EP2693810A1 - Failed cell detection method and device - Google Patents

Failed cell detection method and device Download PDF

Info

Publication number
EP2693810A1
EP2693810A1 EP12773680.9A EP12773680A EP2693810A1 EP 2693810 A1 EP2693810 A1 EP 2693810A1 EP 12773680 A EP12773680 A EP 12773680A EP 2693810 A1 EP2693810 A1 EP 2693810A1
Authority
EP
European Patent Office
Prior art keywords
cell
base station
outage
measurement
controlling base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP12773680.9A
Other languages
German (de)
French (fr)
Other versions
EP2693810A4 (en
EP2693810B1 (en
Inventor
Jun Wang
Xuelong Wang
Haitao Xia
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of EP2693810A1 publication Critical patent/EP2693810A1/en
Publication of EP2693810A4 publication Critical patent/EP2693810A4/en
Application granted granted Critical
Publication of EP2693810B1 publication Critical patent/EP2693810B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition

Definitions

  • Embodiments of the present invention relate to the field of wireless communications, and in particular, to a method and a device for cell outage detection.
  • a self-organizing network (Self-Organizing Network, SON) is a critical type of standardization work engaged by a 3rd generation partnership project (The 3rd Generation Partnership Project, 3GPP) standard organization in an R8/9/10 working period, and its core idea is to reduce traditional manual operations by using an automation process at phases of network planning, deployment, optimization, and maintenance, and to reduce maintenance costs of network operators.
  • 3GPP 3rd Generation Partnership Project
  • a communication cell has an abnormal working state.
  • a cell in this state is unable to provide normal communication services, and a user equipment (User Equipment, UE) residing in this cell cannot establish a communication connection, or a user equipment in an ongoing communication in this cell is disconnected due to the lack of ability to maintain the communication connection.
  • UE User Equipment
  • a cell is in this abnormal working state not because an energy-saving operation is performed in the cell but because a severe failure occurs in the cell. Cells in this case are called outage cells.
  • a system needs a capability of cell outage detection automatically to trigger an outage cell recovery operation or an energy-saving cell deactivating operation, to make the cell return to a normal working state.
  • This automation process of cell outage detection belongs to a self healing (Self healing, SH) category of the self-organizing network.
  • Cyclic detection is performed on specific software and hardware inside the base station, an external power supply system or network connections to determine whether a cell outage failure occurs, and the base station reports a cell outage alarm. This method is strongly correlated with the implementation of the base station, and is limited to the base station only.
  • a network management system periodically collects key performance indicators (Key Performance Indicators, KPIs) and/or performance measurements (PM, Performance Measurements) of the cell; if a performance indicator, such as a radio resource control (Radio Resource Control, RRC) connection setup success rate, or a disconnection or call drop rate (hereinafter referred to as "disconnection/call drop rate") of the cell exceeds a preset threshold within one or several reporting periods, the network management system considers that an outage failure occurs in the cell.
  • KPIs Key Performance Indicators
  • PM Performance Measurements
  • Embodiments of the present invention provide a method and a device for cell outage detection, so that an outage cell can be detected on a real-time basis.
  • the present invention provides a method for cell outage detection, including: receiving, by a controlling base station of a first cell, a request message, where the request message is used to request an outage measurement on a second cell, where the first cell is a neighboring cell of the second cell; selecting, by the controlling base station of the first cell according to the request message, a user equipment in the first cell to measure the second cell; receiving, by the controlling base station of the first cell, measurement information obtained by the user equipment by measuring the second cell, and generating, according to the measurement information, information used to determine whether an outage occurs in the second cell; and sending, by the controlling base station of the first cell, a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • the present invention provides a method for cell outage detection, including: sending a request message to a controlling base station of a first cell when a second cell becomes a potential outage cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell; receiving a reply message sent by the controlling base station of the first cell, where the reply message includes the information used to determine whether an outage occurs in the second cell; and determining, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  • the present invention provides a base station, where the base station is a controlling base station of a first cell and includes: a fist receiving unit, configured to receive a request message, where the request message is used to request an outage measurement on a second cell, where the first cell is a neighboring cell of the second cell; a selecting unit, configured to select, according to the request message, a user equipment which is in the first cell and measures the second cell; a second receiving unit, configured to receive measurement information obtained by the user equipment by measuring the second cell; a generating unit, configured to generate, according to the measurement information, information used to determine whether an outage occurs in the second cell; and a sending unit, configured to send a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • a fist receiving unit configured to receive a request message, where the request message is used to request an outage measurement on a second cell, where the first cell is a neighboring cell of the second cell
  • a selecting unit configured to select, according to
  • the present invention provides a network device, including: a sending unit, configured to: send a request message to a controlling base station of a first cell when a second cell becomes a potential outage cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell; a first receiving unit, configured to receive a reply message sent by the controlling base station of the first cell, where the reply message includes the information used to determine whether an outage occurs in the second cell; and a processing unit, configured to determine, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  • a sending unit configured to: send a request message to a controlling base station of a first cell when a second cell becomes a potential outage cell, where the request
  • a user equipment of the first cell measures the second cell (that is, the target cell), and the controlling base station of the first cell returns, according to the measurement result of the user equipment, information used to determine whether an outage occurs in the second cell.
  • the controlling base station of the first cell returns, according to the measurement result of the user equipment, information used to determine whether an outage occurs in the second cell.
  • the technical solutions of the present invention may be applied to various communication systems, for example, a global system of mobile communication (Global System of Mobile communication, GSM) system, a code division multiple access (Code Division Multiple Access, CDMA) system, a wideband code division multiple access wireless (Wideband Code Division Multiple Access Wireless, WCDMA) system, a time division-synchronous code division multiple access (Time Division-Synchronous Code Division Multiple Access, TD-SCDMA) system, a general packet radio service (General Packet Radio Service, GPRS) system, a long term evolution (Long Term Evolution, LTE) system, and the like.
  • GSM Global System of Mobile communication
  • CDMA code division multiple access
  • WCDMA wideband code division multiple access wireless
  • TD-SCDMA time division-synchronous code division multiple access
  • GPRS General Packet Radio Service
  • LTE Long Term Evolution
  • a user equipment (User Equipment, UE) in the embodiments of the present invention may be a mobile terminal (Mobile Terminal) that can communicate with one or multiple core networks through a radio access network (Radio Access, RAN Network).
  • the mobile terminal may be a mobile phone (or called a "cellular" phone), or a computer equipped with a mobile terminal, for example, a portable, pocket, handheld, computer-embedded, or vehicle-mounted mobile device, which exchanges speeches and/or data with the radio access network.
  • a base station in the embodiments of the present invention may be a base station (Base Transceiver Station, BTS) in GSM or CDMA, or a base station (NodeB) in WCDMA or TD-SCDMA, or an evolved base station (evolved Node B, eNB or e-NodeB) in LTE, which is not limited by the present invention.
  • BTS Base Transceiver Station
  • NodeB base station
  • evolved Node B, eNB or e-NodeB evolved base station
  • a method for cell outage detection is as follows: a target cell (that is, a cell where a cell outage measurement needs to be performed) initiates an auxiliary measurement to a neighboring cell on demand (on demand), and whether an outage occurs in the target cell is determined according to an auxiliary measurement result of the neighboring cell.
  • This method is triggered under the premise that a controlling base station of the target cell determines preliminarily, according to information collected by the controlling base station, that an outage failure may probably occur in the target cell, that is, the target cell becomes a potential outage cell.
  • FIG. 1 is a flowchart schematic of a method for cell outage detection according to an embodiment of the present invention.
  • a first cell and a second cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • a controlling base station of the first cell receives a request message, where the request message is used to request an outage measurement on the second cell, where the first cell is a neighboring cell of the second cell.
  • the controlling base station of the first cell selects, according to the request message, a user equipment in the first cell to measure the second cell.
  • the controlling base station of the first cell receives measurement information obtained by the user equipment by measuring the second cell, and generates, according to the measurement information, information used to determine whether an outage occurs in the second cell.
  • the controlling base station of the first cell sends a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • the second cell is the target of the outage measurement, that is, cell outage detection needs to be performed on the second cell
  • the second cell may also be called a "target cell”
  • the first cell is a neighboring cell of the second cell
  • the first cell may be called a "neighboring cell” or a “neighboring cell”.
  • the foregoing request message may be initiated by a controlling base station of the foregoing second cell (that is, the target cell).
  • the controlling base station of the first cell receives the foregoing request message sent by the controlling base station of the second cell; and in 104, the controlling base station of the first cell sends the foregoing reply message to the controlling base station of the second cell.
  • the foregoing request message may also be coordinated by a network management system independent of a base station for implementation of auxiliary measurement processes of neighboring cells.
  • a network management system independent of a base station for implementation of auxiliary measurement processes of neighboring cells.
  • OAM operations Administration and Maintenance
  • the controlling base station of the first cell receives the foregoing request message sent by a network management system; and in 104, the controlling base station of the first cell sends the foregoing reply message to the foregoing network management system.
  • the request message in each of the foregoing embodiments may include one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  • the controlling base station of the first cell may select, from the first cell, a user equipment adjacent to the cell edge of the second cell to measure the second cell.
  • the controlling base station of the first cell may further acquire handover performance measurement information of the second cell, where the handover performance measurement information of the second cell includes one or more pieces of the following information: the number of handover requests with respect to the second cell, the number of successful handovers with respect to the second cell, a disconnection/call drop rate of the second cell.
  • the controlling base station of the first cell further generates, according to the foregoing measurement information and the handover performance measurement information of the second cell, the information used to determine whether an outage occurs in the second cell.
  • the controlling base station of the first cell When the controlling base station of the first cell generates the information used to determine whether an outage occurs in the second cell, on the basis of consideration of the measurement information reported by the user equipment in the first cell, the controlling base station of the first cell further considers the handover performance measurement information of the second cell. Therefore, the generated information used to determine whether an outage occurs in the second cell is more accurate.
  • the measurement information obtained by the user equipment by measuring the second cell includes measurement information obtained by the user equipment by measuring a reference signal receiving power signal of the second cell or measurement information obtained by the user equipment by detecting an uplink channel and a downlink channel of the second cell.
  • a user equipment in a neighboring cell measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment.
  • the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • FIG. 2 is a flowchart schematic of a method for cell outage detection according to another embodiment of the present invention.
  • a first cell and a second cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • 201 Send a request message to a controlling base station of the first cell when the second cell becomes a potential outage cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell.
  • the foregoing 201 to 203 may be performed by the controlling base station of the second cell (that is, a target cell).
  • the foregoing 201 to 203 may also be performed by a network management system. If the foregoing 201 to 203 are performed by the network management system, alternatively, the method embodiment illustrated in FIG. 2 further includes: receiving, by the network management system, indication information sent by the controlling base station of the second cell, where the indication information is used to indicate that the second cell becomes a potential outage cell; generating, by the network management system according to the indication information, a request message used to request an outage measurement on the second cell.
  • the request message in each of the foregoing embodiments includes one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  • a user equipment in a neighboring cell measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment.
  • the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • FIG. 3 is a flowchart schematic of a process of cell outage detection according to an embodiment of the present invention.
  • eNB 1 refers to a controlling base station of a target cell
  • eNB2 refers to a controlling base station of a neighboring cell of the target cell
  • UE refers to a user equipment in the neighboring cell.
  • the target cell in this embodiment corresponds to the second cell in the foregoing embodiment
  • the neighboring cell (hereinafter referred to as "neighboring cell”) of the target cell corresponds to the first cell in the foregoing embodiment.
  • the controlling base station of the neighboring cell and the controlling base station of the target cell may belong to different systems, for example, one is an eNB, and the other is a NodeB.
  • the neighboring cell and the target cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • the embodiment of the present invention is not limited thereto.
  • the target cell may be measured by using user equipments in multiple neighboring cells.
  • the embodiment of the present invention is not limited thereto.
  • the target cell may be measured by using multiple UEs in the neighboring cell. All these variations shall fall into the scope of the embodiment of the present invention.
  • FIG. 3 is a process of cell outage detection under a distributed architecture.
  • the process of cell outage detection is initiated by the controlling base station eNB1 of the target cell, and an auxiliary measurement task request is initiated to selected neighboring cells through a network interface (for example, an X2 interface).
  • a controlling base station that is, the eNB2 of each selected neighboring cell returns an execution result of a measurement task to the eNB1, and the eNB1 makes an outage detection judgment on the target cell according to a comprehensive result. If determining that a cell outage occurs in the target cell, the controlling base station eNB1 of the target cell generates a cell outage alarm.
  • the eNB1 determines that the target cell is a potential outage cell. For example, the eNB 1 detects, by using an internal detection mechanism, that traffic of the target cell is 0 within a set reporting period. Specifically, whether the traffic of the cell is 0 may be determined comprehensively by measuring indicators of the cell in a reporting period such as the number of RRC connection attempts, an RRC connection setup success rate, the number of radio access bearer (Radio Access Bearer, RAB) setup attempts, an RAB setup success rate, the number of active users, a wireless call drop/disconnection rate. In this case, the eNB 1 may generate an alarm or a notification indicating that the target cell becomes a potential outage cell, for example, "target cell unavailable".
  • RAB Radio Access Bearer
  • the eNB1 selects, from a neighboring cell list of the target cell, a proper neighboring cell on which an auxiliary measurement needs to be performed.
  • the criterion for selecting a neighboring cell is not limited. For example, a large quantity of UEs are handed over to a neighboring cell of the target cell during a recent period of time.
  • the neighboring cell and the target cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • the eNB1 sends a request message to a controlling base station eNB2 of the selected neighboring cell through an X2 interface or an inter-system network interface, where the request message includes one or more pieces of the following information: an identifier of the target cell, a longest measurement period, and a measurement item requested to be performed.
  • the foregoing request message in this embodiment is exemplarily a "cell outage measurement request".
  • the "cell outage measurement request" may carry an identifier of the target cell (mandatory), a measurement item requested to be performed (optional, including a performance measurement of the target cell, a measurement performed by a UE in the target cell, and the like), and a longest measurement period (mandatory).
  • the eNB2 selects a UE in the neighboring cell to implement an auxiliary outage measurement process on the target cell.
  • the eNB selects a proper UE (for example, a UE located adjacent to a cell edge of the target cell), so that the UE performs a specified measurement item on the target cell in a specified period.
  • the selected UE in the neighboring cell performs a measurement process on the target cell.
  • the measurement process includes but is not limited to: (a) measuring a reference signal receiving power (Reference Signal Receiving Power, RSRP) signal of the target cell; and (b) detecting an uplink channel and a downlink channel of the target cell, for example, checking the random access of the UE.
  • RSRP Reference Signal Receiving Power
  • An existing RRC message may be used as a signaling message of an air interface, for example, a radio bearer reconfiguration or physical channel reconfiguration process with a new information element added to a process message; or a new RRC message may be added to carry an information element required for the UE in the neighboring cell to perform auxiliary outage detection on the target cell.
  • the eNB2 further monitors the performance measurement item of the target cell to obtain handover performance measurement information of the target cell.
  • the handover performance measurement information of the target cell includes one or more pieces of the following information: the number of handover requests with respect to the target cell, the number of successful handovers with respect to the target cell, and a disconnection/call drop rate of the target cell.
  • handover performance indicators of handover of the UE in the neighboring cell to the target cell include the number of attempts of handover to the target cell and a handover success rate within a set monitoring period.
  • 307 is displayed after 304 to 306, but the embodiment of the present invention is not limited thereto. 307 may be performed before 304 to 306, or be performed concurrently with 304 to 306. 307 is an optional step.
  • the eNB2 generates, by using the measurement information returned by the UE, information used to determine whether an outage occurs in the target cell. If 307 is performed, the eNB2 generates, according to the foregoing measurement information and handover performance measurement information of the target cell, information used to determine whether an outage occurs in the target cell.
  • the neighboring cell ends the auxiliary measurement, and generates qualitative information used to determine that the target cell is a "non-outage" cell. If all selected UEs include the identifier of the target cell and an abnormal measured value (for example, an RSRP value) of the specified measurement item of the cell in a measurement result carried in the message returned after the expiration of the measurement period, the neighboring cell ends the auxiliary measurement, and generates qualitative information used to determine that the target cell is an "outage" cell.
  • a normal measured value for example, an RSRP value
  • the eNB2 may generate qualitative information according to the performance measurement item and the measurement information returned by the UE. For example, if a performance measurement indicator is 0 or close to 0 and the measurement result of the UE indicates qualitatively that the target cell is an "outage" cell, the eNB2 accordingly generates qualitative information used to determine that the target cell is an "outage" cell.
  • the eNB2 returns a "cell outage measurement reply" message to the eNB1 through the X2 interface or the inter-system network interface.
  • the cell outage measurement reply message carries qualitative information of the auxiliary measurement of the neighboring cell, for example, outage or non-outage of the target cell.
  • the NB1 finally determines whether an outage occurs in the target cell by combining the cell outage measurement results (the qualitative information) reported by selected neighboring cells. For example, if all the selected neighboring cells return an indication indicating that an outage occurs in the target cell, the eNB1 determines that an outage occurs in the target cell and sends a corresponding alarm, for example, "target cell outage”. Then, the process ends.
  • a user equipment in a neighboring cell measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment.
  • the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • FIG. 4 is a flowchart schematic of a process of cell outage detection according to another embodiment of the present invention.
  • a network management system is exemplarily an OAM
  • eNB1 refers to a controlling base station of a target cell
  • eNB2 refers to a controlling base station of a neighboring cell of the target cell
  • UE refers to a user equipment in the neighboring cell.
  • the OAM may be a network management system of a vendor, for example, an element management system (Element Management System, EMS), or an integrated network management system of an operator, for example, a network management system (Network Management System, NMS).
  • the target cell in this embodiment corresponds to the second cell in the foregoing embodiment
  • the neighboring cell (hereinafter referred to as "neighboring cell”) of the target cell corresponds to the first cell in the foregoing embodiment.
  • FIG. 4 is a process of cell outage detection under a centralized architecture, where a network management system independent of a base station coordinates auxiliary measurement processes on a unified basis.
  • the controlling base station eNB 1 of the target cell preliminarily determines that the target cell is a potential outage cell and sends a corresponding alarm to the OAM; the OAM checks a neighboring cell list of the target cell, selects proper neighboring cells, and initiates an auxiliary measurement task request to the selected neighboring cells through a network management interface. Each of the selected neighboring cells returns an execution result of a measurement task to the OAM, and the OAM makes an outage detection judgment on the target cell according to a comprehensive result. If determining that a cell outage occurs in the target cell, the OAM sends a target cell outage alarm.
  • the eNB1 determines that a target cell is a potential outage cell. For example, the eNB1 detects, by using an internal detection mechanism, that traffic of the target cell is 0 within a set reporting period. Specifically, whether the traffic of the cell is 0 may be determined comprehensively by measuring indicators of the cell in a period such as the number of RRC connection attempts, an RRC connection setup success rate, the number of RAB setup attempts, an RAB setup success rate, the number of active users, a wireless call drop/disconnection rate.
  • the eNB1 sends, to the OAM, an alarm or a notification indicating that the target cell becomes a potential outage cell, for example, "target cell unavailable”.
  • the OAM selects, from a neighboring cell list of the target cell, a proper neighboring cell on which an auxiliary measurement needs to be performed.
  • the criterion for selecting a neighboring cell is not limited. For example, a large quantity of UEs are handed over to a neighboring cell of the target cell during a recent period of time.
  • the neighboring cell and the target cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • the OAM sends a request message to the selected neighboring cell through a network management interface, where the request message includes one or more pieces of the following information: an identifier of the target cell, a longest measurement period, and a measurement item requested to be performed.
  • the request message in this embodiment is exemplarily a "cell outage measurement request".
  • the "cell outage measurement request” carries an identifier of the target cell (mandatory), a measurement item requested to be performed (optional, including a performance measurement of the target cell, a measurement performed by a UE in the target cell, and the like), and a longest measurement period (mandatory).
  • the "cell outage measurement request" message may be implemented by using a specific operation message (for example, a "cell outage measurement” message) in a newly defined interface integration reference point (Interface Integration Reference Point, Interface IRP) of a northbound interface, or by adding a corresponding attribute to a cell object defined in an existing EUTRAN NRM IRP.
  • a specific operation message for example, a "cell outage measurement” message
  • a newly defined interface integration reference point Interface Integration Reference Point, Interface IRP
  • 405 to 409 illustrated in FIG. 4 are similar to 304 to 308 illustrated in FIG. 3 respectively, and therefore are not repeated here.
  • the eNB2 returns a reply message to the OAM through a network management interface, where the reply message carries information obtained by a neighboring cell through auxiliary measurement and used to determine whether an outage occurs in the target cell, for example, qualitative information: an outage or non-outage of the target cell.
  • the foregoing reply message is exemplarily a "cell outage measurement reply”.
  • the "cell outage measurement reply" message may be implemented by using a specific operation message (for example, a "cell outage measurement” message) in a newly defined interface integration reference point (Interface IRP) of a northbound interface, or by adding an attribute of a corresponding qualitative result to a cell object defined in an existing EUTRAN NRM IRP.
  • the OAM finally determines whether an outage occurs in the target cell by combining the cell outage measurement results (the qualitative information) reported by selected neighboring cells. For example, if all the selected neighboring cells return an indication of "target cell outage", the OAM determines that an outage occurs in the target cell and sends a corresponding alarm, for example, "target cell outage”. Then, the process ends.
  • the embodiment of the present invention provides a method where the base station initiates outage cell auxiliary measurements to selected neighboring cells on demand when the base station preliminarily discovers a possible outage of the target cell.
  • the neighboring cells monitor UEs in performing auxiliary measurements on signal quality of the target cell and/or performance measurement indicators of the neighboring cells, thereby further enhancing the accuracy of an outage cell detection judgment.
  • on demand on demand means that the trigger is an event that the base station preliminarily discovers a possible outage of the target cell.
  • Measurement tasks of UEs in the neighboring cells do not impose heavy data load on an air interface, and the UEs can transfer required measurement data to a network quickly and efficiently.
  • FIG. 5 is schematic structural block diagram of a base station according to an embodiment of the present invention.
  • the base station 500 illustrated in FIG. 5 is a controlling base station of a first cell and may be configured to implement operations of the controlling base station of the first cell in all the foregoing method embodiments. For details about the specific operation processes, reference may be made to the foregoing method embodiments, and details are not further described in this embodiment.
  • the base station 500 includes a first receiving unit 501, a selecting unit 502, a second receiving unit 503, a generating unit 504, and a sending unit 505.
  • the first receiving unit 501 receives a request message, where the request message is used to request an outage measurement on a second cell, where the foregoing first cell is a neighboring cell of the second cell; the selecting unit 502 selects, according to the foregoing request message, a user equipment in the first cell to measure the second cell; the second receiving unit 503 receives measurement information obtained by the user equipment by measuring the second cell; the generating unit 504 generates, according to the measurement information, information used to determine whether an outage occurs in the second cell; and the sending unit 505 sends a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • the foregoing request message may be initiated by a controlling base station of the second cell (that is, the target cell).
  • the first receiving unit 501 is further configured to receive the request message sent by the controlling base station of the second cell; and the sending unit 505 is further configured to send the reply message to the controlling base station of the second cell.
  • the foregoing request message may be coordinated by a network management system independent of a base station on a unified basis for implementation of auxiliary measurement processes of neighboring cells.
  • the first receiving unit 501 is further configured to receive the foregoing request message sent by the network management system; and the first sending unit 505 is further configured to send the foregoing reply message to the network management system.
  • the selecting unit 502 is further configured to select, from the first cell, a user equipment adjacent to the cell edge of the second cell to measure the second cell.
  • the base station 500 further includes: an acquiring unit 506, configured to acquire handover performance measurement information of the second cell, where the handover performance measurement information of the second cell includes one or more pieces of the following information: the number of handover requests with respect to the second cell, the number of successful handovers with respect to the second cell, a disconnection/call drop rate of the second cell.
  • the generating unit 504 generates, according to the foregoing measurement information and the handover performance measurement information of the second cell, the information used to determine whether an outage occurs in the second cell.
  • the first receiving unit 501, the second receiving unit 503, the second receiving unit 503, and the sending unit 505 may be integrated in a transceiver device, or they may be different receiving interfaces and sending interfaces.
  • the selecting unit 502 and the generating unit 504 each may be a processor.
  • FIG. 6 is schematic structural block diagram of a network device according to an embodiment of the present invention.
  • the network device 600 illustrated in FIG. 6 includes a sending unit 601, a first receiving unit 602, and a processing unit 603.
  • the sending unit 601 sends a request message to a controlling base station of a first cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell;
  • the first receiving unit 602 receives a reply message sent by the controlling base station of the first cell, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • the processing unit 603 determines, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  • the network device 600 may be a controlling base station of the second cell, and can perform operations of the controlling base station of the second cell in the foregoing method embodiments.
  • the network device 600 may be a controlling base station of the second cell, and can perform operations of the controlling base station of the second cell in the foregoing method embodiments.
  • the network device 600 may also be a network management system, and can perform operations of the network management system in the foregoing method embodiments.
  • the network management system in the foregoing method embodiments.
  • the network device 600 further includes a second receiving unit 604 and a generating unit 605.
  • the second receiving unit 604 receives indication information sent by the controlling base station of the second cell, where the indication information is used to indicate that the second cell becomes a potential outage cell; and the generating unit 605 generates, according to the foregoing indication information, the request message used to request an outage measurement on the second cell.
  • the request message sent by the sending unit 601 in each of the foregoing embodiments includes one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  • the sending unit 601, the first receiving unit 602, and the second receiving unit 604 may be integrated in a transceiver device, or they may be different receiving interfaces and sending interfaces.
  • the processing unit 603 and the generating unit 605 each may be a processor.
  • An embodiment of the present invention also provides a communication system, where the communication system may include the base station provided in the embodiment illustrated in FIG. 5 and the network device provided in the embodiment illustrated in FIG. 6 .
  • the communication system may further include a user equipment in a cell controlled by the base station illustrated in FIG. 5 .
  • a user equipment in a neighboring cell measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment.
  • the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • the disclosed system, apparatus, and method may be implemented in other manners.
  • the described apparatus embodiment is merely exemplary.
  • the unit division is merely logical function division and may be other division in actual implementation.
  • a plurality of units or components may be combined or integrated into another system, or some features may be ignored or not performed.
  • the displayed or discussed mutual couplings or direct couplings or communication connections may be implemented through some interfaces.
  • the indirect couplings or communication connections between the apparatuses or units may be implemented in electronic, mechanical or other forms.
  • the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one position, or may be distributed on a plurality of network units. A part or all of the units may be selected according to actual needs to achieve the objectives of the solutions of the embodiments.
  • functional units in the embodiments of the present invention may be integrated into one processing unit, or each of the units may exist alone physically, or two or more units are integrated into one unit.
  • the integrated unit may be implemented in a form of hardware, or may be implemented in a form of a software functional unit.
  • the integrated unit When the integrated unit is implemented in a form of a software functional unit and sold or used as an independent product, the integrated unit may be stored in a computer-readable storage medium.
  • the computer software product is stored in a storage medium, and includes several instructions for instructing a computer device (which may be a personal computer, a server, or a network device) to perform all or a part of the steps of the methods described in the embodiments of the present invention.
  • the foregoing storage medium includes: any medium that can store program code, such as a USB flash disk, a removable hard disk, a read-only memory (Read-Only Memory, ROM), a random access memory (Random Access Memory, RAM), a magnetic disk, or an optical disk.
  • program code such as a USB flash disk, a removable hard disk, a read-only memory (Read-Only Memory, ROM), a random access memory (Random Access Memory, RAM), a magnetic disk, or an optical disk.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Embodiments of the present invention provide a method and a device for cell outage detection. The method includes: receiving, by a controlling base station of a first cell, a request message, where the request message is used to request an outage measurement on a second cell, where the first cell is a neighboring cell of the second cell; selecting, by the controlling base station of the first cell according to the request message, a user equipment in the first cell to measure the second cell; receiving, by the controlling base station of the first cell, measurement information obtained by the user equipment by measuring the second cell, and generating, according to the measurement information, information used to determine whether an outage occurs in the second cell; and sending, by the controlling base station of the first cell, a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell. By using the foregoing technical solutions, a neighboring cell implements an auxiliary measurement for outage cell detection, thereby increasing the efficiency and accuracy of outage cell detection.

Description

  • This application claims priority to Chinese Patent Application No. 201110099309.7 , filed with the Chinese Patent Office on April 20, 2011 and entitled "METHOD AND DEVICE FOR CELL OUTAGE DETECTION", which is incorporated herein by reference in its entirety.
  • TECHNICAL FIELD
  • Embodiments of the present invention relate to the field of wireless communications, and in particular, to a method and a device for cell outage detection.
  • BACKGROUND
  • A self-organizing network (Self-Organizing Network, SON) is a critical type of standardization work engaged by a 3rd generation partnership project (The 3rd Generation Partnership Project, 3GPP) standard organization in an R8/9/10 working period, and its core idea is to reduce traditional manual operations by using an automation process at phases of network planning, deployment, optimization, and maintenance, and to reduce maintenance costs of network operators.
  • A communication cell has an abnormal working state. A cell in this state is unable to provide normal communication services, and a user equipment (User Equipment, UE) residing in this cell cannot establish a communication connection, or a user equipment in an ongoing communication in this cell is disconnected due to the lack of ability to maintain the communication connection. In addition, a cell is in this abnormal working state not because an energy-saving operation is performed in the cell but because a severe failure occurs in the cell. Cells in this case are called outage cells. A system needs a capability of cell outage detection automatically to trigger an outage cell recovery operation or an energy-saving cell deactivating operation, to make the cell return to a normal working state. This automation process of cell outage detection belongs to a self healing (Self Healing, SH) category of the self-organizing network.
  • Currently, most of methods for cell outage detection are implemented inside a base station. Cyclic detection is performed on specific software and hardware inside the base station, an external power supply system or network connections to determine whether a cell outage failure occurs, and the base station reports a cell outage alarm. This method is strongly correlated with the implementation of the base station, and is limited to the base station only. Another enhanced method is that a network management system periodically collects key performance indicators (Key Performance Indicators, KPIs) and/or performance measurements (PM, Performance Measurements) of the cell; if a performance indicator, such as a radio resource control (Radio Resource Control, RRC) connection setup success rate, or a disconnection or call drop rate (hereinafter referred to as "disconnection/call drop rate") of the cell exceeds a preset threshold within one or several reporting periods, the network management system considers that an outage failure occurs in the cell. These methods all consider the base station only, which may lead to a consequence that a cell has been in an outage state for a long time without being known, so that the time used to determine an outage cell is prolonged or the probability of misjudging an outage cell is increased, thereby greatly degrading the service experience of a user.
  • SUMMARY
  • Embodiments of the present invention provide a method and a device for cell outage detection, so that an outage cell can be detected on a real-time basis.
  • In one aspect, the present invention provides a method for cell outage detection, including: receiving, by a controlling base station of a first cell, a request message, where the request message is used to request an outage measurement on a second cell, where the first cell is a neighboring cell of the second cell; selecting, by the controlling base station of the first cell according to the request message, a user equipment in the first cell to measure the second cell; receiving, by the controlling base station of the first cell, measurement information obtained by the user equipment by measuring the second cell, and generating, according to the measurement information, information used to determine whether an outage occurs in the second cell; and sending, by the controlling base station of the first cell, a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • In another aspect, the present invention provides a method for cell outage detection, including: sending a request message to a controlling base station of a first cell when a second cell becomes a potential outage cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell; receiving a reply message sent by the controlling base station of the first cell, where the reply message includes the information used to determine whether an outage occurs in the second cell; and determining, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  • In another aspect, the present invention provides a base station, where the base station is a controlling base station of a first cell and includes: a fist receiving unit, configured to receive a request message, where the request message is used to request an outage measurement on a second cell, where the first cell is a neighboring cell of the second cell; a selecting unit, configured to select, according to the request message, a user equipment which is in the first cell and measures the second cell; a second receiving unit, configured to receive measurement information obtained by the user equipment by measuring the second cell; a generating unit, configured to generate, according to the measurement information, information used to determine whether an outage occurs in the second cell; and a sending unit, configured to send a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • In another aspect, the present invention provides a network device, including: a sending unit, configured to: send a request message to a controlling base station of a first cell when a second cell becomes a potential outage cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell; a first receiving unit, configured to receive a reply message sent by the controlling base station of the first cell, where the reply message includes the information used to determine whether an outage occurs in the second cell; and a processing unit, configured to determine, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  • In the embodiments of the present invention, a user equipment of the first cell (that is, a neighboring cell of the second cell) measures the second cell (that is, the target cell), and the controlling base station of the first cell returns, according to the measurement result of the user equipment, information used to determine whether an outage occurs in the second cell. In this way, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell is implemented in real time, thereby increasing the efficiency and accuracy of outage cell detection.
  • BRIEF DESCRIPTION OF DRAWINGS
  • To illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings required for describing the embodiments or the prior art. Apparently, the accompanying drawings in the following description show merely some embodiments of the present invention, and a person of ordinary skill in the art may still derive other drawings from these accompanying drawings without creative efforts.
    • FIG. 1 is a flowchart schematic of a method for cell outage detection according to an embodiment of the present invention;
    • FIG. 2 is a flowchart schematic of a method for cell outage detection according to another embodiment of the present invention;
    • FIG. 3 is a flowchart schematic of a process of cell outage detection according to an embodiment of the present invention;
    • FIG. 4 is a flowchart schematic of a process of cell outage detection according to another embodiment of the present invention;
    • FIG. 5 is schematic block structural diagram of a base station according to an embodiment of the present invention; and
    • FIG. 6 is schematic block structural diagram of a network device according to an embodiment of the present invention.
    DESCRIPTION OF EMBODIMENTS
  • The following clearly and completely describes the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Apparently, the described embodiments are merely a part rather than all of the embodiments of the present invention. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
  • The technical solutions of the present invention may be applied to various communication systems, for example, a global system of mobile communication (Global System of Mobile communication, GSM) system, a code division multiple access (Code Division Multiple Access, CDMA) system, a wideband code division multiple access wireless (Wideband Code Division Multiple Access Wireless, WCDMA) system, a time division-synchronous code division multiple access (Time Division-Synchronous Code Division Multiple Access, TD-SCDMA) system, a general packet radio service (General Packet Radio Service, GPRS) system, a long term evolution (Long Term Evolution, LTE) system, and the like.
  • A user equipment (User Equipment, UE) in the embodiments of the present invention may be a mobile terminal (Mobile Terminal) that can communicate with one or multiple core networks through a radio access network (Radio Access, RAN Network). The mobile terminal may be a mobile phone (or called a "cellular" phone), or a computer equipped with a mobile terminal, for example, a portable, pocket, handheld, computer-embedded, or vehicle-mounted mobile device, which exchanges speeches and/or data with the radio access network.
  • A base station in the embodiments of the present invention may be a base station (Base Transceiver Station, BTS) in GSM or CDMA, or a base station (NodeB) in WCDMA or TD-SCDMA, or an evolved base station (evolved Node B, eNB or e-NodeB) in LTE, which is not limited by the present invention.
  • Detection of an outage cell is a complex function involving collection of a plurality of aspects of information and comprehensive judgment. To increase the accuracy of detection, information assisting in judgment making needs to be increased from different aspects to reduce the probability of misjudgment. A method for cell outage detection provided in an embodiment of the present invention is as follows: a target cell (that is, a cell where a cell outage measurement needs to be performed) initiates an auxiliary measurement to a neighboring cell on demand (on demand), and whether an outage occurs in the target cell is determined according to an auxiliary measurement result of the neighboring cell. This method is triggered under the premise that a controlling base station of the target cell determines preliminarily, according to information collected by the controlling base station, that an outage failure may probably occur in the target cell, that is, the target cell becomes a potential outage cell.
  • FIG. 1 is a flowchart schematic of a method for cell outage detection according to an embodiment of the present invention. In this embodiment, a first cell and a second cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • 101. A controlling base station of the first cell receives a request message, where the request message is used to request an outage measurement on the second cell, where the first cell is a neighboring cell of the second cell.
  • 102. The controlling base station of the first cell selects, according to the request message, a user equipment in the first cell to measure the second cell.
  • 103. The controlling base station of the first cell receives measurement information obtained by the user equipment by measuring the second cell, and generates, according to the measurement information, information used to determine whether an outage occurs in the second cell.
  • 104. The controlling base station of the first cell sends a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • In each embodiment of the present invention, because the second cell is the target of the outage measurement, that is, cell outage detection needs to be performed on the second cell, the second cell may also be called a "target cell"; and because the first cell is a neighboring cell of the second cell, the first cell may be called a "neighboring cell" or a "neighboring cell".
  • Alternatively, as an embodiment, the foregoing request message may be initiated by a controlling base station of the foregoing second cell (that is, the target cell). For example, in 101, the controlling base station of the first cell receives the foregoing request message sent by the controlling base station of the second cell; and in 104, the controlling base station of the first cell sends the foregoing reply message to the controlling base station of the second cell.
  • Alternatively, as another embodiment, the foregoing request message may also be coordinated by a network management system independent of a base station for implementation of auxiliary measurement processes of neighboring cells. For example, an operation, administration, and maintenance (Operations Administration and Maintenance, OAM) system coordinates auxiliary measurement processes of neighboring cells on a unified basis in outage cell detection. For example, in 101, the controlling base station of the first cell receives the foregoing request message sent by a network management system; and in 104, the controlling base station of the first cell sends the foregoing reply message to the foregoing network management system.
  • Alternatively, as an embodiment, the request message in each of the foregoing embodiments may include one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  • Alternatively, as an embodiment, in each of the foregoing embodiments, the controlling base station of the first cell may select, from the first cell, a user equipment adjacent to the cell edge of the second cell to measure the second cell.
  • Alternatively, as an embodiment, in each of the foregoing embodiments, the controlling base station of the first cell may further acquire handover performance measurement information of the second cell, where the handover performance measurement information of the second cell includes one or more pieces of the following information: the number of handover requests with respect to the second cell, the number of successful handovers with respect to the second cell, a disconnection/call drop rate of the second cell. The controlling base station of the first cell further generates, according to the foregoing measurement information and the handover performance measurement information of the second cell, the information used to determine whether an outage occurs in the second cell. When the controlling base station of the first cell generates the information used to determine whether an outage occurs in the second cell, on the basis of consideration of the measurement information reported by the user equipment in the first cell, the controlling base station of the first cell further considers the handover performance measurement information of the second cell. Therefore, the generated information used to determine whether an outage occurs in the second cell is more accurate.
  • Alternatively, as an embodiment, in each of the foregoing embodiments, the measurement information obtained by the user equipment by measuring the second cell includes measurement information obtained by the user equipment by measuring a reference signal receiving power signal of the second cell or measurement information obtained by the user equipment by detecting an uplink channel and a downlink channel of the second cell.
  • In the embodiment of the present invention, a user equipment in a neighboring cell (that is, the first cell) measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment. In this way, the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • FIG. 2 is a flowchart schematic of a method for cell outage detection according to another embodiment of the present invention. In this embodiment, a first cell and a second cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • 201. Send a request message to a controlling base station of the first cell when the second cell becomes a potential outage cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell.
  • 202. Receive a reply message sent by the controlling base station of the first cell, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • 203. Determine, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  • Alternatively, as an embodiment, the foregoing 201 to 203 may be performed by the controlling base station of the second cell (that is, a target cell).
  • Alternatively, as another embodiment, the foregoing 201 to 203 may also be performed by a network management system. If the foregoing 201 to 203 are performed by the network management system, alternatively, the method embodiment illustrated in FIG. 2 further includes: receiving, by the network management system, indication information sent by the controlling base station of the second cell, where the indication information is used to indicate that the second cell becomes a potential outage cell; generating, by the network management system according to the indication information, a request message used to request an outage measurement on the second cell.
  • Alternatively, as an embodiment, the request message in each of the foregoing embodiments includes one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  • In the embodiment of the present invention, a user equipment in a neighboring cell (that is, the first cell) measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment. In this way, the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • FIG. 3 is a flowchart schematic of a process of cell outage detection according to an embodiment of the present invention. In the embodiment illustrated in FIG. 3, eNB 1 refers to a controlling base station of a target cell, eNB2 refers to a controlling base station of a neighboring cell of the target cell, and UE refers to a user equipment in the neighboring cell. The target cell in this embodiment corresponds to the second cell in the foregoing embodiment, and the neighboring cell (hereinafter referred to as "neighboring cell") of the target cell corresponds to the first cell in the foregoing embodiment.
  • It should be noted that mark numbers illustrated in FIG. 6 set no limitation to the scope of the embodiment of the present invention. For example, the controlling base station of the neighboring cell and the controlling base station of the target cell may belong to different systems, for example, one is an eNB, and the other is a NodeB. The neighboring cell and the target cell may be intra-frequency cells, inter-frequency cells or inter-system cells. In addition, although only one neighboring cell is illustrated in FIG. 3 for conciseness, the embodiment of the present invention is not limited thereto. The target cell may be measured by using user equipments in multiple neighboring cells. In addition, although only one UE in the neighboring cell is illustrated in FIG. 3 for conciseness, the embodiment of the present invention is not limited thereto. The target cell may be measured by using multiple UEs in the neighboring cell. All these variations shall fall into the scope of the embodiment of the present invention.
  • FIG. 3 is a process of cell outage detection under a distributed architecture. The process of cell outage detection is initiated by the controlling base station eNB1 of the target cell, and an auxiliary measurement task request is initiated to selected neighboring cells through a network interface (for example, an X2 interface). A controlling base station (that is, the eNB2) of each selected neighboring cell returns an execution result of a measurement task to the eNB1, and the eNB1 makes an outage detection judgment on the target cell according to a comprehensive result. If determining that a cell outage occurs in the target cell, the controlling base station eNB1 of the target cell generates a cell outage alarm.
  • 301. The eNB1 determines that the target cell is a potential outage cell. For example, the eNB 1 detects, by using an internal detection mechanism, that traffic of the target cell is 0 within a set reporting period. Specifically, whether the traffic of the cell is 0 may be determined comprehensively by measuring indicators of the cell in a reporting period such as the number of RRC connection attempts, an RRC connection setup success rate, the number of radio access bearer (Radio Access Bearer, RAB) setup attempts, an RAB setup success rate, the number of active users, a wireless call drop/disconnection rate. In this case, the eNB 1 may generate an alarm or a notification indicating that the target cell becomes a potential outage cell, for example, "target cell unavailable".
  • 302. The eNB1 selects, from a neighboring cell list of the target cell, a proper neighboring cell on which an auxiliary measurement needs to be performed. The criterion for selecting a neighboring cell is not limited. For example, a large quantity of UEs are handed over to a neighboring cell of the target cell during a recent period of time. The neighboring cell and the target cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • 303. The eNB1 sends a request message to a controlling base station eNB2 of the selected neighboring cell through an X2 interface or an inter-system network interface, where the request message includes one or more pieces of the following information: an identifier of the target cell, a longest measurement period, and a measurement item requested to be performed. The foregoing request message in this embodiment is exemplarily a "cell outage measurement request". For example, the "cell outage measurement request" may carry an identifier of the target cell (mandatory), a measurement item requested to be performed (optional, including a performance measurement of the target cell, a measurement performed by a UE in the target cell, and the like), and a longest measurement period (mandatory).
  • 304. After receiving the foregoing "cell outage measurement request", the eNB2 selects a UE in the neighboring cell to implement an auxiliary outage measurement process on the target cell. The eNB selects a proper UE (for example, a UE located adjacent to a cell edge of the target cell), so that the UE performs a specified measurement item on the target cell in a specified period.
  • 305. The selected UE in the neighboring cell performs a measurement process on the target cell. The measurement process includes but is not limited to: (a) measuring a reference signal receiving power (Reference Signal Receiving Power, RSRP) signal of the target cell; and (b) detecting an uplink channel and a downlink channel of the target cell, for example, checking the random access of the UE. An existing RRC message may be used as a signaling message of an air interface, for example, a radio bearer reconfiguration or physical channel reconfiguration process with a new information element added to a process message; or a new RRC message may be added to carry an information element required for the UE in the neighboring cell to perform auxiliary outage detection on the target cell.
  • 306. Return information of the measurement performed by the UE in the specified period to the eNB2 through an air interface, where an existing RRC message may be used as a signaling message of the air interface.
  • 307. The eNB2 further monitors the performance measurement item of the target cell to obtain handover performance measurement information of the target cell. The handover performance measurement information of the target cell includes one or more pieces of the following information: the number of handover requests with respect to the target cell, the number of successful handovers with respect to the target cell, and a disconnection/call drop rate of the target cell. For example, handover performance indicators of handover of the UE in the neighboring cell to the target cell include the number of attempts of handover to the target cell and a handover success rate within a set monitoring period. In FIG. 3, 307 is displayed after 304 to 306, but the embodiment of the present invention is not limited thereto. 307 may be performed before 304 to 306, or be performed concurrently with 304 to 306. 307 is an optional step.
  • 308. The eNB2 generates, by using the measurement information returned by the UE, information used to determine whether an outage occurs in the target cell. If 307 is performed, the eNB2 generates, according to the foregoing measurement information and handover performance measurement information of the target cell, information used to determine whether an outage occurs in the target cell.
  • For example, so long as one UE includes the identifier of the target cell and a normal measured value (for example, an RSRP value) of the specified measurement item of the cell in a measurement result carried in the returned message, the neighboring cell ends the auxiliary measurement, and generates qualitative information used to determine that the target cell is a "non-outage" cell. If all selected UEs include the identifier of the target cell and an abnormal measured value (for example, an RSRP value) of the specified measurement item of the cell in a measurement result carried in the message returned after the expiration of the measurement period, the neighboring cell ends the auxiliary measurement, and generates qualitative information used to determine that the target cell is an "outage" cell. If the eNB2 further monitors the performance measurement item of the cell (same as 307), then in 308, the eNB2 may generate qualitative information according to the performance measurement item and the measurement information returned by the UE. For example, if a performance measurement indicator is 0 or close to 0 and the measurement result of the UE indicates qualitatively that the target cell is an "outage" cell, the eNB2 accordingly generates qualitative information used to determine that the target cell is an "outage" cell.
  • 309. The eNB2 returns a "cell outage measurement reply" message to the eNB1 through the X2 interface or the inter-system network interface. The cell outage measurement reply message carries qualitative information of the auxiliary measurement of the neighboring cell, for example, outage or non-outage of the target cell.
  • 310. The NB1 finally determines whether an outage occurs in the target cell by combining the cell outage measurement results (the qualitative information) reported by selected neighboring cells. For example, if all the selected neighboring cells return an indication indicating that an outage occurs in the target cell, the eNB1 determines that an outage occurs in the target cell and sends a corresponding alarm, for example, "target cell outage". Then, the process ends.
  • In the embodiment of the present invention, a user equipment in a neighboring cell (that is, the first cell) measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment. In this way, the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • FIG. 4 is a flowchart schematic of a process of cell outage detection according to another embodiment of the present invention. In the embodiment illustrated in FIG. 4, a network management system is exemplarily an OAM, eNB1 refers to a controlling base station of a target cell, eNB2 refers to a controlling base station of a neighboring cell of the target cell, and UE refers to a user equipment in the neighboring cell. The OAM may be a network management system of a vendor, for example, an element management system (Element Management System, EMS), or an integrated network management system of an operator, for example, a network management system (Network Management System, NMS). The target cell in this embodiment corresponds to the second cell in the foregoing embodiment, and the neighboring cell (hereinafter referred to as "neighboring cell") of the target cell corresponds to the first cell in the foregoing embodiment.
  • FIG. 4 is a process of cell outage detection under a centralized architecture, where a network management system independent of a base station coordinates auxiliary measurement processes on a unified basis. The controlling base station eNB 1 of the target cell preliminarily determines that the target cell is a potential outage cell and sends a corresponding alarm to the OAM; the OAM checks a neighboring cell list of the target cell, selects proper neighboring cells, and initiates an auxiliary measurement task request to the selected neighboring cells through a network management interface. Each of the selected neighboring cells returns an execution result of a measurement task to the OAM, and the OAM makes an outage detection judgment on the target cell according to a comprehensive result. If determining that a cell outage occurs in the target cell, the OAM sends a target cell outage alarm.
  • 401. Same as 301 in FIG. 3, the eNB1 determines that a target cell is a potential outage cell. For example, the eNB1 detects, by using an internal detection mechanism, that traffic of the target cell is 0 within a set reporting period. Specifically, whether the traffic of the cell is 0 may be determined comprehensively by measuring indicators of the cell in a period such as the number of RRC connection attempts, an RRC connection setup success rate, the number of RAB setup attempts, an RAB setup success rate, the number of active users, a wireless call drop/disconnection rate.
  • 402. The eNB1 sends, to the OAM, an alarm or a notification indicating that the target cell becomes a potential outage cell, for example, "target cell unavailable".
  • 403. The OAM selects, from a neighboring cell list of the target cell, a proper neighboring cell on which an auxiliary measurement needs to be performed. The criterion for selecting a neighboring cell is not limited. For example, a large quantity of UEs are handed over to a neighboring cell of the target cell during a recent period of time. The neighboring cell and the target cell may be intra-frequency cells, inter-frequency cells or inter-system cells.
  • 404. The OAM sends a request message to the selected neighboring cell through a network management interface, where the request message includes one or more pieces of the following information: an identifier of the target cell, a longest measurement period, and a measurement item requested to be performed. The request message in this embodiment is exemplarily a "cell outage measurement request". For example, the "cell outage measurement request" carries an identifier of the target cell (mandatory), a measurement item requested to be performed (optional, including a performance measurement of the target cell, a measurement performed by a UE in the target cell, and the like), and a longest measurement period (mandatory). If the OAM is an NMS, the "cell outage measurement request" message may be implemented by using a specific operation message (for example, a "cell outage measurement" message) in a newly defined interface integration reference point (Interface Integration Reference Point, Interface IRP) of a northbound interface, or by adding a corresponding attribute to a cell object defined in an existing EUTRAN NRM IRP.
  • 405 to 409 illustrated in FIG. 4 are similar to 304 to 308 illustrated in FIG. 3 respectively, and therefore are not repeated here.
  • 410. The eNB2 returns a reply message to the OAM through a network management interface, where the reply message carries information obtained by a neighboring cell through auxiliary measurement and used to determine whether an outage occurs in the target cell, for example, qualitative information: an outage or non-outage of the target cell. In this embodiment, the foregoing reply message is exemplarily a "cell outage measurement reply". If the OAM is an NMS, the "cell outage measurement reply" message may be implemented by using a specific operation message (for example, a "cell outage measurement" message) in a newly defined interface integration reference point (Interface IRP) of a northbound interface, or by adding an attribute of a corresponding qualitative result to a cell object defined in an existing EUTRAN NRM IRP.
  • 411. The OAM finally determines whether an outage occurs in the target cell by combining the cell outage measurement results (the qualitative information) reported by selected neighboring cells. For example, if all the selected neighboring cells return an indication of "target cell outage", the OAM determines that an outage occurs in the target cell and sends a corresponding alarm, for example, "target cell outage". Then, the process ends.
  • Therefore, the embodiment of the present invention provides a method where the base station initiates outage cell auxiliary measurements to selected neighboring cells on demand when the base station preliminarily discovers a possible outage of the target cell. The neighboring cells monitor UEs in performing auxiliary measurements on signal quality of the target cell and/or performance measurement indicators of the neighboring cells, thereby further enhancing the accuracy of an outage cell detection judgment. In another aspect, on demand (on demand) means that the trigger is an event that the base station preliminarily discovers a possible outage of the target cell. Measurement tasks of UEs in the neighboring cells do not impose heavy data load on an air interface, and the UEs can transfer required measurement data to a network quickly and efficiently.
  • FIG. 5 is schematic structural block diagram of a base station according to an embodiment of the present invention. The base station 500 illustrated in FIG. 5 is a controlling base station of a first cell and may be configured to implement operations of the controlling base station of the first cell in all the foregoing method embodiments. For details about the specific operation processes, reference may be made to the foregoing method embodiments, and details are not further described in this embodiment. The base station 500 includes a first receiving unit 501, a selecting unit 502, a second receiving unit 503, a generating unit 504, and a sending unit 505.
  • The first receiving unit 501 receives a request message, where the request message is used to request an outage measurement on a second cell, where the foregoing first cell is a neighboring cell of the second cell; the selecting unit 502 selects, according to the foregoing request message, a user equipment in the first cell to measure the second cell; the second receiving unit 503 receives measurement information obtained by the user equipment by measuring the second cell; the generating unit 504 generates, according to the measurement information, information used to determine whether an outage occurs in the second cell; and the sending unit 505 sends a reply message, where the reply message includes the information used to determine whether an outage occurs in the second cell.
  • Alternatively, as an embodiment, the foregoing request message may be initiated by a controlling base station of the second cell (that is, the target cell). The first receiving unit 501 is further configured to receive the request message sent by the controlling base station of the second cell; and the sending unit 505 is further configured to send the reply message to the controlling base station of the second cell.
  • Alternatively, as another embodiment, the foregoing request message may be coordinated by a network management system independent of a base station on a unified basis for implementation of auxiliary measurement processes of neighboring cells. The first receiving unit 501 is further configured to receive the foregoing request message sent by the network management system; and the first sending unit 505 is further configured to send the foregoing reply message to the network management system.
  • Alternatively, as an embodiment, in each of the foregoing embodiments, the selecting unit 502 is further configured to select, from the first cell, a user equipment adjacent to the cell edge of the second cell to measure the second cell.
  • Alternatively, as an embodiment, in each of the foregoing embodiments, the base station 500 further includes: an acquiring unit 506, configured to acquire handover performance measurement information of the second cell, where the handover performance measurement information of the second cell includes one or more pieces of the following information: the number of handover requests with respect to the second cell, the number of successful handovers with respect to the second cell, a disconnection/call drop rate of the second cell. The generating unit 504 generates, according to the foregoing measurement information and the handover performance measurement information of the second cell, the information used to determine whether an outage occurs in the second cell.
  • The first receiving unit 501, the second receiving unit 503, the second receiving unit 503, and the sending unit 505 may be integrated in a transceiver device, or they may be different receiving interfaces and sending interfaces. The selecting unit 502 and the generating unit 504 each may be a processor.
  • FIG. 6 is schematic structural block diagram of a network device according to an embodiment of the present invention. The network device 600 illustrated in FIG. 6 includes a sending unit 601, a first receiving unit 602, and a processing unit 603.
  • When a second cell becomes a potential outage cell, the sending unit 601 sends a request message to a controlling base station of a first cell, where the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, where the first cell is a neighboring cell of the second cell; The first receiving unit 602 receives a reply message sent by the controlling base station of the first cell, where the reply message includes the information used to determine whether an outage occurs in the second cell. The processing unit 603 determines, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  • Alternatively, as an embodiment, the network device 600 may be a controlling base station of the second cell, and can perform operations of the controlling base station of the second cell in the foregoing method embodiments. For details about the specific operations, reference may be made to the foregoing method embodiments, and details are not further described here.
  • Alternatively, as an embodiment, the network device 600 may also be a network management system, and can perform operations of the network management system in the foregoing method embodiments. For details about the specific operations, reference may be made to the foregoing method embodiments, and details are not further described here.
  • If the network device is a network management system, the network device 600 further includes a second receiving unit 604 and a generating unit 605. The second receiving unit 604 receives indication information sent by the controlling base station of the second cell, where the indication information is used to indicate that the second cell becomes a potential outage cell; and the generating unit 605 generates, according to the foregoing indication information, the request message used to request an outage measurement on the second cell.
  • Alternatively, as an embodiment, the request message sent by the sending unit 601 in each of the foregoing embodiments includes one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  • The sending unit 601, the first receiving unit 602, and the second receiving unit 604 may be integrated in a transceiver device, or they may be different receiving interfaces and sending interfaces. The processing unit 603 and the generating unit 605 each may be a processor.
  • An embodiment of the present invention also provides a communication system, where the communication system may include the base station provided in the embodiment illustrated in FIG. 5 and the network device provided in the embodiment illustrated in FIG. 6. The communication system may further include a user equipment in a cell controlled by the base station illustrated in FIG. 5.
  • By using the device and the system provided in the embodiments illustrated in FIG. 5 and FIG. 6, a user equipment in a neighboring cell (that is, the first cell) measures the target cell (that is, the second cell), and the controlling base station of the neighboring cell returns information used to determine whether an outage occurs in the target cell to the target cell according to a measurement result of the user equipment. In this way, the target cell implements, by using an auxiliary measurement result of the neighboring cell, outage detection on the target cell on a real-time basis, thereby increasing the efficiency and accuracy of outage cell detection.
  • A person of ordinary skill in the art may appreciate that, in combination with the examples described in the embodiments disclosed in this specification, units and algorithm steps may be implemented by electronic hardware, computer software, or a combination thereof. In order to clearly describe the interchangeability between the hardware and the software, the foregoing has generally described compositions and steps of every embodiment according to functions. Whether the functions are performed by hardware or software depends on particular applications and design constraint conditions of the technical solutions. A person skilled in the art may use different methods to implement the described functions for each particular application, but it should not be considered that the implementation goes beyond the scope of the present invention.
  • It may be clearly understood by a person skilled in the art that, for the purpose of convenient and brief description, for the detailed working processes of the foregoing system, apparatus, and unit, reference may be made to the corresponding processes in the foregoing method embodiments, and the details are not described herein again.
  • In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus, and method may be implemented in other manners. For example, the described apparatus embodiment is merely exemplary. For example, the unit division is merely logical function division and may be other division in actual implementation. For example, a plurality of units or components may be combined or integrated into another system, or some features may be ignored or not performed. In addition, the displayed or discussed mutual couplings or direct couplings or communication connections may be implemented through some interfaces. The indirect couplings or communication connections between the apparatuses or units may be implemented in electronic, mechanical or other forms.
  • The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one position, or may be distributed on a plurality of network units. A part or all of the units may be selected according to actual needs to achieve the objectives of the solutions of the embodiments.
  • In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each of the units may exist alone physically, or two or more units are integrated into one unit. The integrated unit may be implemented in a form of hardware, or may be implemented in a form of a software functional unit.
  • When the integrated unit is implemented in a form of a software functional unit and sold or used as an independent product, the integrated unit may be stored in a computer-readable storage medium. Based on such understanding, the technical solutions of the present invention essentially, or the part contributing to the prior art, or all or a part of the technical solutions may be implemented in a form of a software product. The computer software product is stored in a storage medium, and includes several instructions for instructing a computer device (which may be a personal computer, a server, or a network device) to perform all or a part of the steps of the methods described in the embodiments of the present invention. The foregoing storage medium includes: any medium that can store program code, such as a USB flash disk, a removable hard disk, a read-only memory (Read-Only Memory, ROM), a random access memory (Random Access Memory, RAM), a magnetic disk, or an optical disk.
  • The foregoing description is merely about specific embodiments of the present invention, but is not intended to limit the protection scope of the present invention. Any variation or replacement readily figured out by a person skilled in the art within the technical scope disclosed in the present invention shall fall within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (20)

  1. A method for cell outage detection, comprising:
    receiving, by a controlling base station of a first cell, a request message, wherein the request message is used to request an outage measurement on a second cell, wherein the first cell is a neighboring cell of the second cell;
    selecting, by the controlling base station of the first cell according to the request message, a user equipment in the first cell to measure the second cell;
    receiving, by the controlling base station of the first cell, measurement information obtained by the user equipment by measuring the second cell, and generating, according to the measurement information, information used to determine whether an outage occurs in the second cell; and
    sending, by the controlling base station of the first cell, a reply message, wherein the reply message comprises the information used to determine whether an outage occurs in the second cell.
  2. The method according to claim 1, wherein the receiving, by a controlling base station of a first cell, a request message comprises: receiving, by the controlling base station of the first cell, the request message sent by a controlling base station of the second cell; and
    the sending, by the controlling base station of the first cell, a reply message comprises:
    sending, by the controlling base station of the first cell, the reply message to the controlling base station of the second cell.
  3. The method according to claim 1, wherein the receiving, by a controlling base station of a first cell, a request message comprises: receiving, by the controlling base station of the first cell, the request message sent by a network management system; and
    the sending, by the controlling base station of the first cell, a reply message comprises:
    sending, by the controlling base station of the first cell, the reply message to the network management system.
  4. The method according to any one of claims 1 to 3, wherein the request message comprises one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  5. The method according to any one of claims 1 to 4, wherein the selecting a user equipment in the first cell to measure the second cell comprises:
    selecting, from the first cell, a user equipment adjacent to a cell edge of the second cell to measure the second cell.
  6. The method according to any one of claims 1 to 5, wherein, the method further comprises: acquiring, by the controlling base station of the first cell, handover performance measurement information of the second cell, wherein the handover performance measurement information of the second cell comprises one or more pieces of the following information: the number of handover requests with respect to the second cell, the number of successful handovers with respect to the second cell, a disconnection/call drop rate of the second cell; and
    the generating, according to the measurement information, information used to determine whether an outage occurs in the second cell comprises: generating, according to the measurement information and the handover performance measurement information of the second cell, the information used to determine whether an outage occurs in the second cell.
  7. The method according to any one of claims 1 to 6, wherein the measurement information obtained by the user equipment by measuring the second cell comprises:
    measurement information obtained by the user equipment by measuring a reference signal receiving power signal of the second cell or measurement information obtained by the user equipment by detecting an uplink channel and a downlink channel of the second cell.
  8. A method for cell outage detection, comprising:
    sending a request message to a controlling base station of a first cell when a second cell becomes a potential outage cell, wherein the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, wherein the first cell is a neighboring cell of the second cell;
    receiving a reply message sent by the controlling base station of the first cell, wherein the reply message comprises the information used to determine whether an outage occurs in the second cell; and
    determining, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  9. The method according to claim 8, wherein the method is executed by a controlling base station of the second cell or by a network management system.
  10. The method according to claim 9, wherein, if the method is executed by the network management system, the method further comprises:
    receiving, by the network management system, indication information sent by the controlling base station of the second cell, wherein the indication information is used to indicate that the second cell becomes a potential outage cell; and
    generating, by the network management system, according to the indication information, the request message used to request an outage measurement on the second cell.
  11. The method according to any one of claims 8 to 10, wherein the request message comprises one or more pieces of the following information: an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
  12. A base station, wherein the base station is a controlling base station of a first cell and comprises:
    a fist receiving unit, configured to receive a request message, wherein the request message is used to request an outage measurement on a second cell, wherein the first cell is a neighboring cell of the second cell;
    a selecting unit, configured to select, according to the request message, a user equipment in the first cell to measure the second cell;
    a second receiving unit, configured to receive measurement information obtained by the user equipment by measuring the second cell;
    a generating unit, configured to generate, according to the measurement information, information used to determine whether an outage occurs in the second cell; and
    a sending unit, configured to send a reply message, wherein the reply message comprises the information used to determine whether an outage occurs in the second cell.
  13. The base station according to claim 12, wherein:
    the first receiving unit is further configured to receive the request message sent by a controlling base station of the second cell; and
    the sending unit is further configured to send the reply message to the controlling base station of the second cell.
  14. The base station according to claim 12, wherein:
    the first receiving unit is further configured to receive the request message sent by a network management system; and
    the sending unit is further configured to send the reply message to the network management system.
  15. The base station according to any one of claims 12 to 14, wherein:
    the selecting unit is further configured to select, from the first cell, a user equipment adjacent to a cell edge of the second cell to measure the second cell.
  16. The base station according to any one of claims 12 to 15, further comprising: an acquiring unit, configured to acquire handover performance measurement information of the second cell, wherein the handover performance measurement information of the second cell comprises one or more pieces of the following information: the number of handover requests with respect to the second cell, the number of successful handovers with respect to the second cell, a disconnection/call drop rate of the second cell;
    wherein the generating unit is further configured to generate, according to the measurement information and the handover performance measurement information of the second cell, the information used to determine whether an outage occurs in the second cell.
  17. A network device, comprising:
    a sending unit, configured to: send a request message to a controlling base station of a first cell when a second cell becomes a potential outage cell, wherein the request message is used to request an outage measurement on the second cell, so that the controlling base station of the first cell selects a user equipment in the first cell to measure the second cell and generates, according to measurement information obtained through the measurement, information used to determine whether an outage occurs in the second cell, wherein the first cell is a neighboring cell of the second cell;
    a first receiving unit, configured to receive a reply message sent by the controlling base station of the first cell, wherein the reply message comprises the information used to determine whether an outage occurs in the second cell; and
    a processing unit, configured to determine, according to the information used to determine whether an outage occurs in the second cell, whether an outage occurs in the second cell.
  18. The network device according to claim 17, wherein the network device is a controlling base station of the second cell or a network management system.
  19. The network device according to claim 18, wherein, if the network device is the network management system, the network device further comprises:
    a second receiving unit, configured to receive indication information sent by the controlling base station of the second cell, wherein the indication information is used to indicate that the second cell becomes a potential outage cell; and
    a generating unit, configured to generate, according to the indication information, the request message used to request an outage measurement on the second cell.
  20. The network device according to any one of claims 17 to 19, wherein the request message sent by the sending unit comprises one or more pieces of the following information:
    an identifier of the second cell, a longest measurement period, and a measurement item requested to be performed.
EP12773680.9A 2011-04-20 2012-04-19 Failed cell detection method and device Not-in-force EP2693810B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201110099309.7A CN102752788B (en) 2011-04-20 2011-04-20 Detect the method and apparatus of failure cells
PCT/CN2012/074376 WO2012142957A1 (en) 2011-04-20 2012-04-19 Failed cell detection method and device

Publications (3)

Publication Number Publication Date
EP2693810A1 true EP2693810A1 (en) 2014-02-05
EP2693810A4 EP2693810A4 (en) 2014-04-30
EP2693810B1 EP2693810B1 (en) 2018-07-04

Family

ID=47032638

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12773680.9A Not-in-force EP2693810B1 (en) 2011-04-20 2012-04-19 Failed cell detection method and device

Country Status (5)

Country Link
US (1) US9408101B2 (en)
EP (1) EP2693810B1 (en)
JP (1) JP5863073B2 (en)
CN (1) CN102752788B (en)
WO (1) WO2012142957A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2555456A (en) * 2016-10-28 2018-05-02 British Telecomm Cellular communications
WO2018077583A1 (en) * 2016-10-28 2018-05-03 British Telecommunications Public Limited Company Method of handling a cell outage in a radiocommunication network
US10420024B2 (en) 2016-03-22 2019-09-17 British Telecommunications Public Limited Company Transmitter outage detection
US10523496B2 (en) 2017-05-04 2019-12-31 Telefonaktiebolaget Lm Ericsson (Publ) Handling of performance degradation in a communications system
US11153769B2 (en) 2017-04-03 2021-10-19 British Telecommunications Public Limited Company Network fault discovery
US11323958B2 (en) 2016-03-22 2022-05-03 British Telecommunications Public Limited Company Transmitter outage reporting

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102932826B (en) 2012-11-30 2015-01-14 北京邮电大学 Cell interruption detection positioning method in self-organizing network of cell mobile communication system
CN103052110B (en) * 2013-01-07 2015-12-02 华为技术有限公司 Cell outage detects and compensation method and device
CN105519175B (en) * 2014-01-21 2019-06-28 华为技术有限公司 A kind of detection device and method of failure cells
WO2016068761A1 (en) * 2014-10-28 2016-05-06 Telefonaktiebolaget L M Ericsson (Publ) First network node, method therein, computer program and computer-readable medium comprising the computer program for detecting outage of a radio cell
WO2016089261A1 (en) * 2014-12-02 2016-06-09 Telefonaktiebolaget Lm Ericsson (Publ) Detection of sleeping cells in a communication network
US9843474B2 (en) * 2015-12-23 2017-12-12 Intel Corporation Telemetry adaptation
CN106412936B (en) * 2016-11-15 2019-06-21 中国联合网络通信集团有限公司 It is a kind of to position the low resident method and device than cell
CN111919463B (en) * 2018-03-21 2023-09-05 瑞典爱立信有限公司 Method and apparatus for call setup failure control
US11812400B2 (en) * 2018-09-26 2023-11-07 Telefonaktiebolaget Lm Ericsson (Publ) Method and system for predicting a state of a cell in radio access network
CN111263394B (en) * 2018-12-17 2022-07-08 维沃移动通信有限公司 Signal resource measuring method and terminal
US11277318B2 (en) * 2020-04-30 2022-03-15 Accenture Global Solutions Limited Analyzing a communication network device, based on capacity analyses associated with decommissioning the communication network device, to determine next actions
US11438273B2 (en) * 2020-07-20 2022-09-06 Altiostar Networks, Inc. Real-time processing in wireless communications systems
US11997511B2 (en) * 2021-02-16 2024-05-28 Rakuten Mobile, Inc. Cell outage compensation system
EP4057673A1 (en) * 2021-03-12 2022-09-14 Deutsche Telekom AG Method for maintaining a radio cell of a ran
CN113727377B (en) * 2021-09-02 2023-07-04 中国联合网络通信集团有限公司 Method and equipment for judging wireless communication environment change based on base station parameters
CN113784378B (en) * 2021-09-10 2023-06-13 中国联合网络通信集团有限公司 Method, device, server and storage medium for detecting faults of indoor partition cells

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006063309A2 (en) * 2004-12-10 2006-06-15 Motorola, Inc. Method and apparatus for mobile station management and system optimization
EP2139278A1 (en) * 2008-05-28 2009-12-30 Alcatel Lucent Method of detecting an outage of a radio cell
EP2154918A1 (en) * 2008-08-13 2010-02-17 Alcatel, Lucent Decentralised method of handling a cell outage in a radiocommunication network

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100463560C (en) * 2005-06-06 2009-02-18 上海原动力通信科技有限公司 Cell switching method based on time-division duplex system
KR20080066561A (en) * 2007-01-12 2008-07-16 한국전자통신연구원 A method of reporting measurement information in packet based on cellular system
CN101796864B (en) * 2007-09-05 2014-07-16 Lm爱立信电话有限公司 A method of monitoring cells in wireless communication systems
JP5119951B2 (en) * 2008-01-30 2013-01-16 日本電気株式会社 Mobile communication system, handover performance monitoring method, and management apparatus
KR101450778B1 (en) * 2008-01-31 2014-10-14 삼성전자주식회사 Method for setting idle time of base station in control station and control station and control station therefor
EP2255571B1 (en) * 2008-03-25 2016-11-16 Telefonaktiebolaget LM Ericsson (publ) Method for automatically selecting a physical cell identity (pci) of a long term evolution (lte) radio cell
US8391158B2 (en) * 2008-07-25 2013-03-05 Qualcomm Incorporated Cell identifier assignment and selection
JP5233523B2 (en) * 2008-09-01 2013-07-10 富士通株式会社 Radio base station state detection method and system
KR101190860B1 (en) * 2008-12-18 2012-10-15 한국전자통신연구원 Method of optimal handover based on wireless link quality of user equipment
US8095143B2 (en) * 2009-02-13 2012-01-10 Telefonaktiebolaget L M Ericsson Random access channel (RACH) reconfiguration for temporarily extended cell coverage
CN101594622B (en) * 2009-06-15 2011-06-08 上海华为技术有限公司 Method, device and system for detecting dormant cell
KR101336762B1 (en) * 2009-12-15 2013-12-16 한국전자통신연구원 A small basestation device and method for searching a suitable cell in the device
KR20170125136A (en) * 2010-01-08 2017-11-13 인터디지탈 패튼 홀딩스, 인크 Method and apparatus for adding csg identities to a white list in connected mode
US8983481B2 (en) * 2010-03-24 2015-03-17 Htc Corporation Apparatuses and methods for measurement reporting in a wireless communications system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006063309A2 (en) * 2004-12-10 2006-06-15 Motorola, Inc. Method and apparatus for mobile station management and system optimization
EP2139278A1 (en) * 2008-05-28 2009-12-30 Alcatel Lucent Method of detecting an outage of a radio cell
EP2154918A1 (en) * 2008-08-13 2010-02-17 Alcatel, Lucent Decentralised method of handling a cell outage in a radiocommunication network

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
HUAWEI ET AL: "Clarification of Self-healing at RAN", 3GPP DRAFT; R3-112773_CLARIFICATION OF SELF-HEALING AT RAN REV0, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG3, no. San Francisco, US, 4 November 2011 (2011-11-04), XP050566014, [retrieved on 2011-11-04] *
HUAWEI: "Potential solutions for self healing", 3GPP DRAFT; R3-120128 POTENTIAL SOLUTIONS FOR SELF HEALING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG3, no. Dresden, Germany; 20120206 - 20120210, 30 January 2012 (2012-01-30), XP050566499, [retrieved on 2012-01-30] *
See also references of WO2012142957A1 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10420024B2 (en) 2016-03-22 2019-09-17 British Telecommunications Public Limited Company Transmitter outage detection
US11323958B2 (en) 2016-03-22 2022-05-03 British Telecommunications Public Limited Company Transmitter outage reporting
GB2555456A (en) * 2016-10-28 2018-05-02 British Telecomm Cellular communications
WO2018077583A1 (en) * 2016-10-28 2018-05-03 British Telecommunications Public Limited Company Method of handling a cell outage in a radiocommunication network
GB2555456B (en) * 2016-10-28 2019-07-03 British Telecomm Cellular communications
US10912004B2 (en) 2016-10-28 2021-02-02 British Telecommunications Public Limited Company Method of handling a cell outage in a radiocommunication network
US11153769B2 (en) 2017-04-03 2021-10-19 British Telecommunications Public Limited Company Network fault discovery
US10523496B2 (en) 2017-05-04 2019-12-31 Telefonaktiebolaget Lm Ericsson (Publ) Handling of performance degradation in a communications system

Also Published As

Publication number Publication date
EP2693810A4 (en) 2014-04-30
CN102752788A (en) 2012-10-24
US20140043998A1 (en) 2014-02-13
WO2012142957A1 (en) 2012-10-26
JP5863073B2 (en) 2016-02-16
CN102752788B (en) 2015-12-16
US9408101B2 (en) 2016-08-02
JP2014514859A (en) 2014-06-19
EP2693810B1 (en) 2018-07-04

Similar Documents

Publication Publication Date Title
US9408101B2 (en) Method and device for cell outage detection
CN109151921B (en) Cell measurement configuration method and device
US9807630B2 (en) Method and system for collecting terminal measurement data
US9554289B2 (en) Management method, apparatus, and system for coverage optimization
US10623977B2 (en) Minimization of drive tests measurement method, user equipment, and network device
EP2567561B1 (en) Method and telecommunications network for deactivating or activating a cell in such a network
US10034189B2 (en) Method and system for controlling radio parameter, network operation management apparatus, and radio station
EP2117135A1 (en) Base station device, user device, and method used in mobile communication system
CN102638831B (en) Handover parameter optimization method and system
EP2509353B1 (en) Method and system for managing neighboring cell information
KR20140010982A (en) Method, system and device for delivering minimization of drive-tests measurement configuration parameters
WO2011085660A1 (en) Method, apparatus and system for measurement reporting
EP3913962A1 (en) Configuration method for minimization of drive-tests and base station
EP2587856A1 (en) Method and equipment for feeding back minimization drive test log
EP3005783B1 (en) Data collection in network management layer coverage and capacity optimization
WO2012041190A1 (en) Method and device for feeding back mdt measurement information
JP6070957B2 (en) Radio parameter control system, radio parameter control apparatus, radio base station, radio parameter control method, and program
CN103686823A (en) Measuring method and device
EP2943010A1 (en) Approach detection and measurement method for inter-frequency neighbour cells, radio network controller and user equipment
US9781651B2 (en) Method, device and system for controlling UE to take measurements
US9918246B2 (en) Enhancing the usage of resources related to the transmission of environment-related information between a user equipment and a mobile communication network
EP3136777B1 (en) Determining reason for kpi decrease
EP2824961B1 (en) MOVEMENT INFORMATION PROCESSING METHODs AND ACCESS NETWORK DEVICE
EP2822318A1 (en) Method of providing performance management data, corresponding network element and corresponding radio communication system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20131029

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

A4 Supplementary search report drawn up and despatched

Effective date: 20140327

RIC1 Information provided on ipc code assigned before grant

Ipc: H04W 24/04 20090101ALN20140321BHEP

Ipc: H04W 24/08 20090101AFI20140321BHEP

DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20170518

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602012048125

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: H04W0052020000

Ipc: H04W0024080000

RIN1 Information on inventor provided before grant (corrected)

Inventor name: XIA, HAITAO

Inventor name: WANG, XUELONG

Inventor name: WANG, JUN

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: H04W 24/08 20090101AFI20171211BHEP

Ipc: H04W 24/04 20090101ALN20171211BHEP

INTG Intention to grant announced

Effective date: 20180108

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1015826

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012048125

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20180704

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1015826

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180704

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181104

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181004

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181005

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012048125

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

26N No opposition filed

Effective date: 20190405

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602012048125

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190419

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190430

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191101

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190430

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190419

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181105

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20200408

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20120419

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210419

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210419

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180704