EP2351971A2 - Air-conditioning monitoring system, control method therefor, air conditioner, and centralized monitoring apparatus - Google Patents
Air-conditioning monitoring system, control method therefor, air conditioner, and centralized monitoring apparatus Download PDFInfo
- Publication number
- EP2351971A2 EP2351971A2 EP10180152A EP10180152A EP2351971A2 EP 2351971 A2 EP2351971 A2 EP 2351971A2 EP 10180152 A EP10180152 A EP 10180152A EP 10180152 A EP10180152 A EP 10180152A EP 2351971 A2 EP2351971 A2 EP 2351971A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- air conditioner
- test operation
- operation data
- monitoring apparatus
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 91
- 238000004378 air conditioning Methods 0.000 title claims abstract description 30
- 238000000034 method Methods 0.000 title claims description 14
- 238000012360 testing method Methods 0.000 claims abstract description 194
- 230000005856 abnormality Effects 0.000 claims abstract description 66
- 238000004891 communication Methods 0.000 claims description 63
- 238000013500 data storage Methods 0.000 claims description 14
- 238000009434 installation Methods 0.000 description 8
- 230000001413 cellular effect Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000011017 operating method Methods 0.000 description 4
- 238000005057 refrigeration Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000011555 saturated liquid Substances 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000003507 refrigerant Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/32—Responding to malfunctions or emergencies
- F24F11/36—Responding to malfunctions or emergencies to leakage of heat-exchange fluid
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/49—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring ensuring correct operation, e.g. by trial operation or configuration checks
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/54—Control or safety arrangements characterised by user interfaces or communication using one central controller connected to several sub-controllers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
- F24F11/57—Remote control using telephone networks
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
- F24F11/58—Remote control using Internet communication
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/64—Electronic processing using pre-stored data
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/32—Responding to malfunctions or emergencies
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2140/00—Control inputs relating to system states
Definitions
- the present invention relates to an air-conditioning monitoring system, a control method therefor, an air conditioner, and a centralized monitoring apparatus.
- This application is based on Japanese Patent Application No. 2010-001996 , the content of which is incorporated herein by reference.
- a multi-type air conditioner in which a plurality of indoor units are connected to one outdoor unit is known.
- the multi-type air conditioner is formed of one outdoor unit and a plurality of indoor units that are connected using shared refrigerant piping.
- a plurality of such multi-type air conditioners are installed as needed.
- a test operation is executed by an on-site worker, and then upon completion of the test operation, the multi-type air conditioner is provided to customers for use.
- Japanese Unexamined Patent Application, Publication No. 2009-14233 discloses a technology of acquiring operating information of an air conditioner by using a cellular phone unit to monitor the operational status of the air conditioner through the cellular phone.
- the processes of installation and test operation depend on the experience of on-site workers. For example, if on-site workers who execute the test operation change frequently, the techniques involved in the test operation are not shared among the on-site workers, and thus the test operation is not properly executed in some cases. Also, because data obtained from the test operation is not evaluated, and a problem cannot be found before installation, there is a problem in that a failure occurs within a very short period of time after the installation.
- the present invention has been made in view of such circumstances, and an object thereof is to provide an air-conditioning monitoring system, a control method therefor, an air conditioner, and a centralized monitoring apparatus that allow control through a remote controller when there is no abnormality in a test operation.
- the present invention provides an air-conditioning monitoring system including: an air conditioner that shifts to a normal operation after a test operation is executed and that is controlled by a remote controller; and a centralized monitoring apparatus that collects operating information of the air conditioner, the air conditioner and the centralized monitoring apparatus being connected via a network so as to be able to communicate with each other, in which the air conditioner includes test operation data collecting for collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; and switching means for switching the air conditioner to a state where control through the remote controller is permitted, when permission data for permitting control through the remote controller is received; and the centralized monitoring apparatus includes permission data output means for outputting the permission data to the air conditioner, that has output the test operation data, when there is no abnormality in the test operation data obtained from the air conditioner.
- the centralized monitoring apparatus when there is no abnormality in the test operation data that indicates an operating condition collected when the test operation of the air conditioner is executed, the centralized monitoring apparatus outputs permission data for permitting control through the remote controller to the air conditioner, which has output this test operation data having no abnormality, and, upon reception of the permission data, the air conditioner is switched to a state in which control through the remote controller is permitted.
- the test operation data includes the compressor discharge temperature, the compressor suction temperature, the heat exchanger temperature, the fan rotation speed, the degree of opening of an expansion valve, the pressure, etc. obtained at the time of the test operation.
- control through the remote controller is permitted only when the test operation is normally executed and there is no abnormality therein, and control through the remote controller is not permitted when there is an abnormality in the test operation, it is possible to reduce the number of cases in which, even though there is an abnormality in the test operation, the air conditioner for which control through the remote controller is permitted is delivered to a customer. Since the centralized monitoring apparatus determines whether there is an abnormality in test operation data for each air conditioner and outputs permission data only to an air conditioner whose test operation data has no abnormality, the use of the remote controller of the air conditioner is not permitted based on permission data for another air conditioner.
- the above-described air-conditioning monitoring system may further include a communication terminal that is interposed between the air conditioner and the centralized monitoring apparatus, that is connected to the air conditioner and to the centralized monitoring apparatus via a network so as to be able to communicate with the air conditioner and with the centralized monitoring apparatus, and that includes a notification device, in which the air conditioner may further include precheck determining means for determining whether a precheck has been executed in the communication terminal before execution of the test operation; and test operation starting means for starting the test operation when the precheck determining means determines that the precheck has been executed.
- the precheck is executed to check the electricity to see whether the air conditioner has been powered on; instrumentation to see whether a signal line has been connected between an indoor unit and an outdoor unit of the air conditioner; piping to see whether an service valve that connects the outdoor unit and the indoor unit has been opened; and whether, when a plurality of outdoor units are provided, a valve of an oil equalizing pipe provided between the outdoor units has been opened.
- the test operation is executed after it is determined that the precheck has been executed, it is possible to reduce human errors and to reduce installation errors.
- the communication terminal is a cellular phone, a personal computer, a PDA (Personal Digital Assistant), or a game machine having a communication function, for example, and is a terminal through which information required for the precheck for the air conditioner is provided to the user using the communication terminal.
- the communication terminal may output the test operation data obtained from the air conditioner to the centralized monitoring apparatus;
- the centralized monitoring apparatus may further include a shipping-list storage section that stores shipping information about shipping of the air conditioner; and the permission data output means may output the permission data based on the shipping information stored in the shipping-list storage section and the test operation data.
- the centralized monitoring apparatus compares a shipping list (shipping information) for the location A with the input information about the power consumption.
- a shipping list shipment information
- the centralized monitoring apparatus compares a shipping list (shipping information) for the location A with the input information about the power consumption.
- the permission data output means of the centralized monitoring apparatus may include: test operation data storage means for storing the obtained test operation data for each the air conditioner; and determination means for determining a criterion used to determinate whether there is an abnormality in the test operation data, based on the test operation data stored in the test operation data storage means and for making the determination based on the criterion.
- test operation data storage means for storing the obtained test operation data for each the air conditioner
- determination means for determining a criterion used to determinate whether there is an abnormality in the test operation data, based on the test operation data stored in the test operation data storage means and for making the determination based on the criterion.
- the centralized monitoring apparatus may notify the communication terminal of information used for removing the abnormality. For example, in some cases, a failure occurs when saturated liquid refrigeration is directly suctioned to the compressor, and examples of the cause thereof include an EEV (Electric Expansion Valve) leakage, an SV (Solenoid Valve) leakage, and a fan operation failure.
- EEV Electrical Expansion Valve
- SV Solenoid Valve
- information for identifying the cause of the failure that is, information for removing the failure
- the operator of the communication terminal identifies the cause of the failure more easily when executing an operation based on the information for removing the failure, notified to the communication terminal.
- the air conditioner may include a temperature sensor, and a temperature measured by the temperature sensor may be included in the test operation data.
- a service valve used for refrigeration or oil
- temperature information is collected by a temperature sensor, thereby detecting the occurrence of the abnormality. In this way, when the temperature information is collected from the temperature sensor as test operation data, the accuracy of detection of an abnormality can be improved.
- the present invention provides an air conditioner that shifts to a normal operation after a test operation is executed, that is controlled by a remote controller, and that is connected to a centralized monitoring apparatus that collects operating information, via a network so as to be able to communicate with each other, the air conditioner including: test operation data collecting for collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; and switching means for switching the air conditioner to a state where control through the remote controller is permitted, when there is no abnormality in the test operation data and when permission data for permitting control through the remote controller is received from the centralized monitoring apparatus.
- the present invention provides a centralized monitoring apparatus that collects operating information of an air conditioner and that is connected to the air conditioner via a network so as to be able to communicate with each other, the air conditioner shifting to a normal operation after a test operation is executed and being controlled by a remote controller, the centralized monitoring apparatus including permission data output means for outputting, when there is no abnormality in test operation data that is collected in and output from the air conditioner and that indicates an operating condition obtained when the test operation is executed, permission data for permitting control through the remote controller to the air conditioner, that has output the test operation data, in which the permission data makes the air conditioner switch to a state where control through the remote controller is permitted.
- the present invention provides a control method for an air-conditioning monitoring system that includes: an air conditioner that shifts to a normal operation after a test operation is executed and that is controlled by a remote controller; and a centralized monitoring apparatus that collects operating information of the air conditioner, the air conditioner the centralized monitoring apparatus being connected via a network so as to be able to communicate with each other, the control method including: a test operation data collecting step, performed by the air conditioner, of collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; a switching step, performed by the air conditioner, of switching the air conditioner to a state where control through the remote controller is permitted, when permission data for permitting control through the remote controller is received; and a permission data outputting step, performed by the centralized monitoring apparatus, of outputting the permission data to the air conditioner, that has output the test operation data, when there is no abnormality in the test operation data obtained from the air conditioner.
- an advantage is afforded in that, when there is no abnormality in a test operation, control through a remote controller is allowed.
- FIG. 1 shows the overall configuration of an air-conditioning monitoring system 1 according to this embodiment.
- the air-conditioning monitoring system 1 includes air conditioners 2a and 2b, a centralized monitoring apparatus 3, and a communication terminal 4.
- the air conditioners are collectively described as air conditioners 2 unless otherwise specified.
- the communication terminal 4 is interposed between the air conditioners 2 and the centralized monitoring apparatus 3 and is connected to the air conditioners 2a and 2b and to the centralized monitoring apparatus 3 so as to enable mutual communication therebetween via a network 5.
- the network 5 uses a communication line that is compatible with the air conditioners 2a and 2b, the communication terminal 4, and the centralized monitoring apparatus 3 ; and it may provide wired communication using general telephone lines, dedicated lines, etc., or wireless communication using a mobile communication system etc. Alternatively, it may provide communication via a LAN, such as Ethernet or a wireless LAN. In this embodiment, a description will be given of a case where two air conditioners are provided; however, the number of air conditioners is not particularly limited, and there is no particular upper limit to the number thereof.
- the air conditioner 2a includes an outdoor unit 21a, a plurality of indoor units 22 connected to the outdoor unit 21a, and a remote controller 23 for operating the indoor units 22.
- the air conditioner 2b also includes an outdoor unit 21b, a plurality of indoor units 22 connected to the outdoor unit 21b, and a remote controller 23 for operating the indoor units 22.
- the air conditioners are collectively described as air conditioners 2 and the outdoor units are collectively described as outdoor units 21.
- the air conditioners 2 shift to a normal operation after execution of a test operation and are controlled by a customer (operator) with the use of the remote controller 23.
- the air conditioners 2 are set in advance to a state where control through the remote controller 23 is not permitted.
- FIG. 2 is a block diagram showing, in outline, the configuration of the air-conditioning monitoring system 1 according to this embodiment.
- the outdoor units 21 each include a precheck determining section (precheck determining means) 50, a test operation starting section (test operation starting means) 51, a test operation data collecting section (test operation data collecting means) 52, and a switching section (switching means) 53.
- the precheck determining section 50 determines whether a precheck has been executed in the communication terminal 4 (to be described in detail later) prior to execution of a test operation. Specifically, when the operator of the communication terminal 4 has executed a precheck, the precheck determining section 50 determines the state of execution of the precheck based on whether a precheck result (for example, information that includes a flag indicating that the precheck has been executed) input by the operator through the communication terminal 4 has been obtained. If it is determined that the precheck has been executed, the precheck determining section 50 outputs information indicating that the precheck has been executed to the test operation starting section 51.
- a precheck result for example, information that includes a flag indicating that the precheck has been executed
- the precheck is work for confirming the state of each air conditioner 2 in order to execute a test operation properly and is executed by the operator of the communication terminal 4. For example, the precheck is executed to check the electricity to see whether the air conditioner 2 has been powered on; instrumentation to see whether a signal line has been connected between the indoor units 22 and the outdoor unit 21 of the air conditioner 2; piping to see whether a service valve that connects the outdoor unit 21 and the indoor units 22 has been opened; and information indicating whether, when a plurality of outdoor units 21 are provided, a valve of an oil equalizing pipe provided between the outdoor units 21 has been opened.
- test operation starting section 51 starts a test operation of the air conditioner 2. In this way, since the test operation is executed after it is confirmed that the precheck has been executed, prior to starting the test operation, it is possible to reduce situations in which a problem occurs in the test operation due to human procedural error etc.
- the test operation data collecting section 52 collects and outputs test operation data indicating the operating conditions obtained when the test operation was executed. For example, the test operation data collecting section 52 collects, as test operation data, the compressor discharge temperature, the compressor suction temperature, the heat exchanger temperature, the fan rotation speed, the degree of opening of an expansion valve, the pressure, etc. and outputs the test operation data to the communication terminal 4.
- a temperature sensor 24 may be additionally provided, and the temperature measured by the temperature sensor 24 may be included in the test operation data, in addition to information from a sensor provided in advance in the air conditioner 2. For example, if a service valve (used for refrigeration or oil, for example) is mistakenly not opened at an installation site of the air conditioner 2, it is difficult for the sensor provided therein in advance to judge whether the service valve is mistakenly not opened.
- a service valve used for refrigeration or oil, for example
- the temperature sensor 24 when the temperature sensor 24 is provided at a location where a change in temperature corresponding to the opening/closing of the service valve can be detected, and temperature information obtained by the temperature sensor 24 is included in the test operation data, it is possible to determine whether the test operation data (temperature information) is normal by comparing the temperature expected to be measured when the service valve is opened with the current temperature measured by the temperature sensor 24. In this way, when the temperature sensor 24 is used, an abnormality in the test operation data can be detected more accurately.
- the switching section 53 switches to a state where the control through the remote controller 23 is permitted.
- the air conditioner 2 is set in advance to the state where the control through the remote controller 23 is not permitted, and, upon reception of the permission data, it is switched from the not-permitted state to the permitted state; however, the switching of the switching section 53 is not limited thereto.
- the air conditioner 2 is switched from the permitted state to the not-permitted state.
- the centralized monitoring apparatus 3 includes a permission data output section (permission data output means) 30 that outputs, when there is no abnormality in the test operation data obtained from the air conditioner 2, "permission data" to the air conditioner 2 which has output the test operation data.
- the permission data output section 30 includes a test operation data storage section (test operation data storage means) 301 and a determination section (determination means) 302.
- the test operation data storage section 301 stores, for each air conditioner 2, reference test operation data obtained when a test operation is normally executed.
- the test operation data storage section 301 stores test operation data for each air conditioner 2 by associating the test operation data with the device information (for example, the device's serial number etc.) obtained together with the test operation data.
- the determination section 302 determines whether there is an abnormality in the test operation data (in other words, whether there is an abnormality in the status of the test operation) by comparing the reference test operation data with the obtained test operation data and, if it is determined that there is no abnormality in the test operation data, outputs "permission data" to the communication terminal 4. If it is determined that there is an abnormality in the test operation data, "abnormality notification data" is sent to the communication terminal 4.
- the abnormality notification data is information used for removing the abnormality and includes an operating method to identify the location of the abnormality and the cause of the abnormality, for example.
- the centralized monitoring apparatus 3 detects a state where saturated liquid refrigeration is directly suctioned into the compressor, based on the test operation data. It is considered that this state is caused by any of a plurality of causes, such as an EEV leakage, an SV leakage, and a fan operation failure, and it is difficult to find the cause through the test operation.
- an operating method to identify the cause of the abnormality is notified to the communication terminal 4. Then, the operator of the communication terminal 4 operates the air conditioner 2 based on the information of the operating method notified to the communication terminal 4, thus making it easy to identify the cause of the abnormality.
- the communication terminal 4 is connected to the air conditioner 2 and to the centralized monitoring apparatus 3 via the network 5 .
- the communication terminal 4 allows the operator to execute the precheck before the execution of the test operation of the air conditioner 2 and to execute the test operation, receives test operation data and device information from the outdoor unit 21 of the air conditioner 2, and sends them to the centralized monitoring apparatus 3. Further, the communication terminal 4 sends permission data or abnormality notification data received from the centralized monitoring apparatus 3 to the air conditioner 2.
- the communication terminal 4 is, for example, a cellular phone, a personal computer, a PDA (personal Digital Assistant), or a game machine having a communication function. Specifically, as shown in FIG. 2 , the communication terminal 4 has a notification section 41 and a storage section 42.
- communication terminal 4 notifies the notification section 41 that is no abnormality in the test operation of the conditioner 2a and outputs the permission data to the air conditioner 2a via a communication section (not shown).
- abnormality notification data for the air conditioner 2b is obtained from the centralized monitoring apparatus 3
- the communication terminal 4 notifies the notification section 41 that there is an abnormality in the test operation data of the air conditioner 2b and also notifies the notification section 41 of information for removing the abnormality included in the abnormality notification data (an operating method to identify the location of the abnormality and the cause of the abnormality). In this way, the determination result of the test operation data of each air conditioner 2 is displayed in the notification section 41 of the communication terminal 4.
- the storage section 42 stores a precheck list serving as an operation procedure used for reliably executing a precheck before executing the test operation of the air conditioner 2. Specifically, when the operator executes an operation prior to the test operation (for example, an operation of pushing a dedicated switch for the test operation if the dedicated switch is provided) in the communication terminal 4 before starting the test operation, the precheck list is read from the storage section 42.
- Information of the precheck list read from the storage section 42 is notified to the notification section 41, thus being provided to the operator of the communication terminal 4 as information required for the precheck executed before the test operation.
- the precheck result is sent to the air conditioner 2 for which the precheck has been executed, via the communication section of the communication terminal 4.
- FIG. 2 the operation of the air-conditioning monitoring system 1, having the above-described configuration, will be described using FIG. 2 .
- the air conditioners 2a and 2b have the same functions, a description will be given of the operation of the air conditioner 2a as an example in this embodiment, on the assumption that the communication terminal 4 focuses on the air conditioner 2a.
- the communication terminal 4 is connected to the air conditioners 2a and 2b via the network 5 (via a cellular phone line, for example).
- the precheck result input to the communication terminal 4 is sent to the air conditioner 2a.
- the precheck determining section 50 it is determined whether the precheck prior to the test operation was executed based on whether the precheck result has been obtained, and, if it is determined that the precheck was executed, the determination result is notified to the test operation starting section 51. If it is determined that the precheck was not executed, the above-described determination is repeated until the precheck is executed.
- the test operation starting section 51 When the test operation starting section 51 obtains information indicating that the precheck was executed, it starts the test operation of the air conditioner 2a, collects test operation data obtained from the air conditioner 2a, and sends the test operation data and the device information to the communication terminal 4. Upon reception of the test operation data and the device information, the communication terminal 4 sends them to the centralized monitoring apparatus 3 via the network 5. Then, the reference test operation data for the air conditioner 2a which has sent the obtained test operation data is read from the test operation data storage section 301 of the centralized monitoring apparatus 3 and is output to the determination section 302. Also, the obtained test operation data is stored in the test operation data storage section 301 together with the device information of the air conditioner 2a.
- the determination section 302 it is determined whether there is an abnormality in the test operation data, and, if it is determined that there is no abnormality in the test operation data, permission data for the air conditioner 2a is sent to the communication terminal 4.
- the notification section 41 of the communication terminal 4 is notified that there is no abnormality in the test operation, and the permission data is sent to the air conditioner 2a.
- abnormality notification data for the air conditioner 2a is sent to the communication terminal 4.
- the notification section 41 of the communication terminal 4 is notified that there is an abnormality in the test operation of the air conditioner 2a and is also notified of information for removing the abnormality. The operator can trace the cause of the notified abnormality by confirming the abnormality notification data notified to the notification section 41.
- the switching section 53 of the air conditioner 2a When the switching section 53 of the air conditioner 2a receives the permission data, it is recognized that the use of the remote controller 23 is permitted, the state of the switching section 53 is switched from the not-permitted state to the permitted state, and the outdoor unit 21 of the air conditioner 2a is permitted to be controlled through the remote controller 23.
- the air conditioner 2a obtains the permission data, this processing ends. In a case where the air conditioner 2a does not receive permission data, the above-described processing is repeated until permission data is received (until permission is given).
- test operation data that is collected when the test operation was executed is compared with expected test operation data that would be collected when the test operation is normally executed, to determine whether the test operation was normally executed. Only when the test operation was normally executed, the air conditioner 2 that has sent the normal test operation data is permitted to be controlled through the remote controller 23.
- the test operation data collected at the time of the test operation is used to determine whether the air conditioner 2 is permitted to be controlled through the remote controller 23, and, only when there is no abnormality in the test operation, the air conditioner 2 is permitted to be operated through the remote controller 23. Accordingly, it is possible to prevent a problem that may occur after the installation of an air conditioner that is delivered to a customer even though an abnormality is included therein.
- a criterion may be determined based on the test operation data stored in the test operation data storage section 301 together with the device information, and it may be determined whether there is an abnormality in obtained test operation data based on this criterion and the obtained test operation data.
- the criterion is determined according to an environment (for example, according to each country or weather) in which the air conditioner 2 is installed. Accordingly, the accuracy of a threshold serving as a criterion for determination can be improved.
- the air conditioner used in this embodiment is a multi-type air conditioner; however, the type thereof is not limited thereto.
- an air conditioner in which one indoor unit is provided for one outdoor unit may be used.
- FIG. 3 An air-conditioning monitoring system 1' according to this embodiment differs from that of the first embodiment in that a shipping-list storage section (shipping-list storage means) 31 that stores shipping information about each air conditioner 2 is provided.
- the air-conditioning monitoring system 1' of this embodiment will be described below mainly in terms of the differences from that of the first embodiment, and a description of similarities will be omitted.
- the shipping-list storage section 31 stores information about shipping (hereinafter, referred to as "shipping information") of an air conditioner 2 shipped to each location, as information for each air conditioner 2. Specifically, the shipping destination of the air conditioner 2 can be found out from the shipping information. For example, in the shipping information, the shipping destination (shipping destination identifying information such as the address and the telephone number), the shipping date and time, the delivery date and time, information about the number of air conditioners (outdoor units and indoor units), and information about the type and the model number are associated with one another.
- the permission data output section 30 determines whether permission data is output, based on the shipping information stored in the shipping-list storage section 31 and obtained test operation data.
- the shipping-list storage section 31 stores shipping information indicating that the air conditioner 2a to be shipped (delivered) to a location A has a model number X
- the centralized monitoring apparatus 3 obtains, from the air conditioner 2a, the device information that includes a model number Y
- the determination section 302 determines that there is an abnormality and sends abnormality notification data regarding the air conditioner 2a to the communication terminal 4.
- the shipping-list storage section 31 stores shipping information indicating that the air conditioner 2b at a location B has one outdoor unit and eight indoor units
- the test operation data obtained from the air conditioner 2b has information (for example, the power consumption value etc.) indicating that there are one outdoor unit and six indoor units
- the shipping information of the air conditioner 2b differs from the test operation data obtained from the air conditioner 2b.
- the determination section 302 determines that there is an abnormality in the air conditioner 2b at the location B and sends abnormality notification data regarding the air conditioner 2b to the communication terminal 4.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Human Computer Interaction (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- Air Conditioning Control Device (AREA)
Abstract
An air-conditioning monitoring system (1) includes an air conditioner that shifts to a normal operation after a test operation is executed and that is controlled by a remote controller; and a centralized monitoring apparatus (3) that collects operating information of the air conditioner, the air conditioner and the centralized monitoring apparatus (3) being connected via a network. The air conditioner includes a test operation data collecting section (52) that collects and outputs test operation data that indicates an operating condition obtained when the test operation is executed; and a switching section (53) that switches the air conditioner to a state where control through the remote controller is permitted, when permission data for permitting control through the remote controller is received. The centralized monitoring apparatus (3) includes a permission data output section (30) that outputs the permission data to the air conditioner, when there is no abnormality in the test operation data obtained from the air conditioner.
Description
- The present invention relates to an air-conditioning monitoring system, a control method therefor, an air conditioner, and a centralized monitoring apparatus.
This application is based on Japanese Patent Application No. , the content of which is incorporated herein by reference.2010-001996 - A multi-type air conditioner in which a plurality of indoor units are connected to one outdoor unit is known. The multi-type air conditioner is formed of one outdoor unit and a plurality of indoor units that are connected using shared refrigerant piping. In a building or a factory, a plurality of such multi-type air conditioners are installed as needed. Conventionally, after installation of a multi-type air conditioner, a test operation is executed by an on-site worker, and then upon completion of the test operation, the multi-type air conditioner is provided to customers for use.
Japanese Unexamined Patent Application, Publication No. discloses a technology of acquiring operating information of an air conditioner by using a cellular phone unit to monitor the operational status of the air conditioner through the cellular phone.2009-14233 - However, the processes of installation and test operation depend on the experience of on-site workers. For example, if on-site workers who execute the test operation change frequently, the techniques involved in the test operation are not shared among the on-site workers, and thus the test operation is not properly executed in some cases. Also, because data obtained from the test operation is not evaluated, and a problem cannot be found before installation, there is a problem in that a failure occurs within a very short period of time after the installation.
- The present invention has been made in view of such circumstances, and an object thereof is to provide an air-conditioning monitoring system, a control method therefor, an air conditioner, and a centralized monitoring apparatus that allow control through a remote controller when there is no abnormality in a test operation.
- In order to solve the above-described problem, the present invention employs the following solutions.
According to one aspect, the present invention provides an air-conditioning monitoring system including: an air conditioner that shifts to a normal operation after a test operation is executed and that is controlled by a remote controller; and a centralized monitoring apparatus that collects operating information of the air conditioner, the air conditioner and the centralized monitoring apparatus being connected via a network so as to be able to communicate with each other, in which the air conditioner includes test operation data collecting for collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; and switching means for switching the air conditioner to a state where control through the remote controller is permitted, when permission data for permitting control through the remote controller is received; and the centralized monitoring apparatus includes permission data output means for outputting the permission data to the air conditioner, that has output the test operation data, when there is no abnormality in the test operation data obtained from the air conditioner. - According to this configuration, when there is no abnormality in the test operation data that indicates an operating condition collected when the test operation of the air conditioner is executed, the centralized monitoring apparatus outputs permission data for permitting control through the remote controller to the air conditioner, which has output this test operation data having no abnormality, and, upon reception of the permission data, the air conditioner is switched to a state in which control through the remote controller is permitted. The test operation data includes the compressor discharge temperature, the compressor suction temperature, the heat exchanger temperature, the fan rotation speed, the degree of opening of an expansion valve, the pressure, etc. obtained at the time of the test operation.
- In this way, since control through the remote controller is permitted only when the test operation is normally executed and there is no abnormality therein, and control through the remote controller is not permitted when there is an abnormality in the test operation, it is possible to reduce the number of cases in which, even though there is an abnormality in the test operation, the air conditioner for which control through the remote controller is permitted is delivered to a customer.
Since the centralized monitoring apparatus determines whether there is an abnormality in test operation data for each air conditioner and outputs permission data only to an air conditioner whose test operation data has no abnormality, the use of the remote controller of the air conditioner is not permitted based on permission data for another air conditioner. - The above-described air-conditioning monitoring system may further include a communication terminal that is interposed between the air conditioner and the centralized monitoring apparatus, that is connected to the air conditioner and to the centralized monitoring apparatus via a network so as to be able to communicate with the air conditioner and with the centralized monitoring apparatus, and that includes a notification device, in which the air conditioner may further include precheck determining means for determining whether a precheck has been executed in the communication terminal before execution of the test operation; and test operation starting means for starting the test operation when the precheck determining means determines that the precheck has been executed.
- For example, the precheck is executed to check the electricity to see whether the air conditioner has been powered on; instrumentation to see whether a signal line has been connected between an indoor unit and an outdoor unit of the air conditioner; piping to see whether an service valve that connects the outdoor unit and the indoor unit has been opened; and whether, when a plurality of outdoor units are provided, a valve of an oil equalizing pipe provided between the outdoor units has been opened.
In this way, since the test operation is executed after it is determined that the precheck has been executed, it is possible to reduce human errors and to reduce installation errors. The communication terminal is a cellular phone, a personal computer, a PDA (Personal Digital Assistant), or a game machine having a communication function, for example, and is a terminal through which information required for the precheck for the air conditioner is provided to the user using the communication terminal. - In the above-described air-conditioning monitoring system, the communication terminal may output the test operation data obtained from the air conditioner to the centralized monitoring apparatus; the centralized monitoring apparatus may further include a shipping-list storage section that stores shipping information about shipping of the air conditioner; and the permission data output means may output the permission data based on the shipping information stored in the shipping-list storage section and the test operation data.
- For example, when information about power consumption obtained through a precheck result for an air conditioner disposed at a location A is input to the centralized monitoring apparatus, the centralized monitoring apparatus compares a shipping list (shipping information) for the location A with the input information about the power consumption. When there is a large difference between power consumption obtained from information about the type and the number of air conditioners (outdoor units and indoor units) based on the shipping list for the location A and the input information about the power consumption, it is estimated that the air conditioner was not properly installed, and the permission data is not output. The shipping list (shipping information) is compared with obtained information about the number of connected indoor units, and, when there is a difference therebetween, it is also estimated that the air conditioner was not properly installed. In this way, since it is determined whether to output permission data, based on not only whether the precheck has been executed but also the precheck result, it is possible to prevent problems caused by a recognition failure occurring when an indoor unit is mistakenly not powered on, an outdoor-unit setting failure, or other failures.
- In the above-described air-conditioning monitoring system, the permission data output means of the centralized monitoring apparatus may include: test operation data storage means for storing the obtained test operation data for each the air conditioner; and determination means for determining a criterion used to determinate whether there is an abnormality in the test operation data, based on the test operation data stored in the test operation data storage means and for making the determination based on the criterion.
In this way, since the collected test operation data is stored for each air conditioner, and it is determined whether there is an abnormality in the test operation data based on the stored test operation data, the determination is made according to the external environment in which the air conditioner is installed, thus improving the accuracy of the centralized monitoring apparatus. - In the above-described air-conditioning monitoring system, when there is an abnormality in the test operation data obtained from the air conditioner, the centralized monitoring apparatus may notify the communication terminal of information used for removing the abnormality.
For example, in some cases, a failure occurs when saturated liquid refrigeration is directly suctioned to the compressor, and examples of the cause thereof include an EEV (Electric Expansion Valve) leakage, an SV (Solenoid Valve) leakage, and a fan operation failure. In such a case, information for identifying the cause of the failure (that is, information for removing the failure) is notified to the communication terminal, and therefore, the operator of the communication terminal identifies the cause of the failure more easily when executing an operation based on the information for removing the failure, notified to the communication terminal. - In the above-described air-conditioning monitoring system, the air conditioner may include a temperature sensor, and a temperature measured by the temperature sensor may be included in the test operation data.
For example, when a service valve (used for refrigeration or oil) is mistakenly not opened, temperature information is collected by a temperature sensor, thereby detecting the occurrence of the abnormality. In this way, when the temperature information is collected from the temperature sensor as test operation data, the accuracy of detection of an abnormality can be improved. - According to another aspect, the present invention provides an air conditioner that shifts to a normal operation after a test operation is executed, that is controlled by a remote controller, and that is connected to a centralized monitoring apparatus that collects operating information, via a network so as to be able to communicate with each other, the air conditioner including: test operation data collecting for collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; and switching means for switching the air conditioner to a state where control through the remote controller is permitted, when there is no abnormality in the test operation data and when permission data for permitting control through the remote controller is received from the centralized monitoring apparatus.
- According to still another aspect, the present invention provides a centralized monitoring apparatus that collects operating information of an air conditioner and that is connected to the air conditioner via a network so as to be able to communicate with each other, the air conditioner shifting to a normal operation after a test operation is executed and being controlled by a remote controller, the centralized monitoring apparatus including permission data output means for outputting, when there is no abnormality in test operation data that is collected in and output from the air conditioner and that indicates an operating condition obtained when the test operation is executed, permission data for permitting control through the remote controller to the air conditioner, that has output the test operation data, in which the permission data makes the air conditioner switch to a state where control through the remote controller is permitted.
- According to still another aspect, the present invention provides a control method for an air-conditioning monitoring system that includes: an air conditioner that shifts to a normal operation after a test operation is executed and that is controlled by a remote controller; and a centralized monitoring apparatus that collects operating information of the air conditioner, the air conditioner the centralized monitoring apparatus being connected via a network so as to be able to communicate with each other, the control method including: a test operation data collecting step, performed by the air conditioner, of collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; a switching step, performed by the air conditioner, of switching the air conditioner to a state where control through the remote controller is permitted, when permission data for permitting control through the remote controller is received; and a permission data outputting step, performed by the centralized monitoring apparatus, of outputting the permission data to the air conditioner, that has output the test operation data, when there is no abnormality in the test operation data obtained from the air conditioner.
- According to the present invention, an advantage is afforded in that, when there is no abnormality in a test operation, control through a remote controller is allowed.
-
-
FIG. 1 is a diagram showing the overall configuration of an air-conditioning monitoring system according to a first embodiment of the present invention. -
FIG. 2 is a block diagram showing, in outline, the configuration of the air-conditioning monitoring system according to the first embodiment of the present invention. -
FIG. 3 is a block diagram showing, in outline, the configuration of an air-conditioning monitoring system according to a second embodiment of the present invention. -
- 1 1' air-conditioning monitoring system
- 2 air conditioner
- 3 centralized monitoring apparatus
- 4 communication terminal
- 5 network
- 23 remote controller
- 30 permission data output section
- 31 shipping-list storage section
- 41 notification section
- 42 storage section
- 50 precheck determining section
- 51 test operation starting section
- 52 test operation data collecting section
- 53 switching section
- 301 test operation data storage section
- 302 determination section
- An air-conditioning monitoring system, a control method therefor, an air conditioner, and a centralized monitoring apparatus according to embodiments of the present invention will be described below with reference to the drawings.
- A first embodiment of the present invention will be described below using
FIG. 1 .
FIG. 1 shows the overall configuration of an air-conditioning monitoring system 1 according to this embodiment. As shown inFIG. 1 , the air-conditioning monitoring system 1 includes 2a and 2b, aair conditioners centralized monitoring apparatus 3, and a communication terminal 4. Hereinafter, the air conditioners are collectively described as air conditioners 2 unless otherwise specified. The communication terminal 4 is interposed between the air conditioners 2 and thecentralized monitoring apparatus 3 and is connected to the 2a and 2b and to theair conditioners centralized monitoring apparatus 3 so as to enable mutual communication therebetween via anetwork 5. - The
network 5 uses a communication line that is compatible with the 2a and 2b, the communication terminal 4, and theair conditioners centralized monitoring apparatus 3 ; and it may provide wired communication using general telephone lines, dedicated lines, etc., or wireless communication using a mobile communication system etc. Alternatively, it may provide communication via a LAN, such as Ethernet or a wireless LAN.
In this embodiment, a description will be given of a case where two air conditioners are provided; however, the number of air conditioners is not particularly limited, and there is no particular upper limit to the number thereof. - The
air conditioner 2a includes an outdoor unit 21a, a plurality ofindoor units 22 connected to the outdoor unit 21a, and aremote controller 23 for operating theindoor units 22. Theair conditioner 2b also includes an outdoor unit 21b, a plurality ofindoor units 22 connected to the outdoor unit 21b, and aremote controller 23 for operating theindoor units 22. Hereinafter, unless otherwise specified, the air conditioners are collectively described as air conditioners 2 and the outdoor units are collectively described asoutdoor units 21.
The air conditioners 2 shift to a normal operation after execution of a test operation and are controlled by a customer (operator) with the use of theremote controller 23. The air conditioners 2 are set in advance to a state where control through theremote controller 23 is not permitted. -
FIG. 2 is a block diagram showing, in outline, the configuration of the air-conditioning monitoring system 1 according to this embodiment.
As shown inFIG. 2 , theoutdoor units 21 each include a precheck determining section (precheck determining means) 50, a test operation starting section (test operation starting means) 51, a test operation data collecting section (test operation data collecting means) 52, and a switching section (switching means) 53. - The
precheck determining section 50 determines whether a precheck has been executed in the communication terminal 4 (to be described in detail later) prior to execution of a test operation. Specifically, when the operator of the communication terminal 4 has executed a precheck, theprecheck determining section 50 determines the state of execution of the precheck based on whether a precheck result (for example, information that includes a flag indicating that the precheck has been executed) input by the operator through the communication terminal 4 has been obtained. If it is determined that the precheck has been executed, theprecheck determining section 50 outputs information indicating that the precheck has been executed to the testoperation starting section 51. - The precheck is work for confirming the state of each air conditioner 2 in order to execute a test operation properly and is executed by the operator of the communication terminal 4. For example, the precheck is executed to check the electricity to see whether the air conditioner 2 has been powered on; instrumentation to see whether a signal line has been connected between the
indoor units 22 and theoutdoor unit 21 of the air conditioner 2; piping to see whether a service valve that connects theoutdoor unit 21 and theindoor units 22 has been opened; and information indicating whether, when a plurality ofoutdoor units 21 are provided, a valve of an oil equalizing pipe provided between theoutdoor units 21 has been opened. - When the
precheck determining section 50 determines that the precheck has been executed, the testoperation starting section 51 starts a test operation of the air conditioner 2. In this way, since the test operation is executed after it is confirmed that the precheck has been executed, prior to starting the test operation, it is possible to reduce situations in which a problem occurs in the test operation due to human procedural error etc.
The test operationdata collecting section 52 collects and outputs test operation data indicating the operating conditions obtained when the test operation was executed. For example, the test operationdata collecting section 52 collects, as test operation data, the compressor discharge temperature, the compressor suction temperature, the heat exchanger temperature, the fan rotation speed, the degree of opening of an expansion valve, the pressure, etc. and outputs the test operation data to the communication terminal 4. - A temperature sensor 24 may be additionally provided, and the temperature measured by the temperature sensor 24 may be included in the test operation data, in addition to information from a sensor provided in advance in the air conditioner 2. For example, if a service valve (used for refrigeration or oil, for example) is mistakenly not opened at an installation site of the air conditioner 2, it is difficult for the sensor provided therein in advance to judge whether the service valve is mistakenly not opened. In such a case, when the temperature sensor 24 is provided at a location where a change in temperature corresponding to the opening/closing of the service valve can be detected, and temperature information obtained by the temperature sensor 24 is included in the test operation data, it is possible to determine whether the test operation data (temperature information) is normal by comparing the temperature expected to be measured when the service valve is opened with the current temperature measured by the temperature sensor 24. In this way, when the temperature sensor 24 is used, an abnormality in the test operation data can be detected more accurately.
- Upon reception of "permission data" for permitting control through the
remote controller 23, the switchingsection 53 switches to a state where the control through theremote controller 23 is permitted. As described above, in this embodiment, the air conditioner 2 is set in advance to the state where the control through theremote controller 23 is not permitted, and, upon reception of the permission data, it is switched from the not-permitted state to the permitted state; however, the switching of theswitching section 53 is not limited thereto. For example, when a rejection command is received in the state where the control through theremote controller 23 is permitted, the air conditioner 2 is switched from the permitted state to the not-permitted state. - The
centralized monitoring apparatus 3 includes a permission data output section (permission data output means) 30 that outputs, when there is no abnormality in the test operation data obtained from the air conditioner 2, "permission data" to the air conditioner 2 which has output the test operation data. Specifically, the permissiondata output section 30 includes a test operation data storage section (test operation data storage means) 301 and a determination section (determination means) 302.
The test operationdata storage section 301 stores, for each air conditioner 2, reference test operation data obtained when a test operation is normally executed. The test operationdata storage section 301 stores test operation data for each air conditioner 2 by associating the test operation data with the device information (for example, the device's serial number etc.) obtained together with the test operation data. - The
determination section 302 determines whether there is an abnormality in the test operation data (in other words, whether there is an abnormality in the status of the test operation) by comparing the reference test operation data with the obtained test operation data and, if it is determined that there is no abnormality in the test operation data, outputs "permission data" to the communication terminal 4. If it is determined that there is an abnormality in the test operation data, "abnormality notification data" is sent to the communication terminal 4. The abnormality notification data is information used for removing the abnormality and includes an operating method to identify the location of the abnormality and the cause of the abnormality, for example. - For example, a description will be given of an example case in which the
centralized monitoring apparatus 3 detects a state where saturated liquid refrigeration is directly suctioned into the compressor, based on the test operation data. It is considered that this state is caused by any of a plurality of causes, such as an EEV leakage, an SV leakage, and a fan operation failure, and it is difficult to find the cause through the test operation. In such a case, an operating method to identify the cause of the abnormality is notified to the communication terminal 4. Then, the operator of the communication terminal 4 operates the air conditioner 2 based on the information of the operating method notified to the communication terminal 4, thus making it easy to identify the cause of the abnormality. - The communication terminal 4 is connected to the air conditioner 2 and to the
centralized monitoring apparatus 3 via thenetwork 5 . The communication terminal 4 allows the operator to execute the precheck before the execution of the test operation of the air conditioner 2 and to execute the test operation, receives test operation data and device information from theoutdoor unit 21 of the air conditioner 2, and sends them to thecentralized monitoring apparatus 3. Further, the communication terminal 4 sends permission data or abnormality notification data received from thecentralized monitoring apparatus 3 to the air conditioner 2. The communication terminal 4 is, for example, a cellular phone, a personal computer, a PDA (personal Digital Assistant), or a game machine having a communication function.
Specifically, as shown inFIG. 2 , the communication terminal 4 has anotification section 41 and astorage section 42. - For example, when the data, which permits control through the
controller 23, forair conditioner 2a is received from thecentralized monitoring apparatus 3, communication terminal 4 notifies thenotification section 41 that is no abnormality in the test operation of theconditioner 2a and outputs the permission data to theair conditioner 2a via a communication section (not shown). When abnormality notification data for theair conditioner 2b is obtained from thecentralized monitoring apparatus 3, the communication terminal 4 notifies thenotification section 41 that there is an abnormality in the test operation data of theair conditioner 2b and also notifies thenotification section 41 of information for removing the abnormality included in the abnormality notification data (an operating method to identify the location of the abnormality and the cause of the abnormality). In this way, the determination result of the test operation data of each air conditioner 2 is displayed in thenotification section 41 of the communication terminal 4. - The
storage section 42 stores a precheck list serving as an operation procedure used for reliably executing a precheck before executing the test operation of the air conditioner 2. Specifically, when the operator executes an operation prior to the test operation (for example, an operation of pushing a dedicated switch for the test operation if the dedicated switch is provided) in the communication terminal 4 before starting the test operation, the precheck list is read from thestorage section 42. - Information of the precheck list read from the
storage section 42 is notified to thenotification section 41, thus being provided to the operator of the communication terminal 4 as information required for the precheck executed before the test operation. After confirming the information of the precheck list, when the operator inputs "a precheck result" as information indicating that the precheck has been executed, the precheck result is sent to the air conditioner 2 for which the precheck has been executed, via the communication section of the communication terminal 4. - Next, the operation of the air-
conditioning monitoring system 1, having the above-described configuration, will be described usingFIG. 2 .
Although the 2a and 2b have the same functions, a description will be given of the operation of theair conditioners air conditioner 2a as an example in this embodiment, on the assumption that the communication terminal 4 focuses on theair conditioner 2a. - The communication terminal 4 is connected to the
2a and 2b via the network 5 (via a cellular phone line, for example). When the operator of the communication terminal 4 confirms the contents of the precheck list according to the operation procedure notified to theair conditioners notification section 41 and inputs a precheck result to the communication terminal 4, the precheck result input to the communication terminal 4 is sent to theair conditioner 2a. In theprecheck determining section 50, it is determined whether the precheck prior to the test operation was executed based on whether the precheck result has been obtained, and, if it is determined that the precheck was executed, the determination result is notified to the testoperation starting section 51. If it is determined that the precheck was not executed, the above-described determination is repeated until the precheck is executed. - When the test
operation starting section 51 obtains information indicating that the precheck was executed, it starts the test operation of theair conditioner 2a, collects test operation data obtained from theair conditioner 2a, and sends the test operation data and the device information to the communication terminal 4. Upon reception of the test operation data and the device information, the communication terminal 4 sends them to thecentralized monitoring apparatus 3 via thenetwork 5.
Then, the reference test operation data for theair conditioner 2a which has sent the obtained test operation data is read from the test operationdata storage section 301 of thecentralized monitoring apparatus 3 and is output to thedetermination section 302. Also, the obtained test operation data is stored in the test operationdata storage section 301 together with the device information of theair conditioner 2a. - In the
determination section 302, it is determined whether there is an abnormality in the test operation data, and, if it is determined that there is no abnormality in the test operation data, permission data for theair conditioner 2a is sent to the communication terminal 4. When the communication terminal 4 receives the permission data, thenotification section 41 of the communication terminal 4 is notified that there is no abnormality in the test operation, and the permission data is sent to theair conditioner 2a. If it is determined that there is an abnormality in the test operation data, abnormality notification data for theair conditioner 2a is sent to the communication terminal 4. In this case, thenotification section 41 of the communication terminal 4 is notified that there is an abnormality in the test operation of theair conditioner 2a and is also notified of information for removing the abnormality. The operator can trace the cause of the notified abnormality by confirming the abnormality notification data notified to thenotification section 41. - When the
switching section 53 of theair conditioner 2a receives the permission data, it is recognized that the use of theremote controller 23 is permitted, the state of theswitching section 53 is switched from the not-permitted state to the permitted state, and theoutdoor unit 21 of theair conditioner 2a is permitted to be controlled through theremote controller 23. When theair conditioner 2a obtains the permission data, this processing ends. In a case where theair conditioner 2a does not receive permission data, the above-described processing is repeated until permission data is received (until permission is given). - As described above, according to the air-
conditioning monitoring system 1, the control method therefor, the air conditioner 2, and thecentralized monitoring apparatus 3 of this embodiment, since the communication terminal 4 executes the precheck before the start of the test operation, the test operation can be reliably executed. Test operation data that is collected when the test operation was executed is compared with expected test operation data that would be collected when the test operation is normally executed, to determine whether the test operation was normally executed. Only when the test operation was normally executed, the air conditioner 2 that has sent the normal test operation data is permitted to be controlled through theremote controller 23.
In this way, the test operation data collected at the time of the test operation is used to determine whether the air conditioner 2 is permitted to be controlled through theremote controller 23, and, only when there is no abnormality in the test operation, the air conditioner 2 is permitted to be operated through theremote controller 23. Accordingly, it is possible to prevent a problem that may occur after the installation of an air conditioner that is delivered to a customer even though an abnormality is included therein. - In this embodiment, it is determined whether there is an abnormality in the test operation data based on reference test operation data stored in advance in the test operation
data storage section 301; however, the determination method is not limited thereto. For example, a criterion may be determined based on the test operation data stored in the test operationdata storage section 301 together with the device information, and it may be determined whether there is an abnormality in obtained test operation data based on this criterion and the obtained test operation data. In this way, when a criterion is determined using test operation data of each air conditioner 2 accumulated in the test operationdata storage section 301, the criterion is determined according to an environment (for example, according to each country or weather) in which the air conditioner 2 is installed. Accordingly, the accuracy of a threshold serving as a criterion for determination can be improved. - A description has been given of a case where the air conditioner used in this embodiment is a multi-type air conditioner; however, the type thereof is not limited thereto. For example, an air conditioner in which one indoor unit is provided for one outdoor unit may be used.
- Next, a second embodiment of the present invention will be described using
FIG. 3 .
An air-conditioning monitoring system 1' according to this embodiment differs from that of the first embodiment in that a shipping-list storage section (shipping-list storage means) 31 that stores shipping information about each air conditioner 2 is provided. The air-conditioning monitoring system 1' of this embodiment will be described below mainly in terms of the differences from that of the first embodiment, and a description of similarities will be omitted. - The shipping-
list storage section 31 stores information about shipping (hereinafter, referred to as "shipping information") of an air conditioner 2 shipped to each location, as information for each air conditioner 2. Specifically, the shipping destination of the air conditioner 2 can be found out from the shipping information. For example, in the shipping information, the shipping destination (shipping destination identifying information such as the address and the telephone number), the shipping date and time, the delivery date and time, information about the number of air conditioners (outdoor units and indoor units), and information about the type and the model number are associated with one another.
The permissiondata output section 30 determines whether permission data is output, based on the shipping information stored in the shipping-list storage section 31 and obtained test operation data. - For example, in a case where the shipping-
list storage section 31 stores shipping information indicating that theair conditioner 2a to be shipped (delivered) to a location A has a model number X, when thecentralized monitoring apparatus 3 obtains, from theair conditioner 2a, the device information that includes a model number Y, since the shipping information of theair conditioner 2a differs from the device information obtained from theair conditioner 2a, thedetermination section 302 determines that there is an abnormality and sends abnormality notification data regarding theair conditioner 2a to the communication terminal 4. - For example, in a case where the shipping-
list storage section 31 stores shipping information indicating that theair conditioner 2b at a location B has one outdoor unit and eight indoor units, when the test operation data obtained from theair conditioner 2b has information (for example, the power consumption value etc.) indicating that there are one outdoor unit and six indoor units, the shipping information of theair conditioner 2b differs from the test operation data obtained from theair conditioner 2b. In this case, thedetermination section 302 determines that there is an abnormality in theair conditioner 2b at the location B and sends abnormality notification data regarding theair conditioner 2b to the communication terminal 4. - In this way, it is determined whether there is an abnormality in the test operation by comparing the test operation data with the shipping information or by comparing the device information with the shipping information. Thus, it is possible to detect a recognition failure caused when an indoor unit is mistakenly not powered on, an outdoor-unit setting failure etc. and to prevent a problem from occurring after installation of the air conditioner.
Claims (9)
- An air-conditioning monitoring system characterized by comprising:an air conditioner (2) that shifts to a normal operation after a test operation is executed and that is controlled by a remote controller (23); anda centralized monitoring apparatus (3) that collects operating information of the air conditioner,the air conditioner and the centralized monitoring apparatus being connected via a network (5) so as to be able to communicate with each other, whereinthe air conditioner (2) comprises
test operation data collecting means (52) for collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; and
switching means (53) for switching the air conditioner to a state where control through the remote controller (23) is permitted, when permission data for permitting control through the remote controller is received; andthe centralized monitoring apparatus (3) comprises permission data output means (30) for outputting the permission data to the air conditioner (2), that has output the test operation data, when there is no abnormality in the test operation data obtained from the air conditioner. - An air-conditioning monitoring system according to claim 1, further comprising a communication terminal (4) that is interposed between the air conditioner (2) and the centralized monitoring apparatus (3), that is connected to the air conditioner and to the centralized monitoring apparatus via a network (5) so as to enable mutual communication therebetween, and that includes a notification device (41),
wherein the air conditioner (2) further comprises
precheck determining means (50) for determining whether a precheck has been executed in the communication terminal (4) before execution of the test operation; and
test operation starting means (51) for starting the test operation when the precheck determining means (50) determines that the precheck has been executed. - An air-conditioning monitoring system according to claim 1 or 2, wherein:the communication terminal (4) outputs the test operation data obtained from the air conditioner (2) to the centralized monitoring apparatus (3);the centralized monitoring apparatus (3) further comprises a shipping-list storage section (31) that stores shipping information about shipping of the air conditioner (2); andthe permission data output means (30) outputs the permission data based on the shipping information stored in the shipping-list storage section (31) and the test operation data.
- An air-conditioning monitoring system according to any one of claims 1 to 3, wherein the permission data output means (30) of the centralized monitoring apparatus (3) comprises:test operation data storage means (301) for storing the obtained test operation data for each the air conditioner; anddetermination means (302) for determining a criterion used to determinate whether there is an abnormality in the test operation data, based on the test operation data stored in the test operation data storage means and for making the determination based on the criterion.
- An air-conditioning monitoring system according to any one of claims 2 to 4, wherein, when there is an abnormality in the test operation data obtained from the air conditioner (2), the centralized monitoring apparatus (3) notifies the communication terminal (4) of information used for removing the abnormality.
- An air-conditioning monitoring system according to any one of claims 1 to 5, wherein the air conditioner (2) includes a temperature sensor, and a temperature measured by the temperature sensor is included in the test operation data.
- An air conditioner characterized in that it shifts to a normal operation after a test operation is executed, in that it is controllable by a remote controller (23), and in that it is connectable to a centralized monitoring apparatus (3) that collects operating information, via a network (5) so as to be able to communicate with each other, the air conditioner (2) comprising:test operation data collecting means (52) for collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed; andswitching means (53) for switching the air conditioner to a state where control through the remote controller (23) is permitted, when there is no abnormality in the test operation data and when permission data for permitting control through the remote controller is received from the centralized monitoring apparatus (3).
- A centralized monitoring apparatus characterized in that it collects operating information of an air conditioner (2) and in that it is connectable to the air conditioner via a network (5) so as to be able to communicate with each other, the air conditioner (2) shifting to a normal operation after a test operation is executed and being controlled by a remote controller (23), the centralized monitoring apparatus (3) comprising permission data output means (30) for outputting, when there is no abnormality in test operation data that is collected in and output from the air conditioner and that indicates an operating condition obtained when the test operation is executed, permission data for permitting control through the remote controller (23) to the air conditioner (2), that has output the test operation data,
wherein the permission data causes the air conditioner (2) to switch to a state where control through the remote controller is permitted. - A control method for an air-conditioning monitoring system that includes: an air conditioner (2) that shifts to a normal operation after a test operation is executed and that is controlled by a remote controller (23); and a centralized monitoring apparatus (3) that collects operating information of the air conditioner, the air conditioner and the centralized monitoring apparatus being connected via a network (5) so as to be able to communicate with each other, the control method comprising:a test operation data collecting step, performed by the air conditioner (2), of collecting and outputting test operation data that indicates an operating condition obtained when the test operation is executed;a switching step, performed by the air conditioner (2), of switching the air conditioner to a state where control through the remote controller is permitted, when permission data for permitting control through the remote controller is received; anda permission data outputting step, performed by the centralized monitoring apparatus (3), of outputting the permission data to the air conditioner, that has output the test operation data, when there is no abnormality in the test operation data obtained from the air conditioner (2).
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010001996A JP2011141081A (en) | 2010-01-07 | 2010-01-07 | Air-conditioning monitoring system, its control method, air conditioner, and centralized monitoring device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP2351971A2 true EP2351971A2 (en) | 2011-08-03 |
Family
ID=43921000
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP10180152A Withdrawn EP2351971A2 (en) | 2010-01-07 | 2010-09-27 | Air-conditioning monitoring system, control method therefor, air conditioner, and centralized monitoring apparatus |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP2351971A2 (en) |
| JP (1) | JP2011141081A (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013104038A1 (en) * | 2012-01-10 | 2013-07-18 | Electrolux Do Brasil S.A. | A system for controlling the operation and providing diagnostics of an air conditioning apparatus; and an air conditioning apparatus |
| CN104422089A (en) * | 2013-09-09 | 2015-03-18 | 三菱电机株式会社 | Air-conditioning system |
| EP2950010A1 (en) * | 2014-05-27 | 2015-12-02 | Mitsubishi Electric Corporation | Air conditioner |
| CN107111543A (en) * | 2014-12-18 | 2017-08-29 | 三菱重工制冷空调系统株式会社 | Transacter, data gathering system, control method and program |
| CN107407492A (en) * | 2015-03-31 | 2017-11-28 | 大金工业株式会社 | Construction Inspection System |
| EP3232132A4 (en) * | 2016-03-01 | 2017-11-29 | Mitsubishi Electric Corporation | Air conditioning system |
| EP3220230A4 (en) * | 2014-12-18 | 2017-11-29 | Mitsubishi Heavy Industries Thermal Systems, Ltd. | Data output device, data output system, control method, and program |
| CN110986291A (en) * | 2019-11-25 | 2020-04-10 | 海信(山东)空调有限公司 | Equipment management method and device and air conditioner |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015111203A1 (en) * | 2014-01-27 | 2015-07-30 | 日立アプライアンス株式会社 | Air conditioner test operation application, and air conditioner test operation system |
| JP6497195B2 (en) * | 2015-04-28 | 2019-04-10 | ダイキン工業株式会社 | Air conditioner |
| WO2017056299A1 (en) * | 2015-10-01 | 2017-04-06 | 三菱電機株式会社 | Air conditioning managing device |
| WO2018087926A1 (en) * | 2016-11-14 | 2018-05-17 | 三菱電機株式会社 | Monitoring/control system, air-conditioning monitoring system, and air-conditioning monitoring method |
| JP6964439B2 (en) * | 2017-06-05 | 2021-11-10 | 三菱電機株式会社 | Equipment test run system |
| JP7788639B2 (en) * | 2022-09-30 | 2025-12-19 | パナソニックIpマネジメント株式会社 | Heat pump installation system |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009014233A (en) | 2007-07-03 | 2009-01-22 | Hitachi Appliances Inc | Air conditioner and air conditioner management system |
| JP2010001996A (en) | 2008-06-20 | 2010-01-07 | Ntn Corp | Rolling bearing for wind power generator |
-
2010
- 2010-01-07 JP JP2010001996A patent/JP2011141081A/en not_active Withdrawn
- 2010-09-27 EP EP10180152A patent/EP2351971A2/en not_active Withdrawn
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009014233A (en) | 2007-07-03 | 2009-01-22 | Hitachi Appliances Inc | Air conditioner and air conditioner management system |
| JP2010001996A (en) | 2008-06-20 | 2010-01-07 | Ntn Corp | Rolling bearing for wind power generator |
Cited By (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013104038A1 (en) * | 2012-01-10 | 2013-07-18 | Electrolux Do Brasil S.A. | A system for controlling the operation and providing diagnostics of an air conditioning apparatus; and an air conditioning apparatus |
| CN104422089A (en) * | 2013-09-09 | 2015-03-18 | 三菱电机株式会社 | Air-conditioning system |
| AU2014215943B2 (en) * | 2013-09-09 | 2015-09-17 | Mitsubishi Electric Corporation | Air-conditioning system |
| EP2853824A3 (en) * | 2013-09-09 | 2015-10-28 | Mitsubishi Electric Corporation | Air-conditioning system |
| US9958179B2 (en) | 2013-09-09 | 2018-05-01 | Mitsubishi Electric Corporation | Air-conditioning system |
| EP2950010A1 (en) * | 2014-05-27 | 2015-12-02 | Mitsubishi Electric Corporation | Air conditioner |
| EP3220230A4 (en) * | 2014-12-18 | 2017-11-29 | Mitsubishi Heavy Industries Thermal Systems, Ltd. | Data output device, data output system, control method, and program |
| EP3220271A4 (en) * | 2014-12-18 | 2018-01-03 | Mitsubishi Heavy Industries Thermal Systems, Ltd. | Data collection device, data collection system, control method, and program |
| CN107111543A (en) * | 2014-12-18 | 2017-08-29 | 三菱重工制冷空调系统株式会社 | Transacter, data gathering system, control method and program |
| CN107407492A (en) * | 2015-03-31 | 2017-11-28 | 大金工业株式会社 | Construction Inspection System |
| EP3276271A4 (en) * | 2015-03-31 | 2018-03-07 | Daikin Industries, Ltd. | Installation check system |
| US20180142913A1 (en) * | 2015-03-31 | 2018-05-24 | Daikin Industries, Ltd. | Installation check system |
| US10408485B2 (en) | 2015-03-31 | 2019-09-10 | Daikin Industries, Ltd. | Installation check system |
| CN107407492B (en) * | 2015-03-31 | 2020-03-24 | 大金工业株式会社 | Construction Inspection System |
| EP3232132A4 (en) * | 2016-03-01 | 2017-11-29 | Mitsubishi Electric Corporation | Air conditioning system |
| CN108700320A (en) * | 2016-03-01 | 2018-10-23 | 三菱电机株式会社 | Air Conditioning System |
| AU2016395065B2 (en) * | 2016-03-01 | 2019-08-22 | Mitsubishi Electric Corporation | Air conditioning system |
| CN108700320B (en) * | 2016-03-01 | 2020-08-21 | 三菱电机株式会社 | Air conditioning system |
| CN110986291A (en) * | 2019-11-25 | 2020-04-10 | 海信(山东)空调有限公司 | Equipment management method and device and air conditioner |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2011141081A (en) | 2011-07-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2351971A2 (en) | Air-conditioning monitoring system, control method therefor, air conditioner, and centralized monitoring apparatus | |
| EP3726157B1 (en) | Air-conditioning system, remote controller, and method for saving a history of operation data of an air conditioner | |
| CN103134142B (en) | Method for detecting complete blockage of air conditioning system | |
| CN100451474C (en) | Air Conditioning Monitoring and Control System | |
| EP3795915B1 (en) | Malfunction diagnosis system | |
| AU2020222538B2 (en) | Device Management System | |
| JP4518208B2 (en) | Remote management system and remote management method for air conditioner | |
| CN106104163A (en) | Air conditioner trial operation application and air conditioner trial operation system | |
| JP7267415B2 (en) | Air conditioner control method, air conditioner and computer readable storage medium | |
| CN108307652B (en) | Information notification method and transfer setting determination device | |
| JP6345240B2 (en) | Display device, method and program | |
| JP2020091561A (en) | Abnormality diagnosis device and abnormality diagnosis method | |
| JP7003285B2 (en) | Air conditioner | |
| EP3745055B1 (en) | State analysis system and state analysis device | |
| CN108307650A (en) | Remote controllers for air conditioning systems | |
| JP4638359B2 (en) | Air conditioner inspection service system | |
| CN110454908B (en) | Air conditioning system and control method | |
| JP2019120422A (en) | Air-conditioning management system | |
| EP3974929A1 (en) | Equipment maintenance system | |
| JP2025014399A (en) | Notification system, control device | |
| WO2017179450A1 (en) | Information notifying method and relocation determining apparatus | |
| WO2018063104A1 (en) | System for monitoring and alerting user of air conditioner malfunction by service provider |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME RS |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
| 18W | Application withdrawn |
Effective date: 20130201 |