EP2285660B1 - Mating - Google Patents
Mating Download PDFInfo
- Publication number
- EP2285660B1 EP2285660B1 EP08760302.3A EP08760302A EP2285660B1 EP 2285660 B1 EP2285660 B1 EP 2285660B1 EP 08760302 A EP08760302 A EP 08760302A EP 2285660 B1 EP2285660 B1 EP 2285660B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- hull
- end piece
- opening
- semi
- submersible unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B75/00—Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B77/00—Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
Definitions
- the present invention relates to a method of constructing a semi-submersible unit comprising a side wall, wherein the method comprises the steps of:
- the present invention also relates to a kit for constructing a semi-submersible unit comprising a side wall, wherein the kit comprises hull comprising an opening and a deck structure. Moreover, the present invention relates to a semi-submersible unit constructed according to the method and/or from a kit according to the present invention.
- Semi-submersible units are inter alia used for drilling for, or production of, natural resources such as gas and oil, when the natural resources for example are located in a source located at the bottom of a sea or lake. Furthermore, semi-submersible units are used for quartering staff working out at sea.
- semi-submersible units have generally increased which results in various problems when constructing the units. For instance, there may be few, if any, dry docks available in the world adapted to accommodate a complete semi-submersible unit the displacement and load carrying capacity of which meets the requirements of a modern drilling or production unit. Moreover, semi-submersible units are often provided with a deck structure adapted to accommodate e.g. drilling or production equipment and such a deck structure is often too heavy and/or large to be lifted by conventional lifting arrangements, such as cranes.
- units comprising a side wall or, even more preferred, being provided with an outer wall delimiting an enclosed area within the unit wherein the outer wall substantially constitutes the hull of the unit.
- the latter unit may be referred to as a ring wall type of semi-submersible unit,
- a method of constructing a platform structure comprising a hull structure and a self-floating deck module, which method comprises the steps of lowering the hull structure into a body of water, floating the deck module over the hull structure and connecting the hull structure with the deck module.
- the steps as defined hereinabove as regards the floating in and connection of the deck module is often referred to as a mating procedure.
- lowering the complete hull structure as proposed by '425 requires a large amount of e.g.
- the '425 hull structure is lowered to a position in which the deck structure may be connected to the hull structure, only a small portion of the hull structure is intersecting a still water level, resulting In a low stability of the hull structure.
- US 6125780 discloses a method of constructing a hull for a ring wall semi-submersible unit which method comprises the steps of providing four substantially identical buoyant modules and attaching them to one another to thereby form a hull of a ring wall type.
- the hull obtained using the '780 method will also exhibit a large water plane area, hence requiring a large amount of e.g. ballast water in order to lower the hull to a position in which a deck structure may be connected to the hull.
- US 2004/159274 A1 discloses a semi-submersible offshore platform comprising: a substantially ring-shaped lower pontoon: at least three columns extending upwardly from the lower pontoon, and an upper beam structure connecting upper portions of the columns with each other.
- the upper beam structure forms a system of lateral beams, arranged in such a way as to allow one or more operation modules to be placed upon or adjacent to the columns next to the lateral beams, either directly on the columns, on brackets connected to the columns or on a deck arranged between upper ends of the columns and the operation modules, the lateral beams protruding vertically upwards above a bottom plane of the operation modules.
- WO 00/40806 A discloses a method for constructing an offshore platform by mating a self-floating deck structure with a self-floating substructure.
- the self-floating deck structure may be a floating pier or barge, on which the desired equipment has been mounted. Mating is achieved by at least partially submerging the substructure, positioning the pier or barge above it, and deballasting the substructure to create a vertical bearing force between the substructure and the pier or barge. Horizontal force may be transmitted between the deck and substructure by a variety of mechanical, structural, and magnetic means.
- EP 1 060 982 A discloses a technique for the installation of a deck on an offshore substructure.
- Two independent pontoons each have two columns spaced apart from each other that extend upwardly from the pontoon.
- Each pontoon is provided with ballast tanks that allow the pontoons to be selectively ballasted or deballasted to control pontoon depth for receiving the deck or installing the deck on the offshore substructure.
- a first object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, wherein no one of the components constituting the semt-submersibie unit is subjected to excessive loading during the construction.
- a second object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, which method ensures that the floating components of the unit provide an appropriately high stability during the construction.
- a third object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, which reduces, preferably eliminates, a risk of obtaining large residual stresses in any part of the semi-submersible unit.
- a fourth object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, which requires a minimum of construction time in a dry dock and/or at a quay.
- At least one of the objects above is achieved by a method for constructing a semi-submersible unit comprising a side wall according to claim 1.
- the present invention relates to a method of constructing a semi-submersible unit comprising a side wall, wherein the method comprises the steps of:
- the method further comprises the steps of:
- the two last steps of the method as presented hereinabove are executed after the deck structure has been connected to the hull.
- the mating of the deck structure with the hull may be performed when the hull provides appropriate hydrostatic characteristics, such as water plane area and stability. Then, the end piece is inserted in the semi-submersible unit thus formed, wherein the introduction of the end piece will further contribute to the hydrostatic characteristics of the hull without impairing the above mentioned mating procedure.
- the deck structure are connected to one another, thus preferably forming a continuous unit prior to the insertion of the end piece, initial deflections of the hull - e.g. due to differences in the inner and outer pressure of the hull - may be reduced, or even avoided since the deck structure generally is a member with a high stiffness.
- the end piece was to be inserted and connected to the hull when the hull was subjected to initial deflections - this may result in residual stresses in at least a portion of the complete semi-submersible unit. These residual stresses may be reduced, or even avoided, by the construction method of the present invention.
- the step of attaching the end piece to the semi-submersible unit need not necessarily be an additional method step, the end piece and semi-submersible unit may namely be arranged to become attached to one another on insertion of the end piece and semi-submersible unit with mating mechanical parts arranged to fasten and/or lock on insertion of the end piece into the semi-submersible unit.
- an end piece need not necessarily fill the entire opening but that several end pieces may be arranged to be inserted into the same opening; said one or more end pieces not necessarily filling the opening. Additionally, and end piece may itself comprise one or more openings.
- the method further comprises a step of elevating the semi-submersible unit after the deck structure has been connected to the hull in order to facilitate the floating in of the end piece.
- the method further comprises a step of elevating the semi-submersible unit after the end piece has been inserted into the opening such that the step of attaching the end piece to the semi-submersible unit may be performed above a still water level of the body of water.
- end piece may be attached to the semi-submersible unit by means of conventional attachment techniques, such as dry welding, which is considerably cheaper and more efficient than for instance wet welding, i.e. welding below the still water surface.
- the end piece is buoyant such that the end piece may be self-floating into the opening, preferably the end piece is towed into the opening.
- the need for additional floating members, such as barges, during the construction of the semi-submersible unit may be reduced, or even omitted.
- the hull comprises a truss assembly at least partially delimiting the opening and the step of attaching the end piece to the semi-submersible unit in turn comprises the steps of:
- the truss assembly as mentioned hereinabove may provide additional structural stiffness to the hull - hence preferably reducing the risk for initial deflections - without substantially increasing the water plane area of the hull.
- the hull comprises guide means for guiding the end piece into the opening and the step of floating the end piece into the opening in turn comprises a step of guiding the end piece into the opening using the guide means.
- the step of attaching the end piece to the semi-submersible structure in turn comprises the steps of: attaching the end piece to the hull, and attaching the end piece to the deck structure.
- a second aspect of the present invention relates to a kit for constructing a semi-submersible unit comprising a side wall, wherein the kit comprises:
- the kit further comprises an end piece adapted to constitute at least a portion of the side wall, the end piece further being adapted to be floated into the opening and attached to the hull after the deck structure has been connected to the hull.
- the hull comprises means for guiding the end piece into the opening.
- the hull comprises a truss assembly at least partially delimiting the opening.
- the hull comprises a first and a second longitudinally extending float, wherein each one of the first and second floats is adapted to extend through a still water level of a body of water, wherein the first and second floats are connected to one another by means of a substantially transversally extending bridging arrangement wherein: at least a portion of the first float, at least a portion of the second float and at least a portion of the bridging arrangement at least partially delimits the opening.
- the end piece comprises structural tanks, such as ballast water tanks.
- the hull comprises tanks adapted to store liquefied natural gas.
- the kit comprises a plurality of end pieces such that the side wall delimits an enclosed area.
- Fig. 1 illustrates a hull 10 which is suitable to be used in the construction method of the present invention.
- the hull 10 comprises a first and a second longitudinally extending float 12, 14. Each one of the first 12 and second 14 floats is adapted to extend through a still water level (SWL) of a body of water.
- the first and second floats 12, 14 are connected to one another by means of a substantially transversally extending bridging arrangement, which bridging arrangement in the implementation of the hull 10 illustrated in Fig.
- the hull 10 may have a displacement within the range of 50 000 - 500 000 metric tonnes when in an operational draught.
- first and the second floats 12, 14 in combination with each one of the bracings 16, 18 form an opening in the hull.
- first and second floats 12, 14 and the first bracing 16 form a first opening 20 whereas the first and second floats 12, 14 and the second bracing 18 form a second opening 22.
- At least one, but preferably both, of the floats 12, 14 are preferably furnished with tanks for storing hydrocarbons, such as gas or oil. More preferred, the floats are furnished with tanks for storing liquefied natural gas (LNG). Moreover, the floats 12, 14 - and possibly also the bracings 16, 18 - are provided with ballast water tanks and a ballast water system including inter alia water pumps for controlling the water level in the aforementioned ballast water tanks such that the load and hence the floating condition of the hull 10 may be controlled.
- LNG liquefied natural gas
- Fig. 2 presents a side view of the Fig. 1 hull 10, wherein deflections of the hull 10 have been exaggerated.
- Fig. 2 illustrates that it is not unlikely that the bracings 16, 18 may be subjected to a bending deflection resulting in that the first and second floats 12, 14 will be inclined away from one another. As such, if an end piece (not shown in Fig.
- Fig. 3 illustrates a further step of the construction method of the present invention, wherein the hull 10 has been lowered into the water such that the freeboard, i.e. the distance from the still water level to the uppermost portion of the first and second floats 12, 14, is so small that a deck structure 24 may be floated over the hull 10.
- the hull 10 is lowered by introducing ballast water into the hull 10, e.g. by using the aforementioned ballast water tanks (not shown). Since the water plane area of the hull 10 is only constituted by the water plane areas of the first 12 and second 14 floats, respectively, the hull 10 may be lowered to a desired draught without subjecting the hull 10 to excessive loads.
- the water plane areas of the first 12 and second 14 floats, respectively preferably are adapted to provide an appropriate stability to the hull 10 in the floating condition illustrated in Fig. 3 .
- the deck structure 24 When the hull 10 is in the position illustrated in Fig. 3 , the deck structure 24 is floated over the hull 10. To this end, the deck structure 24 may be loaded onto one or several barges (not shown) wherein at least one of the barges may be guided through the second opening 22 of the hull 10.
- the deck structure 24 may be buoyant - for instance a centre portion of the deck structure 24 may be adapted to be immersed in water and thus carry the rest of the deck structure 24 when it is introduced through the second opening 22.
- the deck structure 24 may have various designs, depending inter alia on the purpose of the semi-submersible unit to be constructed.
- the deck structure 24 may be a buoyant member or at least have a water tight bottom.
- the deck structure 24 may comprise, or even be constituted by, a truss structure (not shown).
- the deck structure 24 in Fig. 3 is illustrated as being constituted by one single unit, the deck structure 24 may instead be split up into several sub-structures (not shown) wherein each one of the sub-structures are floated into position and connected to the hull 10.
- the deck structure 24 may comprise additional equipment, e.g. for drilling, producing or storing hydrocarbons (not shown).
- a deck structure 24 without the additional equipment as presented hereinabove may weigh approximately 10 000 to 20 000 metric tonnes.
- the deck structure 24, including such arrangements may weigh 60 000 to 80 000 metric tonnes.
- the two components When the deck structure 24 has been placed in position over the hull 10, the two components may be connected to one another to form a semi-submersible unit 26.
- the deck structure 24 may be fixedly attached to the hull 10, e.g. by means of welding.
- the deck structure 24 may simply be resting on the hull 10 wherein the deck structure 24 will be held in place in relation to the hull 10 by means of friction forces developed between the two structures.
- Fig. 4 illustrates a side view of the Fig. 3 semi-submersible unit 26.
- the Fig. 4 semi-submersible unit 26 comprises the deck structure 24 which is connected to the hull 10 and since the deck structure 24 often is relatively stiff, the deflections of the hull 10 in the Fig. 4 configuration are generally substantially less pronounced than in the case illustrated in Fig. 2 .
- the configuration as proposed in Fig. 4 provides for that an end piece may be inserted in the first opening 20 in the hull 10 and may also be attached to the hull 10 when the hull 10 subjected to small initial deflections, resulting in a semi-submersible unit with low residual stresses.
- Fig. 5 illustrates a perspective view of the semi-submersible unit 26 obtained from the construction step illustrated in Fig. 3 .
- Fig. 5 further illustrates that an end piece 28 may be floated into the opening 20 and connected to the semi-submersible unit 26.
- the draught- i.e. the distance from the bottom of the hull 10 to the still water level - of the semi-submersible unit 26 in the condition illustrated in Fig. 5 is preferably substantially lower than the draught of the hull 10 during the deck structure 24 mating step as illustrated in Fig. 3 . This reduction of the draught is carried out order to facilitate the floating in of the end piece 28.
- the end piece 28 preferably constitutes a substantial part of the side wall.
- the end piece 28 may have a height which is in the interval of 0.2 - 0.8 of the height of the hull 10 and the width of the end piece 28 may also range from 0.2 to 0.8 of the width or length, whichever is the largest, of the hull 10.
- the end piece 28 is buoyant such that it may be self-floating into the first opening 20.
- the end piece 28 may preferably be connected to an arrangement (not shown) adapted to propel the end piece 28.
- an arrangement may comprise one or more tugs (not shown).
- the end piece 28 may be loaded on a floating arrangement (not shown) such as a barge (not shown) which floating arrangement in turn may be floated into the first opening 20.
- the end piece 28 is preferably made out of steel and preferably comprises structural tanks, such as ballast water tanks (not shown). Such ballast water tanks may be used to control the floating condition of the end piece 28, in the case of a buoyant end piece 28. Moreover, once the end piece 28 has been connected to the semi-submersible unit 26, the ballast water tanks of the end piece 28 may preferably be connected to a ballast water system (not shown) of the semi-submersible unit 26 such that the ballast water tanks of the end piece 28 may be used for controlling the floating condition of the semi-submersible unit 26.
- ballast water tanks may be used to control the floating condition of the end piece 28, in the case of a buoyant end piece 28.
- the hull 10 and/or the end piece 28 is preferably provided with guide means for guiding the end piece 28 into position in the first opening 20.
- a guide means may comprise a rod (not shown) of the hull 10 which rod extends substantially vertically in the first opening 20 as well as two frames (not shown) located on the bottom of the end piece 28, which frames form a tapering gap.
- the hull 10 may be provided with supports (not shown) located below the opening on which supports the end piece 28 may rest when it has been inserted into the first opening 20.
- the end piece 28 and the semi-submersible unit 26 are attached to one another.
- the end piece 28 is fixedly attached to the semi-submersible unit 26, e.g. by means of welding.
- the end piece 28 is preferably fixedly attached to the hull 10 and, if possible, also to the deck structure 24.
- the end piece 28 may be attached to the semi-submersible unit 26 when the unit 26 is in the floating condition as illustrated in Fig. 5 , e.g. immediately after the end piece 28 has been inserted into the first opening 20.
- the semi-submersible unit 26 is raised - i.e. the draught of the unit 26 is reduced - before the end piece 28 is attached to the unit 26.
- This implementation of the preferred embodiment is illustrated in Fig. 6 . If the end piece 28 is attached to the semi-submersible unit 26 when the unit is in a floating condition as illustrated in Fig. 6 , attachment procedures, such as welding, may be performed in a dry environment which generally provides for a more rapid and efficient attachment procedure.
- Fig. 7 illustrates a side view of another implementation of a hull 10 which may be used in the construction method of the present invention.
- the hull 10 comprises a truss assembly 30 at least partially delimiting the first opening 20.
- the truss assembly 30 adds additional structural stiffness without adding any substantial hydrostatic stiffness to the hull 10.
- the aforementioned changes in the characteristics of the hull 10 obtained by the introduction of the truss assembly 30 may be useful when e.g. performing the construction method of the present invention, for instance as regards deflections of the hull 10 and/or the capability of raising and lowering the hull.
- an end piece (not shown in Fig. 7 ) is preferably attached to the inner portion of the truss assembly 30.
- the truss assembly 30 is preferably sealed from ambient water after the end piece 28 has been inserted in the first opening 20 and attached to the truss assembly 30.
- a sealing is obtained by attaching a sealing arrangement to the truss assembly 30.
- An example of such a sealing arrangement is illustrated in Fig. 8 , wherein the sealing arrangement comprises four steel plates 32', 32", 34' and 34". Each one of the steel plates 32', 32", 34' and 34" is placed in an appropriate position on or over the truss assembly and attached to the hull 10 and the end piece 28.
- the sealing arrangement illustrated in Fig. 8 further comprises a two more plates (not shown in Fig. 8 ) adapted to be located at each side of the end piece 28 and adapted to cover the portions of the truss assembly 30 located below the end piece 28.
- Fig. 9 illustrates another hull 10 for use in the construction method of the present invention may be performed.
- the hull 10 illustrated therein comprises a ring pontoon 36 and four substantially vertically extending columns 38, 40, 42 and 44 wherein each one of the columns is connected to the ring pontoon 36.
- the hull 10 has four openings 46, 48, 50 and 52 and each one of the openings is adapted to receive and end piece (not shown in Fig. 9 ).
- a semi-submersible unit is obtained which has a continuous outer wall, i.e. the unit is of a so called ring wall type.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Earth Drilling (AREA)
- Drying Of Solid Materials (AREA)
Description
- The present invention relates to a method of constructing a semi-submersible unit comprising a side wall, wherein the method comprises the steps of:
- placing a hull in a body of water, the hull comprising an opening for receiving an end piece, the end piece constituting at least a portion of the side wall;
- lowering the hull into the body of water, and
- connecting a deck structure to the hull to form a semi-submersible unit.
- The present invention also relates to a kit for constructing a semi-submersible unit comprising a side wall, wherein the kit comprises hull comprising an opening and a deck structure. Moreover, the present invention relates to a semi-submersible unit constructed according to the method and/or from a kit according to the present invention.
- Semi-submersible units are inter alia used for drilling for, or production of, natural resources such as gas and oil, when the natural resources for example are located in a source located at the bottom of a sea or lake. Furthermore, semi-submersible units are used for quartering staff working out at sea.
- Over the years, the sizes of semi-submersible units have generally increased which results in various problems when constructing the units. For instance, there may be few, if any, dry docks available in the world adapted to accommodate a complete semi-submersible unit the displacement and load carrying capacity of which meets the requirements of a modern drilling or production unit. Moreover, semi-submersible units are often provided with a deck structure adapted to accommodate e.g. drilling or production equipment and such a deck structure is often too heavy and/or large to be lifted by conventional lifting arrangements, such as cranes.
- Furthermore, within the field of semi-submersible units, there has recently been an interest in units comprising a side wall or, even more preferred, being provided with an outer wall delimiting an enclosed area within the unit wherein the outer wall substantially constitutes the hull of the unit. The latter unit may be referred to as a ring wall type of semi-submersible unit,
- When constructing a semi-submersible unit of a ring wall type with a deck structure, the prior art, see e.g.
WO 021092425 - Moreover,
US 6125780 discloses a method of constructing a hull for a ring wall semi-submersible unit which method comprises the steps of providing four substantially identical buoyant modules and attaching them to one another to thereby form a hull of a ring wall type. However, as in the '425 case, the hull obtained using the '780 method will also exhibit a large water plane area, hence requiring a large amount of e.g. ballast water in order to lower the hull to a position in which a deck structure may be connected to the hull. -
US 2004/159274 A1 discloses a semi-submersible offshore platform comprising: a substantially ring-shaped lower pontoon: at least three columns extending upwardly from the lower pontoon, and an upper beam structure connecting upper portions of the columns with each other. The upper beam structure forms a system of lateral beams, arranged in such a way as to allow one or more operation modules to be placed upon or adjacent to the columns next to the lateral beams, either directly on the columns, on brackets connected to the columns or on a deck arranged between upper ends of the columns and the operation modules, the lateral beams protruding vertically upwards above a bottom plane of the operation modules. -
WO 00/40806 A -
EP 1 060 982 A discloses a technique for the installation of a deck on an offshore substructure. Two independent pontoons each have two columns spaced apart from each other that extend upwardly from the pontoon. Each pontoon is provided with ballast tanks that allow the pontoons to be selectively ballasted or deballasted to control pontoon depth for receiving the deck or installing the deck on the offshore substructure. - As such, as may be realized from the above, when a constructing semi-submersible unit comprising a side wall and/or which is of a ring wall type, there is a need for improving the methods by which such units are constructed.
- A first object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, wherein no one of the components constituting the semt-submersibie unit is subjected to excessive loading during the construction.
- A second object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, which method ensures that the floating components of the unit provide an appropriately high stability during the construction.
- A third object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, which reduces, preferably eliminates, a risk of obtaining large residual stresses in any part of the semi-submersible unit.
- A fourth object of the present invention is to provide a method of constructing a semi-submersible unit comprising a side wall, which requires a minimum of construction time in a dry dock and/or at a quay.
- At least one of the objects above is achieved by a method for constructing a semi-submersible unit comprising a side wall according to claim 1.
- As such, the present invention relates to a method of constructing a semi-submersible unit comprising a side wall, wherein the method comprises the steps of:
- placing a hull in a body of water, the hull comprising an opening for receiving an end piece, the end piece constituting at least a portion of the side wall;
- lowering the hull into the body of water, and
- connecting a deck structure to the hull to form a semi-submersible unit.
- The method further comprises the steps of:
- floating the end piece into the opening, and
- attaching the end piece to the semi-submersible unit.
- According to the present invention, the two last steps of the method as presented hereinabove are executed after the deck structure has been connected to the hull.
- Thus, by utilizing the aforementioned method of the invention, the mating of the deck structure with the hull may be performed when the hull provides appropriate hydrostatic characteristics, such as water plane area and stability. Then, the end piece is inserted in the semi-submersible unit thus formed, wherein the introduction of the end piece will further contribute to the hydrostatic characteristics of the hull without impairing the above mentioned mating procedure.
- Moreover, since the hull and deck structure are connected to one another, thus preferably forming a continuous unit prior to the insertion of the end piece, initial deflections of the hull - e.g. due to differences in the inner and outer pressure of the hull - may be reduced, or even avoided since the deck structure generally is a member with a high stiffness. As may be realized by a person skilled in the art, if the end piece was to be inserted and connected to the hull when the hull was subjected to initial deflections - this may result in residual stresses in at least a portion of the complete semi-submersible unit. These residual stresses may be reduced, or even avoided, by the construction method of the present invention.
- It should be noted that the step of attaching the end piece to the semi-submersible unit need not necessarily be an additional method step, the end piece and semi-submersible unit may namely be arranged to become attached to one another on insertion of the end piece and semi-submersible unit with mating mechanical parts arranged to fasten and/or lock on insertion of the end piece into the semi-submersible unit.
- It should also be noted that an end piece need not necessarily fill the entire opening but that several end pieces may be arranged to be inserted into the same opening; said one or more end pieces not necessarily filling the opening. Additionally, and end piece may itself comprise one or more openings.
- According to a preferred embodiment of the method of the present invention, the method further comprises a step of elevating the semi-submersible unit after the deck structure has been connected to the hull in order to facilitate the floating in of the end piece.
- According to another embodiment of the method of the present invention, the method further comprises a step of elevating the semi-submersible unit after the end piece has been inserted into the opening such that the step of attaching the end piece to the semi-submersible unit may be performed above a still water level of the body of water.
- This ensures that the end piece may be attached to the semi-submersible unit by means of conventional attachment techniques, such as dry welding, which is considerably cheaper and more efficient than for instance wet welding, i.e. welding below the still water surface.
- According to a further embodiment of the method of the present invention, the end piece is buoyant such that the end piece may be self-floating into the opening, preferably the end piece is towed into the opening. Thus, if the end piece is self-floating, the need for additional floating members, such as barges, during the construction of the semi-submersible unit, may be reduced, or even omitted.
- According to another embodiment of the method of the present invention, the hull comprises a truss assembly at least partially delimiting the opening and the step of attaching the end piece to the semi-submersible unit in turn comprises the steps of:
- attaching the end piece to the truss assembly, and
- sealing the truss assembly from ambient water by attaching a sealing arrangement, which sealing arrangement preferably comprises a plate such as a steel plate, to the truss assembly.
- The truss assembly as mentioned hereinabove, may provide additional structural stiffness to the hull - hence preferably reducing the risk for initial deflections - without substantially increasing the water plane area of the hull.
- According to a further embodiment of the method of the present invention, the hull comprises guide means for guiding the end piece into the opening and the step of floating the end piece into the opening in turn comprises a step of guiding the end piece into the opening using the guide means.
- According to another embodiment of the method of the present invention, the step of attaching the end piece to the semi-submersible structure in turn comprises the steps of: attaching the end piece to the hull, and attaching the end piece to the deck structure.
- A second aspect of the present invention relates to a kit for constructing a semi-submersible unit comprising a side wall, wherein the kit comprises:
- hull comprising an opening, and
- a deck structure.
- According to the second aspect of the present invention, the kit further comprises an end piece adapted to constitute at least a portion of the side wall, the end piece further being adapted to be floated into the opening and attached to the hull after the deck structure has been connected to the hull.
- According to a preferred embodiment of the second aspect of the present invention, the hull comprises means for guiding the end piece into the opening.
- According to another embodiment of the second aspect of the present invention, the hull comprises a truss assembly at least partially delimiting the opening.
- According to a further embodiment of the second aspect of the present invention, the hull comprises a first and a second longitudinally extending float, wherein each one of the first and second floats is adapted to extend through a still water level of a body of water, wherein the first and second floats are connected to one another by means of a substantially transversally extending bridging arrangement wherein: at least a portion of the first float, at least a portion of the second float and at least a portion of the bridging arrangement at least partially delimits the opening.
- According to another embodiment of the second aspect of the present invention, the end piece comprises structural tanks, such as ballast water tanks.
- According to a further embodiment of the second aspect of the present invention, the hull comprises tanks adapted to store liquefied natural gas.
- According to another embodiment of the second aspect of the present invention, the kit comprises a plurality of end pieces such that the side wall delimits an enclosed area.
- The present invention will hereinafter be further explained by means of non-limiting examples with reference to the appended figures wherein:
-
Fig. 1 illustrates a schematic perspective view of a hull comprising an opening for receiving an end piece; -
Fig. 2 illustrates a schematic side view of the hull illustrated inFig. 1 ; -
Fig. 3 illustrates a schematic perspective view the hull ofFig. 1 as well as a deck structure in a step of the method of the present invention wherein the deck is connected to the hull to form a semi-submersible unit; -
Fig. 4 illustrates a schematic side view of the semi-submersible unit as illustrated inFig. 3 ; -
Fig. 5 illustrates a schematic perspective view of the semi-submersible unit ofFig. 3 , wherein an end piece is floated into the opening of the hull; -
Fig. 6 illustrates a schematic perspective view of the semi-submersible unit inFig. 3 andFig. 5 , wherein the end piece is being attached to the hull; -
Fig. 7 illustrates a side view of an alternative implementation of a hull suitable for the construction method of the present invention; -
Fig. 8 illustrates an top view of the hull illustrated inFig. 7 , and -
Fig. 9 illustrates a schematic perspective view of yet another hull which may be used in the construction method of the present invention. - The invention will be described using examples of embodiments. It should however be realized that the embodiments are included in order to explain principles of the invention and not to limit the scope of the invention, defined by the appended claims.
-
Fig. 1 illustrates ahull 10 which is suitable to be used in the construction method of the present invention. Thehull 10 comprises a first and a secondlongitudinally extending float hull 10 illustrated inFig. 1 is constituted by two transversally extending bracings, namely a first 16 and a second bracing 18, wherein each one of thebracings first float 12 to a lower portion of thesecond float 14. The floats 12, 14 and thebracings hull 10 may have a displacement within the range of 50 000 - 500 000 metric tonnes when in an operational draught. - Furthermore, as may be gleaned from
Fig. 1 , the first and the second floats 12, 14 in combination with each one of thebracings first opening 20 whereas the first and second floats 12, 14 and the second bracing 18 form asecond opening 22. - In the presentation of the construction method of the present invention hereinbelow, reference will be made to the
first opening 20 only. However, a person skilled in the art will directly realize that each step in the construction method is equally applicable for thesecond opening 22. - At least one, but preferably both, of the
floats floats 12, 14 - and possibly also thebracings 16, 18 - are provided with ballast water tanks and a ballast water system including inter alia water pumps for controlling the water level in the aforementioned ballast water tanks such that the load and hence the floating condition of thehull 10 may be controlled. -
Fig. 2 presents a side view of theFig. 1 hull 10, wherein deflections of thehull 10 have been exaggerated. As may be realized fromFig. 2 , when thehull 10 is floating in water, there is a risk that the hull may be subjected to initial deflections due to e.g. difference in the internal pressure and the external pressure - i.e. the water pressure - of thehull 10. Moreover,Fig. 2 illustrates that it is not unlikely that thebracings Fig. 2 ), adapted to be fitted into thefirst opening 20 was to be attached to thehull 10 in the floating condition illustrated inFig. 1 and Fig. 2 , there is a risk that thehull 10 thus obtained - i.e. comprising theoriginal hull 10 and the end piece - would contain residual stresses which may impair the strength of thehull 10. This problem is at least reduced by the construction method of the present invention, as will be explained hereinbelow. -
Fig. 3 illustrates a further step of the construction method of the present invention, wherein thehull 10 has been lowered into the water such that the freeboard, i.e. the distance from the still water level to the uppermost portion of the first and second floats 12, 14, is so small that adeck structure 24 may be floated over thehull 10. Preferably, thehull 10 is lowered by introducing ballast water into thehull 10, e.g. by using the aforementioned ballast water tanks (not shown). Since the water plane area of thehull 10 is only constituted by the water plane areas of the first 12 and second 14 floats, respectively, thehull 10 may be lowered to a desired draught without subjecting thehull 10 to excessive loads. Furthermore, the water plane areas of the first 12 and second 14 floats, respectively, preferably are adapted to provide an appropriate stability to thehull 10 in the floating condition illustrated inFig. 3 . - When the
hull 10 is in the position illustrated inFig. 3 , thedeck structure 24 is floated over thehull 10. To this end, thedeck structure 24 may be loaded onto one or several barges (not shown) wherein at least one of the barges may be guided through thesecond opening 22 of thehull 10. Optionally, thedeck structure 24 may be buoyant - for instance a centre portion of thedeck structure 24 may be adapted to be immersed in water and thus carry the rest of thedeck structure 24 when it is introduced through thesecond opening 22. - The
deck structure 24 may have various designs, depending inter alia on the purpose of the semi-submersible unit to be constructed. Purely by way of example, thedeck structure 24 may be a buoyant member or at least have a water tight bottom. Optionally, thedeck structure 24 may comprise, or even be constituted by, a truss structure (not shown). Moreover, although thedeck structure 24 inFig. 3 is illustrated as being constituted by one single unit, thedeck structure 24 may instead be split up into several sub-structures (not shown) wherein each one of the sub-structures are floated into position and connected to thehull 10. Additionally, thedeck structure 24 may comprise additional equipment, e.g. for drilling, producing or storing hydrocarbons (not shown). Purely by way of example, adeck structure 24 without the additional equipment as presented hereinabove may weigh approximately 10 000 to 20 000 metric tonnes. In a case wherein adeck structure 24 is provided with arrangements for e.g. producing LNG, thedeck structure 24, including such arrangements, may weigh 60 000 to 80 000 metric tonnes. - When the
deck structure 24 has been placed in position over thehull 10, the two components may be connected to one another to form asemi-submersible unit 26. To this end, thedeck structure 24 may be fixedly attached to thehull 10, e.g. by means of welding. Optionally, thedeck structure 24 may simply be resting on thehull 10 wherein thedeck structure 24 will be held in place in relation to thehull 10 by means of friction forces developed between the two structures. -
Fig. 4 illustrates a side view of theFig. 3 semi-submersible unit 26. As may be realized when comparingFig. 4 andFig. 2 , since theFig. 4 semi-submersible unit 26 comprises thedeck structure 24 which is connected to thehull 10 and since thedeck structure 24 often is relatively stiff, the deflections of thehull 10 in theFig. 4 configuration are generally substantially less pronounced than in the case illustrated inFig. 2 . Thus, the configuration as proposed inFig. 4 provides for that an end piece may be inserted in thefirst opening 20 in thehull 10 and may also be attached to thehull 10 when thehull 10 subjected to small initial deflections, resulting in a semi-submersible unit with low residual stresses. -
Fig. 5 illustrates a perspective view of thesemi-submersible unit 26 obtained from the construction step illustrated inFig. 3 .Fig. 5 further illustrates that anend piece 28 may be floated into theopening 20 and connected to thesemi-submersible unit 26. In this respect, the draught- i.e. the distance from the bottom of thehull 10 to the still water level - of thesemi-submersible unit 26 in the condition illustrated inFig. 5 is preferably substantially lower than the draught of thehull 10 during thedeck structure 24 mating step as illustrated inFig. 3 . This reduction of the draught is carried out order to facilitate the floating in of theend piece 28. However, in some implementations of the construction method of the present invention, it may not be necessary to reduce the draught between the steps of the construction method of the present invention as illustrated inFig. 3 andFig. 5 . As further may be realized fromFig. 5 , theend piece 28 preferably constitutes a substantial part of the side wall. Purely by way of example, theend piece 28 may have a height which is in the interval of 0.2 - 0.8 of the height of thehull 10 and the width of theend piece 28 may also range from 0.2 to 0.8 of the width or length, whichever is the largest, of thehull 10. - In a preferred implementation of the
end piece 28 floating in step of the method of the present invention, theend piece 28 is buoyant such that it may be self-floating into thefirst opening 20. To this end, theend piece 28 may preferably be connected to an arrangement (not shown) adapted to propel theend piece 28. Purely by way of example, such an arrangement may comprise one or more tugs (not shown). Optionally, if theend piece 28 is not buoyant or if it by some reasons is so desired, the end piece may be loaded on a floating arrangement (not shown) such as a barge (not shown) which floating arrangement in turn may be floated into thefirst opening 20. - The
end piece 28 is preferably made out of steel and preferably comprises structural tanks, such as ballast water tanks (not shown). Such ballast water tanks may be used to control the floating condition of theend piece 28, in the case of abuoyant end piece 28. Moreover, once theend piece 28 has been connected to thesemi-submersible unit 26, the ballast water tanks of theend piece 28 may preferably be connected to a ballast water system (not shown) of thesemi-submersible unit 26 such that the ballast water tanks of theend piece 28 may be used for controlling the floating condition of thesemi-submersible unit 26. - In order to facilitate the floating in of the
end piece 28 into thefirst opening 20; thehull 10 and/or theend piece 28 is preferably provided with guide means for guiding theend piece 28 into position in thefirst opening 20. Purely by way of example, such a guide means may comprise a rod (not shown) of thehull 10 which rod extends substantially vertically in thefirst opening 20 as well as two frames (not shown) located on the bottom of theend piece 28, which frames form a tapering gap. - Moreover, the
hull 10 may be provided with supports (not shown) located below the opening on which supports theend piece 28 may rest when it has been inserted into thefirst opening 20. - When the
end piece 28 has been inserted into thefirst opening 20, theend piece 28 and thesemi-submersible unit 26 are attached to one another. Preferably, theend piece 28 is fixedly attached to thesemi-submersible unit 26, e.g. by means of welding. Moreover, theend piece 28 is preferably fixedly attached to thehull 10 and, if possible, also to thedeck structure 24. - The
end piece 28 may be attached to thesemi-submersible unit 26 when theunit 26 is in the floating condition as illustrated inFig. 5 , e.g. immediately after theend piece 28 has been inserted into thefirst opening 20. However, in a preferred embodiment of the present invention, thesemi-submersible unit 26 is raised - i.e. the draught of theunit 26 is reduced - before theend piece 28 is attached to theunit 26. This implementation of the preferred embodiment is illustrated inFig. 6 . If theend piece 28 is attached to thesemi-submersible unit 26 when the unit is in a floating condition as illustrated inFig. 6 , attachment procedures, such as welding, may be performed in a dry environment which generally provides for a more rapid and efficient attachment procedure. -
Fig. 7 illustrates a side view of another implementation of ahull 10 which may be used in the construction method of the present invention. As may be gleaned fromFig. 7 , thehull 10 comprises atruss assembly 30 at least partially delimiting thefirst opening 20. Thetruss assembly 30 adds additional structural stiffness without adding any substantial hydrostatic stiffness to thehull 10. As may be realized by a person skilled in the art, the aforementioned changes in the characteristics of thehull 10 obtained by the introduction of thetruss assembly 30 may be useful when e.g. performing the construction method of the present invention, for instance as regards deflections of thehull 10 and/or the capability of raising and lowering the hull. With asemi-submersible unit 26 comprising ahull 10 as illustrated inFig. 7 , an end piece (not shown inFig. 7 ) is preferably attached to the inner portion of thetruss assembly 30. - In order to obtain a buoyant - or at least weather proof - side wall extending from the
first float 12 to thesecond float 14 of thehull 10 as illustrated inFig. 7 , thetruss assembly 30 is preferably sealed from ambient water after theend piece 28 has been inserted in thefirst opening 20 and attached to thetruss assembly 30. Preferably, such a sealing is obtained by attaching a sealing arrangement to thetruss assembly 30. An example of such a sealing arrangement is illustrated inFig. 8 , wherein the sealing arrangement comprises four steel plates 32', 32", 34' and 34". Each one of the steel plates 32', 32", 34' and 34" is placed in an appropriate position on or over the truss assembly and attached to thehull 10 and theend piece 28. Preferably, the sealing arrangement illustrated inFig. 8 further comprises a two more plates (not shown inFig. 8 ) adapted to be located at each side of theend piece 28 and adapted to cover the portions of thetruss assembly 30 located below theend piece 28. - Finally,
Fig. 9 illustrates anotherhull 10 for use in the construction method of the present invention may be performed. As may be gleaned fromFig. 9 , thehull 10 illustrated therein comprises aring pontoon 36 and four substantially vertically extendingcolumns ring pontoon 36. As may be realized fromFig. 9 , thehull 10 has fouropenings Fig. 9 ). Preferably, when all the four openings of a semi-submersible unit, based on thehull 10 illustrated inFig. 9 , have been provided with an end piece, a semi-submersible unit is obtained which has a continuous outer wall, i.e. the unit is of a so called ring wall type. - It should be realized that the present invention is not limited to the embodiments described hereinabove and illustrated in the drawings. Rather, a person skilled in the art will realize that many changes and modifications may be performed within the scope of the appended claims.
Claims (14)
- A method of constructing a semi-submersible unit (26) comprising a side wall, wherein the method comprises the steps of:- placing a hull (10) in a body of water, said hull (10) comprising an opening (20) for receiving an end piece (28), said end piece (28) constituting at least a portion of said side wall;- lowering said hull (10) into said body of water;- connecting a deck structure (24) to said hull (10) to form a semi-submersible unit (26);characterized In that said method, after said deck structure (24) has been connected to said hull (10), further comprises the staps of- floating said end piece (28) into said opening (20), and- attaching said end piece (28) to said semi-submersible unit (26).
- The method according to claim 1, wherein said method further comprises a step of elevating said semi-submersible unit (26) after said deck structure (24) has been connected to said hull (10) in order to facilitate said floating in of said end piece (28).
- The method according to claim 1 or 2, wherein said method further comprises a step of elevating said semi-submersible unit (26) after said end piece (28) has been inserted into said opening (20) such that said step of attaching said end piece (28) to said semi-submersible unit (26) may be performed above a still water level of said body of water.
- The method according to any one of claims 1 to 3, wherein said and (28) piece is buoyant such that said end piece (28) may be self-floating into said opening (20), preferably said end piece is towed into said opening (20).
- The method according to any one of the preceding claims, wherein said hull (!0) comprises a truss assembly (30) at least partially delimiting said opening (20) and said step of attaching said end piece (28) to said semi-submersible unit (26) in tum comprises the steps of:- attaching said end piece (28) to said truss assembly (30), and- sealing sald truss assembly (30) from ambient water by attaching a sealing arrangement, which sealing arrangement preferably comprises a plate such as a steel plate, to said truss assembly (30).
- The method according to any one of the preceding claims, wherein said hull (10) comprises guide means for guiding said end piece (28) into said opening (20) and said step of floating said end piece (28) into said opening (20) in turn comprises a step of guiding said end piece (28) into said opening (20) using said guide means.
- The method according to any one of the preceding claims, wherein said step of attaching said end piece (28) to said semi-submersible structure (26) in turn comprises the steps of: attaching said end piece (28) to said hull (10) and attaching said end piece (28) to said deck structure (24).
- A kit for constructing a semi-submersible unit comprising a side wall, wherein said kit comprises:- a hull (10) comprising an opening (20), and- a deck structure (24)characterized in that said kit further comprises an end piece (28) adapted to constitute at least a portion of said side wall, said end piece (28) further being adapted to be floated into said opening (20) and attached to said hull (10) after said deck structure (24) has been connected to said hull (10).
- The kit according to claim 8, wherein said hull (10) comprises means for guiding said end piece (28) into said opening (20).
- The kit according to claim 8 or 9, wherein said hull (10) comprises a truss assembly (30) at least partially delimiting said opening (20),
- The kit according to any one of claims 8-10 wherein said hull (10) comprises a first and a second longitudinally extending float (12, 14), wherein each one of said first and second float (12, 14) is adapted to extend through a still water level of a body of water, wherein said first and second floats (12, 14) are connected to one another by means of a substantially transversally extending bridging arrangement (16, 18) wherein: at least a portion of said first float (12), at least a portion of said second float (14) and at least a portion of said bridging arrangement (16, 18) at least partially delimits said opening (20).
- The kit according to any one of claims 8 -11, wherein said end piece (28) comprises structural tanks, such as ballast water tanks.
- The kit according to any one of claims 8-12 wherein said hull (10) comprises tanks adapted to store liquefied natural gas.
- The kit according to any one of claims 8 - 13 wherein said kit comprises a plurality of end pieces (28) such that said side wall delimits an enclosed area.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2008/056715 WO2009143899A1 (en) | 2008-05-30 | 2008-05-30 | Mating |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2285660A1 EP2285660A1 (en) | 2011-02-23 |
EP2285660B1 true EP2285660B1 (en) | 2014-05-07 |
Family
ID=40343470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08760302.3A Not-in-force EP2285660B1 (en) | 2008-05-30 | 2008-05-30 | Mating |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP2285660B1 (en) |
KR (1) | KR101508028B1 (en) |
CN (1) | CN102046458B (en) |
AU (1) | AU2008357137B2 (en) |
BR (1) | BRPI0822733A2 (en) |
WO (1) | WO2009143899A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8877780B2 (en) | 2006-08-30 | 2014-11-04 | Celgene Corporation | 5-substituted isoindoline compounds |
KR101616689B1 (en) | 2016-02-01 | 2016-04-29 | 주식회사 마텍 | A offshore platform |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6125780A (en) * | 1997-04-15 | 2000-10-03 | Mobil Oil Corporation | Floating barge-platform and method of assembly |
US6299383B1 (en) * | 1997-10-15 | 2001-10-09 | Deep Oil Technology, Inc. | Method for deck installations on offshore substructure |
US6340272B1 (en) * | 1999-01-07 | 2002-01-22 | Exxonmobil Upstream Research Co. | Method for constructing an offshore platform |
NO20012087L (en) * | 2001-04-27 | 2002-10-28 | Mpu Entpr As | Liquid multi-use platform construction and method of building it |
SE526284C2 (en) | 2003-02-18 | 2005-08-16 | Gva Consultants Ab | Semi-submersible offshore platform and methods for positioning operating modules on said platform |
-
2008
- 2008-05-30 WO PCT/EP2008/056715 patent/WO2009143899A1/en active Application Filing
- 2008-05-30 AU AU2008357137A patent/AU2008357137B2/en not_active Ceased
- 2008-05-30 EP EP08760302.3A patent/EP2285660B1/en not_active Not-in-force
- 2008-05-30 CN CN200880129568.6A patent/CN102046458B/en not_active Expired - Fee Related
- 2008-05-30 BR BRPI0822733-0A patent/BRPI0822733A2/en not_active IP Right Cessation
- 2008-05-30 KR KR1020107028108A patent/KR101508028B1/en active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
KR20110023857A (en) | 2011-03-08 |
CN102046458A (en) | 2011-05-04 |
WO2009143899A1 (en) | 2009-12-03 |
AU2008357137B2 (en) | 2013-09-26 |
BRPI0822733A2 (en) | 2015-07-14 |
CN102046458B (en) | 2015-02-18 |
AU2008357137A1 (en) | 2009-12-03 |
KR101508028B1 (en) | 2015-04-07 |
EP2285660A1 (en) | 2011-02-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU701557B2 (en) | Offshore apparatus and method for oil operations | |
US6652192B1 (en) | Heave suppressed offshore drilling and production platform and method of installation | |
KR101341763B1 (en) | Preloading to reduce loads and save steel on topsides and grillage of catamaran systems | |
FI114306B (en) | Procedure and pontoon for mounting a deck on a floating sea engineering substructure | |
EP2243695B1 (en) | Mating of buoyant hull structure with truss structure | |
US20100224114A1 (en) | Semi-Submersible Vessel, Method For Operating A Semi-Submersible Vessel And Method For Manufacturing A Semi-Submersible Vessel | |
EP1259420A1 (en) | Submersible heavy lift catamaran | |
US8613570B2 (en) | Method and a kit for constructing a semi-submersible unit | |
US20240208619A1 (en) | A semi-submersible service vessel for a floating installation and method therefor | |
EP2285660B1 (en) | Mating | |
WO2015136086A1 (en) | A quay structure, a quay arrangement and a method of installing such structure | |
KR102309460B1 (en) | Port Plants and Methods for Mooring Floating Bodies in Port Plants | |
GB2311042A (en) | Transportation system used to install a deck or modular assembly for an offshore platform | |
CN201258082Y (en) | Split jack-up platform butted by external guide rope | |
GB2485678A (en) | Jack-up vessel system for offshore transport and handling of cargo | |
EP0908382A2 (en) | Methods of assembling floating offshore structures | |
US4834014A (en) | Floating platform structure | |
WO2023135165A1 (en) | Hull structure for a semi-submersible wind power turbine platform | |
CN100515858C (en) | A method of constructing a semi-submersible vessel using dry dock mating | |
EP3867138B1 (en) | Combination of heavy lift vessel and floating appendage structure | |
US7422394B2 (en) | Tendon for tension leg platform | |
EP1517831B1 (en) | Multi-purpose heavy lift vessel | |
Xu et al. | An introduction to extendable draft platform (EDP) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20101125 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: WESTRE, BERNT ERIK |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20120719 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: WESTRE, BERNT ERIK |
|
INTG | Intention to grant announced |
Effective date: 20131127 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 666421 Country of ref document: AT Kind code of ref document: T Effective date: 20140515 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602008032086 Country of ref document: DE Effective date: 20140618 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 666421 Country of ref document: AT Kind code of ref document: T Effective date: 20140507 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20140507 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20140507 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140808 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140907 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602008032086 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140908 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140531 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140531 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602008032086 Country of ref document: DE Effective date: 20141202 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20150302 |
|
26N | No opposition filed |
Effective date: 20150210 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20140807 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20141202 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140530 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140707 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140807 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140507 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20080530 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140530 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20160511 Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: MMEP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170531 |