EP2194017B1 - An offshore crane - Google Patents

An offshore crane Download PDF

Info

Publication number
EP2194017B1
EP2194017B1 EP09177868A EP09177868A EP2194017B1 EP 2194017 B1 EP2194017 B1 EP 2194017B1 EP 09177868 A EP09177868 A EP 09177868A EP 09177868 A EP09177868 A EP 09177868A EP 2194017 B1 EP2194017 B1 EP 2194017B1
Authority
EP
European Patent Office
Prior art keywords
boom
traverser carriage
lifting
traverser
offshore crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP09177868A
Other languages
German (de)
French (fr)
Other versions
EP2194017A1 (en
Inventor
Oddvar Eikrem
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Engineering-Support AS
Original Assignee
Engineering-Support AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Engineering-Support AS filed Critical Engineering-Support AS
Publication of EP2194017A1 publication Critical patent/EP2194017A1/en
Application granted granted Critical
Publication of EP2194017B1 publication Critical patent/EP2194017B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs

Definitions

  • the present invention relates to a crane, and more specifically to an offshore crane and a method of operating an offshore crane in accordance with the preamble of claim 1 and 8, respectively.
  • Prior art offshore crane constructions are made as 360° rotating cranes having a winch operated boom lift for altering the range of the crane.
  • an adequate movement of the hook suspension (the crane arm top) in order to follow the movements of the supply vessel is required.
  • the construction standard for offshore cranes requires 1°/s when altering the boom angle at H 1/3 ⁇ 3,0 m, which yields approx. 0,7 m/s at a favourable boom angle, and a high fastening for the load results in a long pendulum and necessitates a large movement in order to move suspended load.
  • a shorter pendulum results in a safer positioning of the load (cf. knuckle boom cranes).
  • DE 2734960 A1 discloses a crane arrangement comprising a lifting boom and a traverser carriage boom or traverser boom, without any lateral movement of the traverser carriage boom in relation to the lifting boom to which it is connected.
  • GB 2234728 A discloses an offshore crane equipped with measuring and control means in order to maintain the crane within acceptable limits related to the problems of side lead and off lead, but however in a quite different way than provided by the present invention.
  • NL 7509722 A discloses a device for adjusting the position of a crane hook by movement of loads between a first of two stations, which are movable in a limited way in 3 dimensions relative to each other, and a crane, which are carried by the second station, and a sensing means, which is operative in order to determine the position of the hook based on the load which is to be moved, and adjusting means, which are arranged in order to, based on the sensing means, maintain the hook in a predetermined position in relation to the load.
  • the present invention aims at solving or at least mitigating the above or other drawbacks or deficiencies by providing an offshore crane and a method of operating an offshore crane in accordance with the characterizing clause of claim 1 and 8, respectively.
  • the mass of the crane has to be accelerated and retarded in order to follow the movement requirement.
  • the crane according to the invention is provided with a joint or connection for horizontal pivoting between the lifting boom (the main boom) and the traverser carriage boom (the horizontal boom).
  • the herein disclosed crane arrangement may, with its controlling options and dynamics, provide a new dimension as to possibilities for automating the lifting operations, and introduce a change of the user interface. It is feasible that the load is moved in a 3-dimensional virtual coordinate system and that the movements of the cranes are made in accordance with this.
  • the horizontal carriageway may, in accordance with the present invention, preferably also have a lateral movement in order to increase the reaction force during a pivotal movement. This may be required depending on the total rotary inertia of the crane.
  • a double part is used above a spreader to which the hook is attached.
  • Use of a spreader render possible a forced rotation of the load as the hook can be rotated by energy from the crane before landing on deck, which leads to safer working conditions.
  • the crane arrangement of the applicant with its horizontal carriageway which can be lowered to a desired low position above the deck of a supply vessel, results in a relatively large force for rotating the load.
  • an offshore crane 1 comprising a base 2, a lifting boom 3 of which a first, proximal end is pivotally connected 5 to the base 2 and a second, distant end of which is pivotally connected 6 to a traverser carriage boom 4, said pivotal connections 5, 6 providing angular adjustment of the lifting boom 3 and the traverser carriage boom 4 in a substantially vertical direction.
  • a first system of stays, struts and cables comprising a first stay 12 extending parallel to the lifting boom 3 along the length of the lifting boom 3 and which at its distal end is connected to a second stay 13.
  • the second stay 13 is extending between the distal ends of a first strut 14 extending upwards in a variable angle from the distal end of the lifting boom 3 and a second strut 15 extending upwards in a second variable angle from a proximal end of the traverser carriage boom 4 at the pivotal connection 6.
  • the struts 14, 15 preferably have a framework design.
  • three cables 16 are arranged between three separate points along the length of the traverser carriage boom 4 and a single point at the distal end of the second strut 15, and which are tensioned by the weight of the traverser carriage boom 4 and any load to be lifted by means of the traverser carriage boom 4.
  • an angular movement of an actuator 17 extending upwardly at the first pivotal connection 5 and which is connected to a proximal end of the first stay 12 thus results in an angular movement of the traverser carriage boom 4.
  • the stays 12, 13 are preferably arranged in respective parallel pairs.
  • the angular movement of the lifting boom 3 is made by movement of a second system comprising a third stay 18 arranged between a top of a tower 19 of the crane 1 and a distal end of the lifting boom 3, and the operations of the first and second systems are coordinated, either manually or preferably by a common control system, in order to make sure that the traverser carriage boom is substantially horizontally arranged independently of the actual angle of the lifting boom 3, as shown in Figs. 2 - 4 .
  • a control system may also include heave compensation.
  • the traverser carriage boom 4 further comprises a traverser carriage 7 for suspension and lifting or lowering of a load and running back and forth along a length 8 of said traverser carriage boom 4, and thus providing off lead compensation.
  • the pivotal connection 6 between the traverser carriage boom 4 and the lifting boom 3 also provides angular adjustment in a lateral direction, preferably in an angle of 15° in both directions from a neutral or mid position, thus providing side lead compensation.
  • the present invention thus provides an area of movement instead of just a line of movement as for prior art offshore cranes.
  • side lead and “off lead” are well known in the art, and are used for describing deviations in the longitudinal and the lateral direction of a crane, respectively.
  • the lifting boom 3 preferably has a tubular design but could also have a framework design.
  • the traverser carriage boom 4 has a framework design, which is preferably made of aluminium in order to achieve a lightweight construction, und thus lower mass forces and a faster movement.
  • a double part 9 is preferably provided above a spreader 10 to which a hook 11 is attached.
  • a heave compensation system comprising a software controlled hydraulic system with on or several hydraulic cylinders is preferably provided in order to control the position of the traverser carriage boom 4 to be substantially horizontal.
  • the winch of the traverser carriage 7 is the only load hoisting means.
  • a separate winch may be provided at the distal end of the lifting boom 3 for heavy lifts, while the traverser carriage winch is mainly for fast execution of lighter lifts.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

Offshore crane (1) comprising a base (2), a lifting boom (3) of which a first, proximal end is pivotally connected (5) with the base (2) and a second, distant end of which is pivotally connected (6) with a traverser carriage boom (4), said pivotal connections (5,6) providing angular movement of the lifting boom (3) and the traverser carriage boom (4) in a substantially vertical direction, said traverser carriage boom (4) further comprising a traverser carriage (7) for suspension and lifting or lowering of a load and running back and forth along a length (8) of said traverser carriage boom (4), said pivotal connection (6) between the traverser carriage boom (4) and the lifting boom (3) also providing angular movement of the traverser carriage boom (4) in a lateral direction.

Description

  • The present invention relates to a crane, and more specifically to an offshore crane and a method of operating an offshore crane in accordance with the preamble of claim 1 and 8, respectively.
  • Prior art offshore crane constructions are made as 360° rotating cranes having a winch operated boom lift for altering the range of the crane. When operating supply vessels offshore, an adequate movement of the hook suspension (the crane arm top) in order to follow the movements of the supply vessel is required. The construction standard for offshore cranes requires 1°/s when altering the boom angle at H1/3≥3,0 m, which yields approx. 0,7 m/s at a favourable boom angle, and a high fastening for the load results in a long pendulum and necessitates a large movement in order to move suspended load. A shorter pendulum results in a safer positioning of the load (cf. knuckle boom cranes).
  • As to prior art, DE 2734960 A1 discloses a crane arrangement comprising a lifting boom and a traverser carriage boom or traverser boom, without any lateral movement of the traverser carriage boom in relation to the lifting boom to which it is connected.
  • Further, GB 2234728 A discloses an offshore crane equipped with measuring and control means in order to maintain the crane within acceptable limits related to the problems of side lead and off lead, but however in a quite different way than provided by the present invention.
  • Still further, NL 7509722 A discloses a device for adjusting the position of a crane hook by movement of loads between a first of two stations, which are movable in a limited way in 3 dimensions relative to each other, and a crane, which are carried by the second station, and a sensing means, which is operative in order to determine the position of the hook based on the load which is to be moved, and adjusting means, which are arranged in order to, based on the sensing means, maintain the hook in a predetermined position in relation to the load.
  • The present invention aims at solving or at least mitigating the above or other drawbacks or deficiencies by providing an offshore crane and a method of operating an offshore crane in accordance with the characterizing clause of claim 1 and 8, respectively.
  • Favourable embodiments of the invention are stated in the dependent claims.
    • An object of the present invention is thus to render possible a supply to or from an offshore rig at larger maximum wave height than what is normal today.
    • A further object of the invention is automatic following of off-lift and landing site on supply vessels (horizontal plane).
    In order to position the lifting point as a result of the movements of the supply vessel and the rig a large speed is required, which is provided by the use of a traverser carriage having a large capacity of movement.
  • In order to compensate for the movement of the supply vessel in the rotation direction of the crane, the mass of the crane has to be accelerated and retarded in order to follow the movement requirement. In order to obtain a higher acceleration and a better control the crane according to the invention is provided with a joint or connection for horizontal pivoting between the lifting boom (the main boom) and the traverser carriage boom (the horizontal boom). With this solution the required horizontal movement, in order to compensate for the collective horizontal movements, can be reached at a faster speed than by rotating the crane.
    • Compensation for vertical movements of the rig (crane angle).
      For some rigs or vessels the movements of the cranes, through the movements of the vessel or the rig, result in a big need for compensation. For the crane according to the present invention the compensation for the movement in the direction of the crane is achieved by applying a correction movement to the tower through a hydraulic cylinder which tilts said tower in a corresponding counter direction of the movements of the rig/ the vessel. A smaller vertical movement of the hook attachment point is thus achieved, and the traverser carriage path maintains its horizontal position.
    • Compensation for the vertical movements of the movements of the supply
      vessel (hook); i.e. run the hook up and down to follow a moveable landing level. Compensation for relative movement between crane and supply vessel is made by controlling the velocity and the position of the winch. This is prior art technology when using hydraulic cylinders for extra hoisting/lowering movement (linear compensator), for hydraulically operated winches which are controlled both as to heave compensation and hoisting/lowering movement, as to electrically operated winches with frequency controlled asynchronous motors or permanent magnet motors.
    • Controlling the hook position instead of crane movement. (Change of principle).
  • The herein disclosed crane arrangement may, with its controlling options and dynamics, provide a new dimension as to possibilities for automating the lifting operations, and introduce a change of the user interface. It is feasible that the load is moved in a 3-dimensional virtual coordinate system and that the movements of the cranes are made in accordance with this.
  • In order to move a suspended load in the horizontal plane, a force has to be applied to the load in order to achieve acceleration and thus an increasing velocity. The force is achieved through the horizontal component of force of the inclined position of the hoist wire (the pendulum). The larger distance from the centre of gravity of the load and to the point of suspension on of crane, the more the point of suspension has to be moved in order to achieve a sufficient acceleration. A short pendulum is thus crucial for a fast movement of the load, and thus to fulfil the requirements of a safer load handling (cf. knuckle boom cranes).
  • In case of a large movement of the foundation (the rig or the vessel) of the crane, this will result in large vertical movements of the end of a long crane boom. When the movements of the supply vessel are to be compensated , this has to be done by spooling in and out of the hoist winch. By compensating for the movements of the rig by introducing a counter movement of the tower of the crane, the crane boom will maintain its relative position as to the supply vessel, and thus reduce the required power of the hoist winch.
  • For a prior art offshore crane arrangement the load is generally lifted using single part in order to achieve a sufficient hoist velocity. When the working radius of the cranes is reduced, the load is also lifted if this is not compensated by spooling out of the hoist winch. This reduces net velocity and complicates combining of reduced range and at the same time a put down on deck. A similar problem arises when the working radius is to be increased during a lift. The result is that the load is often pulled across the surface of deck before it is finally lifted from the surface.
  • By introducing a substantially horizontal carriageway or path with a traverser carriage for suspension of the lifting wire, the hoisting velocity at horizontal movement of the hoisting point is maintained and the load can be lifted from the deck. The horizontal carriageway may, in accordance with the present invention, preferably also have a lateral movement in order to increase the reaction force during a pivotal movement. This may be required depending on the total rotary inertia of the crane.
  • When using a traverser carriage, as in accordance with the present invention, a double part is used above a spreader to which the hook is attached. Use of a spreader render possible a forced rotation of the load as the hook can be rotated by energy from the crane before landing on deck, which leads to safer working conditions. The crane arrangement of the applicant with its horizontal carriageway which can be lowered to a desired low position above the deck of a supply vessel, results in a relatively large force for rotating the load.
  • A non-limiting embodiment of the offshore crane according to the present invention is described in more detail in the following, with reference to the enclosed drawings in which
    • Fig. 1 is a perspective view of an offshore crane according to the invention,
    • Fig. 2 is an elevation view of the offshore crane of fig. 1, with the lifting boom arranged in an angle of 80°, and the traverser carriage boom horizontally arranged.,
    • Fig. 3 is an elevation view similar to Fig. 2, with the lifting boom arranged in an angle of 45°,
    • Fig. 4 is an elevation view similar to Figs. 2 and 3, with the lifting boom arranged in an angle of -10°, and
    • Fig. 5 is a top view of an offshore crane according to the invention, with the traverser carriage boom in a neutral or mid position indicated by solid lines and in two opposite lateral positions indicated by broken lines.
  • By referring to Figs. 1 - 5, there is shown an offshore crane 1 according to the invention comprising a base 2, a lifting boom 3 of which a first, proximal end is pivotally connected 5 to the base 2 and a second, distant end of which is pivotally connected 6 to a traverser carriage boom 4, said pivotal connections 5, 6 providing angular adjustment of the lifting boom 3 and the traverser carriage boom 4 in a substantially vertical direction. For the angular movement of the traverser carriage boom 4 and thus to make possible a substantial horizontal position of the traverser carriage boom 4, there is provided a first system of stays, struts and cables comprising a first stay 12 extending parallel to the lifting boom 3 along the length of the lifting boom 3 and which at its distal end is connected to a second stay 13. The second stay 13 is extending between the distal ends of a first strut 14 extending upwards in a variable angle from the distal end of the lifting boom 3 and a second strut 15 extending upwards in a second variable angle from a proximal end of the traverser carriage boom 4 at the pivotal connection 6. As shown in the figures, the struts 14, 15 preferably have a framework design. In the embodiment shown in the figures three cables 16 are arranged between three separate points along the length of the traverser carriage boom 4 and a single point at the distal end of the second strut 15, and which are tensioned by the weight of the traverser carriage boom 4 and any load to be lifted by means of the traverser carriage boom 4. An angular movement of an actuator 17 extending upwardly at the first pivotal connection 5 and which is connected to a proximal end of the first stay 12 thus results in an angular movement of the traverser carriage boom 4. In the embodiment shown in the figures, and by referring to Figs. 1 and 5, the stays 12, 13 are preferably arranged in respective parallel pairs. The angular movement of the lifting boom 3 is made by movement of a second system comprising a third stay 18 arranged between a top of a tower 19 of the crane 1 and a distal end of the lifting boom 3, and the operations of the first and second systems are coordinated, either manually or preferably by a common control system, in order to make sure that the traverser carriage boom is substantially horizontally arranged independently of the actual angle of the lifting boom 3, as shown in Figs. 2 - 4. As mentioned below, such a control system may also include heave compensation.
  • The traverser carriage boom 4 further comprises a traverser carriage 7 for suspension and lifting or lowering of a load and running back and forth along a length 8 of said traverser carriage boom 4, and thus providing off lead compensation.
    The pivotal connection 6 between the traverser carriage boom 4 and the lifting boom 3 also provides angular adjustment in a lateral direction, preferably in an angle of 15° in both directions from a neutral or mid position, thus providing side lead compensation. The present invention thus provides an area of movement instead of just a line of movement as for prior art offshore cranes.
  • As to the above paragraph, the terms "side lead" and "off lead" are well known in the art, and are used for describing deviations in the longitudinal and the lateral direction of a crane, respectively.
  • As shown in the figures, the lifting boom 3 preferably has a tubular design but could also have a framework design.
  • As also shown in the figures, the traverser carriage boom 4 has a framework design, which is preferably made of aluminium in order to achieve a lightweight construction, und thus lower mass forces and a faster movement.
  • As shown in Figs. 1 - 4 a double part 9 is preferably provided above a spreader 10 to which a hook 11 is attached. Even though not shown in the figures, a heave compensation system comprising a software controlled hydraulic system with on or several hydraulic cylinders is preferably provided in order to control the position of the traverser carriage boom 4 to be substantially horizontal.
  • There may also be provided a further or alternative compensation system for relative movement between crane and supply vessel by controlling the velocity and the position of a winch in order to run the hook up and down to follow a moveable landing level caused by said relative movements.
  • According to the invention there is also provided a method of operating an offshore crane as described above, comprising the step of pivoting the traverser carriage boom 4 in a lateral direction.
  • In the embodiment of the invention shown in the drawings the winch of the traverser carriage 7 is the only load hoisting means. However, in another feasible embodiment a separate winch may be provided at the distal end of the lifting boom 3 for heavy lifts, while the traverser carriage winch is mainly for fast execution of lighter lifts.

Claims (8)

  1. An offshore crane (1) comprising a base (2); a lifting boom (3) of which a first, proximal end is pivotally connected (5) with the base (2) and a second, distant end of which is pivotally connected (6) with a traverser carriage boom (4), said pivotal connections (5, 6) providing angular movement of the lifting boom (3) and the traverser carriage boom (4) in a substantially vertical direction, said traverser carriage boom (4) further comprising a traverser carriage (7) for suspension and lifting or lowering of a load and running back and forth along a length (8) of said traverser carriage boom (4), characterized in that the pivotal connection (6) between the traverser carriage boom (4) and the lifting boom (3) also provides angular movement of the traverser carriage boom (4) in a lateral direction.
  2. An offshore crane according to claim 1, characterized in that the lifting boom (3) has a tubular design.
  3. An offshore crane according to claim 1, characterized in that the lifting boom (3) has framework design.
  4. An offshore crane according to any of the preceding claims, characterized in that traverser carriage boom (4) has a framework design, and preferably is made of aluminium.
  5. An offshore crane according to any of the preceding claims, characterized in that a double part 9 is provided above a spreader (10) to which a hook (11) is attached.
  6. An offshore crane according to any of the preceding claims, characterized by a heave compensation system to control the position of the traverser carriage boom (4) to be substantially horizontal.
  7. An offshore crane according to claim 5 or 6, characterized by a compensation system for relative movement between the crane (1) and a supply vessel by controlling the velocity and the position of a winch in order to run the hook (11) up and down to follow a moveable landing level caused by said relative movements.
  8. A method of operating an offshore crane (1) according to any of the preceding claims, characterized by the step of pivoting the traverser carriage boom (4) in a lateral direction.
EP09177868A 2008-12-03 2009-12-03 An offshore crane Not-in-force EP2194017B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NO20085058 2008-12-03

Publications (2)

Publication Number Publication Date
EP2194017A1 EP2194017A1 (en) 2010-06-09
EP2194017B1 true EP2194017B1 (en) 2011-10-12

Family

ID=41794684

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09177868A Not-in-force EP2194017B1 (en) 2008-12-03 2009-12-03 An offshore crane

Country Status (2)

Country Link
EP (1) EP2194017B1 (en)
AT (1) ATE528249T1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3424865A1 (en) 2017-07-06 2019-01-09 Siemens Aktiengesellschaft Drive of an offshore crane with optional gangway

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR112014032292A2 (en) * 2012-07-16 2017-06-27 Itrec Bv marine crane with articulated crane
NL2012074C2 (en) 2014-01-10 2015-07-13 Itrec Bv Double jib slewing pedestal crane.
EP3162752A1 (en) * 2015-10-28 2017-05-03 BV Scheepswerf Damen Gorinchem A crane for a vessel, a vessel and a method of operating the crane
US11066279B2 (en) * 2017-04-24 2021-07-20 Itrec B.V. Motion compensating crane for use on an offshore vessel
EP4008679B1 (en) 2020-12-03 2024-10-23 Reel Articulated boom crane, for offshore application
CN113682978B (en) * 2021-08-18 2024-03-12 天津赛挪林柯国际贸易有限责任公司 Offshore platform crane lifting method and lifting device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU8395175A (en) * 1974-08-17 1977-03-03 Ferranti Ltd Means for controlling and measuring the position of crane hook
DE2623151A1 (en) * 1976-05-22 1977-12-01 Heinrich Dipl Ing Sauthof Loading boom overload protection system - has derricking rope reeved to ballast weight lifted on overload
DE2734960A1 (en) * 1977-08-03 1979-02-15 Hochtief Ag Hoch Tiefbauten Tower crane with derricking jib - has slewing rings on base-plate which may be supported on rail bogies or crawler tracks
DE3236510A1 (en) * 1982-08-12 1984-04-05 Elba-Werk Maschinen-Gesellschaft Mbh & Co, 7505 Ettlingen Tower slewing crane with integrated concrete-feed pipe, the end piece of which can be lifted and lowered
DE19644412A1 (en) * 1996-10-25 1998-04-30 Putzmeister Ag Concrete placing boom for concrete pumps

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3424865A1 (en) 2017-07-06 2019-01-09 Siemens Aktiengesellschaft Drive of an offshore crane with optional gangway
WO2019007822A1 (en) 2017-07-06 2019-01-10 Siemens Aktiengesellschaft Drive of an offshore crane with optional gangway

Also Published As

Publication number Publication date
EP2194017A1 (en) 2010-06-09
ATE528249T1 (en) 2011-10-15

Similar Documents

Publication Publication Date Title
US11390494B2 (en) Crane and method for positioning an object
EP2194017B1 (en) An offshore crane
US10894701B2 (en) Crane, vessel comprising such a crane, and a method for up-ending a longitudinal structure
US10941023B2 (en) Wave-induced motion compensating crane for use on an offshore vessel, vessel and load transferring method
EP3153396B1 (en) A main boom and a knuckle boom
CN104968597B (en) For the apparatus and method of the component of displacement structure
CN101652313B (en) Hoisting crane and vessel with such a crane
EP2189575B1 (en) Jack-up offshore platform and a method thereof
EP2855329B1 (en) Handling loads in offshore environments
US20240286875A1 (en) Heave compensated dual hoist crane
EP3538472B1 (en) Marine crane vessel and method of operation
NL2023415B1 (en) hoisting arrangement for assembly of wind turbines
EP3318530A1 (en) Method of upgrading a knuckle-boom crane and a heave-compensating crane
CN109626228A (en) A kind of tandem major-minor derrick crane
EP2895419B1 (en) System for reducing the counterweight of a crane
CN105398944A (en) Three-point type hosting and installing device for steel-structure components
US20240279037A1 (en) Marine crane and offshore vessel
EP3162752A1 (en) A crane for a vessel, a vessel and a method of operating the crane
WO2023072634A1 (en) Installation of a monopile that is adapted to support an offshore wind turbine
KR101643893B1 (en) Flying jib applying method of floating crane

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20091203

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: B66C 23/64 20060101ALI20110222BHEP

Ipc: B66C 23/52 20060101ALI20110222BHEP

Ipc: B66C 23/18 20060101AFI20110222BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009003031

Country of ref document: DE

Effective date: 20111208

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20111012

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20111012

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 528249

Country of ref document: AT

Kind code of ref document: T

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120212

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120213

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120113

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111231

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120112

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20120102

Year of fee payment: 4

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20120831

26N No opposition filed

Effective date: 20120713

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602009003031

Country of ref document: DE

Effective date: 20120703

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111203

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120703

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120102

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120123

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111012

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20140701

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20140206

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131231

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140701

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20140630

Year of fee payment: 5

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20141203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141203