • the coupling may have features as described below.
  • the jacket foundation may be installed by any appropriate technique. As noted above the method of installation of the transition piece means that the foundation part does not need to be installed in any particular orientation. It also reduces the constraints on the method selected for installation of the jacket foundation.
  • the invention provides a transition piece for an offshore structure, the transition piece being for mounting on a jacket foundation of the offshore structure and comprising: a plurality of connecting parts arranged with rotational symmetry about a central axis of the transition piece, the connecting parts being for mounting the transition piece on rotationally symmetrical connecting points on the jacket foundation; and a gangway for providing access to the transition piece, the gangway being coupled to the transition piece at a side of the transition piece; wherein by virtue of the rotationally symmetrical arrangement of the connecting parts the transition piece is capable of being rotated upon installation in order to place the gangway at a leeward side of the offshore structure, thereby permitting installation of the jacket foundation in the most convenient orientation for the weather conditions and the installing apparatus at the time of installation.
  • the transition piece can be oriented with the jacket foundation upon installation in order to ensure that the gangway is located leeward of the offshore structure.
  • the rotational symmetry means that the transition piece need only be rotated by a small amount to give the correct orientation. For example, with a fourfold symmetry the maximum required rotation would be ⁇ 22.5° as compared with ⁇ 180° for a non-symmetrical system.
  • the rotational symmetry is at least threefold. In a preferred embodiment
  • the symmetry is fourfold.
  • the foundation may comprise four main vertical elements arranged symmetrically with four mounting points for the transition piece, which would hence comprise four symmetrically arranged connecting points.
  • the degree of rotational symmetry may correspond to a number of legs of the foundation structure. For example, if a jacket foundation has three or four legs then the transition piece should have a threefold or fourfold rotational symmetry.
  • the transition piece is for supporting functional parts of the offshore structure, for example a tower of a wind turbine or a derrick for offshore oil and gas operations.
  • the transition piece is preferably pre-fabricated onshore and may have a central structure for supporting functional parts of the offshore structure with the connecting parts arranged symmetrically about the central structure.
  • the transition piece is integrated with a functional part such as a wind turbine tower.
  • the connecting parts may be arranged to connect with the connecting points of the foundation structure using an interlocking plug and socket type arrangement.
  • the connecting part may comprise a male or a female coupling for joining with a corresponding female or male coupling at the connecting point on the foundation part.
  • the central structure and connecting parts may be joined by a platform structure and/or by beams or similar.
  • the connecting parts are at distal ends of beams that extend outwardly away from the central structure.
  • the beams taper toward the connecting parts.
  • the beams may have a box beam
  • a beam arrangement of this type provides a strong and stable connection from the connecting points on the foundation to the central structure and the functional parts that it supports.
  • the gangway is preferably positioned at the side of the transition piece outside of the extent of the transition piece, such that when installed it protrudes on the outside of the offshore structure. This makes it easier to access the gangway from a vessel whilst avoiding contact with the structure. It also means that the gangway does not hamper or restrict installation of the transition piece on the jacket foundation, or restrict the design of structurally important parts of the transition piece.
  • the gangway may be at a side of, and preferably outside, the triangle or square defined by vertices at the connecting points.
  • the transition piece may include ancillary parts in addition to the gangway such as one or more of a deck area, a crane, and/or an access way for providing access to the functional parts.
  • the access way may comprise a stairway extending upward through a central structure of the transition piece.
  • this can provide access to the inside of a turbine tower without the need to cut a doorway into the structure of the tower.
  • Turbine towers for offshore wind turbines are typically provided with an internal access way used to reach the top of the tower, since this is protected from weather and the internal parts do not hamper transport of the tower or installation of the wind mill.
  • the transition piece is prefabricated onshore with some or all of the ancillary parts, which preferably includes the gangway, and is transported to the offshore installation location with the ancillary parts already in place.
  • the ancillary parts which preferably includes the gangway
  • the transition piece can be rotated at the offshore location to give the correct orientation for leeward placement of ancillary parts such as the gangway then there are no problems with ensuring correct placement of the gangway during the onshore prefabrication or correct orientation of the jacket foundation during offshore installation.
  • the invention extends to an offshore structure including a transition piece as described above and a jacket foundation with a rotationally symmetrical construction.
  • the connecting points may be at the tops of legs or columns of the jacket foundation.
  • the connecting points comprise male couplings extending upward from the foundation, with the connecting parts of the transition piece hence comprising female couplings.
  • the connecting parts may be secured to the connecting points by grouting.
  • the connecting points are preferably exposed upper ends of piles of the foundation. This means that the transition piece is secured to a strong and stable part of the foundation.
  • the jacket foundation may include a J-tube for passage of cables and the like from the sea-bed to the top of the foundation.
  • the J-tube includes an angled section at the base of the foundation.
  • the angled section may comprise a lower generally horizontal part for receiving a cable running generally horizontally along the floor, a bend that turns the cable through about a right angle, and an upper generally vertical part so that the cable exits the angled section running generally vertically.
  • a J-tube will also include a vertical section of tubing running from the angled section to the top of the foundation.
  • the J-tube of the present foundation does not include such a vertical section.
  • the cabling is passed from the generally vertical exit portion of the angled section to the top of the structure without being enclosed in a tube. It has been found that it is not necessary to enclose the cabling for many offshore structures, including wind turbines. Omitting the vertical tubing makes the construction and installation of the foundation simpler, and also makes it easier to install cables through the J-tube.
  • the J-tube is located adjacent to a leg or column of the foundation and may be clamped to the leg.
  • the J-tube can be rotated in order to direct the lower generally horizontal part of the angled section in any desired direction.
  • the J-tube can receive cabling running from any direction, and hence avoids the need to orient the foundation part relative to the direction of the cabling. This further enhances the advantages of the rotationally symmetrical structure.
  • the foundation is a modular structure comprising jacket modules with hollow legs that are secured to the sea-bed by piles through the hollow legs.
  • the piles may be in multiple segments.
  • One preferred arrangement for the jacket comprises: a plurality of jacket modules stacked one above the other, each of the jacket modules having multiple hollow legs; and a plurality of piles passing through the hollow legs for securing the jacket to the sea-bed; wherein the piles include: foundation piles passing through legs of a lowermost jacket module, extending downward below the lowermost jacket module into the sea-bed, and extending upward out of the tops of the legs of the lowermost jacket module and into legs of a second jacket module located atop the lowermost jacket module such that the foundation piles extend into the legs of the second jacket module by a height less than the height of the jacket modules; and follower piles within the legs of the second jacket module located atop the foundation piles and extending upward out of the tops of the legs of the second jacket module.
  • the second jacket module may be the uppermost jacket module. However, it is preferred to use at least one additional jacket module and also additional follower piles.
  • the jacket may comprise: a third jacket module atop the second jacket module, with the follower piles in the legs of the second jacket module being a first set of follower piles and extending upward into the legs of the third jacket module; and a second set of follower piles within the legs of the third jacket module located atop the first set of follower piles and extending upward out of the tops of the legs of the third jacket module.
  • the jacket includes a total of only three jacket modules.
  • the piles may be secured within the legs of the jacket modules by grout.
  • the grout may be grout that has been pumped into the legs around the piles after assembly of all the jacket modules and piles is completed.
  • the connecting points of the foundation may be the exposed parts of piles at the top of the legs of the foundation.
  • the grout ensures a secure connection between the piles and jacket modules and provides the necessary tensile strength to prevent instability and failure of the jacket and/or transition piece when vertical or horizontal loads on the offshore structure generate tensile loads on the jacket and/or transition piece
  • the jacket modules are designed with an arrangement of legs that is rotationaily symmetrical about an axis extending parallel with the legs, i.e. an axis that is generally vertical when the jacket module is in its installed orientation.
  • the rotationaily symmetrical arrangement of connecting points can be provided by connecting points on the legs of the foundation.
  • the degree of rotational symmetry preferably corresponds to the number of legs. For example, if the jacket module has three or four legs then it should have a threefold or fourfold rotational symmetry.
  • the jacket modules may be entirely rotationaily symmetrical.
  • the jacket modules may comprise symmetrically arranged legs joined by similar truss arrangements.
  • the gangway may be an articulated retractable gangway.
  • the gangway may comprise walkways arranged for relative rotational movement, such that it can fold into a retracted configuration. It is preferred for the gangway to connect to the transition piece at a deck area of the transition piece. The gangway may extend away from the deck area along the side of the transition piece.
  • the gangway comprises: an upper end connecting to the transition piece, for example at a deck area thereof; a lower end for providing access to the gangway from a vessel at water level; and walkways that, in use, extend from the upper end to the lower end in zig-zag fashion with the centre of gravity of the walkways horizontally offset from the upper end; wherein the walkways are arranged to rotate relative to one another such that the gangway is articulated and may be moved between an extended configuration and a retracted configuration; and wherein the gangway further comprises a coupling connected to the lower end of the gangway and arranged for connection to a generally vertical element of the offshore structure in order to permit generally vertical movement of the lower end relative to the offshore structure and in order to transfer a horizontal force from the lower end of the gangway to the offshore structure such that, in use, a horizontal force arising from a moment created by the offset centre of gravity of the walkways is supported by the offshore structure.
  • This arrangement provides a retractable gangway that can be stowed in a retracted configuration during periods when no access to the structure is necessary, and easily deployed to an extended configuration in which the lower end is lowered toward the water level and can be accessed by a vessel at water level.
  • the zig-zag arrangement of the walkways can easily be folded up into a small space. This is a particular advantage for offshore wind turbines since as noted above these will have extended periods of unmanned operation. With the gangway retracted it is difficult for unauthorised persons to access the offshore structure. Also, the retracted gangway is protected from the sea and can avoid direct contact with waves under normal weather conditions. A permanently extended gangway would be constantly in contact with the sea and so would be at risk of corrosion and fouling. The coupling at the lower end bears horizontal forces arising from the weight of the walkways and as a result the mounting of the gangway to the transition piece and/or offshore structure is made easier.
  • walkway is intended to encompass any structure for passage of people, such as a path, stairway, ramp or the like.
  • the walkways are each of a similar length.
  • the walkways extend along a side of the offshore structure, diagonally across a side surface thereof.
  • the gangway may comprise a connector for connecting the upper end of the gangway to the transition piece and this connector should preferably be capable of carrying a horizontal load.
  • the vertical load arising from the weight of the walkways can be supported at any point along the ho izontal extent of the walkways.
  • the vertical load may possibly be supported at the connection of the upper end and by the coupling at the lower end.
  • the vertical load is supported by a winch connected to a lower walkway by a cable.
  • the transition piece or gangway may hence comprise a winch for supporting the retractable gangway.
  • the term cable is used herein as a general term to include ropes, chains, cables and other cable type elements for supporting a load in tension.
  • the winch is connected to the lower end of the gangway, which may be an end of a lower walkway.
  • the gangway With a winch supporting a lower walkway of the gangway the gangway can be moved between its retracted and extended configurations by action of the winch. To extend the gangway the winch lowers the cable until the lower end of the gangway is at the desired level for the vessel at water level. The lower end of the gangway may then be rested on the deck of the vessel and permitted to move up and down with wave movement. In this way the gangway provides an access point which does not move relative to the vessel.
  • a constant tension winch is used. This acts to raise an lower the gangway in a controlled fashion and to damp erratic movement of the gangway that might occur as a consequence of erratic movement of the vessel.
  • the coupling connected to the lower end of the gangway is arranged to permit only generally vertical movement of the lower end, when installed on the vertical element in use.
  • the lower end should be prevented from moving horizontally and should be allow to slide vertically.
  • the coupling may be arranged to resist loads in all horizontal directions.
  • the coupling is preferably arranged for connection to a vertical element that takes the form of a leg of the offshore structure, such as a column or pile of the foundation part.
  • the coupling may be arranged to fully or partially encircle the leg, for example it may be formed as a U-shape or as a collar about the leg. This means that the coupling can easily pass horizontal loads to the vertical element and can also restrain the lower end so that only vertical movement should occur.
  • the coupling includes guide wheels for rolling on the surface of the vertical element. This reduces friction and provides a smooth movement of the coupling in the vertical direction whilst permitting effective transfer of horizontal loads from the gangway to the vertical element.
  • the gangway may incorporate a bumper for contact with a vessel.
  • the bumper is preferably mounted at the lower end of the gangway and preferably arranged to move with the lower end of the gangway.
  • the bumper may move vertically as the coupler permits vertical movement.
  • the bumper may be prevented from moving horizontally.
  • the bumper can provide a fixed point relative to the vessel and to the lower end of the gangway, which moves up and down with the movement of the vessel.
  • the vessel can be moored to the bumper or can press up against the bumper using a small thrust.
  • the bumper may include a resilient body, such as a rubber body or an inflatable body.
  • the bumper may be for receiving a prow of the vessel and hence may include a V-shaped notch or similar geometry.
  • the walkways preferably include: an upper walkway with a first end at the upper end of the structure and a second end spaced away from the first end diagonally downwards from the first end; and a lower walkway with a first end at a lower part of the structure and a second end spaced away from the first end diagonally upwards from the first end.
  • a pantograph mechanism may be used to restrict movement of the walkways.
  • Adjacent walkways may be connected to one another and/or to the intermediate platform by hinged connectors, thereby permitting the required rotational movement.
  • the lower end of the gangway is preferably generally beneath the upper end, i.e. it may be located in about the same horizontal position and vertically below the upper end when the gangway is in use.
  • the connection for the upper end may be at a first, upper, part of the vertical element of the offshore structure, with the coupling for the lower end joining to the same vertical element at a lower part thereof.
  • a winch supports the weight of the walkways it may be located at the upper part of the same vertical element.
  • the lower end When there is an odd number of walkways and the walkways are of similar lengths the lower end would be spaced apart horizontally from the upper end of the gangway. This is less preferred, since it requires the lower end to be supported by a vertical element of the offshore structure that is horizontally spaced from the part of the offshore structure that connects to the upper end of the gangway.
  • some advantages of the gangway can still be realised with this type of arrangement.
  • the second end of the upper walkway and the second end of the lower walkway are adjacent one another and arranged to permit transit of personnel between the upper and lower walkways.
  • the walkways comprise stairs.
  • the walkways may be flights of stairs, or the walkways may include a stairway with adjacent ramp.
  • the use of stairs enables the extended position to the walkways to put the walkways at a steeper angle whilst still enabling personnel to mount the walkways without difficulty or risk of slipping.
  • the gangway may incorporate an access platform at the lower end of the gangway. This may be a horizontal platform extending from the lower walkway. The platform may extend away from the offshore structure, in a direction perpendicular to the horizontal extent of the walkways along the side of the structure. This provides a space between the structure and the vessel moored at the access platform.
  • the access platform may be arranged to land on a deck of a vessel at water level. It may include steps for landing on the deck of the vessel.
  • transition piece has been developed with a focus on the offshore wind industry and hence in a preferred embodiment the transition piece is for an offshore wind turbine.
  • the invention in preferred embodiments, extends to an offshore wind turbine structure incorporating the described transition piece.
  • the transition piece may also be advantageously utilised in other offshore sectors such as oil and gas.
  • the invention provides a J-tube system for passage of cables and the like from the sea-bed to the top of an offshore structure, the J-tube comprising an angled section including a lower generally horizontal part for receiving a cable running generally horizontally along the floor, a bend that turns the cable through about a right angle, an upper generally vertical part so that the cable exits the angled section running generally vertically, and an open non-enclosed cable run extending from the top of the generally vertical part toward the top of the offshore structure.
  • the J-tube With this J-tube the cabling is hence passed from the generally vertical exit portion of the angled section to the top of the structure without being enclosed in a tube.
  • omitting the vertical tubing makes the construction and installation of the jacket simpler, and also makes it easier to install cables through the J-tube.
  • This aspect extends to an offshore structure or a foundation part of an offshore structure incorporating the J-tube.
  • the foundation part may be a jacket type foundation of the type described above, but this is not essential.
  • the proposed J-tube system will provide advantages with other types of foundation as well.
  • the J-tube system may include cable restraints spaced apart up the height of the modular structure, such as rings mounted on legs of the modules.
  • the J-tube is located adjacent to a leg of the foundation part and may be clamped to the leg.
  • the J-tube can be rotated relative to the offshore structure or foundation part in order to direct the lower generally horizontal part of the angled section in any desired direction.
  • the J-tube arrangement comprises two J-tubes mounted adjacent to two opposite legs of the lowermost jacket module.
  • sea level and the sea-bed are referred to herein it will be understood that the structures described herein may also be used in any suitable body of water, such as seas, oceans, estuaries, inland lakes and reservoirs.
  • any reference to sea level should be understood to mean a datum water level for the desired location of the structure in any body of water.
  • sea-bed should be understood to refer to the bottom of the body of water.
  • top and bottom and other terms relating to relative vertical location are intended to reference the normal installed orientation of the described structures.
  • the top of a pile is the part that is uppermost when it is installed, and the bottom of a pile is the opposite end of the pile.
  • the parts of the structure may be manufactured and transported in other orientations.
  • Figure 1 is a partially exploded isometric view of a jacket and wind turbine, with some ancillary parts omitted for clarity;
  • Figure 2 is a side elevation of the jacket
  • Figure 3 is a plan view of the jacket with the transition piece omitted
  • Figures 4 to 10 show the installation of the jacket on the sea-bed
  • Figure 1 1 is an illustration of the detail of the connection between piles within the legs of the jacket, with exaggerated diameter
  • Figure 12 is an elevation of a part of the installed jacket with gangway with the gangway retracted
  • Figure 13 is a similar elevation to Figure 12, with the gangway deployed; and Figure 14 shows the detail of the connection between the lower portion of the gangway and a leg of the jacket.
  • the preferred embodiment is described in the context of a jacket for a wind turbine, as shown in Figure 1.
  • the wind turbine and tower can be of generally
  • the tower is mounted on a transition piece 2 that is installed atop the jacket 4.
  • the jacket 4 comprises three jacket modules 6 secured to the sea-bed by piles 8.
  • Figure 1 shows the extent of the piles beneath the jacket into the sea-bed.
  • the jacket modules 6 are 12 m in height and width, with a generally cubic shape.
  • the piles 8 may extend by around 30 m into the sea-bed, the actual depth being decided depending on soil conditions and on the expected loading on the wind turbine.
  • the jacket 4 is sized so as to allow for one of the three modules to protrude above the reference water level.
  • FIGS 2 and 3 show the jacket 4 in greater detail.
  • Each jacket module 6 is a cube shape with four hollow legs 10 along the vertical edges, which are joined on each vertical outer surface of the cube by a truss structure formed by two cross-beams 12 in an X shape.
  • the preferred embodiment shown in the drawings does not include any other cross beams. However, if required for structural strength then horizontal cross-beams can be added above and/or below the X-shaped beams 12.
  • the jacket modules 6 do not include any beams across the middle of the structure either inside the cube shape or at the horizontal outer surfaces of the cube shape.
  • the preferred embodiment uses tubular hollow beams. In the context of jacket designed to support an offshore wind turbine the hollow beams for this 12 m cube have a diameter of 1 .2 m for the hollow legs 10 and a diameter of 0.6 m for the cross-beams 12.
  • the lowermost jacket module 6 includes mud mats to support the jacket module on the sea-bed.
  • the mud mats may be adapted according to soil conditions in a conventional fashion.
  • the jacket 4 also includes J-tubes (not shown) for passage of cables and the like from the sea-bed to the top of the jacket 4.
  • the J-tubes (not shown) are mounted to the base of legs 10 of the lowermost jacket module 6 and can be rotated.
  • Each J-tube includes an angled section with a lower horizontal part that receives a cable running generally horizontally along the floor, a bend that turns the cable through a right angle, and an upper vertical part so that the cable exits the angled section running vertically upward toward the top of the jacket.
  • the J-tubes in this preferred embodiment do not include a vertical section of tubing running from the angled section to the top of the jacket. Instead, the cabling is passed from the vertical exit portion of the angled section to the top of the structure without being enclosed in a tube. Rings mounted on legs 10 of the modules 6 keep the cables in place during wave and tidal water movements.
  • the J-tube closest to the incoming cabling is rotated in order to direct the lower horizontal part of the angled section in the direction of the cabling.
  • the cabling can then be installed through the J-tube and up to the top of the structure via the rings.
  • the transition piece 2 comprises a central circular structure for supporting a turbine tower and four triangular beams 14 extending outwardly away from the central structure and tapering toward outer connecting parts at the end of each beam 14, which connect to the tops of piles extending upwardly from the uppermost jacket module 6.
  • the beams 14 have a box beam construction.
  • FIG. 4 shows a barge 16 with second and third jacket modules 6b, 6b and the transition piece 2 on deck, and the first jacket module 6a located on the sea-bed.
  • Four foundation piles 8a are inserted into the hollow legs 10 of the first jacket module 6a and as shown in Figure 5 these are driven through the legs 10 and into the sea-bed.
  • the pile driving is done partly in air and partly with the hammer submerged.
  • the extent of the foundation piles 8a into the sea-bed might be about 30 m.
  • the upper end of the foundation pile 8a is left protruding from the tops of the legs 10 of the first jacket module 6a.
  • the exposed length of the pile is at least 4 m.
  • Two of the foundation piles 8a are exposed by 4 m.
  • the other two piles are left with a greater exposed height in order to provide guide piles to facilitate simple alignment of the next jacket module.
  • a first guide pile extends 5.5 m above the tops of the legs 10 and a second guide pile extends 4.5 m above the tops of the legs.
  • the piles 8a could be installed in pre-drilled holes and secured in place by grout or the like.
  • the second jacket module 6b is lowered onto the exposed upper ends of the foundation piles 8a.
  • This step is shown in Figure 6.
  • the second jacket module 6b is first aligned with the first guide pile, which is the foundation pile that extends out of the lowermost jacket module 6a by the greatest height.
  • the second jacket module is landed on this first guide pile, and this provides a first fixed point.
  • the jacket module can be rotate to align with the second guide pile. Landing the second jacket module on the second guide pile fixes the jacket module rigidly in place, preventing further rotation.
  • it is slid down the first and second guide piles it should be correctly aligned with the remaining two foundation piles 8a, allowing it to be easily located on all four piles.
  • follower piles 8b are installed in the legs 10 of the second jacket module 6b.
  • the follower piles 8b have a length that is the same as the height of the jacket modules 6, and hence they protrude out of the tops of the legs of the second jacket module 6b by the same length that the foundation piles 8a protrude from the lowermost jacket module 6a.
  • the follower piles 8a will include first and second guide piles with extra height corresponding to the extra height of the guide piles in the foundation piles 8a.
  • the third jacket module 6c and a further set of follower piles 8b are then installed atop the second module 6b in a similar fashion.
  • the exposed pile ends at the top of the partially constructed jacket are cut to make them level with each other, and to provide an exposed length suitable for supporting the transition piece 2, which is installed on the exposed pile ends as shown in Figure 9.
  • the transition piece 2 is pre-fabricated with an access way 18, which is not shown in Figure 9 but is described below with reference to Figures 12, 13 and 14. Before the transition piece 2 is installed it is rotated so that the access way 18 is on the leeward side of the jacket 4. Since the transition piece 2 and the other parts of the jacket 4 have a rotationally symmetrical structure it can be installed in any rotational orientation relative to the jacket modules 6.
  • transition piece 2 With the transition piece 2 in the correct orientation the four connecting parts of the transition piece 2, which take the form of cylindrical sockets with similar dimensions to the hollow legs 10 of the jacket modules 6, are placed on the top ends of the piles 8, and then grout is injected to secure the transition piece 2 in place.
  • the jacket 4 is then complete, as shown in Figure 10.
  • the transition piece 2 may optionally be installed with the turbine tower already in place, the tower and transition piece 2 having been assembled together onshore.
  • Figure 1 1 shows a cross-section of the jacket leg and piles at a join between two modules, with the diameter of the leg and piles exaggerated compared to the overlap length. As explained above, the length of overlap would be 4 m in this embodiment.
  • the hollow legs 10 of the jacket modules 6 include internal lugs 20 protruding from the wall of the leg and acting to locate the piles 8 in the centre of the hollow legs 10 and also to maintain a set minimum spacing between the piles 8 and the walls of the hollow legs 10.
  • the legs 10 include a connecting ring 22, which in this case is at the bottoms of the legs 10 of the upper module 6.
  • the connecting ring 22 has an inner diameter generally larger than the outer diameter of the legs and includes a tapered part that acts to guide the two legs into alignment and to give a tight, wedged fit of one leg onto the other.
  • An O-ring seal is also included, to ensure that the connecting ring 22 seals the joint between the two legs 10 and contains the grout 23 that is later pumped into the space between the piles 8 and the walls of the hollow legs 10.
  • the two piles 8 are designed to interlock using a plug and socket type
  • the lower pile 8 has a male joint 24 consisting of a truncated cone protruding upward from a flat, with a shoulder about the base of the cone. The shoulder can be used for impacting the hammer when a foundation pile 8a is driven into the sea- bed.
  • the upper pile 8 has a female joint 26 of complementary shape, with a frustoconical volume for receiving the truncated cone of the male joint 24.
  • the cone shape provides a tight fit that prevents undesirable ingress of grout into the join between two piles 8.
  • the foundation pile 8a has the male joint 24 at its upper end.
  • the follower piles 8b are provided with a female joint 26 at one end and a male joint 24 at the other end.
  • Figures 12 and 13 show further detail of the constructed jacket and tower and ancillary parts that are installed on the transition piece 2.
  • These ancillary parts include a deck area 28 on the transition piece that joins to a gangway 30, and a crane 31 .
  • the crane 31 is used to load parts and equipment onto the deck area 28 from a vessel 33 below.
  • the deck area 28 also joins to a stairway up into the tower that provides access into the tower from beneath the base of the tower.
  • this avoids the need to cut a doorway into the tower, which means that the tower is not weakened by holes in its structure.
  • the deck area 28 and gangway 30 are prefabricated on the transition piece 2 and during installation of the transition piece 2, with or without the tower, it is rotated to place the gangway 30 on the leeward side of the jacket.
  • the final stage of the installation process is to connect the gangway 30 to a leg 10 of the upper jacket module 6.
  • Prefabrication of these ancillary parts with the transition piece 2 means that complicated construction and assembly occurs on land rather than at the offshore installation site.
  • the gangway 30 provides access to the deck area 28 and turbine tower from a vessel. It is an articulated stairway with upper and lower parts in the form of flights of stairs 32, 34 that join the deck area 28 to an access platform 36 at the base of the stairway.
  • the upper flight 34 is connected to the deck area 28 at one end and extends away from the deck area 28 to an intermediate platform 38.
  • the intermediate platform 38 the direction of the stairway reverses and the intermediate platform 38 connects to the lower flight 34, which runs back toward the deck area 28, ending at the access platform 36, which in this embodiment is located generally beneath the starting point for the upper flight 32, where it joins the deck area 28.
  • the upper and lower flights 32, 34 are rotatably connected to each other via the intermediate platform 38 and the upper flight 32 is rotatably connected to the deck area 28.
  • the rotating connections allow the gangway 30 to be lowered toward water level in order to place the access platform 36 at deck level for a vessel 33 below.
  • the access platform 36 can be retracted and raised to a stowed configuration with the upper and lower flights 32, 34 folding together.
  • Figure 12 shows the raised/stowed configuration of the gangway 30 and Figure 13 shows the extended/in use configuration.
  • a constant tension winch 40 on the deck area 28 is attached to the access platform 36 via cables and supports the vertical load that arises from the weight of the gangway 30.
  • the winch 40 is used to raise and lower the gangway 30.
  • the access platform 36 sits on the deck of the vessel.
  • the constant tension winch 40 will raise and lower the gangway 30 to match the movement of the vessel 33.
  • the access platform 36 will not move up and down relative to the vessel 33, which will make it easier to use the gangway 30.
  • FIG. 14 An important feature of the gangway 30 is the connection of the base of the stairway to the leg 10 of the uppermost jacket module 6. This is shown in more detail in Figure 14, which includes a close up view of the base of the stairway shown in the deployed configuration with a vessel present.
  • a collar 42 around the leg 10 guides the vertical movement of the access platform 36 and prevents it from moving horizontally.
  • the collar 42 also provides a reaction force to support horizontal loads arising from the weight of the gangway 30. It will be understood that since the stairway extends sideways from its mounting point at the deck area 28 then a moment is created about the mounting point to the deck area 28.
  • the collar 42 provides a horizontal reaction against this moment in order to support the offset gangway 30.
  • the collar 42 includes guide wheels 44 so that it can move smoothly up and down the leg 10.
  • the connection of the upper flight 34 to the deck area 28 also bears a horizontal load, which is equivalent to the horizontal reaction at the collar 42, but in the opposite direction.
  • the collar 42 is connected to the access platform 36 by a shaft 46. Also connected to the collar 42 is a bumper 48.
  • the bumper 48 is designed to receive the prow of the vessel 33 and to hence keep the vessel 33 fixed in place horizontally.
  • the vessel 33 can use a small amount of thrust to keep the prow of the vessel 33 pressed against the bumper 48.
  • the bumper 48 will move up and down with the vessel 33 since, as with the access platform 36, it is supported by the constant tension winch 40.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Foundations (AREA)
  • Wind Motors (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A method of installation of an offshore structure comprising a jacket foundation (4) and a transition piece (2), the method comprising: prefabricating a transition piece (2) onshore, the transition piece (2) comprising a plurality of connecting parts arranged with rotational symmetry about a central axis of the transition piece (2) and a gangway (30) coupled to the transition piece (2) at a side of the transition piece (2); installing the jacket foundation (4) at a desired location in the most convenient orientation for the weather conditions and the installing apparatus at the time of installation; conveying the transition piece (2) to the installation location of the jacket foundation (4); rotating the transition piece (2) in order to place the gangway (30) at a leeward side of the offshore structure; and coupling the connecting parts of the transition piece (2) to rotationally symmetrical connecting points (8) of the jacket foundation (4).

Description

METHOD OF INSTALLATION OF AN OFFSHORE STRUCTURE
The present invention relates to a method of installation of an offshore structure comprising a jacket foundation and a transition piece and to a transition piece for use in the method. The offshore structure may for example be a foundation for a wind turbine.
As a consequence of increased energy demands and a desire to generate a larger amount of so called renewable energy an offshore wind industry has developed. An offshore wind farm avoids many of the restrictions placed on land-based wind farms by planning regulations and suchlike. It also makes transport and installation of large parts to the wind farm site considerably easier, since it is not necessary to design components to be transportable by road, which can restrict the size and weight of individual components. Many designs of offshore wind turbine have been installed and more are in development.
Offshore structures such as offshore wind turbines generally have a structure with three main parts. The lower part of the structure will be a foundation, typically secured to the sea-bed (although floating systems are known) and extending upward above sea- level to support the remainder of the structure. Fixed jacket type foundation structures can be secured to the sea-bed by piles or the like. Gravity foundations are also known, which comprise concrete or metal structures designed to be held in place on the sea-bed by their weight and/or by the weight of ballast placed within the structure. Atop the foundation structure there will be a transition piece (sometimes called a transition deck). The transition piece provides the transition between the foundation structure and the functional parts of the offshore structure and transfers the load from the functional parts to the foundation structure. The functional parts might include a tower for a wind turbine or a derrick for oil and gas offshore operations.
The transition piece generally provides a platform for access to the offshore structure and to support ancillary components. Usually this will include some form of deck or gangway structure providing access for personnel, either for manned operation or for carrying out servicing or maintenance work on an unmanned offshore structure.
Viewed from a first aspect, the present invention provides a method of installation of an offshore structure comprising a jacket foundation and a transition piece, the method comprising: prefabricating a transition piece onshore, the transition piece comprising a plurality of connecting parts arranged with rotational symmetry about a central axis of the transition piece and a gangway coupled to the transition piece at a side of the transition piece; installing the jacket foundation at a desired location in the most convenient orientation for the weather conditions and the installing apparatus at the time of installation; conveying the transition piece to the installation location of the jacket foundation; rotating the transition piece in order to place the gangway at a leeward side of the offshore structure; and coupling the connecting parts of the transition piece to rotationally symmetrical connecting points of the jacket foundation.
With the method of the invention the transition piece is oriented with the foundation structure upon installation in order to ensure that the gangway is located leeward of the structure. The method allows for the jacket foundation to be installed on the sea-bed with any convenient orientation, for example an orientation dictated by the positioning of the installation vessel in relation to wind or wave direction, with the transition piece then being easily installed with the gangway in a desirable leeward location by rotation of the transition piece and matching of the symmetrically arranged parts. This means that significant constraints on the installation vessel are removed. A smaller vessel can be used since it is not required to be able to position itself against the prevailing winds. Installation delays resulting from changes in weather conditions can be avoided since there is a lesser need to await favourable wind or wave direction prior to installation of the foundation.
The method may include providing features of the transition piece, gangway and/or jacket foundation as discussed below.
The transition piece is pre-fabricated onshore and may have a central structure for supporting functional parts of the offshore structure with the connecting parts arranged symmetrically about the central structure. The method may include subsequent installation of a functional part of the offshore structure onto the transition piece. The functional part(s) of the offshore structure may for example comprise a tower of a wind turbine or a derrick for offshore oil and gas operations.
The connecting parts may be coupled with the connecting points of the foundation structure using an interlocking plug and socket type arrangement. Hence, the connecting part may comprise a male or a female coupling for joining with a corresponding female or male coupling at the connecting point on the foundation part. The coupling step may include grouting to fix the connecting parts in place.
Preferably the transition piece is prefabricated onshore with ancillary parts including one or more of a deck area, crane and access way for accessing functional parts of the offshore structure. The transition piece may hence be transported to the offshore installation location with the ancillary parts already in place. The method may include connecting the lower end of the gangway to a vertical element of the jacket foundation using a coupling at the lower end of the gangway. The coupling may have features as described below.
The jacket foundation may be installed by any appropriate technique. As noted above the method of installation of the transition piece means that the foundation part does not need to be installed in any particular orientation. It also reduces the constraints on the method selected for installation of the jacket foundation.
Viewed from a second aspect, the invention provides a transition piece for an offshore structure, the transition piece being for mounting on a jacket foundation of the offshore structure and comprising: a plurality of connecting parts arranged with rotational symmetry about a central axis of the transition piece, the connecting parts being for mounting the transition piece on rotationally symmetrical connecting points on the jacket foundation; and a gangway for providing access to the transition piece, the gangway being coupled to the transition piece at a side of the transition piece; wherein by virtue of the rotationally symmetrical arrangement of the connecting parts the transition piece is capable of being rotated upon installation in order to place the gangway at a leeward side of the offshore structure, thereby permitting installation of the jacket foundation in the most convenient orientation for the weather conditions and the installing apparatus at the time of installation.
With the symmetrical arrangement of the invention the transition piece can be oriented with the jacket foundation upon installation in order to ensure that the gangway is located leeward of the offshore structure. There is no requirement for a particular orientation of the jacket foundation, since the rotational symmetry means that the transition piece need only be rotated by a small amount to give the correct orientation. For example, with a fourfold symmetry the maximum required rotation would be ±22.5° as compared with ±180° for a non-symmetrical system.
Preferably the rotational symmetry is at least threefold. In a preferred
embodiment the symmetry is fourfold. The foundation may comprise four main vertical elements arranged symmetrically with four mounting points for the transition piece, which would hence comprise four symmetrically arranged connecting points. The degree of rotational symmetry may correspond to a number of legs of the foundation structure. For example, if a jacket foundation has three or four legs then the transition piece should have a threefold or fourfold rotational symmetry.
In preferred embodiments, the transition piece is for supporting functional parts of the offshore structure, for example a tower of a wind turbine or a derrick for offshore oil and gas operations. The transition piece is preferably pre-fabricated onshore and may have a central structure for supporting functional parts of the offshore structure with the connecting parts arranged symmetrically about the central structure. In one preferred arrangement the transition piece is integrated with a functional part such as a wind turbine tower.
The connecting parts may be arranged to connect with the connecting points of the foundation structure using an interlocking plug and socket type arrangement. Hence, the connecting part may comprise a male or a female coupling for joining with a corresponding female or male coupling at the connecting point on the foundation part.
The central structure and connecting parts may be joined by a platform structure and/or by beams or similar. In a preferred embodiment, the connecting parts are at distal ends of beams that extend outwardly away from the central structure. Preferably, the beams taper toward the connecting parts. The beams may have a box beam
construction. A beam arrangement of this type provides a strong and stable connection from the connecting points on the foundation to the central structure and the functional parts that it supports.
The gangway is preferably positioned at the side of the transition piece outside of the extent of the transition piece, such that when installed it protrudes on the outside of the offshore structure. This makes it easier to access the gangway from a vessel whilst avoiding contact with the structure. It also means that the gangway does not hamper or restrict installation of the transition piece on the jacket foundation, or restrict the design of structurally important parts of the transition piece. For example, when the connecting points have threefold or fourfold symmetry the gangway may be at a side of, and preferably outside, the triangle or square defined by vertices at the connecting points.
The transition piece may include ancillary parts in addition to the gangway such as one or more of a deck area, a crane, and/or an access way for providing access to the functional parts. The access way may comprise a stairway extending upward through a central structure of the transition piece. Advantageously this can provide access to the inside of a turbine tower without the need to cut a doorway into the structure of the tower. Turbine towers for offshore wind turbines are typically provided with an internal access way used to reach the top of the tower, since this is protected from weather and the internal parts do not hamper transport of the tower or installation of the wind mill.
Preferably the transition piece is prefabricated onshore with some or all of the ancillary parts, which preferably includes the gangway, and is transported to the offshore installation location with the ancillary parts already in place. This makes the offshore installation operation simpler, and since the transition piece can be rotated at the offshore location to give the correct orientation for leeward placement of ancillary parts such as the gangway then there are no problems with ensuring correct placement of the gangway during the onshore prefabrication or correct orientation of the jacket foundation during offshore installation.
The invention extends to an offshore structure including a transition piece as described above and a jacket foundation with a rotationally symmetrical construction. The connecting points may be at the tops of legs or columns of the jacket foundation. In preferred embodiments the connecting points comprise male couplings extending upward from the foundation, with the connecting parts of the transition piece hence comprising female couplings. The connecting parts may be secured to the connecting points by grouting.
The connecting points are preferably exposed upper ends of piles of the foundation. This means that the transition piece is secured to a strong and stable part of the foundation.
The jacket foundation may include a J-tube for passage of cables and the like from the sea-bed to the top of the foundation. Preferably the J-tube includes an angled section at the base of the foundation. The angled section may comprise a lower generally horizontal part for receiving a cable running generally horizontally along the floor, a bend that turns the cable through about a right angle, and an upper generally vertical part so that the cable exits the angled section running generally vertically.
Conventionally, a J-tube will also include a vertical section of tubing running from the angled section to the top of the foundation. In preferred embodiments however the J-tube of the present foundation does not include such a vertical section. Instead, the cabling is passed from the generally vertical exit portion of the angled section to the top of the structure without being enclosed in a tube. It has been found that it is not necessary to enclose the cabling for many offshore structures, including wind turbines. Omitting the vertical tubing makes the construction and installation of the foundation simpler, and also makes it easier to install cables through the J-tube. There may be cable restraints spaced apart up the height of the foundation, such as rings mounted on legs or columns of the foundation. The use of cable restraints keeps the cables in place during wave and tidal water movements.
Preferably, the J-tube is located adjacent to a leg or column of the foundation and may be clamped to the leg. In a preferred embodiment, the J-tube can be rotated in order to direct the lower generally horizontal part of the angled section in any desired direction. This means that the J-tube can receive cabling running from any direction, and hence avoids the need to orient the foundation part relative to the direction of the cabling. This further enhances the advantages of the rotationally symmetrical structure. In a particularly preferred embodiment there may be two J-tubes mounted adjacent to two opposite sides or corners of the foundation. The two J-tubes are preferably both rotatable. This means that the foundation can receive cabling from any direction without the need to run the cabling beneath or through the foundation before it reaches a J-tube.
In preferred embodiments the foundation is a modular structure comprising jacket modules with hollow legs that are secured to the sea-bed by piles through the hollow legs. The piles may be in multiple segments. One preferred arrangement for the jacket comprises: a plurality of jacket modules stacked one above the other, each of the jacket modules having multiple hollow legs; and a plurality of piles passing through the hollow legs for securing the jacket to the sea-bed; wherein the piles include: foundation piles passing through legs of a lowermost jacket module, extending downward below the lowermost jacket module into the sea-bed, and extending upward out of the tops of the legs of the lowermost jacket module and into legs of a second jacket module located atop the lowermost jacket module such that the foundation piles extend into the legs of the second jacket module by a height less than the height of the jacket modules; and follower piles within the legs of the second jacket module located atop the foundation piles and extending upward out of the tops of the legs of the second jacket module.
With this arrangement the piles extend throughout the entire height of the modules but are separated into different segments with the piles and jacket modules overlapping.
The second jacket module may be the uppermost jacket module. However, it is preferred to use at least one additional jacket module and also additional follower piles. Thus, the jacket may comprise: a third jacket module atop the second jacket module, with the follower piles in the legs of the second jacket module being a first set of follower piles and extending upward into the legs of the third jacket module; and a second set of follower piles within the legs of the third jacket module located atop the first set of follower piles and extending upward out of the tops of the legs of the third jacket module. There may be further modules and piles, for example a fourth jacket module and a third set of follower piles. In some preferred embodiment the jacket includes a total of only three jacket modules.
It is preferred for the piles to be secured within the legs of the jacket modules by grout. The grout may be grout that has been pumped into the legs around the piles after assembly of all the jacket modules and piles is completed. As noted above, it is also preferred to secure the transition piece to the jacket by grouting. The connecting points of the foundation may be the exposed parts of piles at the top of the legs of the foundation.
The grout ensures a secure connection between the piles and jacket modules and provides the necessary tensile strength to prevent instability and failure of the jacket and/or transition piece when vertical or horizontal loads on the offshore structure generate tensile loads on the jacket and/or transition piece
Preferably the jacket modules are designed with an arrangement of legs that is rotationaily symmetrical about an axis extending parallel with the legs, i.e. an axis that is generally vertical when the jacket module is in its installed orientation. Thus, the rotationaily symmetrical arrangement of connecting points can be provided by connecting points on the legs of the foundation. The degree of rotational symmetry preferably corresponds to the number of legs. For example, if the jacket module has three or four legs then it should have a threefold or fourfold rotational symmetry. The jacket modules may be entirely rotationaily symmetrical. For example, the jacket modules may comprise symmetrically arranged legs joined by similar truss arrangements.
The gangway may be an articulated retractable gangway. For example, the gangway may comprise walkways arranged for relative rotational movement, such that it can fold into a retracted configuration. It is preferred for the gangway to connect to the transition piece at a deck area of the transition piece. The gangway may extend away from the deck area along the side of the transition piece.
In one preferred embodiment the gangway comprises: an upper end connecting to the transition piece, for example at a deck area thereof; a lower end for providing access to the gangway from a vessel at water level; and walkways that, in use, extend from the upper end to the lower end in zig-zag fashion with the centre of gravity of the walkways horizontally offset from the upper end; wherein the walkways are arranged to rotate relative to one another such that the gangway is articulated and may be moved between an extended configuration and a retracted configuration; and wherein the gangway further comprises a coupling connected to the lower end of the gangway and arranged for connection to a generally vertical element of the offshore structure in order to permit generally vertical movement of the lower end relative to the offshore structure and in order to transfer a horizontal force from the lower end of the gangway to the offshore structure such that, in use, a horizontal force arising from a moment created by the offset centre of gravity of the walkways is supported by the offshore structure. This arrangement provides a retractable gangway that can be stowed in a retracted configuration during periods when no access to the structure is necessary, and easily deployed to an extended configuration in which the lower end is lowered toward the water level and can be accessed by a vessel at water level. The zig-zag arrangement of the walkways can easily be folded up into a small space. This is a particular advantage for offshore wind turbines since as noted above these will have extended periods of unmanned operation. With the gangway retracted it is difficult for unauthorised persons to access the offshore structure. Also, the retracted gangway is protected from the sea and can avoid direct contact with waves under normal weather conditions. A permanently extended gangway would be constantly in contact with the sea and so would be at risk of corrosion and fouling. The coupling at the lower end bears horizontal forces arising from the weight of the walkways and as a result the mounting of the gangway to the transition piece and/or offshore structure is made easier.
The term walkway is intended to encompass any structure for passage of people, such as a path, stairway, ramp or the like. Preferably, the walkways are each of a similar length. In a preferred embodiment the walkways extend along a side of the offshore structure, diagonally across a side surface thereof.
The gangway may comprise a connector for connecting the upper end of the gangway to the transition piece and this connector should preferably be capable of carrying a horizontal load. With this arrangement the vertical load arising from the weight of the walkways can be supported at any point along the ho izontal extent of the walkways. The vertical load may possibly be supported at the connection of the upper end and by the coupling at the lower end. However, preferably the vertical load is supported by a winch connected to a lower walkway by a cable. The transition piece or gangway may hence comprise a winch for supporting the retractable gangway. The term cable is used herein as a general term to include ropes, chains, cables and other cable type elements for supporting a load in tension. In a preferred embodiment the winch is connected to the lower end of the gangway, which may be an end of a lower walkway.
With a winch supporting a lower walkway of the gangway the gangway can be moved between its retracted and extended configurations by action of the winch. To extend the gangway the winch lowers the cable until the lower end of the gangway is at the desired level for the vessel at water level. The lower end of the gangway may then be rested on the deck of the vessel and permitted to move up and down with wave movement. In this way the gangway provides an access point which does not move relative to the vessel. Preferably, a constant tension winch is used. This acts to raise an lower the gangway in a controlled fashion and to damp erratic movement of the gangway that might occur as a consequence of erratic movement of the vessel.
In a preferred embodiment the coupling connected to the lower end of the gangway is arranged to permit only generally vertical movement of the lower end, when installed on the vertical element in use. Thus, the lower end should be prevented from moving horizontally and should be allow to slide vertically. Hence, the coupling may be arranged to resist loads in all horizontal directions. The coupling is preferably arranged for connection to a vertical element that takes the form of a leg of the offshore structure, such as a column or pile of the foundation part. The coupling may be arranged to fully or partially encircle the leg, for example it may be formed as a U-shape or as a collar about the leg. This means that the coupling can easily pass horizontal loads to the vertical element and can also restrain the lower end so that only vertical movement should occur.
Preferably, the coupling includes guide wheels for rolling on the surface of the vertical element. This reduces friction and provides a smooth movement of the coupling in the vertical direction whilst permitting effective transfer of horizontal loads from the gangway to the vertical element.
The gangway may incorporate a bumper for contact with a vessel. The bumper is preferably mounted at the lower end of the gangway and preferably arranged to move with the lower end of the gangway. Hence, the bumper may move vertically as the coupler permits vertical movement. However, the bumper may be prevented from moving horizontally. As a result the bumper can provide a fixed point relative to the vessel and to the lower end of the gangway, which moves up and down with the movement of the vessel. The vessel can be moored to the bumper or can press up against the bumper using a small thrust. The bumper may include a resilient body, such as a rubber body or an inflatable body. The bumper may be for receiving a prow of the vessel and hence may include a V-shaped notch or similar geometry.
The walkways preferably include: an upper walkway with a first end at the upper end of the structure and a second end spaced away from the first end diagonally downwards from the first end; and a lower walkway with a first end at a lower part of the structure and a second end spaced away from the first end diagonally upwards from the first end. There may be additional walkways in between the upper and lower walkways, for example forming an S or sideways W configuration. When four or more walkways are present it may be necessary to have additional couplings for transferring horizontal load to the offshore structure, since otherwise an unrestrained mechanism may be formed. Alternatively, or in addition, a pantograph mechanism may be used to restrict movement of the walkways.
There may be an intermediate platform or landing connecting adjacent walkways. This provides a turning place so that personnel using the walkways can go around the corners of the zig-zag. Adjacent walkways may be connected to one another and/or to the intermediate platform by hinged connectors, thereby permitting the required rotational movement.
With an even number of walkways and the walkways being of similar lengths the lower end of the gangway is preferably generally beneath the upper end, i.e. it may be located in about the same horizontal position and vertically below the upper end when the gangway is in use. With this arrangement the connection for the upper end may be at a first, upper, part of the vertical element of the offshore structure, with the coupling for the lower end joining to the same vertical element at a lower part thereof. It is preferred to have an even number of walkways in this fashion since the gangway can then be supported about a single vertical element of the offshore structure, which may be a column or pile of the offshore structure. Further, with this arrangement when a winch supports the weight of the walkways it may be located at the upper part of the same vertical element.
When there is an odd number of walkways and the walkways are of similar lengths the lower end would be spaced apart horizontally from the upper end of the gangway. This is less preferred, since it requires the lower end to be supported by a vertical element of the offshore structure that is horizontally spaced from the part of the offshore structure that connects to the upper end of the gangway. However some advantages of the gangway can still be realised with this type of arrangement.
In a preferred embodiment the second end of the upper walkway and the second end of the lower walkway are adjacent one another and arranged to permit transit of personnel between the upper and lower walkways. With this arrangement there may be just two walkways in a sideways V configuration and hence the first end of the lower walkway may be at the lower end of the gangway.
In preferred embodiments the walkways comprise stairs. Thus the walkways may be flights of stairs, or the walkways may include a stairway with adjacent ramp. The use of stairs enables the extended position to the walkways to put the walkways at a steeper angle whilst still enabling personnel to mount the walkways without difficulty or risk of slipping. The gangway may incorporate an access platform at the lower end of the gangway. This may be a horizontal platform extending from the lower walkway. The platform may extend away from the offshore structure, in a direction perpendicular to the horizontal extent of the walkways along the side of the structure. This provides a space between the structure and the vessel moored at the access platform. The access platform may be arranged to land on a deck of a vessel at water level. It may include steps for landing on the deck of the vessel.
The transition piece has been developed with a focus on the offshore wind industry and hence in a preferred embodiment the transition piece is for an offshore wind turbine. The invention, in preferred embodiments, extends to an offshore wind turbine structure incorporating the described transition piece. However, the transition piece may also be advantageously utilised in other offshore sectors such as oil and gas.
The J-tube concept described above is considered to be novel and inventive in its own right and hence, view from a further aspect, the invention provides a J-tube system for passage of cables and the like from the sea-bed to the top of an offshore structure, the J-tube comprising an angled section including a lower generally horizontal part for receiving a cable running generally horizontally along the floor, a bend that turns the cable through about a right angle, an upper generally vertical part so that the cable exits the angled section running generally vertically, and an open non-enclosed cable run extending from the top of the generally vertical part toward the top of the offshore structure.
With this J-tube the cabling is hence passed from the generally vertical exit portion of the angled section to the top of the structure without being enclosed in a tube. As noted above, omitting the vertical tubing makes the construction and installation of the jacket simpler, and also makes it easier to install cables through the J-tube. This aspect extends to an offshore structure or a foundation part of an offshore structure incorporating the J-tube. The foundation part may be a jacket type foundation of the type described above, but this is not essential. The proposed J-tube system will provide advantages with other types of foundation as well. The J-tube system may include cable restraints spaced apart up the height of the modular structure, such as rings mounted on legs of the modules. Preferably, the J-tube is located adjacent to a leg of the foundation part and may be clamped to the leg. In a preferred embodiment, the J-tube can be rotated relative to the offshore structure or foundation part in order to direct the lower generally horizontal part of the angled section in any desired direction. In a particularly preferred embodiment the J-tube arrangement comprises two J-tubes mounted adjacent to two opposite legs of the lowermost jacket module.
Whilst sea level and the sea-bed are referred to herein it will be understood that the structures described herein may also be used in any suitable body of water, such as seas, oceans, estuaries, inland lakes and reservoirs. Hence, any reference to sea level should be understood to mean a datum water level for the desired location of the structure in any body of water. Similarly, any reference to the sea-bed should be understood to refer to the bottom of the body of water.
As used herein the terms top and bottom and other terms relating to relative vertical location, such as upper and lower are intended to reference the normal installed orientation of the described structures. Thus, for example, the top of a pile is the part that is uppermost when it is installed, and the bottom of a pile is the opposite end of the pile. Naturally the parts of the structure may be manufactured and transported in other orientations.
Certain preferred embodiments of the invention will now be described by way of example only and with reference to the accompanying drawings in which:
Figure 1 is a partially exploded isometric view of a jacket and wind turbine, with some ancillary parts omitted for clarity;
Figure 2 is a side elevation of the jacket;
Figure 3 is a plan view of the jacket with the transition piece omitted;
Figures 4 to 10 show the installation of the jacket on the sea-bed;
Figure 1 1 is an illustration of the detail of the connection between piles within the legs of the jacket, with exaggerated diameter;
Figure 12 is an elevation of a part of the installed jacket with gangway with the gangway retracted;
Figure 13 is a similar elevation to Figure 12, with the gangway deployed; and Figure 14 shows the detail of the connection between the lower portion of the gangway and a leg of the jacket.
The preferred embodiment is described in the context of a jacket for a wind turbine, as shown in Figure 1. The wind turbine and tower can be of generally
conventional construction and hence are not described in any further detail. The tower is mounted on a transition piece 2 that is installed atop the jacket 4. The jacket 4 comprises three jacket modules 6 secured to the sea-bed by piles 8. Figure 1 shows the extent of the piles beneath the jacket into the sea-bed. In this preferred embodiment the jacket modules 6 are 12 m in height and width, with a generally cubic shape. The piles 8 may extend by around 30 m into the sea-bed, the actual depth being decided depending on soil conditions and on the expected loading on the wind turbine. The jacket 4 is sized so as to allow for one of the three modules to protrude above the reference water level.
Figures 2 and 3 show the jacket 4 in greater detail. Each jacket module 6 is a cube shape with four hollow legs 10 along the vertical edges, which are joined on each vertical outer surface of the cube by a truss structure formed by two cross-beams 12 in an X shape. The preferred embodiment shown in the drawings does not include any other cross beams. However, if required for structural strength then horizontal cross-beams can be added above and/or below the X-shaped beams 12. As can be seen clearly in the plan view of Figure 3 the jacket modules 6 do not include any beams across the middle of the structure either inside the cube shape or at the horizontal outer surfaces of the cube shape. The preferred embodiment uses tubular hollow beams. In the context of jacket designed to support an offshore wind turbine the hollow beams for this 12 m cube have a diameter of 1 .2 m for the hollow legs 10 and a diameter of 0.6 m for the cross-beams 12.
The lowermost jacket module 6 includes mud mats to support the jacket module on the sea-bed. The mud mats may be adapted according to soil conditions in a conventional fashion. The jacket 4 also includes J-tubes (not shown) for passage of cables and the like from the sea-bed to the top of the jacket 4. The J-tubes (not shown) are mounted to the base of legs 10 of the lowermost jacket module 6 and can be rotated. Each J-tube includes an angled section with a lower horizontal part that receives a cable running generally horizontally along the floor, a bend that turns the cable through a right angle, and an upper vertical part so that the cable exits the angled section running vertically upward toward the top of the jacket. Unlike a conventional J-tube the J-tubes in this preferred embodiment do not include a vertical section of tubing running from the angled section to the top of the jacket. Instead, the cabling is passed from the vertical exit portion of the angled section to the top of the structure without being enclosed in a tube. Rings mounted on legs 10 of the modules 6 keep the cables in place during wave and tidal water movements.
After installation of the jacket 4 the J-tube closest to the incoming cabling is rotated in order to direct the lower horizontal part of the angled section in the direction of the cabling. The cabling can then be installed through the J-tube and up to the top of the structure via the rings.
The transition piece 2 comprises a central circular structure for supporting a turbine tower and four triangular beams 14 extending outwardly away from the central structure and tapering toward outer connecting parts at the end of each beam 14, which connect to the tops of piles extending upwardly from the uppermost jacket module 6. The beams 14 have a box beam construction.
Further details of the structure of the jacket 4 will be apparent from the following discussion of installation of the jacket 4, with reference to Figures 4 to 10. The three jacket modules 6, transition piece 2 and piles 8 are conveyed to the installation site by barge 16 and the first, lowermost, jacket module 6a is lowered to the desired position on the sea-bed by crane. Figure 4 shows a barge 16 with second and third jacket modules 6b, 6b and the transition piece 2 on deck, and the first jacket module 6a located on the sea-bed. Four foundation piles 8a are inserted into the hollow legs 10 of the first jacket module 6a and as shown in Figure 5 these are driven through the legs 10 and into the sea-bed. The pile driving is done partly in air and partly with the hammer submerged. As noted above, the extent of the foundation piles 8a into the sea-bed might be about 30 m. The upper end of the foundation pile 8a is left protruding from the tops of the legs 10 of the first jacket module 6a.
For this example using 12 m high jacket modules 6 the exposed length of the pile is at least 4 m. Two of the foundation piles 8a are exposed by 4 m. The other two piles are left with a greater exposed height in order to provide guide piles to facilitate simple alignment of the next jacket module. In this preferred embodiment a first guide pile extends 5.5 m above the tops of the legs 10 and a second guide pile extends 4.5 m above the tops of the legs.
As an alternative to driving the foundation piles 8a into the sea-bed with a hammer the piles could be installed in pre-drilled holes and secured in place by grout or the like.
When the foundation piles 8a are in place the second jacket module 6b is lowered onto the exposed upper ends of the foundation piles 8a. This step is shown in Figure 6. The second jacket module 6b is first aligned with the first guide pile, which is the foundation pile that extends out of the lowermost jacket module 6a by the greatest height. The second jacket module is landed on this first guide pile, and this provides a first fixed point. Then, when the first guide pile is engaged with the second jacket module 6b, then the jacket module can be rotate to align with the second guide pile. Landing the second jacket module on the second guide pile fixes the jacket module rigidly in place, preventing further rotation. When it is slid down the first and second guide piles it should be correctly aligned with the remaining two foundation piles 8a, allowing it to be easily located on all four piles.
When the second jacket module 6b is in place follower piles 8b are installed in the legs 10 of the second jacket module 6b. The follower piles 8b have a length that is the same as the height of the jacket modules 6, and hence they protrude out of the tops of the legs of the second jacket module 6b by the same length that the foundation piles 8a protrude from the lowermost jacket module 6a. This means that the follower piles 8a will include first and second guide piles with extra height corresponding to the extra height of the guide piles in the foundation piles 8a.
The third jacket module 6c and a further set of follower piles 8b are then installed atop the second module 6b in a similar fashion.
When all the jacket modules 6 and piles 8 have been installed grout is pumped into the space between the piles 8 and the jacket legs 10. The grout is pumped upward from the base of the jacket using conventional grout injection techniques and a grouting vessel 17, which is shown schematically in Figure 8. The grout forms the connection between the piles 8 and the jacket legs 10 and ensures that the jacket columns can carry vertical tensile loads.
The exposed pile ends at the top of the partially constructed jacket are cut to make them level with each other, and to provide an exposed length suitable for supporting the transition piece 2, which is installed on the exposed pile ends as shown in Figure 9. The transition piece 2 is pre-fabricated with an access way 18, which is not shown in Figure 9 but is described below with reference to Figures 12, 13 and 14. Before the transition piece 2 is installed it is rotated so that the access way 18 is on the leeward side of the jacket 4. Since the transition piece 2 and the other parts of the jacket 4 have a rotationally symmetrical structure it can be installed in any rotational orientation relative to the jacket modules 6.
With the transition piece 2 in the correct orientation the four connecting parts of the transition piece 2, which take the form of cylindrical sockets with similar dimensions to the hollow legs 10 of the jacket modules 6, are placed on the top ends of the piles 8, and then grout is injected to secure the transition piece 2 in place. The jacket 4 is then complete, as shown in Figure 10. The transition piece 2 may optionally be installed with the turbine tower already in place, the tower and transition piece 2 having been assembled together onshore.
Further details of the inter-module and inter-pile connections will now be described with reference to Figure 1 1 . Figure 1 1 shows a cross-section of the jacket leg and piles at a join between two modules, with the diameter of the leg and piles exaggerated compared to the overlap length. As explained above, the length of overlap would be 4 m in this embodiment. The hollow legs 10 of the jacket modules 6 include internal lugs 20 protruding from the wall of the leg and acting to locate the piles 8 in the centre of the hollow legs 10 and also to maintain a set minimum spacing between the piles 8 and the walls of the hollow legs 10. In addition, the legs 10 include a connecting ring 22, which in this case is at the bottoms of the legs 10 of the upper module 6. The connecting ring 22 has an inner diameter generally larger than the outer diameter of the legs and includes a tapered part that acts to guide the two legs into alignment and to give a tight, wedged fit of one leg onto the other. An O-ring seal is also included, to ensure that the connecting ring 22 seals the joint between the two legs 10 and contains the grout 23 that is later pumped into the space between the piles 8 and the walls of the hollow legs 10.
The two piles 8 are designed to interlock using a plug and socket type
arrangement. The lower pile 8 has a male joint 24 consisting of a truncated cone protruding upward from a flat, with a shoulder about the base of the cone. The shoulder can be used for impacting the hammer when a foundation pile 8a is driven into the sea- bed. The upper pile 8 has a female joint 26 of complementary shape, with a frustoconical volume for receiving the truncated cone of the male joint 24. Advantageously, the cone shape provides a tight fit that prevents undesirable ingress of grout into the join between two piles 8. The foundation pile 8a has the male joint 24 at its upper end. The follower piles 8b are provided with a female joint 26 at one end and a male joint 24 at the other end.
Figures 12 and 13 show further detail of the constructed jacket and tower and ancillary parts that are installed on the transition piece 2. These ancillary parts include a deck area 28 on the transition piece that joins to a gangway 30, and a crane 31 . The crane 31 is used to load parts and equipment onto the deck area 28 from a vessel 33 below. The deck area 28 also joins to a stairway up into the tower that provides access into the tower from beneath the base of the tower. Advantageously this avoids the need to cut a doorway into the tower, which means that the tower is not weakened by holes in its structure.
As noted above, the deck area 28 and gangway 30 are prefabricated on the transition piece 2 and during installation of the transition piece 2, with or without the tower, it is rotated to place the gangway 30 on the leeward side of the jacket. The final stage of the installation process is to connect the gangway 30 to a leg 10 of the upper jacket module 6. Prefabrication of these ancillary parts with the transition piece 2 means that complicated construction and assembly occurs on land rather than at the offshore installation site. The gangway 30 provides access to the deck area 28 and turbine tower from a vessel. It is an articulated stairway with upper and lower parts in the form of flights of stairs 32, 34 that join the deck area 28 to an access platform 36 at the base of the stairway. The upper flight 34 is connected to the deck area 28 at one end and extends away from the deck area 28 to an intermediate platform 38. At the intermediate platform 38 the direction of the stairway reverses and the intermediate platform 38 connects to the lower flight 34, which runs back toward the deck area 28, ending at the access platform 36, which in this embodiment is located generally beneath the starting point for the upper flight 32, where it joins the deck area 28.
The upper and lower flights 32, 34 are rotatably connected to each other via the intermediate platform 38 and the upper flight 32 is rotatably connected to the deck area 28. The rotating connections allow the gangway 30 to be lowered toward water level in order to place the access platform 36 at deck level for a vessel 33 below. When the gangway 30 is not in use the access platform 36 can be retracted and raised to a stowed configuration with the upper and lower flights 32, 34 folding together. Figure 12 shows the raised/stowed configuration of the gangway 30 and Figure 13 shows the extended/in use configuration.
A constant tension winch 40 on the deck area 28 is attached to the access platform 36 via cables and supports the vertical load that arises from the weight of the gangway 30. The winch 40 is used to raise and lower the gangway 30. When a vessel 33 is present and the gangway 30 is lowered the access platform 36 sits on the deck of the vessel. As the vessel 33 rises and falls due to water movement the constant tension winch 40 will raise and lower the gangway 30 to match the movement of the vessel 33. As a result the access platform 36 will not move up and down relative to the vessel 33, which will make it easier to use the gangway 30.
An important feature of the gangway 30 is the connection of the base of the stairway to the leg 10 of the uppermost jacket module 6. This is shown in more detail in Figure 14, which includes a close up view of the base of the stairway shown in the deployed configuration with a vessel present. A collar 42 around the leg 10 guides the vertical movement of the access platform 36 and prevents it from moving horizontally. The collar 42 also provides a reaction force to support horizontal loads arising from the weight of the gangway 30. It will be understood that since the stairway extends sideways from its mounting point at the deck area 28 then a moment is created about the mounting point to the deck area 28. The collar 42 provides a horizontal reaction against this moment in order to support the offset gangway 30. The collar 42 includes guide wheels 44 so that it can move smoothly up and down the leg 10. The connection of the upper flight 34 to the deck area 28 also bears a horizontal load, which is equivalent to the horizontal reaction at the collar 42, but in the opposite direction.
The collar 42 is connected to the access platform 36 by a shaft 46. Also connected to the collar 42 is a bumper 48. The bumper 48 is designed to receive the prow of the vessel 33 and to hence keep the vessel 33 fixed in place horizontally. The vessel 33 can use a small amount of thrust to keep the prow of the vessel 33 pressed against the bumper 48. The bumper 48 will move up and down with the vessel 33 since, as with the access platform 36, it is supported by the constant tension winch 40.

Claims

CLAIMS:
1. A method of installation of an offshore structure comprising a jacket foundation and a transition piece, the method comprising:
prefabricating a transition piece onshore, the transition piece comprising a plurality of connecting parts arranged with rotational symmetry about a central axis of the transition piece and a gangway coupled to the transition piece at a side of the transition piece;
installing the jacket foundation at a desired location in the most convenient orientation for the weather conditions and the installing apparatus at the time of installation;
conveying the transition piece to the installation location of the jacket foundation; rotating the transition piece in order to place the gangway at a leeward side of the offshore structure; and
coupling the connecting parts of the transition piece to rotationally symmetrical connecting points of the jacket foundation.
2. A method as claimed in any preceding claim, wherein the gangway is positioned at the side of the transition piece outside of the extent of the transition piece, such that when the transition piece is installed the gangway protrudes on the outside of the offshore structure.
3. A method as claimed in claim 1 or 2, wherein the connecting points are at the tops of legs or columns of the foundation.
4. A method as claimed in claim 3, wherein the connecting points are exposed upper ends of piles of the foundation part.
5. A method as claimed in any preceding claim, wherein the coupling step includes grouting to fix the connecting parts in place.
6. A method as claimed in any preceding, comprising connecting a lower end of the gangway to a vertical element of the jacket foundation using a coupling at the lower end of the gangway.
7 A transition piece for an offshore structure, the transition piece being for mounting on a jacket foundation of the offshore structure and comprising:
a plurality of connecting parts arranged with rotational symmetry about a central axis of the transition piece, the connecting parts being for mounting the transition piece on rotationally symmetrical connecting points on the jacket foundation; and
a gangway for providing access to the transition piece, the gangway being coupled to the transition piece at a side of the transition piece;
wherein by virtue of the rotationally symmetrical arrangement of the connecting parts the transition piece is capable of being rotated upon installation in order to place the gangway at a leeward side of the offshore structure, thereby permitting installation of the jacket foundation in the most convenient orientation for the weather conditions and the installing apparatus at the time of installation.
8. A transition piece as claimed in claim 7, wherein the connecting parts are at distal ends of beams that extend outwardly away from the central structure.
9. A transition piece as claimed in claim 7 or 8, comprising a stairway extending upward through the central structure.
10. A transition piece as claimed in claim 7, 8 or 9, wherein the gangway is positioned at the side of the transition piece outside of the extent of the transition piece, such that when installed it protrudes on the outside of the offshore structure.
1 1. An offshore structure comprising a transition piece as claimed in any of claims 7 to 10 in combination with a jacket foundation.
12. An offshore structure as claimed in claim 1 1 , wherein the connecting points are at the tops of legs or columns of the jacket foundation.
13. An offshore structure as claimed in claim 1 1 or 21 , wherein the connecting points are exposed upper ends of piles of the jacket foundation.
14. An offshore structure as claimed in claim 1 1 , 12 or 13, comprising a J- tube with an angled section comprising a lower generally horizontal part for receiving a cable running generally horizontally along the floor, a bend that turns the cable through about a right angle, and an upper generally vertical part so that the cable exits the angled section running generally vertically, wherein the J-tube does not include a vertical tube extending up the entire height of the foundation part.
15. An offshore structure as claimed in claim 14, wherein the J-tube is located adjacent to a leg of the foundation part and can be rotated in order to direct the lower generally horizontal part of the angled section in any desired direction.
16. An offshore structure as claimed in claim 14 or 15, comprising two J-tubes mounted adjacent to two opposite legs of the foundation part.
EP12779005.3A 2011-10-17 2012-10-16 Method of installation of an offshore structure Withdrawn EP2769025A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GBGB1117888.6A GB201117888D0 (en) 2011-10-17 2011-10-17 Transition piece for an offshore structure
PCT/EP2012/070470 WO2013057095A1 (en) 2011-10-17 2012-10-16 Method of installation of an offshore structure

Publications (1)

Publication Number Publication Date
EP2769025A1 true EP2769025A1 (en) 2014-08-27

Family

ID=45219818

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12779005.3A Withdrawn EP2769025A1 (en) 2011-10-17 2012-10-16 Method of installation of an offshore structure

Country Status (3)

Country Link
EP (1) EP2769025A1 (en)
GB (2) GB201117888D0 (en)
WO (1) WO2013057095A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201206400D0 (en) * 2012-04-11 2012-05-23 Offshore Group Newcastle Ltd Offshore structure installation
CN109715938B (en) * 2016-09-09 2021-08-03 西门子歌美飒可再生能源公司 Transition piece for wind turbine
CN106948367B (en) * 2017-04-19 2023-05-09 合肥学院 Wind power foundation assembled by quadrangular jacket column jacket and construction method thereof
WO2019043272A1 (en) * 2017-08-29 2019-03-07 Nabrawind Technologies, Sl Connection for connecting a tubular tower to lattice work
CN114063554B (en) * 2021-11-15 2024-04-05 中交第三航务工程局有限公司 Leveling control system and method for three-barrel jacket foundation offshore installation

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6039507A (en) * 1998-06-26 2000-03-21 Atlantic Richfield Company Method and device for assembling cluster platforms
DE10349109B4 (en) * 2003-10-17 2008-02-07 Aerodyn Engineering Gmbh Foundation for an offshore wind energy plant
US7530780B2 (en) * 2006-05-22 2009-05-12 General Electric Company Method and apparatus for wind power foundation
DE202007009474U1 (en) * 2007-07-05 2008-11-13 F & Z Baugesellschaft Mbh Offshore platform
ITTO20070666A1 (en) * 2007-09-24 2009-03-25 Blue H Intellectual Properties OFFSHORE WIND POWER CONVERSION SYSTEM FOR DEEP WATER
US8511940B2 (en) * 2009-06-10 2013-08-20 Keystone Engineering Inc Offshore support structure and associated method of installing
GB2473058A (en) * 2009-08-29 2011-03-02 Slp Engineering Ltd Transition piece with conduit located around the pile of an offshore installation
NO330373B1 (en) * 2009-08-31 2011-04-04 Aker Jacket Technology As Download The transfer device
EP2317123A1 (en) * 2009-10-28 2011-05-04 BARD Holding GmbH Anode holder for cathodic anti-corrosion devices of foundation posts of off-shore wind energy devices, foundation post of an off-shore wind energy device and connection structure between same, cathodic anti-corrosion device of foundation posts of off-shore wind energy devices and off-shore wind energy device
NO20100494A1 (en) * 2010-04-07 2011-10-10 Aker Jacket Technology As A carrier

Also Published As

Publication number Publication date
GB201117888D0 (en) 2011-11-30
WO2013057095A1 (en) 2013-04-25
GB2495830A (en) 2013-04-24
GB2495830B (en) 2015-09-23
GB201218511D0 (en) 2012-11-28

Similar Documents

Publication Publication Date Title
EP2769024B1 (en) Jacket for offshore structure
KR102253903B1 (en) Wind energy power plant and construction method
CN107683371B (en) Method of constructing, assembling and launching a floating wind turbine platform
KR101726988B1 (en) Column-stabilized offshore platform with water-entrapment plates and asymmetric mooring system for support of offshore wind turbines
US10773777B2 (en) Auxiliary floating system for the installation and/or transport of offshore structures and method comprising said system
US20120093589A1 (en) Foundation support system for an offshore wind energy convertor, corresponding to an offshore wind power generating facility
KR20210010997A (en) Wind turbine and method for installing wind turbine
US20220234697A1 (en) A floating structure and method of installation
EP2769025A1 (en) Method of installation of an offshore structure
EP2768724A1 (en) Gangway for an offshore structure
WO2023154536A1 (en) Floating offshore foundation including modular components, method for modular assembly of the floating offshore foundation, and a reconfigurable system for the floating offshore foundation
US20230264784A1 (en) Floating support structure for offshore windmill
AU2022433835A1 (en) Hull structure for a semi-submersible wind power turbine platform
NO20200727A1 (en) Method for transporting and assembling modules for floating support structures
GB2619788A (en) Improvements in and relating to assembling a structure
WO2023244607A1 (en) Floating systems for wind turbines using semi-submersibles
WO2023194711A1 (en) Improvements in and relating to assembling a structure
WO2024003576A1 (en) Improvements in and relating to assembling a structure
KR20240121782A (en) Floating foundations for offshore wind turbines

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140415

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: E04H 12/00 20060101ALI20160428BHEP

Ipc: E02B 17/02 20060101AFI20160428BHEP

Ipc: E02B 17/00 20060101ALI20160428BHEP

Ipc: F03D 1/00 20060101ALI20160428BHEP

INTG Intention to grant announced

Effective date: 20160524

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20161005