US20090033516A1
(en)
*
|
2007-08-02 |
2009-02-05 |
Schlumberger Technology Corporation |
Instrumented wellbore tools and methods
|
US9181796B2
(en)
|
2011-01-21 |
2015-11-10 |
Schlumberger Technology Corporation |
Downhole sand control apparatus and method with tool position sensor
|
US9458685B2
(en)
*
|
2011-08-25 |
2016-10-04 |
Baker Hughes Incorporated |
Apparatus and method for controlling a completion operation
|
WO2014051565A1
(en)
*
|
2012-09-26 |
2014-04-03 |
Halliburton Energy Services, Inc. |
Method of placing distributed pressure gauges across screens
|
US10138707B2
(en)
|
2012-11-13 |
2018-11-27 |
Exxonmobil Upstream Research Company |
Method for remediating a screen-out during well completion
|
EP2923035B1
(en)
*
|
2012-11-21 |
2019-07-31 |
Services Petroliers Schlumberger |
Downhole tool anchoring system
|
WO2014100272A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Apparatus and method for monitoring fluid flow in a wellbore using acoustic signals
|
US20150300159A1
(en)
|
2012-12-19 |
2015-10-22 |
David A. Stiles |
Apparatus and Method for Evaluating Cement Integrity in a Wellbore Using Acoustic Telemetry
|
WO2014100264A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Telemetry system for wireless electro-acoustical transmission of data along a wellbore
|
US10100635B2
(en)
|
2012-12-19 |
2018-10-16 |
Exxonmobil Upstream Research Company |
Wired and wireless downhole telemetry using a logging tool
|
WO2014100274A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Apparatus and method for detecting fracture geometry using acoustic telemetry
|
WO2014100276A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Electro-acoustic transmission of data along a wellbore
|
CA2894634C
(en)
|
2012-12-21 |
2016-11-01 |
Randy C. Tolman |
Fluid plugs as downhole sealing devices and systems and methods including the same
|
US9963960B2
(en)
|
2012-12-21 |
2018-05-08 |
Exxonmobil Upstream Research Company |
Systems and methods for stimulating a multi-zone subterranean formation
|
WO2014099306A2
(en)
|
2012-12-21 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Flow control assemblies for downhole operations and systems and methods including the same
|
US9945208B2
(en)
|
2012-12-21 |
2018-04-17 |
Exxonmobil Upstream Research Company |
Flow control assemblies for downhole operations and systems and methods including the same
|
CN103061746B
(en)
*
|
2013-01-08 |
2015-10-28 |
中国石油天然气集团公司 |
The omnidistance online stress detection device of the distributed optical cable of Oil/gas Well down-hole casing string
|
MX356289B
(en)
*
|
2013-01-28 |
2018-05-22 |
Halliburton Energy Services Inc |
Systems and methods for monitoring and characterizing fluids in a subterranean formation using hookload.
|
CA2898736C
(en)
*
|
2013-02-21 |
2017-02-21 |
Stewart H. Fowler, Jr. |
Systems and methods for optimized well creation in a shale formation
|
EP2964882A1
(en)
|
2013-03-07 |
2016-01-13 |
Evolution Engineering Inc. |
Detection of downhole data telemetry signals
|
US9494018B2
(en)
|
2013-09-16 |
2016-11-15 |
Baker Hughes Incorporated |
Sand control crossover tool with mud pulse telemetry position
|
US10132149B2
(en)
|
2013-11-26 |
2018-11-20 |
Exxonmobil Upstream Research Company |
Remotely actuated screenout relief valves and systems and methods including the same
|
US9416653B2
(en)
*
|
2013-12-18 |
2016-08-16 |
Baker Hughes Incorporated |
Completion systems with a bi-directional telemetry system
|
US9790762B2
(en)
|
2014-02-28 |
2017-10-17 |
Exxonmobil Upstream Research Company |
Corrodible wellbore plugs and systems and methods including the same
|
WO2016028414A1
(en)
|
2014-08-21 |
2016-02-25 |
Exxonmobil Upstream Research Company |
Bidirectional flow control device for facilitating stimulation treatments in a subterranean formation
|
CA2955381C
(en)
|
2014-09-12 |
2022-03-22 |
Exxonmobil Upstream Research Company |
Discrete wellbore devices, hydrocarbon wells including a downhole communication network and the discrete wellbore devices and systems and methods including the same
|
US9951596B2
(en)
|
2014-10-16 |
2018-04-24 |
Exxonmobil Uptream Research Company |
Sliding sleeve for stimulating a horizontal wellbore, and method for completing a wellbore
|
WO2016108883A1
(en)
|
2014-12-31 |
2016-07-07 |
Halliburton Energy Services, Inc. |
Optimizing stimulation and fluid management operations
|
US10329882B2
(en)
*
|
2014-12-31 |
2019-06-25 |
Halliburton Energy Services, Inc. |
Optimizing completion operations
|
US10301913B2
(en)
|
2014-12-31 |
2019-05-28 |
Halliburton Energy Services, Inc. |
Optimizing running operations
|
US9863222B2
(en)
|
2015-01-19 |
2018-01-09 |
Exxonmobil Upstream Research Company |
System and method for monitoring fluid flow in a wellbore using acoustic telemetry
|
US10408047B2
(en)
|
2015-01-26 |
2019-09-10 |
Exxonmobil Upstream Research Company |
Real-time well surveillance using a wireless network and an in-wellbore tool
|
US10007023B2
(en)
|
2015-05-14 |
2018-06-26 |
Halliburton Energy Services, Inc. |
Downhole switching of wellbore logging tools
|
JP2016220709A
(en)
*
|
2015-05-26 |
2016-12-28 |
オムロンヘルスケア株式会社 |
Exercise support device, exercise support method and exercise support program
|
AU2015401212B2
(en)
*
|
2015-06-30 |
2019-07-11 |
Halliburton Energy Services, Inc. |
Position tracking for proppant conveying strings
|
US10196886B2
(en)
|
2015-12-02 |
2019-02-05 |
Exxonmobil Upstream Research Company |
Select-fire, downhole shockwave generation devices, hydrocarbon wells that include the shockwave generation devices, and methods of utilizing the same
|
US20170159419A1
(en)
|
2015-12-02 |
2017-06-08 |
Randy C. Tolman |
Selective Stimulation Ports, Wellbore Tubulars That Include Selective Stimulation Ports, And Methods Of Operating The Same
|
US10309195B2
(en)
|
2015-12-04 |
2019-06-04 |
Exxonmobil Upstream Research Company |
Selective stimulation ports including sealing device retainers and methods of utilizing the same
|
US20180363414A1
(en)
*
|
2015-12-16 |
2018-12-20 |
Schlumberger Technology Corporation |
System and method for performing a real-time integrated cementing operation
|
RU2620824C1
(en)
*
|
2015-12-22 |
2017-05-30 |
Мурад Давлетович Валеев |
Device for sequential oil and water sampling from well
|
US11530606B2
(en)
|
2016-04-07 |
2022-12-20 |
Bp Exploration Operating Company Limited |
Detecting downhole sand ingress locations
|
EP3708769B1
(en)
|
2016-04-07 |
2024-09-11 |
BP Exploration Operating Company Limited |
Detecting downhole sand ingress locations
|
US10526888B2
(en)
|
2016-08-30 |
2020-01-07 |
Exxonmobil Upstream Research Company |
Downhole multiphase flow sensing methods
|
US10697287B2
(en)
|
2016-08-30 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Plunger lift monitoring via a downhole wireless network field
|
US10465505B2
(en)
|
2016-08-30 |
2019-11-05 |
Exxonmobil Upstream Research Company |
Reservoir formation characterization using a downhole wireless network
|
US10344583B2
(en)
|
2016-08-30 |
2019-07-09 |
Exxonmobil Upstream Research Company |
Acoustic housing for tubulars
|
US10364669B2
(en)
|
2016-08-30 |
2019-07-30 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10590759B2
(en)
|
2016-08-30 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Zonal isolation devices including sensing and wireless telemetry and methods of utilizing the same
|
US10487647B2
(en)
|
2016-08-30 |
2019-11-26 |
Exxonmobil Upstream Research Company |
Hybrid downhole acoustic wireless network
|
US10415376B2
(en)
|
2016-08-30 |
2019-09-17 |
Exxonmobil Upstream Research Company |
Dual transducer communications node for downhole acoustic wireless networks and method employing same
|
EP3583296B1
(en)
|
2017-03-31 |
2021-07-21 |
BP Exploration Operating Company Limited |
Well and overburden monitoring using distributed acoustic sensors
|
EA202090528A1
(en)
|
2017-08-23 |
2020-07-10 |
Бп Эксплорейшн Оперейтинг Компани Лимитед |
DETECTION OF WELL SANDS
|
EA202090867A1
(en)
|
2017-10-11 |
2020-09-04 |
Бп Эксплорейшн Оперейтинг Компани Лимитед |
DETECTING EVENTS USING FEATURES IN THE AREA OF ACOUSTIC FREQUENCIES
|
AU2018347876B2
(en)
|
2017-10-13 |
2021-10-07 |
Exxonmobil Upstream Research Company |
Method and system for performing hydrocarbon operations with mixed communication networks
|
US10697288B2
(en)
|
2017-10-13 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Dual transducer communications node including piezo pre-tensioning for acoustic wireless networks and method employing same
|
MX2020003298A
(en)
|
2017-10-13 |
2020-07-28 |
Exxonmobil Upstream Res Co |
Method and system for performing operations using communications.
|
CN111201454B
(en)
|
2017-10-13 |
2022-09-09 |
埃克森美孚上游研究公司 |
Method and system for performing operations with communications
|
CA3079020C
(en)
|
2017-10-13 |
2022-10-25 |
Exxonmobil Upstream Research Company |
Method and system for performing communications using aliasing
|
US10837276B2
(en)
|
2017-10-13 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along a drilling string
|
WO2019099188A1
(en)
|
2017-11-17 |
2019-05-23 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along tubular members
|
US12000273B2
(en)
*
|
2017-11-17 |
2024-06-04 |
ExxonMobil Technology and Engineering Company |
Method and system for performing hydrocarbon operations using communications associated with completions
|
US10690794B2
(en)
|
2017-11-17 |
2020-06-23 |
Exxonmobil Upstream Research Company |
Method and system for performing operations using communications for a hydrocarbon system
|
US10844708B2
(en)
|
2017-12-20 |
2020-11-24 |
Exxonmobil Upstream Research Company |
Energy efficient method of retrieving wireless networked sensor data
|
US11156081B2
(en)
|
2017-12-29 |
2021-10-26 |
Exxonmobil Upstream Research Company |
Methods and systems for operating and maintaining a downhole wireless network
|
US11313215B2
(en)
|
2017-12-29 |
2022-04-26 |
Exxonmobil Upstream Research Company |
Methods and systems for monitoring and optimizing reservoir stimulation operations
|
MX2020008276A
(en)
|
2018-02-08 |
2020-09-21 |
Exxonmobil Upstream Res Co |
Methods of network peer identification and self-organization using unique tonal signatures and wells that use the methods.
|
US11268378B2
(en)
|
2018-02-09 |
2022-03-08 |
Exxonmobil Upstream Research Company |
Downhole wireless communication node and sensor/tools interface
|
AU2018414508B2
(en)
*
|
2018-03-23 |
2023-08-24 |
Halliburton Energy Services, Inc. |
Remote control flow path system for gravel packing
|
US10364659B1
(en)
|
2018-09-27 |
2019-07-30 |
Exxonmobil Upstream Research Company |
Methods and devices for restimulating a well completion
|
WO2020091775A1
(en)
*
|
2018-10-31 |
2020-05-07 |
Halliburton Energy Services, Inc. |
Systems and methods for indicating completion of a reverse cementing operation
|
US11118431B2
(en)
*
|
2018-11-28 |
2021-09-14 |
Chevron U.S.A. Inc. |
Smart sand control service tool positioning
|
BR112021010168A2
(en)
|
2018-11-29 |
2021-08-17 |
Bp Exploration Operating Company Limited |
event detection using machine learning das features
|
GB201820331D0
(en)
|
2018-12-13 |
2019-01-30 |
Bp Exploration Operating Co Ltd |
Distributed acoustic sensing autocalibration
|
US11952886B2
(en)
|
2018-12-19 |
2024-04-09 |
ExxonMobil Technology and Engineering Company |
Method and system for monitoring sand production through acoustic wireless sensor network
|
US11293280B2
(en)
|
2018-12-19 |
2022-04-05 |
Exxonmobil Upstream Research Company |
Method and system for monitoring post-stimulation operations through acoustic wireless sensor network
|
EP4045766A1
(en)
|
2019-10-17 |
2022-08-24 |
Lytt Limited |
Fluid inflow characterization using hybrid das/dts measurements
|
CA3154435C
(en)
|
2019-10-17 |
2023-03-28 |
Lytt Limited |
Inflow detection using dts features
|
WO2021093974A1
(en)
|
2019-11-15 |
2021-05-20 |
Lytt Limited |
Systems and methods for draw down improvements across wellbores
|
CA3180595A1
(en)
|
2020-06-11 |
2021-12-16 |
Lytt Limited |
Systems and methods for subterranean fluid flow characterization
|
CA3182376A1
(en)
|
2020-06-18 |
2021-12-23 |
Cagri CERRAHOGLU |
Event model training using in situ data
|
CN114482891B
(en)
*
|
2020-10-23 |
2024-06-18 |
中国石油化工股份有限公司 |
Friction setting sand prevention pipe column and friction setting packer and method
|
CN113187469B
(en)
*
|
2021-05-08 |
2022-02-25 |
广州海洋地质调查局 |
Method for establishing communication connection between upper completion string and lower completion string
|