EP2707564B1 - Method of stowing and deploying wall panels - Google Patents
Method of stowing and deploying wall panels Download PDFInfo
- Publication number
- EP2707564B1 EP2707564B1 EP11721408.0A EP11721408A EP2707564B1 EP 2707564 B1 EP2707564 B1 EP 2707564B1 EP 11721408 A EP11721408 A EP 11721408A EP 2707564 B1 EP2707564 B1 EP 2707564B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- panel
- cam
- weight
- wall
- lift member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000000034 method Methods 0.000 title claims description 23
- 239000000969 carrier Substances 0.000 claims description 30
- 230000013011 mating Effects 0.000 claims description 10
- 230000005484 gravity Effects 0.000 claims description 4
- 230000000712 assembly Effects 0.000 description 10
- 238000000429 assembly Methods 0.000 description 10
- 239000003638 chemical reducing agent Substances 0.000 description 9
- 238000013459 approach Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B9/00—Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
- E06B9/02—Shutters, movable grilles, or other safety closing devices, e.g. against burglary
- E06B9/06—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type
- E06B9/0607—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type comprising a plurality of similar rigid closing elements movable to a storage position
- E06B9/0646—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type comprising a plurality of similar rigid closing elements movable to a storage position characterised by the relative arrangement of the closing elements in the stored position
- E06B9/0676—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type comprising a plurality of similar rigid closing elements movable to a storage position characterised by the relative arrangement of the closing elements in the stored position stored in a stacked configuration
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B9/00—Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
- E06B9/02—Shutters, movable grilles, or other safety closing devices, e.g. against burglary
- E06B9/06—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type
- E06B9/0607—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type comprising a plurality of similar rigid closing elements movable to a storage position
- E06B9/0615—Shutters, movable grilles, or other safety closing devices, e.g. against burglary collapsible or foldable, e.g. of the bellows or lazy-tongs type comprising a plurality of similar rigid closing elements movable to a storage position characterised by the closing elements
- E06B9/0638—Slats or panels
Definitions
- the present invention relates to walls that are moveable between a stowed position and a deployed position.
- US Patent 5,072,766 describes an example of a prior art panel shutter assembly that includes a plurality of shutter panels.
- the invention provides a method of moving panels from a stowed position, in which the panels are substantially positioned above a ceiling, to a deployed position, in which the panels are substantially vertically aligned to form a wall.
- the method includes supporting a first panel having a first weight on a cam, rotating the cam in a first direction and lowering the first panel in response to rotation of the cam. Lowering the first panel separates the first panel from the cam. Supporting the first panel on a flexible lift member in response to lowering the first panel, so that the flexible lift member bears the first weight. Supporting a second panel having a second weight on a support rack, and biasing the second panel into engagement with the cam.
- the method further includes rotating the cam in the first direction and transferring the second panel from the support rack to the cam in response to rotating the cam, so that the cam bears the second weight.
- the method further includes further rotating the cam in the first direction, lowering the second panel in response to further rotation of the cam and transferring the second panel from the cam to the first panel, so that the first panel bears the second weight, and the flexible lift member bears the first weight and the second weight through the connection between the first panel and the flexible lift member.
- the method further includes fixing the second panel to the first panel through a mating tongue and groove engagement.
- the invention provides a method of moving panels from a deployed position, in which the panels are substantially vertically aligned to form a wall, to a stowed position, in which the panels are substantially positioned above a ceiling.
- the method includes supporting a first panel having a first weight on a flexible lift member, so that the flexible lift member bears the first weight, supporting a second panel having a second weight on the first panel, so that the flexible lift member bears the first weight and the second weight through the connection between the first panel and the flexible lift member.
- the method further includes moving the first and second panels substantially vertically and lifting the second panel off of the first panel with a cam, so that the cam bears the second weight, disengaging the second panel from the first panel by vertically displacing the second panel from the first panel.
- the method further includes transferring the second panel from the cam to a support rack, so that the support rack bears the second weight and displacing the second panel horizontally from the first panel by transferring the second panel onto the support rack.
- the method further includes further moving the first panel substantially vertically, lifting the first panel with the cam, and rotating the cam so that the cam bears the first weight.
- the invention provides a wall panel assembly moveable between a stowed position and a deployed position.
- the wall panel assembly includes a first wall panel having a first weight and including a first carrier, a flexible lift member coupled to the first wall panel and a second wall panel having a second weight and including a second carrier.
- a prime mover moves the first and second wall panels between the stowed position and the deployed position.
- a support rack supports the second carrier and bears the second weight when the second wall panel is in the stowed position, and the flexible lift member bears the second weight when the second wall panel is in the deployed position through the connection between the first wall panel and the flexible lift member.
- a cam has an exterior perimeter that defines a recess sized to receive at least one of the first and second carriers.
- the cam rotates in response to the prime mover. Rotation of the cam in a first direction moves the first and second wall panels into the deployed position, and rotation of the cam in a second direction, opposite the first direction, moves the first and second wall panels into the stowed position.
- Fig. 1 illustrates a wall panel assembly 10 including a plurality of wall panels 15, a drive assembly 20, first and second jamb assemblies 25a, 25b, and a cable device 30.
- the illustrated wall panel assembly 10 includes seven separate wall panels 15, but other quantities of wall panels 15 can be utilized.
- the illustrated plurality of wall panels 15 include a plurality of stowable panels 15s and a bottom panel 15b.
- the illustrated embodiment includes six stowable panels 15s and one bottom panel 15b.
- a ceiling 35 having an opening 40 is illustrated in phantom in Fig. 1 .
- the wall panel assembly 10 is positioned above the ceiling 35 to substantially hide the wall panel assembly 10 from view when stowed.
- the wall panels 15 move through the opening 40 to deploy and the illustrated first and second jamb assemblies 25a, 25b extend through the opening 40.
- Fig. 2 illustrates one of the stowable panels 15s in detail.
- the stowable panels 15s are substantially identical, so the discussion of the stowable panel of Fig. 2 applies to all six of the illustrated stowable panels 15s.
- the illustrated stowable panel 15s includes a frame 45, front and rear panel faces 50f, 50r, top and bottom dovetail pieces 55t, 55b, carrier mounting brackets 60 and carriers 65.
- the frame 45 defines top and bottom support brackets 70t, 70b and left and right support brackets 751, 75r.
- the top and bottom and left and right support brackets 70t, 70b, 751, 75r connect to form the frame 45.
- the front and rear panel faces 50f, 50r are coupled to the frame 45 to provide first and second oppositely-facing wall surfaces.
- the illustrated stowable panel 15s is substantially cuboid in shape.
- the top and bottom dovetail pieces 55t, 55b are mounted on the top and bottom support brackets 70t, 70b, respectively.
- the carrier mounting brackets 60 are coupled to the left and right support brackets 751, 75r, respectively.
- Fig. 3 illustrates one carrier mounting bracket 60 and one carrier 65 in greater detail.
- the illustrated carrier mounting bracket 60 includes a hollow tube 80, a first plate 85, a second plate 90, a plurality of fasteners 95 and a carrier retaining sleeve 100.
- the illustrated hollow tube 80 has a substantially square cross section.
- the hollow tube 80 and the first plate 85 are positioned on an outside surface of the left support bracket 751 and the second plate 90 is positioned on a inside surface of the right support bracket 75r.
- the plurality of fasteners 95 extend through respective apertures in the hollow tube 80, the first plate 85, the right support bracket 75r and the second plate 90 to connect the carrier mounting bracket 60 to the frame 45.
- the carrier retaining sleeve 100 is permanently affixed to the hollow tube 85, extends through an aperture in the first plate 85, and abuts the left support bracket 751.
- the carrier retaining sleeve 100 is hollow and is internally threaded.
- one of the fasteners 95 is positioned above and three of the fasteners 95 are positioned below the carrier retaining sleeve 100. Other quantities, locations and configurations of apertures are possible.
- the carrier 65 includes a fastener 115, a first bearing 120, a snap ring 125, a second bearing 130, a bearing retaining sleeve 135, and a nut 140.
- the fastener 115 may be a shoulder bolt and includes a head 145 and a shaft 150.
- the head 145 has a larger diameter than the shaft 150.
- the illustrated head 145 is round and includes a slot to receive a tool to tighten and loosen the fastener 115.
- the illustrated shaft 150 includes a threaded portion that is threaded into the carrier retaining sleeve 100.
- a distance between the head 145 and the carrier retaining sleeve 100 is adjustable by threading or unthreading the fastener 115 from the carrier retaining sleeve 100.
- the first bearing 120 is positioned on the fastener 115 in abutment with the head 145.
- the illustrated first bearing 120 is a needle bearing, but another suitable bearing or bushing can be utilized.
- the snap ring 125 is positioned adjacent the first bearing 120.
- the shaft 150 defines a groove to receive the snap ring 125 therein.
- the snap ring 125 is operable to retain the first bearing 120 in abutment with the head 145.
- a detent or other structural protuberance is utilized the retain the first bearing 120 in abutment with the head 145.
- the second bearing 130 is positioned adjacent the snap ring 125.
- the illustrated second bearing 130 is a roller bearing, but another suitable bearing or bushing can be utilized.
- the bearing retaining sleeve 135 is positioned adjacent the second bearing 130.
- the bearing retaining sleeve 135 is threaded onto the fastener 115 to retain the second bearing 130 in position on the fastener 115.
- a nut 140 or other structural element is utilized to retain the second bearing 130 in abutment with the snap ring 125.
- the nut 140 is threaded onto the fastener 115 and is spaced from the bearing retaining sleeve 135 in the illustrated embodiment.
- the illustrated nut 140 abuts the carrier retaining sleeve 100.
- the nut 140 permits adjustment of a distance between the head 145 and the carrier retaining sleeve 100.
- the nut 140 performs the function of a lock nut 230 against the carrier retaining sleeve 100.
- Other distance adjustment configurations are possible and the illustrated nut 140 and carrier retaining sleeve 100 are given by way of example only.
- the bottom panel 15b includes many of the same features as the stowable panels 15s; only the features specific to the bottom panel 15b are discussed herein.
- the bottom panel 15b includes a bottom seal 155, an object present sensor assembly 160 and a chain mount 165.
- the seal 155 is coupled directly to the bottom support bracket 70b; the bottom panel 15b has no bottom dovetail piece 55b.
- the seal 155 is flexible and extends downwardly in a substantially arcuate configuration.
- the object presence sensor assembly 160 includes a main body 170, an arm 175, a spring 180 and a circuit element 185.
- the main body 170 is mounted to the bottom support bracket 70b and extends through an aperture 190 in the bottom support bracket 70b.
- the arm 175 is coupled to the main body 170 and extends substantially vertically and downward through the aperture 190 in the bottom support bracket 70b.
- the illustrated arm 175 includes a recess 195 and a pin 200.
- the illustrated main body 170 abuts the pin 200, and the arm 175 substantially abuts the seal.
- the spring 180 is coupled to the main body 170 and the arm 175 and retains the arm 175 in a first, un-actuated position.
- the illustrated circuit element 185 is a switch including a first moveable portion and a second portion.
- the switch second portion is mounted to the main body 170 and the first moveable portion is free to move with respect to the main body 170.
- the first moveable portion When in the first, un-actuated position, the first moveable portion is spaced from the recess 195. In the second, actuated position, the first moveable portion contacts the recess 195.
- the object presence sensor assembly 160 opens a circuit to stop operation of the drive assembly 20.
- the seal 155 abuts an object, such as an obstruction or the floor, the arm 175 is biased upward to actuate the object presence sensor assembly 160 and therefore, stop operation of the drive assembly 20.
- the chain mount 165 includes an elongate bracket 205 having an arm, a second bracket 210 and an adjustable connector assembly 215.
- the elongate bracket 205 is connected to the right support bracket 75r by a plurality of fasteners 220.
- the elongate bracket 205 includes an extension that is connected to the bottom support bracket 70b in addition to or in lieu of the elongate bracket 205 being connected to the right support bracket 75r.
- the arm projects substantially normal to the right support bracket 75r.
- the arm includes an aperture extending vertically therethrough.
- the adjustable connector assembly 215 includes an anchor 225, a stud 230, a nut 235 and a lock nut 240.
- the anchor 225 includes a first aperture oriented along a substantially horizontal axis and a second aperture oriented along a substantially vertical axis.
- the second aperture 240 is threaded in the illustrated embodiment.
- the stud 220 is threaded and extends through the arm aperture and into the vertical anchor aperture.
- the nut 235 and lock nut 240 thread onto the stud 220 below the arm.
- the nut 235 and lock nut 240 are operable to couple the stud 230 to the arm.
- a distance between the arm and the anchor 225 is adjustable by adjusting the position of the nut 235 and the lock nut 240 on the stud 230.
- the drive assembly 20 includes a prime mover 245, a gear reducer 250, first and second output shafts 255a, 255b and first and second drive box assemblies 260a, 260b.
- the illustrated prime mover 245 is an electric motor, but in other embodiments, other suitable prime movers can be utilized.
- the illustrated gear reducer 250 includes one input coupled to the electric motor and first and second outputs 265a, 265b.
- the first and second outputs 265a, 265b are substantially co-linear and extend outwardly from the gear reducer 250.
- the first and second output shafts 255a, 255b are coupled to the respective first and second outputs 265a, 265b for rotation therewith.
- the first and second output shafts 255a, 255b extend toward and engage the respective first and second drive box assemblies 260a, 260b.
- the illustrated gear reducer 250 also includes a third output 270 (see Fig. 1 ) extending downward from the gear reducer 250.
- the third output 270 is engageable by a user for optional manual operation of the gear reducer 250.
- the gear reducer 250 is mounted to the building structure.
- the first and second drive box assemblies 260a, 260b are substantially mirror images, so only the first drive box assembly 260a will be discussed in detail.
- the first second drive box assembly 260a includes a first drive shaft 275, a first sprocket 280, a second drive shaft 285, a second sprocket 290, a cam 295, a third sprocket 300, a first chain 305, an idler sprocket 310, a flexible lift member 315, a support rack 320 and a bar 322.
- the first drive shaft 275 is coupled to the first output shaft 255a for rotation therewith.
- the first sprocket 280 is coupled to the first drive shaft 275 for rotation therewith.
- the illustrated first sprocket 280 has ten teeth.
- the second drive shaft 285 is spaced from and substantially parallel to the first drive shaft 275.
- the second sprocket 290 is coupled to the second drive shaft 285 for rotation therewith.
- the illustrated second sprocket 290 has sixty teeth.
- the cam 295 is coupled to the second drive shaft 285 for rotation therewith.
- the illustrated cam 295 includes a substantially circular outer perimeter defining a first radius and a slot 325 which defines a second radius, smaller than the first radius.
- the slot 325 is sized to receive one of the carriers 65.
- the illustrated slot 325 is substantially symmetrical and includes a first substantially planar portion 325a, a second substantially planar portion 325b and a first recess portion 325c between the first and second substantially planar portions.
- the substantially planar portions 325a, 325b guide the carrier 65 into the recess portion 325c when the cam 295 rotates.
- the third sprocket 300 is coupled to the second drive shaft 285 for rotation therewith.
- the illustrated third sprocket 300 is positioned between the second sprocket 290 and the cam 295.
- the illustrated third sprocket 300 includes thirty teeth and has a one inch pitch.
- the first chain 305 encircles the first sprocket 280 and the second sprocket 290 to couple the first sprocket 280 to the second sprocket 290.
- the first chain 305 connects the first drive shaft 275 and the second drive shaft 285, such that rotation of the first drive shaft 275 causes rotation of the second drive shaft 285.
- the idler sprocket 310 is also coupled to the first chain 305 and is utilized to adjust tension in the first chain 305.
- the first and second sprockets 280, 290 having different quantities of teeth to permit further reduction of rotation of the second drive shaft 285.
- the first sprocket 280 completes six full rotations while the second sprocket 290 completes only one full rotation. Other quantities of teeth and varieties of gear reduction are possible, and the illustrated is given by way of example only.
- the illustrated flexible lift member 315 is a length of chain (herein referred to as a second chain) but other flexible lift members, such as cables, ropes, cords, strings, and the like can be utilized in place of the illustrated second chain 315.
- the second chain 315 engages the third sprocket 300 and thereby moves in response to rotation of the second drive shaft 285.
- the second chain 315 is coupled to the bottom panel 15b via the adjustable connector assembly 215. Specifically, a cross link member of the second chain 315 extends through the first aperture 235 of the anchor 215.
- the illustrated support rack 320 is a vertically extending plate with an inclined upper edge.
- the inclined upper edge is sized to support the carriers 65.
- the carrier second bearing 130 moves along the inclined upper edge.
- the inclined edge of the support rack 320 is angled downwardly toward the cam 295.
- Gravity is utilized to move the carriers 65 into engagement with the cam 295.
- a separate motive force is utilized to move the carriers 65 into engagement with the cam 295.
- the incline is about 5 degrees, but other incline angles can be utilized.
- the bar 322 illustrated in Fig. 8 is positioned above the inclined support rack 320 and inhibits the carriers 65 from detaching from the inclined support rack 320.
- the bar 322 can assist in aligning the stowable panels 15s on the inclined support rack 320.
- the bar 322 is only illustrated in Fig. 8 , but is omitted from the remaining figures for clarity.
- the first jamb assembly 25a includes an external housing assembly 330 and an internal guidance system 335.
- the first jamb assembly 25a and the second jamb assembly 25b are substantial mirror images, so only the first jamb assembly 25a is described in detail.
- the external housing assembly 330 is mounted to a floor and the first drive box assembly 260a and includes first and second L-shaped brackets 340a, 340b, first and second mounting brackets 345a, 345b, first and second gaskets 350a, 350b and first and second alignment brackets 352, 353.
- the first and second L-shaped brackets 340a, 340b define a structure substantially enclosed on three sides, thereby leaving one side substantially open.
- the illustrated first and second L-shaped brackets 340a, 340b are jamb receivers made from extruded aluminum.
- the illustrated first and second mounting brackets 345a, 345b are guide rails that extend across a portion of the open side.
- the first and second mounting brackets 345a, 345b extend inward into an interior of the structure.
- the first and second gaskets 350a, 350b extend inward from the first and second mounting brackets 345a, 345b across a portion of the open side.
- the first and second alignment brackets 352, 353 engage and vertically align the panels 15 during stowage and deployment.
- the illustrated alignment brackets 352, 353 are shown by way of example only. Other configurations, shapes and quantities of alignment brackets can be utilized.
- the alignment brackets are omitted.
- the external housing assembly 330 receives the second chain 315 extending therethrough.
- the first jamb assembly 25a is mounted to a building wall and the external housing assembly 330 extends into a room in the building.
- the first jamb assembly 25a is mounted to a building wall and the external housing assembly 330 is contained within the wall.
- the internal guidance system 335 includes first and second guide brackets 355a, 355b coupled to respective first and second mounting brackets 345a, 345b.
- the first and second guide brackets 355a, 355b define a substantially vertical opening 40 sized to received the carriers 65 therein.
- the first and second guide brackets 355a, 355b substantially surround a portion of the carriers 65 to retain the panels in a substantially aligned orientation.
- the cable device 30 (shown in Fig. 1 ) is a centrifugal cam 295 including a housing 360 and a cable 365. Although not specifically shown, one cable device 30 can be provided per drive box assembly 260a, 260b. The cable 365 is free to move with respect to the housing 360 at low speed, but the cable device 30 brakes at high speed.
- the housing 360 is coupled to the building or other structure and the cable 365 is coupled to the bottom panel 15b. In the event that the any component in the wall panel assembly 10 fails, the cable device(s) 30 support the bottom panel 15b, and thus, the remaining panels resting on the bottom panel 15b.
- the panels 15b, 15s are moved between a stowed position (shown in Fig. 11 ) to a deployed position (shown in Fig. 18 ).
- Figs. 12-17 illustrate some of the steps of deploying the panels 15b, 15s and
- Figs. 19-22 illustrate some of the steps of stowing the panels 15b, 15s.
- the stowable panels 15s are supported on the support racks 320 via the carriers 65.
- the support racks 320 bear the weight of the stowable panels 15s in the illustrated stowed position.
- the support racks 320 are inclined to bias the stowable panels 15s into engagement with the cams 295.
- the bottom panel 15b is supported on the cams 295 via the carriers 65 in the slots 325.
- the cams 295 bear the weight of the bottom panel 15b and the chains 315 bear little or none of the weight of the bottom panel 15b.
- the bottom panel 15b is supported by the chains 315 in the stowed position.
- the bottom panel 15b is supported by the support racks 320 in the stowed position. In the stowed position, the bottom panel 15b is recessed above the ceiling 35 so that the seal 155 is recessed above the ceiling 35. In another embodiment, the seal 155 is level with the ceiling 35 when the wall panels 15 are stowed.
- Operation of the motor 245 rotates the first and second outputs 265a, 265b of the gear reducer 250.
- the first and second outputs 265a, 265b of the gear reducer 250 cause rotation of the respective first and second output shafts 255a, 255b.
- the first and second output shafts 255a, 255b rotate respective first drive shafts 275, which thereby rotate the respective first sprockets 280.
- Rotation of the first sprockets 280 causes movement of the respective first chains 305, which causes rotation of the respective second sprockets 290 and thereby, rotation of the respective second drive shafts 285.
- the cams 295 and the third sprockets 300 are coupled for rotation with the respective second drive shafts 285. Therefore, the cams 295 rotate about the respective second drive shafts 285 in response to operation of the motor 245.
- the motor 245 causes the cams 295 to rotate to release the carriers 65 of the bottom panel 15b from the cam slots 325, to thereby lower the bottom panel 15b (see Fig. 12 ).
- the chains 315 bear the weight of the bottom panel 15b through the chain mounts 165.
- the first and second alignment brackets 352, 353 guide the bottom panel 15b to maintain the bottom panel 15b in a substantially vertical orientation.
- the inclined support racks 320 bias the carriers 65 of the first stowable panel 15s against the respective cams 295.
- the carriers 65 abut the cams 295 as the cams 295 rotate in response to rotation of the second drive shafts 285.
- the second bearings 125 ride along the outside surface of the cams 295.
- the inclined support racks 320 bias the carriers 65 of the first stowable panel 15s into the cam slots 325 (see Fig. 14 ).
- the carriers 65 ride along the inclined support racks 320 into the recess portions 325c.
- the cams 295 lift the first stowable panel 15s off of the inclined support racks 320, thereby transferring the weight of the first stowable panel 15s from the support racks 320 to the cams 295.
- the cams 295 engage the first bearings 120 of the carriers 65.
- the recess portions 325c retain the carriers 65 until the cams 295 have rotated to a position in which the slots 325 are facing substantially horizontal, such as the position illustrated in Fig. 16 .
- the recess portions 325c are sized to receive the carriers 65. In other embodiments, the recess portions 325c are larger than the carriers 65 and permit the carriers 65 to slide along the recess portions 325c. In these embodiments, the carriers 65 roll along the slots 325 when the slots are facing substantially vertically upward.
- the recess portions 325c define a length which is adjustable to accommodate tolerance requirements and to minimize noise when the carriers 65 move along and abut ends of the recess portions 325c.
- the cams 295 continue to rotate in response to operation of the motor 245 to position the first stowable panel 15s substantially vertically above the bottom panel 15b.
- the first and second alignment brackets 352, 353 guide the first stowable panel 15s into vertically alignment with the bottom panel 15b.
- the cams 295 continue to lower the first stowable panel 15s onto the bottom panel 15b, such that the mating dovetail pieces 55t, 55b on a top of the bottom panel 15b and on a bottom of the first stowable panel 15s engage.
- the cams 295 release the first stowable panel 15s and the chains 315 support the first stowable panel 15s in response to the connection between the first bottom panel 15b and the chains 315.
- the first stowable panel 15s is not connected to the chains 315, except for the indirect connection through the first bottom panel 15b.
- the first and second jamb assemblies 25a, 25b specifically the first and second alignment brackets 352, 353, orient the first stowable panel 15s above the bottom panel 15b to guide the dovetails 55t, 55b into mating engagement when the cams 295 release the first stowable panel 15s.
- the first and second jamb assemblies 25a, 25b are fixed to the respective first and second drive box assemblies 260a, 260b and to the floor.
- the first and second alignment brackets 352, 353 guide and vertically align the panels 15b, 15s during deployment and stowage.
- the carriers 65 move within the internal guidance system 335 of the first and second jamb assemblies 25a, 25b.
- the remaining stowable panels 15s are deployed in the same manor as the first stowable panel 15s is deployed.
- the stowable panels 15s rest on top of other stowable panels 15s and the bottom panel 15b when deployed.
- the top dovetail piece 55t of one panel mates with the bottom dovetail piece 55b of the panel above it, when the wall panel assembly 10 is deployed.
- the chains 315 bear the weight of all of the deployed panels 15 via the connection between the chains 315 and the bottom panel 15b.
- Fig. 18 is a perspective view of the panels 15b, 15s in a deployed position in which all of the stowable panels 15s are positioned on the bottom panel 15b.
- the top panel 15s extends through the opening 40 above the ceiling 35.
- a top of the top panel 15s is substantially level with the opening 40.
- the mating dovetail pieces 55t, 55b of the stowable panels 15s engage to substantially fix the adjacent deployed panels 15b, 15s together.
- the weight of the stowable panels 15s, the mating dovetail pieces 55t, 55b and the first and second jamb assemblies 25a, 25b, in combination retain the wall panels 15 in a substantially vertical position when deployed.
- the front and rear panel faces 50f, 50r of the wall panels 15 together provide a substantially continuous wall surface when the wall panel assembly 10 is deployed.
- the motor 245 operates in an opposite direction of that of deployment. Operation of the motor 245 rotates the cams 295 in the opposite direction. With reference to Fig. 19 , the cams 295 engage the carriers 65 of the top panel 15s. In response to rotation of the cams 295, the cams 295 lift the top panel 15s off of the other panels 15s, 15b, as shown in Fig. 20 . The top panel 15s is first vertically displaced from the remaining panels 15s, 15b in response to rotation of the cams 295. The top panel 15s is then horizontally displaces from the remaining panels 15s, 15b in response to further rotation of the cams 295, as shown in Fig. 21 .
- Fig. 21 also illustrates that the chains 315 continue to lift the remaining panels 15s, 15b as the cams 295 transfer the top panel 15s onto the inclined support rack 320.
- the top panel 15s is urged up the inclined support rack 320 by the second substantially planar portion 325a.
- the chains 315 further lift the remaining panels 15s, 15b as the cam 295 slots approach the carriers 65 of the next panel.
- one full rotation of the cam 295 occurs per stowing or deploying of one panel 15.
- the illustrated third sprocket 300 has an outside perimeter that equals the height of the panels 15.
- the illustrated cams 295 have a larger diameter than the third sprockets 300 so that the cams 295 lift the panel 15s off of the remaining panels 15s, 15b while stowing and lowers the panel 15s vertically onto the remaining panels 15s, 15b while deploying.
- This lifting and lowering permits vertical alignment of the mating dovetail protrusions 55t, 55b prior to mating engagement of the mating dovetail protrusions 55t, 55b.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Power-Operated Mechanisms For Wings (AREA)
- Extensible Doors And Revolving Doors (AREA)
Description
- The present invention relates to walls that are moveable between a stowed position and a deployed position.
US Patent 5,072,766 describes an example of a prior art panel shutter assembly that includes a plurality of shutter panels. - In one embodiment, the invention provides a method of moving panels from a stowed position, in which the panels are substantially positioned above a ceiling, to a deployed position, in which the panels are substantially vertically aligned to form a wall. The method includes supporting a first panel having a first weight on a cam, rotating the cam in a first direction and lowering the first panel in response to rotation of the cam. Lowering the first panel separates the first panel from the cam. Supporting the first panel on a flexible lift member in response to lowering the first panel, so that the flexible lift member bears the first weight. Supporting a second panel having a second weight on a support rack, and biasing the second panel into engagement with the cam. The method further includes rotating the cam in the first direction and transferring the second panel from the support rack to the cam in response to rotating the cam, so that the cam bears the second weight. The method further includes further rotating the cam in the first direction, lowering the second panel in response to further rotation of the cam and transferring the second panel from the cam to the first panel, so that the first panel bears the second weight, and the flexible lift member bears the first weight and the second weight through the connection between the first panel and the flexible lift member. The method further includes fixing the second panel to the first panel through a mating tongue and groove engagement.
- In another embodiment, the invention provides a method of moving panels from a deployed position, in which the panels are substantially vertically aligned to form a wall, to a stowed position, in which the panels are substantially positioned above a ceiling. The method includes supporting a first panel having a first weight on a flexible lift member, so that the flexible lift member bears the first weight, supporting a second panel having a second weight on the first panel, so that the flexible lift member bears the first weight and the second weight through the connection between the first panel and the flexible lift member. The method further includes moving the first and second panels substantially vertically and lifting the second panel off of the first panel with a cam, so that the cam bears the second weight, disengaging the second panel from the first panel by vertically displacing the second panel from the first panel. The method further includes transferring the second panel from the cam to a support rack, so that the support rack bears the second weight and displacing the second panel horizontally from the first panel by transferring the second panel onto the support rack. The method further includes further moving the first panel substantially vertically, lifting the first panel with the cam, and rotating the cam so that the cam bears the first weight.
- In still another embodiment, the invention provides a wall panel assembly moveable between a stowed position and a deployed position. The wall panel assembly includes a first wall panel having a first weight and including a first carrier, a flexible lift member coupled to the first wall panel and a second wall panel having a second weight and including a second carrier. A prime mover moves the first and second wall panels between the stowed position and the deployed position. A support rack supports the second carrier and bears the second weight when the second wall panel is in the stowed position, and the flexible lift member bears the second weight when the second wall panel is in the deployed position through the connection between the first wall panel and the flexible lift member. A cam has an exterior perimeter that defines a recess sized to receive at least one of the first and second carriers. The cam rotates in response to the prime mover. Rotation of the cam in a first direction moves the first and second wall panels into the deployed position, and rotation of the cam in a second direction, opposite the first direction, moves the first and second wall panels into the stowed position.
- Other aspects of the invention will become apparent by consideration of the detailed description and accompanying drawings.
-
-
Fig. 1 is a perspective view of a wall panel assembly according to some embodiments of the present invention. -
Fig. 2 is an exploded perspective view of one of the panels of the wall panel assembly. -
Fig. 3 is an exploded perspective view of a carrier and a carrier mounting bracket. -
Fig. 4 is an exploded perspective view of another one of the panels of the wall panel assembly. -
Fig. 5 exploded view of an object presence sensor ofFig. 4 . -
Fig. 6 is a top view of the wall panel assembly ofFig. 1 . -
Fig. 7 is a top view of a drive box assembly according to some embodiments of the present invention. -
Fig. 8 is side view of the drive box assembly with parts removed for clarity. -
Fig. 9 is an exploded perspective view of the drive box assembly. -
Fig. 10 is a top view of a jamb assembly. -
Fig. 11 perspective view of the panels in a stowed position. -
Fig. 12 is a side view illustrating the rotation of the cam to release the bottom panel from the cam. -
Fig. 13 is a side view illustrating the inclined support rack biasing the carrier of the first stowable panel against the cam. -
Fig. 14 is a side view illustrating the cam engaging the carrier of first stowable panel. -
Fig. 15 is a side view illustrating the cam lifting the first stowable panel off of the inclined support rack. -
Fig. 16 is a side view illustrating the cam positioning the first stowable panel vertically above the bottom panel. -
Fig. 17 is a side view illustrating the jamb vertically orienting the first stowable panel and the bottom panel, so that the dovetails of the panels mate when the cam releases first stowable panel. -
Fig. 18 is a side view of the panels in a deployed position. -
Fig. 19 is a side view illustrating the cam engaging the carrier of the top panel. -
Fig. 20 is a side view illustrating the cam vertically displacing the top panel off of the remaining panels. -
Fig. 21 is a side view illustrating the cam horizontally displacing the top panel with respect to the remaining panels as the cam transfers top panel onto the inclined support rack. -
Fig. 22 is a side view illustrating the chain further lifting the remaining panels as the cam slot approaches the carrier of the next panel. - Before any embodiments of the invention are explained in detail, it is to be understood that the invention is not limited in its application to the details of construction and the arrangement of components set forth in the following description or illustrated in the following drawings. The invention is capable of other embodiments and of being practiced or of being carried out in various ways. Also, it is to be understood that the phraseology and terminology used herein is for the purpose of description and should not be regarded as limiting. The use of "including," "comprising," or "having" and variations thereof herein is meant to encompass the items listed thereafter and equivalents thereof as well as additional items. Unless specified or limited otherwise, the terms "mounted," "connected," "supported," and "coupled" and variations thereof are used broadly and encompass both direct and indirect mountings, connections, supports, and couplings. Further, "connected" and "coupled" are not restricted to physical or mechanical connections or couplings.
-
Fig. 1 illustrates awall panel assembly 10 including a plurality ofwall panels 15, adrive assembly 20, first andsecond jamb assemblies cable device 30. The illustratedwall panel assembly 10 includes sevenseparate wall panels 15, but other quantities ofwall panels 15 can be utilized. The illustrated plurality ofwall panels 15 include a plurality ofstowable panels 15s and abottom panel 15b. The illustrated embodiment includes sixstowable panels 15s and onebottom panel 15b. - A
ceiling 35 having anopening 40 is illustrated in phantom inFig. 1 . Thewall panel assembly 10 is positioned above theceiling 35 to substantially hide thewall panel assembly 10 from view when stowed. Thewall panels 15 move through the opening 40 to deploy and the illustrated first andsecond jamb assemblies -
Fig. 2 illustrates one of thestowable panels 15s in detail. Thestowable panels 15s are substantially identical, so the discussion of the stowable panel ofFig. 2 applies to all six of the illustratedstowable panels 15s. The illustratedstowable panel 15s includes aframe 45, front and rear panel faces 50f, 50r, top andbottom dovetail pieces carrier mounting brackets 60 andcarriers 65. Theframe 45 defines top andbottom support brackets right support brackets 751, 75r. The top and bottom and left andright support brackets frame 45. The front and rear panel faces 50f, 50r are coupled to theframe 45 to provide first and second oppositely-facing wall surfaces. The illustratedstowable panel 15s is substantially cuboid in shape. The top andbottom dovetail pieces bottom support brackets - The
carrier mounting brackets 60 are coupled to the left andright support brackets 751, 75r, respectively.Fig. 3 illustrates onecarrier mounting bracket 60 and onecarrier 65 in greater detail. The illustratedcarrier mounting bracket 60 includes ahollow tube 80, afirst plate 85, asecond plate 90, a plurality offasteners 95 and acarrier retaining sleeve 100. The illustratedhollow tube 80 has a substantially square cross section. Thehollow tube 80 and thefirst plate 85 are positioned on an outside surface of the left support bracket 751 and thesecond plate 90 is positioned on a inside surface of theright support bracket 75r. The plurality offasteners 95 extend through respective apertures in thehollow tube 80, thefirst plate 85, theright support bracket 75r and thesecond plate 90 to connect thecarrier mounting bracket 60 to theframe 45. In the illustrated embodiment, thecarrier retaining sleeve 100 is permanently affixed to thehollow tube 85, extends through an aperture in thefirst plate 85, and abuts the left support bracket 751. Thecarrier retaining sleeve 100 is hollow and is internally threaded. In the illustrated embodiment, one of thefasteners 95 is positioned above and three of thefasteners 95 are positioned below thecarrier retaining sleeve 100. Other quantities, locations and configurations of apertures are possible. - The
carrier 65 includes afastener 115, afirst bearing 120, asnap ring 125, asecond bearing 130, abearing retaining sleeve 135, and anut 140. Thefastener 115 may be a shoulder bolt and includes ahead 145 and ashaft 150. Thehead 145 has a larger diameter than theshaft 150. The illustratedhead 145 is round and includes a slot to receive a tool to tighten and loosen thefastener 115. The illustratedshaft 150 includes a threaded portion that is threaded into thecarrier retaining sleeve 100. A distance between thehead 145 and thecarrier retaining sleeve 100 is adjustable by threading or unthreading thefastener 115 from thecarrier retaining sleeve 100. Thefirst bearing 120 is positioned on thefastener 115 in abutment with thehead 145. The illustratedfirst bearing 120 is a needle bearing, but another suitable bearing or bushing can be utilized. Thesnap ring 125 is positioned adjacent thefirst bearing 120. In the illustrated embodiment, theshaft 150 defines a groove to receive thesnap ring 125 therein. Thesnap ring 125 is operable to retain thefirst bearing 120 in abutment with thehead 145. In another embodiment, a detent or other structural protuberance is utilized the retain thefirst bearing 120 in abutment with thehead 145. - The
second bearing 130 is positioned adjacent thesnap ring 125. The illustratedsecond bearing 130 is a roller bearing, but another suitable bearing or bushing can be utilized. Thebearing retaining sleeve 135 is positioned adjacent thesecond bearing 130. In some embodiments, thebearing retaining sleeve 135 is threaded onto thefastener 115 to retain thesecond bearing 130 in position on thefastener 115. In the illustrated embodiment, anut 140 or other structural element is utilized to retain thesecond bearing 130 in abutment with thesnap ring 125. Thenut 140 is threaded onto thefastener 115 and is spaced from thebearing retaining sleeve 135 in the illustrated embodiment. The illustratednut 140 abuts thecarrier retaining sleeve 100. Thenut 140 permits adjustment of a distance between thehead 145 and thecarrier retaining sleeve 100. Thenut 140 performs the function of alock nut 230 against thecarrier retaining sleeve 100. Other distance adjustment configurations are possible and the illustratednut 140 andcarrier retaining sleeve 100 are given by way of example only. - With reference to
Fig. 4 , thebottom panel 15b includes many of the same features as thestowable panels 15s; only the features specific to thebottom panel 15b are discussed herein. Thebottom panel 15b includes abottom seal 155, an objectpresent sensor assembly 160 and achain mount 165. Theseal 155 is coupled directly to thebottom support bracket 70b; thebottom panel 15b has nobottom dovetail piece 55b. Theseal 155 is flexible and extends downwardly in a substantially arcuate configuration. - With reference to
Fig. 5 , the objectpresence sensor assembly 160 includes amain body 170, anarm 175, aspring 180 and acircuit element 185. Themain body 170 is mounted to thebottom support bracket 70b and extends through anaperture 190 in thebottom support bracket 70b. Thearm 175 is coupled to themain body 170 and extends substantially vertically and downward through theaperture 190 in thebottom support bracket 70b. The illustratedarm 175 includes arecess 195 and apin 200. The illustratedmain body 170 abuts thepin 200, and thearm 175 substantially abuts the seal. Thespring 180 is coupled to themain body 170 and thearm 175 and retains thearm 175 in a first, un-actuated position. The illustratedcircuit element 185 is a switch including a first moveable portion and a second portion. The switch second portion is mounted to themain body 170 and the first moveable portion is free to move with respect to themain body 170. When in the first, un-actuated position, the first moveable portion is spaced from therecess 195. In the second, actuated position, the first moveable portion contacts therecess 195. When actuated, the objectpresence sensor assembly 160 opens a circuit to stop operation of thedrive assembly 20. When theseal 155 abuts an object, such as an obstruction or the floor, thearm 175 is biased upward to actuate the objectpresence sensor assembly 160 and therefore, stop operation of thedrive assembly 20. - With reference to
Fig. 4 , thechain mount 165 includes anelongate bracket 205 having an arm, asecond bracket 210 and anadjustable connector assembly 215. Theelongate bracket 205 is connected to theright support bracket 75r by a plurality offasteners 220. In another embodiment, theelongate bracket 205 includes an extension that is connected to thebottom support bracket 70b in addition to or in lieu of theelongate bracket 205 being connected to theright support bracket 75r. The arm projects substantially normal to theright support bracket 75r. The arm includes an aperture extending vertically therethrough. Theadjustable connector assembly 215 includes ananchor 225, astud 230, anut 235 and alock nut 240. Theanchor 225 includes a first aperture oriented along a substantially horizontal axis and a second aperture oriented along a substantially vertical axis. Thesecond aperture 240 is threaded in the illustrated embodiment. Thestud 220 is threaded and extends through the arm aperture and into the vertical anchor aperture. Thenut 235 and locknut 240 thread onto thestud 220 below the arm. Thenut 235 and locknut 240 are operable to couple thestud 230 to the arm. A distance between the arm and theanchor 225 is adjustable by adjusting the position of thenut 235 and thelock nut 240 on thestud 230. - With reference to
Fig. 6 , thedrive assembly 20 includes aprime mover 245, agear reducer 250, first andsecond output shafts drive box assemblies prime mover 245 is an electric motor, but in other embodiments, other suitable prime movers can be utilized. The illustratedgear reducer 250 includes one input coupled to the electric motor and first andsecond outputs second outputs gear reducer 250. The first andsecond output shafts second outputs second output shafts drive box assemblies gear reducer 250 also includes a third output 270 (seeFig. 1 ) extending downward from thegear reducer 250. Thethird output 270 is engageable by a user for optional manual operation of thegear reducer 250. Although not specifically illustrated, thegear reducer 250 is mounted to the building structure. - The first and second
drive box assemblies drive box assembly 260a will be discussed in detail. As shown in greater detail inFigs. 7-9 , the first seconddrive box assembly 260a includes afirst drive shaft 275, afirst sprocket 280, asecond drive shaft 285, asecond sprocket 290, acam 295, athird sprocket 300, afirst chain 305, anidler sprocket 310, aflexible lift member 315, asupport rack 320 and abar 322. Thefirst drive shaft 275 is coupled to thefirst output shaft 255a for rotation therewith. Thefirst sprocket 280 is coupled to thefirst drive shaft 275 for rotation therewith. The illustratedfirst sprocket 280 has ten teeth. Thesecond drive shaft 285 is spaced from and substantially parallel to thefirst drive shaft 275. Thesecond sprocket 290 is coupled to thesecond drive shaft 285 for rotation therewith. The illustratedsecond sprocket 290 has sixty teeth. Thecam 295 is coupled to thesecond drive shaft 285 for rotation therewith. The illustratedcam 295 includes a substantially circular outer perimeter defining a first radius and aslot 325 which defines a second radius, smaller than the first radius. Theslot 325 is sized to receive one of thecarriers 65. The illustratedslot 325 is substantially symmetrical and includes a first substantiallyplanar portion 325a, a second substantiallyplanar portion 325b and afirst recess portion 325c between the first and second substantially planar portions. The substantiallyplanar portions carrier 65 into therecess portion 325c when thecam 295 rotates. Thethird sprocket 300 is coupled to thesecond drive shaft 285 for rotation therewith. The illustratedthird sprocket 300 is positioned between thesecond sprocket 290 and thecam 295. The illustratedthird sprocket 300 includes thirty teeth and has a one inch pitch. - The
first chain 305 encircles thefirst sprocket 280 and thesecond sprocket 290 to couple thefirst sprocket 280 to thesecond sprocket 290. Thefirst chain 305 connects thefirst drive shaft 275 and thesecond drive shaft 285, such that rotation of thefirst drive shaft 275 causes rotation of thesecond drive shaft 285. Theidler sprocket 310 is also coupled to thefirst chain 305 and is utilized to adjust tension in thefirst chain 305. The first andsecond sprockets second drive shaft 285. In the illustrated embodiment, thefirst sprocket 280 completes six full rotations while thesecond sprocket 290 completes only one full rotation. Other quantities of teeth and varieties of gear reduction are possible, and the illustrated is given by way of example only. - The illustrated
flexible lift member 315 is a length of chain (herein referred to as a second chain) but other flexible lift members, such as cables, ropes, cords, strings, and the like can be utilized in place of the illustratedsecond chain 315. Thesecond chain 315 engages thethird sprocket 300 and thereby moves in response to rotation of thesecond drive shaft 285. Thesecond chain 315 is coupled to thebottom panel 15b via theadjustable connector assembly 215. Specifically, a cross link member of thesecond chain 315 extends through thefirst aperture 235 of theanchor 215. - The illustrated
support rack 320 is a vertically extending plate with an inclined upper edge. The inclined upper edge is sized to support thecarriers 65. In the illustrated embodiment, the carrier second bearing 130 moves along the inclined upper edge. The inclined edge of thesupport rack 320 is angled downwardly toward thecam 295. Gravity is utilized to move thecarriers 65 into engagement with thecam 295. In another embodiment, a separate motive force (in addition to gravity) is utilized to move thecarriers 65 into engagement with thecam 295. In the illustrated embodiment, the incline is about 5 degrees, but other incline angles can be utilized. Thebar 322 illustrated inFig. 8 is positioned above theinclined support rack 320 and inhibits thecarriers 65 from detaching from theinclined support rack 320. Thebar 322 can assist in aligning thestowable panels 15s on theinclined support rack 320. Thebar 322 is only illustrated inFig. 8 , but is omitted from the remaining figures for clarity. - With reference to
Fig. 10 , thefirst jamb assembly 25a includes anexternal housing assembly 330 and aninternal guidance system 335. Thefirst jamb assembly 25a and thesecond jamb assembly 25b are substantial mirror images, so only thefirst jamb assembly 25a is described in detail. Theexternal housing assembly 330 is mounted to a floor and the firstdrive box assembly 260a and includes first and second L-shapedbrackets brackets second gaskets second alignment brackets brackets brackets brackets brackets second gaskets brackets second alignment brackets 352, 353 (seeFig. 8 ) engage and vertically align thepanels 15 during stowage and deployment. The illustratedalignment brackets external housing assembly 330 receives thesecond chain 315 extending therethrough. In some embodiments, thefirst jamb assembly 25a is mounted to a building wall and theexternal housing assembly 330 extends into a room in the building. In other embodiments, thefirst jamb assembly 25a is mounted to a building wall and theexternal housing assembly 330 is contained within the wall. - The
internal guidance system 335 includes first andsecond guide brackets 355a, 355b coupled to respective first and second mountingbrackets second guide brackets 355a, 355b define a substantiallyvertical opening 40 sized to received thecarriers 65 therein. The first andsecond guide brackets 355a, 355b substantially surround a portion of thecarriers 65 to retain the panels in a substantially aligned orientation. - The cable device 30 (shown in
Fig. 1 ) is acentrifugal cam 295 including ahousing 360 and acable 365. Although not specifically shown, onecable device 30 can be provided perdrive box assembly cable 365 is free to move with respect to thehousing 360 at low speed, but thecable device 30 brakes at high speed. Thehousing 360 is coupled to the building or other structure and thecable 365 is coupled to thebottom panel 15b. In the event that the any component in thewall panel assembly 10 fails, the cable device(s) 30 support thebottom panel 15b, and thus, the remaining panels resting on thebottom panel 15b. - In operation, the
panels Fig. 11 ) to a deployed position (shown inFig. 18 ).Figs. 12-17 illustrate some of the steps of deploying thepanels Figs. 19-22 illustrate some of the steps of stowing thepanels - In a stowed position, the
stowable panels 15s are supported on the support racks 320 via thecarriers 65. The support racks 320 bear the weight of thestowable panels 15s in the illustrated stowed position. The support racks 320 are inclined to bias thestowable panels 15s into engagement with thecams 295. In the illustrated stowed position, thebottom panel 15b is supported on thecams 295 via thecarriers 65 in theslots 325. In the illustrated stowed position, thecams 295 bear the weight of thebottom panel 15b and thechains 315 bear little or none of the weight of thebottom panel 15b. In another embodiment, thebottom panel 15b is supported by thechains 315 in the stowed position. In still another embodiment, thebottom panel 15b is supported by the support racks 320 in the stowed position. In the stowed position, thebottom panel 15b is recessed above theceiling 35 so that theseal 155 is recessed above theceiling 35. In another embodiment, theseal 155 is level with theceiling 35 when thewall panels 15 are stowed. - Operation of the
motor 245 rotates the first andsecond outputs gear reducer 250. The first andsecond outputs gear reducer 250 cause rotation of the respective first andsecond output shafts second output shafts first drive shafts 275, which thereby rotate the respectivefirst sprockets 280. Rotation of thefirst sprockets 280 causes movement of the respectivefirst chains 305, which causes rotation of the respectivesecond sprockets 290 and thereby, rotation of the respectivesecond drive shafts 285. Thecams 295 and thethird sprockets 300 are coupled for rotation with the respectivesecond drive shafts 285. Therefore, thecams 295 rotate about the respectivesecond drive shafts 285 in response to operation of themotor 245. - To deploy the
wall panels 15, themotor 245 causes thecams 295 to rotate to release thecarriers 65 of thebottom panel 15b from thecam slots 325, to thereby lower thebottom panel 15b (seeFig. 12 ). When released from thecam slots 325, thechains 315 bear the weight of thebottom panel 15b through the chain mounts 165. As thesecond drive shafts 285 continue to rotate, thechains 315 continue to lower thebottom panel 15b. The first andsecond alignment brackets bottom panel 15b to maintain thebottom panel 15b in a substantially vertical orientation. - As shown in
Fig. 13 , the inclined support racks 320 bias thecarriers 65 of the firststowable panel 15s against therespective cams 295. Thecarriers 65 abut thecams 295 as thecams 295 rotate in response to rotation of thesecond drive shafts 285. In the illustrated embodiment, thesecond bearings 125 ride along the outside surface of thecams 295. When thecam 295 slots are oriented to receive thecarriers 65 of the firststowable panel 15s, the inclined support racks 320 bias thecarriers 65 of the firststowable panel 15s into the cam slots 325 (seeFig. 14 ). Thecarriers 65 ride along the inclined support racks 320 into therecess portions 325c. - With reference to
Fig. 15 , thecams 295 lift the firststowable panel 15s off of the inclined support racks 320, thereby transferring the weight of the firststowable panel 15s from the support racks 320 to thecams 295. In the illustrated embodiment, thecams 295 engage thefirst bearings 120 of thecarriers 65. Therecess portions 325c retain thecarriers 65 until thecams 295 have rotated to a position in which theslots 325 are facing substantially horizontal, such as the position illustrated inFig. 16 . - In the illustrated embodiment, the
recess portions 325c are sized to receive thecarriers 65. In other embodiments, therecess portions 325c are larger than thecarriers 65 and permit thecarriers 65 to slide along therecess portions 325c. In these embodiments, thecarriers 65 roll along theslots 325 when the slots are facing substantially vertically upward. Therecess portions 325c define a length which is adjustable to accommodate tolerance requirements and to minimize noise when thecarriers 65 move along and abut ends of therecess portions 325c. - As shown in
Fig. 16 , thecams 295 continue to rotate in response to operation of themotor 245 to position the firststowable panel 15s substantially vertically above thebottom panel 15b. The first andsecond alignment brackets stowable panel 15s into vertically alignment with thebottom panel 15b. Thecams 295 continue to lower the firststowable panel 15s onto thebottom panel 15b, such that themating dovetail pieces bottom panel 15b and on a bottom of the firststowable panel 15s engage. As shown inFig. 17 , thecams 295 release the firststowable panel 15s and thechains 315 support the firststowable panel 15s in response to the connection between the firstbottom panel 15b and thechains 315. The firststowable panel 15s is not connected to thechains 315, except for the indirect connection through the firstbottom panel 15b. - With continued reference to
Fig. 17 , the first andsecond jamb assemblies second alignment brackets stowable panel 15s above thebottom panel 15b to guide the dovetails 55t, 55b into mating engagement when thecams 295 release the firststowable panel 15s. The first andsecond jamb assemblies drive box assemblies second alignment brackets panels carriers 65 move within theinternal guidance system 335 of the first andsecond jamb assemblies - The remaining
stowable panels 15s are deployed in the same manor as the firststowable panel 15s is deployed. Thestowable panels 15s rest on top of otherstowable panels 15s and thebottom panel 15b when deployed. Thetop dovetail piece 55t of one panel mates with thebottom dovetail piece 55b of the panel above it, when thewall panel assembly 10 is deployed. Thechains 315 bear the weight of all of the deployedpanels 15 via the connection between thechains 315 and thebottom panel 15b.Fig. 18 is a perspective view of thepanels stowable panels 15s are positioned on thebottom panel 15b. In the illustrated embodiment, thetop panel 15s extends through theopening 40 above theceiling 35. In another embodiment, a top of thetop panel 15s is substantially level with theopening 40. Themating dovetail pieces stowable panels 15s engage to substantially fix the adjacent deployedpanels stowable panels 15s, themating dovetail pieces second jamb assemblies wall panels 15 in a substantially vertical position when deployed. The front and rear panel faces 50f, 50r of thewall panels 15 together provide a substantially continuous wall surface when thewall panel assembly 10 is deployed. - To stow the
panels 15, themotor 245 operates in an opposite direction of that of deployment. Operation of themotor 245 rotates thecams 295 in the opposite direction. With reference toFig. 19 , thecams 295 engage thecarriers 65 of thetop panel 15s. In response to rotation of thecams 295, thecams 295 lift thetop panel 15s off of theother panels Fig. 20 . Thetop panel 15s is first vertically displaced from the remainingpanels cams 295. Thetop panel 15s is then horizontally displaces from the remainingpanels cams 295, as shown inFig. 21 . -
Fig. 21 also illustrates that thechains 315 continue to lift the remainingpanels cams 295 transfer thetop panel 15s onto theinclined support rack 320. Thetop panel 15s is urged up theinclined support rack 320 by the second substantiallyplanar portion 325a. As shown inFig. 22 , thechains 315 further lift the remainingpanels cam 295 slots approach thecarriers 65 of the next panel. In the illustrated embodiment, one full rotation of thecam 295 occurs per stowing or deploying of onepanel 15. The illustratedthird sprocket 300 has an outside perimeter that equals the height of thepanels 15. The illustratedcams 295 have a larger diameter than thethird sprockets 300 so that thecams 295 lift thepanel 15s off of the remainingpanels panel 15s vertically onto the remainingpanels protrusions protrusions - Various features and advantages of the invention are set forth in the following claims.
Claims (15)
- A method of moving panels (15) from a stowed position, in which the panels (15) are substantially positioned above a ceiling (35), to a deployed position, in which the panels are substantially vertically aligned to form a wall, the method comprising:supporting a first panel (15b) on a cam (295), the first panel having a first weight;rotating the cam (295) in a first direction;lowering the first panel (15b) in response to rotation of the cam (295), wherein lowering the first panel (15b) separates the first panel (15b) from the cam (295);supporting the first panel (15b) on a flexible lift member (315) in response to lowering the first panel (15b), characterised in that the flexible lift member (315) directly bears the first weight and further characterised by:supporting a second panel (15s) on a support rack (320), the second panel (15s) having a second weight;biasing the second panel (15s) into engagement with the cam (295);rotating the cam (295) in the first direction;transferring the second panel (15s) from the support rack (320) to the cam (295) in response to rotating the cam (295), wherein the cam (295) bears the second weight;further rotating the cam (295) in the first direction;lowering the second panel (15s) in response to further rotation of the cam (295);transferring the second panel (15s) from the cam (295) to the first panel (15b), wherein the first panel (15b) bears the second weight, and wherein the flexible lift member (315) bears the first weight and the second weight only through the connection between the first panel (15b) and the flexible lift member (315); andfixing the second panel (15s) to the first panel (15b) only through a mating tongue and groove (55t, 55b) engagement.
- The method of claim 1, further comprising supporting a third panel (15s) on the support rack (320), wherein the third panel (15s) has a third weight;
biasing the third panel (15s) into engagement with the cam (295);
rotating the cam (295) in the first direction;
transferring the third panel (15s) from the support rack (320) to the cam (295) in response to rotating the cam (295), wherein the cam (295) bears the third weight;
further rotating the cam (295);
lowering the third panel (15s) in response to further rotation of the cam (295);
transferring the third panel (15s) from the cam (295) to the first (15b) and second (15s) panels, wherein the first panel (15b) bears the second weight and the third weight, and wherein the flexible lift member (315) bears the first, second and third weights through the connection between the first panel (15b) and the flexible lift member (315); and
fixing the third panel (15s) to the second panel (15s) through a mating tongue and groove (55t, 55b) engagement. - The method of claim 2, wherein the cam (295) rotates approximately 360 degrees between transferring the second panel (15s) from the support rack (320) to the cam (295) and transferring the third panel (15s) from the support rack (320) to the cam (295).
- The method of claim 1, wherein moving the second panel (15s) into engagement with the cam (295) includes inclining the support rack (320) at a non-horizontal angle, and moving the second panel (15s) into engagement with the cam (295) under the influence of gravity.
- The method of claim 1, further comprising guiding the first panel (15b) to retain the first panel (15b) in a substantially vertical orientation while lowering the first panel (15b).
- A method of moving panels (15) from a deployed position, in which the panels (15) are substantially vertically aligned to form a wall, to a stowed position, in which the panels (15) are substantially positioned above a ceiling (35), the method comprising:supporting a first panel (15b) on a flexible lift member (315), the first panel (15b) having a first weight, characterised in that the flexible lift member (315) directly bears the first weight and further characterised by:supporting a second panel (15s) on the first panel (15b), the second panel (15s) having a second weight, wherein the flexible lift member (315) bears the first weight and the second weight through the connection between the first panel (15b) and the flexible lift member (315);moving the first (15b) and second panels (15s) substantially vertically;lifting the second panel (15s) off of the first panel (15b) with a cam (295), wherein the cam (295) bears the second weight;disengaging the second panel (15s) from the first panel (15b) by vertically displacing the second panel (15s) from the first panel (15b);transferring the second panel (15s) from the cam (295) to a support rack (320), wherein the support rack (320) bears the second weight;displacing the second panel (15s) horizontally from the first panel (15b) by transferring the second panel (15s) onto the support rack (320);further moving the first panel (15b) substantially vertically;lifting the first panel (15b) with the cam (295); androtating the cam (295) such that the cam (295) bears the first weight.
- The method of claim 6, further comprising supporting a third panel (15s) on the second panel (15s), the third panel (15s) having a third weight, wherein the third weight is supported by the flexible lift member (315) through the connection between the flexible lift member (315) and the first panel (15b);
lifting the third panel (15s) off of the second panel (15s) with the cam (295), wherein the cam (295) bears the third weight;
disengaging the third panel (15s) from the second panel (15s) by vertically displacing the third panel (15s) from the second panel (15s);
transferring the third panel (15s) from the cam (295) to the support rack (320), wherein the support rack (320) bears the third weight, wherein the third panel (15s) is lifted and transferred prior to lifting and transferring the second panel (15s); and
displacing the third panel (15s) horizontally from the second panel (15s) by transferring the third panel (15s) onto the support rack (320). - The method of claim 7, wherein the cam (295) rotates approximate 360 degrees between lifting the third panel (15s) with the cam (295) and lifting the second panel (15s) with the cam (295).
- The method of claim 7, further comprising biasing the third panel (15s) up an incline in response to transferring the second panel (15s) from the cam (295) to the support rack (320).
- The method of claim 6, further comprising guiding the first panel (15b) to retain the first panel (15b) in a substantially vertical orientation while moving the first panel (15b) vertically.
- A wall panel assembly (10) moveable between a stowed position and a deployed position, the wall panel assembly comprising:a first wall panel (15b) having a first weight and including a first carrier (65);a flexible lift member (315) coupled to the first wall panel (15b);a second wall panel (15s) having a second weight and including a second carrier (65);a prime mover (245) operable to move the first (15b) and second (15s) wall panels between the stowed position and the deployed position;a support rack (320), wherein the support rack (320) supports the second carrier (65) and bears the second weight when the second wall panel (15s) is in the stowed position; characterised in that the flexible lift member (315) indirectly bears the second weight when the second wall panel (15s) is in the deployed position only through the connection between the first wall panel (15b) and the flexible lift member (315); anda cam (295) having an exterior perimeter defining a recess (325), the recess (325) sized to receive at least one of the first and second carriers (65), the cam (295) being rotatable in response to the prime mover (245), wherein rotation of the cam (295) in a first direction moves the first (15b) and second (15s) wall panels into the deployed position, and wherein rotation of the cam (295) in a second direction, opposite the first direction, moves the first (15b) and second wall panels (15s) into the stowed position.
- The wall panel assembly (10) of claim 11, further comprising a third wall panel (15s) having a third weight and including a third carrier (65), wherein the support rack (320) supports the third carrier (65) and bears the third weight when the third wall panel (15s) is in the stowed position, and wherein the flexible lift member (315) bears the third weight when the third wall panel (15s) is in the deployed position through the connection between the first wall panel (15b) and the flexible lift member (315).
- The wall panel assembly (10) of claim 11, wherein the cam (295) rotates approximate 360 degrees between receiving the first carrier (65) and receiving the second carrier (65).
- The wall panel assembly (10) of claim 13, further comprising a sprocket (300) coupled to the cam (295), wherein the cam (295) has a first diameter and the sprocket (300) has a second diameter, less than the first diameter.
- The wall panel assembly (10) of claim 11, wherein:the support rack (320) includes a non-horizontal incline, and wherein the second carrier (65) moves down the incline under the influence of gravity into engagement with the cam (295) when the second wall panel (15s) is in the stowed position; and/orthe cam recess (325) is substantially symmetrical, wherein the cam recess (325) includes a first portion (325a) for transferring the second wall panel (15s) from the support rack (320) to the cam (295) and a second portion (325b) for transferring the second wall panel (15s) from the first wall panel (15b) to the cam (295); and/orthe wall panel assembly (10) further comprises a jamb (25a,b) sized to receive the first and second carriers (65) when the flexible lift member (315) bears the first and second weights, wherein the jamb at least partially surrounds the first and second carriers (65) to retain the first (15b) and second (15s) wall panels in a substantially vertical orientation; and/orthe first carrier (65) comprises a shaft (150), a head (145), and at least one bearing (120), wherein the at least one bearing (120) engages the support rack (320) when the first wall panel (15b) is stowed and engages the cam (295) when the first wall panel (15b) is moved between the stowed and deployed positions; and/orthe first wall panel (15b) is connected to the flexible lift member (315) and the second wall panel (15s) is connected to the flexible lift member (315) only coupled to the flexible lift member (315) indirectly through the first wall panel (15b); and/orthe flexible lift member (315) is a chain.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2011/036477 WO2012158147A1 (en) | 2011-05-13 | 2011-05-13 | Method of stowing and deploying wall panels |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2707564A1 EP2707564A1 (en) | 2014-03-19 |
EP2707564B1 true EP2707564B1 (en) | 2015-11-04 |
Family
ID=44170470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11721408.0A Not-in-force EP2707564B1 (en) | 2011-05-13 | 2011-05-13 | Method of stowing and deploying wall panels |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2707564B1 (en) |
BR (1) | BR112013029351B1 (en) |
CA (1) | CA2838161C (en) |
WO (1) | WO2012158147A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1021265B1 (en) * | 2014-01-29 | 2015-10-13 | Gmp Nv | SECTIONAL PORT WITH OPTIL MECHANISM |
WO2015155793A1 (en) * | 2014-04-10 | 2015-10-15 | Cmvi Group Srl | Foldable shutter having slats provided with an innovative mutual couple-hooking system to safety close openings of civil and industrial buildings |
BE1023136B1 (en) * | 2015-05-28 | 2016-11-29 | Renson Sunprotection Screens Nv | Slat roof and method for adjusting a slat roof |
RO134244A2 (en) * | 2018-12-28 | 2020-06-30 | Simon Andreas Maurer | Retractable modular wall |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5072766A (en) * | 1991-01-03 | 1991-12-17 | Bunka Shutter Co., Ltd. | Panel shutter assembly |
DE9421755U1 (en) * | 1994-12-30 | 1996-09-26 | Wiederoder, Herbert, 70771 Leinfelden-Echterdingen | Selection gate |
DE19505999A1 (en) * | 1995-02-21 | 1996-08-22 | Wiederoder Herbert | Anti-drop safety mechanism for belt raised sectional gate |
DE102006058864B4 (en) * | 2005-12-07 | 2016-06-09 | Itw Industrietore Gmbh | Sectional gate |
-
2011
- 2011-05-13 WO PCT/US2011/036477 patent/WO2012158147A1/en active Application Filing
- 2011-05-13 CA CA2838161A patent/CA2838161C/en active Active
- 2011-05-13 BR BR112013029351A patent/BR112013029351B1/en active IP Right Grant
- 2011-05-13 EP EP11721408.0A patent/EP2707564B1/en not_active Not-in-force
Also Published As
Publication number | Publication date |
---|---|
WO2012158147A1 (en) | 2012-11-22 |
EP2707564A1 (en) | 2014-03-19 |
BR112013029351A2 (en) | 2017-04-18 |
CA2838161A1 (en) | 2012-11-22 |
BR112013029351B1 (en) | 2020-05-19 |
CA2838161C (en) | 2017-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8468751B2 (en) | Method of stowing and deploying wall panels | |
EP2707564B1 (en) | Method of stowing and deploying wall panels | |
US6186444B1 (en) | Sliding pocket door for aircraft use capable of nondestructive blow-out and easy access | |
US20120325124A1 (en) | Aircraft table system with rolling sled member | |
WO2022142773A1 (en) | Lifting apparatus and handling robot | |
KR20090007438U (en) | Angle regulation apparatus | |
CA3049876C (en) | Garage door safety device | |
KR20120132995A (en) | Automatic storage device for tire storage | |
CN113481878B (en) | Prevent falling thing and hang external device of basket safety protection | |
KR101782936B1 (en) | A folding safty gondola with horizontal control function | |
EP3138984A1 (en) | A panel system and a panel with a supporting member | |
KR101327675B1 (en) | Outer wall climbing apparatus | |
EP2208844B1 (en) | Sectional door system | |
KR102202536B1 (en) | Balcony railing with crime prevention function of apartment house | |
EP4015734B1 (en) | A roller blind and a process for mounting a roller blind. | |
US20130014684A1 (en) | Anchor lock device | |
KR101542723B1 (en) | Folding Mechanism with variable frame arm for flat panel disply to store into ceiling | |
CN111780268B (en) | Movable clamping device and air conditioner external unit mounting platform | |
CN220412746U (en) | Vehicle lifting device and power exchange station with same | |
KR101330457B1 (en) | Folding Mechanism for flat panel disply to store into ceiling | |
CN216692742U (en) | Mounting bracket for fixing security camera | |
JP4986928B2 (en) | Movable column device | |
US6315270B1 (en) | Cable pulley | |
JP2003343172A (en) | Door opening/closing apparatus | |
KR101233539B1 (en) | Lift unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20131118 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20140923 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20150521 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 759332 Country of ref document: AT Kind code of ref document: T Effective date: 20151115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602011021156 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20151104 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 759332 Country of ref document: AT Kind code of ref document: T Effective date: 20151104 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160304 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160204 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160205 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160304 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602011021156 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160531 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20160805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160513 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160531 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160513 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20110513 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160531 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151104 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20220324 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20220308 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20220322 Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602011021156 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20230513 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20231201 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230513 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230531 |