EP2339276B1 - Refrigerator - Google Patents

Refrigerator Download PDF

Info

Publication number
EP2339276B1
EP2339276B1 EP10193809.0A EP10193809A EP2339276B1 EP 2339276 B1 EP2339276 B1 EP 2339276B1 EP 10193809 A EP10193809 A EP 10193809A EP 2339276 B1 EP2339276 B1 EP 2339276B1
Authority
EP
European Patent Office
Prior art keywords
refrigerant
hot pipe
evaporator
refrigerating chamber
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP10193809.0A
Other languages
German (de)
French (fr)
Other versions
EP2339276A2 (en
EP2339276A3 (en
Inventor
Yong Han Kim
Kook Jeong Seo
Won Jae Yoon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Samsung Electronics Co Ltd
Original Assignee
Samsung Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Samsung Electronics Co Ltd filed Critical Samsung Electronics Co Ltd
Publication of EP2339276A2 publication Critical patent/EP2339276A2/en
Publication of EP2339276A3 publication Critical patent/EP2339276A3/en
Application granted granted Critical
Publication of EP2339276B1 publication Critical patent/EP2339276B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D11/00Self-contained movable devices, e.g. domestic refrigerators
    • F25D11/02Self-contained movable devices, e.g. domestic refrigerators with cooling compartments at different temperatures
    • F25D11/022Self-contained movable devices, e.g. domestic refrigerators with cooling compartments at different temperatures with two or more evaporators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B5/00Compression machines, plants or systems, with several evaporator circuits, e.g. for varying refrigerating capacity
    • F25B5/04Compression machines, plants or systems, with several evaporator circuits, e.g. for varying refrigerating capacity arranged in series
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D21/00Defrosting; Preventing frosting; Removing condensed or defrost water
    • F25D21/04Preventing the formation of frost or condensate
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/04Refrigeration circuit bypassing means
    • F25B2400/0409Refrigeration circuit bypassing means for the evaporator
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2511Evaporator distribution valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B5/00Compression machines, plants or systems, with several evaporator circuits, e.g. for varying refrigerating capacity

Definitions

  • Embodiments discussed herein relate to a refrigerator having a refrigeration cycle including evaporators provided respectively in a refrigerating chamber and a freezing chamber and an operation control method thereof.
  • a refrigerator is an apparatus that supplies low-temperature cool air into a storage chamber to store food in the storage chamber at low temperature in a fresh state.
  • the refrigerator may include a freezing chamber to store food at below freezing temperature and a refrigerating chamber to store food at a temperature slightly higher than freezing temperature.
  • Cool air to be supplied into the refrigerator is generated through heat exchange of a refrigerant.
  • a refrigeration cycle of compression, condensation, expansion, and evaporation is repetitively performed to continuously supply cool air into the refrigerator.
  • the supplied cool air is uniformly diffused in the refrigerator by convection to store or keep food in the refrigerator at a predetermined temperature.
  • a refrigerator in which a refrigeration cycle includes evaporators provided respectively in a refrigerating chamber and a freezing chamber and a three-way valve to supply a refrigerant discharged from a condenser to the evaporator on the refrigerating chamber side or the evaporator on the freezing chamber side, thereby controlling flow of the refrigerant according to an operation mode of the refrigerator.
  • a refrigerator is also disclosed in which a hot pipe extending from the condenser of the refrigeration cycle is arranged in the perimeters of the openings of the refrigerating chamber and the freezing chamber to prevent dew formation.
  • the hot pipe is a refrigerant pipe mounted at a high-pressure side.
  • the hot pipe is arranged upstream of the three-way valve throughout the perimeters of the openings of the refrigerating chamber and the freezing chamber to prevent dew formation at the openings of the refrigerating chamber and the freezing chamber through dissipation of heat from a high-temperature refrigerant gas during the operation of a compressor.
  • energy loss may occur due to unbalance in the amounts of heat generated from the hot pipe on the freezing chamber side and the hot pipe on the refrigerating chamber side and unbalance in the amount of the refrigerant.
  • US 2007/0068180 A1 discloses a refrigerator with the features of the pre-characterizing part of claim 1.
  • a refrigerator comprises a compressor, a condenser, a refrigerator chamber, a freezing chamber and some other parts.
  • the second circulation channel may be connected to another outlet of the channel switching valve, and the second circulation channel may be connected to the compressor via a second expansion device and a second evaporator on the freezing chamber side.
  • the first circulation channel may be connected to a second evaporator on the freezing chamber side and the compressor via the second hot pipe, a first expansion device, a first evaporator on the refrigerating chamber side, and a third expansion device in a series.
  • the first circulation channel may be connected to a first evaporator on the refrigerating chamber side and the compressor via the second hot pipe and a first expansion device.
  • the channel switching valve may include a three-way valve having one inlet connected to an outlet of the first hot pipe and two outlets connected respectively to the first circulation channel and the second circulation channel.
  • a refrigerator includes a compressor, a condenser, a first hot pipe on a freezing chamber side and a second hot pipe on a refrigerating chamber site, and a controller to control a first operation mode to cool a refrigerating chamber and a second operation mode to cool a freezing chamber, wherein the controller controls a refrigerant channel such that a refrigerant discharged from the condenser cools the freezing chamber via the first hot pipe and the second hot pipe returns to the compressor during an operation in the first operation mode.
  • the controller may control a refrigerant channel such that the refrigerant flows to the first hot pipe during an operation in the second operation mode.
  • the controller may control a refrigerant channel such that the refrigerant discharged from the condenser cools the refrigerating chamber and the freezing chamber via the first hot pipe and the second hot pipe and returns to the compressor during an operation in the first operation mode.
  • the controller may control a refrigerant channel such that the refrigerant discharged from the condenser cools the refrigerating chamber via the first hot pipe and the second hot pipe and returns to the compressor during an operation in the first operation mode.
  • an operation control method of a refrigerator including a compressor, a condenser, a first hot pipe on a freezing chamber side, a second hot pipe on a refrigerating chamber side, a refrigerating chamber, and a freezing chamber includes determining whether the refrigerating chamber or the freezing chamber is to be cooled and controlling a refrigerant discharged from the condenser to cool the freezing chamber via the first hot pipe upon determining that the freezing chamber is to be cooled.
  • the operation control method may further include controlling the refrigerant discharged from the condenser to cool the refrigerating chamber via the first hot pipe and the second hot pipe upon determining that the refrigerating chamber is to be cooled.
  • the operation control method may further include controlling the refrigerant to cool the freezing chamber, after cooling the refrigerating chamber, and return to the compressor.
  • the operation control method may further include controlling the refrigerant to return to the compressor after cooling the refrigerating chamber.
  • a refrigerator may include a refrigerator body 10 and a plurality of storage chambers 12 and 13 partitioned by a partition 11.
  • the storage chambers 12 and 13 include a refrigerating chamber 12 to store food at a temperature slightly higher than freezing temperature and a freezing chamber 13 to store food at below freezing temperature.
  • a refrigerating chamber 12 to store food at a temperature slightly higher than freezing temperature
  • a freezing chamber 13 to store food at below freezing temperature.
  • evaporators 28 and 29 may be respectively provided evaporators 28 and 29 to perform heat exchange with air in the storage chambers 12 and 13.
  • the evaporators 28 and 29 include a first evaporator 28 mounted in the refrigerating chamber 12 and a second evaporator 29 mounted in the freezing chamber 13, respectively.
  • the evaporators 28 and 29 are connected to a refrigeration cycle to cool the respective storage chambers 12 and 13.
  • the refrigeration cycle includes a compressor 21 to compress a gas refrigerant into a high-temperature and high-pressure state, a condenser 22 to condense the gas refrigerant compressed by the compressor 21 into a liquid state, expansion devices 24 and 25 (see FIG. 2 ) to convert the liquid refrigerant into a low-temperature and low-pressure state, and evaporators 28 and 29 to evaporate the low-temperature and low-pressure liquid refrigerant to generate cool air.
  • These are connected to one another via a refrigerant pipe 30 such that the refrigerant is circulated while the phase of the refrigerant is changed.
  • the expansion devices 24 and 25 may include capillary tubes or expansion valves.
  • the evaporators 28 and 29 may be provided in the respective storage chambers 12 and 13.
  • the refrigeration cycle may further include a dryer 26 provided between the compressor 22 and the expansion devices 24 and 25 to remove moisture from the refrigerant supplied from the condenser 22 and an accumulator 27 provided between the evaporators 28 and 29 and the compressor 21 to restrain the supply of the liquid refrigerant to the condenser 21.
  • a cluster pipe 31 arranged at the top and opposite sidewalls of the refrigerator body 10 in a serpentine fashion and hot pipes 32 and 33 arranged along the perimeter of a front opening of the refrigerator body 10.
  • the hot pipes 32 and 33 extend from the condenser 22 such that the hot pipes 32 and 33 are buried along the perimeter of the opening of the refrigerator body 10. Formation of dew at the front of the refrigerator body 10 due to a temperature difference between the inside and outside of the refrigerator body 10 is prevented, and the amount of heat dissipated from the high-pressure side is increased, by the dissipation of heat from the high-temperature refrigerant flowing in the hot pipes 32 and 22.
  • the hot pipes 32 and 33 may include, a first hot pipe 32 buried in the perimeter of the refrigerator body 10 constituting the freezing chamber 13 and a second hot pipe 33 buried in the perimeter of the refrigerator body 10 constituting the refrigerating chamber 12.
  • a hot pipe is connected to a refrigerant pipe.
  • the inlet and outlet of the hot pipe are connected respectively to the outlet of a high-pressure side refrigerant pipe and the inlet of a valve to control the flow of a refrigerant to a refrigerating chamber or freezing chamber evaporator.
  • a channel switching valve may be provided on a refrigerant circulation channel on the second hot pipe inlet side buried in the perimeter of the opening of the refrigerator body constituting the refrigerating chamber 12 to prevent lowering of energy efficiency of the refrigerator due to excessive heat generation from the hot pipe.
  • FIG. 2 is a schematic view illustrating the construction of a refrigeration cycle 20 according to an embodiment.
  • the refrigeration cycle is configured such that a first evaporator to generate cool air for the refrigerating chamber and a second evaporator to generate cool air for the freezing chamber are connected in series.
  • the refrigeration cycle 20 is configured such that a condenser 22 is connected to a high-pressure side discharge port of a compressor 21, and a first hot pipe 32 buried in the perimeter of the opening of the freezing chamber 13 in FIG. 1 is connected to the outlet of the condenser 22.
  • the channel switching valve 34 is not particularly restricted as long as one of the outlets is selectively opened, or bidirectional opening and closing is performed.
  • a second expansion device 25 for the freezing chamber and a second evaporator 29 are sequentially connected to the outlet of the channel switching valve 34 connected to the second circulation channel 36.
  • the outlet of the second evaporator 29 is connected to the compressor 21 via a suction pipe 37.
  • connection refrigerant pipe 38 the outlet of the first evaporator 28 and the inlet of the second evaporator 29 are connected in series via a connection refrigerant pipe 38.
  • a third expansion device 39 is mounted on the connection refrigerant pipe 38.
  • the refrigeration cycle may include a first operation mode to simultaneously cool the refrigerating chamber 12 and the freezing chamber 13, a second operation mode to cool the freezing chamber 13 alone, and a controller 100 to control the first operation mode and the second operation mode.
  • the channel switching valve 34 opens only the second circulation channel 36 under the control of the controller 100. Consequently, the refrigerant, introduced into the channel switching valve 34, cools the freezing chamber 13 via the second expansion device 25 and the second evaporator 29. The refrigerant, discharged from the second evaporator 29, returns to the compressor 21 via the suction pipe 37.
  • the amount of a refrigerant optimally filled in the refrigeration cycle may be changed depending upon a refrigerating operation or a freezing operation. Generally, an amount of a refrigerant between optimal amounts of a refrigerant for the refrigerating and freezing operations is filled in the refrigeration cycle.
  • the refrigeration cycle 40 is configured such that a condenser 22 is connected to a high-pressure side discharge port of a compressor 21, and a first hot pipe 32 buried in the perimeter of the opening of the freezing chamber 13 in FIG. 1 is connected to the outlet of the condenser 22.
  • the second hot pipe 33, the first expansion device 24, the first evaporator 28, and a suction pipe 37 are sequentially connected to the outlet of the channel switching valve 34 connected to the first circulation channel 41.
  • a second expansion device 25, a second evaporator 29, and the suction pipe 37 are sequentially connected to the outlet of the channel switching valve 34 connected to the second circulation channel 42.
  • a check valve 45 is mounted on the second discharge refrigerant pipe 44 is mounted to prevent backward flow of the refrigerant from the first discharge refrigerant pipe 43.
  • the channel switching valve 34 opens only the second circulation channel 42 under the control of the controller. Consequently, the refrigerant, introduced into the channel switching valve 34 sequentially flows through the second expansion device 25 and the second evaporator 29, and returns to the compressor 21 via the suction pipe 37.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Description

    BACKGROUND 1. Field
  • Embodiments discussed herein relate to a refrigerator having a refrigeration cycle including evaporators provided respectively in a refrigerating chamber and a freezing chamber and an operation control method thereof.
  • 2. Description of the Related Art
  • Generally, a refrigerator is an apparatus that supplies low-temperature cool air into a storage chamber to store food in the storage chamber at low temperature in a fresh state. The refrigerator may include a freezing chamber to store food at below freezing temperature and a refrigerating chamber to store food at a temperature slightly higher than freezing temperature.
  • Cool air to be supplied into the refrigerator is generated through heat exchange of a refrigerant. A refrigeration cycle of compression, condensation, expansion, and evaporation is repetitively performed to continuously supply cool air into the refrigerator. The supplied cool air is uniformly diffused in the refrigerator by convection to store or keep food in the refrigerator at a predetermined temperature.
  • A refrigerator is disclosed in which a refrigeration cycle includes evaporators provided respectively in a refrigerating chamber and a freezing chamber and a three-way valve to supply a refrigerant discharged from a condenser to the evaporator on the refrigerating chamber side or the evaporator on the freezing chamber side, thereby controlling flow of the refrigerant according to an operation mode of the refrigerator.
  • When cool air inside the refrigerator and hot air outside the refrigerator directly/indirectly contact each other, dew may be formed in the perimeters of openings of the refrigerating chamber and the freezing chamber due to a temperature difference. A refrigerator is also disclosed in which a hot pipe extending from the condenser of the refrigeration cycle is arranged in the perimeters of the openings of the refrigerating chamber and the freezing chamber to prevent dew formation.
  • The hot pipe is a refrigerant pipe mounted at a high-pressure side. Generally, the hot pipe is arranged upstream of the three-way valve throughout the perimeters of the openings of the refrigerating chamber and the freezing chamber to prevent dew formation at the openings of the refrigerating chamber and the freezing chamber through dissipation of heat from a high-temperature refrigerant gas during the operation of a compressor.
  • In the refrigeration cycle including the hot pipe, energy loss may occur due to unbalance in the amounts of heat generated from the hot pipe on the freezing chamber side and the hot pipe on the refrigerating chamber side and unbalance in the amount of the refrigerant.
  • US 2007/0068180 A1 discloses a refrigerator with the features of the pre-characterizing part of claim 1. Such a refrigerator comprises a compressor, a condenser, a refrigerator chamber, a freezing chamber and some other parts.
  • SUMMARY
  • It is an object of the embodiments to provide a refrigerator that reduces unbalance in the amount of a refrigerant according to an operation mode of a refrigeration cycle, thereby improving cooling efficiency of a refrigerating chamber and a freezing chamber.
  • It is another aspect to provide a refrigerator that reduces unbalance in the amount of heat generated from a hot pipe, thereby reducing power consumption.
  • Additional aspects will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the embodiments.
  • The object is solved by the features of claim 1.
  • The second circulation channel may be connected to another outlet of the channel switching valve, and the second circulation channel may be connected to the compressor via a second expansion device and a second evaporator on the freezing chamber side.
  • The first circulation channel may be connected to a second evaporator on the freezing chamber side and the compressor via the second hot pipe, a first expansion device, a first evaporator on the refrigerating chamber side, and a third expansion device in a series.
  • The first circulation channel may be connected to a first evaporator on the refrigerating chamber side and the compressor via the second hot pipe and a first expansion device.
  • The channel switching valve may include a three-way valve having one inlet connected to an outlet of the first hot pipe and two outlets connected respectively to the first circulation channel and the second circulation channel.
  • Hereinafter, examples useful for understanding the invention are described.
  • According to one example, a refrigerator includes a compressor, a condenser, a first hot pipe on a freezing chamber side and a second hot pipe on a refrigerating chamber site, and a controller to control a first operation mode to cool a refrigerating chamber and a second operation mode to cool a freezing chamber, wherein the controller controls a refrigerant channel such that a refrigerant discharged from the condenser cools the freezing chamber via the first hot pipe and the second hot pipe returns to the compressor during an operation in the first operation mode.
  • The controller may control a refrigerant channel such that the refrigerant flows to the first hot pipe during an operation in the second operation mode.
  • The controller may control a refrigerant channel such that the refrigerant discharged from the condenser cools the refrigerating chamber and the freezing chamber via the first hot pipe and the second hot pipe and returns to the compressor during an operation in the first operation mode.
  • The controller may control a refrigerant channel such that the refrigerant discharged from the condenser cools the refrigerating chamber via the first hot pipe and the second hot pipe and returns to the compressor during an operation in the first operation mode.
  • In accordance with a further example, an operation control method of a refrigerator including a compressor, a condenser, a first hot pipe on a freezing chamber side, a second hot pipe on a refrigerating chamber side, a refrigerating chamber, and a freezing chamber includes determining whether the refrigerating chamber or the freezing chamber is to be cooled and controlling a refrigerant discharged from the condenser to cool the freezing chamber via the first hot pipe upon determining that the freezing chamber is to be cooled.
  • The operation control method may further include controlling the refrigerant discharged from the condenser to cool the refrigerating chamber via the first hot pipe and the second hot pipe upon determining that the refrigerating chamber is to be cooled.
  • The operation control method may further include controlling the refrigerant to cool the freezing chamber, after cooling the refrigerating chamber, and return to the compressor.
  • The operation control method may further include controlling the refrigerant to return to the compressor after cooling the refrigerating chamber.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • These and/or other aspects will become apparent and more readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
    • FIG. 1 is a schematic perspective view illustrating a refrigeration cycle of a refrigerator according to an embodiment;
    • FIG. 2 is a view illustrating a first operation mode of a refrigeration cycle according to an embodiment;
    • FIG. 3 is a view illustrating a second operation mode of the refrigeration cycle of FIG. 2;
    • FIG. 4 is a view illustrating a first operation mode of a refrigeration cycle according to another embodiment; and
    • FIG. 5 is a view illustrating a second operation mode of the refrigeration cycle of FIG. 4.
    DETAILED DESCRIPTION
  • Reference will now be made in detail to the embodiments, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to like elements throughout.
  • Referring to FIG. 1, a refrigerator according to an embodiment may include a refrigerator body 10 and a plurality of storage chambers 12 and 13 partitioned by a partition 11.
  • The storage chambers 12 and 13 include a refrigerating chamber 12 to store food at a temperature slightly higher than freezing temperature and a freezing chamber 13 to store food at below freezing temperature. In the storage chambers 12 and 13 may be respectively provided evaporators 28 and 29 to perform heat exchange with air in the storage chambers 12 and 13.
  • The evaporators 28 and 29 include a first evaporator 28 mounted in the refrigerating chamber 12 and a second evaporator 29 mounted in the freezing chamber 13, respectively. The evaporators 28 and 29 are connected to a refrigeration cycle to cool the respective storage chambers 12 and 13.
  • The refrigeration cycle includes a compressor 21 to compress a gas refrigerant into a high-temperature and high-pressure state, a condenser 22 to condense the gas refrigerant compressed by the compressor 21 into a liquid state, expansion devices 24 and 25 (see FIG. 2) to convert the liquid refrigerant into a low-temperature and low-pressure state, and evaporators 28 and 29 to evaporate the low-temperature and low-pressure liquid refrigerant to generate cool air. These are connected to one another via a refrigerant pipe 30 such that the refrigerant is circulated while the phase of the refrigerant is changed.
  • The expansion devices 24 and 25 may include capillary tubes or expansion valves. The evaporators 28 and 29 may be provided in the respective storage chambers 12 and 13.
  • Also, the refrigeration cycle may further include a dryer 26 provided between the compressor 22 and the expansion devices 24 and 25 to remove moisture from the refrigerant supplied from the condenser 22 and an accumulator 27 provided between the evaporators 28 and 29 and the compressor 21 to restrain the supply of the liquid refrigerant to the condenser 21.
  • In the refrigerant pipe 30 connected between the condenser 22 and the expansion devices 24 and 25 may provided a cluster pipe 31 arranged at the top and opposite sidewalls of the refrigerator body 10 in a serpentine fashion and hot pipes 32 and 33 arranged along the perimeter of a front opening of the refrigerator body 10.
  • The hot pipes 32 and 33 extend from the condenser 22 such that the hot pipes 32 and 33 are buried along the perimeter of the opening of the refrigerator body 10. Formation of dew at the front of the refrigerator body 10 due to a temperature difference between the inside and outside of the refrigerator body 10 is prevented, and the amount of heat dissipated from the high-pressure side is increased, by the dissipation of heat from the high-temperature refrigerant flowing in the hot pipes 32 and 22.
  • The hot pipes 32 and 33 may include, a first hot pipe 32 buried in the perimeter of the refrigerator body 10 constituting the freezing chamber 13 and a second hot pipe 33 buried in the perimeter of the refrigerator body 10 constituting the refrigerating chamber 12.
  • Generally, a hot pipe is connected to a refrigerant pipe. The inlet and outlet of the hot pipe are connected respectively to the outlet of a high-pressure side refrigerant pipe and the inlet of a valve to control the flow of a refrigerant to a refrigerating chamber or freezing chamber evaporator.
  • In this case, a high-temperature refrigerant always flows in the hot pipe during the operation of a compressor, with the result that the amount of heat generated from a hot pipe on the refrigerating chamber side, the temperature of which is relatively low, is excessive, thereby lowering energy efficiency.
  • In this embodiment, therefore, a channel switching valve may be provided on a refrigerant circulation channel on the second hot pipe inlet side buried in the perimeter of the opening of the refrigerator body constituting the refrigerating chamber 12 to prevent lowering of energy efficiency of the refrigerator due to excessive heat generation from the hot pipe.
  • Hereinafter, the refrigerant circulation channel of the refrigeration cycle will be described. FIG. 2 is a schematic view illustrating the construction of a refrigeration cycle 20 according to an embodiment. In this embodiment, the refrigeration cycle is configured such that a first evaporator to generate cool air for the refrigerating chamber and a second evaporator to generate cool air for the freezing chamber are connected in series.
  • As shown in FIG. 2, the refrigeration cycle 20 is configured such that a condenser 22 is connected to a high-pressure side discharge port of a compressor 21, and a first hot pipe 32 buried in the perimeter of the opening of the freezing chamber 13 in FIG. 1 is connected to the outlet of the condenser 22.
  • A channel switching valve 34 is connected to the outlet of the first hot pipe 32. The channel switching valve 34 may include a three-way valve having one inlet and two outlets. The outlets of the channel switching valve 34 may be connected respectively to a first circulation channel 35 and a second circulation channel 36.
  • The channel switching valve 34 is not particularly restricted as long as one of the outlets is selectively opened, or bidirectional opening and closing is performed.
  • A second hot pipe 33 buried in the perimeter of the opening of the refrigerating chamber 12 is connected to the outlet of the channel switching valve 34 connected to the first circulation channel 35. A first expansion device 24 for the refrigerating chamber and a first evaporator 28 are sequentially connected to the outlet of the second hot pipe 33.
  • A second expansion device 25 for the freezing chamber and a second evaporator 29 are sequentially connected to the outlet of the channel switching valve 34 connected to the second circulation channel 36. The outlet of the second evaporator 29 is connected to the compressor 21 via a suction pipe 37.
  • Also, the outlet of the first evaporator 28 and the inlet of the second evaporator 29 are connected in series via a connection refrigerant pipe 38. A third expansion device 39 is mounted on the connection refrigerant pipe 38.
  • Hereinafter, the operation of the refrigeration cycle of FIG. 2 will be described.
  • In this embodiment, the refrigeration cycle may include a first operation mode to simultaneously cool the refrigerating chamber 12 and the freezing chamber 13, a second operation mode to cool the freezing chamber 13 alone, and a controller 100 to control the first operation mode and the second operation mode.
  • The controller 100 may be a microprocessor or microcontroller including a central processing unit (CPU) to perform at least one computer command to control operations of the respective components of the refrigerator according to manipulation set by a user or a predetermined program.
  • In the first operation mode as shown in FIG. 2, a refrigerant, compressed by and discharged from the compressor 21, is introduced into the condenser 22. The refrigerant, condensed by the condenser 22, flows to the channel switching valve 34 via the first hot pipe 32.
  • At this time, the channel switching valve 34 opens only the first circulation channel 35 under the control of the controller 100. Consequently, the refrigerant, introduced into the channel switching valve 34, is introduced into the first evaporator 28 via the second hot pipe 33 and the first expansion device 24 to cool the refrigerating chamber 12.
  • The refrigerant, discharged from the first evaporator 28, is introduced into the second evaporator 29 via the third expansion device 39 to cool the freezing chamber 13. The refrigerant, discharged from the second evaporator 29, returns to the compressor 21 via the suction pipe 37.
  • In the second operation mode as shown in FIG. 3, a refrigerant, compressed by and discharged from the compressor 21, is introduced into the condenser 22. The refrigerant, condensed by the condenser 22, flows to the channel switching valve 34 via the first hot pipe 32.
  • At this time, the channel switching valve 34 opens only the second circulation channel 36 under the control of the controller 100. Consequently, the refrigerant, introduced into the channel switching valve 34, cools the freezing chamber 13 via the second expansion device 25 and the second evaporator 29. The refrigerant, discharged from the second evaporator 29, returns to the compressor 21 via the suction pipe 37.
  • That is, the controller 100 determines whether the refrigerating chamber 12 or the freezing chamber 13 is to be cooled. Upon determining that the freezing chamber 13 is to be cooled, the controller 100 controls the second circulation channel 36 of the channel switching valve 34 such that the refrigerant discharged from the condenser 22 cools the freezing chamber 13 via the first hot pipe 32. Upon determining that the refrigerating chamber 12 is to be cooled, the controller 100 controls the first circulation channel 35 of the channel switching valve 34 such that the refrigerant discharged from the condenser 22 cools the refrigerating chamber 12 via the first hot pipe 32 and the second hot pipe 33.
  • Meanwhile, the amount of a refrigerant optimally filled in the refrigeration cycle may be changed depending upon a refrigerating operation or a freezing operation. Generally, an amount of a refrigerant between optimal amounts of a refrigerant for the refrigerating and freezing operations is filled in the refrigeration cycle.
  • As a result, the refrigerant is excessive in one of the refrigerating and freezing operations and is insufficient in the other of the refrigerating and freezing operations.
  • That is, the refrigerant is excessive in the refrigerating operation, and the refrigerant is insufficient in the freezing operation, with the result that energy loss may occur due to unbalance in the amount of the refrigerant. In this embodiment, such energy loss may be minimized.
  • Referring to FIG. 2, in the first operation mode of the refrigeration cycle, a larger amount of the refrigerant than the optimal amount of the refrigerant to be introduced into the first evaporator 28 is filled. At this time, the refrigerant flows to the second hot pipe 33, thereby preventing the refrigerant from being excessively introduced into the first evaporator 28.
  • Referring to FIG. 3, in the second operation mode of the refrigeration cycle, a smaller amount of the refrigerant than the optimal amount of the refrigerant to be introduced into the second evaporator 29 is filled. At this time, the refrigerant does not flow to the second hot pipe 33, thereby preventing the refrigerant from being insufficiently introduced into the second evaporator 29.
  • Consequently, in a conventional structure in which the refrigerant flows to both the first hot pipe 32 and the second hot pipe 33 during the operation of the compressor 21, energy efficiency is lowered due to unbalance in the amount of the refrigerant. In this embodiment, the unbalance in the amount of the refrigerant is relatively reduced, thereby improving energy efficiency of the refrigerator.
  • Also, since the amount of heat to be provided to prevent dew formation is generally calculated based on the first hot pipe 32 on the freezing chamber side, heat is excessively generated from the second hot pipe 33 on the refrigerating chamber side, thereby excessively increasing thermal load of the refrigerator. In this embodiment, the amount of heat generated from the second hot pipe 33 of the refrigeration cycle is relatively reduced as compared with the amount of heat generated from the first hot pipe 32, with the result that increase of thermal load due to excessive generation of heat is prevented, thereby improving energy efficiency of the refrigerator.
  • FIG. 4 is a schematic view illustrating the construction of a refrigeration cycle 40 according to another embodiment.
  • Hereinafter, components of this embodiment identical to those of the previous embodiment are denoted by the same reference numerals, and a detailed description thereof will not be given.
  • In this embodiment, the refrigeration cycle is configured such that a first evaporator to generate cool air for the refrigerating chamber and a second evaporator to generate cool air for the freezing chamber are connected in parallel, unlike the previous embodiment.
  • As shown in FIG. 4, the refrigeration cycle 40 is configured such that a condenser 22 is connected to a high-pressure side discharge port of a compressor 21, and a first hot pipe 32 buried in the perimeter of the opening of the freezing chamber 13 in FIG. 1 is connected to the outlet of the condenser 22.
  • A channel switching valve 34 is connected to the outlet of the first hot pipe 32. The channel switching valve 34 may include a three-way valve having one inlet and two outlets. The outlets of the channel switching valve 34 may be connected respectively to a first circulation channel 41 on the refrigerating chamber side and a second circulation channel 42 on the freezing chamber side.
  • A second hot pipe 33 buried in the perimeter of the opening of the refrigerating chamber 12 is connected to the outlet of the channel switching valve 34 connected to the first circulation channel 41. A first expansion device 24 for the refrigerating chamber and a first evaporator 28 are sequentially connected to the outlet of the second hot pipe 33.
  • Referring to FIG. 4, the second hot pipe 33, the first expansion device 24, the first evaporator 28, and a suction pipe 37 are sequentially connected to the outlet of the channel switching valve 34 connected to the first circulation channel 41. A second expansion device 25, a second evaporator 29, and the suction pipe 37 are sequentially connected to the outlet of the channel switching valve 34 connected to the second circulation channel 42.
  • The outlet of the first evaporator 28 is connected to a first discharge refrigerant pipe 43, which is a discharge channel of the refrigerating chamber 12. The outlet of the second evaporator 29 is connected to a second discharge refrigerant pipe 44, which is a discharge channel of the freezing chamber 13.
  • A refrigerant discharged from the first discharge refrigerant pipe 43 and a refrigerant discharged from the second discharge refrigerant pipe 44 are mixed before introduction thereof into the compressor 21. The joint between the first discharge refrigerant pipe 43 and the second discharge refrigerant pipe 44 is connected to the inlet of the compressor 21 via the suction pipe 37.
  • A check valve 45 is mounted on the second discharge refrigerant pipe 44 is mounted to prevent backward flow of the refrigerant from the first discharge refrigerant pipe 43.
  • Hereinafter, the operation of the refrigeration cycle of FIG. 4 will be described.
  • In this embodiment, the refrigeration cycle may include a first operation mode to operate the refrigerating chamber 12, a second operation mode to operate the freezing chamber 13, and a controller to control the first operation mode and the second operation mode.
  • In the first operation mode as shown in FIG. 4, a refrigerant, compressed by and discharged from the compressor 21, is introduced into the condenser 22. The refrigerant, condensed by the condenser 22, flows to the channel switching valve 34 via the first hot pipe 32.
  • At this time, the channel switching valve 34 opens only the first circulation channel 41 under the control of the controller. Consequently, the refrigerant, introduced into the channel switching valve 34, sequentially flows through the second hot pipe 33, the first expansion device 24, and the first evaporator 28, and returns to the compressor via the suction pipe 37.
  • In the refrigeration cycle in which a larger amount of the refrigerant than the optimal amount of the refrigerant to be introduced into the first evaporator 28 is filled, therefore, the refrigerant flows to the second hot pipe 33, thereby preventing the refrigerant from being excessively introduced into the first evaporator 28.
  • Also, the amount of heat generated from the second hot pipe 33 is relatively reduced as compared with the amount of heat generated from the first hot pipe 32, with the result that increase of thermal load due to excessive generation of heat from the second hot pipe 33 is prevented.
  • In the second operation mode as shown in FIG. 5, a refrigerant, compressed by and discharged from the compressor 21, is introduced into the condenser 22. The refrigerant, condensed by the condenser 22, flows to the channel switching valve 34 via the first hot pipe 32.
  • At this time, the channel switching valve 34 opens only the second circulation channel 42 under the control of the controller. Consequently, the refrigerant, introduced into the channel switching valve 34 sequentially flows through the second expansion device 25 and the second evaporator 29, and returns to the compressor 21 via the suction pipe 37.
  • In the refrigeration cycle in which a smaller amount of the refrigerant than the optimal amount of the refrigerant to be introduced into the second evaporator 29 is filled, therefore, the refrigerant does not flow to the second hot pipe 33, thereby preventing the refrigerant from being insufficiently introduced into the second evaporator 29.
  • In the refrigeration cycle having the coolant circulation channel as described above, therefore, unbalance in the amount of the refrigerant and unbalance in the amounts of heat generated from the hot pipes 32 and 33 depending upon the operation modes are reduced, thereby improving energy efficiency of the refrigerator.
  • As is apparent from the above description, unbalance in the amount of the refrigerant and unbalance in the amounts of heat generated from the hot pipes depending upon the operation modes of the refrigeration cycle are reduced, thereby improving energy efficiency of the refrigerator.
  • Although a few embodiments have been shown and described, it would be appreciated by those skilled in the art that changes may be made in these embodiments without departing from the scope of the invention as defined in the claims.

Claims (5)

  1. A refrigerator comprising a compressor (21), a condenser (22), a refrigerating chamber (12), a freezing chamber (13), a first circulation channel (35) to cool the refrigerating chamber (12), a second circulation channel (36) to cool the freezing chamber (13), and a channel switching valve (34) to perform switching between the circulation channels, characterized by
    a first hot pipe (32) on a freezing chamber side; a second hot pipe (33) on a refrigerating chamber side,
    wherein the first hot pipe (32) is connected to the condenser (22) and an inlet of the channel switching valve (34), and the second hot pipe (33) is connected to an outlet of the channel switching valve (34).
  2. The refrigerator according to claim 1, wherein
    the second circulation channel (36) is connected to another outlet of the channel switching valve (34), and
    the second circulation channel (36) is connected to the compressor (21) via a second expansion device (25) and a second evaporator (29) on the freezing chamber side.
  3. The refrigerator according to claim 1, wherein the first circulation channel (35) is connected to a second evaporator (29) on the freezing chamber side and the compressor (21) via the second hot pipe (33), a first expansion device (24), a first evaporator (28) on the refrigerating chamber side, and a third expansion device (39) in a series.
  4. The refrigerator according to claim 1, wherein the first circulation channel (35) is connected to a first evaporator (28) on the refrigerating chamber side and the compressor (21) via the second hot pipe (33) and a first expansion device (24).
  5. The refrigerator according to claim 1, wherein the channel switching valve (34) comprises a three-way valve having one inlet connected to an outlet of the first hot pipe (32) and two outlets connected respectively to the first circulation channel (35) and the second circulation channel (36).
EP10193809.0A 2009-12-22 2010-12-06 Refrigerator Not-in-force EP2339276B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090129106A KR101666428B1 (en) 2009-12-22 2009-12-22 Refrigerator and operation control method thereof

Publications (3)

Publication Number Publication Date
EP2339276A2 EP2339276A2 (en) 2011-06-29
EP2339276A3 EP2339276A3 (en) 2018-05-23
EP2339276B1 true EP2339276B1 (en) 2019-03-27

Family

ID=43639909

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10193809.0A Not-in-force EP2339276B1 (en) 2009-12-22 2010-12-06 Refrigerator

Country Status (4)

Country Link
US (1) US20110146310A1 (en)
EP (1) EP2339276B1 (en)
KR (1) KR101666428B1 (en)
CN (1) CN102102934B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024080510A1 (en) * 2022-10-12 2024-04-18 삼성전자주식회사 Refrigerator and control method for same

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012214117A1 (en) * 2012-08-09 2014-02-13 BSH Bosch und Siemens Hausgeräte GmbH Refrigeration appliance and operating method for it
JP5973852B2 (en) * 2012-09-06 2016-08-23 シャープ株式会社 refrigerator
JP5973853B2 (en) * 2012-09-06 2016-08-23 シャープ株式会社 refrigerator
KR102264917B1 (en) * 2013-08-06 2021-06-15 엘지전자 주식회사 A refrigerator
KR102188231B1 (en) * 2014-03-23 2020-12-10 주식회사 위니아딤채 Hot-pipe for refrigerator
JP6340586B2 (en) * 2014-04-18 2018-06-13 パナソニックIpマネジメント株式会社 refrigerator
CN104236149A (en) * 2014-10-11 2014-12-24 合肥美的电冰箱有限公司 Cooling system for refrigerator and refrigerator
JP6523765B2 (en) * 2015-04-20 2019-06-05 日立グローバルライフソリューションズ株式会社 Fluid circuit and device provided with fluid circuit
WO2017067035A1 (en) * 2015-10-21 2017-04-27 合肥华凌股份有限公司 Liquid receiver assembly for refrigerating system, and refrigerating system and freezer having same
WO2018001504A1 (en) * 2016-07-01 2018-01-04 Arcelik Anonim Sirketi Refrigeration appliance having a heat exchange circuit with improved thermal performance
CN107869872A (en) * 2016-09-28 2018-04-03 博西华电器(江苏)有限公司 Refrigerator
US10465967B2 (en) * 2017-05-17 2019-11-05 Haier Us Appliance Solutions, Inc. Refrigerator appliance with a convertible freezer compartment
CN110579060A (en) * 2019-09-24 2019-12-17 长虹美菱股份有限公司 Modularized refrigerator based on heat pipe combined refrigeration system
KR20220093973A (en) * 2020-12-28 2022-07-05 삼성전자주식회사 Refrigerator and control method thereof

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2135091A (en) * 1936-01-22 1938-11-01 Gen Motors Corp Refrigerating apparatus
US2943456A (en) * 1957-04-23 1960-07-05 Lee Aaron Ice cube making addition to domestic refrigerators
US3572051A (en) * 1969-09-22 1971-03-23 Gen Motors Corp Partial internal condenser
US3984223A (en) * 1975-11-28 1976-10-05 General Motors Corporation Refrigerator cabinet with condenser tube loop in partition mullion
US4192149A (en) * 1978-09-18 1980-03-11 General Electric Company Post condenser loop case heater controlled by ambient humidity
JPS5710063A (en) * 1980-06-20 1982-01-19 Hitachi Ltd Refrigerating plant
US4416119A (en) * 1982-01-08 1983-11-22 Whirlpool Corporation Variable capacity binary refrigerant refrigeration apparatus
US4499738A (en) * 1982-06-30 1985-02-19 Tokyo Shibaura Denki Kabushiki Kaisha Control device for a refrigerator
US4748823A (en) * 1984-12-07 1988-06-07 Nippondenso Co., Ltd. Automotive refrigerator
US4854130A (en) * 1987-09-03 1989-08-08 Hoshizaki Electric Co., Ltd. Refrigerating apparatus
US5406805A (en) * 1993-11-12 1995-04-18 University Of Maryland Tandem refrigeration system
SE9600684D0 (en) * 1996-02-23 1996-02-23 Lop Lundgren & Perzon Ab Device at refrigerated or freezer counters
KR20000001934A (en) * 1998-06-15 2000-01-15 전주범 Structure for preventing dew from forming in a refrigerator
JP3437764B2 (en) * 1998-06-29 2003-08-18 株式会社東芝 Refrigerator control method
JP3456905B2 (en) * 1998-09-18 2003-10-14 株式会社東芝 refrigerator
JP2000111230A (en) * 1998-10-02 2000-04-18 Toshiba Corp Freezer-refrigerator
US6427463B1 (en) * 1999-02-17 2002-08-06 Tes Technology, Inc. Methods for increasing efficiency in multiple-temperature forced-air refrigeration systems
KR100404984B1 (en) * 2000-08-24 2003-11-10 가부시끼가이샤 도시바 Refrigerator and controlling method therefor
JP3576092B2 (en) * 2000-11-10 2004-10-13 松下冷機株式会社 refrigerator
JP2002195724A (en) * 2000-12-21 2002-07-10 Hitachi Ltd Refrigerator
KR20040020618A (en) * 2002-08-31 2004-03-09 삼성전자주식회사 Refrigerator
KR100638103B1 (en) * 2002-11-06 2006-10-25 삼성전자주식회사 Cooling apparatus
US6931870B2 (en) * 2002-12-04 2005-08-23 Samsung Electronics Co., Ltd. Time division multi-cycle type cooling apparatus and method for controlling the same
US20050210898A1 (en) * 2004-03-23 2005-09-29 Samsung Electronics Co., Ltd. Refrigerator and control method thereof
US7441413B2 (en) * 2004-03-23 2008-10-28 Samsung Electronics Co., Ltd. Refrigerator and control method thereof
KR100687933B1 (en) * 2005-08-18 2007-02-27 삼성전자주식회사 Refrigerator and its operation control method
KR100687934B1 (en) * 2005-09-28 2007-02-27 삼성전자주식회사 Refrigerator and controlling method for the same
KR100719242B1 (en) * 2005-10-11 2007-05-17 주식회사 대우일렉트로닉스 Refrigerator having improved set up structure of hot pipe
KR100845857B1 (en) * 2006-12-26 2008-07-14 엘지전자 주식회사 Apparatus for refrigeration cycle and refrigerator including the apparatus and control method for the refrigerator

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024080510A1 (en) * 2022-10-12 2024-04-18 삼성전자주식회사 Refrigerator and control method for same

Also Published As

Publication number Publication date
US20110146310A1 (en) 2011-06-23
EP2339276A2 (en) 2011-06-29
CN102102934B (en) 2015-01-14
KR20110072251A (en) 2011-06-29
KR101666428B1 (en) 2016-10-17
EP2339276A3 (en) 2018-05-23
CN102102934A (en) 2011-06-22

Similar Documents

Publication Publication Date Title
EP2339276B1 (en) Refrigerator
US9857103B2 (en) Refrigerator having a condensation loop between a receiver and an evaporator
WO2005061970A1 (en) Refrigerator
KR20110006998A (en) Refrigerator
US9746226B2 (en) Refrigerator
WO2020175829A1 (en) Method for controlling refrigerator
JP3746496B2 (en) refrigerator
KR101770467B1 (en) Refrigerator and colntrol method for refrigerator
CN104823010A (en) Refrigerator
JP2004293820A (en) Refrigerator
KR20080109146A (en) Refrigerator
KR100764267B1 (en) Refrigerator, and method for controlling operation of the same
KR100844598B1 (en) Refrigerator
KR20120003224A (en) Refrigerant circulation system for refrigerating apparatus
WO2020175824A1 (en) Method for controlling refrigerator
JP3725397B2 (en) refrigerator
KR100759047B1 (en) System for heat radiating and deiced water evaporating of machinery room of refrigerator and controll method of the same
KR100249195B1 (en) Refrigerator
US11852387B2 (en) Refrigerator
KR101233778B1 (en) Refrigerator having heating apparatus
US20220146155A1 (en) Refrigerator
JP6640778B2 (en) Refrigeration cycle and refrigerator having refrigeration cycle
KR20070107858A (en) Refrigerator
KR102099391B1 (en) Method for driving kimchi refrigerator
JP2000266445A (en) Refrigerator

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SAMSUNG ELECTRONICS CO., LTD.

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: F25D 21/04 20060101ALI20180419BHEP

Ipc: F25D 11/02 20060101ALI20180419BHEP

Ipc: F25D 21/14 20060101AFI20180419BHEP

Ipc: F25B 5/00 20060101ALN20180419BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180814

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: F25D 21/14 20060101AFI20180907BHEP

Ipc: F25D 21/04 20060101ALI20180907BHEP

Ipc: F25D 11/02 20060101ALI20180907BHEP

Ipc: F25B 5/00 20060101ALN20180907BHEP

INTG Intention to grant announced

Effective date: 20180927

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1113585

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602010057799

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190627

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190628

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190627

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1113585

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190727

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190727

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602010057799

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

26N No opposition filed

Effective date: 20200103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20200227

Year of fee payment: 11

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20191206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191206

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191206

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20201120

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20101206

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190327

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602010057799

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220701

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211231