EP2578371B1 - Dismountable plant for concrete manufacture - Google Patents
Dismountable plant for concrete manufacture Download PDFInfo
- Publication number
- EP2578371B1 EP2578371B1 EP12187503.3A EP12187503A EP2578371B1 EP 2578371 B1 EP2578371 B1 EP 2578371B1 EP 12187503 A EP12187503 A EP 12187503A EP 2578371 B1 EP2578371 B1 EP 2578371B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- concrete
- plant
- silos
- containers
- manufacture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims description 34
- 239000000463 material Substances 0.000 claims description 42
- 239000004568 cement Substances 0.000 claims description 15
- 238000003860 storage Methods 0.000 claims description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 239000000654 additive Substances 0.000 claims description 5
- 238000005406 washing Methods 0.000 claims description 5
- 238000011084 recovery Methods 0.000 claims description 4
- 239000003643 water by type Substances 0.000 claims description 4
- 230000000996 additive effect Effects 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 238000000926 separation method Methods 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 2
- 230000010006 flight Effects 0.000 claims 1
- 239000000428 dust Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000005202 decontamination Methods 0.000 description 1
- 230000003588 decontaminative effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 239000007943 implant Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28C—PREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28C9/00—General arrangement or layout of plant
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28C—PREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28C7/00—Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
- B28C7/0046—Storage or weighing apparatus for supplying ingredients
- B28C7/0053—Storage containers, e.g. hoppers, silos, bins
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D88/00—Large containers
- B65D88/26—Hoppers, i.e. containers having funnel-shaped discharge sections
Definitions
- the present invention refers to a plant for the manufacture of concrete, and in particular to a moving plant, i.e. a plant apt to be disassembled and reassembled from one building site to another quickly and easily.
- WO2002/100741 discloses a large, fixed, port plant for the management and sorting through containers of loose materials transported on ships. Loading containers are disclosed, moved by a rail-mounted transtainer, which are filled in a conventional manner with the loose material taken from the ship or barge and then stacked on fixed unloading containers, in turn connected to weighing and transport systems to shipping containers or other means of transport.
- inert materials are transported loose on lorries from the quarry to the building site plant where they are emptied out onto the ground on the yard; from here, with mechanical shovels or with other known lifting and transport means - having a high degree of complexity and large bulk and which hence require large manoeuvring spaces - they are loaded onto loading hoppers of conveyor belts, for the filling of fixed storage silos.
- Said storage silos of inert materials are located above the dosing scales of the inert materials and of the concrete and above the mixers meant for concrete forming, through a mix with water and additives of such elements.
- this type of arrangement requires very large spaces for transport means manoeuvre and the temporary storage of the inert materials, as well as for the arrangement of the belt conveyors for the loading of the silos, and it is furthermore evident how this type of arrangement determines a high degree of dust and noise pollution in the surrounding environment.
- the problem at the basis of the invention is hence that of proposing a new type of concrete manufacturing plant, which allows to simultaneously solve the problems mentioned above of the known-type plants, and in particular which exhibits: versatility and adjustability to the available spaces; reduced bulk; quick and safe mounting system based on modular elements; low level of dust and noise pollution in the management of the inert materials; closed-circuit system for the washing and recovery of concrete residues; finally, an actual opportunity for the moving and reuse of the plant in situations which have different availability of space and varied requirements of concrete manufacture.
- the moving concrete manufacturing plant departs from the traditional management mode of inert materials described above, fully eliminating the transport and loose loading of the same and the moving thereof on the ground in the plant yard, and adopts instead a transport of the inert materials in moving and stackable containers specifically designed for the purpose.
- such containers are suited to be loaded on a standard lorry for the transport from the quarries to the plant and to be mutually stacked there to thus form loading silos, or stacked on silos already prepared for providing to the loading thereof through a crane, all as better detailed in the following, which crane - also in this case in a fully innovative way with respect to known concrete manufacturing plants - forms an integral part of the plant of the invention.
- a first embodiment of the plant is shown in figs. 1-4 .
- the plant comprises a rectangular concrete foundation bed A, cast in situ or formed by means of prefabricated blocks, whereon a crane C and a plurality of silos B are arranged and suitably anchored, said silos B containing the solid matter for concrete forming, i.e. cement and inert materials.
- silos B and crane C are arranged aligned in a single row, crane C being arranged between two silos B c meant to contain cement (left of crane C in fig. 1 ) and five silos meant to contain the inert materials (right of crane C in fig.1 ), and precisely two silos B s containing sand and three silos B g containing gravel.
- Each one of the seven silos B is supported by a basic reticular framework F, preferably of the type with modular elements which can be assembled by means of screw joints or pin joints, so as to make the assembling and disassembling operations thereof quick and easy.
- the height of the reticular frameworks F is sufficient for housing within all the plant services, namely: transport systems of the cement and of the inert materials to the mixer; dosing scales for cement and inert materials; mixer; water tanks and additive tanks; loading area of concrete-mixer lorries and hauled concrete pumps; washing devices of such machines; devices for the recovery, separation and storage of the dirty wash waters; access ladders to the different levels of the reticular frameworks F and to crane C; storage areas and offices.
- silos B g and B s meant to contain the inert materials - unlike what happens in conventional plants where such silos consist of monolithic cylindrical tanks - are of a modular type, and precisely they consist of a plurality of containers 1 of a height equal to or close to the width thereof, which are mutually stacked until they reach the desired silo capacity.
- monolithic silos having the same outer configuration of the above-said containers, and to then load said silos of inert materials stacking thereon one or more of said loaded containers.
- containers 1 for inert materials is clearly visible, in section and in top plan view, in figs. 6 and 7 and consists of a sturdy outer cylindrical body 12 to the lower inner part of which an upside truncated cone 13 is welded which ends with an opening 14, suitably recessed with respect to the base of said cylindrical body 12.
- the surface of truncated cone 13 hence forms an inner hopper bottom of container 1 through which the gravel or sand loaded in the container is unloaded by the same through opening 14.
- Said opening is furthermore provided with a diaphragm-type closure means which can be actuated and adjusted from the outside, of the type known per se and not shown in the drawings, which is maintained in a closed position during the transport of container 1.
- the containers 1 for inert materials are used not only for the forming of silos B, but also for the transport of inert materials from the production quarry thereof to the concrete manufacturing plant.
- containers 1, after the opening 14 thereof has been duly closed, are filled directly in the quarry with gravel or sand and then loaded onto lorries and transported to the concrete manufacturing plant of the invention.
- containers 1 are taken from the means of transport directly by crane C and hence positioned on the reticular framework F, in the positions provided for this purpose.
- the dimensions thereof In order to allow the swift transportability of containers 1, the dimensions thereof must hence be such as to be able to be transported by road, loaded with inert materials, through an ordinary means of transport.
- Preferred dimensions are the ones indicated in the drawings, where one can see that container 1 is comprised within a cube having a side of 2.4 metres.
- silos B After having arranged on reticular framework F a first series of basic containers 1, subsequent containers 1 are stacked one on top of the other to form silos B of the desired height.
- stacked or “stackable” it is meant to define a condition in which containers 1 simply rest on one another, with no permanent mutual-fastening means, the stability of the silo formed by multiple containers being entrusted to the shape of container 1 and to the weight thereof. It is of course possible to additionally provide also quick release devices to make containers 1 temporarily and mutually integral once stacked, which fastening systems may prove necessary only when the plants are installed in areas subject to strong winds or at high seismic risk.
- the silos consist of 6 containers, each one 2.40 m high and of equal diameter.
- the overall height of silos B is hence over 13 metres, taking into account an overlapping area of about 0.20 m height between stacked containers 1, which allows to achieve the desired stability and tipping-over safety.
- the closing means of opening 14 of containers 1 after the first one are opened as the containers are arranged in position and the adjustment of the unloading of whole silo B thus formed is accomplished through the closing means of opening 14 of the container 1 of each silo B arranged in the lowest position, i.e. the one resting on reticular framework F.
- external cavities 16 are furthermore formed in the thickness of the cylinder and on the outer portion of the same, preferably by mechanical machining through material removal, each cavity 16 being provided with a perforated central rib 17, for the easy fastening of container 1 through a multiple-hook lifting system, for example that of crane C.
- silos B can concern the entire vertical extension of the silo, as indicated in fig. 2 , or only a portion thereof, as indicated in alternative embodiment of fig. 4 , wherein the lower portion of the silo consists of a conventional silo 11, on the top of which a reduced number (1-4) of containers 1 can be housed which alternatively act either as simple silo reloading means, or as an integral element of the silo.
- This second embodiment may be conveniently used also for the silos of cement B c , as a valid alternative to the conventional silos with pneumatic-filling or screw conveyor-filling, when such type of filling is not available or causes dust scattering problems.
- the distribution of the different services of the plant inside the same is of course designed depending on the composition of the individual plant, which composition may vary in the arrangement thereof, as shown in the four different embodiments shown in figs. 5A-5D , wherein, however, all the essential plant elements as described above are always present, even though in a varied number and arrangement.
- framework F comprises in height three different portions, namely a lower portion F b of about 4.40 m height, a middle portion F m and an upper portion F t , these last two measuring both about 2.2 m height each and the plant services already listed above consist of and are arranged as follows:
- the concrete manufacturing plant of the present invention has fully reached all the provided objects.
- the plant provides an extremely reduced space occupation and, in particular, strictly limited to those spaces which are taken up by storage silos, since all the yard spaces meant for the handling of the inert materials have been eliminated and since all plant services are inserted in the same perimeter occupied by the silos.
- the use of closed containers for the handling of inert materials through crane C furthermore completely eliminates dust and noise pollution, typical of conventional plants.
- the simplicity and modularity of the plant allows both extremely fast assembling and disassembling - facilitated by the very presence of crane C within the plant, which hence plays an essential role both in the assembling/disassembling steps and in the running of the plant- and a change of the layout and of the number of the individual plant components, to adjust itself flexibly to the spaces available in the proximity of the building site for the installation of the plant.
Landscapes
- Chemical & Material Sciences (AREA)
- Dispersion Chemistry (AREA)
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
- The present invention refers to a plant for the manufacture of concrete, and in particular to a moving plant, i.e. a plant apt to be disassembled and reassembled from one building site to another quickly and easily.
- As known, in the building industry very large use of concrete has been made for a long time for the construction of foundations, structural elements, slabs, etcetera. In the case of individual buildings of low volume, concrete is normally purchased from third parties' fixed plants for concrete manufacture, often installed in the proximity of quarries for the manufacture of inert materials, which concrete is transported by road to the building site in concrete-mixer lorries.
- In the construction of buildings of a larger volume, resorting to third parties' plants for concrete manufacture is not preferred. As a matter of fact, waiting times for concrete-mixer lorries are not easily programmable according to the activities of the building site, the quality of the supplied concrete is often not suited to the request and finally costs are variable and depending on market conditions. For these reasons, in the case of large buildings the habit has become widespread to build fixed plants for concrete manufacture on the same building site, or immediately nearby, so as to be able to have a dedicated and controlled production which is perfectly suited to building site requirements.
- However, concrete manufacturing plants of the currently known type are mainly fixed plants built with techniques of traditional, welded metal structural work and are expensive, have a large bulk, require long mounting times and finally, at the end of the use thereof, are not apt to be disassembled conservatively and are hence disposed of as scrap iron.
- In
US-6,832,851 a partly moving plant in accordance with the preamble ofclaim 1 is proposed, wherein at least part of the plant components are modularly prefabricated using international-standard-sized container structures, as building elements and/or to hold equipment. Although with this type of plant transport/shipment operations may actually be carried out in a short time, such advantage is at least partly cancelled by the fact that assembling and disassembling operations are complicated by the need to adjust the various pieces of equipment of the plant to the standard size of the containers, by providing joints or connections which increase the costs thereof and make the use thereof less functional. Moreover, the mutual attachment of the individual containers is not sufficient to guarantee the mechanical stability of the plant and additional support, fastening and strengthening structures of the traditional type must hence be provided.. -
WO2002/100741 discloses a large, fixed, port plant for the management and sorting through containers of loose materials transported on ships. Loading containers are disclosed, moved by a rail-mounted transtainer, which are filled in a conventional manner with the loose material taken from the ship or barge and then stacked on fixed unloading containers, in turn connected to weighing and transport systems to shipping containers or other means of transport. - Also these types of plants hence have - even though to a smaller extent - the problems of large bulks and long assembling/disassembling times of the fixed plants.
- Finally, all known plants are in any case affected by the significant disadvantages connected with the current transport modes of inert materials, which will be dealt with more in detail in the following.
- As a further drawback, all the above-mentioned known implants are characterised by high environmental impact and pollution and hence require thorough decontamination of the occupied soil at the end of the works.
- For all the reasons set forth above this type of fixed or partly moving plants on the building site are used today only on building sites in which really large volumes are built, wherein the costs of the concrete manufacturing plant can be amortized and, preferably, on building sites not included in already densely populated areas, due to the pollution problems highlighted above.
- As mentioned above, particularly critical in this type of known plants is the management of inert materials. As a matter of fact, said materials are transported loose on lorries from the quarry to the building site plant where they are emptied out onto the ground on the yard; from here, with mechanical shovels or with other known lifting and transport means - having a high degree of complexity and large bulk and which hence require large manoeuvring spaces - they are loaded onto loading hoppers of conveyor belts, for the filling of fixed storage silos. Said storage silos of inert materials are located above the dosing scales of the inert materials and of the concrete and above the mixers meant for concrete forming, through a mix with water and additives of such elements. It is hence evident how this type of arrangement requires very large spaces for transport means manoeuvre and the temporary storage of the inert materials, as well as for the arrangement of the belt conveyors for the loading of the silos, and it is furthermore evident how this type of arrangement determines a high degree of dust and noise pollution in the surrounding environment.
- The problem at the basis of the invention is hence that of proposing a new type of concrete manufacturing plant, which allows to simultaneously solve the problems mentioned above of the known-type plants, and in particular which exhibits: versatility and adjustability to the available spaces; reduced bulk; quick and safe mounting system based on modular elements; low level of dust and noise pollution in the management of the inert materials; closed-circuit system for the washing and recovery of concrete residues; finally, an actual opportunity for the moving and reuse of the plant in situations which have different availability of space and varied requirements of concrete manufacture.
- These objects are achieved through a concrete manufacturing plant provided with the features defined in the herewith attached
claim 1. The dependent claims describe further preferred features of the invention. - Further features and advantages of the concrete manufacturing plant according to the present invention will in any case be better evident from the following detailed description of a preferred embodiment of the same, given purely as a non-limiting example and shown in the attached drawings, wherein:
-
fig. 1 is a schematic, side-elevation view of a moving concrete manufacturing plant, according to the present invention; -
fig. 2 is a section view along a vertical plane, marked II-II, of the moving concrete manufacturing plant offig. 1 ; -
fig. 3 is a section view along a horizontal plane, marked III-III, of the moving concrete manufacturing plant offig. 1 . For ease of reading such drawing is shown on the same plate and in the same scale asfig. 1 and furthermore on a separate, enlarged-scale plate; -
fig. 4 is a section view similar tofig. 2 , of an alternative embodiment of the concrete loading silos; -
figs. 5A, 5B ,5C and 5D are section views, similar to the enlarged-scale one offig. 3 , which show some different possible embodiments of the concrete manufacturing plant offig. 1 ; -
fig. 6 is a vertical, diametral section view of a modular container for inert materials used in the moving concrete manufacturing plant offig. 1 ; -
fig. 7 is a top plan view of the modular container for inert materials offig. 6 ; and -
fig. 8 is an enlarged perspective view, from the outside, of the detail of the modular container offig. 7 enclosed in a circle, which shows one of the fastening ribs of said modular container. - As will be clear from the following description, the moving concrete manufacturing plant departs from the traditional management mode of inert materials described above, fully eliminating the transport and loose loading of the same and the moving thereof on the ground in the plant yard, and adopts instead a transport of the inert materials in moving and stackable containers specifically designed for the purpose. As a matter of fact, such containers are suited to be loaded on a standard lorry for the transport from the quarries to the plant and to be mutually stacked there to thus form loading silos, or stacked on silos already prepared for providing to the loading thereof through a crane, all as better detailed in the following, which crane - also in this case in a fully innovative way with respect to known concrete manufacturing plants - forms an integral part of the plant of the invention.
- A first embodiment of the plant is shown in
figs. 1-4 . In its essential lines, the plant comprises a rectangular concrete foundation bed A, cast in situ or formed by means of prefabricated blocks, whereon a crane C and a plurality of silos B are arranged and suitably anchored, said silos B containing the solid matter for concrete forming, i.e. cement and inert materials. In the embodiment shown infigs. 1 and3 , silos B and crane C are arranged aligned in a single row, crane C being arranged between two silos Bc meant to contain cement (left of crane C infig. 1 ) and five silos meant to contain the inert materials (right of crane C infig.1 ), and precisely two silos Bs containing sand and three silos Bg containing gravel. - Each one of the seven silos B is supported by a basic reticular framework F, preferably of the type with modular elements which can be assembled by means of screw joints or pin joints, so as to make the assembling and disassembling operations thereof quick and easy. The height of the reticular frameworks F is sufficient for housing within all the plant services, namely: transport systems of the cement and of the inert materials to the mixer; dosing scales for cement and inert materials; mixer; water tanks and additive tanks; loading area of concrete-mixer lorries and hauled concrete pumps; washing devices of such machines; devices for the recovery, separation and storage of the dirty wash waters; access ladders to the different levels of the reticular frameworks F and to crane C; storage areas and offices.
- According to a main feature silos Bg and Bs meant to contain the inert materials - unlike what happens in conventional plants where such silos consist of monolithic cylindrical tanks - are of a modular type, and precisely they consist of a plurality of
containers 1 of a height equal to or close to the width thereof, which are mutually stacked until they reach the desired silo capacity. Alternatively, it is nevertheless also possible to use monolithic silos having the same outer configuration of the above-said containers, and to then load said silos of inert materials stacking thereon one or more of said loaded containers. - The structure of
containers 1 for inert materials is clearly visible, in section and in top plan view, infigs. 6 and 7 and consists of a sturdy outercylindrical body 12 to the lower inner part of which an upside truncatedcone 13 is welded which ends with an opening 14, suitably recessed with respect to the base of saidcylindrical body 12. The surface oftruncated cone 13 hence forms an inner hopper bottom ofcontainer 1 through which the gravel or sand loaded in the container is unloaded by the same throughopening 14. Said opening is furthermore provided with a diaphragm-type closure means which can be actuated and adjusted from the outside, of the type known per se and not shown in the drawings, which is maintained in a closed position during the transport ofcontainer 1. - As a matter of fact, the
containers 1 for inert materials are used not only for the forming of silos B, but also for the transport of inert materials from the production quarry thereof to the concrete manufacturing plant. As a matter of fact,containers 1, after theopening 14 thereof has been duly closed, are filled directly in the quarry with gravel or sand and then loaded onto lorries and transported to the concrete manufacturing plant of the invention. Herecontainers 1 are taken from the means of transport directly by crane C and hence positioned on the reticular framework F, in the positions provided for this purpose. In order to allow the swift transportability ofcontainers 1, the dimensions thereof must hence be such as to be able to be transported by road, loaded with inert materials, through an ordinary means of transport. Preferred dimensions are the ones indicated in the drawings, where one can see thatcontainer 1 is comprised within a cube having a side of 2.4 metres. - After having arranged on reticular framework F a first series of
basic containers 1,subsequent containers 1 are stacked one on top of the other to form silos B of the desired height. By the term "stacked" or "stackable" it is meant to define a condition in whichcontainers 1 simply rest on one another, with no permanent mutual-fastening means, the stability of the silo formed by multiple containers being entrusted to the shape ofcontainer 1 and to the weight thereof. It is of course possible to additionally provide also quick release devices to makecontainers 1 temporarily and mutually integral once stacked, which fastening systems may prove necessary only when the plants are installed in areas subject to strong winds or at high seismic risk. In the embodiment shown the silos consist of 6 containers, each one 2.40 m high and of equal diameter. The overall height of silos B is hence over 13 metres, taking into account an overlapping area of about 0.20 m height between stackedcontainers 1, which allows to achieve the desired stability and tipping-over safety. The closing means of opening 14 ofcontainers 1 after the first one are opened as the containers are arranged in position and the adjustment of the unloading of whole silo B thus formed is accomplished through the closing means of opening 14 of thecontainer 1 of each silo B arranged in the lowest position, i.e. the one resting on reticular framework F. - To improve the mutual stacking of
containers 1, the outercylindrical body 12 thereof, as well as that of monolithic silos 11 which will be dealt with shortly, ends above with aconical edge 15 inclined inwards, which acts as guide and centring for acontainer 1 arranged on top thereof and, once mounted, it determines the above-said overlapping area between adjacent containers which already allows to have an optimal safety level, with respect to the stability of the modular silos, even in the absence of mutual-fastening devices. - Finally, on the upper edge of
cylinder 12, as shown in the detail offig. 8 , external cavities 16 (four in the embodiment shown) are furthermore formed in the thickness of the cylinder and on the outer portion of the same, preferably by mechanical machining through material removal, eachcavity 16 being provided with a perforatedcentral rib 17, for the easy fastening ofcontainer 1 through a multiple-hook lifting system, for example that of crane C. - The modular construction of silos B described above can concern the entire vertical extension of the silo, as indicated in
fig. 2 , or only a portion thereof, as indicated in alternative embodiment offig. 4 , wherein the lower portion of the silo consists of a conventional silo 11, on the top of which a reduced number (1-4) ofcontainers 1 can be housed which alternatively act either as simple silo reloading means, or as an integral element of the silo. This second embodiment may be conveniently used also for the silos of cement Bc, as a valid alternative to the conventional silos with pneumatic-filling or screw conveyor-filling, when such type of filling is not available or causes dust scattering problems. - The distribution of the different services of the plant inside the same is of course designed depending on the composition of the individual plant, which composition may vary in the arrangement thereof, as shown in the four different embodiments shown in
figs. 5A-5D , wherein, however, all the essential plant elements as described above are always present, even though in a varied number and arrangement. - In the embodiment of
fig. 1 , framework F comprises in height three different portions, namely a lower portion Fb of about 4.40 m height, a middle portion Fm and an upper portion Ft, these last two measuring both about 2.2 m height each and the plant services already listed above consist of and are arranged as follows: - transport systems of cement and inert materials to a mixer, consisting of a
screw conveyor 5 and ofconveyor belts 6 arranged in the upper portion Ft of reticular framework F, immediately below the outlets of silos S. In the embodiment shown, screw conveyor5 for cement transport has an inclined configuration, to be able to collect the product unloaded from silos Bc which are arranged at different heights from the ground, and occupies also part of the central portion Fm of framework F, whileconveyor belt 6 is horizontal, because the outlets of silos Bg e Bs are all arranged at the same height from the ground; - dosing scales 3 for cement and inert materials arranged inside the body of crane C, also in the upper portion Ft of the framework F, and fed by
screw conveyor 5 and byconveyor belts 6; - a mixer 4, also arranged inside the body of crane C, in the above-said intermediate portion Fm of framework F, below dosing scales 3 and fed thereby;
- a water tank and additive tanks arranged, in a central position, in the lower portion Fb of framework F which supports the inert material silos;
- a loading area 2, consisting of a bridge-like base structure of crane C which hence allows concrete-mixer lorries and hauled concrete pumps direct access under mixer 4, so as to make the loading operations of the same as easy, quick and clean as possible;
- washing devices for washing concrete-mixer lorries, hauled concrete pumps and mixer 4, in the shape of conventional pressurised-water jets or nozzles, are provided in the same loading area 2 of such machines. In the flooring of said loading area 2, a
grid 9 with drain well allows to recover entirely the wash waters and the cement and inert materials transported thereby; - devices for the recovery, separation and storage of the above-said dirty wash waters, also arranged in the portion Fb of framework F which supports the inert material silos, namely in the portion adjacent to crane C. Through such devices it is possible to separate and store separately the different components of the slurry collected through the
grid 9 with drain well. Such components are then sent for recycling to mixer 4 in a subsequent concrete-forming cycle; - storage areas of various material for plant operation are formed in the portion Fb of framework F which supports the inert material silos, namely in the part facing towards the plant outside;
-
access stairs 7 are provided in the base portion Fb of reticular framework F which supports the cement silos Bc, for the purpose of providing access to the area of mixer 4 and to central portion Fm of reticular framework F, wherein the offices for plant control and management are located; - from the arrival area of
access stairs 7, i.e. from the area of mixer 4, alternate-flights stairs 8 rise around crane C to provide access to the high portion of the same crane C and to metal inspection catwalks G which are provided at the different levels reported in the drawings. - The plans, the measurements and the dimensions, the number and the contents of the silos, as well as the distribution system of the inert materials, are purely indicative and exemplifying and hence serve solely to illustrate the plant operation. As a matter of fact, in the practical working of the invention there is always a high opportunity for the user to adjust the plant to the specific requirements of positioning, dimensions and accessibility of the mounting site.
- From the preceding description it should be clear how the concrete manufacturing plant of the present invention has fully reached all the provided objects. As a matter of fact, the plant provides an extremely reduced space occupation and, in particular, strictly limited to those spaces which are taken up by storage silos, since all the yard spaces meant for the handling of the inert materials have been eliminated and since all plant services are inserted in the same perimeter occupied by the silos. The use of closed containers for the handling of inert materials through crane C furthermore completely eliminates dust and noise pollution, typical of conventional plants. Finally, the simplicity and modularity of the plant allows both extremely fast assembling and disassembling - facilitated by the very presence of crane C within the plant, which hence plays an essential role both in the assembling/disassembling steps and in the running of the plant- and a change of the layout and of the number of the individual plant components, to adjust itself flexibly to the spaces available in the proximity of the building site for the installation of the plant.
- All these positive features cause the concrete manufacturing plant according to the present invention to be able to be mounted also in already densely populated areas, and in particular in urban building sites, without causing drawbacks or inconvenience to the workforce meant for the plant nor to the residents of the surrounding buildings, thus allowing greater economy, execution swiftness and quality of the concrete works carried out as well as a reduction of the vehicle traffic otherwise necessary for the supply of the urban building site with concrete coming from external plants.
- It is hence understood that the invention must not be considered limited to the particular arrangements shown above, which represent only exemplifying embodiments thereof, but that a number of other variants are possible, all within the reach of a person skilled in the field, without departing from the scope of the invention, as defined in the following claims.
Claims (8)
- Plant for the manufacture of concrete, of the type comprising multiple silos (B) for the loading of cement and inert materials, one or more scales (3) for dosing the cement and the inert materials supplied by said silos (B) through belt- and screw-conveyors (5, 6), a mixer (4) supplied by said dosing scales (3) and apt to manufacture the concrete, a water tank and possible tanks for additives, characterised in that said inert material silos (Bg, Bs) consist at least in part of a plurality of containers (1), stacked with no permanent, mutual-fastening means, each one of said containers having such a size as to be able to be road-transported full of inert materials by means of an ordinary means of transport, wherein each of said containers (1) consists of a cylindrical body (12) having a hopper-shaped inner bottom (13) provided with a discharge opening (14), preferably recessed with respect to the base of said cylindrical body, and said opening (14) being further provided with a diaphragm closing means which can be actuated from outside the container (1), wherein each one of said containers (1) comprises an upper conical edge (15) inclined towards the inside of the container and integral with said cylindrical body (12), said upper conical edge (15) forming a guiding and centring element for a container (1) stacked on top thereof and in that the plant furthermore comprises a crane (C) for moving said containers (1).
- Plant for the manufacture of concrete as claimed in claim 1, wherein each one of said containers (1) comprises, in correspondence of the upper edge of said cylindrical body (12), multiple external cavities (16), each one provided with a perforated central rib (17) for moving the container (1), said cavity (16) and said perforated rib (17) being preferably formed by material removal in the thickness of said cylindrical body (12).
- Plant for the manufacture of concrete as claimed in claims 1 or 2, wherein said silos (B) are supported by a base reticular framework (F), preferably of the type having modular elements which can be assembled by means of screw joints or pin joints.
- Plant for the manufacture of concrete as claimed in claim 3, wherein said reticular framework (F) has a height sufficient for housing inside all the plant services.
- Plant for the manufacture of concrete as claimed in claim 4, wherein said reticular framework (F) comprises the following portions and corresponding services:- a lower portion (Fb) comprising: devices for the washing of concrete-mixer lorries and hauled concrete pumps; devices for the recovery, separation and storage of wash waters; access steps (7) to the various levels of the reticular frameworks (F); water and additive tanks; storage-areas;- an intermediate portion (Fm) comprising: screw conveyors (5) for transporting the cement to the dosing scales (3); offices;- an upper portion (Ft) comprising: belt-and-screw conveyors for the transport of the inert materials (6) and of the cement (5) to the dosing scales (3).
- Plant for the manufacture of concrete as claimed in claim 3, wherein said crane (C) comprises a bridge-like base structure which houses inside therein a loading area (2) of the concrete-mixer lorries and of the hauled concrete pumps.
- Plant for the manufacture of concrete as claimed in claim 6, wherein above said bridge-like base structure (2) and inside the body of the crane (C) there are housed, one on top of the other, said scales (3) for the dosing of the cement and of the inert materials as well as said mixer (4).
- Plant for the manufacture of concrete as claimed in claim 7, furthermore comprising alternate flights of steps (8) which runs around the crane (C) from the area housing the mixer (4) up to the top of the same crane (C), moreover providing access to intermediate metal catwalks G for the inspection of the silos (B).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT001814A ITMI20111814A1 (en) | 2011-10-06 | 2011-10-06 | MOBILE SYSTEM FOR CONCRETE PRODUCTION. |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2578371A1 EP2578371A1 (en) | 2013-04-10 |
EP2578371B1 true EP2578371B1 (en) | 2017-10-04 |
Family
ID=45809415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12187503.3A Active EP2578371B1 (en) | 2011-10-06 | 2012-10-05 | Dismountable plant for concrete manufacture |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2578371B1 (en) |
IT (1) | ITMI20111814A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112936608A (en) * | 2021-02-05 | 2021-06-11 | 西安高科新达混凝土有限责任公司 | Factory raw material residual material quantity detection feedback system |
CN115404901B (en) * | 2022-08-01 | 2023-05-09 | 中建交通建设集团有限公司 | Assembled slurry stirring station foundation and construction method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19901904A1 (en) * | 1999-01-19 | 2000-07-20 | Heilit & Woerner Bau Ag | Transportable concrete mixing station has a modular construction which packs into standard containers and which uses the containers as building modules |
EP1406825A4 (en) * | 2001-06-13 | 2006-10-11 | Ong Bee Kim | Containerised handling of bulk materials and apparatus therefor |
-
2011
- 2011-10-06 IT IT001814A patent/ITMI20111814A1/en unknown
-
2012
- 2012-10-05 EP EP12187503.3A patent/EP2578371B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP2578371A1 (en) | 2013-04-10 |
ITMI20111814A1 (en) | 2012-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20240182237A1 (en) | Mobile support structure for bulk material containers | |
US11141882B2 (en) | Concrete batching plant having reduced cycle time and reduced installation and dismantling time | |
US7252309B2 (en) | Containerised handling of bulk materials and apparatus therefor | |
CA2967291C (en) | Container bulk material delivery system | |
CA3004709C (en) | Semi-rigid bulk material storage container | |
CA2747116C (en) | Vertically oriented transportable container with improved stability | |
US10059535B2 (en) | Granular material storage with input and output | |
US3742664A (en) | Overhead storage bin | |
US20190276225A1 (en) | Dust control systems for bulk material containers | |
US2958983A (en) | Concrete storage structure | |
EP2578371B1 (en) | Dismountable plant for concrete manufacture | |
ITPG20090061A1 (en) | MOBILE SYSTEM FOR CONCRETE PRODUCTION | |
KR101359246B1 (en) | Structure for connecting column in silo and silo using the same | |
US8381899B2 (en) | Apparatus for storing rolling material in a pile and reclaiming from the pile | |
CN211812384U (en) | Symmetrical mixing station storage bin | |
WO2005030622A1 (en) | A method and system for filling the entire volume of 20 feet steel shipping containers | |
US20170225204A1 (en) | Concrete washout apparatus | |
RU2665718C2 (en) | Device for preparation of cement concrete and other mixtures | |
ES2223322T3 (en) | INSTALLATION FOR STORAGE, HANDLING AND FEEDING LOOSE MATERIALS AND CORRESPONDING OPERATING PROCEDURE. | |
US3977541A (en) | Storage structure for granular materials | |
US3871148A (en) | Grain hopper structure | |
CN209467585U (en) | Pitch, concrete agitation station storage bin | |
Lynskey et al. | Small Volume Concrete Walled Silo Solutions | |
RU2464165C2 (en) | Mobile concrete-mixing plant | |
SU898021A1 (en) | Grain elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20131008 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
17Q | First examination report despatched |
Effective date: 20160407 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B28C 9/00 20060101ALI20161116BHEP Ipc: B28C 7/00 20060101AFI20161116BHEP Ipc: B65D 88/26 20060101ALI20161116BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170418 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 933572 Country of ref document: AT Kind code of ref document: T Effective date: 20171015 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602012038065 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: PATENTANWAELTE SCHAAD, BALASS, MENZL AND PARTN, CH |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20171004 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 933572 Country of ref document: AT Kind code of ref document: T Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180105 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180204 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180104 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602012038065 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171005 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20171031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171031 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
26N | No opposition filed |
Effective date: 20180705 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171005 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171005 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180104 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20121005 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171004 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20210921 Year of fee payment: 10 Ref country code: FR Payment date: 20210921 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20210922 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602012038065 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230522 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221031 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221031 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230503 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221031 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20230927 Year of fee payment: 12 |