EP1750994B1 - Anchoring system for a floating construction - Google Patents
Anchoring system for a floating construction Download PDFInfo
- Publication number
- EP1750994B1 EP1750994B1 EP05742398A EP05742398A EP1750994B1 EP 1750994 B1 EP1750994 B1 EP 1750994B1 EP 05742398 A EP05742398 A EP 05742398A EP 05742398 A EP05742398 A EP 05742398A EP 1750994 B1 EP1750994 B1 EP 1750994B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- elongated
- anchoring
- elements
- mass
- anchoring system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
Description
- The invention relates to an anchoring system for a floating construction and provided with elongated elements, with which a mass is suspended from the floating construction and the floating construction is connected with anchoring members. In order to keep a floating construction in place in horizontal direction, the anchoring system needs to be able to absorb environmental forces resulting from wind, current, waves and the like on the floating construction and be able to provide a resetting force. These forces have a part which is constant in time and a part which is variable in time, which moves the floating construction, such as by gusts, current changing due to wind and tide and waves moving back and forth as well as dispersing waves.
- An anchoring system can be made to be so strong and stiff that movement of the floating construction is largely prevented, yet anchoring systems are often designed such that movement of the floating construction is allowed and the average environmental forces can be absorbed. Such an anchoring system, which is sufficiently strong to absorb environmental forces and sufficiently flexible to allow movements, provides a connection between the floating construction and the sea bottom. The attachment to the bottom under the floating construction can be realized with the aid of an anchoring element, such as for instance a heavy object, a classic anchor, a driven-in pile or a suction anchor, while the connection between the anchoring element and the floating construction is often realized by means of elongated elements, such as for instance ropes, chains, steel cables or plastic cables.
- Here, absorbing the forces attempting to move the floating construction, and generating the desired resetting force may be realized by providing the elongated elements with the flexibility and strength sufficient for this purpose. Here, the flexibility is determined by the spring characteristic of the elongated elements and the shape assumed by the elongated elements. Factors playing a role in this are the weight and the length of the elongated element, the water depth and the variable stress in the elongated element. In addition, the elongated element may further be composed of different materials and embodiments. Thus, an anchoring system can be geared to a specific use. However, such a gearing remains problematic in an anchoring system for relatively shallow water and relatively large horizontal movements. In particular if a permanent anchoring system, such as for instance for floating windmills, in shallow sea, such as for instance the continental shelf in the North Sea, is involved, this can only be realized at high costs.
- As is known from
US-A-5,107,784 , which is considered to be the closest prior art, it is also possible to generate the resetting force with the aid of a mass being suspended from the floating construction. Here, the elongated elements run over pulleys such that, upon displacement of the floating construction from its starting position, the mass moves upwards, so that, upon dropping of the moving force by moving the mass downwards, the floating construction is again moved towards its starting position. However, by using pulleys, and more particularly pulleys under water, and elongated elements running over them, the anchoring system becomes expensive, maintenance-prone and complicated. This is the more so since, for a good resetting action, use is made of elongated elements crossing one another, and particularly at the location of the suspended and moving mass. - The invention contemplates an anchoring system which obviates the above-mentioned problems by providing a relatively simple system which is not maintenance-prone, which, in addition, provides an optimal resetting after both a horizontal displacement and a rotation about the vertical axis.
- This is achieved according to the invention with an anchoring system of the type described in the opening paragraph and known from
US-A-5,107,784 by suspending the mass from the floating construction by means of an elongated carrying element having a fixed length, which elongated carrying element is further provided with attachment points for at least two elongated anchoring elements, wherein at least one elongated anchoring element extends, at least in the starting position, substantially horizontally from an attachment point to a connection point with a further elongated auxiliary element, which extends, at least in the starting position, substantially vertically downwards between an attachment point on the floating construction and the connection point with the elongated anchoring element, which extends downwards at an inclination from the connection point to an anchoring member provided on or in the bottom under water. Through these measures, it is achieved that, upon a horizontal displacement of the floating construction, a mass suspended from an elongated carrying element is, due to its flexible anchoring, initially pulled upwards at a slight inclination by means of the elongated anchoring elements, and after dropping of the force causing the horizontal displacement, it falls downwards to its starting position, guided by the elongated elements, and thus the horizontal displacement that occurred is undone. Further, upon a rotation of the floating construction, the elongated carrying and auxiliary elements will assume an inclined position rotated relative to one another, so that, as a result of the mutual coupling, via the elongated anchoring elements, a mass suspended from an elongated carrying element is pulled upwards and thus a resetting moment is provided which undoes the rotation when the cause causing the rotation is removed or drops. In order to optimize this resetting, it is preferred that the force vector generated by the weight of the mass or the combined masses runs through the center of gravity of the floating construction. - If use is made of one mass, which is preferably suspended centrally, i.e. perpendicular under the center of gravity of the floating construction, then it is, according to a further embodiment of the invention, preferably provided that at least two elongated anchoring elements extend, at least in the starting position, substantially horizontally from an attachment point to a connection point, with in each case a further elongated auxiliary element and extend vertically downwards at an inclination from the respective connection point to in each case an anchoring member provided on or in a bottom. Thus, upon a rotation of the floating construction, at least two elongated auxiliary elements are rotated relative to one another and thus a resetting moment is generated.
- If use is made of more than one mass, then this can be realized in that at least one elongated auxiliary element carries a mass in the manner of an elongated carrying element, so that the one elongated carrying element forms an elongated auxiliary element for the elongated carrying element, and vice versa. A particularly advantageous embodiment can be realized if at least three elongated carrying elements are present, while in each case at least two elongated carrying elements acts as elongated auxiliary elements for a further elongated carrying element, while the masses suspended from the elongated carrying elements then preferably have equal weights and are arranged in a radially symmetrical manner around the center of gravity of the floating construction. Here, in the case that three elongated carrying elements are present, it is preferred that they are in each case connected two by two by an equal-length elongated element, so that the three masses suspended from the elongated carrying elements are arranged in the shape of an equilateral triangle, whose center of gravity is, at least in the starting position, located right under the center of gravity of the floating construction.
- In case use is made of one elongated carrying element with mass suspended therefrom, a similar rotationally symmetrical construction can be obtained if further three elongated auxiliary elements are present, while each elongated carrying element is in each case connected by an equal-length elongated element with a connecting point of an elongated auxiliary element.
- In order to make the displacement of a mass as large as possible upon a rotation of the floating construction, it is further preferred that an attachment point of an elongated element is in the proximity of an attachment point of the mass. Here, it is noted that a mass needs to be suspended at such a height above the sea bottom that, even with the expected maximum vertical displacements, it will not contact the sea bottom, in order to thus prevent impact loads in the system.
- If, depending on the conditions, it is preferred to provide the anchoring system with a greater rotational stiffness, this can be provided according to a further embodiment of the invention if a part of an elongated anchoring element running downwards at an inclination from an attachment or connection point in each case continues in a split, for instance V-shaped, manner to an anchoring member.
- With reference to embodiments shown in the drawing, albeit exclusively by way of non-limiting examples, the anchoring system according to the invention will now be discussed in more detail. In the drawing:
-
Fig. 1 shows a first embodiment of an anchoring system according to the invention in side elevational view; -
Fig. 2 shows a cross section along line II-II inFig. 1 ; -
Fig. 3 shows a second embodiment of an anchoring system according to the invention in side elevational view; -
Fig. 4 shows a cross section along line IV-IV inFig. 2 ; -
Fig. 5 shows a third embodiment of an anchoring system according to the invention in side elevational view; -
Fig. 6 shows a cross section along line VI-VI inFig. 5 ; -
Fig. 7 schematically shows a fourth embodiment; and -
Fig. 8 schematically shows a fifth embodiment. -
Figs. 1 and 2 show a floating construction in the form of apontoon 1 which is kept in place by means of an anchoring system. The anchoring system is provided with amass 3 suspended from a carryingelement 2 centrally under thepontoon 1, whichmass 3 is kept in place by threeanchoring elements 4, which are, asFig. 2 shows, arranged in a rotationally symmetrical manner around themass 3 and are, on the one side, connected with thecarrying element 2 directly above themass 3 and are, on the other side, fixed in a bottom under water by means of ananchor 5. Further, from thepontoon 1, threeauxiliary elements 6 extend, which are each connected with one of theanchoring elements 4 at a point between themass 3 and ananchor 5. All this has been chosen such that, in a neutral starting position, as shown inFig. 1 , thecarrying element 2 and theauxiliary elements 6 extend substantially vertically, the parts of theanchoring elements 4 between the connection with thecarrying element 2 and that with theauxiliary element 6 run substantially horizontally and the parts of theanchoring element 4 incline downwards from their connection with theauxiliary element 6 to theanchor 5. - It is noted that the carrying, anchoring and auxiliary elements are indicated as wires. However, they may also have any different suitable and desirable design, such as ropes, chains, plastic or steel cables and the like, or combinations of such embodiments. If desired and depending on the conditions in which the anchoring is to take place, floats or weights may be attached to these elements. Also, at least parts of the elements may consist of one or more stiff or rigid elements. Further, the Figures only show a schematic view of the anchoring system. Thus, the inclined parts of the
anchoring elements 4 may be considerably longer than shown in the Figures.Fig. 1 shows these parts as somewhat sagging under their own weight. This, and the elasticity of theseelongated elements - If a force is exerted on the
pontoon 1, for instance by wave action, wind or current, which force pushes thepontoon 1 to the right inFig. 1 , then the inclined part of theanchoring element 4, designated byreference numeral 4a, will be under more stress than the inclined parts designated by 4b and 4c of the twoother anchoring elements 4. By this flexible retaining, themass 3 will be able to move less to the right than thepontoon 1, which causes themass 3 suspended from the carryingelement 2 then assuming an inclined position to move upwards. Upon dropping of the force which attempts to push away thepontoon 1 to the right, initiated by the weight of themass 3 and supported by the interplay of forces in thevarious elements pontoon 1 will return to its force-neutral position of equilibrium, i.e. to the position shown inFig. 1 . - If the exerted force (also) results in the
pontoon 1 starting to rotate about a vertical axis, then the flexible retaining of the lower ends of theauxiliary elements 6 and the rotation relative thereto of the attachment points on thepontoon 1 will result in theauxiliary elements 6 assuming an inclined position and thus pulling theelements 4 and 4A and optionallymass 3 upwards. After the dropping of the force which attempts to rotate thepontoon 1, initiated by the weight of themass 3 and supported by the interplay of forces in theelements pontoon 1 will again return to its force-neutral position of equilibrium, i.e. to the position shown inFig. 1 . - If desired, the anchoring system can have a stiffer design by in each case mutually connecting two connection points of the
auxiliary elements 6 with theanchoring elements 4 with an elongated supportingelement 7, as shown by dashed lines inFig. 2 . Then, two surfaces connected by theauxiliary elements 6 are created, as it were, which are rotated relative to one another upon rotation of thepontoon 1. -
Figs. 3 and 4 show a floating construction in the form of aplatform 11 with a deck which is kept at a distance above a water surface by means of three floating bodies. Theplatform 1 is kept in place with an anchoring system provided with threemasses element elements masses elements anchor 15. AsFig. 4 shows, in each case two anchoring elements are in line with one supporting element. - The operation of this anchoring system is essentially the same as the one described with reference to
Figs. 1 and 2 . Upon a lateral displacement or a rotation of theplatform 11, mass will be pulled upwards and elongated elements will be put under more stress. Upon dropping of the force causing the displacement or rotation, theplatform 11 will again be returned to its force-neutral starting position in the manner as discussed hereinabove. - It is noted that, due to the use of multiple masses, the anchoring system actually consists of a number of parts which are mutually integrated and interrelated. Thus, the
mass 13a suspended from the carryingelement 12a can be considered as being fixed by four anchoring elements, namely the anchoring element 18a1, the anchoring element 18a2, the supportingelement 17a with the anchoring element 18b2 being in line therewith and the supportingelement 17c with the anchoring element 18c1 being in line therewith. The carryingelements mass 13a suspended from the carryingelement 12a. Further, the carryingelement 12b will not only also be auxiliary element for themass 13a suspended from carryingelement 12a, but also auxiliary element for the mass 13c suspended from carryingelement 12c. Thus, each carrying element also acts twice as an auxiliary element. If we consider the anchoring elements and the supporting elements, then they are all found to have a dual function. Thus, the supportingelement 17c forms, together with the anchoring element 18c1, an anchoring element for themass 13a and with the anchoring element 18a2 an anchoring element for the mass 13c, while the anchoring element 18c1 in itself also forms an anchoring element for the mass 13c and the anchoring element 18a2 can in itself also be considered as an anchoring element for themass 13a. - It is further noted that two anchoring elements starting from a mass can also be combined to one single anchoring element which will then extend along the bisector of these two anchoring elements. It will be clear that such a combined element will have a threefold function, just like the carrying elements.
- In
Figs. 5 and 6 , as a floating construction apontoon 21 is chosen which is provided with projectingarms 21a to which carryingelements 22 are attached from whichmasses 23 are suspended. The carryingelements 22 are mutually connected by supportingelements 27, while, to an connection point between a carryingelement 22 and a supportingelement 27, in each case the ends of two anchoringelements 28 connect, whose other ends are in each case locked by ananchor 25 with respect to a bottom under water. The construction and operation of this anchoring system are essentially the same of those of the anchoring system according toFigs. 3 and 4 , albeit use is now made of four masses. -
Fig. 7 shows a variant of the anchoring system in which use is made of twomasses 33, which are each suspended from a carryingelement 32 starting from a floating construction (not shown). The two carryingelements 32 are mutually connected by a supportingelement 37. From each connection point of the supportingelement 37 with in each case a carryingelement 32, two anchoringelements 38 in each case extend to ananchor 35. In this anchoring system, the two carryingelements 32 have a dual function: besides as a carrying element, they also act as an auxiliary element. This also holds true for theanchoring elements 38 and the supportingelement 37. With two anchoringelements 38 starting from amass 33, a supportingelement 37 in each case forms an anchoring element for the other mass, while the anchoringelements 38 each further independently form an anchoring element for the mass from which they start. -
Fig. 8 shows a variant of the anchoring system shown inFig. 7 in the sense that now a mass 43 suspended from a carryingelement 42 is present, while two supporting elements 47 extend from the carryingelement 42 to a connection point with in each case anauxiliary element 46 and two anchoringelements 48, which are each fixed with ananchor 45. Just like the anchoring system shown inFig. 7 , the basis of the operation of this anchoring system is the above-described pulling upwards of the mass and the putting under more stress of a number of elongated elements upon displacement or rotation of the floating construction, and the return to the force-neutral starting position initiated by the weight of the mass. - It goes without saying that, within the framework of the invention as set forth in the appended claims, many further modifications and variants are possible in addition to the ones already mentioned. For instance, for the anchoring in the bottom under water, in each case an anchor is used in the drawings. It is of course also possible to use any other suitable anchoring member, such as for instance a heavy object resting on the bottom, a driven-in pile or a suction anchor for this purpose. In the embodiments shown, always more or less symmetrical arrangements are used. Depending on the construction of the floating construction, a more asymmetrical arrangement can also be chosen.
Claims (10)
- An anchoring system for a floating construction (1) and provided with elongated elements (2), with which a mass (3) is suspended from the floating construction and the floating construction is connected with anchoring member (5) provided on or in a bottom under water, characterized in that the mass (3) is suspended from the floating construction by means of an elongated carrying element (2) with a fixed length, which elongated carrying element is further provided with attachment points for at least two elongated anchoring elements (4), wherein at least one elongated element extends, at least in said starting position, substantially horizontally from an attachment point to a connection point with a further elongated auxiliary element (6), which extends, at least in said starting position, substantially vertically downwards between an attachment point on the floating construction and the connection point with said elongated anchoring element (4), which extends downwards at an inclination from the connection point to an anchoring member (5) provided on or in a bottom under water.
- An anchoring system according to claim 1, characterized in that at least two elongated anchoring elements extend, at least in said starting position, substantially horizontally from an attachment point to a connection point with in each case a further elongated auxiliary element and extend downwards at an inclination from the respective connection point to in each case a anchoring member provided on or in the bottom under water.
- An anchoring system according to claim 1 or 2, characterized in that at least one elongated auxiliary element carries a mass in the manner of an elongated carrying element.
- An anchoring system according to any one of the preceding claims, characterized in that at least three elongated carrying elements are present, wherein in each case at least two elongated carrying elements act as elongated auxiliary elements for a further elongated carrying element.
- An anchoring system according to claim 4, characterized in that three elongated carrying element are present, which are in each case connected two by two by an equal-length elongated element.
- An anchoring system according to claim 1 or 2, characterized in that one elongated carrying element and three elongated auxiliary elements are present, wherein the elongated carrying element is in each case connected by an equal-length elongated element with a connection point of an elongated auxiliary element.
- An anchoring system according to any one of the preceding claims, characterized in that an attachment point of an elongated element is in the proximity of an attachment point of the mass.
- An anchoring system according to any one of the preceding claims, characterized in that that the force vector generated by the weight of the mass or the combined masses runs substantially through the center of gravity of the floating construction.
- An anchoring system according to any one of the preceding claims, characterized in that a part of an elongated anchoring element running downwards at an inclination from an attachment or connection point in each case continues in a split, for instance V-shaped, manner to each anchoring member.
- An anchoring element according to any one of the preceding claims, characterized in that an attachment or connection point is connected with another attachment or connection point by means of an elongated supporting member.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL1026131A NL1026131C2 (en) | 2004-05-06 | 2004-05-06 | Anchor system for a floating construction. |
PCT/NL2005/000336 WO2005108199A1 (en) | 2004-05-06 | 2005-05-03 | Anchoring system for a floating construction |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1750994A1 EP1750994A1 (en) | 2007-02-14 |
EP1750994B1 true EP1750994B1 (en) | 2010-07-07 |
Family
ID=34969293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05742398A Active EP1750994B1 (en) | 2004-05-06 | 2005-05-03 | Anchoring system for a floating construction |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP1750994B1 (en) |
DE (1) | DE602005022186D1 (en) |
DK (1) | DK1750994T3 (en) |
ES (1) | ES2348523T3 (en) |
NL (1) | NL1026131C2 (en) |
PT (1) | PT1750994E (en) |
WO (1) | WO2005108199A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2907419B1 (en) * | 2006-10-20 | 2009-01-09 | Nenuphar Sarl | FLOATER NETWORK, PARTICULARLY FOR WIND TURBINES AND / OR HYDROLIENNES ON MARINE SITES OF SIGNIFICANT DEPTH. |
DK201000268A (en) * | 2010-03-31 | 2010-03-31 | Uggen Per | Wind turbines mounted on displacement foundation |
IT1399506B1 (en) * | 2010-04-21 | 2013-04-19 | Auto Nautica Service S R L | ANCHORING STRUCTURE OF FLOATING WORKS, IN PARTICULAR DOCK AND / OR FLOATING PONCHES |
CN103282274B (en) | 2010-11-04 | 2017-03-29 | 缅因大学系统理事会 | Floating mixing composite wind turbine platform and tower system |
JP6983640B2 (en) * | 2017-12-04 | 2021-12-17 | 三菱造船株式会社 | Floating body, floating body mooring device and floating body mooring method |
JP6949690B2 (en) * | 2017-12-04 | 2021-10-13 | 日鉄エンジニアリング株式会社 | Floating body mooring method and floating body |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1491564A (en) * | 1966-07-01 | 1967-08-11 | Mooring or mooring device with return to position | |
US3425069A (en) * | 1967-12-01 | 1969-02-04 | Us Army | Mooring buoy |
US5107784A (en) * | 1991-02-19 | 1992-04-28 | Lacy Franklin R | Docking system for boats |
-
2004
- 2004-05-06 NL NL1026131A patent/NL1026131C2/en not_active IP Right Cessation
-
2005
- 2005-05-03 DE DE602005022186T patent/DE602005022186D1/en active Active
- 2005-05-03 EP EP05742398A patent/EP1750994B1/en active Active
- 2005-05-03 PT PT05742398T patent/PT1750994E/en unknown
- 2005-05-03 DK DK05742398.0T patent/DK1750994T3/en active
- 2005-05-03 ES ES05742398T patent/ES2348523T3/en active Active
- 2005-05-03 WO PCT/NL2005/000336 patent/WO2005108199A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
DE602005022186D1 (en) | 2010-08-19 |
ES2348523T3 (en) | 2010-12-07 |
DK1750994T3 (en) | 2010-11-01 |
WO2005108199A1 (en) | 2005-11-17 |
EP1750994A1 (en) | 2007-02-14 |
PT1750994E (en) | 2010-09-29 |
NL1026131C2 (en) | 2005-11-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1750994B1 (en) | Anchoring system for a floating construction | |
AU2007248730B2 (en) | Improved wave energy converter (WEC) with heave plates | |
US10787233B2 (en) | Floating device supporting an offshore wind turbine, and corresponding floating wind turbine unit | |
EP0096446B1 (en) | System for maintaining a buoyant body in position in relation to another body | |
JP6607867B2 (en) | Floatable support structure for offshore wind turbines or other devices | |
US10507894B2 (en) | Self-restoring motion compensating mooring system | |
CN107002638A (en) | For the floating platform using wind energy | |
JP6155326B2 (en) | Wind turbine on a floating support stabilized by a raised anchoring system | |
US4694771A (en) | Mooring device | |
US20230257075A1 (en) | Mooring system for floating wind turbine | |
EP2693047A1 (en) | Wind power plant | |
JP2013119289A (en) | Floating structure connection system and mooring system using the same | |
AU2022218538B2 (en) | Net of non-horizontal connections | |
KR20130142700A (en) | Mat type leg of floating structure | |
WO2000063067A1 (en) | Floating structure having anchor lines comprising damping means | |
CN104334870A (en) | Apparatus and method for harvesting renewable energy | |
KR102537987B1 (en) | Buoyant Structure Pended Buoyantly | |
NL2010709C2 (en) | Floating wind turbine. | |
EP0209941B1 (en) | Mooring system | |
EP4112439A1 (en) | Floating platform for a floating wind turbine facility | |
WO2011121627A1 (en) | Supporting structure submerged |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20061204 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE DK ES FR GB PT |
|
DAX | Request for extension of the european patent (deleted) | ||
RBV | Designated contracting states (corrected) |
Designated state(s): DE DK ES FR GB PT |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE DK ES FR GB PT |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 602005022186 Country of ref document: DE Date of ref document: 20100819 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20100922 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Effective date: 20101124 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20110408 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602005022186 Country of ref document: DE Effective date: 20110408 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: SPLANEMANN PATENT- UND RECHTSANWAELTE PARTNERS, DE |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: PC2A Owner name: GUSTOMSC RESOURCES B.V. Effective date: 20120525 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: SPLANEMANN PATENTANWAELTE PARTNERSCHAFT, DE Effective date: 20120515 Ref country code: DE Ref legal event code: R081 Ref document number: 602005022186 Country of ref document: DE Owner name: SBM SCHIEDAM B.V., NL Free format text: FORMER OWNER: MARINE STRUCTURE CONSULTANTS (MSC) B.V., ROTTERDAM, NL Effective date: 20120515 Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: SPLANEMANN PATENT- UND RECHTSANWAELTE PARTNERS, DE Effective date: 20120515 Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: VEREENIGDE OCTROOIBUREAUX V.O., DE Effective date: 20120515 Ref country code: DE Ref legal event code: R081 Ref document number: 602005022186 Country of ref document: DE Owner name: GUSTOMSC RESOURCES B.V., NL Free format text: FORMER OWNER: MARINE STRUCTURE CONSULTANTS (MSC) B.V., ROTTERDAM, NL Effective date: 20120515 |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: PC4A Owner name: SBM SCHIEDAM B.V., NL Effective date: 20121218 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20120525 Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: SPLANEMANN PATENT- UND RECHTSANWAELTE PARTNERS, DE |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20130207 AND 20130214 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602005022186 Country of ref document: DE Owner name: SBM SCHIEDAM B.V., NL Free format text: FORMER OWNER: GUSTOMSC RESOURCES B.V., SCHIEDAM, NL Effective date: 20130122 Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: SPLANEMANN PATENTANWAELTE PARTNERSCHAFT, DE Effective date: 20130122 Ref country code: DE Ref legal event code: R081 Ref document number: 602005022186 Country of ref document: DE Owner name: GUSTOMSC RESOURCES B.V., NL Free format text: FORMER OWNER: GUSTOMSC RESOURCES B.V., SCHIEDAM, NL Effective date: 20130122 Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: VEREENIGDE OCTROOIBUREAUX V.O., DE Effective date: 20130122 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: PC2A Owner name: SBM SCHIEDAM B.V. Effective date: 20130509 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PT Payment date: 20130408 Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: MM4A Free format text: LAPSE DUE TO NON-PAYMENT OF FEES Effective date: 20141103 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20141103 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20150626 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140504 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602005022186 Country of ref document: DE Representative=s name: VEREENIGDE OCTROOIBUREAUX V.O., DE Ref country code: DE Ref legal event code: R081 Ref document number: 602005022186 Country of ref document: DE Owner name: GUSTOMSC RESOURCES B.V., NL Free format text: FORMER OWNER: SBM SCHIEDAM B.V., SCHIEDAM, NL |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20160310 AND 20160316 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: TP Owner name: GUSTOMSC RESOURCES B.V., NL Effective date: 20160413 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20180518 Year of fee payment: 14 Ref country code: DE Payment date: 20180522 Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602005022186 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20190531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191203 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20230309 Year of fee payment: 19 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |