EP2031077A1 - Lumped skull lining material - Google Patents
Lumped skull lining material Download PDFInfo
- Publication number
- EP2031077A1 EP2031077A1 EP08104234A EP08104234A EP2031077A1 EP 2031077 A1 EP2031077 A1 EP 2031077A1 EP 08104234 A EP08104234 A EP 08104234A EP 08104234 A EP08104234 A EP 08104234A EP 2031077 A1 EP2031077 A1 EP 2031077A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- skull
- blast
- skull lining
- lining material
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/04—Blast furnaces with special refractories
- C21B7/06—Linings for furnaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/0003—Linings or walls
- F27D1/0006—Linings or walls formed from bricks or layers with a particular composition or specific characteristics
Definitions
- This invention relates to the ferrous metallurgy, in general, and to blast-furnace manufacture, in particular. It may be used while cast iron production in blast-furnaces.
- Conventional lumped skull lining material in accordance with the 'Method of blast-furnace melting' (SU 1401046, IPC: C21 B 5/00 from 21/08/85) is a skull lining agglomerate containing V 2 O 5 0.3 -1.00 % and TiO 2 1.00 - 3.00 % from material mass.
- the essence of the conventional decision is that while blast-furnace melting with the conversion pig iron fed into the furnace without V 2 O 5 and TiO 2 skull lining agglomerate is fed periodically into the furnace with the ferrous part containing V 2 O 5 and TiO 2
- the main disadvantage of the conventional skull lining material is that titanium dioxide in the agglomerate is considered to be enough for effective formation of the protective layer of skull lining.
- the fact that the basis of this agglomerate as the material for cast iron melting are ferrous oxides and skull lining components are supporting additives does not taken into consideration. It is known that the conditions providing successful operating processes of cast iron melting do not coincide with the conditions of skull lining formation in metal receiver. On the contrary, they often contradict. That is why they must be separated in space and time. Moreover, it is rather problematic to combine the basic components necessary for getting cast iron and skull lining in one material which is agglomerate.
- the known lumped skull lining material is described in 'Method of protective skull lining formation in blast-furnace' (RU No 2179583 IPC: 21 B 5/00 from 28.11.2000) as a slug 70 -100 mm received in the result of smelting of titanium-magnetite-iron ore materials.
- the known lumped skull lining material contains (see the table below): Metal, % from mass CaO SiO2 MgO Al2O3 TiO2 FeO TiCN 3-5 28-32 28-31 10-11 12-15 8-10 0.5-1.5 1.5-3.5
- the other known lumped skull lining material described in 'Method of protective skull lining formation in blast-furnace' (RU No 2223331 IPC: C 21 B 3/00 from 29.01.2003) is a metallic concentrate containing a mixture of metallic component (35 - 50 % from mass) which forms a basis and skull component (50 - 65 %) which is a skull lining component and flux.
- the skull component of the known metallic concentrate contains, in average:
- skull lining component is not the basis of the known materials described above. That is why titanium component can not work effectively. As the result, the more volume of skull lining material is necessary and, therefore, more undesirable components are included in it among which is Si02 which content achieves 31 %.
- the periodical feeding of the known skull lining materials requires remixing since with titanium containing material not being a basis either significant amount of metal forming or skull forming materials is fed into the mixture.
- this influences slag regime of furnaces and introduces additional disturbances in the process of melting and can cause mistakes when taking optimum technical decisions.
- the low concentration of skull lining component and as a consequence high specific consumption of the materials do not allow to use them locally for the protection of the separate zones of blast furnace tuyere from burn-out.
- the object of this invention is to provide a mineralogical composition and the structure of lumped skull lining material, the use of which will provide effective building of durable skull lining in metal receiver of blast furnace without significant disturbances in the process of blast furnace melting due to the basic properties of the material.
- the titanium containing component includes grains of ilmenite and/or pseudobrukite, and/or perovskite.
- the flux component generally includes calcium alum silicates and titanite (sphenum) or water compounds of alum silicates, calcium silicates and calcium alum ferrite, wherein content of the component is as follows: grains of ilmenite and/or pseudobrukite, and/or perovskite 51 -60%, vol. flux connection 15 - 35 %, vol. pores the rest
- the lumped skull lining material in accordance with claim 1 is characterized by containing alumina additives, eg. stavrolite and/or slag/cinder got from ferrotitanium melting up to 20%.
- alumina additives eg. stavrolite and/or slag/cinder got from ferrotitanium melting up to 20%.
- the applied for invention mineralogical composition contains ilmenite grains (FeTi03) and/or pseudobrukite (Fe2Ti05) and/or perovskite (CaOTi02) as the basis, and the flux connecting component (15-35 %) which forms the material structure that provides strength while overloading, transporting and storing from the one hand, and from the other, formation of hard durable skull lining even when used locally due to the complex influence on the processes of Ti transition into cast iron as well as in the walls of the hearth and the blast-furnace bottom in the local zones commensurable with the sizes of the separate zones of the disturbances of carbonic lining of metal receiver.
- ilmenite grains FeTi03
- pseudobrukite Fe2Ti05
- CaOTi02 perovskite
- the mentioned ilmenite grains and/or pseudobrukite and/or perovskite as the basis together with the mentioned flux component provide necessary fluctuation of the compound which demonstrates an effective capability in the tuyere zone without substantial disturbances of the blast-furnace melting process.
- the decrease of the content of the grains of ilmenite and/or pseudobrukite and/or perovskite lower than 51 % due to the increase of the flux connecting component over 31 % contributes much into the increase of material strength and to improvement of its granular metric composition after loading and transporting.
- lowered temperature of the material of the primary slag formation, its viscosity, toughness and high activity contribute to the dispersion of the necessary for the fluctuation of high temperature mass needed for skull lining composition formation.
- composition of the material of the alumina-containing starts in the form of staurolite and/or slag from the smelting of ferrotitanium within the indicated limits ensures the partial replacement of titanium containing components because of the more complete transition of titanium into the metallic phase during the smelting of cast iron and shaping of sufficiently strong lining slag from the excessive carbon nitride phases.
- the alumina containing materials which decrease the viscosity of the primary slag during melting of the skull lining material in the blast furnace easify the process of reduction of titanium from the slag solution when it interacts with carbon of coke and transition of titanium into cast iron.
- Slag from the smelting of ferrotitanium acts analogously, and they are additional source of titanium in the form of metal or its alloy with iron, which relatively easily passes into cast iron as a result of dissolution.
- the body of the essential factors of the technical solution applied for invention makes it possible to solve the stated objective aimed at the effective guidance of durable skull lining in the well of the blast furnace, including local, without the introduction of essential interferences in the course of blast furnace melting.
- the initial stock components taken in relationship 70:30 were mixed up and briquettes made from this mixture were formed on the press on the bond from the foundry concentrate.
- the briquettes were fired in the air atmosphere under the conditions included drying, heating up to the temperature 13500 C, holding at this temperature and cooling together with the kiln.
- Briquettes with high apparent porosity 35-40% and strength for compression 6-7MPa were obtained.
- Their structure composed 40-45% of ilmenite and 35-40% of perovskite and alumina silicate of calcium.
- the briquettes were obtained by unfired method, with the application of the ground cement clinker.
- the briquettes with comparatively low porosity 10-15% and strength for the compression of 11-12 MPa were obtained.
- Their structure consisted of 50-55% of the ilmenite grains, cemented by the bond of hydrated alum silicates, silicates of calcium and alum ferrite of calcium.
- lumped skull lining material ensures effective formation of fluctuation of the compounds with high temperature viscous mass while blast-furnace melting due to the mineral composition the material applied whereby the objective to guide effectively strong durable skull lining in blast-furnace metal receiver, including local one, can be fulfilled without any substantial disturbances into the melting process.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Manufacture And Refinement Of Metals (AREA)
- Disintegrating Or Milling (AREA)
- Crucibles And Fluidized-Bed Furnaces (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
Abstract
grains of ilmenite and/or pseudobrukite, and/or perovskite
51 -60%, vol.
flux connection
15 - 35 %, vol.
pores
the rest
Description
- This invention relates to the ferrous metallurgy, in general, and to blast-furnace manufacture, in particular. It may be used while cast iron production in blast-furnaces.
- It is known that protective layer of skull lining on the walls of metal receiver is necessary for long campaign of blast furnaces and getting their high technical and economic indices. To achieve this objective while melting different skull lining materials containing titanium are introduced in the furnace by different methods. One of the most effective methods is feeding skull lining material through the blast-furnace mouth. This kind of feeding demands specific requirements to granular metric composition of lumped skull lining materials and their strength.
- Conventional lumped skull lining material in accordance with the 'Method of blast-furnace melting' (SU 1401046, IPC: C21 B 5/00 from 21/08/85) is a skull lining agglomerate containing V2 O5 0.3 -1.00 % and TiO2 1.00 - 3.00 % from material mass. The essence of the conventional decision is that while blast-furnace melting with the conversion pig iron fed into the furnace without V2 O5 and TiO2 skull lining agglomerate is fed periodically into the furnace with the ferrous part containing V2 O5 and TiO2
- The main disadvantage of the conventional skull lining material is that titanium dioxide in the agglomerate is considered to be enough for effective formation of the protective layer of skull lining. The fact that the basis of this agglomerate as the material for cast iron melting are ferrous oxides and skull lining components are supporting additives does not taken into consideration. It is known that the conditions providing successful operating processes of cast iron melting do not coincide with the conditions of skull lining formation in metal receiver. On the contrary, they often contradict. That is why they must be separated in space and time. Moreover, it is rather problematic to combine the basic components necessary for getting cast iron and skull lining in one material which is agglomerate.
- It should be kept in mind that the above mentioned agglomerate is irrational and ineffective for the use in modern methods of local building of skull lining in the places of tuyere of blast- furnace hearth. Besides, it leads to over consumption of expensive titanium and to the decrease of available hearth storage and as a result to the decline of technical and economic indices of melting.
- The known lumped skull lining material is described in 'Method of protective skull lining formation in blast-furnace' (RU Nº 2179583 IPC: 21 B 5/00 from 28.11.2000) as a slug 70 -100 mm received in the result of smelting of titanium-magnetite-iron ore materials. The known lumped skull lining material contains (see the table below):
Metal, % from mass CaO SiO2 MgO Al2O3 TiO2 FeO TiCN 3-5 28-32 28-31 10-11 12-15 8-10 0.5-1.5 1.5-3.5 - The other known lumped skull lining material described in 'Method of protective skull lining formation in blast-furnace' (RU Nº 2223331 IPC: C 21 B 3/00 from 29.01.2003) is a metallic concentrate containing a mixture of metallic component (35 - 50 % from mass) which forms a basis and skull component (50 - 65 %) which is a skull lining component and flux.
- The skull component of the known metallic concentrate contains, in average:
- Al2 O3 14 -16 %, MgO 11 -14 %, Ti02 8 -10%, MnO 0.3-0.4%, FeO 1.5-2.0%, Si02 25 - 28%, CaO - the rest.
- The main disadvantage of the conventional and the known compositions of lumped skull lining materials is that skull lining component is not the basis of the known materials described above. That is why titanium component can not work effectively. As the result, the more volume of skull lining material is necessary and, therefore, more undesirable components are included in it among which is Si02 which content achieves 31 %.
- Furthermore, the periodical feeding of the known skull lining materials requires remixing since with titanium containing material not being a basis either significant amount of metal forming or skull forming materials is fed into the mixture. On the one hand, this influences slag regime of furnaces and introduces additional disturbances in the process of melting and can cause mistakes when taking optimum technical decisions. On the other hand, the low concentration of skull lining component and as a consequence high specific consumption of the materials do not allow to use them locally for the protection of the separate zones of blast furnace tuyere from burn-out.
- Accordingly, the object of this invention is to provide a mineralogical composition and the structure of lumped skull lining material, the use of which will provide effective building of durable skull lining in metal receiver of blast furnace without significant disturbances in the process of blast furnace melting due to the basic properties of the material.
- This objective may be accomplished with a lumped skull lining material which contains a titanium containing component and a flux component. The titanium containing component includes grains of ilmenite and/or pseudobrukite, and/or perovskite. Being a connecting component, the flux component generally includes calcium alum silicates and titanite (sphenum) or water compounds of alum silicates, calcium silicates and calcium alum ferrite, wherein content of the component is as follows:
grains of ilmenite and/or pseudobrukite, and/or perovskite 51 -60%, vol. flux connection 15 - 35 %, vol. pores the rest - The lumped skull lining material in accordance with claim 1 is characterized by containing alumina additives, eg. stavrolite and/or slag/cinder got from ferrotitanium melting up to 20%.
- The applied for invention mineralogical composition contains ilmenite grains (FeTi03) and/or pseudobrukite (Fe2Ti05) and/or perovskite (CaOTi02) as the basis, and the flux connecting component (15-35 %) which forms the material structure that provides strength while overloading, transporting and storing from the one hand, and from the other, formation of hard durable skull lining even when used locally due to the complex influence on the processes of Ti transition into cast iron as well as in the walls of the hearth and the blast-furnace bottom in the local zones commensurable with the sizes of the separate zones of the disturbances of carbonic lining of metal receiver.
- When skull lining material with the mineralogical content described above is fed over tuyere zone, the mentioned ilmenite grains and/or pseudobrukite and/or perovskite as the basis together with the mentioned flux component provide necessary fluctuation of the compound which demonstrates an effective capability in the tuyere zone without substantial disturbances of the blast-furnace melting process.
- Increase of the content of the grains of ilmenite and/or pseudobrukite and/or perovskite over 60% due to the decrease of the flux connecting component lower than 15% significantly worsens the strength characteristics of the separately taken piece of the lumped skull lining material and its granular metric composition after loading and transporting operations. In the same time the temperature of the primary slag formation and its toughness grow that cause substantial kinetic difficulties in the course of mass exchange processes which ensure the high temperature titanium-containing skull lining phases and skull lining formation.
- The decrease of the content of the grains of ilmenite and/or pseudobrukite and/or perovskite lower than 51 % due to the increase of the flux connecting component over 31 % contributes much into the increase of material strength and to improvement of its granular metric composition after loading and transporting. However, lowered temperature of the material of the primary slag formation, its viscosity, toughness and high activity contribute to the dispersion of the necessary for the fluctuation of high temperature mass needed for skull lining composition formation.
- Introduction into the composition of the material of the alumina-containing starts in the form of staurolite and/or slag from the smelting of ferrotitanium within the indicated limits ensures the partial replacement of titanium containing components because of the more complete transition of titanium into the metallic phase during the smelting of cast iron and shaping of sufficiently strong lining slag from the excessive carbon nitride phases.
- The alumina containing materials, which decrease the viscosity of the primary slag during melting of the skull lining material in the blast furnace easify the process of reduction of titanium from the slag solution when it interacts with carbon of coke and transition of titanium into cast iron. Slag from the smelting of ferrotitanium acts analogously, and they are additional source of titanium in the form of metal or its alloy with iron, which relatively easily passes into cast iron as a result of dissolution.
- Exceeding the mentioned interface of the alumina containing materials will influence significantly the process of skull lining formation. The decreased temperature of the primary slag formation, the viscosity of slag and its high activity will contribute to the dispersion of the necessary for the fluctuation of high temperature masses necessary for the formation of the skull lining composition.
- Thus, the body of the essential factors of the technical solution applied for invention makes it possible to solve the stated objective aimed at the effective guidance of durable skull lining in the well of the blast furnace, including local, without the introduction of essential interferences in the course of blast furnace melting.
- This is confirmed by the examples of the concrete realization of the applied invention.
- To obtain lumped skull lining material under laboratory conditions ilmenite concentrate and limestone were used.
- The initial stock components taken in relationship 70:30 were mixed up and briquettes made from this mixture were formed on the press on the bond from the foundry concentrate. The briquettes were fired in the air atmosphere under the conditions included drying, heating up to the temperature 13500 C, holding at this temperature and cooling together with the kiln. Briquettes with high apparent porosity 35-40% and strength for compression 6-7MPa were obtained. Their structure composed 40-45% of ilmenite and 35-40% of perovskite and alumina silicate of calcium.
- After the reheating of the briquettes up to the temperature 9500 C in the atmosphere of CO2 and the presence of carbon their strength decreased to 3-4 MPa that can indirectly testify about the sensitive decrease of their strength in the upper levels of blast furnace.
- In the second series of experiments the pore-forming limestone was replaced by the grinded to 70 mkm cement clinker. The regime of kilning was not changed. The briquettes with acceptable porosity of 25-30% and strength for the compression of 12-14 MPa were obtained. Their structure was 55-58% of the ilmenite and the perovskite. The bond consisted of alum silicate of calcium predominantly and titanite (sphene) and glass (uncrystallized phase) in small volumes.
- After the reheating of the briquettes to the temperature of 9500 C in the atmosphere of CO2 and the presence of carbon their strength in effect did not decrease that testifies about their high heat resistance.
- In the third series of experiments the briquettes were obtained by unfired method, with the application of the ground cement clinker. The briquettes with comparatively low porosity 10-15% and strength for the compression of 11-12 MPa were obtained. Their structure consisted of 50-55% of the ilmenite grains, cemented by the bond of hydrated alum silicates, silicates of calcium and alum ferrite of calcium.
- After the reheating of the briquettes to the temperature 9500 C in the atmosphere CO2 and with the presence of carbon the samples were covered by cracks that indicated their relatively low heat resistance and possible separation into the separate fragments in the upper levels of blast furnace. Although their strength decreased it was 5-6 MPa that is sufficient for the material not be carried out from the furnace by blowing.
-
- where {Ti } - titanium content in the slag/cinder,
- [Ti] - titanium content in the cast iron,
- Al2O3 - content of Al2O3 in the slag.
- All the mentioned above leads to a conclusion that the more Al2O3 in blast-furnace slag/cinder, the more titanium transit into iron cast. The claimed effect confirms this fact.
- The research of the complex influence of the lumped skull lining material on the indicators of melting in blast-furnaces was carried out at the blast-furnaces of two metallurgical plants. Durable melting proved that application of the lumped skull lining material reduces heat loads on refrigerators according to melting intensity and coefficient of hearth wear from 4% to 18% that in its turn may ensure decrease of coke on 8-20 kg/ton and increase in the productivity of blast-furnace on 5-8%.
- Therefore, it is evident that applied for invention lumped skull lining material ensures effective formation of fluctuation of the compounds with high temperature viscous mass while blast-furnace melting due to the mineral composition the material applied whereby the objective to guide effectively strong durable skull lining in blast-furnace metal receiver, including local one, can be fulfilled without any substantial disturbances into the melting process.
- The formation of strong lining slag according to the results of examples reduces thermal loads on the refrigerators of metal receiver depending on the intensity of melting and coefficient of wear of furnace hearth from 4 to 18% that in its turn ensures reduction in the expenditures of coke per 8-20 kg/t of cast iron and increase in the productivity of blast furnaces on 5-8%.
Claims (2)
- A lumped skull lining material comprising a titanium containing component and a flux component characterized in that said titanium containing component includes grains of ilmenite and/or pseudobrukite, and/or perovskite and said flux component is
a connecting component and generally consists of calcium alum silicates and titanite (sphenum) or water combination of alum silicates, calcium silicates and alum ferrites, wherein the proportion of the structural components is:grains of ilmenite and/or pseudobrukite, and/or perovskite 51 -60%, vol. flux connection 15 - 35 %, vol. pores the rest. - The lumped skull lining material in accordance with claim 1 is characterized in that it includes alumina containing additives up to 20%, eg. stavrolite and/or slag/cinder got from ferrotitanium melting.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
UAA200709095A UA88348C2 (en) | 2007-08-07 | 2007-08-07 | agglomerated skullforming material |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2031077A1 true EP2031077A1 (en) | 2009-03-04 |
EP2031077B1 EP2031077B1 (en) | 2010-03-10 |
Family
ID=40090171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08104234A Not-in-force EP2031077B1 (en) | 2007-08-07 | 2008-06-03 | Lumped skull lining material |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2031077B1 (en) |
AT (1) | ATE460502T1 (en) |
DE (1) | DE602008000782D1 (en) |
UA (1) | UA88348C2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2445375C2 (en) * | 2010-06-16 | 2012-03-20 | Общество с ограниченной ответственностью "Северсталь-Проект" (ООО "Северсталь-Проект") | Method for creating protective slag lining in shaft of blast furnace |
CN102603318A (en) * | 2012-03-13 | 2012-07-25 | 任健均 | Long-service-life lining material for whole pipeline of large and medium sized blast furnace hot blast stove |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2223329C1 (en) * | 2003-01-29 | 2004-02-10 | Открытое акционерное общество "Северсталь" | Method of forming protective skull in blast furnace hearth |
-
2007
- 2007-08-07 UA UAA200709095A patent/UA88348C2/en unknown
-
2008
- 2008-06-03 DE DE602008000782T patent/DE602008000782D1/en active Active
- 2008-06-03 EP EP08104234A patent/EP2031077B1/en not_active Not-in-force
- 2008-06-03 AT AT08104234T patent/ATE460502T1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2223329C1 (en) * | 2003-01-29 | 2004-02-10 | Открытое акционерное общество "Северсталь" | Method of forming protective skull in blast furnace hearth |
Non-Patent Citations (1)
Title |
---|
KURUNOV I F ET AL: "Methods of extending a blast-furnace campaign", METALLURGIST, KLUWER ACADEMIC PUBLISHERS-PLENUM PUBLISHERS, NE, vol. 50, no. 11-12, 1 November 2006 (2006-11-01), pages 605 - 613, XP019506205, ISSN: 1573-8892 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2445375C2 (en) * | 2010-06-16 | 2012-03-20 | Общество с ограниченной ответственностью "Северсталь-Проект" (ООО "Северсталь-Проект") | Method for creating protective slag lining in shaft of blast furnace |
CN102603318A (en) * | 2012-03-13 | 2012-07-25 | 任健均 | Long-service-life lining material for whole pipeline of large and medium sized blast furnace hot blast stove |
CN102603318B (en) * | 2012-03-13 | 2014-01-22 | 任健均 | Long-service-life lining material for whole pipeline of large and medium sized blast furnace hot blast stove |
Also Published As
Publication number | Publication date |
---|---|
UA88348C2 (en) | 2009-10-12 |
DE602008000782D1 (en) | 2010-04-22 |
EP2031077B1 (en) | 2010-03-10 |
ATE460502T1 (en) | 2010-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107109501B (en) | Make the method for molten metal dephosphorization in refining process | |
CN104446538B (en) | A kind of high alumina is combined ladle brick and preparation method thereof | |
Umadevi et al. | Influence of magnesia on iron ore sinter properties and productivity | |
EP2031077B1 (en) | Lumped skull lining material | |
CN101468386B (en) | Continuous casting mould powder and preparation method thereof | |
KR100936163B1 (en) | Refractories for industrial iron and steel | |
CN1298465C (en) | Bottom fire-proof material of large steel ladle | |
US20190185378A1 (en) | Spinel refractory granulates which are suitable for elasticizing heavy-clay refractory products, method for their production and use thereof | |
CN107841594A (en) | A kind of method of refining for reducing ladle liner and corroding | |
CN103993122B (en) | A kind of converter final slag modifier and preparation method thereof and converter steel making method | |
RU2410447C1 (en) | Mix material for production of manganese-containing staflux | |
CN111132950B (en) | Refractory batch, method for producing an unshaped refractory ceramic product from the batch and unshaped refractory ceramic product obtained by the method | |
JP2000178074A (en) | Castable refractory for blast furnace tapping spout | |
KR101099792B1 (en) | Preparation method for calciumferrite flux for steelmaking | |
US20030084821A1 (en) | Method for producing pozzolanic binders for the cement industry from steel slags using a reduction metal bath | |
US20170275714A1 (en) | Mixture, use of this mixture, and method for conditioning a slag located on a metal melt in a metallurgical vessel in iron and steel metallurgy | |
Richmond | Doloma refractories | |
JP2599870B2 (en) | Amorphous refractory composition | |
JP3177267B2 (en) | Manufacturing method of iron-chromium alloy | |
RU2464125C1 (en) | Heat-insulating slag-forming and protective mix for ladle car | |
JP4011774B2 (en) | Secondary smelting ladle lining refractories using irregular refractories | |
UA32087U (en) | Pelletized skull-forming material | |
KR20220128492A (en) | Method of manufacturing calcium-ferrite flux using steel by-product | |
JP2911633B2 (en) | Refractory lining for kiln | |
JPH09256028A (en) | Production of aluminum-containing stainless steel small in sliver flaw |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
17P | Request for examination filed |
Effective date: 20090803 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
AKX | Designation fees paid |
Designated state(s): AT BG CZ DE |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BG CZ DE |
|
REF | Corresponds to: |
Ref document number: 602008000782 Country of ref document: DE Date of ref document: 20100422 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100310 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100310 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BG Payment date: 20100602 Year of fee payment: 3 Ref country code: DE Payment date: 20100528 Year of fee payment: 3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20101213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120103 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602008000782 Country of ref document: DE Effective date: 20120103 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120630 |