EP2766253A1 - Seabed anchoring system and method for such a system - Google Patents

Seabed anchoring system and method for such a system

Info

Publication number
EP2766253A1
EP2766253A1 EP12770508.5A EP12770508A EP2766253A1 EP 2766253 A1 EP2766253 A1 EP 2766253A1 EP 12770508 A EP12770508 A EP 12770508A EP 2766253 A1 EP2766253 A1 EP 2766253A1
Authority
EP
European Patent Office
Prior art keywords
pile
soil
hollow
anchoring
anchoring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12770508.5A
Other languages
German (de)
French (fr)
Inventor
Samy Alhayari
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Single Buoy Moorings Inc
Original Assignee
Single Buoy Moorings Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Single Buoy Moorings Inc filed Critical Single Buoy Moorings Inc
Priority to EP12770508.5A priority Critical patent/EP2766253A1/en
Publication of EP2766253A1 publication Critical patent/EP2766253A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/24Anchors
    • B63B21/26Anchors securing to bed
    • B63B21/27Anchors securing to bed by suction

Definitions

  • the invention relates to a seabed anchoring system comprising an anchoring element to be stabilized in the soil before fully engaging the anchoring element in the seafloor.
  • the invention also relates to a method for such a system to stabilize and add a hollow pile into the soil.
  • Piles are often sunk into the soil under bodies of water.
  • a typical suction pile would be sunk by sealing the upper end of the pile and suctioning the inside of the pile, which suctioning drops the pressure within the pile.
  • the pressure drop (hydrostatic under pressure) causes the pressure of the water surrounding the suction pile to force the pile into the soil.
  • a typical driven pile or drilling casing is driven into engagement in the soil by using a pile hammer deployed from a Mobile Offshore Drilling Unit to drive the drilling casing into the soil.
  • the solution proposed in the present invention enables to ensure a controlled penetration of an anchoring element that can be used to moor vessels, Tension Leg Platforms (TLP), semisubs, spars and any type of floating structure without requesting large supporting device further referred as floater.
  • the solution proposed can also be used for installation of offshore windmills anchoring foundations.
  • the object of the present invention is to provide a seabed anchoring system comprising an anchoring element to be stabilized in the soil before fully engaging the anchoring element within the seafloor wherein the anchoring element comprises a top flange adapted to receive a suction head and a contact surface for receiving a driving hammer.
  • the object is achieved by the anchoring system according to claim 1.
  • the proposed seabed anchoring system can also be used for the installation of foundations of offshore platforms and subsea structures.
  • the seabed anchoring system according to the present invention allows installation of foundation and/or substructure of an offshore seabed supported windmill.
  • the anchoring element of anchoring system also comprises a water injection device located at the engagement with the seafloor location part in order to ease the anchoring element penetration in the soil.
  • the anchoring element is a hollow subsea pile that can have a mooring line attachment lug and an additional water injection device located at the lug level within the pile.
  • the pile is provided with a removable cover comprising a top flange with a suction head, which cover is tightly closing the hollow subsea pile using inflatable seals.
  • Another object of the present invention is a method for stabilizing a hollow subsea pile in the lower end of a body of water, in which the pile is lowered onto the lower end, the method comprising the steps of:
  • the method can also comprise the step of injecting some water towards the soil by using water injection device in order to ease its penetration in the soil.
  • Fig. la shows an anchor pile for mooring a floater placed in the soil
  • Fig. lb shows an anchor pile for mooring a tension leg platform (TLP)
  • Fig. lc shows an anchor pile as a foundation for an offshore windmill
  • FIG. 2 shows a view of an anchor handling vessel installing an anchor pile into the soil
  • FIG. 3a shows a hollow anchor pile according the invention penetrating by its own weight the soil when lowered
  • Fig 3b shows the anchor pile of fig 3a penetrating the soil due to hydrostatic underpressure (suction), activated by a ROV
  • Fig. 3c shows that the suction head of the hollow anchor pile being removed
  • Fig. 3d shows an underwater pile hammer being connected to the hollow anchor pile with the help of a ROV
  • Fig. 3e shows the underwater pile hammer connected to the hollow anchor pile and hammering the pile further into the soil
  • Fig. 3f shows the hollow anchor pile fully penetrated into the soil.
  • the engagement with the seafloor location part is at the lower end of the anchoring element,
  • the water injection system used in the present invention (not shown) is similar to the one used to install piles in harder soils such as very dense sand.
  • the use of water injection avoids any risk of pile refusal.
  • the water injection device is in a shape of a ring at the lower end of the hollow pile placed at the interior, radially inward injecting water via nozzles that will spray water coming from the installation vessel via a water supply network, or sucked in from the surrounding seawater via a Remote Operated Vehicle (ROV) that is connected to the hollow pile.
  • ROV Remote Operated Vehicle
  • the water sprayed liquefies the sand at the lower end of the hollow pile and eases the penetration of the pile into the soil during the suction or hammering process.
  • Such a system allows installing offshore mooring elements and (windmill) foundations having large dimensions e.g. 50 meters height and 10 meters diameter.
  • the offshore anchoring element and method can also be used when the top part of the anchoring pile stays above water level which is for example the case in low water depths; in that case the suction and hammering process is started above water level at the upper end of the anchoring pile while the lower end of the anchoring pile is penetrating the seabed.
  • the suction and hammering process is started above water level at the upper end of the anchoring pile while the lower end of the anchoring pile is penetrating the seabed.
  • this is advantageous for example for installing offshore windmills in low depth waters as the top part of the windmill can in that case be connected to the installed anchoring element above water level in a dry environment without the use of ROV's or divers.
  • Fig. la shows an anchor pile 1 for mooring a floater by means of a mooring line 10.
  • the anchor pile 1 is placed in the soil 100 of the seabed.
  • Fig. lb shows an anchor pile 1 for mooring a tension leg platform (TLP).
  • the anchor pile 1 is placed in the seabed 100.
  • a mooring connection 20, 21 to the TLP is provided on the upper part of the anchor pile 1.
  • Fig. lc shows an anchor pile 1 as a foundation for an offshore windmill.
  • a portion of a foundation 30 is placed, which extends above the seabed or soil 100.
  • the foundation is arranged for carrying an offshore windmill or windturbine (not shown).
  • Fig. 2 shows a view of an anchor handling vessel 300 installing an anchor pile 1 into the soil 100.
  • the anchor pile is positioned in the water 200 above the seabed level 100. Close to the top of the anchor pile an ROV 40 is shown that assists the penetration of the anchor pile into the seabed soil 100.
  • Fig. 3a shows a hollow anchor pile 1 that is arranged to penetrate by its own weight the soil when lowered.
  • the top of the anchor pile 1 is attached to a suction head 50. Further the anchor pile may be attached to auxiliary positioning lines (not shown) attached to the installation vessel or auxiliary vessels (not shown).
  • Fig 3b shows the anchor pile of fig 3 a penetrating (arrow P) the soil due to hydrostatic underpressure (suction), activated by the ROV 40.
  • Fig. 3c shows that the suction head 50 of the hollow anchor pile 1 is being removed
  • Fig. 3d shows an underwater pile hammer or driving hammer 51 being connected
  • Fig. 3e shows the underwater pile hammer 51 connected to the hollow anchor pile 1 and hammering(arrow C) the pile 1 further into the soil 100
  • Fig. 3f shows the hollow anchor pile 1 fully penetrated into the soil 100 of the seabed.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

An anchoring system for a floater includes an anchoring element to be added into the soil (100) in a controlled and stabilized way. The anchoring element forms a mooring element for a floater, is hollow and comprises a top flange adapted to receive a suction head (50) which forms also a contact surface for receiving a driving hammer (51). Also a method is provided for an anchoring system for stabilizing and or penetrating an anchoring element including a hollow pile (1) in the lower end of a body of water (200), in which the pile (1) is lowered onto the lower end, using: a) closing the pile (1) with a removable cover that includes a top flange with a suction head (50) b) reducing the pressure inside the pile (1) to cause the pile (1) to penetrate the lower end of the pile (1) into the soil (100) over a part of its length c) removing the cover from the top end of the pile (1) d) installing a follower or a hammering device (51) onto the top end of the pile (1) to hammer the pile further into the soil (100) during by hammering on the contact surface of the hollow pile (1).

Description

Seabed anchoring system and method for such a system Field of the invention
The invention relates to a seabed anchoring system comprising an anchoring element to be stabilized in the soil before fully engaging the anchoring element in the seafloor. The invention also relates to a method for such a system to stabilize and add a hollow pile into the soil.
Background of the invention
Piles are often sunk into the soil under bodies of water. A typical suction pile would be sunk by sealing the upper end of the pile and suctioning the inside of the pile, which suctioning drops the pressure within the pile. The pressure drop (hydrostatic under pressure) causes the pressure of the water surrounding the suction pile to force the pile into the soil. A typical driven pile or drilling casing is driven into engagement in the soil by using a pile hammer deployed from a Mobile Offshore Drilling Unit to drive the drilling casing into the soil.
Usually for anchoring elements the penetration into the seafloor is controlled by using a securing and supporting structure as described in patent publication US6273645.
However for anchoring elements having large dimensions such a structure would be too big and difficult to handle. The proposed prior art solution does not describe a method to ensure a controlled penetration of an anchoring element having large dimensions into the soil without requesting large supporting device.
The solution proposed in the present invention enables to ensure a controlled penetration of an anchoring element that can be used to moor vessels, Tension Leg Platforms (TLP), semisubs, spars and any type of floating structure without requesting large supporting device further referred as floater. The solution proposed can also be used for installation of offshore windmills anchoring foundations.
Summary of the Invention
The object of the present invention is to provide a seabed anchoring system comprising an anchoring element to be stabilized in the soil before fully engaging the anchoring element within the seafloor wherein the anchoring element comprises a top flange adapted to receive a suction head and a contact surface for receiving a driving hammer. The object is achieved by the anchoring system according to claim 1.
The proposed seabed anchoring system can also be used for the installation of foundations of offshore platforms and subsea structures. The seabed anchoring system according to the present invention allows installation of foundation and/or substructure of an offshore seabed supported windmill.
One advantage of the present invention is that the anchoring element of anchoring system also comprises a water injection device located at the engagement with the seafloor location part in order to ease the anchoring element penetration in the soil. A further advantage of the present invention is that the anchoring element is a hollow subsea pile that can have a mooring line attachment lug and an additional water injection device located at the lug level within the pile.
Another advantage of the present invention is that the pile is provided with a removable cover comprising a top flange with a suction head, which cover is tightly closing the hollow subsea pile using inflatable seals.
Another object of the present invention is a method for stabilizing a hollow subsea pile in the lower end of a body of water, in which the pile is lowered onto the lower end, the method comprising the steps of:
a) closing the pile with a removable cover comprising a top flange with a suction head
b) reducing the pressure inside the pile to cause the pile to penetrate the lower end and a column of lower end material to penetrate the interior of the pile until the pile
c) removing the cover
d) installing the follower between the top of the pile in order to create a contact surface for hammering the pile during installation.
According to the present invention the method can also comprise the step of injecting some water towards the soil by using water injection device in order to ease its penetration in the soil.
Brief description of the drawings:
The invention will be further described below in connection with exemplary embodiments with reference to the accompanying drawings, wherein Fig. la shows an anchor pile for mooring a floater placed in the soil Fig. lb shows an anchor pile for mooring a tension leg platform (TLP)
Fig. lc shows an anchor pile as a foundation for an offshore windmill
Fig. 2 shows a view of an anchor handling vessel installing an anchor pile into the soil Fig. 3a shows a hollow anchor pile according the invention penetrating by its own weight the soil when lowered
Fig 3b shows the anchor pile of fig 3a penetrating the soil due to hydrostatic underpressure (suction), activated by a ROV
Fig. 3c shows that the suction head of the hollow anchor pile being removed
Fig. 3d shows an underwater pile hammer being connected to the hollow anchor pile with the help of a ROV
Fig. 3e shows the underwater pile hammer connected to the hollow anchor pile and hammering the pile further into the soil
Fig. 3f shows the hollow anchor pile fully penetrated into the soil.
The engagement with the seafloor location part is at the lower end of the anchoring element, The water injection system used in the present invention (not shown) is similar to the one used to install piles in harder soils such as very dense sand. The use of water injection avoids any risk of pile refusal. The water injection device is in a shape of a ring at the lower end of the hollow pile placed at the interior, radially inward injecting water via nozzles that will spray water coming from the installation vessel via a water supply network, or sucked in from the surrounding seawater via a Remote Operated Vehicle (ROV) that is connected to the hollow pile. The water sprayed liquefies the sand at the lower end of the hollow pile and eases the penetration of the pile into the soil during the suction or hammering process. Such a system allows installing offshore mooring elements and (windmill) foundations having large dimensions e.g. 50 meters height and 10 meters diameter.
Usually the suction to stabilization phase longs until the pile is engaged in a 20 meters depth within the soil.
The offshore anchoring element and method can also be used when the top part of the anchoring pile stays above water level which is for example the case in low water depths; in that case the suction and hammering process is started above water level at the upper end of the anchoring pile while the lower end of the anchoring pile is penetrating the seabed. In very low waters even the upper end of the very long anchoring pile stays above water level after installation of the foundation pile; this is advantageous for example for installing offshore windmills in low depth waters as the top part of the windmill can in that case be connected to the installed anchoring element above water level in a dry environment without the use of ROV's or divers.
Fig. la shows an anchor pile 1 for mooring a floater by means of a mooring line 10. The anchor pile 1 is placed in the soil 100 of the seabed.
Fig. lb shows an anchor pile 1 for mooring a tension leg platform (TLP). The anchor pile 1 is placed in the seabed 100. A mooring connection 20, 21 to the TLP is provided on the upper part of the anchor pile 1.
Fig. lc shows an anchor pile 1 as a foundation for an offshore windmill. On the top of the anchor pile 1 a portion of a foundation 30 is placed, which extends above the seabed or soil 100. The foundation is arranged for carrying an offshore windmill or windturbine (not shown).
Fig. 2 shows a view of an anchor handling vessel 300 installing an anchor pile 1 into the soil 100. By a line 21 the anchor pile is positioned in the water 200 above the seabed level 100. Close to the top of the anchor pile an ROV 40 is shown that assists the penetration of the anchor pile into the seabed soil 100.
Fig. 3a shows a hollow anchor pile 1 that is arranged to penetrate by its own weight the soil when lowered. The top of the anchor pile 1 is attached to a suction head 50. Further the anchor pile may be attached to auxiliary positioning lines (not shown) attached to the installation vessel or auxiliary vessels (not shown).
Fig 3b shows the anchor pile of fig 3 a penetrating (arrow P) the soil due to hydrostatic underpressure (suction), activated by the ROV 40.
Fig. 3c shows that the suction head 50 of the hollow anchor pile 1 is being removed
(arrow R) after placing the pile into the soil 100 underwater 200.
Fig. 3d shows an underwater pile hammer or driving hammer 51 being connected
(arrow C) to the hollow anchor pile 1 with the help of the ROV 40.
Fig. 3e shows the underwater pile hammer 51 connected to the hollow anchor pile 1 and hammering(arrow C) the pile 1 further into the soil 100
Fig. 3f shows the hollow anchor pile 1 fully penetrated into the soil 100 of the seabed.
Although particular embodiments of the invention have been described and illustrated herein, it is recognized that modifications and variations may readily occur to those skilled in the art, and consequently, it is intended that the claims be interpreted to cover such modifications and equivalents.

Claims

1. Anchoring system for a floater comprising an anchoring element to be added into the soil in a controlled and stabilized way, wherein the anchoring element forms a mooring element for a floater, is hollow and comprises a top flange adapted to receive a suction head which forms also a contact surface for receiving a driving hammer.
2. Anchoring system for an offshore windmill comprising an anchoring element to be added into the soil in a controlled and stabilized way, wherein the anchoring element forms a foundation for an offshore windmill, is hollow and comprises a top flange adapted to receive a suction head which forms also a contact surface for receiving a driving hammer.
3. Anchoring system according to claim 1 or 2 wherein the anchoring element also comprises a water injection device located at the engagement with the seafloor location part in order to ease the mooring element's penetration in the soil.
4. Anchoring system according to any one of the preceding claims wherein the anchoring element is a hollow subsea pile.
5. Anchoring system according to claim 4 wherein the pile comprises a mooring line attachment lug and a water injection device located at the lug level within the pile.
6. Anchoring system according to any one of the preceding claims wherein the pile is provided with a removable cover comprising a top flange with a suction head.
7. Anchoring system according to claim 6 wherein the removable cover is arranged for tightly closing the hollow subsea pile using inflatable seals at its upper end.
8. Method for an anchoring system for stabilizing and or penetrating an anchoring element comprising a hollow pile in the lower end of a body of water, in which the pile is lowered onto the lower end, characterized by the steps of:
a) closing the pile with a removable cover comprising a top flange with a suction head b) reducing the pressure inside the pile to cause the pile to penetrate the lower end of the pile into the soil over a part of its length
c) removing the cover from the top end of the pile
d) installing a follower or a hammering device onto the top end of the pile to hammer the pile further into the soil during by hammering on the contact surface of the hollow pile.
9. Method for stabilizing a hollow subsea pile according to claim 8 wherein water injection is provided at the lower part of the subsea pile in order to ease penetration of the pile in the soil.
EP12770508.5A 2011-10-14 2012-10-15 Seabed anchoring system and method for such a system Withdrawn EP2766253A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP12770508.5A EP2766253A1 (en) 2011-10-14 2012-10-15 Seabed anchoring system and method for such a system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
EP11185337 2011-10-14
EP11189952 2011-11-21
EP12770508.5A EP2766253A1 (en) 2011-10-14 2012-10-15 Seabed anchoring system and method for such a system
PCT/EP2012/070374 WO2013053936A1 (en) 2011-10-14 2012-10-15 Seabed anchoring system and method for such a system

Publications (1)

Publication Number Publication Date
EP2766253A1 true EP2766253A1 (en) 2014-08-20

Family

ID=47010621

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12770508.5A Withdrawn EP2766253A1 (en) 2011-10-14 2012-10-15 Seabed anchoring system and method for such a system

Country Status (2)

Country Link
EP (1) EP2766253A1 (en)
WO (1) WO2013053936A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019183446A1 (en) * 2018-03-23 2019-09-26 Cashman Dredging And Marine Contracting, Co., Llc Anchor driving device
WO2019191486A1 (en) * 2018-03-28 2019-10-03 The Texas A&M University System Multiline ring anchor and installation method
GB2603910B (en) 2021-02-17 2023-09-13 Subsea 7 Do Brasil Servicos Ltda Subsea foundations
CN113998056B (en) * 2021-02-22 2023-10-03 吴常文 Expansion type ocean oil gas platform anchoring pile tying device

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5704732A (en) * 1995-11-29 1998-01-06 Deep Oil Technology Incorporated Deep water piling and method of installing or removing
NO971478D0 (en) 1997-04-02 1997-04-02 Norwegian Anchoring Technology Method for establishing and connecting and disconnecting positioned point fixings into varying subsea formations, as well as equipment for such
US6719496B1 (en) * 1997-11-01 2004-04-13 Shell Oil Company ROV installed suction piles
GB9822769D0 (en) * 1998-10-20 1998-12-16 Duggan Marine Equip Ltd Method and apparatus
GB2414221B (en) * 2003-03-04 2006-05-31 Exxonmobil Upstream Res Co Anchor installation system
GB2436241B (en) * 2003-03-04 2007-11-07 Exxonmobil Upstream Res Co Pile anchor with external vanes
SE526076C2 (en) * 2003-05-14 2005-06-28 Gva Consultants Ab Sealing device and method for sealing between a chain and a chain shaft
US7770655B2 (en) * 2005-07-20 2010-08-10 Intermoor Inc. Conductor casing installation by anchor handling/tug/supply vessel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2013053936A1 *

Also Published As

Publication number Publication date
WO2013053936A1 (en) 2013-04-18

Similar Documents

Publication Publication Date Title
CN109790824B (en) Mooring buoy for a floating wind turbine
CN102906339B (en) Auxiliary equipment stake is arranged in sea bed, offshore foundation structure and set up the method for offshore foundation
US5704732A (en) Deep water piling and method of installing or removing
NO313340B1 (en) Procedure for piling guide tubes into a water bottom
EP2766253A1 (en) Seabed anchoring system and method for such a system
EP3222783B1 (en) Floating marine structure with suction piles
US6203248B1 (en) Sliding-resistant bottom-founded offshore structures
EP2216447A1 (en) Floating marine structure with suction piles and platform resting on a barge clamped between suction piles and platform.
KR101772508B1 (en) Structure for supporting offshore facility and method for structuring thereof
JP5502538B2 (en) Pile construction method and pile construction device
AU2009212944B2 (en) Ballasted driven pile
US6773207B2 (en) Method of lowering a floating body of a floating foundation
US10267009B2 (en) Method of forming a mudline cellar for offshore arctic drilling
US9316081B2 (en) Well capping assembly and method of capping underwater well
US8888407B2 (en) Method and a device for sealing and/or securing a borehole
KR101735949B1 (en) Moving system for investingating geological features of the sea bottom using suction bucket foundation
WO2014202948A1 (en) Gravity base for a marine structure
US8657535B2 (en) Tideway positioning system
US9789932B2 (en) System and method for installing suction piles
US20230264789A1 (en) Method for installing at least one mooring line of a floating installation in a body of water and associated floating installation
US20110158746A1 (en) Tideway anchor system
KR20090099162A (en) Method of provisional suction pile construction work for constructing a pile
KR20170013707A (en) Integrated Monitoring Apparatus and Method for Jack-up Rig
JP2023056370A (en) Foundation structure, and construction method of foundation structure
GB2341409A (en) Supporting a pipeline above the seabed

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140424

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
RIN1 Information on inventor provided before grant (corrected)

Inventor name: ALHAYARI, SAMY

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20160503